CN106501592A - A kind of SF6 breaker open operation electric current Real-time Collections and processing method for switched capacitor reactor - Google Patents

A kind of SF6 breaker open operation electric current Real-time Collections and processing method for switched capacitor reactor Download PDF

Info

Publication number
CN106501592A
CN106501592A CN201611016241.0A CN201611016241A CN106501592A CN 106501592 A CN106501592 A CN 106501592A CN 201611016241 A CN201611016241 A CN 201611016241A CN 106501592 A CN106501592 A CN 106501592A
Authority
CN
China
Prior art keywords
open operation
breaker open
electric current
switched capacitor
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611016241.0A
Other languages
Chinese (zh)
Inventor
王硕君
胡中
杨玺
陈义龙
胡泰
张贤超
许巧云
麦荣焕
仇智诚
陈文鸿
郭素梅
李晓斌
华栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Eagle Technology Co ltd
Jiangmen Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Guangzhou Eagle Technology Co ltd
Jiangmen Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Eagle Technology Co ltd, Jiangmen Power Supply Bureau of Guangdong Power Grid Co Ltd filed Critical Guangzhou Eagle Technology Co ltd
Priority to CN201611016241.0A priority Critical patent/CN106501592A/en
Publication of CN106501592A publication Critical patent/CN106501592A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R19/00Arrangements for measuring currents or voltages or for indicating presence or sign thereof
    • G01R19/25Arrangements for measuring currents or voltages or for indicating presence or sign thereof using digital measurement techniques
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R19/00Arrangements for measuring currents or voltages or for indicating presence or sign thereof
    • G01R19/25Arrangements for measuring currents or voltages or for indicating presence or sign thereof using digital measurement techniques
    • G01R19/2506Arrangements for conditioning or analysing measured signals, e.g. for indicating peak values ; Details concerning sampling, digitizing or waveform capturing
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/327Testing of circuit interrupters, switches or circuit-breakers
    • G01R31/3271Testing of circuit interrupters, switches or circuit-breakers of high voltage or medium voltage devices
    • GPHYSICS
    • G08SIGNALLING
    • G08CTRANSMISSION SYSTEMS FOR MEASURED VALUES, CONTROL OR SIMILAR SIGNALS
    • G08C23/00Non-electrical signal transmission systems, e.g. optical systems
    • G08C23/06Non-electrical signal transmission systems, e.g. optical systems through light guides, e.g. optical fibres

Abstract

The invention discloses a kind of SF6 breaker open operation electric current Real-time Collections and processing method for switched capacitor reactor, including step:1)Build SF6 breaker open operation current acquisition topological structure;2)Collecting unit monitor in real time primary cut-out auxiliary contact, judge primary cut-out opening and closing information, are determined with this time point and catch opening and closing instantaneous current value and carry out record ripple, and the record ripple time is 100ms before and after auxiliary contact action;3)SPI storage chips are selected to meet the high speed of data transfer, while consider that the reliability I C buses of system meet normal information communication and only receive SPI chip inner high voltage choppers and cut-offfing, closing transient data access, two-way cooperates;4)Treated digital quantity is sent to combining unit by electro-optic conversion transmission, and then is transferred to industry control server and is analyzed process.

Description

A kind of SF6 breaker open operation electric current Real-time Collections for switched capacitor reactor With processing method
Technical field
The present invention relates to breaker open operation electric current real-time collecting method, more particularly to a kind of for switched capacitor reactor SF6 breaker open operation electric current Real-time Collections and processing method.
Background technology
With expanding economy, net capacity increases sharply, requirement more and more higher of the power system to power supply reliability.Electric power Equipment is the primary element of power system, is to ensure power system security, the stable, basis of economical operation.Primary cut-out is Most important high-tension switch gear in power system, it play dual parts of to control in electrical network and protect, if high pressure is breaking Device breaks down and can cause large-area power-cuts, causes huge economic loss.
At present, switching substation capacitors reactor mainly has SF6 choppers and vacuum circuit breaker, SF6 choppers to be used for Frequent switching reactive apparatus(Particularly switched capacitor group), there is a problem of that electric life is low, loop resistance rises.And using true Though it is longer that empty chopper is used for frequent switching capacitor bank electric life, there may be in some cases to restrike and ask with overvoltage Topic, and primary cut-out is more frequent as the more commonly used switching of switching reactive apparatus, so ensureing that transformer station's switching is idle The reliability of the primary cut-out of equipment seems more urgent.
However, be directly based upon relay protection Verification of Measuring Current Transformer building below data collecting system presence seriously not Foot:1)Be limited by conventional current transformer characteristic, measurement range can only the rated current of chopper and following measure, no It is sufficient for chopper and cut-offs the big requirement of moment separating brake rush of current;2)The restriction of the conventional current transformer class of insulation, only Can be used in the circuit with good insulation and run;3)When SF6 choppers cut-off, often running current is more than specified electricity Stream, and conventional current transformer can cause serious heating because of magnetic saturation, bring potential safety hazard to power system;4)Real time data is adopted Collecting system data sampling frequency cannot meet the needs of chopper residue electric life analysis and early warning.
Content of the invention
In order to overcome the disadvantages mentioned above of prior art and deficiency, it is an object of the invention to provide a kind of be used for switching capacitance The SF6 breaker open operation electric current Real-time Collections of device reactor and processing method.
The purpose of the present invention is achieved through the following technical solutions.
Active distribution network isolated island divides the modeling method of mixed-integer programming model, comprises the following steps:
SF6 breaker open operation electric current Real-time Collections and processing method for switched capacitor reactor, it is characterised in that include Following steps:
Step 1, structure SF6 breaker open operation current acquisition topological structure;
Step 2, record ripple is carried out to separating brake electric current;
Step 3, the process of data split-phase;
Step 4, utilize SPI and I2C makees data storage;
Step 5, combining unit is transferred to by opto-electronic conversion.
Described in step 1, topological mechanism is divided into 3 layers of mechanism:Data collection layer, information transfer and analysis judge layer.Data Acquisition layer installs photo-electricity mutual-inductor as collecting unit, Real-time Collection breaker open operation electric current in chopper downstream;Information transfer Multiline message is pooled to combining unit by optical fiber by layer;Analysis judges that layer is then that analysis is pre- centered on early warning system software Alert chopper residue electric life.
The triggering of step 2 separating brake current recording comes from auxiliary contacts of circuit breaker.Specifically, the electricity to photo-electricity mutual-inductor Signal is filtered, integrates, A/D is changed and stores;Monitoring primary cut-out auxiliary contact, judge that primary cut-out opening and closing are believed Breath, is determined with this time point and catches opening and closing instantaneous current value and carry out record ripple.
Split-phase data processing described in step 3 refers to that A, B, C three-phase integrated signal forms voltage signal passback through specific electrical resistance, Entering system acquisition device carries out independent process, carries out opto-electronic conversion to output signal.
Signal storage described in step 4 is divided into two kinds of bus forms of I C and SPI.As primary cut-out drop-out current continues Time is very short, selects SPI storage chips to meet the high speed of data transfer, while considering that the reliability I C buses of system meet Normal information communication and only reception SPI chip inner high voltage choppers cut-off, close transient data access, and two-way cooperates.
Combining unit described in step 5, can receive multichannel current signal by opto-electronic conversion, and final combining unit is by the signal Data are transferred to industry control server for the process of early warning system software analysis by RS485/RS232.
Compared with prior art, the present invention has advantages below and beneficial effect:
Firstth, the current transformer that the present invention is measured using wide scope monitors real-time transient state electricity installed in SF6 choppers outfan Stream, is not restricted by relay protection measurement electric power mutual-inductor characteristic, is that chopper residue electric life assessment data used perform standard Standby;When SF6 choppers cut-off, running current will not can be caused sternly because of magnetic saturation more than conventional current transformer rated current Retransmit heat potential safety hazard is brought to power system;
Secondth, the present invention uses modulate circuit, including:Amplifying circuit, integrating circuit, A/D convertor circuit, control circuit and storage Processing of circuit real-time current signal;Monitoring auxiliary contacts of circuit breaker, judges chopper opening and closing information, is determined with this time point and is caught Opening and closing instantaneous current value is caught, and opto-electronic conversion is carried out to output signal;
3rd, digital signal is passed back to control room using optical-fibre communications mode by the present invention, is not limited by the class of insulation, to circuit Insulating properties has no requirement;
4th, split-phase data processing method of the present invention, can be greatly decreased fibre optic installations, cost-effective;Signal is stored It is divided into two kinds of bus forms of I C and SPI, takes into account high-performance and reliability.
Description of the drawings
Flow charts of the Fig. 1 for the embodiment of the present invention;
Fig. 2 shows for the topological structure of the embodiment of the present invention;
Separating brake current acquisitions of the Fig. 3 for the embodiment of the present invention.
Specific embodiment
With reference to embodiment, the present invention is described in further detail, but embodiments of the present invention not limited to this.
Embodiment
SF6 breaker open operation electric current Real-time Collection and process flow of the present invention for switched capacitor reactor, As shown in figure 1, comprising the following steps:
Step 1, structure SF6 breaker open operation current acquisition topological structure are divided into 3 layers:Data collection layer, information transfer and point Analysis judges layer.Data collection layer installs photo-electricity mutual-inductor as collecting unit, Real-time Collection breaker open operation in chopper downstream Electric current;Multiline message is pooled to combining unit by optical fiber by information transfer;Analysis judges that layer is then with early warning system software Centered on, analysis and early warning chopper residue electric life.Topological structure such as Fig. 1.
Step 2, the triggering of separating brake current recording come from auxiliary contacts of circuit breaker.Specifically, to photo-electricity mutual-inductor The signal of telecommunication is filtered, integrates, A/D is changed and stores;Monitoring primary cut-out auxiliary contact, judge primary cut-out opening and closing Information, is determined with this time point and catches opening and closing instantaneous current value and carry out record ripple.Collecting unit combines primary cut-out auxiliary and touches Point real-time capture its opening and closing instantaneous current value, the electric signal of the photo-electricity mutual-inductor being captured after filtering, by gathering after amplification A/D change-over circuits inside unit are processed, and output voltage range is the analog voltage signal of 0~10V, but require to enter ARM cores The voltage range of piece is 0~2.5V, so 0~2.5V need to be converted voltages into through signaling conversion circuit.Sample frequency is arranged For:100KHz, carries out sampling processing for STM32.
Step 3, by A, B, C three-phase integrated signal through specific electrical resistance formed voltage signal passback, enter system acquisition dress Putting carries out independent process, carries out opto-electronic conversion to output signal.
Step 4, signal storage are divided into two kinds of bus forms of I C and SPI.Due to the primary cut-out drop-out current persistent period Very short, select SPI storage chips to meet the high speed of data transfer, while considering that the reliability I C buses of system meet normally Information communication and only reception SPI chip inner high voltage choppers cut-off, close transient data access, and two-way cooperates.
Step 5, multichannel current signal can be received by opto-electronic conversion, the signal data is passed through by final combining unit RS485/RS232 is transferred to industry control server for the process of early warning system software analysis.
The SF6 breaker open operation electric currents for collecting are as shown in Figure 3.
Above-described embodiment is the present invention preferably embodiment, but embodiments of the present invention are not by the embodiment Limit, other any spirit without departing from the present invention and the change, modification, replacement that is made under principle, combine, simplification, Equivalent substitute mode is should be, is included within protection scope of the present invention.

Claims (6)

1. SF6 breaker open operation electric current Real-time Collections and the processing method of switched capacitor reactor are used for, it is characterised in that bag Include following steps:
Step 1, structure SF6 breaker open operation current acquisition topological structure;
Step 2, record ripple is carried out to separating brake electric current;
Step 3, the process of data split-phase;
Step 4, utilize SPI and I2C makees data storage;
Step 5, combining unit is transferred to by opto-electronic conversion.
2. SF6 breaker open operation electric current Real-time Collections and the place for switched capacitor reactor according to claim 1 Reason method, it is characterised in that topological mechanism is divided into 3-tier architecture described in step 1:Data collection layer, information transfer and analysis Judge layer;Data collection layer installs photo-electricity mutual-inductor as collecting unit, Real-time Collection breaker open operation electricity in chopper downstream Stream;Multiline message is pooled to combining unit by optical fiber by information transfer;Analysis judges that layer is then to be with early warning system software Center, analysis and early warning chopper residue electric life.
3. SF6 breaker open operation electric current Real-time Collections and the place for switched capacitor reactor according to claim 1 Reason method, it is characterised in that in step 2, the triggering of separating brake current recording come from auxiliary contacts of circuit breaker;Specifically, right The signal of telecommunication of photo-electricity mutual-inductor is filtered, integrates, A/D is changed and stores;Monitoring primary cut-out auxiliary contact, judge high pressure Chopper opening and closing information, is determined with this time point and catches opening and closing instantaneous current value and carry out record ripple.
4. SF6 breaker open operation electric current Real-time Collections and the place for switched capacitor reactor according to claim 1 Reason method, it is characterised in that split-phase data processing described in step 3 refers to that A, B, C three-phase integrated signal is formed through specific electrical resistance Voltage signal is returned, and entering system acquisition device carries out independent process, carries out opto-electronic conversion to output signal.
5. SF6 breaker open operation electric current Real-time Collections and the place for switched capacitor reactor according to claim 1 Reason method, it is characterised in that signal storage described in step 4 is divided into two kinds of bus forms of I C and SPI;Due to primary cut-out The drop-out current persistent period is very short, selects SPI storage chips to meet the high speed of data transfer, while considering the reliability of system I C buses meet normal information communication and only receive SPI chip inner high voltage choppers to be cut-off, closes transient data access, two-way Cooperate.
6. SF6 breaker open operation electric current Real-time Collections and the place for switched capacitor reactor according to claim 1 Reason method, it is characterised in that combining unit described in step 5, can receive multichannel current signal by opto-electronic conversion, final merging The signal data is transferred to industry control server for the process of early warning system software analysis by RS485/RS232 by unit.
CN201611016241.0A 2016-11-18 2016-11-18 A kind of SF6 breaker open operation electric current Real-time Collections and processing method for switched capacitor reactor Pending CN106501592A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611016241.0A CN106501592A (en) 2016-11-18 2016-11-18 A kind of SF6 breaker open operation electric current Real-time Collections and processing method for switched capacitor reactor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611016241.0A CN106501592A (en) 2016-11-18 2016-11-18 A kind of SF6 breaker open operation electric current Real-time Collections and processing method for switched capacitor reactor

Publications (1)

Publication Number Publication Date
CN106501592A true CN106501592A (en) 2017-03-15

Family

ID=58324982

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611016241.0A Pending CN106501592A (en) 2016-11-18 2016-11-18 A kind of SF6 breaker open operation electric current Real-time Collections and processing method for switched capacitor reactor

Country Status (1)

Country Link
CN (1) CN106501592A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106980085A (en) * 2017-04-24 2017-07-25 珠海伊能电子科技有限公司 Obtain system, the method and device of primary cut-out residual life
CN112783019A (en) * 2020-12-10 2021-05-11 国网江苏省电力有限公司盐城供电分公司 Intelligent control system of high-voltage circuit breaker and detection method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201177653Y (en) * 2007-12-21 2009-01-07 江苏省电力公司扬州供电公司 Circuit breaker life on-line monitoring system
CN201887549U (en) * 2010-11-22 2011-06-29 广州智光电气股份有限公司 Intelligent component device for monitoring circuit breaker
CN102759706A (en) * 2012-06-25 2012-10-31 广西电网公司电力科学研究院 Circuit breaker electrical endurance diagnosis system
CN202870216U (en) * 2012-10-31 2013-04-10 常熟开关制造有限公司(原常熟开关厂) Intelligent photovoltaic confluence data collection apparatus
CN203658542U (en) * 2013-12-18 2014-06-18 国家电网公司 System for monitoring state of high-voltage circuit breaker
CN203981839U (en) * 2014-01-23 2014-12-03 珠海伊能电子科技有限公司 Vacuum circuit breaker electrical endurance pick-up unit based on Internet of Things

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201177653Y (en) * 2007-12-21 2009-01-07 江苏省电力公司扬州供电公司 Circuit breaker life on-line monitoring system
CN201887549U (en) * 2010-11-22 2011-06-29 广州智光电气股份有限公司 Intelligent component device for monitoring circuit breaker
CN102759706A (en) * 2012-06-25 2012-10-31 广西电网公司电力科学研究院 Circuit breaker electrical endurance diagnosis system
CN202870216U (en) * 2012-10-31 2013-04-10 常熟开关制造有限公司(原常熟开关厂) Intelligent photovoltaic confluence data collection apparatus
CN203658542U (en) * 2013-12-18 2014-06-18 国家电网公司 System for monitoring state of high-voltage circuit breaker
CN203981839U (en) * 2014-01-23 2014-12-03 珠海伊能电子科技有限公司 Vacuum circuit breaker electrical endurance pick-up unit based on Internet of Things

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106980085A (en) * 2017-04-24 2017-07-25 珠海伊能电子科技有限公司 Obtain system, the method and device of primary cut-out residual life
CN112783019A (en) * 2020-12-10 2021-05-11 国网江苏省电力有限公司盐城供电分公司 Intelligent control system of high-voltage circuit breaker and detection method thereof

Similar Documents

Publication Publication Date Title
CN104377816B (en) A kind of control method of intelligentized reclosing breaker and its automatic reclosing
CN104578426B (en) Detection method for information comprehensive analysis and intelligent alarming application
CN102957208B (en) Intelligent monitoring device of power distribution transformer and control method thereof
CN101478154A (en) Measure for solving AC, DC earthing and short circuit and novel design of DC system
CN201408236Y (en) Power distribution network failure locating device
CN203133246U (en) On-line switch monitoring device
CN110389276A (en) A kind of singlephase earth fault management system and method
CN106501592A (en) A kind of SF6 breaker open operation electric current Real-time Collections and processing method for switched capacitor reactor
CN112098829A (en) FTU-based terminal and method for monitoring service life of power distribution switch
CN207799030U (en) A kind of high-voltage circuit-breaker status on-line monitoring system
CN105871645A (en) Automatic collecting and publishing device for grid fault information
CN109301937A (en) A kind of scheduling substation accident resultant signal synthetic method and system
CN205693447U (en) A kind of intelligent interconnection switch control terminal
CN218919965U (en) Dry-type reactor protection device
CN115441408A (en) Dry-type reactor protection device
CN208209513U (en) A kind of mesolow DC distribution net bus protection relay system
CN204214991U (en) A kind of equipment and system of testing electronic mutual inductor polarity
CN104020393B (en) A kind of with electrical network one-phase short-circuit current Fault Locating Method
CN202013399U (en) Power transmission line fault ranging plug-in with arc light short circuit identification considered
CN205863906U (en) A kind of Microcomputer Protection plate for intelligent interconnection switch control terminal
CN105510731B (en) Power transformer medium voltage side power grid parallel resonance detects alarm method and system
CN212008850U (en) Intelligent primary and secondary fused on-column circuit breaker
CN105048631B (en) A kind of multi-functional Top-down design device towards interval
CN208443924U (en) A kind of pair of line loss realizes the circuit breaker system of management through quantification
CN208272608U (en) Overcurrent protection relay circuit and overcurrent protection relay

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170315