CN106522562A - Bundler and shear wall reinforcing mesh structure construction method - Google Patents

Bundler and shear wall reinforcing mesh structure construction method Download PDF

Info

Publication number
CN106522562A
CN106522562A CN201611104982.4A CN201611104982A CN106522562A CN 106522562 A CN106522562 A CN 106522562A CN 201611104982 A CN201611104982 A CN 201611104982A CN 106522562 A CN106522562 A CN 106522562A
Authority
CN
China
Prior art keywords
tumbler
silk
box
screw rod
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611104982.4A
Other languages
Chinese (zh)
Other versions
CN106522562B (en
Inventor
何景洲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Erju 3rd Engineering Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201611104982.4A priority Critical patent/CN106522562B/en
Publication of CN106522562A publication Critical patent/CN106522562A/en
Application granted granted Critical
Publication of CN106522562B publication Critical patent/CN106522562B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/12Mounting of reinforcing inserts; Prestressing

Abstract

The invention provides a bundler and a shear wall reinforcing mesh structure construction method, belonging to the field of building construction. The bundler comprises a pressing wheel, a screw rod, a sleeve and a rotating piece, wherein the pressing wheel is disk-shaped; the screw rod is perpendicularly connected to the pressing wheel; the sleeve is arranged outside the rotating piece in a sleeving manner and is connected with the rotating piece in a rotatable manner; a connection hole is formed in the rotating piece; the inner wall of the connection hole is provided with a spiral structure; the screw rod is connected to the connection hole; when moving in the connection hole along the axial direction relative to the connection hole, the screw rod can drive the rotating piece to rotate; and two penetrating holes are symmetrically formed in the rotating piece, and are coaxial with the connection hole. The bundler is applied to the construction method. During construction, the bundling learning difficulty of a reinforcing mesh can be substantially reduced, so that new staff can quickly master the working skill and work with dedication as quick as possible, and old staff does not need to spend much time on teaching, so that the working efficiency is improved. Meanwhile, the manufacturing cost of equipment is low, so that the staff does not need to worry about loss of the equipment, and the enterprise cost is reduced.

Description

A kind of bundling device and shear force wall reinforcing steel bar web frame construction method
Technical field
The present invention relates to the realm of building construction, in particular to a kind of bundling device and the construction of shear force wall reinforcing steel bar web frame Method.
Background technology
Shear wall is to be primarily subjected to horizontal loading and the vertical lotus that wind load or geological process cause in house or structures The body of wall of load, prevents structure shear from destroying.Shear wall is typically made with armored concrete, needs pre-production in work progress Bar-mat reinforcement.
The many reinforcing bar arrangements for interweaving in bar-mat reinforcement in length and breadth, are tied using tied silk at each intersecting cross node Prick.
At present when carrying out tying up this operation all by being accomplished manually, workman is tightened tied silk in steel by instrument On muscle.
The metallic article of this instrument possibly L-shaped, workman could grasp use substantially by prolonged training study Method, also often occurs tying up shakiness, the problems such as error rate is high in practice;And flow of personnel is big on building site, it is likely that when One new worker does not also grasp or has just left office after just grasping using method, causes training cost high, low construction efficiency.
Also there is electronic instrument, but this electric tool is primarily present two aspect problems, first electric tool is wound Tied silk simply define an annular tied silk circle, can not necessarily cause steel by tied silk colligation at the node of reinforcing bar Muscle colligation is unstable, has endless trouble;Which two is that common qualified electric tool purchase price is more than thousand yuan, and constructs In journey must several workman's synchronous constructions, need substantial amounts of electric tool, this necessarily huge expense, common building site is not A fortune may be put on this instrument, secondly, the electric tool of high price is easily lost after coming into operation, it is not easy to managed Reason, is easy to cause damage to enterprise after input, and does not allow after electric tool goes wrong easy-maintaining, it is necessary to tie up to special personnel Repair, this necessarily causes the further reduction of efficiency of construction, loses more than gain.Therefore this electric tool is extremely in practice It is rare, go over 100 building sites and also can not see a building site and use in a large number, it may be said that one of popularity rate deficiency percentage.
It can therefore be seen that existing construction tool is not suitable enough, cause efficiency of construction not high enough, indirect lifting construction into This.
The content of the invention
The invention provides a kind of bundling device and shear force wall reinforcing steel bar web frame construction method, it is intended to solve the above problems.
What the present invention was realized in:
A kind of bundling device, including pinch roller, screw rod, sleeve and tumbler;
The pinch roller is plate-like, and the screw rod vertically connects the pinch roller;
The sleeve is sheathed on outside tumbler and the two is rotatedly connected;
The tumbler is provided with connecting hole, and the connecting hole inwall has helical structure, and the screw rod is connected to the connection Hole;The screw rod can drive the tumbler to rotate when being axially moveable relative to connecting hole in the connecting hole;
Two perforation are arranged with the tumbler, and the perforation is coaxially disposed with the connecting hole.
Further, the sleeve is symmetrically arranged on two with two handles near one end of the pinch roller.
Further, the two ends of the sleeve inner are provided with bearing, and the tumbler passes through the bearing and the sleeve Rotate connection.
Further, the tumbler includes connected connecting portion and work department, and the connecting portion is stretched in the sleeve simultaneously Connect the bearing;The working position is in the cartridge exterior.
Further, the external diameter of the work department is more than the connecting portion.
Further, through the work department, the connecting hole runs through the tumbler for the perforation.
A kind of shear force wall reinforcing steel bar web frame construction method, using above-mentioned bundling device:
Tied silk is bypassed into reinforcing bar, by two perforation on two free end insertion tumblers of tied silk;
By lower pressure wheel, make tumbler rotate and drive two ends of tied silk to rotate and wind, complete tying up for reinforcing bar.
Further, the tied silk is placed in tied silk conveyer;
The tied silk conveyer includes casing and support, and the casing is positioned on the support;The casing top has can The case lid of opening;The casing includes storage box, repeater box and the conveying box for connecting from top to bottom successively;
The storage box has funnelform bottom;The gear that can be opened or closed is provided between the storage box and the repeater box Plate;
The blend stop for stopping bundle silk whereabouts is provided between the repeater box and the conveying box;The side wall activity of the repeater box It is connected with the cutter that can cut off band on bundle silk;
The conveying box has Tui Si mechanisms, and the Tui Si mechanisms include the push rod located at conveying box side wall, the push rod Can slide in the horizontal direction, in conveying box side, wall is additionally provided with wire vent hole, the push rod can be by the tied silk in conveying box from institute State the release of wire vent hole.
Bundling device and shear force wall reinforcing steel bar web frame construction method that the present invention is provided, during use, can be greatly reduced reinforcing bar That what is netted ties up learning difficulty, enables new employee quickly to grasp skill, devotes oneself to work as early as possible;Old employee is also without cost More time above, improves work efficiency in teaching.Each equipment making cost is not high simultaneously, without worrying loss problem, drop Low entreprise cost.
Description of the drawings
Fig. 1 is the front view of bundling device provided in an embodiment of the present invention;
Fig. 2 is the sectional view of bundling device provided in an embodiment of the present invention;
Top view when Fig. 3 is bundling device removal pinch roller provided in an embodiment of the present invention and screw rod;
Upward view when Fig. 4 is bundling device removal pinch roller provided in an embodiment of the present invention and screw rod;
Fig. 5 is the front view of tied silk conveyer provided in an embodiment of the present invention;
Fig. 6 is the sectional view of tied silk conveyer provided in an embodiment of the present invention;
Fig. 7 is the left side view of tied silk conveyer provided in an embodiment of the present invention;
Fig. 8 is the right side view of tied silk conveyer provided in an embodiment of the present invention;
Fig. 9 is tied silk conveyer provided in an embodiment of the present invention cross-sectional schematic when in use;
Figure 10 is cross-sectional schematic of the tied silk conveyer provided in an embodiment of the present invention when in use after silk clamping is tied for two;
When Figure 11 is that the bundle silk of two clampings is pushed open by tied silk conveyer provided in an embodiment of the present invention when in use using push rod Cross-sectional schematic;
Figure 12 is the partial enlarged drawing of Figure 11;
Figure 13 is the cross-sectional schematic of tied silk conveyer repeater box provided in an embodiment of the present invention;
Figure 14 is the cross-sectional schematic of conveying box in tied silk conveyer provided in an embodiment of the present invention.
Reference collects:Pinch roller 10;Screw rod 11;Sleeve 12;Bearing 13;Handle 14;Tumbler 20;Connecting portion 21;Work Make portion 22;Connecting hole 23;Perforation 24;
Casing 100;Case lid 101;Storage box 110;Perforation 111;Push rod 112;Jacking part 113;Push-and-pull portion 114;Repeater box 120; Horizontal stripe 121;Baffle plate 122;Grip part 123;Blend stop 124;Side door 125;Cutter 126;Rotating shaft 127;Spring 128;Side opening 129;It is defeated Send case 140;Support bar 141;Push rod 142;Bar hole 143;Wire vent hole 144;Support 200;Dividing plate 210;Bundle silk 300;Tied silk 301;Band 302.
Specific embodiment
In order that those skilled in the art more fully understands technical scheme, below in conjunction with the accompanying drawings and embodiment party The present invention is described in further detail for formula.
Embodiment.
A kind of shear force wall reinforcing steel bar web frame construction method is present embodiments provided, colligation is carried out to reinforcing bar using bundling device.
As Figure 1-Figure 4, bundling device includes pinch roller 10, screw rod 11, sleeve 12 and tumbler 20;Pinch roller 10 is plate-like, 11 vertical connection pinch roller 10 of screw rod;Sleeve 12 is sheathed on outside tumbler 20 and the two is rotatedly connected;20 company of being provided with of tumbler Hole 23 is connect, 23 inwall of connecting hole has helical structure, and screw rod 11 is connected to connecting hole 23;Screw rod 11 is relative in connecting hole 23 to be connected Connecing tumbler 20 can be driven to rotate when hole 23 is axially moveable;Be arranged with tumbler 20 two perforation 24, and bore a hole 24 with Connecting hole 23 is coaxially disposed.
Pinch roller 10 is conjoined structure with screw rod 11, presses pinch roller 10 and screw rod 11 can be driven to move;Sleeve 12 and tumbler 20 is the part that mutually rotates, tumbler 20 can relative sleeve 12 rotate.The connecting hole 23 arranged on tumbler 20 can be with Screw rod 11 is engaged, and the helicitic texture arranged by the two outline enables screw rod 11 to drive tumbler 20 to rotate.Tumbler On 20, symmetrically arranged two perforation 24 can be through the free end of tied silk.
When in use, each part is assembled;Tied silk is bypassed into reinforcing bar, by two free end insertion tumblers 20 of tied silk Two perforation 24;By lower pressure wheel 10, make tumbler 20 rotate and drive two ends of tied silk to rotate and wind, complete reinforcing bar Tie up.
This bundling device reasonable in design, new person can be in the short time(In half an hour)Quickly learn its using method, Put in the work progress of anxiety as soon as possible.And its stroke is controllable, it is determined that pressing lower pressure wheel 10 after stroke, you can control tumbler 20 number of turns for rotating, and then determine the number of turns of tied silk winding so that all tied silks are all determined within the scope of one so that construction matter Amount is stable.
Sleeve 12 is symmetrically arranged on two with two handles 14 near one end of pinch roller 10.The design of handle 14 is convenient to be gripped, Two finger grip handles 14 of user, press pinch roller 10 with palm, you can complete colligation work;Tied silk is inserted by another handss Perforation 24, two handss cooperate, and work efficiency is very high.
As shown in Fig. 2 the two ends inside sleeve 12 are provided with bearing 13, tumbler 20 is rotated with sleeve 12 by bearing 13 Connection.The structure of this design so that tumbler 20 can steadily and lower resistance rotation, reduce operation when resistance.
As shown in Fig. 2 tumbler 20 includes connected connecting portion 21 and work department 22, connecting portion 21 is stretched in sleeve 12 simultaneously Connection bearing 13;Work department 22 is located at outside sleeve 12.
The external diameter of work department 22 is more than connecting portion 21.20 global sections of tumbler are T-shaped, between work department 22 and sleeve 12 Gap can be stretched into through perforation 24 in the end for having gap, tied silk, be adapted to tied silk different in size.
Perforation 24 runs through work department 22, and connecting hole 23 runs through tumbler 20.Perforation 24 through work department 22 can make bundle Silk is passed through, and the connecting hole 23 through tumbler 20 can increase the stroke of screw rod 11.
Tied silk conveyer is used in this construction method also.
As shown in Figure 5-Figure 8, tied silk conveyer includes casing 100 and support 200, and casing 100 is positioned on support 200; There is at the top of casing 100 openable case lid 101;Casing 100 includes storage box 110, the relaying for connecting from top to bottom successively Case 120 and conveying box 140;
Storage box 110 has funnelform bottom;The baffle plate that can be opened or closed is provided between storage box 110 and repeater box 120 122;The blend stop 124 for stopping bundle silk 300 whereabouts is provided between repeater box 120 and conveying box 140;The side wall of repeater box 120 It is connected with the cutter 126 that can cut off band 302 on bundle silk 300;Conveying box 140 has Tui Si mechanisms, Tui Si mechanisms bag The push rod 142 located at 140 side wall of conveying box is included, push rod 142 can be slided in the horizontal direction, be additionally provided with 140 side wall of conveying box Tied silk 301 in conveying box 140 can be released by wire vent hole 144, push rod 142 from wire vent hole 144.
The bundle silk 300 tied up with band 302 is placed in the storage box 110 of tied silk conveyer, opening baffle plate 122 makes Drop down onto under one group of bundle silk 300 in repeater box 120 and close baffle plate 122;
The band 302 on bundle silk 300 is cut off with cutter 126 makes to drop down onto in conveying box 140 under tied silk 301;Operation push rod 142 will be pricked Silk 301 releases conveying box 140 from wire vent hole 144;
Reinforcing bar is tied up with tied silk 301.
Casing 100 is the primary structure of tied silk conveyer, and support 200 plays the work for supporting and lifting 140 height of conveying box With.Case lid 101 is arranged on the top of casing 100, can be taken in and out tying silk 300 after opening into storage box 110.Storage box The bundle silk 300 that 110 funnelform bottoms enable which internal slides to repeater box 120 along inclined polycrystalline substance.Storage box 110 The baffle plate 122 arranged between repeater box 120 can stop that bundle silk 300 falls.Arrange between repeater box 120 and conveying box 140 Blend stop 124 can stop that the bundle silk 300 in repeater box 120 falls.
Operationally, opening baffle plate 122 makes to drop down onto in repeater box 120 under a bundle bundle silk 300 and close baffle plate 122, adopts The band 302 for tying up silk 300 is cut off by the cutter 126 that 120 side wall activity of repeater box is arranged, and makes tied silk 301 scatter;Scatter Tied silk 301 is just no longer stopped by blend stop 124, can be entirely fallen in conveying box 140.
Tied silk 301 in conveying box 140 can be released from wire vent hole 144 storage box 110 for Tui Si mechanisms.This mechanism has Automatic chopsticks-distributing machine is similar to a bit.Push rod 142 is moved rearwards by making tied silk 301 to whereabouts, and pastes push rod 142 and one end of tied silk 301 Close, and then promote push rod 142, the tied silk 301 in front of push rod 142 can be released from wire vent hole 144, make the objective tied silk of quantity 301 part is exposed to outside, enables workman easily to take out a tied silk 301 from there and is used.
This tied silk conveyor applications enable substantial amounts of tied silk 301 to be stored in tied silk conveyer in work progress, Make workman station need not all be left within a very long time go tied silk 301 of taking.Meanwhile, tied silk conveyer Zhong Ge mechanisms Design, the process for enabling bundle silk 300 to complete and be cut, and a handful of tied silks 301 can be pulled to casing 100 Outside, the tied silk 301 that workman easily can take single in work each time, has significantly saved in these backmans The time consumed on work, the efficiency of construction of bar-mat reinforcement is improved, reduce the working time during whole building construction.
Specifically, the inner side level of repeater box 120 and it is positioned opposite have two horizontal stripes 121, baffle plate 122 is positioned over horizontal stripe On 121;The sidepiece of repeater box 120 offers the through hole of bar shaped, and one end of baffle plate 122 is extended to outside repeater box 120 from through hole. Horizontal stripe 121 plays the supporting role to baffle plate 122, enables baffle plate 122 to slide in the top of horizontal stripe 121.
Baffle plate 122 is located at the part outside repeater box 120 and is bent to form downwards grip part 123.Downwards bending structure is held The convenient gripping in portion 123 is held, and facilitates workman push-and-pull to be carried out to baffle plate 122.
As shown in figure 9, in the technical program, the width of repeater box 120 only allows that one group of bundle silk 300 passes through.This knot Structure is able to ensure that 300 single group of bundle silk falls, and will not be stuck in repeater box 120, while 126 energy of cutter arranged in repeater box 120 Enough bands 302 to tying silk 300 cut off.
As shown in Figure 10, the bundle silk 300 in the storage box 110 of bottom funnel-shaped portion is when falling, it is understood that there may be two groups of bundle silks The situation of 300 mutual clampings, now two groups of bundle silks 300 can not all fall, for this purpose, be provided with perforation 111 in 110 bottom of storage box, Push rod 112 is provided with storage box 110, the bottom of the push rod 112 is extended to outside casing 100 from perforation 111;Push rod 112 includes Connected jacking part 113 and push-and-pull portion 114, jacking part 113 are the incline structure matched with the bottom of storage box 110.
As shown in figure 11, when there is the situation of two groups of 300 clampings of bundle silk, penetrator ram 112 upwards so as to jacking part 113 By one group of 300 jack-up of bundle silk, the bundle silk 300 of two groups of phase clampings can be separated from same level so as to will not clamping, it is another Group bundle silk 300 can smoothly under drop down onto repeater box 120.The design of the jacking part 113 of incline structure in push rod 112, can not only Make which smoothly tie 300 jack-up of silk, and its structure matched with 110 bottom of storage box can be with 110 phase of storage box Laminating, usually in the case of will not hinder to tie the whereabouts of silk 300.Again, the jacking part 113 and push-and-pull portion 114 of mutual oblique, makes top Bar 112 will not be dropped along perforation 111 downwards, make jacking part 113 stably inside storage box 110.Meanwhile, such as Figure 12 institutes Show, the groove being engaged with jacking part 113 is outputed at the top of perforation 111, enables jacking part 113 to be trapped in the position, Bu Huixiang Outer protrusion.
As shown in figure 13, the side wall of repeater box 120 offers the side opening 129 of bar shaped, and cutter 126 passes through what is vertically arranged Rotating shaft 127 is rotationally connected with side opening 129;Cutter 126 has a blade near the one end on the inside of repeater box 120, cutter 126 it is another End extends to the outside of repeater box 120.
Cutter 126 is strip structure, and through the side opening 129 of repeater box 120, blade is located inside repeater box 120, the other end It is convenient outside repeater box 120 to operate.Rotating shaft 127 is vertically arranged, and cutter 126 is by rotating shaft 127 and repeater box 120 It is connected, cutter 126 is rotated in the horizontal plane;During work, the one end outside repeater box 120 is located at by cutter 126 and is turned Dynamic cutter 126 so as to which internal blade is cut off the band 302 on silk 300 is tied.
Cutter 126 is located between the one end outside repeater box 120 and repeater box 120 and is connected with spring 128.Cutter 126 leads to Cross spring 128 to be connected with repeater box 120, enable cutter 126 to be maintained at certain position.After release, cutter 126 can pass through The active force homing of spring 128.
Take out for convenience of the band 302 for cutting off cutter 126, the side wall of repeater box 120 is additionally provided with openable side door 125。
Figure 14 is referred to, Tui Si mechanisms there are vertically spaced two groups;Tui Si mechanisms also include level and set relatively The support bar 141 on the inside of conveying box 140 is put, push rod 142 is positioned on support bar 141;The side wall of conveying box 140 is along level side To bar hole 143 is provided with, one end of push rod 142 is extended to outside conveying box 140 from bar hole 143;Liang Zutuisi mechanisms go out Silk hole 144 is respectively arranged on two relative side walls of conveying box 140.
The setting in two groups of wire vent holes 144, enables two workmans while using the tied silk conveyer, due to tied silk conveyer A large amount of tied silks 301 of storage inside make which be fully able to meet two work Man's Demands.Support bar 141 plays support push rod 142 Effect, the end of push rod 142 passes through bar hole 143, the design of 143 structure of bar hole to enable push rod 142 to slide.
As can be seen here, the tied silk conveyer of this structure can complete to push into the conveying of product bundle silk 300, cut off, separates Program sex work, makes workman use tied silk 301 incessantly substantially, and more importantly tied silk 301 is from wire vent hole 144 Stretch out, between each tied silk 301, there is proportional spacing, facilitate workman quickly to twist with the fingers and get a tied silk 301, when significantly reducing work Between.
This tied silk conveyer is employed in work progress, the working time can be reduced, work efficiency is lifted.
Bundling device and tied silk conveyer are used cooperatively, and bar-mat reinforcement can be greatly reduced ties up learning difficulty, makes new member Work can quickly grasp skill, devote oneself to work as early as possible;Old employee is improved also without taking more time in teaching above Work efficiency.Each equipment making cost is not high simultaneously, without worrying loss problem, reduces entreprise cost.
The foregoing description of the disclosed embodiments, enables professional and technical personnel in the field to realize or using the present invention. Various modifications to these embodiments will be apparent for those skilled in the art, as defined herein General Principle can be realized without departing from the spirit or scope of the present invention in other embodiments.Therefore, the present invention The embodiments shown herein is not intended to be limited to, and is to fit to and principles disclosed herein and features of novelty phase one The most wide scope for causing.

Claims (8)

1. a kind of bundling device, it is characterised in that including pinch roller, screw rod, sleeve and tumbler;
The pinch roller is plate-like, and the screw rod vertically connects the pinch roller;
The sleeve is sheathed on outside tumbler and the two is rotatedly connected;
The tumbler is provided with connecting hole, and the connecting hole inwall has helical structure, and the screw rod is connected to the connection Hole;The screw rod can drive the tumbler to rotate when being axially moveable relative to connecting hole in the connecting hole;
Two perforation are arranged with the tumbler, and the perforation is coaxially disposed with the connecting hole.
2. bundling device according to claim 1, it is characterised in that both sides pair of the sleeve near one end of the pinch roller Title is provided with two handles.
3. bundling device according to claim 1, it is characterised in that the two ends of the sleeve inner are provided with bearing, described Tumbler is rotated with the sleeve by the bearing and is connected.
4. bundling device according to claim 3, it is characterised in that the tumbler includes connected connecting portion and work Portion, the connecting portion stretch in the sleeve and connect the bearing;The working position is in the cartridge exterior.
5. bundling device according to claim 4, it is characterised in that the external diameter of the work department is more than the connecting portion.
6. bundling device according to claim 5, it is characterised in that the perforation runs through the work department, the connecting hole Through the tumbler.
7. a kind of shear force wall reinforcing steel bar web frame construction method, using the bundling device described in any one of claim 1-6, its feature exists In:
Tied silk is bypassed into reinforcing bar, by two perforation on two free end insertion tumblers of tied silk;
By lower pressure wheel, make tumbler rotate and drive two ends of tied silk to rotate and wind, complete tying up for reinforcing bar.
8. shear force wall reinforcing steel bar web frame construction method according to claim 7, it is characterised in that the tied silk is placed on bundle In silk conveyer;
The tied silk conveyer includes casing and support, and the casing is positioned on the support;The casing top has can The case lid of opening;The casing includes storage box, repeater box and the conveying box for connecting from top to bottom successively;
The storage box has funnelform bottom;The gear that can be opened or closed is provided between the storage box and the repeater box Plate;
The blend stop for stopping bundle silk whereabouts is provided between the repeater box and the conveying box;The side wall activity of the repeater box It is connected with the cutter that can cut off band on bundle silk;
The conveying box has Tui Si mechanisms, and the Tui Si mechanisms include the push rod located at conveying box side wall, the push rod Can slide in the horizontal direction, in conveying box side, wall is additionally provided with wire vent hole, the push rod can be by the tied silk in conveying box from institute State the release of wire vent hole.
CN201611104982.4A 2016-12-05 2016-12-05 A kind of shear force wall reinforcing steel bar web frame construction method Expired - Fee Related CN106522562B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611104982.4A CN106522562B (en) 2016-12-05 2016-12-05 A kind of shear force wall reinforcing steel bar web frame construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611104982.4A CN106522562B (en) 2016-12-05 2016-12-05 A kind of shear force wall reinforcing steel bar web frame construction method

Publications (2)

Publication Number Publication Date
CN106522562A true CN106522562A (en) 2017-03-22
CN106522562B CN106522562B (en) 2019-01-01

Family

ID=58354875

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611104982.4A Expired - Fee Related CN106522562B (en) 2016-12-05 2016-12-05 A kind of shear force wall reinforcing steel bar web frame construction method

Country Status (1)

Country Link
CN (1) CN106522562B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH062433A (en) * 1992-06-18 1994-01-11 Osaka Rasenkan Kogyo Kk Binding tool for wire
CN201214902Y (en) * 2008-06-18 2009-04-01 浙江展诚建设集团股份有限公司 Banding tool for reinforced bar binding wire
CN201377183Y (en) * 2009-03-31 2010-01-06 覃坤 Quick and portable hook
CN102400557A (en) * 2011-11-16 2012-04-04 仝寿礼 Reinforcing steel bar bundling gun
CN203654776U (en) * 2013-11-25 2014-06-18 成都市翻鑫家科技有限公司 Grip strength driven steel bar binding hook
CN203867193U (en) * 2014-04-11 2014-10-08 董小闵 Reinforcing steel bar binding machine

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH062433A (en) * 1992-06-18 1994-01-11 Osaka Rasenkan Kogyo Kk Binding tool for wire
CN201214902Y (en) * 2008-06-18 2009-04-01 浙江展诚建设集团股份有限公司 Banding tool for reinforced bar binding wire
CN201377183Y (en) * 2009-03-31 2010-01-06 覃坤 Quick and portable hook
CN102400557A (en) * 2011-11-16 2012-04-04 仝寿礼 Reinforcing steel bar bundling gun
CN203654776U (en) * 2013-11-25 2014-06-18 成都市翻鑫家科技有限公司 Grip strength driven steel bar binding hook
CN203867193U (en) * 2014-04-11 2014-10-08 董小闵 Reinforcing steel bar binding machine

Also Published As

Publication number Publication date
CN106522562B (en) 2019-01-01

Similar Documents

Publication Publication Date Title
DE1914028C3 (en) Machine for compacting and tying rolls of wire
DE2002776A1 (en) Method and apparatus for making preformed loops
DE2055217A1 (en) Bag transport device
DE1486489B (en) Closure for the folded neck of a packaging bag, as well as method and device for producing this closure
CN106522562A (en) Bundler and shear wall reinforcing mesh structure construction method
DE2534298A1 (en) PROCESS AND DEVICE FOR THORNLESS REWINDING OF PRE-CUT BAGS MADE OF PLASTIC OR OTHER RAW MATERIALS
CN205187084U (en) Remote brick clamp of using
CN107826360B (en) A kind of coiled body on socks baling press
CN108836090A (en) A kind of knot installation for simulated Christmas tree branch
CN207675059U (en) A kind of detonator storing material collecting device
CN108569450A (en) Automatic volume socks structure in being packed for socks
DE2657987A1 (en) DEVICE FOR TRANSPORTING BAGS OR SIMILAR CONTAINERS FROM ONE FILLING STATION TO FURTHER STATIONS
CN106742787A (en) A kind of tied silk conveyer and shear force wall reinforcing steel bar web frame construction method
CN110336175B (en) Workstation that pencil wire stripping was used
CN207595335U (en) A kind of baler snap fastener device
CN206132424U (en) Sample thief for metallurgy
CN218929922U (en) Knotting winding device
CN106586067B (en) A kind of pressure binding apparatus
CN215710447U (en) Wrapping sticker coiling mechanism
CN106314861B (en) A kind of socks packing machine with strap-on structure
DE2807769A1 (en) Continuous packaging for pourable materials - uses hose shaped packaging material which is attached to movable filler pipe and closed and cut when filled
CN206544623U (en) Belt euphroe
CN107963259A (en) A kind of detonator storing rewinding method
AT392619B (en) DEVICE FOR BUNNING AND BINDING LONG GOODS
CN215501305U (en) Tobacco leaf bundling device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20181203

Address after: 610000 No. 33 Lantian Road, Chengdu High-tech Zone, Sichuan Province

Applicant after: CHINA RAILWAY ERJU THIRD ENGINEERING Co.,Ltd.

Address before: 473000 1 building 401, oil construction company, Guan Zhuang Town, Wancheng District, Nanyang, Henan

Applicant before: He Jingzhou

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190101

CF01 Termination of patent right due to non-payment of annual fee