CN106523448B - The uniform tensioning intelligent tensioning system of the power such as prestressing tendon and its method for the uniform tensioning of the power such as prestressing tendon - Google Patents

The uniform tensioning intelligent tensioning system of the power such as prestressing tendon and its method for the uniform tensioning of the power such as prestressing tendon Download PDF

Info

Publication number
CN106523448B
CN106523448B CN201611114719.3A CN201611114719A CN106523448B CN 106523448 B CN106523448 B CN 106523448B CN 201611114719 A CN201611114719 A CN 201611114719A CN 106523448 B CN106523448 B CN 106523448B
Authority
CN
China
Prior art keywords
power
pretension
tensioning
integral tension
jack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611114719.3A
Other languages
Chinese (zh)
Other versions
CN106523448A (en
Inventor
王祯
苏伟
禚一
王旭
顾津申
邸昊
王淑敏
覃映昶
张皓
邓年春
苏庆勇
谢辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Design Corp
Liuzhou OVM Machinery Co Ltd
Original Assignee
China Railway Design Corp
Liuzhou OVM Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Design Corp, Liuzhou OVM Machinery Co Ltd filed Critical China Railway Design Corp
Priority to CN201611114719.3A priority Critical patent/CN106523448B/en
Publication of CN106523448A publication Critical patent/CN106523448A/en
Application granted granted Critical
Publication of CN106523448B publication Critical patent/CN106523448B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B11/00Servomotor systems without provision for follow-up action; Circuits therefor
    • F15B11/16Servomotor systems without provision for follow-up action; Circuits therefor with two or more servomotors
    • F15B11/17Servomotor systems without provision for follow-up action; Circuits therefor with two or more servomotors using two or more pumps
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F3/00Devices, e.g. jacks, adapted for uninterrupted lifting of loads
    • B66F3/24Devices, e.g. jacks, adapted for uninterrupted lifting of loads fluid-pressure operated

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Structural Engineering (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Abstract

A kind of uniform tensioning intelligent tensioning system of the power such as prestressing tendon, including the power pretension integral tension intelligence such as m platforms jack, high-pressure oil pipe, data wire, n intelligent hydraulic pumping plant and control system, the power pretension integral tension intelligence jack such as described is made up of the power such as twisted wire pre-tightening apparatus, integral tension clamping device, punching integral tension device and displacement measuring device;Under working condition, the steel strand wires at prestressing tendon both ends to be tensioned through work anchor slab, work clip sheet, limiting plate and tool clamping piece with etc. the anchored end of the power pre-tightening apparatus such as the twisted wire of power pretension integral tension intelligence jack be connected;Connected by high-pressure oil pipe etc. between each jack and pumping plant of power pretension integral tension intelligence jack, be connected etc. between power pretension integral tension intelligence jack and control system by data wire.The system tensioning quality is good, operating efficiency is high, the problem of prestressing force intelligent tensioning system of existing entire beam tension can be overcome to exist.M, n is any even number less than 50 more than or equal to 2.

Description

The uniform tensioning intelligent tensioning system of the power such as prestressing tendon and its for power such as prestressing tendons The method of uniform tensioning
Technical field
The present invention relates to a kind of engineering tensioning system and its application, the uniform tensioning intelligence of the power such as particularly a kind of prestressing tendon Tensioning system and its method for the uniform tensioning of the power such as prestressing tendon.
Background technology
The tensioning of prestressing tendon is when concrete reaches certain intensity, and tensioning is carried out using prestressed stretch-draw equipment; Tensioner system generally comprises the composition such as hydraulic jack, supporting high-pressure oil pump, pressure gauge and external oil pipe, it and anchorage Support the use.
In recent years, prestressing force intelligent tensioning heat has been started both at home and abroad;Prestressing force intelligent tensioning is to use intelligent tensioning system System, automatic, synchronous and accurate tensioning is carried out to prestressing tendon;It is to control stretching oil pump and jack by computer, is utilized The measurement data of force cell and displacement transducer is fed back, and realizes prestressing force synchronization and accurate tensioning, while to stretching process Data are stored, and can retrieve for examination historical data at any time;Interference from human factor can be so eliminated, is effective to ensure that prestressed stretch-draw Construction quality.
The intelligent tensioning system patent of domestic applications is relatively more, but its structure is substantially all, including intelligent jack, intelligence Can pumping plant, control system(Independent or embedded pumping plant)It is interior;Its jack is the form using integral tension, and each jack includes A set of work anchor, kit anchor, all prestressing force twisted wires are anchored first with moveable anchor and carry out tensioning, then put Zhang Zaijin OK;The intelligent jack and tensioning system that these patents use, are all entire beam tensions, are carried out without the single strand in halved tie Tensioning;After prestressing tendon steel stranded wire penetrating adapter, moveable anchor is loaded onto at steel strand wires both ends simultaneously and intermediate plate carries out prestressing force entire beam tension, And the tension force of each single strand is not adjusted, each steel strand wires unbalance stress in prestressing tendon certainly will be caused;The initial stress of prestressing tendon Uniformity does not ensure fracture of wire or stripped thread phenomenon easily occur, and influences prestressing tendon relaxation property, turns into effective prestress and damages for a long time Lose one of the main reason for excessive;If prestressing tendon steel stranded wire penetrating adapter, installation tool anchor and then use single steel strand are used Jack carries out, by root pretension tensioning, to accomplish that initial stress is uniform, but should for several or even tens of the pre- of steel strand wires composition Power Shu Eryan, operating efficiency are too low;At present both at home and abroad, it there is no the power such as integrated prestressing tendon entire beam tension and each steel strand wires initial stress The demand of tensioning two is in the prestressing force pull system of integration.
The content of the invention
It is an object of the invention to:There is provided a kind of power such as prestressing tendon uniform tensioning intelligent tensioning system, the system is one The initial stress tensioning such as the integrated each steel strand wires of prestressing tendon of kind and entire beam tension function are in uniform tensioning of power such as the prestressing tendons of one Intelligent tensioning system, while the method that the system is used for the uniform tensioning of power such as prestressing tendon is provided, to solve prior art Existing above mentioned problem.
The technical scheme to solve the above problems is:A kind of uniform tensioning intelligent tensioning system of the power such as prestressing tendon, its feature It is:The uniform tensioning intelligent tensioning system of the power such as the prestressing tendon includes power pretension integral tension intelligence jack, the height such as m platforms Pressuring oil pipe, data wire, n intelligent hydraulic pumping plant and control system;M, n span is:M, n is respectively small more than or equal to 2 In 50 any even number;
The power pretension integral tension intelligence jack such as described by the power such as twisted wire pre-tightening apparatus, integral tension clamping device, wear Heart integral tension device and the part of displacement measuring device four composition;Punching integral tension device positioned at etc. power pretension integral tension intelligence The rearmost end of energy jack, integral tension clamping device are installed on by bolt on the piston of punching integral tension device;Twisted wire It is installed on etc. power pre-tightening apparatus by bolt on the fixed piston of integral tension clamping device;Displacement measuring device is pacified by bolt Loaded on punching integral tension device;
The intelligent hydraulic pumping plant is to provide power for jack top, and the hydraulic power exported by pumping plant drives jack Stretch cylinder and contracting cylinder;Each intelligent hydraulic pumping plant includes motor, plunger pump, control valve, hydraulic transducer and fuel tank;Every pumping plant can Drive the power pretension integral tension intelligence jack such as one or more;
The independent control that the control system includes the integrated control system being integrated in intelligent hydraulic pumping plant or is independently arranged System processed;Including each self-driven one or more by a main intelligent hydraulic pumping plant with control system and more auxiliary pump stations The power pretension integral tension intelligence jack such as platform;An either control system controls more intelligent hydraulic pumping plants, intelligent hydraulic Pumping plant drives the power pretension integral tension intelligence jack such as one or more;
Under working condition, the steel strand wires at prestressing tendon both ends to be tensioned pass through work anchor slab, work clip sheet, limiting plate and work Tool intermediate plate with etc. the anchored end of the power pre-tightening apparatus such as the twisted wire of power pretension integral tension intelligence jack be connected;It is overall etc. power pretension Connected between each jack and pumping plant of tensioning intelligence jack by high-pressure oil pipe, etc. power pretension integral tension intelligence jack It is connected between control system by data wire.
The further technical scheme of the uniform tensioning intelligent tensioning system of the power such as described prestressing tendon is:The power pretension such as described The power pre-tightening apparatus such as the twisted wire of integral tension intelligence jack include single pretension piston, seal assembly, rear end cap, cylinder barrel, preceding By being threadably mounted on cylinder barrel, seal assembly is arranged on single pretension piston for end cap and tool clamping piece, rear end cap and drive end bearing bracket On, the power pre-tightening apparatus such as whole twisted wire is divided into independent sealing tensioning cavity and sealing backhaul cavity;All single pretensions are lived The sealing tensioning cavity of plug is interconnected, and the sealing backhaul cavity of all single pretension pistons is interconnected.
The integral tension clamping device of the power pretension integral tension intelligence jack such as described includes fixed piston, top anchor group Part, instrument anchor slab, movable cylinder barrel, tool clamping piece, tight anchor pressing plate and preloading spring;Top anchor assemblies are fixed on work by bolt On moveable cylinder, instrument anchor slab is fixed on fixed piston by bolt, and tight anchor pressing plate is fixed on activity by bolt On cylinder barrel, tool clamping piece and preloading spring are arranged on instrument anchor slab, are fixed by tight anchor pressing plate pretension;Movable cylinder barrel or so moves It is dynamic, drive top anchor assemblies and tight anchor pressing plate to realize automatic clamping and loose anchor.
The punching integral tension device of the power pretension integral tension intelligence jack such as described includes location nut, plug, work Plug, oil cylinder, punching set, rear sealing plate, hold-down ring, rear position plate and guide cylinder;Piston is arranged in oil cylinder, and oil cylinder both ends pass through Screw thread installation location nut, plug, rear sealing plate and hold-down ring;Punching set is arranged on plug;Guide cylinder is installed by screw thread In location nut, rear position plate matches with guide cylinder and is installed on punching by bolt and puts.
Related another technical scheme is:A kind of method of the uniform tensioning of the power such as prestressing tendon, it is using in the present invention The method that the uniform tensioning intelligent tensioning system of the power such as the prestressing tendon stated realizes the uniform tensioning of the power such as prestressing tendon, in implementation process In, a holding device is respectively adopted etc. each steel strand wires in power pretension integral tension intelligence jack pair prestressing tendon, respectively Holding device is isobaric using connection, the power pretension such as carries out to the primary stress of steel strand wires;The uniform tensioning intelligence of the power such as prestressing tendon Tensioning system carries out the clamping of entire beam tension intermediate plate, the whole beam synchronization grading tension of more jacking rows, while automatic record to prestressing tendon The stretch value of steel strand wires in the uniform stretching process of the power such as prestressing tendon.
A kind of method of the uniform tensioning of the power such as described prestressing tendon comprises the concrete steps that:
A, system is installed:
A1, reeve and installment work anchor slab, work clip sheet, limiting plate, tool clamping piece;
By the steel strand wires at prestressing tendon both ends to be tensioned through work anchor slab, work clip sheet, limiting plate and tool clamping piece with The anchored end of the power pre-tightening apparatus such as the twisted wire etc. power pretension integral tension intelligence jack is connected;
The power pretension integral tension intelligence jack such as A2, installation and control system:
By etc. power pretension integral tension intelligence jack each jack and pumping plant between connected by high-pressure oil pipe, etc. power It is connected between pretension integral tension intelligence jack and control system by data wire;
B, tensioning:
The power pretension tensioning such as B1, more twisted wires:The power pretension tensioning such as more twisted wires is carried out by the power such as twisted wire pre-tightening apparatus;
B2:The clamping of entire beam tension intermediate plate, the whole beam synchronization grading tension of more jacking rows:When through power such as B1 steps, more twisted wires When pretension tensioning is tightened to the 10% of design stretching force in advance, system automatically selects carries out entire beam tension folder by integral tension clamping device Piece clamps, and is held in place;Each pretension piston retraction of the power pre-tightening apparatus such as twisted wire, then carries out whole beam by punching integral tension device Synchronous grading tension and pause;
C:Unloading anchoring, Song Jia:After the completion of pressurize to be tensioned, carry out slowly unloading and complete, integral tension clamping device is opened Begin to unclamp the power pretension integral tension such as intermediate plate, dismounting intelligence.
The uniform tensioning intelligent tensioning system of the power such as the prestressing tendon of the present invention is integrated prestressing tendon steel strand wires single tendon stretch Function with integral tension is in the tensioning system of one, to prestressing tendon initial stress and entire beam tension power, respectively disposable tensioning In place, and for intelligent jack, Intelligent pumping station the intelligent tensioning system combined, therefore a kind of power such as prestressing tendon of the present invention The uniform tensioning intelligent tensioning system and its method for the uniform tensioning of the power such as prestressing tendon has the characteristics that and beneficial effect:
1st, tensioning quality is good, can overcome existing for the prestressing force intelligent tensioning system of existing entire beam tension in prestressing tendon beam Each steel strand wires unbalance stress;The initial stress uniformity of prestressing tendon does not ensure the problem of fracture of wire or stripped thread phenomenon easily occur:
A kind of uniform tensioning intelligent tensioning system of the power such as prestressing tendon of invention and its uniformly opened for power such as prestressing tendons The method of drawing is adopted respectively in implementation process etc. each steel strand wires in power pretension integral tension intelligence jack pair prestressing tendon With a holding device, each holding device is isobaric using connection, the power pretension such as carries out to the primary stress of steel strand wires;Prestressing tendon The clamping of entire beam tension intermediate plate, the synchronously classification of the whole beam of more jacking rows are carried out to prestressing tendon etc. the uniform tensioning intelligent tensioning system of power Draw;
And existing prestressing force intelligent tensioning system is all entire beam tension, the single strand in no halved tie is opened Draw;After prestressing tendon steel stranded wire penetrating adapter, moveable anchor is loaded onto at steel strand wires both ends simultaneously and intermediate plate carries out prestressing force entire beam tension, and The tension force of each single strand is not adjusted, certainly will cause each steel strand wires unbalance stress in prestressing tendon beam;The initial stress of prestressing tendon Uniformity does not ensure fracture of wire or stripped thread phenomenon easily occur.
2nd, operating efficiency is high:
The uniform tensioning intelligent tensioning system of the power such as the prestressing tendon of the present invention is the power pretensions such as integrated prestressing tendon steel strand wires Function with integral tension is in the tensioning system of one, to prestressing tendon initial stress and entire beam tension power, respectively disposable tensioning In place, operating efficiency is high.
3rd, structure type is various, applied widely:
1. the uniform tensioning intelligent tensioning system of the power such as the prestressing tendon of the present invention can drive one by an intelligent hydraulic pumping plant Platform integral tension intelligence jack forms, and completes the power pretensions such as more twisted wires and integral tension continuously operation function free of discontinuities.
2. the uniform tensioning intelligent tensioning system of the power such as the prestressing tendon of the present invention also can by a main intelligent hydraulic pumping plant and The power pretension integral tension intelligence jack composition such as each self-driven one or more of more auxiliary pump stations, completes the power such as more twisted wires The continuous operation function free of discontinuities of pretension and integral tension.
3. the uniform tensioning intelligent tensioning system of the power such as the prestressing tendon of the present invention can also control more by a bench control system Intelligent hydraulic pumping plant, intelligent hydraulic pumping plant drive the power pretension integral tension intelligence jack composition such as one or more, completed The continuous operation function free of discontinuities of the power pretensions such as more twisted wires and integral tension.
Below, with reference to accompanying drawing and embodiment to a kind of uniform tensioning intelligent tensioning system of the power such as prestressing tendon of the present invention And its technical characteristic further instruction of the method for the uniform tensioning of the power such as prestressing tendon.
Brief description of the drawings
Fig. 1 is one of overall structure diagram of the uniform tensioning intelligent tensioning system of the power such as prestressing tendon(The power such as single beam are equal Even tensioning intelligent tensioning system);
Fig. 2 is the two of the overall structure diagram of the uniform tensioning intelligent tensioning system of the power such as prestressing tendon(The power such as multi beam are equal Even tensioning intelligent tensioning system diagram);
Fig. 3 is the control principle drawing of the uniform tensioning intelligent tensioning system of the power such as prestressing tendon;
Fig. 4 such as is at the uniform tensioning intelligent tensioning jack structure of power and the installment state schematic diagram;
Fig. 5 such as is at the power pre-tightening apparatus structural representations such as the twisted wire of power pretension integral tension intelligence jack;
Fig. 6 such as is at the integral tension clamping device structural representation of power pretension integral tension intelligence jack;
Fig. 7 such as is at the punching integral tension apparatus structure schematic diagram of power pretension integral tension intelligence jack.
In figure:
1- intelligent hydraulic pumping plants, 2- stretch-draw jacks;
The power pre-tightening apparatus such as the power pretension integral tension intelligence jack such as 3-, 31- twisted wires, 32- integral tension clamping devices, 33- punching integral tension devices;
The single pretension pistons of 311-, 312- rear end caps, 313- seal assemblies, 314- cylinder barrels, 315- drive end bearing brackets, 316- instruments Intermediate plate;
321- fixed pistons, 322- tops anchor assemblies, 323- instrument anchor slabs, 324- activity cylinder barrels, 325- tool clamping pieces, 326- Tight anchor pressing plate, 327- preloading springs;
331- location nuts, 332- plugs, 333- pistons, 334- oil cylinders, 335- punching sets, sealing plate after 336-, 337- Hold-down ring, 338- rear position plates, 339- guide cylinders;
4- high-pressure oil pipes, 5- data wires, 6- limiting plates, 7- work clip sheets, 8- work anchor slabs, 9- steel strand wires, 10- beam bodies, 11- tool clamping pieces.
Embodiment
Embodiment one:
A kind of uniform tensioning intelligent tensioning system of the power such as single beam prestressing tendon:
As shown in figure 1, the uniform tensioning intelligent tensioning system of the power such as described prestressing tendon includes the power pretension integral tensions such as 2 Intelligent jack 3, high-pressure oil pipe 4,5,2 intelligent hydraulic pumping plants 1 of data wire and control system 2;
As shown in figure 4, the power pretension integral tension intelligence jack 3 such as described is by the power such as twisted wire pre-tightening apparatus 31, entirety Draw clamping device 32, punching integral tension device 33 and the part of displacement measuring device 34 4 composition;Punching integral tension device 33 Positioned at etc. power pretension integral tension intelligence jack rearmost end, it is whole that integral tension clamping device 32 by bolt is installed on punching On the piston of body tensioning equipment 33;The power such as twisted wire pre-tightening apparatus 31 is installed on the fixation of integral tension clamping device 32 by bolt On piston;Displacement measuring device 34 is installed on punching integral tension device 33 by bolt;
The intelligent hydraulic pumping plant 1 is to provide power for jack top, and the hydraulic power exported by pumping plant drives very heavy Stretch cylinder and contracting cylinder in top;Each intelligent hydraulic pumping plant includes motor, plunger pump, control valve, hydraulic transducer and fuel tank;Every pumping plant The power pretension integral tension intelligence jack such as one or more can be driven(In Fig. 1, two pumps station drives the power such as one pre- respectively Tight integral tension intelligence jack;
The independent control that the control system 2 includes the integrated control system being integrated in intelligent hydraulic pumping plant or is independently arranged System processed;
Under working condition, the steel strand wires at prestressing tendon both ends to be tensioned pass through work anchor slab 8, work clip sheet 7, limiting plate 6 With tool clamping piece 11 with etc. the anchored end of the power pre-tightening apparatus 31 such as the twisted wire of power pretension integral tension intelligence jack 3 be connected;Deng Connected by high-pressure oil pipe 4 between each jack and pumping plant of power pretension integral tension intelligence jack 3, integrally opened etc. power pretension Draw and be connected between intelligent jack and control system 2 by data wire 5.
As shown in figure 5, the power pre-tightening apparatus 31 such as twisted wire of the power pretension integral tension intelligence jack 3 such as described includes:It is single Root pretension piston 311, seal assembly 313, rear end cap 312, cylinder barrel 314, drive end bearing bracket 315 and tool clamping piece 316, rear end cap 312 With drive end bearing bracket 315 by being threadably mounted on cylinder barrel 314, seal assembly 313 is arranged on single pretension piston 311, will be whole The power pre-tightening apparatus such as twisted wire is divided into independent sealing tensioning cavity and sealing backhaul cavity;All single pretension pistons 311 it is close Envelope tensioning cavity is interconnected, and the sealing backhaul cavity of all single pretension pistons 311 is interconnected.
As shown in fig. 6, the integral tension clamping device 32 of the power pretension integral tension intelligence jack 3 such as described includes:Gu Fixed piston 321, top anchor assemblies 322, instrument anchor slab 323, movable cylinder barrel 324, tool clamping piece 325, tight anchor pressing plate 326 and pretension bullet Spring 327;Top anchor assemblies are fixed on movable cylinder barrel 324 by bolt, and instrument anchor slab 323 is fixed on solid by bolt On fixed piston 311, tight anchor pressing plate 326 is fixed on movable cylinder barrel 324 by bolt, tool clamping piece 325 and preloading spring 327 are arranged on instrument anchor slab 325, are fixed by the tight pretension of anchor pressing plate 326.Movable cylinder barrel 324 moves left and right, and drives top anchor group Part 322 and tight anchor pressing plate 326 realize automatic clamping and loose anchor.
As shown in fig. 7, the punching integral tension device 33 of the power pretension integral tension intelligence jack 3 such as described includes:It is fixed Position nut 331, plug 332, piston 333, oil cylinder 334, punching set 335, rear sealing plate 336, hold-down ring 337, rear position plate 338 With guide cylinder 339;Piston 333 is arranged in oil cylinder 334, and location nut 331, plug 332 are installed in the both ends of oil cylinder 334 by screw thread With rear sealing plate 336, hold-down ring 337;Punching set 335 is arranged on plug 332;Guide cylinder 339 is by being threadably mounted at positioning On nut 331, rear position plate 338 is matched with guide cylinder 339 and is installed on by bolt on punching set 335.
One kind as the embodiment of the present invention one converts, the uniform tensioning intelligent tensioning system of power such as described prestressing tendon Number m etc. power pretension integral tension intelligence jack 3 can be increased or decreased, and m span is:M is more than or equal to 2 Any even number less than 50, depending on the beam number of the prestressing tendon of entire beam tension as needed, as Fig. 2 represents two beam prestressing tendons, Then etc. the number m of power pretension integral tension intelligence jack 3 is 4, and two beam prestressing tendon both ends have the power pretensions such as two whole respectively Body tensioning intelligence jack 3.
As one kind conversion of the embodiment of the present invention one, the number n of intelligent hydraulic pumping plant 1 and the controlling party of control system 2 Formula can also have following several ways:
1. the uniform tensioning intelligent tensioning system of the power such as the prestressing tendon of the present invention can drive one by an intelligent hydraulic pumping plant Platform integral tension intelligence jack forms, and completes the power pretensions such as more twisted wires and integral tension continuously operation function free of discontinuities;
2. the uniform tensioning intelligent tensioning system of the power such as the prestressing tendon of the present invention also can by a main intelligent hydraulic pumping plant and The power pretension integral tension intelligence jack composition such as more auxiliary pump stations each self-driven one or m platforms, completes the power such as more twisted wires The continuous operation function free of discontinuities of pretension and integral tension;
3. the uniform tensioning intelligent tensioning system of the power such as the prestressing tendon of the present invention can also control n platform intelligence by a bench control system Energy hydraulic power unit, the 1 intelligent hydraulic pumping plant driving power pretension integral tension intelligence such as one or m platforms jack composition, is completed The continuous operation function free of discontinuities of the power pretensions such as more twisted wires and integral tension;M, n span is:M, n be respectively be more than etc. It is less than 50 any even number in 2.
It is that an intelligent hydraulic pumping plant drives an integral tension intelligence jack shown in Fig. 4.
Due to by control system control hydraulic power unit drive an integral tension intelligence jack Control system architecture with And control mode is all that those skilled in the art can be implemented using prior art, here is omitted.
Embodiment two
A kind of method of the uniform tensioning of the power such as prestressing tendon:
This method is to realize prestressing force using the uniform tensioning intelligent tensioning system of the power such as the prestressing tendon described in embodiment one The method of the uniform tensioning of the power such as beam, in implementation process, etc. each in power pretension integral tension intelligence jack pair prestressing tendon A holding device is respectively adopted in root steel strand wires, and each holding device is isobaric using connection, the primary stress of steel strand wires is carried out etc. Power pretension;The uniform tensioning intelligent tensioning system of the power such as prestressing tendon carries out the clamping of entire beam tension intermediate plate, more jackings to prestressing tendon The whole beam synchronization grading tension of row, meanwhile, the uniform tensioning intelligent tensioning system of the power such as prestressing tendon is uniformly opened in power such as prestressing tendons Automatically steel strand wires stretch value is recorded during drawing
This method comprises the concrete steps that:
A, system is installed:
A1, reeve and installment work anchor slab, work clip sheet, limiting plate, tool clamping piece;
The steel strand wires at prestressing tendon both ends to be tensioned are passed through into work anchor slab 8, work clip sheet 7, limiting plate 6 and tool clamping piece 11 with etc. the anchored end of the power pre-tightening apparatus 31 such as the twisted wire of power pretension integral tension intelligence jack 3 be connected;
The power pretension integral tension intelligence such as A2, installation jack 3 and control system:(Referring to Fig. 1, Fig. 2)
By etc. power pretension integral tension intelligence jack each jack and pumping plant between connected by high-pressure oil pipe 4, etc. It is connected between power pretension integral tension intelligence jack and control system 2 by data wire 5;
B, tensioning:
The power pretension tensioning such as B1, more twisted wires:The power pretension tensioning such as more twisted wires is carried out by the power such as twisted wire pre-tightening apparatus 31;
B2:The clamping of entire beam tension intermediate plate, the whole beam synchronization grading tension of more jacking rows:When through power such as B1 steps, more twisted wires When pretension tensioning is tightened to the 10% of design stretching force in advance, system automatically selects carries out entire beam tension by integral tension clamping device 32 Intermediate plate clamps, and is held in place;31 each pretension piston of the power such as twisted wire pre-tightening apparatus bounces back, and is then entered by punching integral tension device 33 The whole beam synchronization grading tension of row and pause;
C:Unloading anchoring, Song Jia:After the completion of pressurize to be tensioned, carry out slowly unloading and complete, integral tension clamping device 32 Start to unclamp the power pretension integral tension such as intermediate plate, dismounting intelligence.

Claims (6)

  1. A kind of 1. uniform tensioning intelligent tensioning system of the power such as prestressing tendon, it is characterised in that:The power such as the prestressing tendon are uniformly opened Intelligent tensioning system is drawn to include the power pretension integral tension intelligence jack such as m platforms(3), high-pressure oil pipe(4), data wire(5), n Intelligent hydraulic pumping plant(1)And control system(2);M, n span is:M, n is respectively to be more than or equal to the 2 any idols for being less than 50 Number;
    The power pretension integral tension intelligence jack such as described(3)By the power pre-tightening apparatus such as twisted wire(31), integral tension clamping device (32), punching integral tension device(33)And displacement measuring device(34)Four parts form;Punching integral tension device(33)Position In etc. power pretension integral tension intelligence jack rearmost end, integral tension clamping device(32)It is whole that punching is installed on by bolt Body tensioning equipment(33)Piston on;The power pre-tightening apparatus such as twisted wire(31)Integral tension clamping device is installed on by bolt(32) Fixed piston on;Displacement measuring device(34)Punching integral tension device is installed on by bolt(33)On;
    The intelligent hydraulic pumping plant(1)It is to provide power for jack, the hydraulic power exported by pumping plant drives jack to stretch Cylinder and contracting cylinder;Each intelligent hydraulic pumping plant includes motor, plunger pump, control valve, hydraulic transducer and fuel tank;Every pumping plant can drive Move the power pretension integral tension intelligence jack such as one or more;
    The control system(2)Including the integrated control system being integrated in intelligent hydraulic pumping plant or the independent control being independently arranged System;Including by a main intelligent hydraulic pumping plant with control system and each self-driven one or more, more auxiliary pump stations Etc. power pretension integral tension intelligence jack;An either control system controls more intelligent hydraulic pumping plants, intelligent hydraulic pump Stand and drive the power pretension integral tension intelligence jack such as one or more;
    Under working condition, the steel strand wires at prestressing tendon both ends to be tensioned pass through work anchor slab(8), work clip sheet(7), limiting plate (6)And tool clamping piece(11)With etc. power pretension integral tension intelligence jack(3)The power pre-tightening apparatus such as twisted wire(31)Anchoring End is connected;Pass through high-pressure oil pipe between each jack and pumping plant etc. power pretension integral tension intelligence jack(4)Connection, etc. power Pretension integral tension intelligence jack and control system(2)Between pass through data wire(5)It is connected.
  2. 2. the uniform tensioning intelligent tensioning system of the power such as prestressing tendon according to claim 1, it is characterised in that:The power such as described Pretension integral tension intelligence jack(3)The power pre-tightening apparatus such as twisted wire(31)Including:Single pretension piston(311), sealing group Part(313), rear end cap(312), cylinder barrel(314), drive end bearing bracket(315)And tool clamping piece(316), rear end cap(312)And drive end bearing bracket (315)By being threadably mounted at cylinder barrel(314)On, seal assembly(313)Installed in single pretension piston(311)On, will be whole The power pre-tightening apparatus such as twisted wire is divided into independent sealing tensioning cavity and sealing backhaul cavity;All single pretension pistons(311)'s Sealing tensioning cavity is interconnected, all single pretension pistons(311)Sealing backhaul cavity be interconnected.
  3. 3. the uniform tensioning intelligent tensioning system of the power such as prestressing tendon according to claim 1, it is characterised in that:The power such as described Pretension integral tension intelligence jack(3)Integral tension clamping device(32)Including fixed piston(321), top anchor assemblies (322), instrument anchor slab(323), movable cylinder barrel(324), tool clamping piece(325), tight anchor pressing plate(326)And preloading spring(327); Top anchor assemblies are fixed on movable cylinder barrel by bolt(324)On, instrument anchor slab(323)Fixation is fixed on by bolt Piston(311)On, tight anchor pressing plate(326)Movable cylinder barrel is fixed on by bolt(324)On, tool clamping piece(325)With it is pre- Tight spring(327)Installed in instrument anchor slab(323)On, pass through tight anchor pressing plate(326)Pretension is fixed;Movable cylinder barrel(324)Left and right It is mobile, drive top anchor assemblies(322)With tight anchor pressing plate(326)Realize automatic clamping and loose anchor.
  4. 4. the uniform tensioning intelligent tensioning system of the power such as prestressing tendon according to claim 1, it is characterised in that:The power such as described Pretension integral tension intelligence jack(3)Punching integral tension device(33)Including location nut(331), plug(332), it is living Plug(333), oil cylinder(334), punching set(335), rear sealing plate(336), hold-down ring(337), rear position plate(338)And guide cylinder (339);Piston(333)Installed in oil cylinder(334)It is interior, oil cylinder(334)Both ends location nut is installed by screw thread(331), plug (332), rear sealing plate(336)And hold-down ring(337);Punching set(335)Installed in plug(332)On;Guide cylinder(339)Pass through It is threadably mounted at location nut(331)On, rear position plate(338)With guide cylinder(339)Match and punching is installed on by bolt Set(335)On.
  5. A kind of 5. method of the uniform tensioning of the power such as prestressing tendon, it is characterised in that:It is to utilize the prestressing force described in claim 1 The method that the uniform tensioning intelligent tensioning system of the power such as beam realizes the uniform tensioning of the power such as prestressing tendon, it is pre- etc. power in implementation process A holding device is respectively adopted in each steel strand wires in tight integral tension intelligence jack pair prestressing tendon, and each holding device is adopted It is isobaric with connection, the power pretension such as carry out to the primary stress of steel strand wires;The uniform tensioning intelligent tensioning system pair of the power such as prestressing tendon Prestressing tendon carries out the clamping of entire beam tension intermediate plate, the whole beam synchronization grading tension of more jacking rows, while automatic record prestressing tendon etc. The stretch value of steel strand wires in the uniform stretching process of power.
  6. A kind of 6. method of the uniform tensioning of the power such as prestressing tendon according to claim 5, it is characterised in that:The tool of this method Body step is:
    A, system is installed:
    A1, reeve and installment work anchor slab, work clip sheet, limiting plate, tool clamping piece;
    The steel strand wires at prestressing tendon both ends to be tensioned are passed through into work anchor slab(8), work clip sheet(7), limiting plate(6)And tool holder Piece(11)With etc. power pretension integral tension intelligence jack(3)The power pre-tightening apparatus such as twisted wire(31)Anchored end be connected;
    The power pretension integral tension intelligence jack such as A2, installation(3)And control system:
    By etc. power pretension integral tension intelligence jack each jack and pumping plant between pass through high-pressure oil pipe(4)Connection, etc. power Pretension integral tension intelligence jack and control system(2)Between pass through data wire(5)It is connected;
    B, tensioning:
    The power pretension tensioning such as B1, more twisted wires:By the power pre-tightening apparatus such as twisted wire(31)Carry out the power pretension tensioning such as more twisted wires;
    B2:The clamping of entire beam tension intermediate plate, the whole beam synchronization grading tension of more jacking rows:When through power pretensions such as B1 steps, more twisted wires When tensioning is tightened to the 10% of design stretching force in advance, system is automatically selected by integral tension clamping device(32)Carry out entire beam tension folder Piece clamps, and is held in place;The power pre-tightening apparatus such as twisted wire(31)Each pretension piston retraction, then by punching integral tension device(33) Carry out whole beam synchronization grading tension and pause;
    C:Unloading anchoring, Song Jia:After the completion of pressurize to be tensioned, carry out slowly unloading and complete, integral tension clamping device(32)Open Begin to unclamp the power pretension integral tension such as intermediate plate, dismounting intelligence.
CN201611114719.3A 2016-12-07 2016-12-07 The uniform tensioning intelligent tensioning system of the power such as prestressing tendon and its method for the uniform tensioning of the power such as prestressing tendon Active CN106523448B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611114719.3A CN106523448B (en) 2016-12-07 2016-12-07 The uniform tensioning intelligent tensioning system of the power such as prestressing tendon and its method for the uniform tensioning of the power such as prestressing tendon

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611114719.3A CN106523448B (en) 2016-12-07 2016-12-07 The uniform tensioning intelligent tensioning system of the power such as prestressing tendon and its method for the uniform tensioning of the power such as prestressing tendon

Publications (2)

Publication Number Publication Date
CN106523448A CN106523448A (en) 2017-03-22
CN106523448B true CN106523448B (en) 2018-03-16

Family

ID=58342683

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611114719.3A Active CN106523448B (en) 2016-12-07 2016-12-07 The uniform tensioning intelligent tensioning system of the power such as prestressing tendon and its method for the uniform tensioning of the power such as prestressing tendon

Country Status (1)

Country Link
CN (1) CN106523448B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108408635A (en) * 2018-04-28 2018-08-17 东南大学 A kind of combined bay that lifting jack detachable load is combined with guiding
CN110847040A (en) * 2019-10-28 2020-02-28 广西大学 Intelligent equal-tension system of magnetic flux sensor and operation method thereof
CN111056476A (en) * 2019-12-04 2020-04-24 柳州泰姆预应力机械有限公司 Intelligent lifting control method and system
CN114808718A (en) * 2022-05-05 2022-07-29 武汉理工大学 Drawing instrument for graded tensioning and graded tensioning method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3658297A (en) * 1970-02-24 1972-04-25 William L Banks Jr Rope or cable tie including a hydraulic take-up
CN102431090A (en) * 2011-10-25 2012-05-02 南开大学滨海学院 Fiber grating precast beam prestress intelligent tensioning control system and implementation method thereof
CN103147399A (en) * 2013-02-07 2013-06-12 柳州市邱姆预应力机械有限公司 Intelligent prestressing force stretching system
CN103526948A (en) * 2013-10-24 2014-01-22 柳州黔桥工程材料有限公司 Control method of intelligent tension system and intelligent tension system
CN104947592A (en) * 2015-04-30 2015-09-30 湖南联智桥隧技术有限公司 Tensioning and adjusting construction method for slings of sling-type bridge
CN205521921U (en) * 2016-02-25 2016-08-31 上海大禺预制构件有限公司 Whole straining means
CN206360951U (en) * 2016-12-07 2017-07-28 铁道第三勘察设计院集团有限公司 The uniform tensioning intelligent tensioning system of the power such as prestressing tendon

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3658297A (en) * 1970-02-24 1972-04-25 William L Banks Jr Rope or cable tie including a hydraulic take-up
CN102431090A (en) * 2011-10-25 2012-05-02 南开大学滨海学院 Fiber grating precast beam prestress intelligent tensioning control system and implementation method thereof
CN103147399A (en) * 2013-02-07 2013-06-12 柳州市邱姆预应力机械有限公司 Intelligent prestressing force stretching system
CN103526948A (en) * 2013-10-24 2014-01-22 柳州黔桥工程材料有限公司 Control method of intelligent tension system and intelligent tension system
CN104947592A (en) * 2015-04-30 2015-09-30 湖南联智桥隧技术有限公司 Tensioning and adjusting construction method for slings of sling-type bridge
CN205521921U (en) * 2016-02-25 2016-08-31 上海大禺预制构件有限公司 Whole straining means
CN206360951U (en) * 2016-12-07 2017-07-28 铁道第三勘察设计院集团有限公司 The uniform tensioning intelligent tensioning system of the power such as prestressing tendon

Also Published As

Publication number Publication date
CN106523448A (en) 2017-03-22

Similar Documents

Publication Publication Date Title
CN106523448B (en) The uniform tensioning intelligent tensioning system of the power such as prestressing tendon and its method for the uniform tensioning of the power such as prestressing tendon
CN206360951U (en) The uniform tensioning intelligent tensioning system of the power such as prestressing tendon
CN101598647B (en) Steel wire fretting fatigue testing machine and method
CN102785290A (en) Core-penetrating pull-type pedestal for pre-tensioned pre-stressing U-shaped beam and construction method thereof
CN205775861U (en) A kind of reaction frame for steel wire rope prestressed anchor cable stretching
CN202925767U (en) Low-retraction pre-stressed anchorage device
CN105352813A (en) Tension force applying device for steel wire with small diameter
CN201267931Y (en) Sponge roller pressing machine
CN106049291B (en) Hollow force snesor bite type tensioning system and method built in bridge
CN105403454B (en) The anchor of single hole steel strand wires fatigue test clip type anchor
CN208304332U (en) Bearing block assembles device
CN203199934U (en) Front-clamping type tensioning jack
CN107747279B (en) Construction device and implementation method based on group anchor system single tensioning and cable adjusting
CN2695428Y (en) Front clamp type low expansion lifting jack
CN104316407A (en) Fatigue test device and test method of steel stranded wire in bending state
CN201162311Y (en) Clip type anchorage used for carbon fiber reinforced polymeric material pre-stress tendon
CN103332637B (en) Steel strand pretightening device
CN106514213A (en) Four-column type oil cylinder dismounting and mounting all-in-one machine and dismounting and mounting method
CN202045207U (en) Inner wall shaper for steel tube
CN113512950B (en) Hydraulic clamping device for adjusting tension of steel strand and using method thereof
CN109083022B (en) System and method for monitoring construction cable force uniformity of parallel steel strand stay cable
CN202359502U (en) Hydraulic through-type jacking device for lifting jack
CN105034162A (en) Single die bench non-pretensioned whole tensioning apparatus and work method thereof
CN108265631A (en) A kind of prestressing force pull system of porous tool anchor and steel strand wires
CN220224985U (en) Steel strand replacement tensioning device suitable for compact operation space

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 300142 Tianjin City Binhai New Area Tianjin self trade test area (Airport Economic Zone) west two road 82 Li port mansion 201

Applicant after: China Railway Design Group Limited

Applicant after: Liuzhou OVM Machinery Co., Ltd.

Address before: 300142 Tianjin Binhai New Area Airport Economic Zone West two road 82 Li port mansion 201

Applicant before: China Railway Third Survey and Design Institute Group Ltd.

Applicant before: Liuzhou OVM Machinery Co., Ltd.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant