CN106514526A - Clamping system and method of bogie framework - Google Patents

Clamping system and method of bogie framework Download PDF

Info

Publication number
CN106514526A
CN106514526A CN201611263359.3A CN201611263359A CN106514526A CN 106514526 A CN106514526 A CN 106514526A CN 201611263359 A CN201611263359 A CN 201611263359A CN 106514526 A CN106514526 A CN 106514526A
Authority
CN
China
Prior art keywords
clamping
longeron
cap cylinder
bogie frame
linking arm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611263359.3A
Other languages
Chinese (zh)
Other versions
CN106514526B (en
Inventor
杜永强
郑建科
厉永泽
刘景才
连满义
王玉龙
纪建鹏
孟翔飞
甄强
吕海龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CRRC Tangshan Co Ltd
Original Assignee
CRRC Tangshan Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CRRC Tangshan Co Ltd filed Critical CRRC Tangshan Co Ltd
Priority to CN201611263359.3A priority Critical patent/CN106514526B/en
Publication of CN106514526A publication Critical patent/CN106514526A/en
Application granted granted Critical
Publication of CN106514526B publication Critical patent/CN106514526B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25BTOOLS OR BENCH DEVICES NOT OTHERWISE PROVIDED FOR, FOR FASTENING, CONNECTING, DISENGAGING OR HOLDING
    • B25B11/00Work holders not covered by any preceding group in the subclass, e.g. magnetic work holders, vacuum work holders
    • B25B11/02Assembly jigs

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Jigs For Machine Tools (AREA)

Abstract

The invention provides a clamping system and method of a bogie framework. The clamping system comprises a base table, a first fixing device, two second fixing devices, a leveling device, an aligning device and a clamping locating device. The first fixing device clamps the middle of a first longitudinal beam, the two second fixing devices clamp cap connection arms of a second longitudinal beam, and therefore three-point isosceles triangle supporting is formed, the problem that stress deformation of different degrees is caused by stress imbalance of four points because the four supporting points are different in height and are located on different planes can be prevented, the clamping efficiency can be improved, the operation can be fast and simple, and the requirement of machining bogie frameworks in batches can be met. In addition, because the first fixing device is arranged in the middle of the first longitudinal beam, the self weight of the bogie framework can be shared to a large extent, stress on the cap connection arms with poor rigidity can be reduced to a large extent, and therefore the phenomenon that the bogie framework rebounds when the clamping system is loosened after machining can be reduced, and the machining precision can be improved.

Description

The mounting and clamping system of bogie frame and method
Technical field
The present embodiments relate to field of fixtures, more particularly to a kind of mounting and clamping system of bogie frame and method.
Background technology
The manufacture of the bogie frame of rail vehicle belongs to flexibility manufacture, as bogie frame is steel plate welding knot Structure, overall rigidity are poor, and compact conformation, and the position of processing is more, and requirement on machining accuracy is high, and difficulty of processing is big, and small clamping becomes Shape is unclamped clamping equipment and produces bounce-back after the completion of all causing work pieces process, and then it is full to cause requirement on machining accuracy high-order bit to be difficult to Foot is required.Because of the difference of support zone before compressing after being especially framed in supporting, own wt produces different size to its inside Stress deformation, can cause processing after produce rebound deformation.Main cause is that EMU framework weighs about 1.5 tons certainly, mainly Concentrate on crossbeam composition, and in order to have certain buffering and vibration resistance in train travelling process, increase relaxing for passenger Adaptive and the stability of train operation, positioned at the steel plate sheet material that the cap cylinder position of the curb girder of framework corner is selected, rigidity is relatively Difference, the deadweight of clamping process bogie frame can make which produce stress deformation, and workpiece produces bounce-back after processing, and then causes processing Precision is poor.
The clamping process of the bogie frame of existing rail vehicle, as the levelling levelling line of frame supports is typically drawn On the outer side elevation of four cap cylinders of framework corner, therefore, it is usually chosen at four cap cylinders and is supported, as cap cylinder connects The rigidity of arm is poor, easily after frame supports compress before stress deformation is produced due to its gravity, due to four-point supporting it is difficult to Ensure in same level, therefore it is different degrees of to easily lead to generation at the unbalance stress on four points, therefore at 4 points Stress deformation, just will can make the levelling line in each position concordant through repeatedly adjusting repeatedly in clamping process, and due to unbalanced stress Even, compaction process can produce pressure folder deformation, although levelling before compressing, but looking for for a certain Support Position easily occur after compressing Horizontal line shifts, and needs to unclamp pressing plate, re-starts levelling, and clamping time when causing framework to be processed is typically little in 3-4 When, efficiency is low, loses time, and unclamps clamping equipment after processing, and bogie frame bounce-back, machining accuracy are poor.
The content of the invention
The present invention provides a kind of mounting and clamping system of bogie frame and method, to reduce answering for bogie frame clamping process Force deformation, raising machining accuracy, and the efficiency of clamping can be improved, and it is swift to operate simple, to adapt to criticizing for bogie frame Amount processing.
One aspect of the present invention provides a kind of mounting and clamping system of bogie frame, for the bogie of clamping rail vehicle Framework, wherein, the bogie frame includes crossbeam, is respectively perpendicular the first longeron and the second longeron for being arranged at crossbeam both sides, Two ends of the longeron are respectively equipped with cap cylinder linking arm, and the cap cylinder linking arm is fixedly connected with cap cylinder, the steering structure Rack-mounted clipping system includes:
Base station, is removably provided with the first fixing device and two the second fixing devices on the base station;
First fixing device includes the first supporting part and the first clamping part;First supporting part is vertically arranged and high Degree is adjustable, for the lower surface being supported in the middle part of first longeron;The first clamping part height adjustable, for being held on State the upper surface in the middle part of the first longeron;
Second fixing device includes the second supporting part, the second clamping part and the 3rd clamping part;Second supporting part It is vertically arranged and height adjustable, for being supported in the lower surface of the cap cylinder linking arm of second longeron;Second clamping part Height adjustable, for being held on the upper surface of the cap cylinder linking arm;3rd clamping part is used for being held in the cap cylinder linking arm Two relative vertical sides, to adjust the position of the cap cylinder linking arm and the position of the cap cylinder linking arm carried out It is fixed;
Leveling unit, on the basis of the leveling unit, by adjusting first supporting part and described second Support part makes default horizontal line on four cap cylinder linking arms of the bogie frame be on sustained height, with levelling institute State bogie frame;
Alignment device, for, on the basis of the alignment device, adjusting second longeron by the 3rd clamping part The position of two cap cylinder linking arms make default centering line on second longeron parallel with the centering line of the base station, With bogie frame described in centering on base station position;
Clamping and positioning device, for surveying during clamping the upper surface in the middle part of first longeron in first clamping part Measure and record the height and position of the upper surface in the middle part of first longeron and the cap cylinder connection is clamped in second clamping part The height and position of the upper surface of the cap cylinder linking arm is measured and is recorded during the upper surface of arm.
Further, first supporting part include the first pedestal and be connected with first base thread first Support member.
Further, first clamping part includes the first supporting member being fixedly connected with first pedestal and described The first screw rod and the first compressing member being connected with first screw flight that first pedestal is fixedly connected;
The first compressing member lower surface be held in first supporting member and first longeron simultaneously in the middle part of upper table Face.
Further, first support member and first supporting member are bolt;
First compressing member includes horizontally disposed first pressing plate and is resisted against the first of the first pressing plate upper surface Nut, first nut are connected with first screw flight.
Further, the second support that second supporting part is included the second pedestal and is connected with second base thread Part.
Further, second clamping part includes the second supporting member being fixedly connected with second pedestal and described The second screw rod and the second compressing member being connected with second screw flight that second pedestal is fixedly connected;
The second compressing member lower surface is held in the upper surface of second supporting member and the cap cylinder linking arm simultaneously.
Further, the 3rd clamping part includes two lateral adjustment parts being relatively arranged on second pedestal, The lateral adjustment part is horizontally extending, and is vertically resisted against two of the cap cylinder linking arm relative vertical sides On face.
Further, second support member, second supporting member and the equal lateral adjustment part are bolt;
Second compressing member includes horizontally disposed second pressing plate and is resisted against the second of the second pressing plate upper surface Nut, second nut are connected with second screw flight.
Further, the leveling unit is tosecan or dial gauge;
The alignment device is lathe centering pin;
The clamping and positioning device is the dial gauge being vertically arranged.
Another aspect of the present invention provides a kind of mounting and clamping system using above-mentioned arbitrary described bogie frame and enters The method of row bogie frame clamping, for the bogie frame of clamping rail vehicle, wherein, the bogie frame includes horizontal stroke Beam, the first longeron and the second longeron for being arranged at crossbeam both sides is respectively perpendicular, two ends of the longeron are respectively equipped with cap cylinder company Arm is connect, the cap cylinder linking arm is fixedly connected with cap cylinder, and methods described includes:
The bogie frame is positioned on base station, described first is supported in by the first supporting part of the first fixing device Lower surface in the middle part of longeron, is respectively supported at two caps of second longeron by the second supporting part of two the second fixing devices The lower surface of cylinder linking arm;
Leveling unit is directed at in any one of cap cylinder linking arm upper default horizontal line, with the leveling unit is Benchmark, adjusts first supporting part and second supporting part, makes four cap cylinder linking arms of the bogie frame Upper default horizontal line is on sustained height;
3rd clamping part of second fixing device is held in into two relative vertical sides of the cap cylinder linking arm Alignment device is directed at one end of default centering line on the second longeron by face, on the basis of the alignment device, adjusts described the Three clamping parts, make the centering line parallel with the centering line of the base station;
Clamping and positioning device positions the upper surface in the middle part of first longeron, is designated as the first initial position, adjusts described the One supporting part makes first longeron rise the first predetermined altitude, by the clamping of the first clamping part, and is pressed in described first and indulges Upper surface in the middle part of beam, makes the upper surface in the middle part of first longeron be reduced to first initial position;
The clamping and positioning device positions the upper surface of the cap cylinder linking arm, is designated as the second initial position, adjusts described Second supporting part makes the cap cylinder linking arm rise the second predetermined altitude, by the clamping of the first clamping part, and is pressed in the cap The upper surface of cylinder linking arm, makes the upper surface of the cap cylinder linking arm be reduced to second initial position.
Further, first predetermined altitude and second predetermined altitude are 0.2-0.3mm.
The mounting and clamping system of the bogie frame that the present invention is provided and method, by first the first longeron of fixing device clamping Portion, the cap cylinder linking arm of two second the second longerons of fixing device clamping form the supported at three point of isosceles triangle, it may be determined that one Individual stable clamping plane, it is to avoid as four strong points are highly different not same flat during prior art four-point supporting Cause 4 points of unbalance stress to produce different degrees of stress deformation on face, so as to be difficult quickly to efficiently accomplish centering, it is levelling and Clamping process, it is possible to increase the efficiency of clamping, it is swift to operate simple, to adapt to the batch machining of bogie frame;Further, since First fixing device is arranged at the middle part of the first longeron, can largely share the deadweight of bogie frame, can be with larger Stress at the rigid poor cap cylinder linking arm of reduction of degree, reduces the stress deformation of bogie frame, so as to reduce processing When unclamping mounting and clamping system afterwards, the bounce-back of bogie frame, improves machining accuracy.
Description of the drawings
In order to be illustrated more clearly that the specific embodiment of the invention or technical scheme of the prior art, below will be to concrete Needed for embodiment or description of the prior art, accompanying drawing to be used is briefly described.In all of the figs, similar element Or part is typically identified by similar reference.In accompanying drawing, each element or part might not be drawn according to actual ratio.
The structural representation of the mounting and clamping system of the bogie frame that Fig. 1 is provided for one embodiment of the invention;
Fig. 2 is the partial enlarged drawing of the mounting and clamping system of the bogie frame shown in Fig. 1;
Fig. 3 is the structure chart of the first fixing device of the mounting and clamping system of the bogie frame shown in Fig. 1;
Fig. 4 is the structure chart of the second fixing device of the mounting and clamping system of the bogie frame shown in Fig. 1.
Specific embodiment
It should be noted that unless otherwise stated, technical term used in this application or scientific terminology should be this The ordinary meaning understood by bright one of ordinary skill in the art.
In the description of the present application, it is to be understood that term " " center ", " longitudinal direction ", " horizontal ", " length ", " on ", The orientation of the instruction such as D score, " vertical ", " level ", " top ", " bottom ", " interior ", " outward " or position relationship are based on shown in the drawings Orientation or position relationship, be for only for ease of description the present invention and simplify description, rather than indicate or imply indication device or Element with specific orientation, with specific azimuth configuration and operation, therefore must be not considered as limiting the invention.This Outward, term " first ", " second " etc. are only used for describing purpose, and it is not intended that indicating or implying relative importance or implicit Indicate the quantity of indicated technical characteristic.In describing the invention, " multiple " are meant that two or more, unless otherwise bright It is really specific to limit.
The structural representation of the mounting and clamping system of the bogie frame that Fig. 1 is provided for one embodiment of the invention;Fig. 2 is Fig. 1 institutes The partial enlarged drawing of the mounting and clamping system of the bogie frame for showing;Fig. 3 is the first of the mounting and clamping system of the bogie frame shown in Fig. 1 The structure chart of fixing device;Fig. 4 is the structure chart of the second fixing device of the mounting and clamping system of the bogie frame shown in Fig. 1.
As Figure 1-4, the present embodiment provides a kind of mounting and clamping system of bogie frame, turning for clamping rail vehicle To framework frame, wherein, bogie frame includes crossbeam 130, is respectively perpendicular 110 and of the first longeron for being arranged at 130 both sides of crossbeam Second longeron 120, two ends of longeron are respectively equipped with cap cylinder linking arm 121, and cap cylinder linking arm 121 is fixedly connected with cap cylinder 122, Bogie frame mounting and clamping system includes:Base station (not shown), 200, two the second fixing devices 300 of the first fixing device, Leveling unit 400, alignment device (not shown) and clamping and positioning device 500.
Wherein, the first fixing device 200 and two the second fixing devices 300 are removably installed on base station;
First fixing device 200 includes the first supporting part 210 and the first clamping part 220;First supporting part 210 is vertically arranged And height adjustable, for the lower surface being supported in the middle part of the first longeron 110;First clamping part, 220 height adjustable, for being held on Upper surface in the middle part of first longeron 110;
Second fixing device 300 includes the second supporting part, the second clamping part and the 3rd clamping part 330;Second supporting part is erected It is straight to arrange and height adjustable, for being supported in the lower surface of the cap cylinder linking arm 121 of the second longeron 120;Second clamping part height It is adjustable, for being held on the upper surface of cap cylinder linking arm 121;3rd clamping part 330 is used for being held in the two of cap cylinder linking arm 121 Individual relative vertical side, is fixed with the position of adjustment cap cylinder linking arm 121 and to the position of cap cylinder linking arm 121.
In the present embodiment, the first fixing device 200 and two the second being installed in isosceles triangle of fixing device 300 On base station, the first fixing device 200 is located at the isosceles triangle vertex position relative with base, indulges for supporting and fixing first In the middle part of beam 110, the second fixing device 300 is located at the isosceles triangle vertex position relative with two waists, for supporting and fixing The cap cylinder linking arm 121 of the second longeron 120.The lower surface of the first fixing device 200 and the second fixing device 300 is provided with convex Platform, and the slot coordinated with boss on the precalculated position on base station, is provided with, three are capable of achieving by boss is inserted in slot Fixing device is installed with the accurately and rapidly detachable of base station.It should be noted that needing Jing before three fixing devices are installed On base station, the debris such as iron filings are cleaned out, to ensure the cooperation of boss and slot.
Specifically, as in Figure 2-4, the first supporting part 210 may include the first pedestal 211, and with 211 screw thread of the first pedestal First support member 212 of connection.First pedestal 211 is set, can cause it is more firm to the support in the middle part of the first longeron 110, and Pedestal can also be easily installed the first clamping part 220, so as to form first between the first clamping part 220 and the first support member 212 Clamping position in the middle part of longeron 110.First support member 212 is threadedly coupled with the first pedestal 211, is capable of achieving altitude mixture control.Wherein One support member 212 can be bolt, and bolt and the first pedestal 211 be can self-locking be threadedly coupled, prevent in clamping process There is the skew of height in middle skidding.Further, it is another on the first support member 212 that a self-locking nut is set, when the first support Part 212 is adjusted to proper height, screws off self-locking nut so that the upper surface of the lower surface of self-locking nut and the first pedestal 211 Abut, so as to further increase self-lock ability.
The first supporting member 221 that first clamping part 220 may include to be fixedly connected with the first pedestal 211, and the first pedestal 211 The first screw rod 222 for being fixedly connected, and the first compressing member 223 for being threadedly coupled with the first screw rod 222;Under first compressing member 223 Surface be held in the first supporting member 221 and the first longeron 110 simultaneously in the middle part of upper surface.Wherein preferred, the first screw rod 222 sets It is placed between the first supporting member 221 and the first pedestal 211, the lower surface of 223 one end of the first compressing member is held in the first supporting member 221 upper surface, the lower surface of the other end are held in the upper surface in the middle part of the first longeron 110, when the first compressing member 223 is pushed, One moment of flexure is applied in 223 one end of the first compressing member by the first supporting member 221 so that 223 other end of the first compressing member can be compressed The middle part of the first longeron 110, can make thrust bigger.
More specifically, the first supporting member 221 can be bolt, be capable of achieving the height of the first supporting member 221 by swivel bolt Adjust, so as to the size of scalable thrust;First compressing member 223 may include horizontally disposed first pressing plate and be resisted against first First nut of pressing plate upper surface, the first nut are threadedly coupled with the first screw rod 222.First pressure can be compressed by the first nut Plate, wherein the first pressing plate can be U-shaped pressing plate, may pass through the first screw rod 222 and scalable is pressed in 221 upper table of the first supporting member The length of the upper surface in the middle part of face and the first longeron 110, and disassembly process can not screw off the first nut on the first pressing plate, can Insert or pull out from screw rod side, easy accessibility.
Certainly, the first fixing device 200 is not limited in said structure, the existing support for being capable of achieving the first longeron 110 The purpose of the present invention is capable of achieving with the structure of clamping, within the scope of the present invention.
Likewise, as shown in figure 4, second supporting part and the second clamping part of the second fixing device 300 can be supported with first Portion 210 is similar, for support and clip-on cap cylinder linking arm 121, the second supporting part include the second pedestal 311 and with the second pedestal Second support member 312 of threaded connection, the second supporting member 321 that the second clamping part includes being fixedly connected with the second pedestal 311, and The second screw rod 322 that second pedestal 311 is fixedly connected, and the second compressing member for being threadedly coupled with the second screw rod 322;Second compresses Part lower surface is held in the upper surface of the second supporting member and cap cylinder linking arm simultaneously.
Compared to the first fixing device 200, difference is that the second fixing device 300 is except including the second supporting part Outside the second clamping part, also including the 3rd clamping part 330, two for being held in the cap cylinder linking arm 121 are relative to hang down Straight sided, to adjust the position of the cap cylinder linking arm 121 and the position of the cap cylinder linking arm 121 be fixed.
Specifically, the 3rd clamping part 330 may include two lateral adjustment parts being relatively arranged on the second pedestal 311, side It is horizontally extending to regulating part, and be vertically resisted against in two relative vertical sides of cap cylinder linking arm 121.Wherein, Lateral adjustment part installing hole is provided with second pedestal 311, and lateral adjustment part can be bolt, with lateral adjustment part installing hole spiral shell Stricture of vagina connects.
In the mounting and clamping system of the bogie frame of the present embodiment, also including the device of position finding.
Specifically, leveling unit 400 is on the basis of leveling unit 400, by adjusting the first supporting part 210 and second Supporting part makes default horizontal line on four cap cylinder linking arms 121 of bogie frame be on sustained height, with levelling steering Framework frame;
Alignment device adjusts two caps of the second longeron 120 by the 3rd clamping part 330 on the basis of alignment device The position of cylinder linking arm 121 makes default centering line on the second longeron 120 parallel with the centering line of base station, with centering steering structure Frame position on base station;
Clamping and positioning device 500 is for the survey during the upper surface in the middle part of the first longeron 110 of clamping of the first clamping part 220 Measure and record the height and position of the upper surface in the middle part of the first longeron 110 and in the upper of the second clamping part clip-on cap cylinder linking arm 121 The height and position of the upper surface of cap cylinder linking arm 121 is measured and is recorded in surface process.
It should be noted that leveling unit 400 can be tosecan or dial gauge, if tosecan, then tosecan is needed Prevent with base station, and default horizontal line on any one cap cylinder linking arm 121 that aligns, and lock tosecan, with tosecan On the basis of pointer, go to compare default horizontal line on other three cap cylinder linking arms 121, if not, in sustained height, then it is right to adjust Up to default horizontal line on four cap cylinder linking arms 121 on sustained height, error can be controlled in 0.2mm to the supporting part answered It is interior.If the dial gauge being vertically arranged, four cap cylinder inner side planes can be detected using dial gauge then using the dial gauge of lathe Drawing reference position (now can not on cap cylinder linking arm 121 preset level line), repeatedly adjusts respective support portion, until looking for Flat, error is can be controlled in 0.5mm.Alignment device is lathe centering pin, is preset with centering line on the second longeron 120, is adopted Lathe centering pin is directed at an end position of centering line, then moves on the second longeron 120 along the parallel direction of the centering line of base station The other end of centering line, compares the deviation at two ends, by adjusting the lateral adjustment part of the 3rd clamping part 330, supports cap cylinder company The movement of 121 side of arm is connect, is adjusted to so that centering line is parallel with the centering line of base station on the second longeron 120.Certain centering line is simultaneously Be not limited only to be preset on the second longeron 120, be adjusted if being arranged on and same process being also adopted by the first longeron 110.
Clamping and positioning device 500 can be the dial gauge being vertically arranged, and can be fixed on the pedestal of each fixing device, with The height and position of the upper surface of upper surface and cap cylinder linking arm 121 in the middle part of the first longeron 110 of measure and record, specific example Such as, (distance near clamping part exists the dial gauge to be fixed to the upper surface in the middle part of the first longeron 110 by the gauge head of dial gauge Within 10mm-100mm), adjustment dial gauge indicator (makes little pin reading index between 0.5-1mm, large needle reading index is adjusted To 0 scale, it is ensured that the plane contact of the upper surface in the middle part of dial indicator measuring head and the first longeron 110).Adjust the first supporting part 210 Rise the first longeron 110, dial gauge large needle reading dial compresses the first clamping part 220, on one side between 0.2-0.3mm Dial gauge reading dial is checked, makes dial gauge large needle scale return to 0.
The process that bogie frame clamping is carried out using the mounting and clamping system of the bogie frame of the present embodiment is, by bogie Framework is positioned on base station, is supported in the following table in the middle part of the first longeron 110 by the first supporting part 210 of the first fixing device 200 Face, is respectively supported at two cap cylinder linking arms 121 of the second longeron 120 by the second supporting part of two the second fixing devices 300 Lower surface;Leveling unit 400 is directed at in any one cap cylinder linking arm 121 upper default horizontal line, with leveling unit 400 On the basis of, the first supporting part 210 and the second supporting part is adjusted, is made default on four cap cylinder linking arms 121 of bogie frame Horizontal line is on sustained height;3rd clamping part 330 of the second fixing device 300 is held in into the two of cap cylinder linking arm 121 Alignment device is directed at one end of default centering line on the second longeron 120, with alignment device as base by individual relative vertical side Standard, adjusts the 3rd clamping part 330, makes centering line parallel with the centering line of base station;Clamping and positioning device 500 positions the first longeron Upper surface in the middle part of in the of 110, is designated as the first initial position, and adjusting the first supporting part 210 makes the first longeron 110 rise the first predetermined height Degree, is clamped by the first clamping part 220, and the upper surface that is pressed in the middle part of the first longeron 110, is made in the middle part of the first longeron 110 Upper surface is reduced to the first initial position;The upper surface of 500 positioning cap cylinder linking arm 121 of clamping and positioning device, is designated as at the beginning of second Beginning position, adjust the second supporting part make cap cylinder linking arm 121 rise the second predetermined altitude, clamped by the first clamping part 220, and The upper surface of cap cylinder linking arm 121 is pressed in, makes the upper surface of cap cylinder linking arm 121 be reduced to the second initial position.Wherein, One predetermined altitude and second predetermined altitude are 0.2-0.3mm, spiral shell of its 0.2-0.3mm amount for supporting part and clamping part etc. The backlash compensation amount (test value) of stricture of vagina connection, to improve the precision of clamping, and guarantees that bogie frame is unstressed.
It should be noted that will also carry out levelling after centering again, to verify levelling line again, prevent from looking for During just, short transverse changes, and causes clamping error, affects precision;Certainly, it is also required to after clamping be looked for again The checking of flat, centering.Additionally, the clamping compaction process and the second clamping part in the middle part of 220 pairs of the first longerons 110 of the first clamping part Clamping compaction process to cap cylinder linking arm 121 simultaneously do not differentiate between sequencing.
In addition, complete in the middle part of the first longeron 110 and the clamping of 110 two cap cylinder linking arms 121 of the first longeron after, can root Need remaining cap cylinder linking arm 121 is supported and is clamped according to processing, also can to being supported in the middle part of the second longeron 120 and Clamping, certainly, if corresponding position need not process, can not support and clamp.
After the clamping added after bogie frame is completed, in addition it is also necessary to which centering tests the zero point that line sets up bogie frame, specifically Process is:
During another curb girder is verified again after one curb girder centrage of manual operation lathe centering pin checking bogie frame Heart line, confirms that centre line aligning is errorless, then in carrying out point, sets up Y-direction zero point, and charge to lathe;Manual operation lathe centering Centrage on the crossbeam 130 of pin checking bogie frame, sets up X to zero point, and charges to lathe;It is high with tosecan checking corner Levelling line is spent, and after confirmation is errorless, Z-direction zero is set up with Test-cut met (or the datum line for curb girder facade of being made uniform with centering pin with right-angle head) Point, and lathe is charged to, centering line error is controlled within 0.2mm.Lathe by compare bogie frame zero point and its from The zero point of body, can make lathe determine the machining coordinate of bogie frame.
The mounting and clamping system of the bogie frame that the present embodiment is provided, by 200 the first longeron of clamping 110 of the first fixing device Middle part, the cap cylinder linking arm 121 of two 300 the second longerons of clamping 120 of the second fixing device form 3 points of isosceles triangle Support, it may be determined that stable clamping plane, it is to avoid due to each not phase of four strong points height during prior art four-point supporting With not causing 4 points of unbalance stress to produce different degrees of stress deformation at grade, so as to be difficult quickly to efficiently accomplish Centering, levelling and clamping process, it is possible to increase the efficiency of clamping, it is swift to operate simple, added with the batch for adapting to bogie frame Work;Further, since the first fixing device 200 is arranged at the middle part of the first longeron 110, steering structure can be largely shared The deadweight of frame, can largely reduce the stress at the poor cap cylinder linking arm 121 of rigidity, reduce answering for bogie frame Force deformation, when unclamping mounting and clamping system after processing so as to reduce, the bounce-back of bogie frame, improves machining accuracy.
Another aspect of the present invention is to provide a kind of mounting and clamping system of the bogie frame of utilization above-described embodiment and carries out The method of bogie frame clamping, for the bogie frame of clamping rail vehicle, wherein, bogie frame includes crossbeam, divides First longeron and the second longeron of crossbeam both sides are not vertically installed in, two ends of longeron are respectively equipped with cap cylinder linking arm, cap cylinder Linking arm is fixedly connected with cap cylinder, and method includes:
Bogie frame is positioned on base station, is supported in the middle part of the first longeron by the first supporting part of the first fixing device Lower surface, be respectively supported under two cap cylinder linking arms of the second longeron by the second supporting part of two the second fixing devices Surface;
Leveling unit is directed at in any one cap cylinder linking arm upper default horizontal line, on the basis of leveling unit, is adjusted The first supporting part and the second supporting part is saved, makes default horizontal line on four cap cylinder linking arms of bogie frame be in same height On degree;
3rd clamping part of the second fixing device is held in into two relative vertical sides of cap cylinder linking arm, by centering Device is directed at one end of default centering line on the second longeron, on the basis of alignment device, adjusts the 3rd clamping part, makes centering line It is parallel with the centering line of base station;
Clamping and positioning device positions the upper surface in the middle part of the first longeron, is designated as the first initial position, adjusts the first supporting part Make the first longeron rise the first predetermined altitude, by the clamping of the first clamping part, and the upper surface that is pressed in the middle part of the first longeron, make Upper surface in the middle part of first longeron is reduced to the first initial position;
The upper surface of clamping and positioning device positioning cap cylinder linking arm, is designated as the second initial position, and adjusting the second supporting part makes Cap cylinder linking arm rises the second predetermined altitude, by the clamping of the first clamping part, and is pressed in the upper surface of cap cylinder linking arm, makes cap The upper surface of cylinder linking arm is reduced to the second initial position.
Method provided in the present embodiment, has been carried out in the mounting and clamping system embodiment of above-mentioned bogie frame in detail Illustrate, no longer repeated herein.
It should be noted that will also carry out levelling after centering again, to verify levelling line again, prevent from looking for During just, short transverse changes, and causes clamping error, affects precision;Certainly, it is also required to after clamping be looked for again The checking of flat, centering.Additionally, the first clamping part is to the clamping in the middle part of the first longeron and compaction process and the second clamping part are to cap cylinder The clamping of linking arm compaction process simultaneously do not differentiate between sequencing.
Further, the first predetermined altitude and the second predetermined altitude are 0.2-0.3mm.
The method of the bogie frame clamping that the present embodiment is provided, in the middle part of first the first longeron of fixing device clamping, The cap cylinder linking arm of two second the second longerons of fixing device clamping, forms the supported at three point of isosceles triangle, it may be determined that one Stable clamping plane, it is to avoid as four strong points are highly different not in same plane during prior art four-point supporting 4 points of unbalance stress are above caused to produce different degrees of stress deformation, so as to be difficult quickly to efficiently accomplish centering, levelling and folder Hold process, it is possible to increase the efficiency of clamping, it is swift to operate simple, to adapt to the batch machining of bogie frame;Further, since the One fixing device is arranged at the middle part of the first longeron, can largely share the deadweight of bogie frame, can be with larger journey Stress at the rigid poor cap cylinder linking arm of reduction of degree, reduces the stress deformation of bogie frame, so as to reduce after processing The bounce-back of bogie frame when unclamping mounting and clamping system, improves machining accuracy.
Finally it should be noted that:Various embodiments above only to illustrate technical scheme, rather than a limitation;To the greatest extent Pipe has been described in detail to the present invention with reference to foregoing embodiments, it will be understood by those within the art that:Its according to So the technical scheme described in foregoing embodiments can be modified, or which part or all technical characteristic are entered Row equivalent;And these modifications or replacement, do not make the essence of appropriate technical solution depart from various embodiments of the present invention technology The scope of scheme.

Claims (10)

1. a kind of mounting and clamping system of bogie frame, it is characterised in that for the bogie frame of clamping rail vehicle, wherein, The bogie frame includes crossbeam, is respectively perpendicular the first longeron and the second longeron for being arranged at crossbeam both sides, the longeron two Individual end is respectively equipped with cap cylinder linking arm, and the cap cylinder linking arm is fixedly connected with cap cylinder, the bogie frame mounting and clamping system Including:
Base station, is removably provided with the first fixing device and two the second fixing devices on the base station;
First fixing device includes the first supporting part and the first clamping part;First supporting part is vertically arranged and height can Adjust, for the lower surface being supported in the middle part of first longeron;The first clamping part height adjustable, for being held on described Upper surface in the middle part of one longeron;
Second fixing device includes the second supporting part, the second clamping part and the 3rd clamping part;Second supporting part is vertical Arrange and height adjustable, for being supported in the lower surface of the cap cylinder linking arm of second longeron;Second clamping part height It is adjustable, for being held on the upper surface of the cap cylinder linking arm;3rd clamping part is used for being held in the two of the cap cylinder linking arm Individual relative vertical side, to adjust the position of the cap cylinder linking arm and the position of the cap cylinder linking arm be carried out solid It is fixed;
Leveling unit, on the basis of the leveling unit, by adjusting first supporting part and second supporting part Default horizontal line on four cap cylinder linking arms of the bogie frame is made to be on sustained height, with levelling described turn To framework frame;
Alignment device, for, on the basis of the alignment device, adjusting the two of second longeron by the 3rd clamping part The position of the individual cap cylinder linking arm makes default centering line on second longeron parallel with the centering line of the base station, to look for Just described bogie frame position on base station;
Clamping and positioning device, for clamp in first clamping part during the upper surface in the middle part of first longeron measurement and Record the height and position of the upper surface in the middle part of first longeron and the cap cylinder linking arm is clamped in second clamping part The height and position of the upper surface of the cap cylinder linking arm is measured and is recorded during upper surface.
2. the mounting and clamping system of bogie frame according to claim 1, it is characterised in that
The first support member that first supporting part is included the first pedestal and is connected with first base thread.
3. the mounting and clamping system of bogie frame according to claim 2, it is characterised in that
First clamping part includes that the first supporting member being fixedly connected with first pedestal and first pedestal are fixed and connects The first screw rod for connecing and the first compressing member being connected with first screw flight;
The first compressing member lower surface be held in first supporting member and first longeron simultaneously in the middle part of upper surface.
4. the mounting and clamping system of bogie frame according to claim 3, it is characterised in that
First support member and first supporting member are bolt;
First compressing member includes horizontally disposed first pressing plate and being resisted against the first nut of the first pressing plate upper surface, First nut is connected with first screw flight.
5. the mounting and clamping system of bogie frame according to claim 1, it is characterised in that
The second support member that second supporting part is included the second pedestal and is connected with second base thread.
6. the mounting and clamping system of bogie frame according to claim 5, it is characterised in that
Second clamping part includes that the second supporting member being fixedly connected with second pedestal and second pedestal are fixed and connects The second screw rod for connecing and the second compressing member being connected with second screw flight;
The second compressing member lower surface is held in the upper surface of second supporting member and the cap cylinder linking arm simultaneously.
7. the mounting and clamping system of bogie frame according to claim 6, it is characterised in that
3rd clamping part includes two lateral adjustment parts being relatively arranged on second pedestal, the lateral adjustment part It is horizontally extending, and be vertically resisted against in two of the cap cylinder linking arm relative vertical sides.
8. the mounting and clamping system of bogie frame according to claim 7, it is characterised in that
Second support member, second supporting member and the equal lateral adjustment part are bolt;
Second compressing member includes horizontally disposed second pressing plate and being resisted against the second nut of the second pressing plate upper surface, Second nut is connected with second screw flight.
9. the mounting and clamping system of the bogie frame according to any one of claim 1-8, it is characterised in that
The leveling unit is tosecan or dial gauge;
The alignment device is lathe centering pin;
The clamping and positioning device is the dial gauge being vertically arranged.
10. a kind of mounting and clamping system using bogie frame as claimed in any one of claims 1-9 wherein carries out bogie frame The method of clamping, it is characterised in that for the bogie frame of clamping rail vehicle, wherein, the bogie frame includes horizontal stroke Beam, the first longeron and the second longeron for being arranged at crossbeam both sides is respectively perpendicular, two ends of the longeron are respectively equipped with cap cylinder company Arm is connect, the cap cylinder linking arm is fixedly connected with cap cylinder, and methods described includes:
The bogie frame is positioned on base station, first longeron is supported in by the first supporting part of the first fixing device The lower surface at middle part, two cap cylinders for being respectively supported at second longeron by the second supporting part of two the second fixing devices connect Connect the lower surface of arm;
Leveling unit is directed at in any one of cap cylinder linking arm upper default horizontal line, with the leveling unit as base Standard, adjusts first supporting part and second supporting part, makes on four cap cylinder linking arms of the bogie frame Default horizontal line is on sustained height;
3rd clamping part of second fixing device is held in into two relative vertical sides of the cap cylinder linking arm, will Alignment device is directed at one end of default centering line on the second longeron, on the basis of the alignment device, adjusts the 3rd folder Portion is held, makes the centering line parallel with the centering line of the base station;
Clamping and positioning device positions the upper surface in the middle part of first longeron, is designated as the first initial position, adjusts described first Support part makes first longeron rise the first predetermined altitude, by the clamping of the first clamping part, and is pressed in first longeron The upper surface in portion, makes the upper surface in the middle part of first longeron be reduced to first initial position;
The clamping and positioning device positions the upper surface of the cap cylinder linking arm, is designated as the second initial position, adjusts described second Supporting part makes the cap cylinder linking arm rise the second predetermined altitude, by the clamping of the first clamping part, and is pressed in the cap cylinder and connects The upper surface of arm is connect, makes the upper surface of the cap cylinder linking arm be reduced to second initial position.
CN201611263359.3A 2016-12-30 2016-12-30 The mounting and clamping system and method for bogie frame Active CN106514526B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611263359.3A CN106514526B (en) 2016-12-30 2016-12-30 The mounting and clamping system and method for bogie frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611263359.3A CN106514526B (en) 2016-12-30 2016-12-30 The mounting and clamping system and method for bogie frame

Publications (2)

Publication Number Publication Date
CN106514526A true CN106514526A (en) 2017-03-22
CN106514526B CN106514526B (en) 2018-10-02

Family

ID=58336073

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611263359.3A Active CN106514526B (en) 2016-12-30 2016-12-30 The mounting and clamping system and method for bogie frame

Country Status (1)

Country Link
CN (1) CN106514526B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108115645A (en) * 2017-12-18 2018-06-05 贵州安吉航空精密铸造有限责任公司 A kind of scribing tooling for ruling on the casting with complex profile
CN109282995A (en) * 2017-07-21 2019-01-29 中车唐山机车车辆有限公司 Parameter of bogie testboard

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101143420A (en) * 2007-10-31 2008-03-19 济南轨道交通装备有限责任公司 Railway goods train bogie side frame inner conductive frame processing clamping positioning technology
KR20120005583A (en) * 2010-07-09 2012-01-17 현대중공업 주식회사 Jig devic of the center flange fabrication
FR2956828B1 (en) * 2010-02-26 2012-03-30 Peugeot Citroen Automobiles Sa ASSEMBLY MACHINE HAVING A COMMON POST OF TOOLS
CN102825413A (en) * 2012-09-10 2012-12-19 北京二七轨道交通装备有限责任公司 Assembling and welding tooling of bogie frame
CN105151068A (en) * 2015-08-24 2015-12-16 唐山轨道客车有限责任公司 Power bogie and light rail vehicle
CN105922154A (en) * 2016-05-23 2016-09-07 中车唐山机车车辆有限公司 Positioning support device used for vehicle body assembling of railway vehicle

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101143420A (en) * 2007-10-31 2008-03-19 济南轨道交通装备有限责任公司 Railway goods train bogie side frame inner conductive frame processing clamping positioning technology
FR2956828B1 (en) * 2010-02-26 2012-03-30 Peugeot Citroen Automobiles Sa ASSEMBLY MACHINE HAVING A COMMON POST OF TOOLS
KR20120005583A (en) * 2010-07-09 2012-01-17 현대중공업 주식회사 Jig devic of the center flange fabrication
CN102825413A (en) * 2012-09-10 2012-12-19 北京二七轨道交通装备有限责任公司 Assembling and welding tooling of bogie frame
CN105151068A (en) * 2015-08-24 2015-12-16 唐山轨道客车有限责任公司 Power bogie and light rail vehicle
CN105922154A (en) * 2016-05-23 2016-09-07 中车唐山机车车辆有限公司 Positioning support device used for vehicle body assembling of railway vehicle

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109282995A (en) * 2017-07-21 2019-01-29 中车唐山机车车辆有限公司 Parameter of bogie testboard
CN109282995B (en) * 2017-07-21 2020-06-30 中车唐山机车车辆有限公司 Bogie parameter test bench
CN108115645A (en) * 2017-12-18 2018-06-05 贵州安吉航空精密铸造有限责任公司 A kind of scribing tooling for ruling on the casting with complex profile

Also Published As

Publication number Publication date
CN106514526B (en) 2018-10-02

Similar Documents

Publication Publication Date Title
US4366624A (en) Arrangement for benches for measuring and straightening vehicles
CN112414652B (en) Efficient high-precision white car body static rigidity measurement system and test method
CN108608216A (en) A kind of gate bridge miller column mounting and adjusting structure and its method of adjustment
NO773970L (en) CONTROL AND MEASURING DEVICE FOR VEHICLE CHASSIS
CN105773610B (en) A kind of robot calibration's device
CN208419973U (en) A kind of measuring tool of track installation adjustment
CN109175004B (en) A kind of frame alignment equipment
CN106514526B (en) The mounting and clamping system and method for bogie frame
CN111774799B (en) Assembly tool for welding box beam splicing structure frame
CN208296765U (en) A kind of ball screw assembly, journey error measuring device with compensation device
CN112550608B (en) Leveling installation method for inclinometer base during building of ship on slipway
CN211234266U (en) Measuring tool for measuring concentricity of large drill
CN106363425A (en) Engine cylinder oblique-hole processing clamp and aligning method thereof
CN109443141A (en) A kind of three-dimensional tester
CN111945579B (en) Positioning and adjusting device and positioning and installing method for PC track beam cast steel tension support
CN214980547U (en) Clamp for eccentric measurement
CN210850550U (en) Adjusting device for optical centering instrument
CN210135403U (en) Level gauge support for railway engineering measurement
CN103453888A (en) Levelling rod perpendicularity calibrating stand
CN201677266U (en) Clamping device and clamping equipment
CN101387486A (en) Pin hole symmetrical degree testing device
CN110044242A (en) It is a kind of can micro adjustment leveling ruler testing agency
CN109238723A (en) A kind of engine quick centering device
CN220016712U (en) Multifunctional quick meter-setting device for generator
CN212645680U (en) Workpiece surface roughness's inspection device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant