CN106532591B - Distributing frame - Google Patents

Distributing frame Download PDF

Info

Publication number
CN106532591B
CN106532591B CN201610941864.2A CN201610941864A CN106532591B CN 106532591 B CN106532591 B CN 106532591B CN 201610941864 A CN201610941864 A CN 201610941864A CN 106532591 B CN106532591 B CN 106532591B
Authority
CN
China
Prior art keywords
orifice plate
wiring
threading
box
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610941864.2A
Other languages
Chinese (zh)
Other versions
CN106532591A (en
Inventor
张盼
薛广森
侯蕊
徐明月
刘强
董琳
张安勇
阴淑杰
张建军
房茜
高林
曹延芳
张居涛
刘瑞峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Jinan Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Jinan Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Jinan Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201610941864.2A priority Critical patent/CN106532591B/en
Publication of CN106532591A publication Critical patent/CN106532591A/en
Application granted granted Critical
Publication of CN106532591B publication Critical patent/CN106532591B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G3/00Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
    • H02G3/02Details
    • H02G3/04Protective tubing or conduits, e.g. cable ladders or cable troughs

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Laying Of Electric Cables Or Lines Outside (AREA)
  • Patch Boards (AREA)

Abstract

配线架,包括配线柜和线槽箱,线槽箱内间隔设置多个支撑板,支撑板之间设置有绞线盘,绞线盘的两端设有转轴,支撑板通过第一轴承安装连接轴,连接轴通过卡接销与转轴可拆卸的连接,线槽箱外设置摇柄,摇柄的横杆通过第二轴承伸入线槽箱后与最外侧的支撑板上的连接轴固定,线槽箱顶部开设多个穿线口,配线柜内设置隔板和走线槽,走线槽内设置固定机构,固定机构包括第一孔板和第二孔板,第一孔板、第二孔板上分别开设有多个上下对应的第一穿线孔、第二穿线孔,第二穿线孔外设置伸出第一穿线孔的压紧管,压紧管的一端与第二孔板固定,其另一端穿过第一穿线孔后设置碗状的收紧头。本发明方便对走线槽内的线路进行管理和使用。

The distribution frame includes a wiring cabinet and a trunking box. A plurality of support plates are arranged at intervals in the trunking box. A twisting reel is arranged between the supporting plates. Rotating shafts are arranged at both ends of the twisting reel, and the supporting plate passes through the first bearing. Install the connecting shaft, the connecting shaft is detachably connected with the rotating shaft through the snap pin, the crank handle is arranged outside the trunking box, and the cross bar of the cranking handle extends into the trunking box through the second bearing and connects with the connecting shaft on the outermost support plate Fixed, multiple threading openings are opened on the top of the wiring trough box, partitions and wiring troughs are set in the wiring cabinet, and a fixing mechanism is set in the wiring trough. The fixing mechanism includes the first orifice plate and the second orifice plate, the first orifice plate, The second orifice plate is respectively opened with a plurality of first threading holes and second threading holes corresponding up and down. A compression tube extending out of the first threading hole is arranged outside the second threading hole. One end of the compression tube is connected to the second orifice plate. Fixed, the other end is provided with a bowl-shaped tightening head after passing through the first threading hole. The invention facilitates the management and use of the lines in the line slot.

Description

配线架patch panel

技术领域technical field

本发明涉及一种电力系统控制柜,尤其涉及一种方便使用和管理电线的配线架。The invention relates to a power system control cabinet, in particular to a distribution frame for convenient use and management of electric wires.

背景技术Background technique

电力系统中,配线架主要用于敷设电缆以及与电气部件、设备等的连接,配线架一侧连接外线,另一侧连接内部设备,方便对各种线路进行统一管理和布线。现有的配线架通常由2部分组成,包括放置绞盘的线盘箱和固定在线盘箱上方的配线柜,配线柜中采用隔板或支撑架安装开关、继电器、理线器等各种元件,配线柜中电缆的敷设,由施工人员采用扎带进行统一固定或者是杂乱的放置在线槽内,在同时敷设有多根电缆的情况下,利用电缆线端部与部件的连接触点作为受力点,因此,使用过程中连接触点一直受到重力的影响,易发生线路故障;同时,在线槽内为了区分不同线路,会在线路外周设置编号,但在线路故障需要排查的情况下,依然不方便对线路进行区分。In the power system, the distribution frame is mainly used for laying cables and connecting with electrical components, equipment, etc. One side of the distribution frame is connected to the external line, and the other side is connected to the internal equipment, which is convenient for unified management and wiring of various lines. The existing distribution frame usually consists of two parts, including the wire reel box for placing the winch and the wiring cabinet fixed above the wire reel box. In the wiring cabinet, partitions or support frames are used to install switches, relays, cable managers, etc. For the laying of the cables in the wiring cabinet, the construction personnel use cable ties to fix them uniformly or place them in the wire slots in a messy manner. Therefore, the connection contacts are always affected by gravity during use, and line faults are prone to occur; at the same time, in order to distinguish different lines in the wire slot, numbers will be set on the outer periphery of the line, but in the case of line faults that need to be checked However, it is still inconvenient to distinguish the lines.

发明内容Contents of the invention

本发明提供一种配线架,用于解决现有技术中的问题,通过在配线柜的走线槽内设置固定机构,便于线路管理鹤使用。The invention provides a distribution frame, which is used to solve the problems in the prior art. A fixing mechanism is provided in a wiring trough of a distribution cabinet to facilitate the use of line management cranes.

为了实现本发明的目的,采用以下技术方案:In order to realize the purpose of the present invention, adopt following technical scheme:

配线架,包括配线柜和线槽箱,线槽箱设置在配线柜的底部,所述线槽箱内间隔设置多个竖向的支撑板,支撑板之间设置有绞线盘,绞线盘的两端设有转轴,支撑板通过第一轴承安装连接轴,连接轴通过卡接销与转轴可拆卸的连接,线槽箱外设置摇柄,摇柄的横杆通过第二轴承伸入线槽箱后与最外侧的支撑板上的连接轴固定,所述线槽箱顶部开设多个穿线口,配线柜内设置多块隔板和竖向的走线槽,所述走线槽内设置用于连接电缆穿设的固定机构,所述固定机构包括第一孔板和第二孔板,第一孔板、第二孔板上分别开设有多个上下对应的第一穿线孔、第二穿线孔,第二穿线孔外设置伸出第一穿线孔的压紧管,压紧管的一端与第二孔板固定,其另一端穿过第一穿线孔后设置碗状的收紧头。The distribution frame includes a wiring cabinet and a trunking box. The trunking box is arranged at the bottom of the wiring cabinet. A plurality of vertical support plates are arranged at intervals in the trunking box, and a twisting plate is arranged between the support plates. The two ends of the winch reel are provided with rotating shafts, the supporting plate is installed with the connecting shaft through the first bearing, and the connecting shaft is detachably connected with the rotating shaft through snap pins. After extending into the trunking box, it is fixed with the connecting shaft on the outermost support plate. Multiple wiring openings are opened on the top of the trunking box, and multiple partitions and vertical wiring troughs are arranged in the wiring cabinet. A fixing mechanism for connecting cables to pass through is arranged in the trunking. The fixing mechanism includes a first orifice plate and a second orifice plate. The first orifice plate and the second orifice plate are respectively provided with a plurality of corresponding first threading hole, the second threading hole, the second threading hole is provided with a compression tube extending out of the first threading hole, one end of the compression tube is fixed to the second orifice plate, and the other end is set through the first threading hole after a bowl-shaped Tighten your head.

为了进一步实现本发明的目的,还可以采用以下技术方案:In order to further realize the object of the present invention, the following technical solutions can also be adopted:

如上所述的配线架,所述第一孔板与走线槽内壁固定,第一孔板两端的走线槽内壁开有相对的第一凹槽,所述第二孔板两端分别设置在第一凹槽内并可上下移动。In the distribution frame as described above, the first orifice plate is fixed to the inner wall of the wiring trough, and the inner wall of the wiring trough at both ends of the first orifice plate is provided with opposite first grooves, and the two ends of the second orifice plate are respectively provided with It is in the first groove and can move up and down.

如上所述的配线架,所述凹槽的高度等于压紧管的高度。As in the distribution frame above, the height of the groove is equal to the height of the compression tube.

如上所述的配线架,所述走线槽竖向固定在多块隔板后端或配线柜内壁上。As for the above-mentioned distribution frame, the wiring trough is vertically fixed on the rear ends of multiple partitions or on the inner wall of the distribution cabinet.

如上所述的配线架,所述走线槽内壁间隔设置多个相对的第二凹槽,所述第一孔板两端通过第二凹槽与走线槽内壁连接。In the distribution frame as described above, a plurality of opposite second grooves are arranged at intervals on the inner wall of the wiring trough, and both ends of the first hole plate are connected to the inner wall of the wiring trough through the second grooves.

本发明的有益效果:Beneficial effects of the present invention:

本发明在配线柜内设置有方便穿线的走线槽,走线槽内设有固定机构,利用固定机构可以方便对穿设的线路进行固定,即,当第二孔板靠在第一孔板侧面,电线可以方便的从第一穿线孔、第二穿线孔依次穿过;当需要固定时,将第二孔板向下移动,第二孔板带动压紧管移动,从而将压紧管端部的碗状收紧头与电线外周接触,利用第一穿线孔对碗状收紧头的挤压完成对应电线的固定。In the present invention, a wiring trough for easy threading is provided in the wiring cabinet, and a fixing mechanism is provided in the wiring trough, and the wiring that is passed through can be fixed conveniently by using the fixing mechanism, that is, when the second orifice plate leans against the first hole On the side of the plate, the wires can pass through the first threading hole and the second threading hole conveniently; when it needs to be fixed, move the second orifice plate downwards, and the second orifice plate will drive the compression tube to move, so that the compression tube The bowl-shaped tightening head at the end is in contact with the outer circumference of the electric wire, and the fixing of the corresponding electric wire is completed by squeezing the bowl-shaped tightening head through the first threading hole.

除此之外,由于电线可以按第一孔板的位置、顺序敷设,使用和检修时将非常直观和方便的确定所要检查的线路,同时,不同电线隔开设置,更换电线时不会对其它线路产生影响,因此,对线路的管理和调整非常方便。In addition, since the wires can be laid according to the position and order of the first orifice plate, it will be very intuitive and convenient to determine the line to be inspected during use and maintenance. Therefore, it is very convenient to manage and adjust the lines.

附图说明Description of drawings

图1是本发明的结构示意图。Fig. 1 is a schematic structural view of the present invention.

图2是图1的后视图。Fig. 2 is a rear view of Fig. 1 .

图3是图2中I局部放大图。Fig. 3 is a partial enlarged view of I in Fig. 2 .

图4是图3中A向示意图。Fig. 4 is a schematic diagram of direction A in Fig. 3 .

图5是本发明第一种所述收紧头的间隔示意图。Fig. 5 is a schematic diagram of intervals of the tightening head of the first type of the present invention.

图6中本发明第二种所述收紧头的间隔示意图。Fig. 6 is a schematic diagram of the spacing of the second tightening head of the present invention.

附图标记:1-配线柜,2-线槽箱,3-支撑板,4-绞线盘,5-转轴,6-连接轴,7-摇柄,8-穿线口,9-隔板,10-走线槽,11-固定机构,111-第一孔板,112-第二孔板,113-压紧管,114-收紧头,115-第一凹槽。Reference signs: 1-wiring cabinet, 2-wire trunking box, 3-support plate, 4-twisting coil, 5-rotating shaft, 6-connecting shaft, 7-rocking handle, 8-threading port, 9-partition , 10-wire trough, 11-fixing mechanism, 111-first orifice plate, 112-second orifice plate, 113-pressing tube, 114-tightening head, 115-first groove.

具体实施方式Detailed ways

为使本发明实施例的目的、技术方案和优点更加清楚,下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments It is a part of embodiments of the present invention, but not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of the present invention.

如图1-图4所示,本实施例一种配线架,包括配线柜1和线槽箱2,线槽箱2设置在配线柜1的底部,线槽箱2内间隔设置多个竖向的支撑板3,相邻2块支撑板3之间设置有绞线盘4,绞线盘4的两端设有转轴5,支撑板3通过第一轴承安装连接轴6,连接轴6通过卡接销与转轴5可拆卸的连接,线槽箱2外设置摇柄7,摇柄7的横杆通过第二轴承伸入线槽箱2后与最外侧的支撑板3上的连接轴6固定,其特征在于,线槽箱2顶部开设多个穿线口8,配线柜1内设置多块隔板9和竖向的走线槽10,走线槽10内设置用于连接电缆穿设的固定机构11,固定机构11包括第一孔板111和第二孔板112,第一孔板111、第二孔板112上分别开设有多个上下对应的第一穿线孔、第二穿线孔,第二穿线孔外设置伸出第一穿线孔的压紧管113,压紧管113的一端与第二孔板112固定,其另一端穿过第一穿线孔后设置碗状的收紧头114。As shown in Figures 1 to 4, a distribution frame in this embodiment includes a wiring cabinet 1 and a trunking box 2. A vertical support plate 3, a twisting coil 4 is arranged between adjacent two supporting plates 3, and the two ends of the twisting coil 4 are provided with a rotating shaft 5, and the supporting plate 3 is installed with a connecting shaft 6 through the first bearing, and the connecting shaft 6. It is detachably connected with the rotating shaft 5 through the snap-in pin. A rocker 7 is arranged outside the trunking box 2. The cross bar of the cranking handle 7 extends into the trunking box 2 through the second bearing and is connected to the outermost support plate 3. The shaft 6 is fixed, and the feature is that the top of the trunking box 2 is provided with multiple threading openings 8, and the wiring cabinet 1 is provided with a plurality of partitions 9 and vertical wiring troughs 10, and the wiring troughs 10 are provided for connecting cables. The fixing mechanism 11 is provided. The fixing mechanism 11 includes a first orifice plate 111 and a second orifice plate 112. The first orifice plate 111 and the second orifice plate 112 are respectively provided with a plurality of upper and lower corresponding first threading holes and second orifice holes. Threading hole, outside the second threading hole, a compression tube 113 stretching out from the first threading hole is set, and one end of the compression tube 113 is fixed with the second orifice 112, and the other end passes through the first threading hole and then a bowl-shaped closing tube is set. Tight head 114.

具体而言,本实施例提供的一种配线架,在配线柜1内设置有方便穿线的走线槽10,走线槽10内设有固定机构11,利用固定机构11可以方便对穿设的电线进行固定,即,当第二孔板112靠在第一孔板111侧面,电线可以方便的从第一穿线孔、第二穿线孔依次穿过;当需要固定时,将第二孔板112向下移动,第二孔板112带动压紧管113移动,从而将压紧管113端部的碗状的收紧头114与电线外周接触,利用第一穿线孔对碗状收紧头114的挤压完成对应电线的固定。其中碗状的收紧头,采用可收缩变形的材料制成,例如可以是橡胶或者塑料,如图5、6所示,碗状的收紧头具有向外的凸起部,可以在第一孔板对其挤压时,利用凸起部向内收起贴合在电线的外周,图6中,第二种收紧头还设置有向内侧的凸起部,因此,和第一孔板上的第一穿线孔配合时具有更好的对电线的夹持力。Specifically, in the distribution frame provided by this embodiment, a wiring trough 10 for easy threading is provided in the wiring cabinet 1. A fixing mechanism 11 is provided in the wiring trough 10, and the fixing mechanism 11 can be used to facilitate threading. The provided electric wires are fixed, that is, when the second orifice plate 112 leans against the first orifice plate 111 side, the electric wires can pass through the first threading hole and the second threading hole conveniently; The plate 112 moves downward, and the second orifice plate 112 drives the compression tube 113 to move, thereby contacting the bowl-shaped tightening head 114 at the end of the compression tube 113 with the outer periphery of the wire, and using the first threading hole to tighten the bowl-shaped tightening head. The extrusion of 114 completes the fixing of the corresponding electric wires. Wherein the bowl-shaped tightening head is made of shrinkable and deformable material, such as rubber or plastic, as shown in Figures 5 and 6, the bowl-shaped tightening head has an outward protrusion, which can be used in the first When the orifice plate squeezes it, use the raised part to pack inwards and stick to the outer periphery of the wire. In Figure 6, the second type of tightening head is also provided with a raised part facing the inside. Therefore, it is different from the first orifice plate. When the first threading hole on the top is matched, it has better clamping force on the wire.

除此之外,由于电线可以按第一孔板111的位置、顺序敷设,使用和检修时,将非常直观和方便的确定所要检查的线路;同时,不同线路隔开设置,更换电线时不会对其它电线产生影响,因此,对线路的管理和调整非常方便。In addition, since the electric wires can be laid according to the position and order of the first orifice plate 111, it will be very intuitive and convenient to determine the line to be inspected during use and maintenance; at the same time, different lines are set apart, so there is no need to replace the electric wires. It affects other wires, so it is very convenient to manage and adjust the lines.

如图2所示,本实施例的第一孔板111与走线槽10内壁固定,第一孔板111两端的走线槽10内壁开有相对的第一凹槽115,第二孔板112两端分别设置在第一凹槽115内并可上下移动。利用第一凹槽115可以限定第二孔板112移动的距离,从而更好的给第二孔板112以支撑力,避免在意外情况下,碗状收紧头114从第一穿线孔中脱落。As shown in Figure 2, the first orifice plate 111 of this embodiment is fixed to the inner wall of the wiring trough 10, and the inner wall of the wiring trough 10 at both ends of the first orifice plate 111 is provided with a first groove 115 opposite to that of the second orifice plate 112. The two ends are respectively arranged in the first groove 115 and can move up and down. The moving distance of the second orifice plate 112 can be limited by using the first groove 115, so as to better support the second orifice plate 112 and prevent the bowl-shaped tightening head 114 from falling off from the first threading hole under unexpected circumstances .

如图3所示,本实施例中第一凹槽115的高度等于压紧管113的高度。压紧管113可以采用由塑料制成的可变形直管,压紧管113的高度与第一凹槽115高度相等,可以进一步限定碗状收紧头114对电线具有较好的夹紧力,使其固定性能更好。As shown in FIG. 3 , the height of the first groove 115 in this embodiment is equal to the height of the compression tube 113 . The compression tube 113 can adopt a deformable straight tube made of plastic, and the height of the compression tube 113 is equal to the height of the first groove 115, which can further limit the bowl-shaped tightening head 114 to have a better clamping force on the electric wire, Make it fix better.

为了方便布置,如图2所示,本实施例中的走线槽10竖向固定在多块隔板9后端,另外,走线槽10也可以固定在配线柜1内壁上,根据需要,在走线槽10的侧面可以开设多个用于进线口,以方便不同隔板9上的电线进行敷设。In order to facilitate the layout, as shown in Figure 2, the wiring trough 10 in this embodiment is vertically fixed on the rear ends of a plurality of partitions 9. In addition, the wiring trough 10 can also be fixed on the inner wall of the wiring cabinet 1, as required A plurality of wire inlets can be provided on the side of the wiring groove 10 to facilitate the laying of wires on different partitions 9 .

进一步的,本实施例在走线槽10内壁间隔设置多个相对的第二凹槽,第一孔板111两端通过第二凹槽与走线槽10内壁连接。利用第二凹槽、第一凹槽115可以调整固定机构11的位置,满足不同穿线条件下的固定线路需要,更方便使用。Further, in this embodiment, a plurality of opposite second grooves are provided at intervals on the inner wall of the wiring trough 10 , and both ends of the first orifice plate 111 are connected to the inner wall of the wiring trough 10 through the second grooves. The position of the fixing mechanism 11 can be adjusted by using the second groove and the first groove 115 to meet the needs of fixing lines under different threading conditions, and it is more convenient to use.

本发明未详尽描述的技术内容均为公知技术。The technical contents not described in detail in the present invention are all known technologies.

Claims (4)

1.配线架,包括配线柜和线槽箱,线槽箱设置在配线柜的底部,所述线槽箱内间隔设置多个竖向的支撑板,相邻2块支撑板之间设置有绞线盘,绞线盘的两端设有转轴,支撑板通过第一轴承安装连接轴,连接轴通过卡接销与转轴可拆卸的连接,线槽箱外设置摇柄,摇柄的横杆通过第二轴承伸入线槽箱后与最外侧的支撑板上的连接轴固定,其特征在于,所述线槽箱顶部开设多个穿线口,配线柜内设置多块隔板和竖向的走线槽,所述走线槽内设置用于连接电缆穿设的固定机构,所述固定机构包括第一孔板和第二孔板,第一孔板、第二孔板上分别开设有多个上下对应的第一穿线孔、第二穿线孔,第二穿线孔外设置伸出第一穿线孔的压紧管,压紧管的一端与第二孔板固定,其另一端穿过第一穿线孔后设置碗状的收紧头;所述第一孔板与走线槽内壁固定,第一孔板两端的走线槽内壁开有相对的第一凹槽,所述第二孔板两端分别设置在第一凹槽内并可上下移动。1. Distribution frame, including wiring cabinet and trunking box. The wiring trunking box is set at the bottom of the wiring cabinet. Multiple vertical support plates are arranged at intervals in the wiring trunking box. Between two adjacent support plates A winch reel is provided, and the two ends of the winch reel are provided with a rotating shaft. The supporting plate is installed with the connecting shaft through the first bearing, and the connecting shaft is detachably connected with the rotating shaft through a snap pin. The cross bar extends into the trunking box through the second bearing and is fixed to the connecting shaft on the outermost support plate. It is characterized in that a plurality of threading openings are opened on the top of the trunking box, and a plurality of partitions and A vertical wiring trough. A fixing mechanism for connecting cables to pass through is provided in the wiring trough. The fixing mechanism includes a first orifice plate and a second orifice plate. The first orifice plate and the second orifice plate are respectively There are a plurality of first threading holes and second threading holes corresponding up and down. A compression tube protruding from the first threading hole is arranged outside the second threading hole. One end of the compression tube is fixed to the second orifice plate, and the other end is threaded through Set a bowl-shaped tightening head after passing through the first threading hole; the first orifice plate is fixed to the inner wall of the wiring trough, and the inner wall of the wiring trough at both ends of the first orifice plate is provided with a first relative groove, and the second orifice plate is fixed to the inner wall of the wiring trough. Two ends of the orifice plate are respectively arranged in the first groove and can move up and down. 2.根据权利要求1所述的配线架,其特征在于,所述第一凹槽的高度等于压紧管的高度。2. The distribution frame according to claim 1, wherein the height of the first groove is equal to the height of the pressing tube. 3.根据权利要求1所述的配线架,其特征在于,所述走线槽竖向固定在多块隔板后端或配线柜内壁上。3 . The distribution frame according to claim 1 , wherein the wiring trough is vertically fixed to the rear ends of multiple partitions or the inner wall of the distribution cabinet. 4 . 4.根据权利要求1所述的配线架,其特征在于,所述走线槽内壁间隔设置多个相对的第二凹槽,所述第一孔板两端通过第二凹槽与走线槽内壁连接。4. The distribution frame according to claim 1, wherein a plurality of opposite second grooves are arranged at intervals on the inner wall of the wiring trough, and the two ends of the first orifice plate are connected with the wiring through the second grooves. Groove inner wall connection.
CN201610941864.2A 2016-10-31 2016-10-31 Distributing frame Active CN106532591B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610941864.2A CN106532591B (en) 2016-10-31 2016-10-31 Distributing frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610941864.2A CN106532591B (en) 2016-10-31 2016-10-31 Distributing frame

Publications (2)

Publication Number Publication Date
CN106532591A CN106532591A (en) 2017-03-22
CN106532591B true CN106532591B (en) 2018-07-03

Family

ID=58293438

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610941864.2A Active CN106532591B (en) 2016-10-31 2016-10-31 Distributing frame

Country Status (1)

Country Link
CN (1) CN106532591B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108963924A (en) * 2018-06-26 2018-12-07 浙江邮电职业技术学院 It is a kind of based on the wiring of smart home detachable Distributing frame structure

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102963778A (en) * 2012-12-13 2013-03-13 山东电力集团公司检修公司 Distributing frame
CN202888733U (en) * 2012-09-24 2013-04-17 南车戚墅堰机车有限公司 Locomotive cable clamp
CN205450385U (en) * 2016-03-01 2016-08-10 广东亚鹏通信设备有限公司 Indoor wideband comprehensive distribution case
CN205666447U (en) * 2016-05-26 2016-10-26 黄国华 Novel simple and easy cubical switchboard
CN205666435U (en) * 2016-05-26 2016-10-26 黄国华 Take cubical switchboard of function of working a telephone switchboard alone

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101349697B1 (en) * 2013-10-22 2014-01-10 아이에스(주) Cable splitter

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202888733U (en) * 2012-09-24 2013-04-17 南车戚墅堰机车有限公司 Locomotive cable clamp
CN102963778A (en) * 2012-12-13 2013-03-13 山东电力集团公司检修公司 Distributing frame
CN205450385U (en) * 2016-03-01 2016-08-10 广东亚鹏通信设备有限公司 Indoor wideband comprehensive distribution case
CN205666447U (en) * 2016-05-26 2016-10-26 黄国华 Novel simple and easy cubical switchboard
CN205666435U (en) * 2016-05-26 2016-10-26 黄国华 Take cubical switchboard of function of working a telephone switchboard alone

Also Published As

Publication number Publication date
CN106532591A (en) 2017-03-22

Similar Documents

Publication Publication Date Title
CN107683062B (en) Cabinet and wiring mechanism
CN203826885U (en) Machine frame deconcentrator
US20130081559A1 (en) Bilateral rotation apparatus and furniture including the same
CN202042846U (en) Wire distribution frame
CN208227519U (en) A kind of server cabinet convenient for lineation
CN108513476A (en) A kind of cabinet wire-management device
CN103118517B (en) Clamping device and use the wiring chest of this clamping device
CN106532591B (en) Distributing frame
CN104006221B (en) Two-way wire-management device
CN206783020U (en) One kind reason line winding device
CN211266264U (en) Electric wire wiring frame
CN202454997U (en) Wire arrangement frame and wiring box using wire arrangement frame
CN203632998U (en) Outdoor equipment cabinet for road monitoring and speed measurement system
CN214899086U (en) Detachable socket for comprehensive wiring
CN203836390U (en) Bidirectional wire arranging device
CN210443004U (en) Real standard platform of electric installation
CN103956693A (en) Cable laying device for crane
CN210379918U (en) Block terminal convenient to overhaul
CN209824248U (en) Cabinet with cable trough
CN203801189U (en) Case cabling channel structure
CN209169875U (en) Container data center incoming line structure
CN209419029U (en) Telescopic cabinet wiring box and cabinets using this wiring box
CN209488094U (en) A weak current bridge cable management device
CN205944917U (en) Roof cable device and rail vehicle
CN209273842U (en) A mounting sheet metal structure for an injection molding machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant