CN106493518A - Steel alloy circle quenching roller production technology used by galvanized wire - Google Patents

Steel alloy circle quenching roller production technology used by galvanized wire Download PDF

Info

Publication number
CN106493518A
CN106493518A CN201610950961.8A CN201610950961A CN106493518A CN 106493518 A CN106493518 A CN 106493518A CN 201610950961 A CN201610950961 A CN 201610950961A CN 106493518 A CN106493518 A CN 106493518A
Authority
CN
China
Prior art keywords
quenching
circle
roller
quenching roller
production technology
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610950961.8A
Other languages
Chinese (zh)
Other versions
CN106493518B (en
Inventor
刘青锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changzhou Yexing Heavy Engineering Technology Co., Ltd.
Original Assignee
Changzhou Spring Heavy Industry Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changzhou Spring Heavy Industry Technology Co Ltd filed Critical Changzhou Spring Heavy Industry Technology Co Ltd
Priority to CN201610950961.8A priority Critical patent/CN106493518B/en
Publication of CN106493518A publication Critical patent/CN106493518A/en
Application granted granted Critical
Publication of CN106493518B publication Critical patent/CN106493518B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Heat Treatment Of Articles (AREA)

Abstract

The invention discloses steel alloy circle quenching roller production technology used by a kind of galvanized wire, with following steps:A, blanking circle circle:B, welding processing:C, time circle are processed:D, to the quenching distortion portion Vehicle Processing at the roller two ends of quenching to before quenching size;E, Quenching Treatment:F, temper:G, forming.The present invention is made using 40Cr steel alloys, it is two times of this characteristics of common iron using alloy steel hardenability, improve the uniformity of quenching roller quenching hardness on a large scale, controlled by weld seam interlayer temperature during welding, effectively prevent, after selected welding material can fully meet quenching, hardness is consistent with mother metal, zero defect, solve major diameter, ultra-thin-wall quenching roller problem on deformation after heat treatment, be conducive to the quality of stable quenching roller, improve the service life of quenching roller, it is particularly well-suited under 250 DEG C of ambient temperature used by high-grade galvanization production line.

Description

Steel alloy circle quenching roller production technology used by galvanized wire
Technical field
The present invention relates to the steel alloy circle quenching roller production technology used by a kind of galvanization production line.
Background technology
Quenching roller used by galvanization production line, was all import in the past, relatively costly, and thus domestic enterprise carries out technology and opens Research is sent out, using welding quenching roller after 45 steel plate rings circle, but use under normal temperature environment as 45 steel can only be met, quench the straight of roller Footpath is Φ 1500mm to the maximum, and galvanization production line top roller maximum gauge reaches Φ 2000mm, use environment temperature at 250 DEG C or so, Therefore using the quenching roller of 45 steel, continuously there are quality problems, a most short use is scrapped, is difficult to for only 48 hours Meet the modern high technology use requirement that makes rapid progress.
45# steel rings circle welding quenching roller, is only intended to normal temperature environment, diameter maximum Φ 1500mm, and top roller maximum gauge For Φ 2000mm, in the top roller that company is shaken by the Japan of Baosteel import in 2014 three, continuously there are quality problems, a most short use is only 48h, in the case, trial-production task assigned by Baosteel, and proposes former 45# Steel materials and be changed to 40Cr steel alloys, because steel alloy is quenched Permeability is that 45# steel is quenched deep 2 times, and such service life is improved, and cost reduces, stable through use quality, existing Baosteel big straight Footpath top roller is my company's manufacture, the such as new line in the transformation project of Baosteel and Baosteel Zhanjiang.
Content of the invention
The technical problem to be solved in the present invention is:Overcome the deficiency in prior art, there is provided alloy used by a kind of galvanized wire Steel circle quenching roller production technology, to improve the conforming product rate and service life of quenching roller, reduces cost meets modern high-new The use requirement of technology.
The technical solution adopted for the present invention to solve the technical problems is:Steel alloy circle quenching roller used by a kind of galvanized wire Production technology, with following steps:
A, blanking circle circle:According to technical requirements and consider quench shrinkage factor, calculate 40Cr steel plate blanking sizes, to 40Cr steel Circle circle is carried out after plate heating;
B, welding processing:First the steel plate after circle circle is preheated, is then distinguished at the steel plate combination of inner and outside after circle circle Welded, in its wlding used by China and foreign countries junction, the degree of main component is:C:0.45~0.55%, Si:0.40 ~0.50%;Mn:0.85~0.95%;Cr:1.25~1.35%;Ni:0.045~0.060%, during welding between control weld layer Temperature is 400 DEG C ± 2 DEG C;
C, time circle are processed:Quenching roller after to welding carries out back circle shaping, and quenching roller circularity is not more than 3mm;
D, the quenching distortion portion Vehicle Processing at the quenching roller two ends handled well by Hui Yuan are to the front size that quenches;
E, Quenching Treatment:To quenching, roller carries out Quenching Treatment;
F, temper:Quenching roller after to Quenching Treatment carries out temper;
G, forming:The quenching roller turnery processing good to temper is to satisfactory size.
Specifically, in above steps:
In described step a, 40Cr steel plates are heated 850 DEG C and is incubated after one hour, carry out circle circle.
In described step b, the steel plate weld after circle circle is preheated to 350 DEG C, during welding using electric heater unit, interior knot At conjunction from the 10Mn2 welding wires of mother metal equality strength as wlding material, the hundred of main component in wlding used by outer junction Divide and than content be:C:0.50%, Si:0.45%;Mn:0.90%;Cr:1.30%;Ni:0.05%, pass through electrical heating during welding Device controls weld interpass temperature for 400 DEG C.
Further, described electric heater unit includes that the electric blanket for being separately positioned on weld seam both sides, electric blanket circuit connect It is connected to the temperature controller that control electric blanket is turned on and off.
In described step c, return circle process be by welding after quenching roller enter heating furnace immediately, from welding when 350 DEG C 850 DEG C of insulations are heated to, and temperature retention time is incubated three minutes by every millimeter of steel plate and determines, circle process, Hui Yuan is carried out back after coming out of the stove Quenching roller afterwards enters heating furnace again carries out 650 DEG C of tempering elimination stress, and insulation cools to 200 DEG C with the furnace after three hours and comes out of the stove.
In described step d, quenching roller both ends are processed respectively as the cone that length 300mm, taper are 1 °~3 °, Described cone two ends are symmetrical and diameter is consistent.
In described step e, Quenching Treatment adopts mid frequency induction hardening mode, and hardening heat is 1020 DEG C, the movement of induction coil Speed is 90mm/min, while water-spraying control.
Temper in described step f is to heat in the quenching roller entrance circulated air heating furnace that will have been quenched and be incubated More than eight hours.
In described step g, the quenching roller body Vehicle Processing good to temper is to the size that meets the requirements.
The invention has the beneficial effects as follows:The present invention is made using 40Cr steel alloys, is ordinary steel using alloy steel hardenability Two times of this characteristics of material, are improve the uniformity of quenching roller quenching hardness on a large scale, are controlled by weld seam interlayer temperature during welding, Effectively prevent, selected welding material can fully meet hardness and mother after quenching Material is consistent, zero defect, solves major diameter, ultra-thin-wall quenching roller problem on deformation after heat treatment, is conducive to stable quenching roller Quality, improve the service life of quenching roller, be particularly well-suited under 250 DEG C of ambient temperature used by high-grade galvanization production line.
Description of the drawings
The present invention is further described with reference to the accompanying drawings and examples.
Fig. 1 is the schematic diagram behind the front Vehicle Processing quenching roller two ends quenching distortion portion of quenching.
Fig. 2 be quenching after obtain quenching roller schematic diagram.
The structural representation of electric heater unit used when Fig. 3 is Quenching Treatment in the present invention.
1. 3. temperature controller of quenching 2. electric blanket of roller, 4. weld seam in figure
Specific embodiment
Below by taking the 40Cr steel alloys circle quenching roller 1 of diameter of phi 2000 as an example, the invention will be further described.
Steel alloy circle quenching roller production technology used by a kind of galvanized wire, with following steps:
A, blanking circle circle:According to technical requirements and consider quench shrinkage factor, calculate 40Cr steel plate blanking sizes, to 40Cr steel After plate is heated to 850 DEG C and is incubated one hour, circle circle is carried out.
B, welding processing:350 DEG C are preheated to using electric heater unit to the steel plate weld after circle circle first, then in circle circle Welded at the steel plate combination of inner and outside afterwards respectively, welding adopts argon arc welding, interior junction to select and mother metal equality strength Used as wlding material, in wlding used by outer junction, the degree of main component is 10Mn2 welding wires:C:0.50%, Si: 0.45%;Mn:0.90%;Cr:1.30%;Ni:0.05%, controlling weld interpass temperature by electric heater unit during welding is 400℃.
Specifically, as shown in figure 3, described electric heater unit includes being separately positioned on 1 cylinder weld seam of quenching roller, 4 both sides Electric blanket 2, described 2 connection of electric blanket have the temperature controller 3 that control electric blanket 2 is turned on and off, and pass through temperature control during welding Instrument 3 is acted on, and when weld interpass temperature reaches 400 DEG C, 2 power-off of electric blanket stops heating, when weld interpass temperature is once less than When 400 DEG C, then 2 electrified regulation of electric blanket, so that it is guaranteed that 4 interlayer temperature of cylinder weld seam of quenching roller 1 is maintained at 400 DEG C, so as to 4 internal gas of weld seam are overflowed, is prevented from inside weld seam 4, producing pore, and is used argon arc welding reduce heat input, prevent element Scaling loss.
C, time circle are processed:Quenching roller 1 after by welding enters heating furnace immediately, and 350 DEG C when welding are heated to 850 DEG C of guarantors Temperature, this temperature both softener material, when increasing plasticity, play positive fire action again, be that follow-up quenching heat treatment is prepared, and being incubated Between be then incubated three minutes by every millimeter of steel plate and determine, carrying out back circle after coming out of the stove and processing, the quenching roller 1 after Hui Yuan enters heating furnace again Carry out 650 DEG C of tempering and eliminate stress, insulation cools to 200 DEG C with the furnace after three hours and comes out of the stove, it is ensured that quenching 1 circularity of roller is not more than 3mm.
Size before d, the quenching distortion portion Vehicle Processing extremely quenching at 1 two ends of quenching roller handled well by Hui Yuan, i.e., in quenching roller 1 Both ends are processed respectively as the cone that length 300mm, taper are 2 °, and described cone two ends are symmetrical and diameter one Cause, as shown in Figure 1.
E, Quenching Treatment:To quenching, roller 1 carries out Quenching Treatment;Quenching Treatment adopts mid frequency induction hardening mode, and hardening heat is 1020 DEG C, the translational speed of induction coil is 90mm/min, while water-spraying control, as 1 diameter of roller that quenches is big, wall book, can not keep away The deformation that exempts from, therefore cooling are controlled using inner core, cooling system are put in quenching 1 cylinder of roller before quenching and are quenched, and Ensure that the magnitude of interference, quenching shrink and hold cooling system tightly on the premise of precalculated amount of contraction, it is ensured that circularity, reaching technology will Ask, 1 shape of quenching roller obtained after quenching is as shown in Figure 2.
F, temper:The quenching roller 1 for having quenched is entered and in circulated air heating furnace, heats and be incubated more than eight hours.
G, forming:1 turnery processing of quenching roller good to temper is to satisfactory size.
Excircle dimension of the cylinder of above-mentioned quenching roller 1 before quenching is Φ 2023, and endoporus is Φ 1963, and cooling system is cylindrical Size Φ 1943.5, the cylinder size of the roller 1 that quenches after quenching is Φ 2003.
The present invention is made using 40Cr steel alloys, is two times of this characteristics of common iron using alloy steel hardenability, is improved The uniformity of quenching roller 1 quenching hardness on a large scale, by the control of weld seam 4 interlayer temperature during welding, effectively prevent weld seam 4 Internal generation pore and melting loss of elements, after selected welding material can fully meet quenching, hardness is consistent with mother metal, zero defect, solution Determined major diameter, ultra-thin-wall quenching the problem on deformation after heat treatment of roller 1, be conducive to stable quenching roller 1 quality, improve quenching The service life of roller 1, is particularly well-suited under 250 DEG C of ambient temperature used by high-grade galvanization production line.
Above-described embodiment technology design only to illustrate the invention and feature, its object is to allow person skilled in the art Scholar will appreciate that present disclosure and be carried out, can not be limited the scope of the invention with this, all according to the present invention Equivalence changes or modification that spirit is made, should all cover within the scope of the present invention.

Claims (9)

1. steel alloy circle quenching roller production technology used by a kind of galvanized wire, is characterized in that:There are following steps:
A, blanking circle circle:According to technical requirements and consider quench shrinkage factor, calculate 40Cr steel plate blanking sizes, 40Cr steel plates are added Circle circle is carried out after heat;
B, welding processing:First the steel plate after circle circle is preheated, is then carried out at the steel plate combination of inner and outside after circle circle respectively Welding, in its wlding used by China and foreign countries junction, the degree of main component is:C:0.45~0.55%, Si:0.40~ 0.50%;Mn:0.85~0.95%;Cr:1.25~1.35%;Ni:0.045~0.060%, temperature between control weld layer during welding Spend for 400 DEG C ± 2 DEG C;
C, time circle are processed:Quenching roller after to welding carries out back circle shaping, and quenching roller circularity is not more than 3mm;
D, the quenching distortion portion Vehicle Processing at the quenching roller two ends handled well by Hui Yuan are to the front size that quenches;
E, Quenching Treatment:To quenching, roller carries out Quenching Treatment;
F, temper:Quenching roller after to Quenching Treatment carries out temper;
G, forming:The quenching roller turnery processing good to temper is to satisfactory size.
2. steel alloy circle quenching roller production technology used by galvanized wire according to claim 1, is characterized in that:Described step In rapid a, 40Cr steel plates are heated 850 DEG C and is incubated after one hour, carry out circle circle.
3. steel alloy circle quenching roller production technology used by galvanized wire according to claim 1, is characterized in that:Described step In rapid b, the steel plate weld after circle circle is preheated to 350 DEG C, during welding using electric heater unit, and interior junction is selected same with mother metal Used as wlding material, in wlding used by outer junction, the degree of main component is equicohesive 10Mn2 welding wires:C: 0.50%, Si:0.45%;Mn:0.90%;Cr:1.30%;Ni:0.05%, weld layer is controlled by electric heater unit during welding Between temperature be 400 DEG C.
4. steel alloy circle quenching roller production technology used by galvanized wire according to claim 3, is characterized in that:Described electricity Heater includes that the electric blanket for being separately positioned on quenching roller body weld seam both sides, electric blanket connection have control electric blanket to open The temperature controller for opening or closing.
5. steel alloy circle quenching roller production technology used by galvanized wire according to claim 1, is characterized in that:Described step In rapid c, return circle and process be by welding after quenching roller enter heating furnace immediately, 350 DEG C when welding are heated to 850 DEG C of insulations, Temperature retention time is incubated three minutes by every millimeter of steel plate and determines, carries out back circle and process after coming out of the stove, the quenching roller after Hui Yuan enter again plus Hot stove carries out 650 DEG C of tempering and eliminates stress, and insulation cools to 200 DEG C with the furnace after three hours and comes out of the stove.
6. steel alloy circle quenching roller production technology used by galvanized wire according to claim 1, is characterized in that:Described step In rapid d, quenching roller both ends are processed respectively as the cone that length 300mm, taper are 1 °~3 °, described cone two ends Symmetrical and diameter is consistent.
7. steel alloy circle quenching roller production technology used by galvanized wire according to claim 1, is characterized in that:Described step In rapid e, Quenching Treatment adopts mid frequency induction hardening mode, and hardening heat is 1020 DEG C, and the translational speed of induction coil is 90mm/min, with When water-spraying control.
8. steel alloy circle quenching roller production technology used by galvanized wire according to claim 1, is characterized in that:Described step Temper in rapid f is to heat in the quenching roller entrance circulated air heating furnace that will have been quenched and be incubated more than eight hours.
9. steel alloy circle quenching roller production technology used by galvanized wire according to claim 1, is characterized in that:Described step In rapid g, the quenching roller body Vehicle Processing good to temper is to the size that meets the requirements.
CN201610950961.8A 2016-11-02 2016-11-02 Steel alloy circle quenching roller production technology used in galvanized wire Active CN106493518B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610950961.8A CN106493518B (en) 2016-11-02 2016-11-02 Steel alloy circle quenching roller production technology used in galvanized wire

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610950961.8A CN106493518B (en) 2016-11-02 2016-11-02 Steel alloy circle quenching roller production technology used in galvanized wire

Publications (2)

Publication Number Publication Date
CN106493518A true CN106493518A (en) 2017-03-15
CN106493518B CN106493518B (en) 2018-10-12

Family

ID=58322209

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610950961.8A Active CN106493518B (en) 2016-11-02 2016-11-02 Steel alloy circle quenching roller production technology used in galvanized wire

Country Status (1)

Country Link
CN (1) CN106493518B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110480264A (en) * 2019-08-16 2019-11-22 昆山新合宇制辊有限公司 The cold and hot roller processing technology of slit type

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101157174A (en) * 2007-11-07 2008-04-09 刘青锋 Production technology of ring round quench roller
CN101168226A (en) * 2007-11-30 2008-04-30 刘青锋 Technique for producing circle quenching roller
CN102560021A (en) * 2012-02-17 2012-07-11 南车四方车辆有限公司 Heat treatment method for 40Cr wearing plate
CN104152640A (en) * 2014-08-17 2014-11-19 成都亨通兆业精密机械有限公司 Carrier roller processing technique conducive to reducing heat treatment defects
CN205020045U (en) * 2015-09-18 2016-02-10 溧阳市华生机械制造有限公司 Granulator compression roller assembly

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101157174A (en) * 2007-11-07 2008-04-09 刘青锋 Production technology of ring round quench roller
CN101168226A (en) * 2007-11-30 2008-04-30 刘青锋 Technique for producing circle quenching roller
CN102560021A (en) * 2012-02-17 2012-07-11 南车四方车辆有限公司 Heat treatment method for 40Cr wearing plate
CN104152640A (en) * 2014-08-17 2014-11-19 成都亨通兆业精密机械有限公司 Carrier roller processing technique conducive to reducing heat treatment defects
CN205020045U (en) * 2015-09-18 2016-02-10 溧阳市华生机械制造有限公司 Granulator compression roller assembly

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
上海电气(集团)总公司: "《电焊工(中级)》", 31 August 2001, 上海科学技术出版社 *
徐焕安等: "特种汽车大型回转盘40Cr薄板焊接工艺", 《金属加工(热加工)》 *
阎承沛: "《典型零件热处理缺陷分析及对策480例》", 31 July 2008, 机械工业出版社 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110480264A (en) * 2019-08-16 2019-11-22 昆山新合宇制辊有限公司 The cold and hot roller processing technology of slit type
CN110480264B (en) * 2019-08-16 2021-04-30 昆山新合宇制辊有限公司 Slotted cold and hot roller processing technology

Also Published As

Publication number Publication date
CN106493518B (en) 2018-10-12

Similar Documents

Publication Publication Date Title
CN104451082B (en) A kind of preparation method of the average grain size 304 austenitic stainless steels less than 100nm
CN103962747B (en) A kind of diameter is less than the nickel-base alloy bare welding filler metal of 3mm
CN106637012A (en) Low-stress GH4169 superalloy ring part manufacturing method
CN103962755B (en) A kind of diameter is less than the preparation method of 3mm nickel-base alloy bare welding filler metal
CN104846176B (en) A kind of eliminate the casting-rolling method of delta ferrite in martensite aged stainless steel strip
CN106938324B (en) A kind of device and method reducing microalloying slab corner crack
CN104451452B (en) A kind of bearing steel for wind power equipment and preparation method thereof
CN105108377A (en) Nickel alloy welding wire for welding cast iron pipe
CN109182705B (en) Method for rapidly preparing oriented thin strip electrical steel at room temperature by pulse current
CN107541591A (en) A kind of manufacture method of super electromagnetic pure iron DT4C bars
CN110428924A (en) A kind of aerial condutor aluminium nickel coat molybdenum alloy steel wire and preparation method thereof
CN106493518A (en) Steel alloy circle quenching roller production technology used by galvanized wire
CN102836870B (en) Rolling and cogging production method for large austenite stainless and heat-resistant gas valve steel 21-4N ingot
CN103949800B (en) A kind of welding wire be made up of Cr28Ni48W5 nickel-base alloy
CN204690074U (en) A kind of electrical steel annealing heating device
CN103938134B (en) Improve the method for the radial homogeneity of structure of refractory alloy heavy wall extruded tube
CN103949807B (en) A kind of preparation method of nickel-base alloy bare welding filler metal
CN103849736A (en) Heat treatment process of high-chromium cast iron
CN103962756B (en) Cr28Ni48W5 nickel-base alloy is made the method for welding wire
CN103949801B (en) A kind of welding wire
CN103949799B (en) A kind of nickel-base alloy bare welding filler metal
CN102814347A (en) Medium carbon alloy steel electrical contact heating warm drawing process
CN100546760C (en) The production technology of circle quenching roller
CN101733617B (en) Method for cladding bimetal
CN100569432C (en) The production technology of circle quenching roller

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190816

Address after: 213144 Yangzhuang Village, Zou District Town, Zhonglou District, Changzhou City, Jiangsu Province

Patentee after: Changzhou Yexing Heavy Engineering Technology Co., Ltd.

Address before: 213144 Jiangsu province Changzhou City Zhonglou District Zou Industrial Road No. 10

Patentee before: Changzhou Spring Heavy Industry Technology Co., Ltd.