CN106503201A - A kind of implementation method based on IEC61850 source maintenance technologies - Google Patents
A kind of implementation method based on IEC61850 source maintenance technologies Download PDFInfo
- Publication number
- CN106503201A CN106503201A CN201610945875.8A CN201610945875A CN106503201A CN 106503201 A CN106503201 A CN 106503201A CN 201610945875 A CN201610945875 A CN 201610945875A CN 106503201 A CN106503201 A CN 106503201A
- Authority
- CN
- China
- Prior art keywords
- file
- files
- cim
- iec61850
- plant stand
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/10—File systems; File servers
- G06F16/17—Details of further file system functions
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Data Mining & Analysis (AREA)
- Databases & Information Systems (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The embodiment of the invention discloses a kind of implementation method based on IEC61850 source maintenance technologies, for solve by conventional 104 stipulations can only on send data, can not on send model, support without model, the self-described of data can not be realized, need to send in manual configuration transformer substation end data and the corresponding relation between dispatching terminal data receiver, two ends also need to the correctness for carrying out actual transmission test to verify data configuration that cooperates, whole maintenance process needs the conversion twice between object oriented programming model and point table, forwarding information table configuration is complicated, configuration and debugging work load are big and error-prone.Meanwhile, the source maintenance for extending 104 modes there is also complicated, the error-prone technical problem of maintenance process.
Description
Technical field
A kind of the present invention relates to power system automatic field, more particularly to reality based on IEC61850 source maintenance technologies
Existing method.
Background technology
Communication between boss stands at present is still mainly using stipulations such as the telemechanicals 101,104 based on a table.Common by extension
The mode of IEC104 stipulations realizes that the source of boss station artwork is safeguarded.
Find in practice to safeguard by the source for extending the boss station artwork that 104 modes are realized and there is following asking
Topic:104 stipulations can only on send data, it is impossible to above send model, the support without model, it is impossible to realize the self-described of data, need
Send in manual configuration transformer substation end data and the corresponding relation between dispatching terminal data receiver, two ends also need to cooperate and carry out
Actual transmission test is needed between object oriented programming model and point table with verifying the correctness of data configuration, whole maintenance process
Conversion twice, forwarding information table configuration is complicated, and configuration and debugging work load are big and error-prone.Meanwhile, extend the source of 104 modes
End maintenance there is also maintenance process complicated, error-prone the problems such as.
Content of the invention
A kind of implementation method based on IEC61850 source maintenance technologies is embodiments provided, is solved by normal
Advise 104 stipulations can only on send data, it is impossible to above send model, the support without model, it is impossible to realize the self-described of data, need hand
Send and the corresponding relation between dispatching terminal data receiver in work configuration transformer substation end data, two ends also need to cooperate carries out reality
The transmission test on border is needed between object oriented programming model and point table with verifying the correctness of data configuration, whole maintenance process
Change twice, forwarding information table configuration is complicated, configuration and debugging work load are big and error-prone.Meanwhile, extend the source of 104 modes
Safeguard and there is also complicated, the error-prone technical problem of maintenance process.
A kind of implementation method based on IEC61850 source maintenance technologies provided in an embodiment of the present invention, including:
S1:The File more new signal of substation upload is received, and the CIM moulds that need to be updated are obtained from plant stand smart motion machine
Type file, SVG graphic files, relational file;
S2:The new CIM file of importing and SVG graphic files, the CIM file updated according to the need for getting,
SVG graphic files, relational file, carry out associating for equipment and measuring point with plant stand, generate map files;
S3:The map files are sent to substation.
Preferably, also include:
S4:The map files are sent to behind substation, substation are received and is simplified according to the new of the map file generateds for receiving
Scd files.
Preferably, step S2 is specifically included:
CIM file, SVG graphic files that the need for getting update is read, new CIM file and SVG is imported
Graphic file, the CIM file updated according to the need for getting, SVG graphic files, relational file, carries out equipment with plant stand
With the association of measuring point, and choose and to generate map files.
Preferably, also include after step S4:
S5:Receive new simplify scd files after, opening report-control block carries out the transmission and exchange of data.
Preferably, step S1 is specifically included:
The File more new signal of substation upload is received, is attached with plant stand, obtained from plant stand smart motion machine
The CIM file that need to update, SVG graphic files, relational file.
A kind of main website based on IEC61850 source maintenance technologies provided in the embodiment of the present invention, including:
Acquiring unit, for receiving the File more new signal of substation upload, obtaining from plant stand smart motion machine needs
The CIM file of renewal, SVG graphic files, relational file;
Signal generating unit, for importing new CIM file and SVG graphic files, according to the CIM that the need for getting update
Model file, SVG graphic files, relational file, carry out associating for equipment and measuring point with plant stand, generate map files;
Transmitting element, for being sent to substation by the map files.
Preferably, also include:
Receiving unit, for the map files are sent to behind substation, receives substation according to the map file generateds for receiving
New simplify scd files.
Preferably, signal generating unit is specifically included:
Subelement is read, for reading CIM file, the SVG graphic files that the need for getting update;
Subelement is imported, after the CIM file of the need renewal got for reading, SVG graphic files, is imported new
CIM file and SVG graphic files;
Subelement is generated, for importing after new CIM file and SVG graphic files, is updated according to needing of getting
CIM file, SVG graphic files, relational file, carry out associating for equipment and measuring point with plant stand, and choose and generate map texts
Part.
Preferably, also include:
Data processing unit, for receive new simplify after scd files, opening report-control block carries out the transmission of data
With exchange.
Preferably, the acquiring unit is specifically included:
Connection subelement, for receiving the file more new signal of substation upload, is attached with plant stand;
Subelement is obtained, and after being attached with plant stand, the CIM that need to be updated is obtained from plant stand smart motion machine
File, SVG graphic files, relational file.
A kind of system based on IEC61850 source maintenance technologies provided in the embodiment of the present invention, including:
Main website end and plant stand end, wherein described plant stand end include smart motion machine, IEC61850 data/address bus;The intelligence
Fitness machine includes that state estimating unit or data screening unit, the storage of plant stand uniform data are gathered with integral unit, uniform data
Unit;The smart motion machine is connected with the IEC61850 data/address bus;The main website end is connected with the plant stand end.
As can be seen from the above technical solutions, the embodiment of the present invention has advantages below:
A kind of implementation method based on IEC61850 source maintenance technologies provided in the embodiment of the present invention, including S1:Receive
To the File more new signal that substation uploads, CIM file, the SVG figures that need to be updated is obtained from plant stand smart motion machine
Shape files, relational file;S2:New CIM file and SVG graphic files is imported, according to the CIM moulds that the need for getting update
Type file, SVG graphic files, relational file, carry out associating for equipment and measuring point with plant stand, generate map files;S3:Will be described
Map files are sent to substation.In the present embodiment, by receiving the File more new signal of substation upload, intelligently transport from plant stand
In motivation obtain need to update CIM file, SVG graphic files, relational file;Import new CIM file and SVG figures
Shape files, the CIM file updated according to the need that get, SVG graphic files, relational file, with plant stand carry out equipment and
The association of measuring point, generates map files;By the map files be sent to substation solve by conventional 104 stipulations can only on send number
According to, it is impossible to model is above sent, the support without model, it is impossible to realize the self-described of data, need manual configuration transformer substation end data
On send and the corresponding relation between dispatching terminal data receiver, two ends also need to cooperate and carry out actual transmission test to verify
The correctness of data configuration, whole maintenance process need the conversion twice between object oriented programming model and point table, forwarding information
Table configuration is complicated, and configuration and debugging work load are big and error-prone.Meanwhile, the source for extending 104 modes safeguards that there is also maintenance flows
Complicated, the error-prone technical problem of journey.
Description of the drawings
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing
Accompanying drawing to be used needed for having technology description is briefly described, it should be apparent that, drawings in the following description are only this
Some embodiments of invention, for those of ordinary skill in the art, without having to pay creative labor, may be used also
To obtain other accompanying drawings according to these accompanying drawings.
Fig. 1 is of a kind of implementation method based on IEC61850 source maintenance technologies provided in the embodiment of the present invention
The schematic flow sheet of embodiment;
Fig. 2 is a kind of the another of implementation method based on IEC61850 source maintenance technologies of offer in the embodiment of the present invention
The schematic flow sheet of individual embodiment;
Fig. 3 is an a kind of enforcement of the main website based on IEC61850 source maintenance technologies provided in the embodiment of the present invention
The structural representation of example;
Fig. 4 is a kind of another reality for the main website based on IEC61850 source maintenance technologies provided in the embodiment of the present invention
Apply the structural representation of example;
Fig. 5 is a kind of the another of implementation method based on IEC61850 source maintenance technologies of offer in the embodiment of the present invention
The schematic flow sheet of individual embodiment;
Fig. 6 is an a kind of enforcement of the system based on IEC61850 source maintenance technologies provided in the embodiment of the present invention
The structural representation of example.
Specific embodiment
A kind of implementation method based on IEC61850 source maintenance technologies is embodiments provided, is solved by normal
Advise 104 stipulations can only on send data, it is impossible to above send model, the support without model, it is impossible to realize the self-described of data, need hand
Send and the corresponding relation between dispatching terminal data receiver in work configuration transformer substation end data, two ends also need to cooperate carries out reality
The transmission test on border is needed between object oriented programming model and point table with verifying the correctness of data configuration, whole maintenance process
Change twice, forwarding information table configuration is complicated, configuration and debugging work load are big and error-prone.Meanwhile, extend the source of 104 modes
Safeguard and there is also complicated, the error-prone technical problem of maintenance process.
For enabling the goal of the invention of the present invention, feature, advantage more obvious and understandable, below in conjunction with the present invention
Accompanying drawing in embodiment, to the embodiment of the present invention in technical scheme be clearly and completely described, it is clear that disclosed below
Embodiment be only a part of embodiment of the invention, and not all embodiment.Embodiment in based on the present invention, this area
All other embodiment that those of ordinary skill is obtained under the premise of creative work is not made, belongs to protection of the present invention
Scope.
Fig. 1 is referred to, a kind of implementation method based on IEC61850 source maintenance technologies provided in the embodiment of the present invention
One embodiment include:
101st, the File more new signal of substation upload is received, and the CIM that need to be updated is obtained from plant stand smart motion machine
Model file, SVG graphic files, relational file;
102nd, the new CIM file of importing and SVG graphic files, the CIM file updated according to the need for getting,
SVG graphic files, relational file, carry out associating for equipment and measuring point with plant stand, generate map files;
103rd, the map files are sent to substation.
The above is that a kind of implementation method based on IEC61850 source maintenance technologies is described in detail, below will be right
A kind of process of the implementation method based on IEC61850 source maintenance technologies is described in detail, and refers to Fig. 2, and the present invention is real
Another embodiment for applying a kind of implementation method based on IEC61850 source maintenance technologies provided in example includes:
201st, the File more new signal of substation upload is received, is attached with plant stand, from plant stand smart motion machine
Obtain need to update CIM file, SVG graphic files, relational file;
At plant stand end, SCD model files and SVG graphic files is set up, SCD model files are converted to CIM
File;Generate the relational file of 61850 pathnames and the rdf of CIM;Set up the connection of main website and plant stand;
At main website end, the file more new signal of substation upload is received, the CIM that need to be updated is obtained from plant stand intelligent telecontrol communication machine
Model file, SVG graphic files, relational file.
202nd, CIM file, SVG graphic files that the need that get update are read, import new CIM file and
SVG graphic files, the CIM file updated according to the need for getting, SVG graphic files, relational file, are set with plant stand
The association of standby and measuring point, and choose a generation map file;
At main website end, CIM file, SVG graphic files that the need for getting update actively is read, new CIM is imported
Model file and SVG graphic files, according to relational file, the CIM file that need to be updated and SVG graphic files, by main website with
Plant stand carries out the association of equipment and measuring point, and the point for selecting needs generates map files.
203rd, the map files are sent to substation;
The map files are sent to substation by main website.
204th, the map files are sent to behind substation, receive substation and simplified according to the new of the map file generateds for receiving
Scd files;
In plant stand intelligent telecontrol generator terminal, when receiving map files, new simplifying is generated according to the point for selecting map files
The scd files passes main website that crosses;Main website receives new scd files.
205th, receive new simplify scd files after, opening report-control block carries out the transmission and exchange of data.
After main website receives new scd files, opening report-control block carries out the transmission and exchange of data.
Refer to Fig. 3, one of a kind of main website based on IEC61850 source maintenance technologies provided in an embodiment of the present invention
Embodiment includes:
Acquiring unit 301, for receiving the File more new signal of substation upload, obtains from plant stand smart motion machine
The CIM file that need to update, SVG graphic files, relational file;
Signal generating unit 302, for importing new CIM file and SVG graphic files, updates according to the need for getting
CIM file, SVG graphic files, relational file, carry out associating for equipment and measuring point with plant stand, generate map files;
Transmitting element 303, for being sent to substation by the map files.
The above is that a kind of main website each unit based on IEC61850 source maintenance technologies is described in detail, and below will
A kind of main website extra cell based on IEC61850 source maintenance technologies is described in detail, Fig. 4 is referred to, the present invention is real
Another embodiment for applying a kind of main website based on IEC61850 source maintenance technologies provided in example includes:
Acquiring unit 401, for receiving the File more new signal of substation upload, obtains from plant stand smart motion machine
The CIM file that need to update, SVG graphic files, relational file;
The acquiring unit 401 is specifically included:
Connection subelement 4011, for receiving the file more new signal of substation upload, is attached with plant stand;
Subelement 4012 is obtained, and after being attached with plant stand, the CIM that need to be updated is obtained from plant stand smart motion machine
Model file, SVG graphic files, relational file.
Signal generating unit 402, for importing new CIM file and SVG graphic files, updates according to the need for getting
CIM file, SVG graphic files, relational file, carry out associating for equipment and measuring point with plant stand, generate map files;
Signal generating unit 402 is specifically included:
Subelement 4021 is read, for reading CIM file, the SVG graphic files that the need for getting update;
Subelement 4022 is imported, after the CIM file of the need renewal got for reading, SVG graphic files, is imported
New CIM file and SVG graphic files;
Subelement 4023 is generated, for importing after new CIM file and SVG graphic files, according to the need for getting
The CIM file of renewal, SVG graphic files, relational file, carry out associating for equipment and measuring point with plant stand, and choose and generate
Map files.
Transmitting element 403, for being sent to substation by the map files;
Receiving unit 404, for the map files are sent to behind substation, receives substation according to the map files life for receiving
Into new simplify scd files;
Data processing unit 405, for receive new simplify after scd files, open report-control block carry out data
Transmission and exchange.
A kind of another reality for the implementation method based on IEC61850 source maintenance technologies provided in the embodiment of the present invention
Apply example and refer to Fig. 5, structural representation refers to Fig. 6, comprises the following steps:
Plant stand end is modeled to whole station using IEC61850 systems, and to transformer station's electric network composition, primary equipment secondary sets
Standby and incidence relation is modeled.Derive cim models, svg figures, relational file in plant stand end.
The connection with plant stand end intelligent telecontrol communication machine is set up at main website end, and successful connection, if not plant stand cim mould in system
Type, svg figures, relational file, then actively call cim models, svg figures, relational file, if the plant stand cim model,
Svg figures, relational file, then the file cim that more new signal automatic-calling changed for being uploaded according to plant stand end intelligent telecontrol communication machine
Model, svg figures, relational file.
Cim models all devices point parameter information is imported main website parameter database using model import tool by main website end,
And svg figures are converted into the graphical format that main station system needs using figure crossover tool, and will be imported by relational file
Main website database in equipment point parameter information be associated with the measuring point on main station system figure.
Main website picks out the equipment point information for needing plant stand end to upload in real time according to cim models, generates map files, will be raw
Into map files issue substation.
The scd files that substation is simplified according to the map file generateds for receiving, send scd file change signals to main website.
New scd files are called by main website after receiving scd file change signals, enable report-control block and carry out data transmission.
Fig. 6 is referred to, a kind of system based on IEC61850 source maintenance technologies provided in the embodiment of the present invention, bag
Include:
Main website end and plant stand end, wherein described plant stand end include smart motion machine, IEC61850 data/address bus;The intelligence
Fitness machine includes that state estimating unit or data screening unit, the storage of plant stand uniform data are gathered with integral unit, uniform data
Unit;The smart motion machine is connected with the IEC61850 data/address bus;The main website end is connected with the plant stand end.
Those skilled in the art can be understood that, for convenience and simplicity of description, the system of foregoing description,
Device and the specific work process of unit, may be referred to the corresponding process in preceding method embodiment, will not be described here.
In several embodiments provided herein, it should be understood that disclosed system, apparatus and method can be with
Realize by another way.For example, device embodiment described above is only schematic, for example, the unit
Divide, only a kind of division of logic function can have other dividing mode, for example multiple units or component when actually realizing
Can in conjunction with or be desirably integrated into another system, or some features can be ignored, or not execute.Another, shown or
The coupling each other for discussing or direct-coupling or communication connection can be the indirect couplings by some interfaces, device or unit
Close or communicate to connect, can be electrical, mechanical or other forms.
The unit that illustrates as separating component can be or may not be physically separate, aobvious as unit
The part for showing can be or may not be physical location, you can be located at a place, or can also be distributed to multiple
On NE.Some or all of unit therein can be selected according to the actual needs to realize the mesh of this embodiment scheme
's.
In addition, each functional unit in each embodiment of the invention can be integrated in a processing unit, it is also possible to
It is that unit is individually physically present, it is also possible to which two or more units are integrated in a unit.Above-mentioned integrated list
Unit both can be realized in the form of hardware, it would however also be possible to employ the form of SFU software functional unit is realized.
If the integrated unit is realized and as independent production marketing or use using in the form of SFU software functional unit
When, can be stored in a computer read/write memory medium.Such understanding is based on, technical scheme is substantially
The part that in other words prior art is contributed or all or part of the technical scheme can be in the form of software products
Embody, the computer software product is stored in a storage medium, use so that a computer including some instructions
Equipment (can be personal computer, server, or network equipment etc.) executes the complete of each embodiment methods described of the invention
Portion or part steps.And aforesaid storage medium includes:USB flash disk, portable hard drive, read-only storage (ROM, Read-Only
Memory), random access memory (RAM, Random Access Memory), magnetic disc or CD etc. are various can store journey
The medium of sequence code.
The above, above example only in order to technical scheme to be described, rather than a limitation;Although with reference to front
State embodiment to be described in detail the present invention, it will be understood by those within the art that:Which still can be to front
State the technical scheme described in each embodiment to modify, or equivalent is carried out to which part technical characteristic;And these
Modification is replaced, and does not make the essence of appropriate technical solution depart from the spirit and scope of various embodiments of the present invention technical scheme.
Claims (10)
1. a kind of implementation method based on IEC61850 source maintenance technologies, it is characterised in that include:
S1:Receive substation upload file more new signal, from plant stand smart motion machine obtain need to update CIM file,
SVG graphic files, relational file;
S2:New CIM file and SVG graphic files is imported, the CIM file, SVG figures according to the need renewal for getting
Shape files, relational file, carry out associating for equipment and measuring point with plant stand, generate map files;
S3:The map files are sent to substation.
2. the implementation method based on IEC61850 source maintenance technologies according to claim 1, it is characterised in that after S3
Also include:
S4:The map files are sent to behind substation, to simplify scd literary according to the map file generateds for receiving new to receive substation
Part.
3. the implementation method based on IEC61850 source maintenance technologies according to claim 2, it is characterised in that the step
Rapid S2 is specifically included:
CIM file, SVG graphic files that the need for getting update is read, new CIM file and SVG figures is imported
File, the CIM file updated according to the need for getting, SVG graphic files, relational file, carries out equipment and survey with plant stand
The association of point, and generate map files.
4. the implementation method based on IEC61850 source maintenance technologies according to claim 3, it is characterised in that the step
Also include after rapid S4:
S5:Receive new simplify scd files after, opening report-control block carries out the transmission and exchange of data.
5. the implementation method based on IEC61850 source maintenance technologies according to claim 4, it is characterised in that the step
Rapid S1 is specifically included:
The File more new signal of substation upload is received, is attached with plant stand, obtaining from plant stand smart motion machine needs more
New CIM file, SVG graphic files, relational file.
6. a kind of main website based on IEC61850 source maintenance technologies, it is characterised in that include:
Acquiring unit, for receiving the File more new signal of substation upload, obtaining from plant stand smart motion machine needs to update
CIM file, SVG graphic files, relational file;
Signal generating unit, for importing new CIM file and SVG graphic files, according to the CIM that the need for getting update
File, SVG graphic files, relational file, carry out associating for equipment and measuring point with plant stand, generate map files;
Transmitting element, for being sent to substation by the map files.
7. the main website based on IEC61850 source maintenance technologies according to claim 6, it is characterised in that also include:
Receiving unit, for the map files are sent to behind substation, receives substation according to the new of the map file generateds for receiving
Simplify scd files;
Data processing unit, for receive new simplify after scd files, opening report-control block carries out the transmission and friendship of data
Change.
8. the main website based on IEC61850 source maintenance technologies according to claim 7, it is characterised in that the generation list
Unit specifically includes:
Subelement is read, for reading CIM file, the SVG graphic files that the need for getting update;
Subelement is imported, after the CIM file of the need renewal got for reading, SVG graphic files, new CIM is imported
Model file and SVG graphic files;
Subelement is generated, for importing after new CIM file and SVG graphic files, according to the CIM that the need for getting update
Model file, SVG graphic files, relational file, carry out associating for equipment and measuring point with plant stand, and generate map files.
9. the main website based on IEC61850 source maintenance technologies according to claim 8, it is characterised in that the acquisition list
Unit specifically includes:
Connection subelement, for receiving the file more new signal of substation upload, is attached with plant stand;
Subelement is obtained, and after being attached with plant stand, the CIM text that need to be updated is obtained from plant stand smart motion machine
Part, SVG graphic files, relational file.
10. a kind of system based on IEC61850 source maintenance technologies, it is characterised in that include:
Main website end and plant stand end, wherein described plant stand end include smart motion machine, IEC61850 data/address bus;The smart motion
Machine includes state estimating unit or data screening unit, the storage of plant stand uniform data and integral unit, uniform data collecting unit;
The smart motion machine is connected with the IEC61850 data/address bus;The main website end is connected with the plant stand end.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610945875.8A CN106503201A (en) | 2016-11-02 | 2016-11-02 | A kind of implementation method based on IEC61850 source maintenance technologies |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610945875.8A CN106503201A (en) | 2016-11-02 | 2016-11-02 | A kind of implementation method based on IEC61850 source maintenance technologies |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106503201A true CN106503201A (en) | 2017-03-15 |
Family
ID=58321185
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610945875.8A Pending CN106503201A (en) | 2016-11-02 | 2016-11-02 | A kind of implementation method based on IEC61850 source maintenance technologies |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106503201A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108520163A (en) * | 2018-08-06 | 2018-09-11 | 中国能源建设集团湖南省电力设计院有限公司 | Three-dimensional net rack method for automatic modeling based on CIM model and SVG figures |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102185383A (en) * | 2011-05-16 | 2011-09-14 | 广东电网公司深圳供电局 | Method and system for realizing data sharing between power distribution main station system and power distribution GIS (Geographic Information System) |
CN104820679A (en) * | 2015-04-16 | 2015-08-05 | 广东电网有限责任公司电力科学研究院 | IEC61850 protocol-based electric measurement remote transmission method for measuring terminal based on IEC61850 protocol |
CN104821936A (en) * | 2015-03-24 | 2015-08-05 | 广东电网有限责任公司电力科学研究院 | System for realizing IEC61850 station level communication protocol based on socket and ASN.1 |
-
2016
- 2016-11-02 CN CN201610945875.8A patent/CN106503201A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102185383A (en) * | 2011-05-16 | 2011-09-14 | 广东电网公司深圳供电局 | Method and system for realizing data sharing between power distribution main station system and power distribution GIS (Geographic Information System) |
CN104821936A (en) * | 2015-03-24 | 2015-08-05 | 广东电网有限责任公司电力科学研究院 | System for realizing IEC61850 station level communication protocol based on socket and ASN.1 |
CN104820679A (en) * | 2015-04-16 | 2015-08-05 | 广东电网有限责任公司电力科学研究院 | IEC61850 protocol-based electric measurement remote transmission method for measuring terminal based on IEC61850 protocol |
Non-Patent Citations (2)
Title |
---|
冯善强 等: "分布式部署的新型远动机传输方案研究", 《电力系统保护与控制》 * |
黄凯 等: "一体化电网运行智能系统的源端维护技术", 《电力系统自动化》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108520163A (en) * | 2018-08-06 | 2018-09-11 | 中国能源建设集团湖南省电力设计院有限公司 | Three-dimensional net rack method for automatic modeling based on CIM model and SVG figures |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103762723B (en) | Method and system for managing a power grid | |
CN101873008B (en) | Method for converting SCD (substation configuration description) model into CIM (common information model) model of dispatching center | |
CN102622463B (en) | Drawing-model uniformity based method for automatic check of design drawings | |
CN107483082A (en) | A kind of low-voltage distribution network topology automatic identification method and system based on the work frequency carrier communication technology | |
CN104102790B (en) | Power supply figure automatic mapping system and method based on GIS | |
CN106408207A (en) | Modeling method and system for secondary virtual loop of intelligent substation | |
CN107590749A (en) | A kind of processing method and system with electricity consumption data | |
CN104318006B (en) | A kind of optimization method of virtual terminals of intelligent substation design | |
CN205691139U (en) | Air conditioner charging system | |
CN102243676B (en) | Three-level modeling method of new energy comprehensive monitoring system | |
CN105914890A (en) | Transformer substation automation control system | |
CN110535236A (en) | Intelligent substation bay level simulation self-acceptance system and method | |
CN108592311A (en) | Air conditioner equipment pairing method and device | |
CN110266037A (en) | Distributed new based on topological auto-polymerization observes modeling method and system entirely | |
CN110956466A (en) | Energy transaction system and method based on block chain | |
CN103065269A (en) | Marketing and distribution main data management system | |
CN105259860B (en) | A kind of master-slave mode intelligent power device method of automatic configuration | |
CN106910143A (en) | Power distribution network artwork multi-edition control method and system | |
CN104881739B (en) | Data consistency verification method is matched somebody with somebody by a kind of battalion based on IEC61970/61968 CIM standards | |
CN102970163A (en) | Method and system for upgrading nodes in power communication backbone network | |
CN106017514A (en) | Air conditioner charging system | |
CN104182818B (en) | A kind of method and system of substation information intelligence automatic data collection | |
CN106503201A (en) | A kind of implementation method based on IEC61850 source maintenance technologies | |
CN108227644A (en) | A kind of equipment replacement method, apparatus, storage medium and electronic device | |
CN206975698U (en) | A kind of power transmission and transformation line equipment routing inspection system based on AR |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170315 |
|
RJ01 | Rejection of invention patent application after publication |