CN106485458A - Gunter drawing generating method and device, webpage generating method and device - Google Patents

Gunter drawing generating method and device, webpage generating method and device Download PDF

Info

Publication number
CN106485458A
CN106485458A CN201510544143.3A CN201510544143A CN106485458A CN 106485458 A CN106485458 A CN 106485458A CN 201510544143 A CN201510544143 A CN 201510544143A CN 106485458 A CN106485458 A CN 106485458A
Authority
CN
China
Prior art keywords
planned
action message
adjacent
time
time started
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510544143.3A
Other languages
Chinese (zh)
Inventor
赵亚兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cainiao Smart Logistics Holding Ltd
Original Assignee
Alibaba Group Holding Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Alibaba Group Holding Ltd filed Critical Alibaba Group Holding Ltd
Priority to CN201510544143.3A priority Critical patent/CN106485458A/en
Publication of CN106485458A publication Critical patent/CN106485458A/en
Pending legal-status Critical Current

Links

Landscapes

  • Information Transfer Between Computers (AREA)

Abstract

This application provides a kind of gunter drawing generating method and device, webpage generating method and device.Described Gantt chart is used for planning the arrangement of time of the action message to be planned on the ad-hoc location of webpage to generate webpage.Described gunter drawing generating method includes:Time started according to action message to be planned is ranked up to action message to be planned;The time started and end time of adjacent action message to be planned in the action message to be planned after sequence is compared;Based on described result of the comparison, eliminate the overlap on the adjacent persistent period of action message to be planned;Based on the action message to be planned eliminating overlap, generate Gantt chart.This application provides a kind of scheme generating Gantt chart, it can prevent the display of webpage generation activity generating according to it overlapping.

Description

Gunter drawing generating method and device, webpage generating method and device
Technical field
The application is related to internet arena, more particularly, to a kind of gunter drawing generating method and device, webpage Generation method and device.
Background technology
Current website often has a lot of activities, and the such as activity of reading day, Father's Day are movable, double 11 activities etc..In order to manage these activities, the network operator of website uses Gantt chart.Gantt chart is For planning the arrangement of time of the action message to be planned on the ad-hoc location of webpage to generate webpage Figure, as shown in Figure 1B.Its horizontal axis plots time, the longitudinal axis represents on the ad-hoc location of webpage The activity schedule of planning.Figure 1A-B represents a generating process of Gantt chart in prior art.
For example, on an ad-hoc location of webpage, such as one region, it is scheduled that one 4 at present The free Reading Activities in 10-April 15 moon (i.e. in this region of this webpage, place a lot of books The introduction of nationality and link, after reader clicks on respective links, can freely read corresponding books).But It is on same region, to arrange the electric equipment products exhibition in April 14 a to April 16 again Show activity (i.e. in the same area of webpage, showing many electric equipment products and introduction), as Figure 1A institute Show.Due to arranging to be probably to be arranged by the different staff in website twice, lead in April 14 Day-April 15 activity schedule repeats, and the Gantt chart made in this case is as shown in Figure 1B. In this case, in 14-April 15 April, will show in this region of this webpage simultaneously Show two activities, occur display overlapping.
Content of the invention
One of technical problem that the application solves is to provide a kind of scheme generating Gantt chart, and it can be prevented The display of the webpage generation activity only generating according to it is overlapping.
An embodiment according to the application, there is provided a kind of gunter drawing generating method, wherein said gunter Scheme for the arrangement of time planning the action message to be planned on the ad-hoc location of webpage to generate webpage, Described gunter drawing generating method includes;Time started according to action message to be planned believes to activity to be planned Breath is ranked up;To in the action message to be planned after sequence during the beginning of adjacent action message to be planned Between and the end time be compared;Based on described result of the comparison, eliminate adjacent action message to be planned Persistent period on overlap;Based on the action message to be planned eliminating overlap, generate Gantt chart.
An a kind of embodiment according to the application, there is provided webpage generating method, including:According to waiting to advise The time started drawing action message is ranked up to action message to be planned;To the activity to be planned after sequence In information, the adjacent time started of action message to be planned and end time are compared;Based on described ratio Result relatively, eliminates the overlap on the adjacent persistent period of action message to be planned;It is based on and eliminate weight Folded action message to be planned, generates Gantt chart, and wherein said Gantt chart is used for planning the certain bits of webpage The arrangement of time of the action message to be planned put is to generate webpage;Net is generated according to described Gantt chart Page.
An embodiment according to the application, there is provided a kind of Gantt chart generating means, wherein said gunter Scheme for the arrangement of time planning the action message to be planned on the ad-hoc location of webpage to generate webpage, Described Gantt chart generating means include:Sequencing unit, for the time started according to action message to be planned Action message to be planned is ranked up;First comparing unit, for the activity letter to be planned after sequence In breath, the adjacent time started of action message to be planned and end time are compared;Eliminate unit, use In based on described result of the comparison, eliminate the overlap on the adjacent persistent period of action message to be planned; Gantt chart signal generating unit, for based on the action message to be planned eliminating overlap, generating Gantt chart.
An a kind of embodiment according to the application, there is provided auto-building html files device, including:Sequencing unit, For the time started according to action message to be planned, action message to be planned is ranked up;First compares Unit, for the time started to adjacent action message to be planned in the action message to be planned after sequence It is compared with the end time;Eliminate unit, for based on described result of the comparison, eliminating adjacent treating Overlap on the persistent period of planning action message;Gantt chart signal generating unit, eliminates overlap for being based on Action message to be planned, generate Gantt chart, wherein said Gantt chart is used for planning the ad-hoc location of webpage On action message to be planned arrangement of time in case generate webpage;Auto-building html files unit, for according to institute State Gantt chart and generate webpage.
Due to, in the scheme of the embodiment of the present application, first treating rule according to the time started of action message to be planned Draw action message to be ranked up, to adjacent action message to be planned in the action message to be planned after sequence Time started and the end time be compared, and according to this result of the comparison, eliminate and adjacent wait to advise Draw action message persistent period on overlap, so, the time started sequentially adjacent treat regular work There is no overlap, the webpage accordingly generating would not occur on a certain area not on the dynamic information persistent period With showing two movable situations, the display eliminating activity is overlapping.
Although those of ordinary skill in the art will be appreciated that referenced in schematic is implemented by detailed description below Example, accompanying drawing are carried out, but the application is not limited in these embodiments.But, scope of the present application It is extensive, and is intended to be bound only by appended claims to limit scope of the present application.
Brief description
By reading the detailed description that non-limiting example is made made with reference to the following drawings, Other features, objects and advantages will become more apparent upon:
Figure 1A-B shows two activities to be held on the same position of webpage in prior art Arrangement of time on have a process generating Gantt chart in the case of overlap.
The flow chart that Fig. 2 shows the gunter drawing generating method according to one embodiment of the application.
Fig. 3 A shows according to the application one embodiment opening in adjacent action message to be planned Beginning time consistency but the end time inconsistent in the case of, eliminate adjacent action message to be planned An example before overlap on persistent period.
Fig. 3 B shows that Fig. 3 A eliminates the overlap on the adjacent persistent period of action message to be planned Situation afterwards.
Fig. 3 C shows the Gantt chart generating for Fig. 3 A.
Fig. 4 A shows according to the application one embodiment opening in adjacent action message to be planned Holding of adjacent action message to be planned is eliminated in the case that beginning time consistency, end time are also consistent An example before continuous temporal overlap.
Fig. 4 B shows that Fig. 4 A eliminates holding of adjacent action message to be planned according to first kind of way Situation after continuous temporal overlap.
Fig. 4 C shows the Gantt chart that Fig. 4 A generates according to first kind of way.
Fig. 4 D shows that Fig. 4 A eliminates holding of adjacent action message to be planned according to the second way Situation after continuous temporal overlap.
Fig. 4 E shows the Gantt chart that Fig. 4 A generates according to the second way.
Fig. 4 F shows to issue the user with to send in the case of Fig. 4 A and selects adjacent work to be planned The schematic interface of the instruction of of dynamic information.
Fig. 4 G shows that Fig. 4 A eliminates holding of adjacent action message to be planned according to the third mode Situation after continuous temporal overlap.
Fig. 4 H shows the Gantt chart that Fig. 4 A generates according to the third mode.
Fig. 5 A shows according to the application one embodiment opening in adjacent action message to be planned Beginning Time Inconsistency, time started preceding activity to be planned in adjacent action message to be planned The feelings that the end time of information, the end time of posterior action message to be planned was delayed than the time started An example before the overlap on the adjacent persistent period of action message to be planned is eliminated under condition.
Fig. 5 B shows that Fig. 5 A eliminates the overlap on the adjacent persistent period of action message to be planned Situation afterwards.
Fig. 5 C shows the Gantt chart generating for Fig. 5 A.
Fig. 6 A shows according to the application one embodiment opening in adjacent action message to be planned Beginning Time Inconsistency, time started preceding activity to be planned in adjacent action message to be planned End time of the end time of information to be planned action message posterior with the time started equal feelings An example before the overlap on the adjacent persistent period of action message to be planned is eliminated under condition.
Fig. 6 B shows that Fig. 6 A eliminates the overlap on the adjacent persistent period of action message to be planned Situation afterwards.
Fig. 6 C shows the Gantt chart generating for Fig. 6 A.
Fig. 7 A shows according to the application one embodiment opening in adjacent action message to be planned Time started preceding activity letter to be planned in beginning Time Inconsistency, adjacent action message to be planned The situation that the end time of breath, the time started of posterior action message to be planned was delayed than the time started An example before the lower overlap eliminating on the adjacent persistent period of action message to be planned.
Fig. 7 B shows that Fig. 7 A eliminates the overlap on the adjacent persistent period of action message to be planned Situation afterwards.
Fig. 7 C shows the Gantt chart generating for Fig. 7 A.
Fig. 8 A shows an application examples, is scheduled that in this application examples on the same position of webpage 5 activities.
The Gantt chart that Fig. 8 B generates in the case of showing Fig. 8 A.
The flow chart that Fig. 9 shows the gunter drawing generating method according to another embodiment of the application.
Figure 10 A shows and is existed according to the adjacent action message to be planned of this another embodiment of the application Eliminate an example of the situation before overlap.
Figure 10 B shows situation after eliminating overlap for Figure 10 A.
Figure 10 C shows the process further after eliminating overlap in this another embodiment.
The flow chart that Figure 11 shows the webpage generating method according to one embodiment of the application.
The flow chart that Figure 12 shows the webpage generating method according to another embodiment of the application.
Figure 13 shows the block diagram of the Gantt chart generating means according to one embodiment of the application.
Figure 14 shows the block diagram of the Gantt chart generating means according to another embodiment of the application.
Figure 15 shows the block diagram of the auto-building html files device according to one embodiment of the application.
Figure 16 shows the block diagram of the auto-building html files device according to another embodiment of the application.
Although those of ordinary skill in the art will be appreciated that referenced in schematic is implemented by detailed description below Example, accompanying drawing are carried out, but the application is not limited in these embodiments.But, scope of the present application It is extensive, and is intended to be bound only by appended claims to limit scope of the present application.
Specific embodiment
Should be mentioned that some exemplary realities before exemplary embodiment is discussed in greater detail Apply process or the method that example is described as describing as flow chart.Although operations are retouched by flow chart State into the process of order, but many of which operation can be by concurrently, concomitantly or simultaneously Implement.Additionally, the order of operations can be rearranged.Described place when its operations are completed Reason can be terminated, it is also possible to have the additional step being not included in accompanying drawing.Described process Can correspond to method, function, code, subroutine, subprogram etc..
Described computer equipment includes user equipment and the network equipment.Wherein, described user equipment bag Include but be not limited to computer, smart mobile phone, PDA etc.;The described network equipment is including but not limited to single The webserver, multiple webserver composition server group or be based on cloud computing (Cloud Computing the cloud being made up of a large amount of computers or the webserver), wherein, cloud computing is point One kind that cloth calculates, a super virtual computing being made up of a group loosely-coupled computer collection Machine.Wherein, described computer equipment can isolated operation realizing the application, also can access network simultaneously By realizing the application with the interactive operation of other computer equipments in network.Wherein, described Network residing for computer equipment include but is not limited to the Internet, wide area network, Metropolitan Area Network (MAN), LAN, VPN etc..
It should be noted that described user equipment, the network equipment and network etc. are only for example, other The existing or computer equipment being likely to occur from now on or network are such as applicable to the application, also should wrap Within being contained in the application protection domain, and it is incorporated herein with way of reference.
Method (some of them are illustrated by flow process) discussed hereafter can be by hardware, soft Part, firmware, middleware, microcode, hardware description language or its combination in any are implementing.When During with software, firmware, middleware or microcode to implement, in order to implement the program generation of necessary task Code or code segment can be stored in machine or computer-readable medium (such as storage medium).(one Individual or multiple) processor can implement necessary task.
Concrete structure disclosed herein and function detail are only representational, and are for retouching State the purpose of the exemplary embodiment of the application.But the application can by many alternative forms Lai Implement, and be not interpreted as being limited only by the embodiments set forth herein.
Although it should be appreciated that may have been used term " first ", " second " etc. here To describe unit, but these units should not be limited by these terms.Using these terms Just for the sake of a unit and another unit are made a distinction.For example, without departing substantially from showing In the case of the scope of example property embodiment, first module can be referred to as second unit, and is similar to Ground second unit can be referred to as first module.Term "and/or" used herein above is included wherein Any and all combination of one or more listed associated item.
It should be appreciated that when a unit is referred to as " connection " or " coupled " to another unit When, it can be connected or coupled to described another unit, or there may be temporary location. On the other hand, when a unit is referred to as " being directly connected " or " directly coupled " to another unit When, then there is not temporary location.Should explain in a comparable manner be used for describe unit it Between relation other words (for example " between being in ... " compared to " between being directly in ... ", " with ... Neighbouring " compared to " with ... it is directly adjacent to " etc.).
Term used herein above is used for the purpose of description specific embodiment and is not intended to limit exemplary Embodiment.Unless the context clearly dictates otherwise, otherwise singulative " used herein above Individual ", " one " also attempt to including plural number.It is to be further understood that term " bag used herein above Include " and/or "comprising" specify stated feature, integer, step, operation, unit and/or group The presence of part, and do not preclude the presence or addition of other features one or more, integer, step, behaviour Work, unit, assembly and/or a combination thereof.
It should further be mentioned that in some replaces realization modes, the function/action being previously mentioned is permissible Occur according to different from the order indicating in accompanying drawing.For example, depending on involved function/dynamic Make, the two width figures in succession illustrating can essentially substantially simultaneously execute or sometimes can be according to phase Anti- order is executing.
Below in conjunction with the accompanying drawings the technical scheme of the application is described in further detail.
Fig. 2 is the flow chart of the gunter drawing generating method according to one embodiment of the application.The application Gantt chart in embodiment be for plan action message to be planned on the ad-hoc location of webpage when Between arrange in case generate webpage figure.Action message to be planned refers to rule on the ad-hoc location of webpage Draw the information of the activity held.For example, in figure ia, be in April on a certain region of webpage 10 days-April 15 held movable A (for example freely reading), 14 days -4 the same area April Movable B (the such as extensive stock such as household electrical appliances, clothing, general merchandise, the displaying of service) will be held within 16th the moon, Then the information of the information of movable A and movable B just belongs to action message to be planned.
The method to be completed by server-side device, mainly comprises the steps S110~S140:
S110, according to the time started of action message to be planned, action message to be planned is ranked up.
Movable A, April 14 days are held with 10-April 15 the same area April in webpage above As a example-April 16 will hold movable B, the time started of movable A is April 10, movable B Time started be April 14.If by the ascending sort of time started, movable A, activity B is ordered as:Movable A activity B.
If in action message to be planned, there is the beginning of 2 or more action message to be planned Time is equal, and the sequence between them is arbitrary.For example there are following 5 activities:
Activity Time started End time
Activity 1 April 10 April 15
Activity 2 April 1 April 12
Activity 3 April 10 April 12
Activity 4 April 23 April 28
Activity 5 March 28 April 1
Result after then sorting is likely to be:Movable 2 movable 1 activities 3 of activity 5 Activity 4 is it is also possible to be:Movable 3 movable 1 activities 4 of activity 5 activity 2.
S120, the time started to adjacent action message to be planned in the action message to be planned after sequence It is compared with the end time.
Adjacent action message to be planned refers to that in the action message to be planned after sequence sequence number differs from the two of 1 Individual action message to be planned., if the result after sequence is activity 5 taking movable 1-5 above as a example Movable 1 movable 3 activities 4 of activity 2, then activity 5 and 2, activity 2 and 1, live Dynamic 1 and 3, activity 3 and 4 respectively constitutes four groups of adjacent action messages to be planned.To in this four groups Execution step S120 to be distinguished, and eliminate the overlap on the persistent period in S130 respectively for each group.
Time started to adjacent action message to be planned and end time be compared refer to adjacent In action message to be planned, the time started of previous action message to be planned, end time are treated with latter one The time started of planning action message, end time compare, specifically, including:
- time started of adjacent action message to be planned is compared.
That is, to time started of previous action message to be planned in adjacent action message to be planned and after The time started of one action message to be planned is compared.For example, for movable 5 activities 2, The time started of activity 5 is March 28, and the time started of activity 2 is April 1, and the two differs Cause.And for movable 1 activity 3, because their time started is all April 10, the two one Cause.
- in the case that the time started of adjacent action message to be planned is consistent, to adjacent to be planned The end time of action message is compared.
That is, to end time of previous action message to be planned in adjacent action message to be planned and after The end time of one action message to be planned is compared.For example for movable 1 activity 3, live Dynamic 1 end time is April 15, and the end time of activity 3 is April 12, the knot of activity 1 The bundle time is later than the end time of activity 3.
- in the case that the time started of adjacent action message to be planned is inconsistent, wait to advise to adjacent Draw action message end time and to the time started in adjacent action message to be planned treating formerly The time started of the end time to be planned action message posterior with the time started of planning action message enters Row compares.
That is, to end time of previous action message to be planned in adjacent action message to be planned and after The end time of one action message to be planned is compared, then the knot to previous action message to be planned The time started of bundle time and a rear action message to be planned is compared.For example for activity 5 Activity 2, the end time of activity 5 is April 1, and the end time of activity 2 is April 12, lives Dynamic 2 end time is later than the end time of activity 5;The end time of activity 5 is April 1, lives Dynamic 2 time started is April 1, and the end time of activity 5 is equal to the time started of activity 2.
S130, it is based on described result of the comparison, eliminate on adjacent persistent period of action message to be planned Overlap.
Due to comparing the time started of adjacent action message to be planned in the step s 120 first, under Face is directed to the two inconsistent situation of making peace and discusses respectively.
(1) in the case that the time started of adjacent action message to be planned is consistent:
Due to such as described in the step s 120, consistent in the time started of adjacent action message to be planned In the case of, the end time of adjacent action message to be planned is compared, at the end of therefore having Between one make peace inconsistent two kinds of situations:
A) end time of adjacent action message to be planned is inconsistent
In this case, delete end time preceding activity to be planned in adjacent action message to be planned Information.
As shown in Figure 3A, on the same position of webpage, 10-April 15 April will hold movable A, But 10-April of April 13 will hold movable B, now deletion activity B, as shown in Figure 3 B.Right As shown in Figure 3 C, this will in step S140 in detail for the Gantt chart that should generate in following step S140 State.
B) end time of adjacent action message to be planned is consistent
In this case, execute any one of following action:
B1) delete any one action message to be planned in described adjacent action message to be planned;
B2) persistent period section common for described adjacent action message to be planned is divided equally, thus after dividing equally Persistent period section arrange described adjacent action message to be planned respectively;
B3) send the instruction of select adjacent action message to be planned one.
As shown in Figure 4 A, on the same position of webpage, 10-April 15 April will hold movable A, But 10-April of April 15 will hold movable B.
Now, if according to scheme b 1), can delete movable A and B any one.Assume to delete and live Dynamic B, as shown in Figure 4 B.Correspond to the Gantt chart generating in following step S140 as shown in Figure 4 C, This will describe in detail in step S140.
If according to scheme b 2), it is 10-April of April by obtaining the common persistent period section of A and B This was divided into two sections for six days on 15th, every section three days, be respectively:10-April 12 April, arrangement activity A;13-April 15 April, arrangement activity B, as shown in Figure 4 D.Correspond in following step As shown in Figure 4 E, this will describe in detail in step S140 the Gantt chart generating in S140.Certainly, also may be used With in April 10-April 12 arrangement activity B, in April 13-April 15 arrangement activity A.
If according to scheme b 3), send the instruction of select adjacent action message to be planned one.
For example, dialog box is shown on display interfaces:" movable A and movable B is in time at present It is completely superposed, please select one of:", and have two OptionButtons in the following of dialog box, respectively It is " movable A ", " movable B ", as illustrated in figure 4f.Assume that user clicks on and have selected " movable B " OptionButton, then delete " movable A ", as shown in Figure 4 G.Corresponding raw in following step S140 As shown at figure 4h, this will describe in detail in step S140 the Gantt chart becoming.
(2) in the case that the time started of adjacent action message to be planned is consistent:
As described in the step s 120, inconsistent in the time started of adjacent action message to be planned In the case of, the end time of adjacent action message to be planned is compared, to adjacent to be planned In action message, the end time of action message to be planned formerly time started is posterior with the time started The time started of action message to be planned is also carried out comparing.Both is considered below compare.
A) comparison of the adjacent end time of action message to be planned
Comparative result has three kinds of possibility:(1) at the end of time started preceding action message to be planned Between than the time started, the end time of posterior action message to be planned is delayed;(2) time started exists The front end time of action message to be planned and the end of time started posterior action message to be planned Time is equal;(3) end time of time started preceding action message to be planned compares the time started The end time of posterior action message to be planned shifts to an earlier date.Introduce the concrete of these three situations individually below Process.
(1) end time of time started preceding action message to be planned is more posterior than time started The end time of action message to be planned is delayed
In this case, add in the persistent period of time started preceding action message to be planned Intermission section, the time started of setting intermission section is equal to time started posterior work to be planned The time started of dynamic information, the end time of intermission section is posterior to be planned equal to the time started The end time of action message.
As shown in Figure 5A, April 10-April 15 activity to be held on the same position of webpage A, but 11-April of April 13 to hold movable B.The end of time started preceding activity A April 15 time, the April 13 end time of posterior activity B was delayed than the time started, Now as shown in Figure 5 B, need to arrange intermission section.The time started of intermission is equal to and starts On the April 11 time started of time posterior activity B, the end time of intermission section is equal to opens The April 13 end time of time beginning posterior activity B.Correspond in following step S140 As shown in Figure 5 C, this will describe in detail in step S140 the Gantt chart generating.
(2) end time of time started preceding action message to be planned is posterior with the time started The end time of action message to be planned is equal
In this case, the end time of adjustment time started preceding action message to be planned is equal to The time started of time started posterior action message to be planned deducts a time quantum.
Time quantum is the unit on Gantt chart time shafts.For example, webpage is with sky over plan Activity to be held (for example holding movable A on 15th in the month in April 10-4) on the ad-hoc location of webpage When, time quantum is sky.If being to plan with hour to want on the ad-hoc location of webpage on webpage The activity held is (for example 10 days 7 April:00-12:00 holds movable A, 12:00-19:00 Hold movable B), time quantum is hour.
As shown in Figure 6A, April 10-April 15 activity to be held on the same position of webpage A, but 11-April of April 15 to hold movable B.The end of time started preceding activity A The April 15 end time of April 15 time activity posterior with time started B is equal, this When as shown in Figure 6B, adjustment the time started preceding activity A end time exist equal to the time started The April 11 time started of movable B afterwards deducts one day, i.e. April 10 days.After adjustment, live The time started of dynamic A and end time are all April 10 that is to say, that only lasting for one day.Right As shown in Figure 6 C, this will be in step S140 for the Gantt chart that should generate in following step S140 Describe in detail.
(3) end time of time started preceding action message to be planned is more posterior than time started The end time of action message to be planned shifts to an earlier date
This kind of situation does not need to process.
B) in adjacent action message to be planned time started action message to be planned formerly end The comparison of the time started of time and time started posterior action message to be planned
Comparative result still has three kinds of possibility:(1) time started in adjacent action message to be planned The end time of preceding action message to be planned posterior action message to be planned than the time started Time started is delayed;(2) time started preceding work to be planned in adjacent action message to be planned The time started of to be planned action message posterior with the time started end time of dynamic information is equal; (3) at the end of time started preceding action message to be planned in adjacent action message to be planned Between than the time started, the time started of posterior action message to be planned shifts to an earlier date.
(1) in adjacent action message to be planned time started preceding action message to be planned knot The bundle time, the time started of posterior action message to be planned was delayed than the time started
In this case, end time of adjustment time started preceding action message to be planned etc. Deduct a time quantum in the time started of time started posterior action message to be planned.
As shown in Figure 7 A, April 10-April 15 activity to be held on the same position of webpage A, but 14-April of April 16 to hold movable B.The knot of time started preceding activity A April 15 bundle time, the April 14 time started of posterior activity B was delayed than the time started, Now as shown in Figure 7 B, the end time of adjustment time started preceding activity A is equal to the time started The April 14 time started of posterior activity B deducts a time quantum, i.e. April 13 days.Right As seen in figure 7 c, this will be in step S140 for the Gantt chart that should generate in following step S140 Describe in detail.
(2) in adjacent action message to be planned time started preceding action message to be planned knot The time started of to be planned action message posterior with time started bundle time is equal
This situation does not deal with, because it is not result in hold between adjacent action message to be planned Continue temporal overlap.
(3) in adjacent action message to be planned time started preceding action message to be planned knot The bundle time, the time started of posterior action message to be planned shifted to an earlier date than the time started.
This situation does not deal with, because it is not result in hold between adjacent action message to be planned Continue temporal overlap.
S140, based on eliminate overlap action message to be planned, generate Gantt chart.
S140 includes:When the action message to be planned eliminating overlap was arranged according to the time started Countershaft, and reflect the time started of the action message to be planned respectively eliminating overlap on a timeline And the end time.
Due to having eliminated in step s 130 on the persistent period of adjacent action message to be planned Overlap, the persistent period of the action message each to be planned now sorting on a timeline should not have Overlap, that is, do not have the end of the action message previous to be planned in adjacent action message to be planned Time is later than the situation of the time started of a rear action message to be planned.
For example, in the case of figure 3b, because movable B has been deleted, only remaining activity A, Movable A is arranged on a timeline, and marks its April 10 time started and end time 4 The moon 15, that is, obtain Gantt chart corresponding with Fig. 3 A, as shown in Figure 3 C.
For example, in the case of figure 4b, because movable B has been deleted, only remaining activity A, Movable A is arranged on a timeline, and marks its April 10 time started and end time 4 Months 15 days, that is, obtain scheme b 1) under Gantt chart corresponding with Fig. 4 A, as shown in Figure 4 C.
For example, in the case of Fig. 4 D, the persistent period section of movable A becomes 10-April of April 12, the persistent period section obtaining B became 13-April of April 15, and movable A, B are arranged Cloth on a timeline, and marks 10 days-April 12 section April persistent period of movable A, obtains 13 days-the April 15 section April persistent period of B, that is, obtain scheme b 2) under corresponding with Fig. 4 A Gantt chart, as shown in Figure 4 E.
For example, in the case of Fig. 4 G, because movable A has been deleted, only remaining activity B, Movable B is arranged on a timeline, and marks its April 10 time started and end time 4 Months 15 days, that is, obtain scheme b 3) under Gantt chart corresponding with Fig. 4 A, as shown at figure 4h.
For example, in case of fig. 5b, add section April intermission in the time period of movable A 11 days-April 13, the time period of movable A becomes two sections, is to be April 10 persistent period respectively The movable A of one day day and persistent period are the movable A in 14-April 15 April, when will continue Between for the movable A in one day on the 10th April, the persistent period for 14-April 15 April movable A, And activity B arranged on a timeline according to the time started, and indicate that the persistent period is April 10 The movable A of one day, persistent period are that the movable A and movable B in 14-April 15 April are each From persistent period, that is, obtain Gantt chart corresponding with Fig. 5 A, as shown in Figure 5 C.
For example, in the case of Fig. 6 B, the persistent period of movable A is adjusted to April one day on the 10th, By the movable A after adjustment, movable B according to time started arrangement on a timeline, and after indicating adjustment Movable A, the movable B respective persistent period, that is, obtain Gantt chart corresponding with Fig. 6 A, such as scheme Shown in 6C.
For example, in the case of Fig. 7 B, the persistent period of movable A is adjusted to 10-April of April 13, the movable A after adjustment, movable B are arranged on a timeline according to the time started, and mark Movable A after bright adjustment, movable B respective persistent period, that is, obtain gunter corresponding with Fig. 7 A Figure, as seen in figure 7 c.
Fig. 8 A shows an application examples, and taking this application examples as a example complete explanation S110-S140's is whole Individual process.
5 activities are scheduled that in this application examples on the same position of webpage, this 5 movable Time started and end time such as following table:
Activity Time started End time
Activity 1 April 10 April 10
Activity 2 April 11 April 12
Activity 3 April 11 April 13
Activity 4 April 15 April 16
Activity 5 April 15 April 16
First, in step s 110, according to the time started of movable 1-5, movable 1-5 is arranged Sequence, the result of sequence is:Movable 3 movable 4 activities 5 of activity 1 activity 2.
In action message to be planned after sequence, adjacent action message to be planned has 4 groups, that is, Activity 1 and activity 2, activity 2 and activity 3, activity 3 and activity 4, activity 4 and activity 5. For each group in this 4 groups, execution step S120, S130 to be distinguished.
For activity 1 and activity 2, their time started is compared, finds their beginning Time Inconsistency.At this moment, the end time of activity 1, activity 2 is compared, and right The end time of activity 1 was compared with the time started of activity 2.Due to the time started formerly Activity 1 posterior movable 2 end time is early than the time started end time, and with movable 2 Time started consistent, these are all the situations not dealt with, therefore for activity 1 and activity 2 Temporarily do not process and will execute.
For activity 2 and activity 3, their time started is compared, finds their beginning Time consistency.At this moment, to be compared for the end time of activity 2, activity 3, find its knot Bundle Time Inconsistency, now needs to delete end time preceding activity, i.e. activity 2.
For activity 3 and activity 4, their time started is compared, finds their beginning Time Inconsistency.At this moment, the end time of activity 3, activity 4 is compared, and right The end time of activity 3 was compared with the time started of activity 4.Due to the time started formerly The end time of activity 3, posterior movable 4 end time was early than the time started, and than activity 4 Time started also early, these are all the situations not dealt with, therefore for activity 3 and activity 4 Temporarily do not process and will execute.
For activity 4 and activity 5, their time started is compared, finds their beginning Time consistency.At this moment, to be compared for the end time of activity 4, activity 5, find its knot Bundle time consistency, now needs any one of deletion activity 4, activity 5.Assume to delete activity 5.
Accordingly, as eliminating overlapping result, activity 2,5 has been deleted.In step S140 In, based on eliminating only remaining movable 1,3,4 after overlap, they are arranged on a timeline Cloth, and indicate the time started of each of which, end time, the Gantt chart obtaining is as shown in Figure 8 B.
The flow chart that Fig. 9 shows the gunter drawing generating method according to another embodiment of the application. Compared to Fig. 2, it increased step between step S130, S140:
S133, compare eliminate overlap the time started of action message to be planned and the end time;
If S137 eliminate overlap action message to be planned time started than eliminate overlap wait advise The end time drawing action message is delayed, then delete this action message to be planned.
In general, if planning unit of time and the elimination in step S130 of action message to be planned The time quantum deducting in some cases when overlapping is consistent, is not need step S133, S137 's.For example, webpage is with sky over plan activity (example to be held on the ad-hoc location of webpage As held movable A within 15th in the month in April 10-4) when, such as front when eliminating overlapping in step s 130 The time quantum deducting in some cases described in literary composition is also one day, is not need at the method for Fig. 9 Reason.
If however, the unit of time of planning action message to be planned is overlapping with elimination in step S130 When the time quantum that deducts in some cases inconsistent, sometimes eliminate the activity to be planned of overlap The time started of information was also delayed than the end time of the action message to be planned eliminating overlap, this It is logically obstructed.As shown in Figure 10 A, it is specific to hour in planning activity A, B, The persistent period of such as planning activity A is on April 10 20:On 00 to April 11 8:00, activity The persistent period of B is on April 11 0:On 00 to April 12 24:00.According to the aforementioned time started The end time of preceding action message to be planned posterior action message to be planned than the time started Time started needs to adjust the end of time started preceding action message to be planned in the case of delaying The time started that time is equal to time started posterior action message to be planned deducts a time quantum Rule it is assumed that the time quantum deducting here is daily, then the end time of movable A is just The 8 of April 10 can be adjusted to:00, as shown in Figure 10 B.The persistent period of the movable A after adjustment It is represented by dashed line, its time started 801 is the 20 of April 10:00, its end time is April The 8 of 10 days:00, this is obviously implausible.Therefore, after execution S133, S137, send out The time started of the movable A after now adjusting is also more late than the end time, deletes this movable A, such as Figure 10 C Shown.
The flow chart that Figure 11 shows the webpage generating method according to one embodiment of the application.With figure 2 compare, and it increased step S150, generate webpage according to Gantt chart.Due to according to Gantt chart Generating webpage is prior art, therefore its detailed process is not repeated.
The flow chart that Figure 12 shows the webpage generating method according to another embodiment of the application.Phase In Figure 11, it increased step between step S130, S140 to ratio:
S133, compare eliminate overlap the time started of action message to be planned and the end time;
If S137 eliminate overlap action message to be planned time started than eliminate overlap wait advise The end time drawing action message is delayed, then delete this action message to be planned.
As shown in figure 13, according to one embodiment of present invention, additionally provide a kind of Gantt chart and generate dress Put 100.Described Gantt chart is used for planning the time peace of the action message to be planned on the ad-hoc location of webpage Row is to generate webpage.Described Gantt chart generating means 100 include:
Sequencing unit 110, for the time started according to action message to be planned to action message to be planned It is ranked up;
First comparing unit 120, for adjacent work to be planned in the action message to be planned after sequence The time started of dynamic information and end time are compared;
Eliminate unit 130, for based on described result of the comparison, eliminating adjacent action message to be planned Persistent period on overlap;
Gantt chart signal generating unit 140, for based on the action message to be planned eliminating overlap, generating sweet Special figure.
Alternatively, described first comparing unit 120 is used for:
The time started of adjacent action message to be planned is compared;
In the case that the time started of adjacent action message to be planned is consistent, to adjacent work to be planned The end time of dynamic information is compared;
In the case that the time started of adjacent action message to be planned is inconsistent, to adjacent to be planned The end time of action message and to the time started in adjacent action message to be planned formerly wait advise The time started drawing the end time to be planned action message posterior with the time started of action message is carried out Relatively.
Alternatively, in the case that the time started of adjacent action message to be planned is consistent, described elimination Unit 130 is used for:
If the end time of adjacent action message to be planned is inconsistent, delete adjacent activity to be planned End time preceding action message to be planned in information.
Alternatively, in the case that the time started of adjacent action message to be planned is consistent, described elimination Unit 130 is used for:
If the end time of adjacent action message to be planned is consistent, execute arbitrary in following action ?:
Delete any one action message to be planned in described adjacent action message to be planned;
Persistent period section common for described adjacent action message to be planned is divided equally, thus holding after dividing equally The continuous time period arranges described adjacent action message to be planned respectively;
Send the instruction of select adjacent action message to be planned one.
Alternatively, in the case that the time started of adjacent action message to be planned is inconsistent, described disappear Except unit 130 is used for:
At the end of time started preceding action message to be planned in adjacent action message to be planned Between in the case that than the time started, the end time of posterior action message to be planned delays, when starting Between preceding action message to be planned persistent period in add intermission section, arrange intermission section Time started be equal to time started posterior action message to be planned time started, intermission section End time be equal to time started posterior action message to be planned end time.
Alternatively, in the case that the time started of adjacent action message to be planned is inconsistent, described disappear Except unit 130 is used for:
At the end of time started preceding action message to be planned in adjacent action message to be planned Between to be planned action message posterior with the time started end time equal in the case of, adjustment starts The end time of time preceding action message to be planned is equal to time started posterior activity letter to be planned The time started of breath deducts a time quantum.
Alternatively, in the case that the time started of adjacent action message to be planned is inconsistent, described disappear Except unit 130 is used for:
At the end of time started preceding action message to be planned in adjacent action message to be planned Between in the case that than the time started, the time started of posterior action message to be planned delays, adjustment starts The end time of time preceding action message to be planned is equal to time started posterior activity letter to be planned The time started of breath deducts a time quantum.
Alternatively, as shown in figure 14, described Gantt chart generating means 100 also include:
Second comparing unit 133, for comparing the time started of the action message to be planned eliminating overlap And the end time;
Delete unit 137, if the time started ratio of the action message to be planned for eliminating overlap eliminates The end time of overlapping action message to be planned is delayed, then delete this action message to be planned.
According to one embodiment of present invention, as shown in figure 15, additionally provide a kind of auto-building html files device 100, including:
Sequencing unit 110, for the time started according to action message to be planned to action message to be planned It is ranked up;
First comparing unit 120, for adjacent work to be planned in the action message to be planned after sequence The time started of dynamic information and end time are compared;
Eliminate unit 130, for based on described result of the comparison, eliminating adjacent action message to be planned Persistent period on overlap;
Gantt chart signal generating unit 140, for based on the action message to be planned eliminating overlap, generating sweet Special figure, wherein said Gantt chart is used for planning the time of the action message to be planned on the ad-hoc location of webpage Arrange to generate webpage;
Auto-building html files unit 150, for generating webpage according to described Gantt chart.
Alternatively, described first comparing unit 120 is used for:
The time started of adjacent action message to be planned is compared;
In the case that the time started of adjacent action message to be planned is consistent, to adjacent work to be planned The end time of dynamic information is compared;
In the case that the time started of adjacent action message to be planned is inconsistent, to adjacent to be planned The end time of action message and to the time started in adjacent action message to be planned formerly wait advise The time started drawing the end time to be planned action message posterior with the time started of action message is carried out Relatively.
Alternatively, in the case that the time started of adjacent action message to be planned is consistent, described elimination Unit 130 is used for:
If the end time of adjacent action message to be planned is inconsistent, delete adjacent activity to be planned End time preceding action message to be planned in information.
Alternatively, in the case that the time started of adjacent action message to be planned is consistent, described elimination Unit 130 is used for:
If the end time of adjacent action message to be planned is consistent, execute arbitrary in following action ?:
Delete any one action message to be planned in described adjacent action message to be planned;
Persistent period section common for described adjacent action message to be planned is divided equally, thus holding after dividing equally The continuous time period arranges described adjacent action message to be planned respectively;
Send the instruction of select adjacent action message to be planned one.
Alternatively, in the case that the time started of adjacent action message to be planned is inconsistent, described disappear Except unit 130 is used for:
At the end of time started preceding action message to be planned in adjacent action message to be planned Between in the case that than the time started, the end time of posterior action message to be planned delays, when starting Between preceding action message to be planned persistent period in add intermission section, arrange intermission section Time started be equal to time started posterior action message to be planned time started, intermission section End time be equal to time started posterior action message to be planned end time.
Alternatively, in the case that the time started of adjacent action message to be planned is inconsistent, described disappear Except unit 130 is used for:
At the end of time started preceding action message to be planned in adjacent action message to be planned Between to be planned action message posterior with the time started end time equal in the case of, adjustment starts The end time of time preceding action message to be planned is equal to time started posterior activity letter to be planned The time started of breath deducts a time quantum.
Alternatively, in the case that the time started of adjacent action message to be planned is inconsistent, described disappear Except unit 130 is used for:
At the end of time started preceding action message to be planned in adjacent action message to be planned Between in the case that than the time started, the time started of posterior action message to be planned delays, adjustment starts The end time of time preceding action message to be planned is equal to time started posterior activity letter to be planned The time started of breath deducts a time quantum.
Alternatively, as shown in figure 16, described auto-building html files device 100 includes:
Second comparing unit 133, for comparing the time started of the action message to be planned eliminating overlap And the end time;
Delete unit 137, if the time started ratio of the action message to be planned for eliminating overlap eliminates The end time of overlapping action message to be planned is delayed, then delete this action message to be planned.
It should be noted that the application can be carried out in software and/or software with the assembly of hardware, For example, can be using special IC (ASIC), general purpose computer or any other is similar hard Part equipment is realizing.In one embodiment, the software program of the application can be held by processor Row is to realize steps described above or function.Similarly, the software program of the application (includes related Data structure) can be stored in computer readable recording medium storing program for performing, for example, RAM memory, Magnetically or optically driver or floppy disc and similar devices.In addition, some steps of the application or function can Employ hardware to realize, for example, as with processor cooperation thus executing each step or function Circuit.
In addition, the part of the application can be applied to computer program, such as computer journey Sequence instructs, and when it is computer-executed, by the operation of this computer, can call or provide According to the present processes and/or technical scheme.And call the programmed instruction of the present processes, can Can be stored in fixing or moveable recording medium, and/or be held by broadcast or other signals Carry the data flow in media and be transmitted, and/or be stored in the meter according to described program instruction operation Calculate in the working storage of machine equipment.Here, a dress is included according to an embodiment of the application Put, this device includes the memorizer for storing computer program instructions and is used for execute program instructions Processor, wherein, when this computer program instructions is by this computing device, trigger this device Run the methods and/or techniques scheme based on aforementioned multiple embodiments according to the application.
It is obvious to a person skilled in the art that the application is not limited to above-mentioned one exemplary embodiment Details, and in the case of without departing substantially from spirit herein or basic feature, can be with others Concrete form realizes the application.Which point therefore, no matter from the point of view of, embodiment all should be regarded as Exemplary, and be nonrestrictive, scope of the present application by claims rather than on State bright restriction, it is intended that by the institute in the implication and scope of the equivalency of claim that falls Change and be included in the application.Any reference in claim should not be considered as limiting institute The claim being related to.Furthermore, it is to be understood that " inclusion " one word is not excluded for other units or step, single Number is not excluded for plural number.In system claims, multiple units of statement or device can also be by lists Unit or device are realized by software or hardware.The first, the second grade word is used for representing title, And it is not offered as any specific order.

Claims (32)

1. a kind of gunter drawing generating method, wherein said Gantt chart is used for planning the ad-hoc location of webpage Action message to be planned arrangement of time in case generate webpage it is characterised in that described Gantt chart generate Method includes:
Time started according to action message to be planned is ranked up to action message to be planned;
Time started to adjacent action message to be planned in the action message to be planned after sequence and knot The bundle time is compared;
Based on described result of the comparison, eliminate the weight on the adjacent persistent period of action message to be planned Folded;
Based on the action message to be planned eliminating overlap, generate Gantt chart.
2. gunter drawing generating method according to claim 1 it is characterised in that described to adjacent The time started of action message to be planned and the step that is compared of end time include:
The time started of adjacent action message to be planned is compared;
In the case that the time started of adjacent action message to be planned is consistent, to adjacent work to be planned The end time of dynamic information is compared;
In the case that the time started of adjacent action message to be planned is inconsistent, to adjacent to be planned The end time of action message and to the time started in adjacent action message to be planned formerly wait advise The time started drawing the end time to be planned action message posterior with the time started of action message is carried out Relatively.
3. gunter drawing generating method according to claim 2 is it is characterised in that treat in adjacent In the case that the time started of planning action message is consistent, described adjacent based on the elimination of described result of the comparison The persistent period of action message to be planned on the step of overlap include:
If the end time of adjacent action message to be planned is inconsistent, delete adjacent activity to be planned End time preceding action message to be planned in information.
4. gunter drawing generating method according to claim 2 is it is characterised in that treat in adjacent In the case that the time started of planning action message is consistent, described adjacent based on the elimination of described result of the comparison The persistent period of action message to be planned on the step of overlap include:
If the end time of adjacent action message to be planned is consistent, execute arbitrary in following action ?:
Delete any one action message to be planned in described adjacent action message to be planned;
Persistent period section common for described adjacent action message to be planned is divided equally, thus holding after dividing equally The continuous time period arranges described adjacent action message to be planned respectively;
Send the instruction of select adjacent action message to be planned one.
5. gunter drawing generating method according to claim 2 is it is characterised in that treat in adjacent Planning action message time started inconsistent in the case of, described based on described result of the comparison eliminate phase The step of the overlap on the adjacent persistent period of action message to be planned includes:
At the end of time started preceding action message to be planned in adjacent action message to be planned Between in the case that than the time started, the end time of posterior action message to be planned delays, when starting Between preceding action message to be planned persistent period in add intermission section, arrange intermission section Time started be equal to time started posterior action message to be planned time started, intermission section End time be equal to time started posterior action message to be planned end time.
6. gunter drawing generating method according to claim 2 is it is characterised in that treat in adjacent Planning action message time started inconsistent in the case of, described based on described result of the comparison eliminate phase The step of the overlap on the adjacent persistent period of action message to be planned includes:
At the end of time started preceding action message to be planned in adjacent action message to be planned Between to be planned action message posterior with the time started end time equal in the case of, adjustment starts The end time of time preceding action message to be planned is equal to time started posterior activity letter to be planned The time started of breath deducts a time quantum.
7. gunter drawing generating method according to claim 2 is it is characterised in that treat in adjacent Planning action message time started inconsistent in the case of, described based on described result of the comparison eliminate phase The step of the overlap on the adjacent persistent period of action message to be planned includes:
At the end of time started preceding action message to be planned in adjacent action message to be planned Between in the case that than the time started, the time started of posterior action message to be planned delays, adjustment starts The end time of time preceding action message to be planned is equal to time started posterior activity letter to be planned The time started of breath deducts a time quantum.
8. gunter drawing generating method according to claim 1 is it is characterised in that in described elimination After the step of overlap on the adjacent persistent period of action message to be planned, described gunter drawing generating method Including:
Relatively eliminate the time started of action message to be planned and the end time of overlap;
If the time started eliminating the action message to be planned of overlap is than the work to be planned eliminating overlap The end time of dynamic information is delayed, then delete this action message to be planned.
9. a kind of webpage generating method is it is characterised in that include:
Time started according to action message to be planned is ranked up to action message to be planned;
Time started to adjacent action message to be planned in the action message to be planned after sequence and knot The bundle time is compared;
Based on described result of the comparison, eliminate the weight on the adjacent persistent period of action message to be planned Folded;
Based on the action message to be planned eliminating overlap, generate Gantt chart, wherein said Gantt chart is used for The arrangement of time of the action message to be planned on the ad-hoc location of planning webpage is to generate webpage;
Webpage is generated according to described Gantt chart.
10. webpage generating method according to claim 9 it is characterised in that described to adjacent The step that the time started of action message to be planned and end time are compared includes:
The time started of adjacent action message to be planned is compared;
In the case that the time started of adjacent action message to be planned is consistent, to adjacent work to be planned The end time of dynamic information is compared;
In the case that the time started of adjacent action message to be planned is inconsistent, to adjacent to be planned The end time of action message and to the time started in adjacent action message to be planned formerly wait advise The time started drawing the end time to be planned action message posterior with the time started of action message is carried out Relatively.
11. webpage generating methods according to claim 10 are it is characterised in that treat in adjacent In the case that the time started of planning action message is consistent, described adjacent based on the elimination of described result of the comparison The persistent period of action message to be planned on the step of overlap include:
If the end time of adjacent action message to be planned is inconsistent, delete adjacent activity to be planned End time preceding action message to be planned in information.
12. webpage generating methods according to claim 10 are it is characterised in that treat in adjacent In the case that the time started of planning action message is consistent, described adjacent based on the elimination of described result of the comparison The persistent period of action message to be planned on the step of overlap include:
If the end time of adjacent action message to be planned is consistent, execute arbitrary in following action ?:
Delete any one action message to be planned in described adjacent action message to be planned;
Persistent period section common for described adjacent action message to be planned is divided equally, thus holding after dividing equally The continuous time period arranges described adjacent action message to be planned respectively;
Send the instruction of select adjacent action message to be planned one.
13. webpage generating methods according to claim 10 are it is characterised in that treat in adjacent Planning action message time started inconsistent in the case of, described based on described result of the comparison eliminate phase The step of the overlap on the adjacent persistent period of action message to be planned includes:
At the end of time started preceding action message to be planned in adjacent action message to be planned Between in the case that than the time started, the end time of posterior action message to be planned delays, when starting Between preceding action message to be planned persistent period in add intermission section, arrange intermission section Time started be equal to time started posterior action message to be planned time started, intermission section End time be equal to time started posterior action message to be planned end time.
14. webpage generating methods according to claim 10 are it is characterised in that treat in adjacent Planning action message time started inconsistent in the case of, described based on described result of the comparison eliminate phase The step of the overlap on the adjacent persistent period of action message to be planned includes:
At the end of time started preceding action message to be planned in adjacent action message to be planned Between to be planned action message posterior with the time started end time equal in the case of, adjustment starts The end time of time preceding action message to be planned is equal to time started posterior activity letter to be planned The time started of breath deducts a time quantum.
15. webpage generating methods according to claim 10 are it is characterised in that treat in adjacent Planning action message time started inconsistent in the case of, described based on described result of the comparison eliminate phase The step of the overlap on the adjacent persistent period of action message to be planned includes:
At the end of time started preceding action message to be planned in adjacent action message to be planned Between in the case that than the time started, the time started of posterior action message to be planned delays, adjustment starts The end time of time preceding action message to be planned is equal to time started posterior activity letter to be planned The time started of breath deducts a time quantum.
16. webpage generating methods according to claim 9 are it is characterised in that in described elimination phase After the step of overlap on the adjacent persistent period of action message to be planned, described webpage generating method bag Include:
Relatively eliminate the time started of action message to be planned and the end time of overlap;
If the time started eliminating the action message to be planned of overlap is than the work to be planned eliminating overlap The end time of dynamic information is delayed, then delete this action message to be planned.
A kind of 17. Gantt chart generating means, wherein said Gantt chart is used for planning the ad-hoc location of webpage Action message to be planned arrangement of time in case generate webpage it is characterised in that described Gantt chart generate Device includes:
Sequencing unit, was carried out to action message to be planned for the time started according to action message to be planned Sequence;
First comparing unit, for adjacent activity letter to be planned in the action message to be planned after sequence The time started of breath and end time are compared;
Eliminate unit, for based on described result of the comparison, eliminating holding of adjacent action message to be planned Continue temporal overlap;
Gantt chart signal generating unit, for based on the action message to be planned eliminating overlap, generating Gantt chart.
18. Gantt chart generating means according to claim 17 are it is characterised in that described first Comparing unit is used for:
The time started of adjacent action message to be planned is compared;
In the case that the time started of adjacent action message to be planned is consistent, to adjacent work to be planned The end time of dynamic information is compared;
In the case that the time started of adjacent action message to be planned is inconsistent, to adjacent to be planned The end time of action message and to the time started in adjacent action message to be planned formerly wait advise The time started drawing the end time to be planned action message posterior with the time started of action message is carried out Relatively.
19. Gantt chart generating means according to claim 18 are it is characterised in that adjacent In the case that the time started of action message to be planned is consistent, described elimination unit is used for:
If the end time of adjacent action message to be planned is inconsistent, delete adjacent activity to be planned End time preceding action message to be planned in information.
20. Gantt chart generating means according to claim 18 are it is characterised in that adjacent In the case that the time started of action message to be planned is consistent, described elimination unit is used for:
If the end time of adjacent action message to be planned is consistent, execute arbitrary in following action ?:
Delete any one action message to be planned in described adjacent action message to be planned;
Persistent period section common for described adjacent action message to be planned is divided equally, thus holding after dividing equally The continuous time period arranges described adjacent action message to be planned respectively;
Send the instruction of select adjacent action message to be planned one.
21. Gantt chart generating means according to claim 18 are it is characterised in that adjacent In the case that the time started of action message to be planned is inconsistent, described elimination unit is used for:
At the end of time started preceding action message to be planned in adjacent action message to be planned Between in the case that than the time started, the end time of posterior action message to be planned delays, when starting Between preceding action message to be planned persistent period in add intermission section, arrange intermission section Time started be equal to time started posterior action message to be planned time started, intermission section End time be equal to time started posterior action message to be planned end time.
22. Gantt chart generating means according to claim 18 are it is characterised in that adjacent In the case that the time started of action message to be planned is inconsistent, described elimination unit is used for:
At the end of time started preceding action message to be planned in adjacent action message to be planned Between to be planned action message posterior with the time started end time equal in the case of, adjustment starts The end time of time preceding action message to be planned is equal to time started posterior activity letter to be planned The time started of breath deducts a time quantum.
23. Gantt chart generating means according to claim 18 are it is characterised in that adjacent In the case that the time started of action message to be planned is inconsistent, described elimination unit is used for:
At the end of time started preceding action message to be planned in adjacent action message to be planned Between in the case that than the time started, the time started of posterior action message to be planned delays, adjustment starts The end time of time preceding action message to be planned is equal to time started posterior activity letter to be planned The time started of breath deducts a time quantum.
24. Gantt chart generating means according to claim 17 are it is characterised in that described gunter Figure generating means include:
Second comparing unit, for comparing time started and the knot of the action message to be planned eliminating overlap The bundle time;
Delete unit, if the time started ratio of the action message to be planned for eliminating overlap eliminates weight The end time of folded action message to be planned is delayed, then delete this action message to be planned.
A kind of 25. auto-building html files devices are it is characterised in that include:
Sequencing unit, was carried out to action message to be planned for the time started according to action message to be planned Sequence;
First comparing unit, for adjacent activity letter to be planned in the action message to be planned after sequence The time started of breath and end time are compared;
Eliminate unit, for based on described result of the comparison, eliminating holding of adjacent action message to be planned Continue temporal overlap;
Gantt chart signal generating unit, for based on the action message to be planned eliminating overlap, generating Gantt chart, Wherein said Gantt chart is used for planning the arrangement of time of the action message to be planned on the ad-hoc location of webpage So that generation webpage;
Auto-building html files unit, for generating webpage according to described Gantt chart.
26. auto-building html files devices according to claim 25 are it is characterised in that described first compares It is used for compared with unit:
The time started of adjacent action message to be planned is compared;
In the case that the time started of adjacent action message to be planned is consistent, to adjacent work to be planned The end time of dynamic information is compared;
In the case that the time started of adjacent action message to be planned is inconsistent, to adjacent to be planned The end time of action message and to the time started in adjacent action message to be planned formerly wait advise The time started drawing the end time to be planned action message posterior with the time started of action message is carried out Relatively.
27. auto-building html files devices according to claim 26 are it is characterised in that treat in adjacent In the case that the time started of planning action message is consistent, described elimination unit is used for:
If the end time of adjacent action message to be planned is inconsistent, delete adjacent activity to be planned End time preceding action message to be planned in information.
28. auto-building html files devices according to claim 26 are it is characterised in that treat in adjacent In the case that the time started of planning action message is consistent, described elimination unit is used for:
If the end time of adjacent action message to be planned is consistent, execute arbitrary in following action ?:
Delete any one action message to be planned in described adjacent action message to be planned;
Persistent period section common for described adjacent action message to be planned is divided equally, thus holding after dividing equally The continuous time period arranges described adjacent action message to be planned respectively;
Send the instruction of select adjacent action message to be planned one.
29. auto-building html files devices according to claim 26 are it is characterised in that treat in adjacent In the case that the time started of planning action message is inconsistent, described elimination unit is used for:
At the end of time started preceding action message to be planned in adjacent action message to be planned Between in the case that than the time started, the end time of posterior action message to be planned delays, when starting Between preceding action message to be planned persistent period in add intermission section, arrange intermission section Time started be equal to time started posterior action message to be planned time started, intermission section End time be equal to time started posterior action message to be planned end time.
30. auto-building html files devices according to claim 26 are it is characterised in that treat in adjacent In the case that the time started of planning action message is inconsistent, described elimination unit is used for:
At the end of time started preceding action message to be planned in adjacent action message to be planned Between to be planned action message posterior with the time started end time equal in the case of, adjustment starts The end time of time preceding action message to be planned is equal to time started posterior activity letter to be planned The time started of breath deducts a time quantum.
31. auto-building html files devices according to claim 26 are it is characterised in that treat in adjacent In the case that the time started of planning action message is inconsistent, described elimination unit is used for:
At the end of time started preceding action message to be planned in adjacent action message to be planned Between in the case that than the time started, the time started of posterior action message to be planned delays, adjustment starts The end time of time preceding action message to be planned is equal to time started posterior activity letter to be planned The time started of breath deducts a time quantum.
32. auto-building html files devices according to claim 25 are it is characterised in that described webpage is given birth to Device is become to include:
Second comparing unit, for comparing time started and the knot of the action message to be planned eliminating overlap The bundle time;
Delete unit, if the time started ratio of the action message to be planned for eliminating overlap eliminates weight The end time of folded action message to be planned is delayed, then delete this action message to be planned.
CN201510544143.3A 2015-08-28 2015-08-28 Gunter drawing generating method and device, webpage generating method and device Pending CN106485458A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510544143.3A CN106485458A (en) 2015-08-28 2015-08-28 Gunter drawing generating method and device, webpage generating method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510544143.3A CN106485458A (en) 2015-08-28 2015-08-28 Gunter drawing generating method and device, webpage generating method and device

Publications (1)

Publication Number Publication Date
CN106485458A true CN106485458A (en) 2017-03-08

Family

ID=58236080

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510544143.3A Pending CN106485458A (en) 2015-08-28 2015-08-28 Gunter drawing generating method and device, webpage generating method and device

Country Status (1)

Country Link
CN (1) CN106485458A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109785178A (en) * 2019-01-31 2019-05-21 百度在线网络技术(北京)有限公司 Method and apparatus for generating information
CN112859762A (en) * 2020-12-04 2021-05-28 广州明珞装备股份有限公司 Control logic checking method and device, computer equipment and storage medium
WO2021212895A1 (en) * 2020-04-22 2021-10-28 广州明珞装备股份有限公司 Action-positioning-based gantt chart processing method and system, and storage medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101014134A (en) * 2006-12-29 2007-08-08 浙江大学 Method for inserting and relaying IP service data based on cable television network
CN101136087A (en) * 2006-08-31 2008-03-05 国际商业机器公司 System and method for activity management in item management
US20090182611A1 (en) * 2006-02-02 2009-07-16 Matthew Iknoian System and method for scheduling employee shifts
CN102081694A (en) * 2011-01-21 2011-06-01 南开大学 Method for designing experimental scheme of pipe-conveying process evaluation based on complete relation active network
CN102970334A (en) * 2012-10-29 2013-03-13 东莞宇龙通信科技有限公司 Multi-agenda conflict processing method and system thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090182611A1 (en) * 2006-02-02 2009-07-16 Matthew Iknoian System and method for scheduling employee shifts
CN101136087A (en) * 2006-08-31 2008-03-05 国际商业机器公司 System and method for activity management in item management
CN101014134A (en) * 2006-12-29 2007-08-08 浙江大学 Method for inserting and relaying IP service data based on cable television network
CN102081694A (en) * 2011-01-21 2011-06-01 南开大学 Method for designing experimental scheme of pipe-conveying process evaluation based on complete relation active network
CN102970334A (en) * 2012-10-29 2013-03-13 东莞宇龙通信科技有限公司 Multi-agenda conflict processing method and system thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109785178A (en) * 2019-01-31 2019-05-21 百度在线网络技术(北京)有限公司 Method and apparatus for generating information
CN109785178B (en) * 2019-01-31 2021-03-26 百度在线网络技术(北京)有限公司 Method and apparatus for generating information
WO2021212895A1 (en) * 2020-04-22 2021-10-28 广州明珞装备股份有限公司 Action-positioning-based gantt chart processing method and system, and storage medium
CN112859762A (en) * 2020-12-04 2021-05-28 广州明珞装备股份有限公司 Control logic checking method and device, computer equipment and storage medium
CN112859762B (en) * 2020-12-04 2022-07-26 广州明珞装备股份有限公司 Control logic checking method and device, computer equipment and storage medium

Similar Documents

Publication Publication Date Title
CN104657420B (en) Page display method and system
WO2015196008A1 (en) Event visualization on calendar with timeline
CN107239566B (en) User journal generation method, electronic equipment and computer-readable storage medium
CN112148174A (en) Application information display method and device and electronic equipment
CN109064261A (en) The method, apparatus and computer readable storage medium of Recommendations
US20080281644A1 (en) Seat selection method for event tickets
CN103246549B (en) A kind of method and system of data conversion storage
CN106485458A (en) Gunter drawing generating method and device, webpage generating method and device
US20150058295A1 (en) Data Persistence Processing Method and Apparatus, and Database System
JP4405520B2 (en) Computer program, computer apparatus and method for adjusting project progress schedule
Baraz et al. A note on a greedy heuristic for flow-shop makespan minimization with no machine idle-time
CN113076101A (en) Management platform based on visual programming and use method
CN105787034A (en) Data presentation method and device
CN108228121A (en) A kind of method, device and mobile terminal of browser split screen
CN105912324A (en) Method and device for generating Web page
US20190108170A1 (en) Information management and continuity
CN109522079A (en) A kind of landing page generation method and device
US20180365605A1 (en) Supply chain simulation system and supply chain simulation method
DE102013022258A1 (en) Context switching for granularity of a cooperative strand array during trap treatment
CN105159939B (en) A kind of rendering method and device for picture
Dustmann An economic analysis of return migration
CN109164968A (en) Exchange method and device based on list
Ebadi et al. An optimal method for the preemptive job shop scheduling problem
CN109425345A (en) A kind of map route display methods, display system and computer installation
CN106033576A (en) Method and apparatus for displaying object information

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20180412

Address after: Four story 847 mailbox of the capital mansion of Cayman Islands, Cayman Islands, Cayman

Applicant after: CAINIAO SMART LOGISTICS HOLDING Ltd.

Address before: Cayman Islands Grand Cayman capital building a four storey No. 847 mailbox

Applicant before: ALIBABA GROUP HOLDING Ltd.

TA01 Transfer of patent application right