CN106532936A - Dispatching method of unattended substation - Google Patents

Dispatching method of unattended substation Download PDF

Info

Publication number
CN106532936A
CN106532936A CN201610958062.2A CN201610958062A CN106532936A CN 106532936 A CN106532936 A CN 106532936A CN 201610958062 A CN201610958062 A CN 201610958062A CN 106532936 A CN106532936 A CN 106532936A
Authority
CN
China
Prior art keywords
message
transformer station
dispatching method
power
control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610958062.2A
Other languages
Chinese (zh)
Inventor
聂朝林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei Huayi Electrical Technology Co Ltd
Original Assignee
Hefei Huayi Electrical Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei Huayi Electrical Technology Co Ltd filed Critical Hefei Huayi Electrical Technology Co Ltd
Priority to CN201610958062.2A priority Critical patent/CN106532936A/en
Publication of CN106532936A publication Critical patent/CN106532936A/en
Pending legal-status Critical Current

Links

Classifications

    • H02J13/0006
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/16Electric power substations

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a dispatching method of an unattended substation. The dispatching method comprises the following steps of (S1) collecting working parameters of multiple paths of power equipment lines connected with the substation in real time and transporting the working parameters to a control center; (S2) comparing a preset parameter threshold by the control center according to the working parameters of the multiple paths of power equipment lines; and (S3) when real-time power of one or more paths of power equipment lines is greater than the preset threshold, dispatching the line of which the real-time power is smaller than the preset threshold for temporary scheduling compensation by the control center. According to the dispatching method of the unattended substation, automatic dispatching of the unattended substation can be achieved and the dispatching efficiency is improved.

Description

A kind of unattended operation transformer station dispatching method
Technical field
The invention belongs to power system regulation automatization field, more particularly to a kind of unattended operation transformer station dispatching method.
Background technology
At present, with the fast development of China the Internet, the explosion of data scale is worth inside big data Increasingly it is subject to people's attention.People imply that the increase in productivity of a new ripple and water for the excavation and utilization of mass data The arrival of the person's of expense surplus tide.Nowadays, client's behavior on the internet, energy being serviced device are recorded with binary form Come, such as Sina weibo, any active ues more than 100,000,000, daily data are magnanimity.In March, 2013, CSEE For current electric power enterprise and the situation of power industry data, issue《China Power big data develops white paper》.2015 8 The moon 31, State Council is with promulgated by the State Council【2015】No. 50 are printed and distributed《Promote big data developing activity outline》.National policy is vigorously supported, Give power industry and be filled with fresh blood, power industry is in crucial turning point, Intelligent transformer station, instant early warning system The construction of system, measurement and control integration system, the mobile examination and repair system in scene etc. so that originally data type is more single, growth more There is transformation in slow situation, gradually stepped into and switch to analyze based on multiple Variable Factors and large batch of all kinds of heterogeneous resources The novel electric power big data epoch.
The transformer station of various electric pressures is difficult to efficiently quickly by the normal work of operator in running Power scheduling control, if it is possible to unmanned is schedulable transformation facility, is possible to effectively improve the scheduling of transformer station Efficiency.
Therefore, need now a kind of unattended operation transformer station dispatching method badly, the automatic of unattended operation transformer station can be realized Scheduling, uses manpower and material resources sparingly, and improves dispatching efficiency.
The content of the invention
The present invention proposes a kind of unattended operation transformer station dispatching method, solves in prior art by the normal of operator Work is difficult to efficiently the quickly problem of power scheduling control.
The technical scheme is that what is be achieved in that:Unattended operation transformer station dispatching method, comprises the steps:
S1:The running parameter of the electric installation lines that Real-time Collection multichannel is connected with transformer station, and by the running parameter It is transported to control centre;
S2:Running parameter of the control centre according to multiple power equipment, is compared with parameter preset threshold values;
S3:When the realtime power of certain road or a few road power equipments is more than the pre-set threshold value, control centre's scheduling is real When power carry out temporary scheduling compensation less than the circuit of the pre-set threshold value.
As one kind preferred embodiment, line of the power less than pre-set threshold value when control centre's debugging is real-time Road carries out temporary scheduling compensation, including control transformer station correspondence switches on-off operation, and the break-make is instructed Guan Qian, first carries out security constraint verification, determines whether make-break operation meets safety requirements.
As one kind preferred embodiment, line of the power less than pre-set threshold value when control centre's debugging is real-time Road carries out temporary scheduling compensation, including calculates the parameter value of certain road or a few roads beyond pre-set threshold value, and determines idle line Realtime power and pre-set threshold value difference and target compensation information, according to the difference, it is determined that per the power of road idle line Offset.
As one kind preferred embodiment, control centre determines and believes more than pre-set threshold value power lines and compensation control Breath, including the corresponding address of Real-time Collection circuit and net door information, the address and net door information is carried out with actual track Verification matching.
As one kind preferred embodiment, step S4 is provided with after step S3:Control centre's recording power scheduling Compensation record, generates scheduled record trendgram according to scheduled record.
Preferred embodiment the address and net door information are carried out into verification with actual track and is matched as a kind of, wrapped Include the heart in the controlling and be provided with background data base, using the communication packet received from electric installation lines, by communication packet It is analyzed with background data base and compares, so that it is determined that the selecting object of verification matching.
As one kind preferred embodiment, determine whether make-break operation meets safety requirements, when make-break operation meets peace When requiring entirely, corresponding operating is carried out;When make-break operation has illegal information, control centre carries out police instruction and points out illegal Information, and do not carry out make-break operation.
As it is a kind of preferred embodiment, the communication packet includes that the STARTDT of U forms comes into force message, U forms STARTDT confirmation messages, total calling start message, always call confirmation message, always call end message, full remote signalling message, Quan Yao Observe and predict text, remote control select message, remote control return to school message, remote control perform message, remote control perform confirmation message, remote control revocation message, Remote control revocation confirmation message, COS messages and SOE messages.
As one kind preferred embodiment, the communication packet is expressed as:68+ length+4Byte control domains.
As one kind preferred embodiment, it is determined that the selecting object of verification matching, is also included using according to traffic order Identification needs the selecting object and check point table of scheduling and far goes a table to carry out examining judgement.
After employing above-mentioned technical proposal, the invention has the beneficial effects as follows:The reality of different electric installation lines can be passed through When power situation and circuit rated power situation, determine whether the power of electric installation lines exceeded, when more than pre-set threshold value When, automatically controlling idle line carries out the compensative dispatching of power, meets its requirement.
Description of the drawings
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing Accompanying drawing to be used needed for having technology description is briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, without having to pay creative labor, may be used also To obtain other accompanying drawings according to these accompanying drawings.
Fig. 1 is the schematic flow sheet of the present invention.
Specific embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than the embodiment of whole.It is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of protection of the invention.
As shown in figure 1, this unattended operation transformer station dispatching method, comprises the steps:
S1:The running parameter of the electric installation lines that Real-time Collection multichannel is connected with transformer station, and by the running parameter It is transported to control centre;
S2:Running parameter of the control centre according to multiple power equipment, is compared with parameter preset threshold values;
S3:When the realtime power of certain road or a few road power equipments is more than the pre-set threshold value, control centre's scheduling is real When power carry out temporary scheduling compensation less than the circuit of the pre-set threshold value.
When the control centre debugs real-time, power carries out temporary scheduling compensation less than the circuit of the pre-set threshold value, including Control transformer station correspondence switches on-off operation, and the break-make is instructed before controlling switch is assigned, and first carries out security constraint verification, Determine whether make-break operation meets safety requirements.
When the control centre debugs real-time, power carries out temporary scheduling compensation less than the circuit of the pre-set threshold value, including The parameter value of certain road or a few roads beyond pre-set threshold value is calculated, and determines the realtime power of idle line and the difference of pre-set threshold value Value and target compensation information, according to the difference, it is determined that per the power compensating value of road idle line.
Control centre is determined more than pre-set threshold value power lines and compensation control information, including Real-time Collection circuit correspondence Address and net door information, the address and net door information are carried out into verification with actual track and are matched.
Step S4 is provided with after step S3:Control centre's recording power scheduled record, mends according to the scheduling Repay record and generate scheduled record trendgram.
The address and net door information are carried out verification with actual track to match, control centre is included in and is provided with rear number of units According to storehouse, using the communication packet received from electric installation lines, communication packet is analyzed with background data base and is compared, So that it is determined that the selecting object of verification matching.
Determine whether make-break operation meets safety requirements, when make-break operation meets safety requirements, carry out corresponding operating;When When make-break operation has illegal information, control centre carries out police instruction and points out illegal information, and does not carry out make-break operation.
The communication packet include the STARTDT of U forms come into force message, the STARTDT confirmation messages of U forms, total call Start message, always call confirmation message, always call end message, full remote signalling message, full remote measurement message, remote control to select message, distant Control message of returning to school, remote control execution message, remote control execution confirmation message, remote control revocation message, remote control revocation confirmation message, COS to report Text and SOE messages.
The communication packet is expressed as:68+ length+4Byte control domains.
It is determined that verification matching selecting object, also include using according to traffic order recognize needs scheduling selecting object and Check point table and a table is far gone to carry out examining judgement.
Specific communication packet shows as:
The STARTDT of 1.U forms comes into force message (main website → substation)
68 04 07 00 00 00
The STARTDT confirmation messages (substation → main website) of 2.U forms
68 04 0B 00 00 00
3. total calling starts message (main website → substation)
68 0E 00 00 00 00 64 01 06 00 00 00 00 00 00 14
4. it is total to call confirmation message (substation → main website)
68 0E 0E 00 02 00 64 01 07 00 00 00 00 00 00 14
5. it is total to call end message (substation → main website)
68 0E 18 00 02 00 64 01 0A 00 00 00 00 00 00 14
6. full remote signalling message
68 2D 14 00 02 00 01A0 14 00 00 00 81 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00
7. full remote measurement message
68 2D 16 00 02 00 15 90 14 00 00 00 01 07 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00
8. remote control selects message
68 0E 00 00 00 00 2E 01 06 00 00 00 21 0B 00 85
9. remote control is returned to school message
68 0E 00 00 00 00 2E 01 07 00 00 00 21 0B 00 85
10. remote control performs message
68 0E 00 00 00 00 2E 01 06 00 00 00 21 0B 00 05
11. remote controls perform confirmation message
68 0E 00 00 00 00 2E 01 07 00 00 00 21 0B 00 05
12. remote controls cancel message
68 0E 00 00 00 00 2E 01 08 00 00 00 21 0B 00 05
13. remote controls cancel confirmation message
68 0E 00 00 00 00 2E 01 09 00 00 00 21 0B 00 05
14.COS messages
68 0E 00 00 00 00 01 01 03 00 00 00 01 00 00 01
15.SOE messages
68 11 00 00 00 00 02 01 03 00 00 00 01 00 00 01 21 01 20。
Presently preferred embodiments of the present invention is the foregoing is only, not to limit the present invention, all essences in the present invention Within god and principle, any modification, equivalent substitution and improvements made etc. should be included within the scope of the present invention.

Claims (10)

1. a kind of unattended operation transformer station dispatching method, it is characterised in that comprise the steps:
S1:The running parameter of the electric installation lines that Real-time Collection multichannel is connected with transformer station, and the running parameter is conveyed To control centre;
S2:Running parameter of the control centre according to multiple power equipment, is compared with parameter preset threshold values;
S3:When the realtime power of certain road or a few road power equipments is more than the pre-set threshold value, real-time work(is dispatched by control centre Rate carries out temporary scheduling compensation less than the circuit of the pre-set threshold value.
2. unattended operation transformer station dispatching method according to claim 1, it is characterised in that control centre's debugging is real Constantly power carries out temporary scheduling compensation less than the circuit of the pre-set threshold value, including control transformer station correspondence switches on-off behaviour Make, and the break-make is instructed before controlling switch is assigned, and first carries out security constraint verification, determine whether make-break operation meets safety and want Ask.
3. unattended operation transformer station dispatching method according to claim 2, it is characterised in that control centre's debugging is real Constantly power carries out temporary scheduling compensation less than the circuit of the pre-set threshold value, including calculates certain road or a few roads beyond default The parameter value of threshold values, and determine the realtime power of idle line and the difference of pre-set threshold value and target compensation information, according to described Difference, it is determined that per the power compensating value of road idle line.
4. unattended operation transformer station dispatching method according to claim 3, it is characterised in that control centre is determined more than pre- If valve value rate circuit and compensation control information, including the corresponding address of Real-time Collection circuit and net door information, will be described Address and net door information carry out verification with actual track and match.
5. unattended operation transformer station dispatching method according to claim 4, it is characterised in that be provided with after step S3 Step S4:Control centre's recording power scheduled record, generates scheduled record trend according to scheduled record Figure.
6. unattended operation transformer station dispatching method according to claim 5, it is characterised in that the address and net door are believed Breath carries out verification with actual track and matches, and is included in control centre and is provided with background data base, is set from electric power using receiving The communication packet of reserve line, communication packet is analyzed with background data base and is compared, so that it is determined that the selection of verification matching is right As.
7. unattended operation transformer station dispatching method according to claim 6, it is characterised in that determine whether make-break operation accords with Safety requirements is closed, when make-break operation meets safety requirements, corresponding operating is carried out;When there is illegal information in make-break operation, control Center processed carries out police instruction and points out illegal information, and does not carry out make-break operation.
8. unattended operation transformer station dispatching method according to claim 7, it is characterised in that the communication packet includes U Come into force message, the STARTDT confirmation messages of U forms, total callings of the STARTDT of form starts message, always calls confirmation message, total Calling end message, full remote signalling message, full remote measurement message, remote control select return to school message, remote control of message, remote control to perform message, distant Control performs confirmation message, remote control revocation message, remote control revocation confirmation message, COS messages and SOE messages.
9. unattended operation transformer station dispatching method according to claim 8, it is characterised in that the communication packet is represented For:68+ length+4Byte control domains.
10. unattended operation transformer station dispatching method according to claim 9, it is characterised in that it is determined that the choosing of verification matching Object is selected, is also included using the selecting object and check point table that needs scheduling is recognized according to traffic order and is far gone a table to carry out core It is real to judge.
CN201610958062.2A 2016-11-03 2016-11-03 Dispatching method of unattended substation Pending CN106532936A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610958062.2A CN106532936A (en) 2016-11-03 2016-11-03 Dispatching method of unattended substation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610958062.2A CN106532936A (en) 2016-11-03 2016-11-03 Dispatching method of unattended substation

Publications (1)

Publication Number Publication Date
CN106532936A true CN106532936A (en) 2017-03-22

Family

ID=58325706

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610958062.2A Pending CN106532936A (en) 2016-11-03 2016-11-03 Dispatching method of unattended substation

Country Status (1)

Country Link
CN (1) CN106532936A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111191967A (en) * 2020-04-09 2020-05-22 图灵人工智能研究院(南京)有限公司 Energy supply data processing method, system, energy supply control device and storage medium

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104078969A (en) * 2014-07-18 2014-10-01 国家电网公司 Circuit overloading processing method used for direct current transmission system
CN104682383A (en) * 2015-01-30 2015-06-03 广东电网有限责任公司梅州供电局 Method and system for adjusting open loop point by remote automatic bus transfer devices
CN105978159A (en) * 2016-06-29 2016-09-28 国网福建省电力有限公司 Telecontrol testing online execution-free check method for transformer station

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104078969A (en) * 2014-07-18 2014-10-01 国家电网公司 Circuit overloading processing method used for direct current transmission system
CN104682383A (en) * 2015-01-30 2015-06-03 广东电网有限责任公司梅州供电局 Method and system for adjusting open loop point by remote automatic bus transfer devices
CN105978159A (en) * 2016-06-29 2016-09-28 国网福建省电力有限公司 Telecontrol testing online execution-free check method for transformer station

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
田劲: "电力系统站所远方终端DTU的设计与应用研究", 《中国优秀硕士学位论文全文数据库 工程科技II辑》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111191967A (en) * 2020-04-09 2020-05-22 图灵人工智能研究院(南京)有限公司 Energy supply data processing method, system, energy supply control device and storage medium

Similar Documents

Publication Publication Date Title
CN105739460B (en) A kind of method and apparatus for the control interface automatically generating Internet of Things household electrical appliances
GB0422192D0 (en) Transfer of a user equipment in a communication system
WO2006073641A3 (en) Method and system for targeted broadcasting
WO2007051073A3 (en) Method and apparatus for transmitting a pilotreport message in a wireless communication system
CN106155812A (en) Method, device, system and the electronic equipment of a kind of resource management to fictitious host computer
CN102299833A (en) Intelligent remote household control system and method
CN102026357A (en) Power control method and device for base station
CN107015038A (en) A kind of power consumption reminding method, device and ammeter based on intelligent electric meter
CN108171339A (en) Distribution comprehensive business management system and its emergency repair method based on mobile interchange
CN103781122A (en) Flow management device and method
CN104750458A (en) Control method, control device, monitoring processing method and monitoring processing device for terminal application
CN108973760A (en) A kind of charging pile management method based on Internet of Things
CN106532936A (en) Dispatching method of unattended substation
CN103530737A (en) State based maintenance method and state based maintenance system of urban rail transit equipment
CN105137779A (en) Information processing method and smart home environment control equipment
CN109343488A (en) Fieldbus monitoring early-warning system and method based on wechat and FDT technology
CN109587161A (en) The monitoring method of smart grid remote control command transmission overall process information
SE0301933D0 (en) Remote control
CN103647884B (en) Traffic dispatching patcher based on intelligent terminal APP and method
CN102938113A (en) Power grid failure recovery method and system based on power failure management system platform
CN108908343A (en) Intelligent Mobile Robot and scheduling system business operations linkage system and method
CN103702277A (en) Data transmission method and electronic equipment
CN106254448A (en) A kind of information getting method and device
CN110544032A (en) cloud platform-based remote dispatching system and method for generator cars
CN112351080B (en) Internet of things terminal of power distribution system and communication method of Internet of things terminal and external device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication