CN106528968A - 一种基于ssd文件的智能变电站自动动模测试方法 - Google Patents
一种基于ssd文件的智能变电站自动动模测试方法 Download PDFInfo
- Publication number
- CN106528968A CN106528968A CN201610927869.XA CN201610927869A CN106528968A CN 106528968 A CN106528968 A CN 106528968A CN 201610927869 A CN201610927869 A CN 201610927869A CN 106528968 A CN106528968 A CN 106528968A
- Authority
- CN
- China
- Prior art keywords
- test
- intelligent substation
- model
- ssd file
- information
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/30—Circuit design
- G06F30/36—Circuit design at the analogue level
- G06F30/367—Design verification, e.g. using simulation, simulation program with integrated circuit emphasis [SPICE], direct methods or relaxation methods
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
Landscapes
- Engineering & Computer Science (AREA)
- Computer Hardware Design (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Microelectronics & Electronic Packaging (AREA)
- Evolutionary Computation (AREA)
- Geometry (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
本发明涉及一种基于SSD文件的智能变电站自动动模测试方法,首先基于SSD文件,自动建立系统模型;接着根据建立的系统模型,关联二次设备与一次系统;最后进行自动动模标准化测试。本发明可将智能变电站的动模测试难度降低,且形成自动化的测试方案,易将测试过程标准化。
Description
技术领域
本发明涉及电力系统自动化设计领域,特别是一种基于SSD文件的智能变电站自动动模测试方法。
背景技术
电力系统是发电厂、电力网和电力负荷组成的电能生产、输送和应用转化的统一系统,发、输、用电是同一瞬间进行并完成的连续过程。电力系统中各电气设备或直接连接或相互电磁耦合,系统实际试验非常困难,绝大多数试验都在仿真模型上进行,电力系统动态模拟就是一种用于研究电力系统动态特性的物理模拟。近年来计算机软硬件技术的应用使电力系统动态模拟技术在软硬件平台测控统一模型、分布式网络测量系统、仿真器中虚拟现实技术及多媒体技术的应用、智能仿真尤其是人-机复杂大系统的建模和仿真等方面取得了迅猛发展。
但是现有的电力系统动态模拟测试均是采用人工进行系统建模,工作量大,且需要专业人员进行配置,参数配置工作量较大,且一个参数配置错误将引起整个系统的测试不准确。
发明内容
有鉴于此,本发明的目的是提出一种基于SSD文件的智能变电站自动动模测试方法,可将智能变电站的动模测试难度降低,且形成自动化的测试方案,易将测试过程标准化。
本发明采用以下方案实现:一种基于SSD文件的智能变电站自动动模测试方法,具体包括以下步骤:
步骤S1:基于SSD文件,自动建立系统模型;
步骤S2:根据步骤S1建立的系统模型,关联二次设备与一次系统;
步骤S3:进行自动动模标准化测试:通过智能变电站MMS网络读取继电保护系统定值;根据不同间隔的不同测试要求,进行故障设置;动模测试开始,并接收继电保护装置的MMS信息、GOOSE信息及SV信息;根据测试内容及接收到的MMS信息、GOOSE信息、SV信息判断试验的正确与否,并完成测试报告的生成。
进一步地,所述步骤S1具体包括以下步骤;
步骤S11:通过解析SCD文件,获取SSD文件中关于电力系统模型的参数,根据SSD文件中Substation变电站模型、Voltage Level电压等级模型、bay模型、Equipment设备对象模型,建立智能变电站一次系统模型;
步骤S12:解析取得一次系统模型的各个参数,完成智能变电一次系统的模型搭建;根据变电站的规模及容量,设定系统电源参数、变电站负荷参数;
步骤S13:根据步骤S12生成的智能变电站一次系统模型,以bay为最小单元,设置系统的故障类型。
进一步地,所述步骤S2具体包括以下步骤:
步骤S21:解析智能变电站SSD文件中关于一次设备与二次设备关联模型部分,将被测试智能电子设备与对应一次设备间隔进行关联;
步骤S22:将一次系统模型与动模测试系统功率源或数字信号源进行关联,完成一次系统模型与实际被测二次系统的关联;
步骤S23:将功率源或数字信号源与二次设备物理连接,完成自动动模测试的基础准备。
与现有技术相比,本发明有以下有益效果:本发明能够提高动模测试的建模效率,降低测试人员的要求;本发明能够实现动模测试的标准化。
附图说明
图1为本发明实施例中安兜220kV变电站主接线示意图。
图2为本发明实施例中安兜110kV母间隔示意图。
具体实施方式
下面结合附图及实施例对本发明做进一步说明。
本实施例提供了一种基于SSD文件的智能变电站自动动模测试方法,包括三个步骤。
第一步,基于SSD文件的系统自动建模方法。
根据SSD文件中的一次部分的描述,建立起智能变电站一次系统模型。首先根据Substation变电站模型,可得到变电站基本信息:这个变电站的名称为安兜变电站,位于福州。
其次根据Voltage Level电压等级模型,可得变电站有两个电压等级220kV、110kV。根据bay模型,可得,220kV电压等级有一个25B开关间隔、一个#1主变间隔(如图1所示);110kV电压等级有15B开关间隔、110kV I母线间隔(如图2所示)。
根据Equipment设备对象模型,可得到每个间隔内所有的一次设备、变压器的绕组数以及每个间隔间的连接点。
至此,跟据SSD文件建立起变电站一次系统模型,根据建立起的主接线图自动生成故障点,如图1所示,安兜220kV变电站主接线中D1~D5闪电所示。其中每个故障点包含故障单相接地(金属、经小电阻)、两相接地、相间短路、三相短路等故障。其中接地点的选择按以下规律:
1)线路及主变进线间隔:电流互感器两侧各有一个故障点。
2)主变间隔:主变各侧。
3)母线间隔:任意一个连接点。
4)电抗器、电容器间隔以及母联分段间隔参照线路间隔。
5)两个间隔连接点仅取一个间隔,靠母线侧则取母线间隔故障点。
第二步,关联二次设备与一次系统。
根据SSD文件中的关联,可知该变电站主变高压侧配置PT2201A、PT2201B两套保护装置以及CT2201A一套测控装置。保护装置PT2201A有PDIF、PVOC两个逻辑节点;PT2201B有PDIF、PDIS两个逻辑节点。测控装置CT2201A有MMXU逻辑节点。
同理可知,主变低压侧与主变低压侧进线间隔共用CT1101A测控装置。测控装置CT1101A有MMXU逻辑节点关联到主变低压侧绕组,通过CSWI、CILO、MMXU三个逻辑节点控制断路器,通过CSWI、CILO两个逻辑节点控制隔离开关。如图2所示:至此,将一二次设备信息关联起来。
第三步,自动动模标准化测试方法,具体包括以下4个小步骤。
1、通过智能变电站MMS网络读取继电保护系统定值;
通过MMS网读取继电保护系统定值,如线路主保护采用过流速断保护,保护的线路全长70%。
2、根据不同间隔的不同测试要求,进行故障设置;
这里根据规范,以线路保护金属性故障为例进行说明。根据保护的定值(70%),分别设置线路全长14%和56%处的金属单相接地故障。
3、动模测试开始,并接收继电保护装置(安全自动装置)的MMS、GOOSE及SV等信息。
根据一次设备与二次设备的关联信息,将模拟电流(SV报文)接入保护装置(PT2201A),或测控装置(CT2201A);并接收保护装置(PT2201A),或测控装置(CT2201A)发出的GOOSE信息,完成测试的闭环信息采集。
1、根据测试内容及接收到的MMS、GOOSE等信息判断试验的正确与否,并完成测试报告的生成。
在本实施例中,SCD文件为智能变电站全站系统配置文件,SSD文件为智能变电站系统规格文件。
以上所述仅为本发明的较佳实施例,凡依本发明申请专利范围所做的均等变化与修饰,皆应属本发明的涵盖范围。
Claims (3)
1.一种基于SSD文件的智能变电站自动动模测试方法,其特征在于:包括以下步骤:
步骤S1:基于SSD文件,自动建立系统模型;
步骤S2:根据步骤S1建立的系统模型,关联二次设备与一次系统;
步骤S3:进行自动动模标准化测试:通过智能变电站MMS网络读取继电保护系统定值;根据不同间隔的不同测试要求,进行故障设置;动模测试开始,并接收继电保护装置的MMS信息、GOOSE信息及SV信息;根据测试内容及接收到的MMS信息、GOOSE信息、SV信息判断试验的正确与否,并完成测试报告的生成。
2.根据权利要求1所述的一种基于SSD文件的智能变电站自动动模测试方法,其特征在于:所述步骤S1具体包括以下步骤;
步骤S11:通过解析SCD文件,获取SSD文件中关于电力系统模型的参数,根据SSD文件中Substation变电站模型、Voltage Level电压等级模型、bay模型、Equipment设备对象模型,建立智能变电站一次系统模型;
步骤S12:解析取得一次系统模型的各个参数,完成智能变电一次系统的模型搭建;根据变电站的规模及容量,设定系统电源参数、变电站负荷参数;
步骤S13:根据步骤S12生成的智能变电站一次系统模型,以bay为最小单元,设置系统的故障类型。
3.根据权利要求1所述的一种基于SSD文件的智能变电站自动动模测试方法,其特征在于:所述步骤S2具体包括以下步骤:
步骤S21:解析智能变电站SSD文件中关于一次设备与二次设备关联模型部分,将被测试智能电子设备与对应一次设备间隔进行关联;
步骤S22:将一次系统模型与动模测试系统功率源或数字信号源进行关联,完成一次系统模型与实际被测二次系统的关联;
步骤S23:将功率源或数字信号源与二次设备物理连接,完成自动动模测试的基础准备。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610927869.XA CN106528968B (zh) | 2016-10-31 | 2016-10-31 | 一种基于ssd文件的智能变电站自动动模测试方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610927869.XA CN106528968B (zh) | 2016-10-31 | 2016-10-31 | 一种基于ssd文件的智能变电站自动动模测试方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106528968A true CN106528968A (zh) | 2017-03-22 |
CN106528968B CN106528968B (zh) | 2019-05-14 |
Family
ID=58293125
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610927869.XA Active CN106528968B (zh) | 2016-10-31 | 2016-10-31 | 一种基于ssd文件的智能变电站自动动模测试方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106528968B (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107171830A (zh) * | 2017-04-25 | 2017-09-15 | 上海科梁信息工程股份有限公司 | 电力信息物理硬件在环安全性仿真测试平台 |
CN107340858A (zh) * | 2017-06-14 | 2017-11-10 | 贵州电网有限责任公司 | 一种基于变电站设计scd自动化设备虚拟现实装置 |
CN109872112A (zh) * | 2017-12-05 | 2019-06-11 | 国家电网公司 | 一种智能变电站全自动闭环检测方法及装置 |
CN111639141A (zh) * | 2020-05-26 | 2020-09-08 | 李云祥 | 数据测试方法、装置及计算机终端 |
US11327114B2 (en) | 2018-06-15 | 2022-05-10 | State Grid Hebei Electric Power Research Institute | Fully-automatic closed-loop detection method and device for intelligent substation |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101710735A (zh) * | 2009-12-11 | 2010-05-19 | 江西省电力科学研究院 | 智能变电站和主站共享建模方法 |
US7810005B1 (en) * | 2006-11-01 | 2010-10-05 | Credence Systems Corporation | Method and system for correcting timing errors in high data rate automated test equipment |
CN104868599A (zh) * | 2015-05-29 | 2015-08-26 | 国网河南省电力公司电力科学研究院 | 一种智能变电站报文仿真测试与关联分析系统及仿真方法 |
CN105373655A (zh) * | 2015-11-04 | 2016-03-02 | 国网电力科学研究院武汉南瑞有限责任公司 | 一种有机关联智能化变电站一二次系统连接图的方法 |
CN105429291A (zh) * | 2015-10-26 | 2016-03-23 | 山东网聪信息科技有限公司 | 智能变电站一次接线图和二次系统逻辑连接图的关联方法 |
-
2016
- 2016-10-31 CN CN201610927869.XA patent/CN106528968B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7810005B1 (en) * | 2006-11-01 | 2010-10-05 | Credence Systems Corporation | Method and system for correcting timing errors in high data rate automated test equipment |
CN101710735A (zh) * | 2009-12-11 | 2010-05-19 | 江西省电力科学研究院 | 智能变电站和主站共享建模方法 |
CN104868599A (zh) * | 2015-05-29 | 2015-08-26 | 国网河南省电力公司电力科学研究院 | 一种智能变电站报文仿真测试与关联分析系统及仿真方法 |
CN105429291A (zh) * | 2015-10-26 | 2016-03-23 | 山东网聪信息科技有限公司 | 智能变电站一次接线图和二次系统逻辑连接图的关联方法 |
CN105373655A (zh) * | 2015-11-04 | 2016-03-02 | 国网电力科学研究院武汉南瑞有限责任公司 | 一种有机关联智能化变电站一二次系统连接图的方法 |
Non-Patent Citations (4)
Title |
---|
侯艾君等: "《基于扩展SSD的变电站全景建模方法》", 《广东电力》 * |
张志鹏等: "《智能变电站二次设备自动测试系统的设计和实现》", 《科技与生活》 * |
林冶等: "《智能变电站二次系统现场调试技术研究》", 《电力与电工》 * |
赵涵等: "《基于IEC61850的系统描述工具中的SSD文件生成算法》", 《电工电能新技术》 * |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107171830A (zh) * | 2017-04-25 | 2017-09-15 | 上海科梁信息工程股份有限公司 | 电力信息物理硬件在环安全性仿真测试平台 |
CN107340858A (zh) * | 2017-06-14 | 2017-11-10 | 贵州电网有限责任公司 | 一种基于变电站设计scd自动化设备虚拟现实装置 |
CN107340858B (zh) * | 2017-06-14 | 2020-12-11 | 贵州电网有限责任公司 | 一种基于变电站设计scd自动化设备虚拟现实装置 |
CN109872112A (zh) * | 2017-12-05 | 2019-06-11 | 国家电网公司 | 一种智能变电站全自动闭环检测方法及装置 |
CN109872112B (zh) * | 2017-12-05 | 2021-08-10 | 国家电网公司 | 一种智能变电站全自动闭环检测方法及装置 |
US11327114B2 (en) | 2018-06-15 | 2022-05-10 | State Grid Hebei Electric Power Research Institute | Fully-automatic closed-loop detection method and device for intelligent substation |
CN111639141A (zh) * | 2020-05-26 | 2020-09-08 | 李云祥 | 数据测试方法、装置及计算机终端 |
CN111639141B (zh) * | 2020-05-26 | 2023-08-15 | 湖北华中电力科技开发有限责任公司 | 数据测试方法、装置及计算机终端 |
Also Published As
Publication number | Publication date |
---|---|
CN106528968B (zh) | 2019-05-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106528968B (zh) | 一种基于ssd文件的智能变电站自动动模测试方法 | |
CN103105550B (zh) | 一种智能化继电保护装置检测方法及系统 | |
CN109031000B (zh) | 一种基于非故障扰动就地测量电网短路容量的方法及系统 | |
CN102510131B (zh) | 智能变电站整体性能试验方法及其测试装置 | |
CN103605015B (zh) | 高精度电气参数测量型干式电抗器在线监测装置及方法 | |
CN102937685B (zh) | 一种变电站用基于实时仿真技术的一体化测试平台 | |
CN104122474B (zh) | 一种智能分布式馈线自动化逻辑测试系统 | |
CN102957204B (zh) | 一种配电网终端的智能仿真方法及系统 | |
CN103605357B (zh) | 配电网分界开关控制装置的测试系统 | |
CN101153884A (zh) | 继电保护稳态数字动模测试系统 | |
Tolbert et al. | Reconfigurable real-time power grid emulator for systems with high penetration of renewables | |
CN106814263A (zh) | 一种半实物仿真并网检测系统及方法 | |
CN102760192B (zh) | 基于实时数字仿真器的电力系统闭环验证平台及验证方法 | |
CN101915888A (zh) | ±800kV直流输电线路雷击干扰的可拓融合识别方法 | |
CN109918725A (zh) | 基于仿真平台二次设备建模的集成化测试方法 | |
CN107491569A (zh) | 基于iec61850标准goose、sv技术的变电站系统故障在线仿真方法 | |
CN105449847A (zh) | 一种数字化变电站测试系统 | |
CN103197131B (zh) | 光伏发电系统的性能检测系统 | |
CN105637730B (zh) | 电力系统及控制电力系统中的电力潮流和/或电压的方法 | |
CN104166743A (zh) | 电网仿真系统和方法 | |
CN113391145A (zh) | 配电自动化馈线终端的测试系统 | |
CN104317987A (zh) | 一种短路电流仿真计算的误差分析方法 | |
CN102611085B (zh) | 一种连锁跳闸仿真分析方法 | |
Quan et al. | The real-time digital simulation system for distribution network | |
Pazdcrin et al. | Platform for testing IEC 61850 control systems using real-time simulator |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |