CN106532780A - Power control method and device for wind power plant - Google Patents

Power control method and device for wind power plant Download PDF

Info

Publication number
CN106532780A
CN106532780A CN201611263644.5A CN201611263644A CN106532780A CN 106532780 A CN106532780 A CN 106532780A CN 201611263644 A CN201611263644 A CN 201611263644A CN 106532780 A CN106532780 A CN 106532780A
Authority
CN
China
Prior art keywords
power
enhancement mode
generating set
wind power
wind
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611263644.5A
Other languages
Chinese (zh)
Other versions
CN106532780B (en
Inventor
王砼
李璇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Goldwind Science and Creation Windpower Equipment Co Ltd
Original Assignee
Beijing Goldwind Science and Creation Windpower Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Goldwind Science and Creation Windpower Equipment Co Ltd filed Critical Beijing Goldwind Science and Creation Windpower Equipment Co Ltd
Priority to CN201611263644.5A priority Critical patent/CN106532780B/en
Publication of CN106532780A publication Critical patent/CN106532780A/en
Application granted granted Critical
Publication of CN106532780B publication Critical patent/CN106532780B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • H02J3/386
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/76Power conversion electric or electronic aspects

Abstract

The invention discloses a power control method and a power control device for a wind power plant. The method comprises the following steps: when n power enhancement type wind generating sets in m power enhancement type wind generating sets are monitored to be in a nominal power generating state, calculating the current power generation loss of a power grid based on the current power grid input power, wherein n is an integer which is larger than 0 and smaller than or equal to m; comparing the sum of the liftable power of the n power-enhanced wind generating sets with the current power generation loss, wherein the liftable power of the power-enhanced wind generating set is the difference between the actual power and the nominal power of the power-enhanced wind generating set; and when the sum of the power which can be increased of the n power-enhanced wind generating sets is larger than the current power generation loss, controlling the n power-enhanced wind generating sets so that the sum of the power which can be increased of the n power-enhanced wind generating sets is equal to the current power generation loss.

Description

The Poewr control method and device of wind power plant
Technical field
The invention belongs to technical field of wind power, more particularly to a kind of Poewr control method and device of wind power plant.
Background technology
Wind power generation mode is different from thermal power generation mode, hydroelectric generation mode, it has also become a kind of widely used generating Mode, its have randomness it is strong, it is flexible and changeable the characteristics of.By many means energy such as wind power prediction, the personalized controls of blower fan Enough give full play to wind energy turbine set (comparing thermoelectricity, water power) controllability it is strong the characteristics of.
Trunnion axis, upwind, permanent magnet direct-driving aerogenerator are the main generating sets of current wind power generation field, its bag Include the big part such as blade, wheel hub, electromotor, cabin, pylon, control panel.Blade can convert wind energy into rotating mechanical energy And then be converted into electric energy to reach the effect of wind-power electricity generation by electromotor.
Power enhancement mode wind power generating set (Value Plus) type wind power generating set is to refer to output it power 1.1-1.2 times of its nominal power of wind power generating set, power lifted wind-driven generator are promoted in Life cycle Group, adjustable power type wind power generating set, flexible power type wind power generating set are because being referred to as work(with similar characteristic Rate enhancement mode wind power generating set.By taking 1.5MW wind power generating sets as an example, its nominal power of 1.5VP units is 1500kW, works as machine When group operates in power ascension (ValuePlus) pattern, its output can be at arbitrary value between 1500kW to 1650kW, this When relative to nominal power, the output under power ascension pattern (namely under power enhancement mode) is defined as into actual work( Rate.The whole audience is referred to as power enhancement mode wind power plant using the wind energy turbine set of power enhancement mode wind power generating set.For example, wind-powered electricity generation Field nominal power is P megawatt, and actual active power output area is 0 to 1.1P megawatt.
Power enhancement mode wind power plant compares traditional wind energy turbine set in terms of power adjustments with bigger working place, its It is regarded as the wind energy turbine set that actual power is 1.1-1.2 times of nominal power.Here actual power can be understood as wind energy turbine set In unit be in power ascension pattern when actual active power output area maximum.
Prior art proposes new wind-powered electricity generation field control method in terms of power optimization, Power Control, blower fan call three, from The control strategy of wind field is technically innovated and enriched, but in terms of wind energy turbine set income lifting, has not been considered.Existing wind-powered electricity generation exists In running, all too many levels cause generated energy to lose, and in turn result in economic loss.
The content of the invention
The Poewr control method and device of a kind of wind power plant are embodiments provided, wind-force can be effectively lifted Power plant income reduces the impact that power generation loss is caused.
A kind of first aspect, there is provided Poewr control method of wind power plant, wind power plant include that m platforms power strengthens Type wind power generating set, wherein, m is positive integer, and method includes:Deposit in m platform power enhancement mode wind power generating sets are monitored When n platform power enhancement mode wind power generating set is in nominal power generating state, electricity is calculated based on current electric grid input power The step of current generation loss of net, wherein, n is greater than 0 and less than or equal to the integer of m;N platform power enhancement mode wind-force is sent out Group of motors can hoisting power sum the step of be compared with current generation loss, wherein, power enhancement mode wind-driven generator Group can hoisting power be power enhancement mode wind power generating set actual power and nominal power difference;And, when n platforms power increases Strong type wind power generating set can hoisting power sum be more than current generation loss when, to n platform power enhancement mode wind-driven generators Group is controlled, so that the step of power sum that n platform power enhancement mode wind power generating set is lifted is equal to current generation loss.
A kind of second aspect, there is provided output control device of wind power plant, wind power plant include that m platforms power strengthens Type wind power generating set, wherein, m is positive integer, and control device includes:Monitoring calculation unit, comparison judgment unit and control are adjusted Degree unit.There is the increasing of n platforms power in being configured as monitoring m platform power enhancement mode wind power generating sets in the monitoring calculation unit When strong type wind power generating set is in nominal power generating state, the current generating of electrical network is calculated based on current electric grid input power Loss, wherein, n is greater than 0 and less than or equal to the integer of m;The comparison judgment unit is configured to n platform power enhancement mode wind Power generator group can hoisting power sum be compared with current generation loss, wherein, power enhancement mode wind power generating set Can hoisting power be power enhancement mode wind power generating set actual power and nominal power difference;The control scheduling unit is matched somebody with somebody Be set to when n platform power enhancement mode wind power generating sets can hoisting power sum be more than current generation loss when, to n platforms power increase Strong type wind power generating set is controlled, so that the power sum that n platform power enhancement mode wind power generating set is lifted is equal to currently Generation loss.
A kind of third aspect, there is provided output control device of wind power plant, including:Memorizer, processor and bus; The memorizer and processor are connected by bus and complete mutual communication;The memorizer is used for store program codes;At this Reason device runs program corresponding with executable program code by reading in memorizer the executable program code that stores, with In the Poewr control method for performing above-mentioned wind power plant.
The Poewr control method and device of the wind power plant for providing according to embodiments of the present invention, strengthens by using power Type wind power generating set has and can continue to be promoted to the spy of actual power after its nominal power is reached in Life cycle Property, with reference to the different generated energy damaed cordition of wind energy turbine set, power enhancement mode wind power generating set is controlled, so as to effectively more The power generation loss that line loss, field electricity consumption and Wind turbines failure etc. are caused is mended, to lift the income of generating field.
Description of the drawings
In order to be illustrated more clearly that the technical scheme of the embodiment of the present invention, below will be to making needed for the embodiment of the present invention Accompanying drawing is briefly described, it should be apparent that, drawings described below is only some embodiments of the present invention, for For those of ordinary skill in the art, on the premise of not paying creative work, can be obtaining other according to these accompanying drawings Accompanying drawing.
Fig. 1 is the application scenarios schematic diagram of the Poewr control method of the wind power plant of one embodiment of the invention;
Fig. 2 is the method flow diagram of the Poewr control method of the wind power plant of one embodiment of the invention;
Fig. 3 is the application scenarios schematic diagram of the Poewr control method of the wind power plant of another embodiment of the present invention;
Fig. 4 is the method flow diagram of the Poewr control method of the wind power plant of another embodiment of the present invention;
Fig. 5 is the schematic block diagram of the output control device of the wind power plant of one embodiment of the invention;
Fig. 6 is that the control device of the output control device of the wind power plant of one embodiment of the invention realizes structural representation Figure.
Specific embodiment
To make purpose, technical scheme and the advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is The a part of embodiment of the present invention, rather than the embodiment of whole.Based on the embodiment in the present invention, those of ordinary skill in the art The every other embodiment obtained under the premise of creative work is not made, belongs to the scope of protection of the invention.
It should be noted that in the case where not conflicting, the feature in embodiment and embodiment in the application can phase Mutually combine.Below with reference to the accompanying drawings and in conjunction with the embodiments describing the application in detail.
Fig. 1 is the application scenarios schematic diagram of the Poewr control method of the wind power plant of one embodiment of the invention.False wind Electric part wind power generating set is arranged in the manner shown in figure 1, and wind field prevailing wind direction is for from west to east.Wherein L and R difference tables The total inductance in timberline road and resistance value.So in wind power generating set circuit top 1, wind power generating set line end 2, wind-powered electricity generation Field booster stations exit 3, and then have at four nodes of electrical network porch 4:Power from node 1 transmit to node 2 when, exist Certain power loss, it is assumed that for 1%;Transmit to node 3 from node 2, transmission range is shorter, but there is field electricity consumption expenditure, it is assumed that Power loss 2%;Transmit to node 4, through long distance powedr transmission from node 3, it is assumed that power loss 2%, i.e. electric energy are sent out from wind-force During group of motors transports to electrical network, about 5% power is lost altogether.Reach in nominal power power generation process in wind energy turbine set, it is assumed that It is 49500kWh to convey electricity per hour, then loss electricity is 2475kWh, it is assumed that 0.5 yuan of rate for incorporation into the power network is per kWh, i.e., every little When lose 1237.5 yuan, calculated by 2800 hours over hourage is sent out, every year lose 346.5 ten thousand yuan.And the generating of wind park Loss mainly has following characteristic:1. wind energy turbine set generated output is that output is higher, and its line loss is bigger, and this portion of energy loss is straight Connect the generated energy loss for being presented as wind energy turbine set.2. break down under the strong wind operating mode probability of shutdown of wind power generating set can increase Height, stops opportunity loss generated energy under strong wind operating mode, in turn results in income and is damaged.
The power generation loss data obtained from wind park power generation characteristics and based on above-mentioned hypothesis:
When all wind power generating sets of wind park all reach nominal power to generate electricity, line loss generated output is power also up to most Greatly.According to the concrete line parameter circuit value of wind energy turbine set, and electric energy meter data, can accurately calculate current line and field electricity consumption causes Electric quantity loss, for example, in actual productive life, power generation loss can be calculated by 5%, i.e., electricity of surfing the Net at electrical network porch 4 Amount is the 95% of the actual electricity of wind energy turbine set.
Based on the problems referred to above, the Poewr control method and device of a kind of wind power plant proposed by the present invention, based on by work( The power enhancement mode wind power plant of rate enhancement mode wind-driven generator composition, by adding the control method for making up power generation loss, Can at any time, when particularly the maximum output for completely sending out moment, i.e. wind-driven generator of line loss is nominal power, more Reissue the economic loss that electric loss brings.The control feature of power enhancement mode wind power plant be can effectively utilize due to The power loss that wind power generating set generated output ceiling restriction is caused, is made up to the event of line loss, field electricity consumption and Wind turbines The power generation loss that barrier etc. is caused.So that wind energy turbine set is while its power ascension, can be by the controlling party of the embodiment of the present invention The power generation loss that method and device are caused in making up whole field running.
Fig. 2 is the method flow diagram of the Poewr control method of the wind power plant of one embodiment of the invention.As shown in Fig. 2 The Poewr control method of the wind power plant, wind power plant include m platform power enhancement mode wind power generating sets, wherein, m is just Integer, the method include:
, there is n platform power enhancement mode wind power generating sets in m platform power enhancement mode wind power generating sets are monitored in S210 In nominal power generating state when, based on current electric grid input power calculate electrical network current generation loss, wherein, n is big In 0 and less than or equal to the integer of m;
S220, by n platform power enhancement mode wind power generating sets can hoisting power sum compared with current generation loss Compared with, wherein, power enhancement mode wind power generating set can hoisting power be power enhancement mode wind power generating set actual power with The difference of nominal power;And
S230, when n platform power enhancement mode wind power generating sets can hoisting power sum be more than current generation loss when, it is right N platform power enhancement mode wind power generating sets are controlled, so that the power sum that n platform power enhancement mode wind power generating set is lifted Equal to current generation loss.
In some instances, the method can also include when n platform power enhancement mode wind power generating sets can hoisting power When sum is not more than current generation loss, n platform power enhancement mode wind power generating sets are controlled respectively and is generated electricity with actual power.
In some instances, in S210, wind power generating set whether is deposited in judging wind energy turbine set and reach nominal power, if Nominal power is reached currently without wind power generating set, then now, power enhancement mode wind power plant and common wind energy turbine set do not have It is variant, when exist one or more wind power generating set reach nominal power generate electricity when, power enhancement mode wind power plant is then Power Control can be carried out to the power enhancement mode wind power generating set in wind energy turbine set by S220, to make up loss electricity, be entered And increase wind park income.For example, when unit number is completely sent out more than or equal to one and be less than n platforms, it is now in reaching mark Claim the power enhancement mode wind power generating set of power due to Power Limitation, lose part wind energy, can be by calculating current sending out Electric loss, judge current n platforms power enhancement mode wind power generating set can hoisting power sum whether can more power generation loss, example Such as, line loss is made up, if cannot make up, can controls to reach the n platform power enhancement mode wind-driven generators of nominal power Group hoisting power is to actual power;If current n platform power enhancement mode wind power generating set can hoisting power sum can make up Current line is lost, then can currently be needed hoisting power to share the power for reaching nominal power to each or a part strengthens Type wind power generating set, for example, can be controlled according to current wind-resources around each power enhancement mode wind power generating set respectively System is per platform or a part reaches the power enhancement mode wind power generating set of nominal power and lifts different power respectively, it is also possible to flat Equal control often reaches the power enhancement mode wind power generating set of nominal power and lifts identical power to make up electric quantity loss. In some instances, when quantity m=n of power enhancement mode wind power generating set of nominal power is reached, wind energy turbine set now will Bear max line and undermine the economic loss that an electricity consumption brings, after current line loss is calculated, still need to judge that current power lifting is It is no to make up line loss, if it is then can currently be needed hoisting power to share to each or a part reaches nominal work( The power enhancement mode wind power generating set of rate;If cannot make up, every power enhancement mode wind power generating set can be controlled Hoisting power is to actual power.In some instances, current power generation loss, can be based on the current electric grid input power of wind energy turbine set To calculate.In some instances, current power generation loss P0=(current electric grid input power/r)-current electric grid input power, its In, r is loss coefficient, and the coefficient can be by obtaining according to the concrete line parameter circuit value of wind energy turbine set, and electric energy meter data, such as r Can be with value as 0.95.
In some instances, the method can also include:When monitor current electric grid input power be more than electrical network input work When the higher limit of rate is with current generation loss sum;Power Control is carried out to n platform power enhancement mode wind power generating sets, so that n The output sum of platform power enhancement mode wind power generating set is equal to the higher limit and current generation loss of electrical network input power Sum.In some instances, the method can also include monitoring that current electric grid input power is not more than electrical network input power Higher limit with current generation loss sum when;N platform power enhancement mode wind power generating sets are controlled, so that n platform power Enhancement mode wind power generating set is generated electricity with actual power.For example, when the multiple stage power enhancement mode wind-driven generator of generating field When group is generated electricity with the power more than nominal power, it is possible that obtaining current electric grid input power deducts current power generation loss When requiring to electricity volume more than grid dispatching center afterwards, it should be noted that Grid Central here is required to electricity volume Can be understood as the higher limit of electrical network input power.In some instances, the higher limit of the electrical network input power can use relation Formula is obtained:Total nominal power+current electric quantity loss-current electric grid the input work of the higher limit=generating field of electrical network input power Rate.
In some instances, for example under strong wind weather, the fault rate of wind power generating set can than under little wind weather Lifted, also, under strong wind weather, the economic loss that every wind power generating set is brought is also big than under little wind weather.In this feelings Power enhancement mode wind-power electricity generation can also be controlled under condition by the Poewr control method of the wind power plant of the embodiment of the present invention The power of the assembling unit further increases wind park income so as to make up the generated output loss caused by indivedual wind power generating set failures.Example If nominal power is the wind park of 49.5MW, when wind park is under full power generating state, if wherein one wind-power electricity generation Unit breaks down, its per hour electric quantity loss assume to calculate according to 1500kWh, about 750 yuan of economic loss, if multiple stage wind-force Generating set long-time breaks down, and that economic loss will be inestimable.In power enhancement mode wind power plant, run into such Situation, generating that can be by the Poewr control method of above-mentioned wind power plant to be brought by the wind power generating set of disorderly closedown Loss.For example, it is assumed that there is 33 wind power generating sets in wind park, the nominal power of wind park is 49.5MW, is gone out in strong wind Existing 3 disorderly closedowns, whole factory's generated output now is 45MW, if remaining wind power generating set adopts above-mentioned wind power plant Poewr control method, whole factory's generated output can still ensure to reach 49.5MW.Do not considering to make up line loss and station-service electric loss In the case of, total amount is that the power enhancement mode wind power plant of 33 power enhancement mode wind power generating sets can ensure that most 3 In the case that platform wind power generating set is because of disorderly closedown, whole factory's generated output reaches and can arrive nominal power, i.e. rated power.Assume Under strong wind weather, the probability that every wind power generating set breaks down is identical, is 1%, and 33 wind power generating sets do not go out The probability of existing disorderly closedown is about 71.8%, has the break down probability of shutdown of 1 wind power generating set to be about 23.9%, has 2 The probability that platform wind power generating set occurs shutting down simultaneously is about 3.9%, has 3 wind power generating sets while shutdown of breaking down Probability is about 0.4%, and the probability of not more than 3 shutdown of breaking down is about 9.9675%, i.e., using above-mentioned wind power plant Under strong wind weather, whole factory's generated output reaches nominal power generating to the power enhancement mode wind power plant of Poewr control method Probability is promoted to about 99.9675% by about the 71.8% of common wind energy turbine set.Obviously, the lifting of probability means the income of wind park Rate will also be lifted.
Fig. 3 is the application scenarios schematic diagram of the Poewr control method of the wind power plant of another embodiment of the present invention;Such as Fig. 3 Shown, when wind direction is blown over from west to east, the wind-resources of the wind power generating set of A circuits will be better than the wind power generating set of B circuits, Now whole field wind power generating set will reach nominal power generating in part wind power generating set, and part wind power generating set is not Reach nominal power generating state.As can be seen here, due to being affected by many factors such as wind park addressing, prevailing wind direction changes, wind In power generation process, Jing is often met in the range of whole factory for power plant, is had the wind-resources around the wind power generating set of part preferable, is reached mark Claim power generation, and the wind-resources around the wind power generating set of part are subject to other wind power generating set wake flow, geographical position etc. The impact of factor, fails to reach the situation of nominal power generating.Also, reach around the wind power generating set of nominal power generating Wind-resources it is excellent, but be subject to Power Limitation, part wind energy is have lost when nominal power is reached, synchronization is not up to marked Wind-resources around title power wind power generating set are poor, and wind power generating set not yet reaches nominal power, in turn results in the whole audience Wind power generating set be not up in nominal power rating.
Based on the problem shown in Fig. 3, the embodiment of the present invention provides a kind of Poewr control method of wind power plant and can solve Certainly above-mentioned technical problem, makes up the generated output of the uneven loss of wind energy distribution, lifts power plant income.
Fig. 4 is the method flow diagram of the Poewr control method of the wind power plant of another embodiment of the present invention.Such as Fig. 4 institutes Show, the method can also include:
S410, monitors around every power enhancement mode wind power generating set in n platform power enhancement mode wind power generating sets Effective wind speed, the effective wind speed can be understood as can be blade of wind-driven generator powered rotation effective wind wind Speed;
S420, the actual power of power enhancement mode wind power generating set and the difference of nominal power are entered with current generation loss Row compares;
S430, when the actual power of power enhancement mode wind power generating set is less than current generation loss with the difference of nominal power When, control the first maximum power enhancement mode wind-force of the effective wind speed in n platform power enhancement mode wind power generating sets around which and send out Group of motors is generated electricity with actual power.
For example, per Delta to around the wind power generating set of nominal power due to possessing different wind-resources, its power institute The space that can be lifted is also different, and its room for promotion of the big group of motors of the excellent wind-force of wind-resources is relatively large, can basis The current wind-resources situation of unit, i.e., it is with reference to the effective wind speed around wind power generating set, preferential to lift the best unit of wind-resources Power, that is to say, that the method can according to distribution per Delta to the wind power generating set of nominal power can hoisting power, when When the actual power of power enhancement mode wind power generating set is less than current generation loss with the difference of nominal power, Current ambient is had The maximum wind power generating set for reaching nominal power of effect wind speed lifts actual power.
In some instances, the method can also include actual power when power enhancement mode wind power generating set with it is nominal When the difference of power is not less than current generation loss, the effective wind speed around which in n platform power enhancement mode wind power generating sets is controlled Maximum the second power enhancement mode wind power generating set hoisting power in addition to the first power enhancement mode wind power generating set with Make up current generation loss.For example, cannot still make up after the first power enhancement mode wind power generating set is lifted to actual power Current power generation loss, then can be according to the size of Current ambient effective wind speed to reaching the wind power generating set of nominal power It is ranked up, nominal power is lifted into actual power successively, the wind power generating set after power ascension is no longer participate in this wheel work( Rate is lifted, until judging that the actual power of power enhancement mode wind power generating set is damaged not less than current generating with the difference of nominal power It is time-consuming, control the maximum wind power generating set hoisting power of the currently active wind speed to make up current electric grid loss.In some examples In, if here wheel power ascension process when not completing, the other wind-force unit for being not reaching to nominal power can To utilize, then the wheel lifting process will also terminate.The generating of the uneven loss of wind energy distribution can be made up by said method The problem of power, lifts power plant income.
Above in conjunction with Fig. 1 to Fig. 4, the Power Control side of wind power plant according to embodiments of the present invention is described in detail Method, below in conjunction with Fig. 5, describes the output control device of wind power plant according to embodiments of the present invention in detail.
Fig. 5 is the schematic block diagram of the output control device of the wind power plant of one embodiment of the invention;The wind-force The output control device 500 of generating field, wind power plant include m platform power enhancement mode wind power generating sets, wherein, m is just whole Number, control device 500 include:Monitoring calculation unit 510, comparison judgment unit 520 and control scheduling unit 530.The monitoring meter Calculate during unit 510 is configured as monitoring m platform power enhancement mode wind power generating sets and there is n platform power enhancement mode wind-power electricity generations When unit is in nominal power generating state, the current generation loss of electrical network is calculated based on current electric grid input power, wherein, n It is greater than 0 and less than or equal to the integer of m;The comparison judgment unit 520 is configured to n platform power enhancement mode wind-driven generators Group can hoisting power sum be compared with current generation loss, wherein, power enhancement mode wind power generating set can lift work( Rate is the difference of the actual power with nominal power of power enhancement mode wind power generating set;The control scheduling unit 530 is configured to When n platform power enhancement mode wind power generating sets can hoisting power sum be more than current generation loss when, to n platform power enhancement mode Wind power generating set is controlled, so that the power sum that n platform power enhancement mode wind power generating set is lifted is equal to current generating Loss.In some instances, the control scheduling unit 530 is can be additionally configured to when n platform power enhancement mode wind power generating sets Can hoisting power sum be not more than current generation loss when, respectively control n platform power enhancement mode wind power generating sets with reality Power is generated electricity.
In some instances, the comparison judgment unit 520 can be additionally configured to whether monitor current electric grid input power More than the higher limit of electrical network input power;If the control scheduling unit 530 can be additionally configured to current electric grid input power No more than the higher limit of electrical network input power when Power Control is carried out to n platform power enhancement mode wind power generating sets so that n platform work( The output sum of rate enhancement mode wind power generating set is equal to the higher limit and current generation loss sum of electrical network input power.
In some instances, the comparison judgment unit 520 can be additionally configured to work as and monitor current electric grid input power No more than the higher limit of electrical network input power when;The control scheduling unit 530 is can be additionally configured to n platform power enhancement mode wind Power generator group is controlled, so that n platform power enhancement mode wind power generating sets are generated electricity with actual power.
In some instances, the monitoring calculation unit 510 can be additionally configured to monitor n platform power enhancement mode wind-power electricity generations The effective wind speed around every power enhancement mode wind power generating set in unit;The comparison judgment unit 520 can be being matched somebody with somebody It is set to and the actual power of power enhancement mode wind power generating set and the difference of nominal power is compared with current generation loss;Should Control scheduling unit 530 can be additionally configured to the difference of the actual power when power enhancement mode wind power generating set and nominal power During less than current generation loss, control effective wind speed in n platform power enhancement mode wind power generating sets around which it is maximum first Power enhancement mode wind power generating set is generated electricity with actual power.In some instances, the control scheduling unit 530 is also matched somebody with somebody It is set to when the actual power of power enhancement mode wind power generating set is not less than current generation loss with the difference of nominal power, control Effective wind speed in n platform power enhancement mode wind power generating sets around which it is maximum except the first power enhancement mode wind power generating set The second power enhancement mode wind power generating set hoisting power in addition is making up current generation loss.
The output control device 500 of wind power plant according to embodiments of the present invention may correspond to according to embodiments of the present invention Wind power plant Poewr control method in executive agent, it is and each in the output control device 500 of wind power plant Above and other operation of individual unit and/or function for the corresponding flow process of each method in realizing Fig. 2 or Fig. 4, are respectively It is succinct, will not be described here.
Therefore, device according to embodiments of the present invention, having by using power enhancement mode wind power generating set can be Continue to be promoted to the characteristic of actual power in Life cycle after its nominal power is reached, with reference to the different generated energy of wind energy turbine set Damaed cordition, is controlled to power enhancement mode wind power generating set, so as to effectively make up the event of line loss, field electricity consumption and Wind turbines The power generation loss that barrier etc. is caused, to lift the income of generating field.
Fig. 6 is that the control device of the output control device of the wind power plant of one embodiment of the invention realizes structural representation Figure.As shown in fig. 6, the output control device at least a portion with reference to the wind power plant of 5 descriptions can be real by control device 600 It is existing, including memorizer 604, processor 603 and bus 610;The memorizer 604 and processor 603 are connected and complete by bus 610 Into mutual communication;The memorizer 604 is used for store program codes;The processor 630 is stored by reading in memorizer 604 Executable program code running program corresponding with executable program code, for performing wind as shown in Figure 2 and Figure 4 The Poewr control method of power generating field.In some instances, the control device 600 can also include input equipment 601, input Mouthfuls 602, output port 605, and outut device 606.Wherein, input port 602, processor 603, memorizer 604, and defeated Exit port 605 is connected with each other by bus 610, and input equipment 601 and outut device 606 pass through input port 602 and defeated respectively Exit port 605 is connected with bus 610, and then is connected with the other assemblies of control device 600.It should be noted that here defeated Exit port 605 and input port 602 can also be represented with I/O interfaces.Specifically, input equipment 601 is received from the defeated of outside Enter information, and input information is sent to by processor 603 by input port 602;Processor 603 is deposited in being based on memorizer 604 The computer executable instructions of storage are processed to input information to generate output information, by output information temporarily or permanently Output information in the memory 604, is then sent to outut device 606 by output port 605 by storage;Outut device 606 By the outside of output information output to control device 600.
Above-mentioned memorizer 604 includes the mass storage for data or instruction.For example it is unrestricted, memorizer 604 may include HDD, floppy disk, flash memory, CD, magneto-optic disk, tape or USB (universal serial bus) (USB) driver or two The combination of individual or more the above.In a suitable case, memorizer 604 may include removable or non-removable (or solid Medium calmly).In a suitable case, memorizer 604 can be inside or outside control device 600.In a particular embodiment, Memorizer 604 is non-volatile solid state memory.In a particular embodiment, memorizer 604 includes read only memory (ROM). In the case of suitable, the ROM can be the ROM of masked edit program, programming ROM (PROM), erasable PROM (EPROM), electricity can Erasing PROM (EEPROM), electrically-alterable ROM (EAROM) or the combination of flash memory or two or more the above.
Bus 610 includes hardware, software or both, and the part of control device 600 is coupled to each other together.For example And it is unrestricted, bus 610 may include Accelerated Graphics Port (AGP) or other graphics bus, strengthen Industry Standard Architecture (EISA) Bus, Front Side Bus (FSB), super transmission (HT) interconnection, the interconnection of Industry Standard Architecture (ISA) bus, infinite bandwidth, low pin count (LPC) bus, memory bus, micro- channel architecture (MCA) bus, periphery component interconnection (PCI) bus, PCI-Express (PCI-X) bus, Serial Advanced Technology Attachment (SATA) bus, VESA's local (VLB) bus or other conjunctions The combination of suitable bus or two or more the above.In a suitable case, bus 610 may include one or more Bus 610.Although the embodiment of the present invention has been described and illustrated specific bus, the present invention considers any suitable bus or mutual Even.
When the output control device of the wind power plant realized by the control device 600 shown in Fig. 6 with reference to Fig. 5 descriptions When, input equipment 601 receives the generating state of power enhancement mode wind power generating set in wind park, in a particular embodiment, with The I/O interfaces that outut device is connected can include hardware, software or both, there is provided in control device 600 and one or many One or more interfaces of communication between individual I/O equipment.In a suitable case, control device 600 may include one or many Individual these I/O equipment.One or more of these I/O equipment can allow the communication between people and control device 600.For example and Unrestricted, I/O equipment may include keyboard, keypad, mike, monitor, mouse, printer, scanner, speaker, static state Photographing unit, contact pilotage, handwriting pad, touch screen, trace ball, video camera, another suitable I/O equipment or two or more The combination of the above.I/O equipment may include one or more sensors.The embodiment of the present invention considers any conjunction for them Suitable I/O equipment and any suitable I/O interfaces.In a suitable case, I/O interfaces may include one or more devices or energy Processor 603 is enough allowed to drive the software driver of one or more of these I/O equipment.In a suitable case, I/O interfaces can Including one or more I/O interfaces.Although the embodiment of the present invention has been described and illustrated specific I/O interfaces, the present invention is implemented Example considers any suitable I/O interfaces.The processor 603 works as monitoring based on the executable program code stored in memorizer 604 There is n platform power enhancement mode wind power generating set in m platform power enhancement mode wind power generating sets in nominal power generating shape During state, the current generation loss of electrical network is calculated based on current electric grid input power, wherein, n is greater than 0 and less than or equal to m's Integer;By n platform power enhancement mode wind power generating sets can hoisting power sum be compared with current generation loss, wherein, Power enhancement mode wind power generating set can hoisting power be power enhancement mode wind power generating set actual power and nominal power Difference;And, when n platform power enhancement mode wind power generating sets can hoisting power sum be more than current generation loss when, to n platforms Power enhancement mode wind power generating set is controlled, so that power sum of n platform power enhancement mode wind power generating set lifting etc. In current generation loss.Subsequently needing to export above-mentioned control instruction via output port 605 and outut device 606.
The above, the only specific embodiment of the present invention, but protection scope of the present invention is not limited thereto, any Those familiar with the art the invention discloses technical scope in, various equivalent modifications can be readily occurred in or replaced Change, these modifications or replacement should all be included within the scope of the present invention.Therefore, protection scope of the present invention should be with right The protection domain of requirement is defined.

Claims (13)

1. a kind of Poewr control method of wind power plant, it is characterised in that the wind power plant includes m platform power enhancement mode Wind power generating set, wherein, m is positive integer, and methods described includes:
There is n platform power enhancement mode wind power generating sets in the m platforms power enhancement mode wind power generating set is monitored to be in During nominal power generating state, the current generation loss of the electrical network is calculated based on current electric grid input power, wherein, n is big In 0 and less than or equal to the integer of m;
By the n platforms power enhancement mode wind power generating set can hoisting power sum compared with the current generation loss Compared with, wherein, the power enhancement mode wind power generating set can hoisting power be the power enhancement mode wind power generating set work( The difference of the actual power under rate enhancement mode and the nominal power;
When the n platforms power enhancement mode wind power generating set can hoisting power sum be more than the current generation loss when, it is right The n platforms power enhancement mode wind power generating set is controlled, so that what the n platforms power enhancement mode wind power generating set was lifted Power sum is equal to the current generation loss.
2. method according to claim 1, it is characterised in that also include:
When the n platforms power enhancement mode wind power generating set can hoisting power sum be not more than the current generation loss when, Control the n platforms power enhancement mode wind power generating set respectively to be generated electricity with actual power.
3. method according to claim 1 and 2, it is characterised in that also include:
When monitoring that current electric grid input power is more than the higher limit of electrical network input power;
Power Control is carried out to the n platforms power enhancement mode wind power generating set, so that the n platforms power enhancement mode wind-power electricity generation The output sum of unit is equal to the higher limit and current generation loss sum of the electrical network input power.
4. method according to claim 1 and 2, it is characterised in that also include:
When monitoring that current electric grid input power is not more than the higher limit of electrical network input power;
The n platforms power enhancement mode wind power generating set is controlled, so that the n platforms power enhancement mode wind power generating set Generated electricity with actual power.
5. method according to claim 1 and 2, it is characterised in that also include:
Monitor effective around every power enhancement mode wind power generating set in the n platforms power enhancement mode wind power generating set Wind speed;
The actual power of power enhancement mode wind power generating set is entered with the current generation loss with the difference of nominal power Row compares;
When the actual power of the power enhancement mode wind power generating set is less than the current generation loss with the difference of nominal power When, controlling in the n platforms power enhancement mode wind power generating set the first maximum power of the effective wind speed around which strengthens Type wind power generating set is generated electricity with actual power.
6. method according to claim 5, it is characterised in that also include:
When the actual power of the power enhancement mode wind power generating set is damaged not less than current the generating with the difference of nominal power It is time-consuming, control in the n platforms power enhancement mode wind power generating set effective wind speed around which it is maximum except described first The second power enhancement mode wind power generating set hoisting power beyond power enhancement mode wind power generating set is described current to make up Generation loss.
7. a kind of output control device of wind power plant, it is characterised in that the wind power plant includes m platform power enhancement mode Wind power generating set, wherein, m is positive integer, and the control device includes:
Monitoring calculation unit, is configured to monitor every power enhancement mode wind power generating set in current wind park in real time Output, there is n platform power enhancement mode wind-driven generators in the m platforms power enhancement mode wind power generating set is monitored When group is in nominal power generating state, the current generation loss of the electrical network is calculated based on current electric grid input power, wherein, N is greater than 0 and less than or equal to the integer of m;
Comparison judgment unit, be configured to by the n platforms power enhancement mode wind power generating set can hoisting power sum and institute State current generation loss to be compared, wherein, the power enhancement mode wind power generating set can hoisting power be that the power increases The difference of the actual power of strong type wind power generating set and the nominal power;
Control scheduling unit, be configured as the n platforms power enhancement mode wind power generating set can hoisting power sum be more than During the current generation loss, the n platforms power enhancement mode wind power generating set is controlled, so that the n platforms power increases The power sum that strong type wind power generating set is lifted is equal to the current generation loss.
8. device according to claim 7, it is characterised in that the control scheduling unit is additionally configured to:
When the n platforms power enhancement mode wind power generating set can hoisting power sum be not more than the current generation loss when, Control the n platforms power enhancement mode wind power generating set respectively to be generated electricity with actual power.
9. the device according to claim 7 or 8, it is characterised in that
The comparison judgment unit is additionally configured to monitor the upper limit whether current electric grid input power is more than electrical network input power Value;The control scheduling unit is additionally configured to:If current electric grid input power is more than the higher limit of electrical network input power, The n platforms power enhancement mode wind power generating set is controlled, so that the work(of the n platforms power enhancement mode wind power generating set Rate sum is equal to the higher limit and current generation loss sum of the electrical network input power.
10. the device according to claim 7 or 8, it is characterised in that
The comparison judgment unit is additionally configured to monitor the upper limit whether current electric grid input power is more than electrical network input power Value;The control scheduling unit is additionally configured to:If current electric grid input power is not more than the higher limit of electrical network input power When the n platforms power enhancement mode wind power generating set is controlled so that the n platforms power enhancement mode wind power generating set with Actual power is generated electricity.
11. devices according to claim 7 or 8, it is characterised in that
Every power that the monitoring calculation unit is additionally configured to monitor in the n platforms power enhancement mode wind power generating set increases Effective wind speed around strong type wind power generating set;
The comparison judgment unit is additionally configured to the actual power of the power enhancement mode wind power generating set and nominal work( The difference of rate is compared with the current generation loss;
The control scheduling unit is additionally configured to actual power and nominal work(when the power enhancement mode wind power generating set When the difference of rate is less than the current generation loss, control in the n platforms power enhancement mode wind power generating set described around which The first maximum power enhancement mode wind power generating set of effective wind speed is generated electricity with actual power.
12. devices according to claim 11, it is characterised in that
The control scheduling unit is additionally configured to actual power and nominal work(when the power enhancement mode wind power generating set When the difference of rate is not less than the current generation loss, the institute around which is controlled in the n platforms power enhancement mode wind power generating set State maximum the second power enhancement mode wind-power electricity generation in addition to the first power enhancement mode wind power generating set of effective wind speed Unit hoisting power is making up the current generation loss.
13. a kind of output control devices of wind power plant, it is characterised in that include:
Memorizer, processor and bus;
The memorizer and the processor are connected by the bus and complete mutual communication;
The memorizer is used for store program codes;
The processor is run and the executable program by reading the executable program code stored in the memorizer The corresponding program of code, requires the Poewr control method of the wind power plant any one of 1 to 6 for perform claim.
CN201611263644.5A 2016-12-30 2016-12-30 Power control method and device for wind power plant Active CN106532780B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611263644.5A CN106532780B (en) 2016-12-30 2016-12-30 Power control method and device for wind power plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611263644.5A CN106532780B (en) 2016-12-30 2016-12-30 Power control method and device for wind power plant

Publications (2)

Publication Number Publication Date
CN106532780A true CN106532780A (en) 2017-03-22
CN106532780B CN106532780B (en) 2018-12-25

Family

ID=58336370

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611263644.5A Active CN106532780B (en) 2016-12-30 2016-12-30 Power control method and device for wind power plant

Country Status (1)

Country Link
CN (1) CN106532780B (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1844660A (en) * 2006-03-29 2006-10-11 代运波 Wind power generator with functions of changing diameter and solidity, and power supply scheme
KR20130124028A (en) * 2012-05-04 2013-11-13 삼성중공업 주식회사 System and method for output control of wind farm
CN104682410A (en) * 2015-03-25 2015-06-03 成都鼎智汇科技有限公司 Micro-grid system capable of automatically realizing energy balance

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1844660A (en) * 2006-03-29 2006-10-11 代运波 Wind power generator with functions of changing diameter and solidity, and power supply scheme
KR20130124028A (en) * 2012-05-04 2013-11-13 삼성중공업 주식회사 System and method for output control of wind farm
CN104682410A (en) * 2015-03-25 2015-06-03 成都鼎智汇科技有限公司 Micro-grid system capable of automatically realizing energy balance

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
朱瑛等: "新型双功率流风力发电系统控制策略", 《电力系统自动化》 *

Also Published As

Publication number Publication date
CN106532780B (en) 2018-12-25

Similar Documents

Publication Publication Date Title
CN101881254B (en) Wind turbine
US8912674B2 (en) System and method of selecting wind turbine generators in a wind park for change of output power
US8860237B2 (en) System and method of selecting wind turbine generators in a wind park for curtailment of output power to provide a wind reserve
US20090212563A1 (en) System and method for improving performance of power constrained wind power plant
Asmine et al. Field measurements for the assessment of inertial response for wind power plants based on Hydro‐Québec TransÉnergie requirements
US8508061B2 (en) Wind-power generation system and control method for the same
CN103842645B (en) The method and system of the wind turbine of electrical network it is connected to for operation
US20210231103A1 (en) Controlling wind turbines in presence of wake interactions
JP5272113B1 (en) Wind power generation system, control device therefor, and control method therefor
CN101220802B (en) Universal sail multilevel wind velocity self-adapting upright shaft aerogenerator system
Lakshmanan et al. Energy curtailment of DC series–parallel connected offshore wind farms
Jenkins Engineering wind farms
CN111336066A (en) Wind power generation system for generating energy and control method
CN106532780A (en) Power control method and device for wind power plant
CN109372697A (en) A kind of width wind domain breeze power generation system
CN105649886B (en) Wind-driven generator
Topić et al. Reliability model of different wind power plant configuration using sequential Monte Carlo simulation
CN106549389B (en) Amplitude limiting parameter optimization method for direct-current minimum trigger angle limiter
KR101169225B1 (en) Wind power generator having vertical axis
Bošnjaković Wind power buildings integration
KR101636544B1 (en) Method for controlling a output in a wind farm
Bao et al. A data-driven approach for identification and compensation of wind turbine inherent yaw misalignment
CN114930017A (en) Method of avoiding edgewise vibrations during non-operational periods of a wind turbine
CN206368773U (en) Honeycomb wind power station
CN102465840A (en) Wind power generator

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant