CN106529199A - Determining method for conglomerate oil reservoir chemical flooding well spacing - Google Patents

Determining method for conglomerate oil reservoir chemical flooding well spacing Download PDF

Info

Publication number
CN106529199A
CN106529199A CN201611157303.XA CN201611157303A CN106529199A CN 106529199 A CN106529199 A CN 106529199A CN 201611157303 A CN201611157303 A CN 201611157303A CN 106529199 A CN106529199 A CN 106529199A
Authority
CN
China
Prior art keywords
injection
well
formation pressure
pressure gradient
spacing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611157303.XA
Other languages
Chinese (zh)
Other versions
CN106529199B (en
Inventor
程宏杰
张菁
吕建荣
朱桂芳
刘文涛
张德富
聂振荣
周玉辉
刘宝珍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Research Institute Of Exploration & Development Petrochina Xinjiang Oilfield Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Research Institute Of Exploration & Development Petrochina Xinjiang Oilfield Co filed Critical Research Institute Of Exploration & Development Petrochina Xinjiang Oilfield Co
Priority to CN201611157303.XA priority Critical patent/CN106529199B/en
Publication of CN106529199A publication Critical patent/CN106529199A/en
Application granted granted Critical
Publication of CN106529199B publication Critical patent/CN106529199B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G16INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS
    • G16ZINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS, NOT OTHERWISE PROVIDED FOR
    • G16Z99/00Subject matter not provided for in other main groups of this subclass
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/40Controlling or monitoring, e.g. of flood or hurricane; Forecasting, e.g. risk assessment or mapping

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention provides a determining method for conglomerate oil reservoir chemical flooding well spacing. The method comprises the steps of (1), solving formation pressure gradients among injection and production wells according to injection and production well spacing and injection and production well pressure differences; (2), obtaining injection well permeability-formation pressure gradient relational expressions through logarithm regression; (3), dividing the injection and production well pressure differences into different intervals, and obtaining corresponding formation pressure gradient-injection and production well spacing relational expressions through exponential regression according to the injection well permeability in the intervals and the formation pressure gradients among the injection and production wells obtained in the step (1); (4), drawing a plate; and (5), obtaining the corresponding formation pressure gradients on the plate obtained in the step (4) through an injection well permeability-formation pressure gradient curve, and obtaining the injection and production well spacing under the formation pressure gradients according to a formation pressure gradient-injection and production well curve in the corresponding injection and production well pressure differences. According to the method provided by the invention, the conglomerate oil reservoir polymer flooding well pattern well spacing can be obtained rapidly and accurately.

Description

A kind of determination method of Conglomerate Reservoir chemical flooding well spacing
Technical field
A kind of the present invention relates to oil reservoir development technical field, more particularly to determination method of Conglomerate Reservoir chemical flooding well spacing.
Background technology
Conglomerate Reservoir with the deposition characteristics different from conventional sandstone reservoir, the pore structure of conventional physical property and complexity and Heterogeneous reservoirs in plane and on vertical profile, bring great difficulty to the exploitation of Conglomerate Reservoir.Conglomerate Reservoir permeates Rate is one of important content that oil reservoir development is evaluated, and is the ability that rock is allowed fluid from, and permeability is oil storage (gas) rock thing Property important parameter, be the important indicator for predicting oil field development production target and dynamic change situation.
The patent of Application No. 201510847426.5 discloses a kind of oil reservoir Well Pattern And Spacing and determines method and device, foundation Different sedimentary facies and Reservoir type combination is divided, the water drive control of different injection production well arrangements is calculated, with reference to block to be measured Oil in place and results of numerical simulation, draw the overall water drive control of block to be measured and the total well number of different Well Pattern And Spacings Curve chart, and determine the oil reservoir Well Pattern And Spacing of block to be measured according to curve chart.The patent of Application No. 201410638170.2 Disclose a kind of low-permeability oil deposit CO2Drive technical limit well space and determine method, CO is set up by physical test2Drive technological limit to supply Oily radius calculation formula, with the strata pressure distribution situation for obtaining, calculates the proportionality coefficient in mixed phase region and immiscible region domain, Using CO2Drive technical limit well space computing formula and be calculated technical limit well space under the present condition of stratum.Application No. 201510353756.9 patent discloses a kind of method for determining low-permeability oil deposit effective displacement injector producer distance, by water filling When system is connected with oil extraction system, each low-permeability oil deposit pseudo-linear is determined according to the data of flood pattern and the data of oil extraction system Filtrational resistance gradient, it is determined that the effective displacement injector producer distance under the conditions of different average notes adopt pressure differential.Above-mentioned determination well pattern well Away from method, typically all experimental technique or determine method with the Well Pattern And Spacing that non-polymer solution is displacing medium, it is difficult to During actual development suitable for the Conglomerate Reservoir chemical displacement of reservoir oil.
The content of the invention
For above-mentioned technical problem, it is an object of the invention to provide a kind of determination side of Conglomerate Reservoir chemical flooding well spacing Method, provides scientific basis for well net deployment of the technique of polymer flooding in Conglomerate Reservoir development process.
The technical solution used in the present invention is:
A kind of determination method of Conglomerate Reservoir chemical flooding well spacing, comprises the following steps:
(1) the formation pressure gradient k between injection-production well is tried to achieve according to producer-injector spacing and injection-production well pressure reduction:
K=(Pw-P0)/L (1)
In formula, k is the formation pressure gradient between injection-production well, PwFor injection well flowing bottomhole pressure (FBHP), PoFor producing well flowing bottomhole pressure (FBHP), L is producer-injector spacing, Pw- PoFor injection-production well pressure reduction;
(2) according to the formation pressure gradient k between the injection-production well described in injection well permeability and step (1), using right Number recurrence obtains injection well permeability-formation pressure gradient relational expression, such as formula (2):
K=a1ln(a)+b1 (2)
In formula α be injection well permeability, k be injection-production well between formation pressure gradient, a1And b1For regression coefficient;
(3) injection-production well pressure reduction is divided into different interval, according to the injection well permeability and step (1) in each interval Injection-production well between formation pressure gradient, corresponding formation pressure gradient-producer-injector spacing relation is obtained using index return Formula, such as formula (3):
In formula x be injector producer distance, k be injection-production well between formation pressure gradient, a2And b2For regression coefficient;
(4) plate is drawn, injection is drawn according to injection well permeability described in step (2)-formation pressure gradient relational expression Well permeability-formation pressure gradient curve;Drawn according to formation pressure gradient described in step (3)-producer-injector spacing relational expression Formation pressure gradient under different injection-production well pressure reduction-producer-injector spacing curve;
(5) described in step (4) on plate, first according to injection well permeability α, by the injection well permeability-ground Stressor layer gradient curve obtains its corresponding formation pressure gradient, further according to the strata pressure ladder in corresponding injection-production well pressure reduction Degree-producer-injector spacing curve, obtains the producer-injector spacing under the formation pressure gradient.
The determination method of Conglomerate Reservoir chemical flooding well spacing of the present invention, wherein, a in step (2)1=-0.041;b1= 0.3531。
The determination method of Conglomerate Reservoir chemical flooding well spacing of the present invention, wherein, 0.20 in step (3)<a2<0.45;- 0.008<b2<-0.007。
Beneficial effect of the present invention:
(1) the determination method of Conglomerate Reservoir chemical flooding well spacing of the present invention, Method And Principle are clear, quantification, can grasp The property made is strong, is easy to use, and disposes for development plan Well Pattern And Spacing and the construction operation at scene provides reliable reference frame.
(2) the determination method of Conglomerate Reservoir chemical flooding well spacing of the present invention, can rapidly and accurately obtain Conglomerate Reservoir Polymer displacement oil well net well spacing, low cost, efficiency high.For the block of deployed well pattern, adjustment well pattern well can be instructed by the method Away from and injection production pressure difference, for optimized well pattern deployment foundation is provided;Meanwhile, problem of the method to Well Pattern And Spacing under calculating other conditions With stronger reference function.
Description of the drawings
Fig. 1 a are the schematic diagram of injection well permeability-formation pressure gradient curve of the present invention;
When Fig. 1 b are 18MPa for injection-production well pressure reduction, the schematic diagram of formation pressure gradient-producer-injector spacing curve;
When Fig. 1 c are 16MPa for injection-production well pressure reduction, the schematic diagram of formation pressure gradient-producer-injector spacing curve;
When Fig. 1 d are 14MPa for injection-production well pressure reduction, the schematic diagram of formation pressure gradient-producer-injector spacing curve;
When Fig. 1 e are 12MPa for injection-production well pressure reduction, the schematic diagram of formation pressure gradient-producer-injector spacing curve.
Below in conjunction with specific embodiments and the drawings, the invention will be further described.
Specific embodiment
A kind of determination method of Conglomerate Reservoir chemical flooding well spacing, comprises the following steps:
(1) the formation pressure gradient k between injection-production well is tried to achieve according to producer-injector spacing and injection-production well pressure reduction:
K=(Pw-P0)/L
In formula, k is the formation pressure gradient between injection-production well, PwFor injection well flowing bottomhole pressure (FBHP), PoFor producing well flowing bottomhole pressure (FBHP), L is producer-injector spacing, Pw- PoFor injection-production well pressure reduction;L and Pw- PoAnd the result of calculation of k is as shown in table 1;
(2) according to the formation pressure gradient between the injection-production well described in injection well permeability and step (1), using logarithm Recurrence obtains injection well permeability-formation pressure gradient relational expression, such as following formula:
K=-0.041 ln (α)+0.3531
In formula, α is injection well permeability, and k is the formation pressure gradient between injection-production well, and α and k is as shown in table 1;
(3) injection-production well pressure reduction is divided into different interval, according to the injection well permeability and step (1) in each interval Injection-production well between formation pressure gradient, corresponding formation pressure gradient-producer-injector spacing relation is obtained using index return Formula, such as following formula:
During 18MPa:
K=0.4438e-0.008x
During 16MPa:
K=0.2926e-0.007x
During 14MPa:
K=0.2882e-0.007x
During 12MPa:
K=0.2335e-0.007x
In formula, x is injector producer distance, and y is the formation pressure gradient between injection-production well;
(4) plate is drawn, the plate is as shown in figure 1, according to injection well permeability-strata pressure described in step (2) Gradient relation draws injection well permeability-formation pressure gradient curve, as shown in Figure 1a;According to stratum described in step (3) Barometric gradient-producer-injector spacing relational expression draws the formation pressure gradient-producer-injector spacing curve under different injection-production well pressure reduction, such as Shown in Fig. 1 b-1e;
(5), described in step (4) on plate, A points are found according to injection well permeability α first, vertical line and injection is done from A points Well permeability-formation pressure gradient curve intersection obtains its corresponding formation pressure gradient in B points;Horizontal line is done with phase in B points The formation pressure gradient answered-producer-injector spacing curve intersection, in point C, is the strata pressure ladder with injection production pressure difference for 16MPa in Fig. 1 Degree-producer-injector spacing curve intersection, then do vertical line and producer-injector spacing coordinate axess from C points and intersect at D points, the then corresponding number of D points Value is the producer-injector spacing.
The present embodiment drawn according to the actual well spacing data of the multiple blocks of Xinjiang Conglomerate Reservoir, many successes in production With the directive significance with practicable, related data are shown in Table 1, and table 1 is to turn polymer in the Conglomerate Reservoir block water drive later stage Well spacing during drive calculates data, on the basis of raw water drives well pattern, disposes polymerization by the mode such as producing well tuberculosiss and the new well of benefit Thing drives well pattern.
1 plate data table related of table
Embodiment described above is only that the preferred embodiment of the present invention is described, not the model to the present invention Enclose and be defined, on the premise of without departing from design spirit of the present invention, technical side of the those of ordinary skill in the art to the present invention Various modifications and improvement that case is made, all should fall in the protection domain of claims of the present invention determination.

Claims (3)

1. a kind of determination method of Conglomerate Reservoir chemical flooding well spacing, it is characterised in that:Comprise the following steps:
(1) the formation pressure gradient k between injection-production well is tried to achieve according to producer-injector spacing and injection-production well pressure reduction:
K=(Pw-P0)/L (1)
In formula, k is the formation pressure gradient between injection-production well, PwFor injection well flowing bottomhole pressure (FBHP), PoFor producing well flowing bottomhole pressure (FBHP), L is Producer-injector spacing, Pw- PoFor injection-production well pressure reduction;
(2) according to the formation pressure gradient between the injection-production well described in injection well permeability and step (1), using logarithm regression Obtain injection well permeability-formation pressure gradient relational expression, such as formula (2):
K=a1 ln(a)+b1 (2)
In formula α be injection well permeability, k be injection-production well between formation pressure gradient, a1And b1For regression coefficient;
(3) injection-production well pressure reduction is divided into different interval, according to the injection well permeability in each interval and the note described in step (1) The formation pressure gradient between well is adopted, corresponding formation pressure gradient-producer-injector spacing relational expression is obtained using index return, such as Formula (3):
k = a 2 e b 2 X - - - ( 3 )
In formula x be injector producer distance, k be injection-production well between formation pressure gradient, a2And b2For regression coefficient;
(4) plate is drawn, injection well is drawn according to injection well permeability described in step (2)-formation pressure gradient relational expression and is oozed Saturating rate-formation pressure gradient curve;Draw different according to formation pressure gradient described in step (3)-producer-injector spacing relational expression Formation pressure gradient under injection-production well pressure reduction-producer-injector spacing curve;
(5) described in step (4) on plate, first according to injection well permeability α, by the injection well permeability-ground lamination Power gradient curve obtains its corresponding formation pressure gradient, further according to the formation pressure gradient-note in corresponding injection-production well pressure reduction Well well spacing curve is adopted, the producer-injector spacing under the formation pressure gradient is obtained.
2. the determination method of Conglomerate Reservoir chemical flooding well spacing according to claim 1, it is characterised in that:A in step (2)1 =-0.041;b1=0.3531.
3. the determination method of Conglomerate Reservoir chemical flooding well spacing according to claim 1 and 2, it is characterised in that:In step (3) 0.20<a2<0.45;-0.008<b2<-0.007。
CN201611157303.XA 2016-12-15 2016-12-15 A kind of determination method of Conglomerate Reservoir chemical flooding well spacing Active CN106529199B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611157303.XA CN106529199B (en) 2016-12-15 2016-12-15 A kind of determination method of Conglomerate Reservoir chemical flooding well spacing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611157303.XA CN106529199B (en) 2016-12-15 2016-12-15 A kind of determination method of Conglomerate Reservoir chemical flooding well spacing

Publications (2)

Publication Number Publication Date
CN106529199A true CN106529199A (en) 2017-03-22
CN106529199B CN106529199B (en) 2019-01-04

Family

ID=58339514

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611157303.XA Active CN106529199B (en) 2016-12-15 2016-12-15 A kind of determination method of Conglomerate Reservoir chemical flooding well spacing

Country Status (1)

Country Link
CN (1) CN106529199B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111622736A (en) * 2020-04-14 2020-09-04 中国石油大学(华东) Method and system for determining limit well spacing of heavy oil reservoir chemical flooding technology

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090276156A1 (en) * 2008-05-05 2009-11-05 Bp Exploration Operating Company Limited Automated hydrocarbon reservoir pressure estimation
EP2495392A2 (en) * 2007-02-26 2012-09-05 Bp Exploration Operating Company Limited Determining fluid rate and phase information for a hydrocarbon well using predictive models
CN104239703A (en) * 2014-09-03 2014-12-24 中石化江汉石油工程有限公司测录井公司 Quantitative analogical evaluation method for multiple parameters of shale gas reservoir
CN104989341A (en) * 2015-06-24 2015-10-21 中国石油天然气股份有限公司 Method for determining effective displacement injection-production well distance of low-permeability oil reservoirs
CN105019876A (en) * 2014-04-24 2015-11-04 中国石油化工股份有限公司 Staged fracturing horizontal well water-flooding fracture interval and well spacing determining method
CN105401927A (en) * 2015-11-27 2016-03-16 中国石油天然气股份有限公司 Method and device for determining well pattern and well spacing of oil reservoir
CN105626006A (en) * 2014-11-07 2016-06-01 中国石油化工股份有限公司 CO2 drive technological limit well spacing determination method for low-permeability oil reservoir
CN105626023A (en) * 2014-11-07 2016-06-01 中国石油化工股份有限公司 Well test determination method for vertical fracturing fracture azimuth of low-permeability oil reservoir
CN106126866A (en) * 2016-08-09 2016-11-16 中国石油天然气股份有限公司 Sand-proof method for oil-gas well based on geomechanics model and device

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2495392A2 (en) * 2007-02-26 2012-09-05 Bp Exploration Operating Company Limited Determining fluid rate and phase information for a hydrocarbon well using predictive models
US20090276156A1 (en) * 2008-05-05 2009-11-05 Bp Exploration Operating Company Limited Automated hydrocarbon reservoir pressure estimation
CN105019876A (en) * 2014-04-24 2015-11-04 中国石油化工股份有限公司 Staged fracturing horizontal well water-flooding fracture interval and well spacing determining method
CN104239703A (en) * 2014-09-03 2014-12-24 中石化江汉石油工程有限公司测录井公司 Quantitative analogical evaluation method for multiple parameters of shale gas reservoir
CN105626006A (en) * 2014-11-07 2016-06-01 中国石油化工股份有限公司 CO2 drive technological limit well spacing determination method for low-permeability oil reservoir
CN105626023A (en) * 2014-11-07 2016-06-01 中国石油化工股份有限公司 Well test determination method for vertical fracturing fracture azimuth of low-permeability oil reservoir
CN104989341A (en) * 2015-06-24 2015-10-21 中国石油天然气股份有限公司 Method for determining effective displacement injection-production well distance of low-permeability oil reservoirs
CN105401927A (en) * 2015-11-27 2016-03-16 中国石油天然气股份有限公司 Method and device for determining well pattern and well spacing of oil reservoir
CN106126866A (en) * 2016-08-09 2016-11-16 中国石油天然气股份有限公司 Sand-proof method for oil-gas well based on geomechanics model and device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111622736A (en) * 2020-04-14 2020-09-04 中国石油大学(华东) Method and system for determining limit well spacing of heavy oil reservoir chemical flooding technology
CN111622736B (en) * 2020-04-14 2023-04-07 中国石油大学(华东) Method and system for determining limit well spacing of heavy oil reservoir chemical flooding technology

Also Published As

Publication number Publication date
CN106529199B (en) 2019-01-04

Similar Documents

Publication Publication Date Title
CN110334431B (en) Single-well control reserve calculation and residual gas analysis method for low-permeability tight gas reservoir
CN105095986B (en) The method of stratified reservoir overall yield prediction
CN105840187B (en) Compactness reservoir horizontal well staged fracturing Productivity
CN104879103B (en) A kind of seperated layer water injection effect analysis method
CN105243182B (en) Fine and close oil pressure splits the dynamic holdup computational methods of horizontal well
CN106894814B (en) Rapid identification method for secondary enrichment of residual oil in high-water-content later period of complex fault block oil reservoir
CN102041995B (en) System for monitoring complicated oil deposit flooding conditions
CN103939066B (en) An a kind of note adopts the method that well group determines water injection rate determination oilwell produced fluid amount more
CN105386751B (en) A kind of horizontal wellbore logging PRODUCTION FORECASTING METHODS based on reservoir model
CN104533370A (en) Oil deposit, crack and shaft fully-coupled simulating method of fractured horizontal well
CN105738252B (en) The measurement method of the flowable aperture boundary of viscous crude in a kind of crack
CN105041307A (en) Industrial procedure for identifying preferential seepage channels of oil and gas reservoirs of clastic rock
CN103455667B (en) Aeration administers the method for numerical simulation of artesian aquifer seawater invasion
CN105822302A (en) Oil-water distribution recognition method based on well-ground potential method
CN105089595A (en) Oil reservoir numerical simulation method and device under the action of horizontal fracturing fracture diversion
CN104091069A (en) Method for determining oil driving efficiency and sweep coefficient of all layers and positions of heterogeneous reservoir stratum
CN107038268A (en) A kind of method for determining heterogeneous reservoir five-spot pattern water drive sweep efficiency
CN105260543A (en) Double-pore model-based multi-medium oil gas flow simulation method and device
CN114427432B (en) Method for determining development potential of residual gas in gas reservoir
Silin et al. A model of buoyancy-driven two-phase countercurrent fluid flow
CN104727789B (en) Dynamic description method of medium-high-permeability sandstone reservoir water flooding sweep efficiency and water flooding pore volumes
Liu et al. The Control Theory and Application for Well Pattern Optimization of Heterogeneous Sandstone Reservoirs
CN106529199A (en) Determining method for conglomerate oil reservoir chemical flooding well spacing
CN115841083A (en) Method for determining injection allocation amount of water injection well pressure flooding
CN106930759A (en) A kind of Forecasting Methodology of low permeability sandstone reservoir production capacity

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201109

Address after: Intercontinental building, 16 ande Road, Dongcheng District, Beijing, 100007

Patentee after: PetroChina Co.,Ltd.

Address before: 834000 No. 29, Junggar Road, Karamay District, the Xinjiang Uygur Autonomous Region, Karamay

Patentee before: RESEARCH INSTITUTE OF EXPLORATION & DEVELOPMENT, PETROCHINA XINJIANG OILFIELD Co.