CN106522037A - Widening subgrade structure based on existing railway subgrade and construction method of widening subgrade structure - Google Patents
Widening subgrade structure based on existing railway subgrade and construction method of widening subgrade structure Download PDFInfo
- Publication number
- CN106522037A CN106522037A CN201611220533.6A CN201611220533A CN106522037A CN 106522037 A CN106522037 A CN 106522037A CN 201611220533 A CN201611220533 A CN 201611220533A CN 106522037 A CN106522037 A CN 106522037A
- Authority
- CN
- China
- Prior art keywords
- existing railway
- railway roadbed
- subgrade
- soil layer
- layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B2/00—General structure of permanent way
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B2204/00—Characteristics of the track and its foundations
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Railway Tracks (AREA)
Abstract
The invention discloses a widening subgrade structure based on an existing railway subgrade. The widening subgrade structure comprises a step arranged on the side slope of the existing railway subgrade, an inverted filter arranged on the step, and a retaining wall poured on the outer side of a widening railway embankment. The space between the inverted filter and the retaining wall is filled with light soil. A crack-prevention steel bar mesh is laid at the preset height in the light soil. A subgrade filler is constructed on the light soil. The invention further provides a widening subgrade method of the existing railway subgrade. According to the subgrade widening structure based on the existing railway subgrade, the load of the widening subgrade can be reduced greatly through the characteristic of small density of the light soil, the stability of the widening subgrade is improved, and extra sedimentation of a railway operation subgrade is reduced. Through the retaining wall on the outer side of the light soil, the usage quantity of the light soil can be reduced, construction land is saved, and the retaining wall can serve as a template for construction of the light soil.
Description
Technical field
The present invention relates to railway construction technical field, in particular to a kind of side broad way based structures based on existing railway roadbed
And its construction method.
Background technology
Currently, China has been basically formed with the High-speed Railway Network of " four vertical four is horizontal " as skeleton.High-speed iron newly-built from now on
Road, how inter-city passenger rail is connected with existing high ferro network has become a huge technical barrier.
Be introduced in the engineering of existing high-speed railway in newly built railway, newly built railway roadbed how with existing high-speed railway subgrade
The wide connection of engineering side is a technical barrier.Due to high-speed railway deformation controlling standards it is very high, using conventional basement process and
Both technology was filled out by wired side, unavoidably caused both wired additional settlements, and raising is higher or during weak ground, additional settlement is especially
Seriously, the safe operation of existing high-speed railway subgrade is had influence on when serious.
As high-speed railway grade is high, Rail inspection control standard is extremely strict, the small sedimentation of roadbed and level
Displacement will all badly influence the safety of operating line.At present, as the operating line that large-area load by circuit causes is settled
Happen occasionally with horizontal displacement, badly influence the safety of high-speed railway operation, it has to spend very big cost to be renovated.
The content of the invention
It is an object of the present invention to provide a kind of prevent rail track sedimentation and horizontal displacement based on existing railway roadbed
Side broad way based structures.
For achieving the above object, the present invention designed by include being arranged on based on the side broad way based structures of existing railway roadbed
Step, the loaded filter being arranged on the step in the side slope of existing railway roadbed and it is cast on the outside of the wide railroad embankment of side
Barricade, between the loaded filter and the barricade be filled with lightweight soil layer, be transversely equipped with anticracking in the lightweight soil layer
Bar-mat reinforcement, fills the bedding filler that connects with the side slope of existing railway roadbed above the lightweight soil layer.
Preferably, the lightweight soil layer adopts 7~10kN/m of unit weight3, 0.8~1.5MPa of comprcssive strength lightweight
Foam concrete.
Preferably, 1 to 3 layer of galvanized metal net is equipped with along short transverse interval in the lightweight soil layer.
Preferably, the lower section of the lightweight soil layer is up equipped with blotter, folder antiseepage soil successively from ground
The medium-sand seam and galvanized metal net of work film.
Preferably, folder anti-seepage geomembrane is equipped between the top of the lightweight soil layer and the bedding filler
Medium-sand seam.
Preferably, the barricade is reinforced concrete cast-in-situ Cantilever Retaining Wall or counterfort wall, the barricade
Base plate embedment above-ground route under, offer spilled water hole on the body of wall of the barricade, the spilled water hole with the medium-sand seam in
The position correspondence of anti-seepage geomembrane.
Preferably, the bar diameter of the anticracking bar-mat reinforcement is 6~10mm, and bar spacing is 100~200mm.
The present invention also aims to, there is provided it is a kind of to prevent rail track sedimentation and horizontal displacement based on existing railway road
The side broad way based structures construction method of base.
For achieving the above object, the side broad way based structures construction method based on existing railway roadbed designed by the present invention,
Comprise the following steps:A () removes the side slope protection of existing railway roadbed;B () is being helped to pour barricade on the outside of wide railroad embankment;
C () digs step in the side slope of existing railway roadbed, lay loaded filter after often digging one layer of step on the step;D () exists
It is covered with the ground between the step of the loaded filter and the barricade and lays blotter;E () is in the blotter
Top laying folder anti-seepage geomembrane medium-sand seam;F () lays zinc-plated gold at the top of the anti-seepage geomembrane of the medium-sand seam
Category net;G () is in the online placement layer by layer lightweight soil layer of the galvanized metal;H the transversely laying of () in the lightweight soil layer is prevented
Split bar-mat reinforcement;I the described lightweight soil layer middle berth of () above the anticracking bar-mat reinforcement sets 1 to 3 layer of anticracking galvanized metal net;(j)
In the medium-sand seam of the top laying folder anti-seepage geomembrane of the lightweight soil layer;And (k) is in the top of the medium-sand seam point
Layer fills bedding filler and connects to forming subgrade bed with the side slope of existing existing railway roadbed.
Preferably, in the step (g), the step is dug in lightweight soil layer described in placement in layers, it is described
The lift height of lightweight soil layer is 0.5~2m.
Preferably, the lightweight soil layer is vertically arranged with expansion joint, the light soil along the circuit of railway bed
Layer adopts 7~10kN/m of unit weight3, 0.8~1.5MPa of comprcssive strength light foam concrete.
The invention has the beneficial effects as follows:The side broad way based structures based on existing railway roadbed and its construction method of the present invention
Using the little characteristic of light soil density, side can be greatly reduced and filled out the load of roadbed, improved the stability that roadbed is filled out by side, reduce railway
Operation roadbed additional settlement;Barricade on the outside of light soil, can reduce light soil consumption, save construction land, and can conduct
The template that light soil is filled.
Description of the drawings
Fig. 1 illustrates for the work progress of the side broad way based structures based on existing railway roadbed of the preferred embodiments of the present invention
Figure.
Fig. 2 illustrates for the work progress of the side broad way based structures based on existing railway roadbed of the preferred embodiments of the present invention
Figure.
Fig. 3 illustrates for the work progress of the side broad way based structures based on existing railway roadbed of the preferred embodiments of the present invention
Figure.
Fig. 4 is the knot after the completion of the side broad way based structures construction based on existing railway roadbed of the preferred embodiments of the present invention
Structure schematic diagram.
After the completion of Fig. 5 is the side broad way based structures construction based on existing railway roadbed of another preferred embodiment of the invention
Structural representation.
In figure, each part numbers are as follows:Step 1, loaded filter 2, barricade 3 (wherein, base plate 3.1, spilled water hole 3.2), rubble pad
Layer 4, medium-sand seam 5, galvanized metal net 6, lightweight soil layer 7, bar-mat reinforcement 8, bedding filler 9.
Specific embodiment
The present invention is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
By research discovery being carried out to existing railway bed, cause existing high-speed railway road to reduce newly built railway roadbed
The additional settlement problem of base, need to set about in terms of two:One is that ground is processed;Two is to reduce newly built railway Roadbed Soil lotus
Carry.
The present invention's passes through to reduce newly built railway Roadbed Soil load based on the side broad way based structures of existing railway roadbed, with
The stability of existing embankment is kept, the additional settlement of existing high-speed railway subgrade is reduced.
Refer to Fig. 1 to Fig. 4, the present invention based on the side broad way based structures of existing railway roadbed include both sides step 1,
Loaded filter 2 and barricade 3, and the blotter 4, medium-sand seam 5, galvanized metal net 6, light being laid between step 1 and barricade 3
Matter soil layer 7, bar-mat reinforcement 8 and bedding filler 9.
Step 1 is arranged in the side slope of existing railway roadbed, excavates and form step 1 in the side slope of existing railway roadbed.
(building by laying bricks or stones) loaded filter 2 is laid on step 1, loaded filter 2 can ensure to permeate the soil do not taken away in railway bed when water flows out, from
And can the native generation of anti-fluid stopping.Barricade 3 is poured on the outside of the wide railroad embankment of side, barricade 3 adopts reinforced concrete cast-in-situ structure, its
Under the embedment above-ground route of base plate 3.1, spilled water hole 3.2 on its body of wall, is offered.Side is layered between step 1 and barricade 3 and fills out light soil
Layer 7.Blotter 4 is up laid successively, the medium-sand seam 5 of anti-seepage geomembrane is pressed from both sides and zinc-plated from ground in the bottom of lightweight soil layer 7
Wire netting 6.Anticracking bar-mat reinforcement 8 is laid transversely at appropriate height in lightweight soil layer 7.The inherent anticracking reinforcing bar of lightweight soil layer 7
The top of net 8 is laterally spaced to be equipped with 1~3 layer of galvanized metal net 6.Folder anti-seepage geomembrane is equipped with above lightweight soil layer 7
Medium-sand seam 5.More than 5 placement in layers subgrade bed filler 9 of medium-sand seam, the side slope phase of bedding filler 9 and existing railway roadbed
Connect to form roadbed lathe.
Barricade 3 arranges spilled water hole 3.2 in anti-seepage geomembrane (i.e. medium-sand seam 5) correspondence position.Anti-seepage geomembrane collection antiseepage
With drainage in one, it is provided simultaneously with isolating the function with reinforcement, spilled water hole 3.2 is available for the hydrops of anti-seepage geomembrane to draw.
It is pointed out that in the embodiment shown in Fig. 1 to Fig. 4, barricade 3 is Cantilever Retaining Wall.In other preferred realities
Apply in example, barricade 3 may also be employed counterfort wall as shown in Figure 5.
It is to meet other requirements while the requirement for reducing newly built railway Roadbed Soil load is met, lightweight soil layer 7 is adopted
With 7~10kN/m of unit weight3, 0.8~1.5MPa of comprcssive strength light soil, the durability of lightweight soil layer 7 and major project life-span
It is identical, without harmful and combustible material in which, it is to avoid environmental pollution and hidden fire-fighting danger.Lightweight soil layer 7 can be mixed using light foam
Solidifying soil, but it is not limited only to light-weight foamed concrete.
Please further in conjunction with refering to Fig. 1 to Fig. 4, the side broad way based structures construction method based on existing railway roadbed of the present invention
Comprise the following steps:
(1) earth's surface humic substance is removed, grade, grinding compacting carry out basement process.
(2) remove the side slope protection of existing railway roadbed.
(3) helping to pour cantilever (counterfort) formula barricade 3 on the outside of wide railroad embankment, barricade 3 is in light soil anti-seepage geomembrane
Correspondence position arranges spilled water hole 3.2, and the hydrops of anti-seepage geomembrane are drawn.
(4) side slope of existing railway roadbed digs step 1, after typically often digging one layer of step, lays (building by laying bricks or stones) loaded filter 2.
(5) in the ground laying blotter 4 being covered between the step 1 of loaded filter 2 and barricade 3.
(6) medium-sand seam 5 of folder anti-seepage geomembrane is laid at the top of blotter 4.
(7) galvanized metal net 6 is laid at the top of the anti-seepage geomembrane of medium-sand seam 5, to prevent light soil layer 7 from ftractureing.
(8) lightweight soil layer 7, generic hierarchical 0.5~2m of thickness are poured in 6 higher slice of galvanized metal net.
(9) step 1 is dug when lightweight soil layer 7 is filled, must not once be excavated to top, in case Near Existing Railway Embankment slope is by rain
Water logging is bubbled open to be split.
(10) anticracking bar-mat reinforcement 8, with reinforcement structure intensity, anticracking bar-mat reinforcement 8 are laid at 7 appropriate height of lightweight soil layer
6~10mm of bar diameter, 100~200mm of spacing.
(11) one to three layer of anticracking galvanized metal net 6 of laying in the lightweight soil layer 7 above anticracking bar-mat reinforcement 8.
(12) medium-sand seam 5 of anti-seepage geomembrane is pressed from both sides in the top laying in lightweight soil layer 7, prevents rainwater from invading lightweight soil layer
7 inside.
(13) medium-sand seam 5 top placement in layers bedding filler 9 and connect with the side slope of existing existing railway roadbed,
Form subgrade bed.
The medium-sand seam 5 of one to three layer of anticracking galvanized metal net 6 and folder anti-seepage geomembrane is laid in 7 top surface of lightweight soil layer,
Prevent rainwater from invading the inside of light soil.
(12) 9 placement in layers subgrade bed of bedding filler is used at the top of the anti-seepage geomembrane of the medium-sand seam 5 of top layer.
For expanding with heat and contract with cold of avoiding that Changes in weather causes and may cause to produce excessive temperature stress in the structure, gently
Matter soil layer 7 is along the longitudinally disposed expansion joint of circuit of railway bed.
The side broad way based structures based on existing railway roadbed and method of the present invention, can using the little characteristic of light soil density
The load that roadbed is filled out by side is greatly reduced, the stability that roadbed is filled out by side is improved, reduces the additional settlement of railway operation roadbed.Light soil
The retaining wall in outside, can reduce light soil consumption, save construction land, and " template " that can be filled as light soil.
Embodiment described above only expresses the several embodiments of the present invention, and its description is more concrete and detailed, but and
Therefore the restriction to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that for one of ordinary skill in the art
For, without departing from the inventive concept of the premise, some deformations and improvement can also be made, these belong to the guarantor of the present invention
Shield scope.Therefore, the protection domain of patent of the present invention should be defined by claims.
Claims (10)
1. a kind of side broad way based structures based on existing railway roadbed, it is characterised in that:The side based on existing railway roadbed
Broad way based structures include the step (1) being arranged in the side slope of existing railway roadbed, the loaded filter being arranged on the step (1)
(2) and the barricade (3) that is cast on the outside of the wide railroad embankment of side, filled with light between the loaded filter (2) and the barricade (3)
Matter soil layer (7), is transversely equipped with anticracking bar-mat reinforcement (8), fills above the lightweight soil layer (7) in the lightweight soil layer (7)
Having.
2. side broad way based structures based on existing railway roadbed according to claim 1, it is characterised in that:The light soil
Layer (7) is using 7~10kN/m of unit weight3, 0.8~1.5MPa of comprcssive strength light foam concrete.
3. side broad way based structures based on existing railway roadbed according to claim 1, it is characterised in that:The light soil
1 to 3 layer of galvanized metal net (6) is equipped with along short transverse interval in layer (7).
4. side broad way based structures based on existing railway roadbed according to claim 1, it is characterised in that:The light soil
The lower section of layer (7) is up equipped with blotter (4), the medium-sand seam (5) of folder anti-seepage geomembrane and zinc-plated gold successively from ground
Category net (6).
5. side broad way based structures based on existing railway roadbed according to claim 1, it is characterised in that:The light soil
The medium-sand seam (5) of folder anti-seepage geomembrane is equipped between the top of layer (7) and the bedding filler (9).
6. side broad way based structures based on existing railway roadbed according to claim 4 or 5, it is characterised in that:The gear
Wall (3) is reinforced concrete cast-in-situ Cantilever Retaining Wall or counterfort wall, base plate (3.1) the embedment above-ground route of the barricade (3)
Under, offer spilled water hole (3.2) on the body of wall of the barricade (3), the spilled water hole (3.2) with the medium-sand seam (5) in
The position correspondence of anti-seepage geomembrane.
7. side broad way based structures based on existing railway roadbed according to claim 1, it is characterised in that:The anticracking steel
The bar diameter of muscle net (8) is 6~10mm, and bar spacing is 100~200mm.
8. a kind of side broad way based structures construction method based on existing railway roadbed, comprises the following steps:
A () removes the side slope protection of existing railway roadbed;
B () is being helped to pour barricade (3) on the outside of wide railroad embankment;
C () digs step (1) in the side slope of existing railway roadbed, laid after often digging one layer of step (1) on the step (1)
Loaded filter (2);
D () lays blotter on the ground being covered between the step (1) of the loaded filter (2) and the barricade (3)
(4);
The medium-sand seam (5) of (e) in the top laying folder anti-seepage geomembrane of the blotter (4);
F () lays galvanized metal net (6) at the top of the anti-seepage geomembrane of the medium-sand seam (5);
G () pours lightweight soil layer (7) in galvanized metal net (6) higher slice;
Transversely laying anticracking bar-mat reinforcement (8) of (h) in the lightweight soil layer (7);
1 to 3 layer of anticracking galvanized metal net (6) of laying in the described lightweight soil layer (7) of (i) above the anticracking bar-mat reinforcement (8);
The medium-sand seam (5) of (j) in the top laying folder anti-seepage geomembrane of the lightweight soil layer (7);And
(k) top placement in layers bedding filler (9) side slope phase with existing existing railway roadbed in the medium-sand seam (5)
Connect to form subgrade bed.
9. the side broad way based structures construction method based on existing railway roadbed according to claim 8, it is characterised in that:
In the step (g), the step (1), the layering of the lightweight soil layer (7) are dug at lightweight soil layer (7) described in placement in layers
Thickness is 0.5~2m.
10. the side broad way based structures construction method based on existing railway roadbed according to claim 8, it is characterised in that:
The lightweight soil layer (7) is vertically arranged with expansion joint along the circuit of railway bed, the lightweight soil layer (7) using unit weight 7~
10kN/m3, 0.8~1.5MPa of comprcssive strength light foam concrete.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611220533.6A CN106522037B (en) | 2016-12-26 | 2016-12-26 | Side broad way based structures based on existing railway roadbed and its construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611220533.6A CN106522037B (en) | 2016-12-26 | 2016-12-26 | Side broad way based structures based on existing railway roadbed and its construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106522037A true CN106522037A (en) | 2017-03-22 |
CN106522037B CN106522037B (en) | 2018-09-25 |
Family
ID=58337996
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611220533.6A Active CN106522037B (en) | 2016-12-26 | 2016-12-26 | Side broad way based structures based on existing railway roadbed and its construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106522037B (en) |
Cited By (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107119665A (en) * | 2017-06-29 | 2017-09-01 | 中铁第四勘察设计院集团有限公司 | Structure and construction method are repaired in soft clay area railway station platform sedimentation displacement |
CN108560340A (en) * | 2018-03-26 | 2018-09-21 | 中铁工程设计咨询集团有限公司 | A kind of high-speed railway utilizes existing embankment remodeling method |
CN108951335A (en) * | 2018-09-06 | 2018-12-07 | 四川省交通运输厅公路规划勘察设计研究院 | A kind of light-duty escarpment road structure |
CN109033547A (en) * | 2018-07-03 | 2018-12-18 | 三峡大学 | Bituminous pavement roadbed work area depth calculation model |
CN109487802A (en) * | 2018-10-26 | 2019-03-19 | 中铁二院成都勘察设计研究院有限责任公司 | A kind of wide processing method of roadbed side |
CN109914448A (en) * | 2019-04-16 | 2019-06-21 | 大连交通大学 | A kind of composite supporting construction widened for rock matter embankment and construction method |
CN110144767A (en) * | 2019-04-03 | 2019-08-20 | 中铁第四勘察设计院集团有限公司 | Help broad way based structures and construction method |
CN110158367A (en) * | 2019-04-12 | 2019-08-23 | 同济大学 | A kind of structure and deformation control method for helping the existing high-speed railway subgrade of width |
CN110374134A (en) * | 2019-07-15 | 2019-10-25 | 浙江交工集团股份有限公司 | A kind of combined member increased suitable for retaining wall and construction method |
CN110485218A (en) * | 2019-09-11 | 2019-11-22 | 北京铁科特种工程技术有限公司 | It is a kind of to help wide construction method for railway bed |
CN110725162A (en) * | 2019-10-22 | 2020-01-24 | 中铁十局集团第八工程有限公司 | Roadbed device for rail transit and manufacturing method |
CN110761126A (en) * | 2019-12-04 | 2020-02-07 | 中铁二院工程集团有限责任公司 | Rock foundation existing high-speed rail fine-grained soil filled embankment side width structure and construction method |
CN111441789A (en) * | 2020-04-30 | 2020-07-24 | 浙江大学城市学院 | High-steep-terrain bridge-tunnel connection foam concrete filling-first and digging-second transition structure and construction method |
CN111979863A (en) * | 2020-08-17 | 2020-11-24 | 中铁八局集团第三工程有限公司 | Construction method for filling high embankment by using foam lightweight concrete adjacent to high-speed rail |
CN112095380A (en) * | 2020-08-07 | 2020-12-18 | 广东盛瑞科技股份有限公司 | Layered filling method for light combined roadbed at steep slope section |
CN113235341A (en) * | 2021-05-31 | 2021-08-10 | 中铁第六勘察设计院集团有限公司 | Construction method for adding high-speed railway subgrade to existing high-speed railway in parallel |
CN113338155A (en) * | 2021-06-18 | 2021-09-03 | 华东交通大学 | Roadbed for controlling differential settlement of transition section of highway bridge and construction method |
CN113403900A (en) * | 2021-01-26 | 2021-09-17 | 绍兴文理学院 | Light two-ash soil roadbed construction method based on solid waste utilization |
CN113981750A (en) * | 2021-11-17 | 2022-01-28 | 中铁七局集团郑州工程有限公司 | Construction method for rapid first-aid repair after water damage of embankment of existing railway riverside vehicle station |
CN114108690A (en) * | 2021-12-02 | 2022-03-01 | 国能朔黄铁路发展有限责任公司 | Buttress type retaining wall for newly-built rail material platform and construction device |
CN114232525A (en) * | 2021-12-30 | 2022-03-25 | 中铁七局集团有限公司 | Construction method for quickly lengthening existing frame culvert in high-speed railway reconstruction and extension |
CN114482118A (en) * | 2022-01-17 | 2022-05-13 | 兰州铁道设计院有限公司 | Method for realizing width of embankment side by existing-newly built combined cantilever type retaining wall |
WO2023213117A1 (en) * | 2022-05-05 | 2023-11-09 | 中交路桥建设有限公司 | Widening structure and construction method for existing subgrade embankment wall section near river |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH03279501A (en) * | 1990-03-27 | 1991-12-10 | Kurosawa Kensetsu Kk | Widening of road |
US20130136538A1 (en) * | 2010-05-21 | 2013-05-30 | R&B Leasing, Llc | System and method for increasing roadway width incorporating a reverse oriented retaining wall and soil nail suppports |
CN203960883U (en) * | 2014-02-20 | 2014-11-26 | 中铁第四勘察设计院集团有限公司 | One both wired high embankment is helped wide ruggedized construction |
CN104532857A (en) * | 2014-12-24 | 2015-04-22 | 中铁二院工程集团有限责任公司 | Flexible expansion reduced ecological slope protection construction |
CN104631221A (en) * | 2015-02-17 | 2015-05-20 | 铁道第三勘察设计院集团有限公司 | High-speed railway widening subgrade structure |
CN104928996A (en) * | 2015-06-24 | 2015-09-23 | 中铁第四勘察设计院集团有限公司 | Light soil side wide roadbed structure for railway |
CN105019326A (en) * | 2015-06-29 | 2015-11-04 | 河南华泰建材开发有限公司 | Roadbed structure applied to road widening and construction method |
CN105862671A (en) * | 2016-04-08 | 2016-08-17 | 北京群祥兴科技有限公司 | Construction method based on ecological organic sponge |
CN205711612U (en) * | 2016-05-18 | 2016-11-23 | 山东省交通规划设计院 | Widening of Freeway engineering freeboard section new-old pavement splicing construction |
CN206346075U (en) * | 2016-12-26 | 2017-07-21 | 中铁第四勘察设计院集团有限公司 | Side broad way based structures based on existing railway roadbed |
-
2016
- 2016-12-26 CN CN201611220533.6A patent/CN106522037B/en active Active
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH03279501A (en) * | 1990-03-27 | 1991-12-10 | Kurosawa Kensetsu Kk | Widening of road |
US20130136538A1 (en) * | 2010-05-21 | 2013-05-30 | R&B Leasing, Llc | System and method for increasing roadway width incorporating a reverse oriented retaining wall and soil nail suppports |
CN203960883U (en) * | 2014-02-20 | 2014-11-26 | 中铁第四勘察设计院集团有限公司 | One both wired high embankment is helped wide ruggedized construction |
CN104532857A (en) * | 2014-12-24 | 2015-04-22 | 中铁二院工程集团有限责任公司 | Flexible expansion reduced ecological slope protection construction |
CN104631221A (en) * | 2015-02-17 | 2015-05-20 | 铁道第三勘察设计院集团有限公司 | High-speed railway widening subgrade structure |
CN104928996A (en) * | 2015-06-24 | 2015-09-23 | 中铁第四勘察设计院集团有限公司 | Light soil side wide roadbed structure for railway |
CN105019326A (en) * | 2015-06-29 | 2015-11-04 | 河南华泰建材开发有限公司 | Roadbed structure applied to road widening and construction method |
CN105862671A (en) * | 2016-04-08 | 2016-08-17 | 北京群祥兴科技有限公司 | Construction method based on ecological organic sponge |
CN205711612U (en) * | 2016-05-18 | 2016-11-23 | 山东省交通规划设计院 | Widening of Freeway engineering freeboard section new-old pavement splicing construction |
CN206346075U (en) * | 2016-12-26 | 2017-07-21 | 中铁第四勘察设计院集团有限公司 | Side broad way based structures based on existing railway roadbed |
Cited By (29)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107119665A (en) * | 2017-06-29 | 2017-09-01 | 中铁第四勘察设计院集团有限公司 | Structure and construction method are repaired in soft clay area railway station platform sedimentation displacement |
CN108560340B (en) * | 2018-03-26 | 2020-05-19 | 中铁工程设计咨询集团有限公司 | Method for transforming high-speed railway by utilizing existing embankment |
CN108560340A (en) * | 2018-03-26 | 2018-09-21 | 中铁工程设计咨询集团有限公司 | A kind of high-speed railway utilizes existing embankment remodeling method |
CN109033547A (en) * | 2018-07-03 | 2018-12-18 | 三峡大学 | Bituminous pavement roadbed work area depth calculation model |
CN109033547B (en) * | 2018-07-03 | 2023-04-07 | 三峡大学 | Depth calculation model for working area of bituminous pavement roadbed |
CN108951335A (en) * | 2018-09-06 | 2018-12-07 | 四川省交通运输厅公路规划勘察设计研究院 | A kind of light-duty escarpment road structure |
CN109487802A (en) * | 2018-10-26 | 2019-03-19 | 中铁二院成都勘察设计研究院有限责任公司 | A kind of wide processing method of roadbed side |
CN110144767A (en) * | 2019-04-03 | 2019-08-20 | 中铁第四勘察设计院集团有限公司 | Help broad way based structures and construction method |
CN110144767B (en) * | 2019-04-03 | 2024-06-07 | 中铁第四勘察设计院集团有限公司 | Side-width roadbed structure and construction method |
CN110158367A (en) * | 2019-04-12 | 2019-08-23 | 同济大学 | A kind of structure and deformation control method for helping the existing high-speed railway subgrade of width |
CN109914448A (en) * | 2019-04-16 | 2019-06-21 | 大连交通大学 | A kind of composite supporting construction widened for rock matter embankment and construction method |
CN110374134A (en) * | 2019-07-15 | 2019-10-25 | 浙江交工集团股份有限公司 | A kind of combined member increased suitable for retaining wall and construction method |
CN110485218A (en) * | 2019-09-11 | 2019-11-22 | 北京铁科特种工程技术有限公司 | It is a kind of to help wide construction method for railway bed |
CN110725162A (en) * | 2019-10-22 | 2020-01-24 | 中铁十局集团第八工程有限公司 | Roadbed device for rail transit and manufacturing method |
CN110761126A (en) * | 2019-12-04 | 2020-02-07 | 中铁二院工程集团有限责任公司 | Rock foundation existing high-speed rail fine-grained soil filled embankment side width structure and construction method |
CN110761126B (en) * | 2019-12-04 | 2024-05-24 | 中铁二院工程集团有限责任公司 | Rock foundation existing high-speed railway fine soil filling embankment side width structure and construction method |
CN111441789A (en) * | 2020-04-30 | 2020-07-24 | 浙江大学城市学院 | High-steep-terrain bridge-tunnel connection foam concrete filling-first and digging-second transition structure and construction method |
CN112095380A (en) * | 2020-08-07 | 2020-12-18 | 广东盛瑞科技股份有限公司 | Layered filling method for light combined roadbed at steep slope section |
CN111979863A (en) * | 2020-08-17 | 2020-11-24 | 中铁八局集团第三工程有限公司 | Construction method for filling high embankment by using foam lightweight concrete adjacent to high-speed rail |
CN113403900A (en) * | 2021-01-26 | 2021-09-17 | 绍兴文理学院 | Light two-ash soil roadbed construction method based on solid waste utilization |
CN113235341A (en) * | 2021-05-31 | 2021-08-10 | 中铁第六勘察设计院集团有限公司 | Construction method for adding high-speed railway subgrade to existing high-speed railway in parallel |
CN113338155A (en) * | 2021-06-18 | 2021-09-03 | 华东交通大学 | Roadbed for controlling differential settlement of transition section of highway bridge and construction method |
CN113981750A (en) * | 2021-11-17 | 2022-01-28 | 中铁七局集团郑州工程有限公司 | Construction method for rapid first-aid repair after water damage of embankment of existing railway riverside vehicle station |
CN114108690A (en) * | 2021-12-02 | 2022-03-01 | 国能朔黄铁路发展有限责任公司 | Buttress type retaining wall for newly-built rail material platform and construction device |
CN114108690B (en) * | 2021-12-02 | 2023-01-24 | 国能朔黄铁路发展有限责任公司 | A construction equipment that is used for newly-built rail material platform's counterfort formula barricade |
CN114232525A (en) * | 2021-12-30 | 2022-03-25 | 中铁七局集团有限公司 | Construction method for quickly lengthening existing frame culvert in high-speed railway reconstruction and extension |
CN114482118A (en) * | 2022-01-17 | 2022-05-13 | 兰州铁道设计院有限公司 | Method for realizing width of embankment side by existing-newly built combined cantilever type retaining wall |
CN114482118B (en) * | 2022-01-17 | 2024-03-26 | 兰州铁道设计院有限公司 | Method for realizing embankment width by existing-newly-built combined cantilever retaining wall |
WO2023213117A1 (en) * | 2022-05-05 | 2023-11-09 | 中交路桥建设有限公司 | Widening structure and construction method for existing subgrade embankment wall section near river |
Also Published As
Publication number | Publication date |
---|---|
CN106522037B (en) | 2018-09-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106522037B (en) | Side broad way based structures based on existing railway roadbed and its construction method | |
CN104928996B (en) | Railway light soil side broad way based structures | |
CN102505695B (en) | Construction method for deep foundation pit of three-dimensional garage | |
CN103276639B (en) | Roadbed structure for deep soft soil region | |
CN205874850U (en) | Railway soft soil foundation light soil roadbed structure | |
CN104278608A (en) | Novel highway embankment widened structure and construction method | |
CN108103871B (en) | Construction method of roadbed foam concrete filling technology adjacent to existing subway facility | |
CN206346075U (en) | Side broad way based structures based on existing railway roadbed | |
CN108797249A (en) | The construction method of soft soil roadbed high roadbed steep slope road section Foam lightweight soil | |
CN107245912B (en) | A kind of Foam lightweight soil railway bed structure and engineering method | |
CN111395060B (en) | Design and construction method for widening roadbed structure of existing cutting in karst area | |
CN206219897U (en) | Medium-and low-speed maglev two-wire excavation location pile foundation combined type support rail beam transition section structure | |
CN108316344A (en) | A kind of construction method of subway station hall layer | |
CN203247478U (en) | Composite structure pavement with reinforced geocells for hardening underworkings baseplate | |
CN117127642A (en) | Fluidized solidified soil bearing platform structure and manufacturing method | |
CN204715136U (en) | A kind of road-bridge transition section road structure | |
CN111576118A (en) | Down-through type road culvert transition section foam light soil roadbed structure and construction method thereof | |
CN206157485U (en) | Moderate -low speed magnetic levitation single line excavation location pile foundation combined type support rail roof beam transition section structure | |
CN204982556U (en) | Wide roadbed structure of railway light soil group | |
CN206127736U (en) | Moderate -low speed magnetic levitation double -line compound framing formula support rail roof beam transition section structure of location pile foundation that fills | |
CN211872447U (en) | Side wide roadbed structure | |
CN211227882U (en) | Rock foundation existing high-speed rail coarse-grained soil filling embankment side width structure | |
CN107119665A (en) | Structure and construction method are repaired in soft clay area railway station platform sedimentation displacement | |
CN207567572U (en) | A kind of Foam lightweight soil railway bed structure | |
CN206127757U (en) | Moderate -low speed magnetic levitation single line location detached pier column type support rail roof beam transition section structure that fills |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |