CN106498980A - 城市地下综合管廊建造 - Google Patents
城市地下综合管廊建造 Download PDFInfo
- Publication number
- CN106498980A CN106498980A CN201510554669.XA CN201510554669A CN106498980A CN 106498980 A CN106498980 A CN 106498980A CN 201510554669 A CN201510554669 A CN 201510554669A CN 106498980 A CN106498980 A CN 106498980A
- Authority
- CN
- China
- Prior art keywords
- concrete
- meters
- support body
- construction
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
用于城市地下管廊建设,参照国内外已有地下开挖技术,在安全可靠性、建造成本、减少占地方面,有较大优势,用于市政管线铺设、雨水存储排泄、管廊内设有轨道维修车辆及覌光、在地面土地资源紧缺的繁华地段,可向外延伸连带建造地下立体智能停车场(在商铺集中地段用做智能车型箱式库房)。采用本发明钻进机械,在每次新端面开挖前,在设计洞口上方及左右俩侧,按照一定的外斜角度,做成可替代一次衬砌的混凝土加钢管管棚的超前支护体,在支护体的保护范围内(保护范围半圆形洞体上部,流砂层含水层有效),进行土方及钢筋混凝土结构施工,全部完成后,重复做混凝土加钢管管棚超前支护体施工,向前掘进,可用小型挖土机作业,提高功效降低成本。
Description
技术领域
本发明用于城市地下管廊建设。
背景技术
该技术参照国内外已有地下开挖技术,在安全可靠性、建造成本、减少占地方面,有较大优势,可用于市政管线铺设、雨水存储排泄、管廊内设有轨道维修车辆也可以用做游览覌光、地面土地资源紧缺地点可连带建造地下立体智能停车场(在商铺集中地段,或用做智能车型箱式库房)。
发明内容
城市地下综合管廊掘进机械和方法,每次新端面开挖前,在设计洞口上方及左右俩侧,按照一定的外斜角度,做成可替代一次衬砌的钢筋混凝土加钢管管棚超前支护体,在支护体的保护范围内,进行土方及钢筋混凝土结构施工,施工步骤如下;1、用本次发明的钻进机械,打人钢筋混凝土管棚超前支护体,2、对超前支护体进行高压注水泥浆,3、如有地下水,在将开挖洞体下部前方进行真空喷射井点降水,4、在支护体的保护范围(洞体半上部)内,进行土方及钢筋混凝土结构施工,5、全部完成后,重复以上4步工作,向前掘进。
钻进机械工作原理简介;1、传动轮转动,带动链条移动,链条上的削土刀削土钻进,同时跟进的喷射混凝土管,喷射混凝土,填满钻后空间,形成钢管管棚和混凝土的超前支护体,2、钻至设计深度后,截断链条并拉出,支护钢管、导向架、钢制喷管、高压注浆管留在超前支护体中。
地下立体智能停车场,延城市地下综合管廊垂直方向,做一条巷道,宽、高分别为6米3米,是车辆的长和高,巷道长暂定60米,延巷道垂直方向左右两侧,间隔3米,将直径2.5米,长5米的钢管(或预制构件),用顶管方式,做成长5米直径约2.5米的停车空间(或智能车型箱式库房),共计40个车位,在地面合适的位置,做竖井与巷道联通,做成车辆的进出口,安装巷道堆垛式机械停车设备,同样的方法可下挖2层、3层,总车位100个左右,该部分严格做好防水,截断与城市地下综合管廊的水利联系。
Claims (4)
1.城市地下综合管廊掘进方法,每次新掘进断面开挖前,在设计洞口上方及左右俩侧,按照一定的外斜角度,做成可替代一次衬砌的,混凝土加钢管管棚超前支护体,在支护体的保护范围(洞体上部)内,进行土方及钢筋混凝土结构施工,施工步骤如下;1、用本次发明的钻进机械,打人混凝土管棚超前支护体,2、对超前支护体进行高压注水泥浆,3、如有地下水,在将开挖的洞体下部进行真空喷射井点降水,4、在支护体的保护范围内,进行土方及钢筋混凝土结构施工,5、全部完成后,重复以上4步工作,向前掘进。
2.城市地下综合管廊掘进机械;1、传动齿轮转动,齿轮旋转带动链条移动,链条上的削土刀削土钻进,同时跟进的喷射混凝土管喷射混凝土,填满钻进后留下空间,形成钢管管棚和混凝土的超前支护体,2、钻至设计深度后,截断链条并拉出,支护钢管、导向架、钢制喷管、高压注浆管留在超前支护体中。
3.该技术参照国内外已有地下开挖技术,在安全可靠性、建造成本、拆迁成本方面,有很大优势,可用于市政管线铺设、雨水存储排泄、管廊内设有轨道维修车辆也可以用做游览覌光。
4.在停车难繁华地段,可连带建造地下立体智能停车场(在商铺集中地段用做智能车型箱式库房),延城市地下综合管廊垂直方向,做一条巷道,暂定宽、高分别为6米3米,是车辆的长和高,巷道长暂定60米,延巷道垂直方向左右两侧,间隔3米,将直径2.5米,长5米的钢管(或预制构件),用顶管方式,做成长5米直径2.5米的停车空间(或智能车型箱式库房),共计40个车位,在地面合适的位置,做竖井与巷道联通,做成车辆的进出口,安装巷道堆垛式机械停车设备,同样的方法可下挖2至5层,共计停车位可达100多个,该部分严格做好防水,截断与城市地下综合管廊的水利联系。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510554669.XA CN106498980A (zh) | 2015-09-04 | 2015-09-04 | 城市地下综合管廊建造 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510554669.XA CN106498980A (zh) | 2015-09-04 | 2015-09-04 | 城市地下综合管廊建造 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106498980A true CN106498980A (zh) | 2017-03-15 |
Family
ID=58286328
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510554669.XA Pending CN106498980A (zh) | 2015-09-04 | 2015-09-04 | 城市地下综合管廊建造 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106498980A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107795188A (zh) * | 2017-12-05 | 2018-03-13 | 北京中岩大地科技股份有限公司 | 一种与地下综合管廊相结合的地下车库 |
CN108150205A (zh) * | 2017-12-31 | 2018-06-12 | 中铁隧道集团二处有限公司 | 顶管隧道构筑地下停车场的方法 |
-
2015
- 2015-09-04 CN CN201510554669.XA patent/CN106498980A/zh active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107795188A (zh) * | 2017-12-05 | 2018-03-13 | 北京中岩大地科技股份有限公司 | 一种与地下综合管廊相结合的地下车库 |
CN108150205A (zh) * | 2017-12-31 | 2018-06-12 | 中铁隧道集团二处有限公司 | 顶管隧道构筑地下停车场的方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106088149B (zh) | 一种预制拼装式地下廊道的机械化快速施工方法 | |
CN101936167B (zh) | 桥梁托换结合盾构施工穿越桥梁桩基的施工方法 | |
CN102359379B (zh) | 一种隧道施工方法 | |
CN204312099U (zh) | 基于环境保护的隧道涌水防治系统 | |
CN106049532B (zh) | 一种综合管廊明挖施工支挡装置及其施工方法 | |
CN209212297U (zh) | 一种用于富水区段隧道的防排水及降压体系 | |
CN101440708A (zh) | Pba浅埋暗挖近距离大断面三洞分离岛式结构施工方法 | |
CN104196547B (zh) | 集成支护系统及装有该集成支护系统的隧道掘进机 | |
CN102704873A (zh) | 自带泥浆池及泥浆分离装置钻/冲孔灌注桩的施工设备 | |
CN103114857A (zh) | 一种盾构隧道施工方法 | |
CN102787846A (zh) | 海底隧道断层破碎带上堵下排的施工方法 | |
CN102748040A (zh) | 地铁大跨度车站主体结构及其柱拱法施工方法 | |
CN107435541A (zh) | 一种具备管棚施工能力的新型tbm及其施工方法 | |
CN205260041U (zh) | 一种水平旋喷冻结法支护结构 | |
CN103195454A (zh) | 充填体内巷道或硐室支护方法 | |
CN204532364U (zh) | 全断面岩石隧道掘进机工法地铁隧道泄压式衬砌结构 | |
CN203700978U (zh) | 箱涵先导管幕装置 | |
CN106498980A (zh) | 城市地下综合管廊建造 | |
CN203499695U (zh) | 繁华城区浅埋暗挖隧道加固结构 | |
CN102619521A (zh) | 一种立井基岩段井壁结构的施工方法 | |
CN108374674A (zh) | 六导洞十二步地下空间开挖支护方法 | |
CN204082166U (zh) | 集成支护系统及装有该集成支护系统的隧道掘进机 | |
CN207131408U (zh) | 一种具备管棚施工能力的新型tbm | |
CN106869962A (zh) | 一种盾构管片防水结构及其施工方法 | |
CN205876390U (zh) | 一种用于隧道暗挖机的吸污装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170315 |