CN106476854B - A kind of train diagram establishment method and device - Google Patents
A kind of train diagram establishment method and device Download PDFInfo
- Publication number
- CN106476854B CN106476854B CN201610894455.1A CN201610894455A CN106476854B CN 106476854 B CN106476854 B CN 106476854B CN 201610894455 A CN201610894455 A CN 201610894455A CN 106476854 B CN106476854 B CN 106476854B
- Authority
- CN
- China
- Prior art keywords
- train
- predetermined threshold
- threshold value
- frequency
- arrival time
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/10—Operations, e.g. scheduling or time tables
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Train Traffic Observation, Control, And Security (AREA)
Abstract
The invention provides a kind of train diagram establishment method and device.This method includes:In the route map of train of the uniform departing time interval of completion prepared in advance, according to the matching train groups at the current station of the sequential search at train arrival moment;The matching train groups include the first train and the second train, first train travels in opposite directions with the second train at current station, and the absolute value that first train reaches the difference of the frequency of the arrival time and second train at the current station at current station is less than the second predetermined threshold value;Adjust the frequency of the second train in route map of train, so that the difference of the frequency of the arrival time of the first train and the second train is the first predetermined threshold value, first train completes skidding in the first predetermined threshold value, and the second train is completed to accelerate to start in the first predetermined threshold value.The present invention realizes that the energy for the train brake that arrives at a station is transferred directly in the acceleration of departing trains, avoids energy loss.
Description
Technical field
The present invention relates to train scheduling technical field, and in particular to a kind of train diagram establishment method and device.
Background technology
Route map of train is the diagram of the time and space relation of train operation, it represent train run in each section and
Each station parking or the two-dimentional lines figure for passing through state.Route map of train is with coordinate principles illustrated Train Schedule, space
Relation, represent train in each section run time and in the parking of each station and passage time;Abscissa represents time, ordinate table
Show each separation (station).
In existing train diagram establishment method, target is to maintain uniform departing time interval, such as flat peak is 6 points
Clock departing time interval, peak are 3 minutes departing time intervals.Route map of train is worked out in this way, can cause train
The electric energy of train braking passes through energy-recuperation system when arriving at a station, and train departure can utilize the energy regeneration system in energy-recuperation system
It is dynamic, have a certain degree of loss by the energy of energy-recuperation system.Existing operation data is shown, in subway circulation power consumption
There is 50% to come from train traction energy consumption, energy caused by regenerative braking is the 46% of train traction energy consumption.
If train diagram establishment method can make to arrive at a station, the electric power of train brake is transferred directly to during departing trains accelerate,
Electric power can not can then reduce energy loss by energy-recuperation system, significant to saving energy consumption.
The content of the invention
The embodiment of the present invention provides a kind of train diagram establishment method and device, for solving existing route map of train
Preparing method causes the problem of energy loss in train operation.
The embodiments of the invention provide a kind of train diagram establishment method, including:
It is suitable according to the train arrival moment in the route map of train of the uniform departing time interval of completion prepared in advance
Sequence searches the matching train groups at current station;The matching train groups include the first train and the second train, first train
Travelled in opposite directions at current station with the second train, first train reaches the arrival time and described second at the current station
Train is less than the second predetermined threshold value in the absolute value of the difference of the frequency at current station;
The frequency of the second train described in the route map of train is adjusted, so that the arrival time of first train
And the difference of the frequency of second train is the first predetermined threshold value, first train is complete in first predetermined threshold value
Into skidding, second train is completed to accelerate to start in first predetermined threshold value.
Alternatively, the matching train groups at the current station of the sequential search according to the train arrival moment, including:
Arrival time of each train number at current station is ranked up according to the sequencing at train arrival moment, generated
Arrival time queue;
Search pair of each element of the arrival time queue successively from queue header element according to the route map of train
Answer the matching train groups of train.
Alternatively, methods described also includes:
If matching train groups are not present in the corresponding train of the queue header element of the arrival time queue, by the queue
Header element is deleted.
Alternatively, methods described also includes:
If the arrival time queue is sky, the prompt message for not finding matching train groups is exported.
Alternatively, the frequency of adjustment second train includes:
Determine the target frequency of second train, the arrival time of first train and second train
The difference of target frequency is the first predetermined threshold value;
Judge second train in the parking at the current station according to the target frequency of second train
Between whether be less than the 3rd predetermined threshold value;
If being less than, sending for second train is adjusted to the target frequency constantly.
The embodiments of the invention provide a kind of train diagram establishment device, including:
Match train groups searching unit, the route map of train for the uniform departing time interval in completion prepared in advance
In, according to the matching train groups at the current station of the sequential search at train arrival moment;The matching train groups include the first train
With the second train, first train travels in opposite directions with the second train at current station, and first train reaches described current
The absolute value of the difference of the frequency of the arrival time at station and second train at current station is less than the second predetermined threshold value;
Train diagram establishment unit, for adjusting the frequency of second train, so that first train
The difference of the frequency of arrival time and second train is the first predetermined threshold value, and first train is default described first
Skidding is completed in threshold value, second train is completed to accelerate to start in first predetermined threshold value.
Alternatively, the matching train groups searching unit includes:
Arrival time queue generation module, for the sequencing according to the train arrival moment by each train number in current vehicle
The arrival time stood is ranked up, and generates arrival time queue;
Train groups searching modul is matched, for arriving at a station described in being searched successively from queue header element according to the route map of train
The matching train groups of the corresponding train of each element of moment queue.
Alternatively, described device also includes:
Queue header element deletes unit, and the corresponding train for the queue header element when the arrival time queue is not present
When matching train groups, then the queue header element is deleted.
Alternatively, described device also includes:
Prompt message output unit, for being space-time when the arrival time queue, then export and do not find matching train groups
Prompt message.
Alternatively, the train diagram establishment unit includes:
Target frequency determining module, for determining the target frequency of second train, first train
Arrival time and the difference of target frequency of second train be the first predetermined threshold value;
Judge module, for judging second train described current according to the target frequency of second train
Whether the down time at station is less than the 3rd predetermined threshold value;
Target frequency adjusting module, judge described second according to the target frequency of second train for working as
When down time of the train at the current station is less than three predetermined threshold values, then the sending for the second train is adjusted constantly
For the target frequency.
Train diagram establishment method and device provided in an embodiment of the present invention, uniform in completion prepared in advance are dispatched a car
In the route map of train of time interval, according to the matching train groups at the current station of the sequential search at train arrival moment;Adjustment
Frequency with departing trains in train groups, so that the arrival time and departing trains of the train that arrived at a station in the matching train groups
Frequency departing trains completed in first predetermined threshold value accelerate start.The embodiment of the present invention is for the hair with station
The car moment close to station to due in train number, by adjusting frequency so that frequency is earlier than to arrival
Moment, the period for the train deceleration that arrives at a station at utmost overlap with the Acceleration of starting period of departing trains, realize the train that arrives at a station
The energy of brake is transferred directly in the acceleration of departing trains, and energy by energy-recuperation system, does not avoid energy loss, together
When can also farthest reduce be detained station passenger's number.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing
There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are the present invention
Some embodiments, for those of ordinary skill in the art, on the premise of not paying creative work, can also basis
These accompanying drawings obtain other accompanying drawings.
Fig. 1 is the schematic flow sheet of the train diagram establishment method of one embodiment of the invention;
Fig. 2 is the schematic diagram of the matching train groups of the same platform of lookup of one embodiment of the invention;
Fig. 3 is the schematic diagram of the train diagram establishment method of one embodiment of the invention;
Fig. 4 is the structural representation of the train diagram establishment device of one embodiment of the invention.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention
In accompanying drawing, clear, complete description is carried out to the technical scheme in the embodiment of the present invention, it is clear that described embodiment is
Part of the embodiment of the present invention, rather than whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art
The every other embodiment obtained under the premise of creative work is not made, belongs to the scope of protection of the invention.
The technical concept that the present invention is implemented be in the establishment of route map of train, holding as much as possible slow down simultaneously with it is same
When accelerating vehicle quantity it is consistent, the route map of train of the uniform departing time interval of completion prepared in advance is adjusted to uniform
(such as with flat peak 4-8 minute intervals, peak 2-4 minutes interval is as when dispatching a car for the route map of train of departing time interval scope
Between limitation scope), the period for the train deceleration that arrives at a station at utmost overlaps with the Acceleration of starting period of departing trains, realize
The energy of train brake of arriving at a station is transferred directly in the acceleration of departing trains, and energy by energy-recuperation system, does not avoid energy
Amount loss, while can also farthest reduce the passenger's number for being detained station.
Fig. 1 is the schematic flow sheet of the train diagram establishment method of one embodiment of the invention.As shown in figure 1, this hair
The train diagram establishment method of bright embodiment includes:
S11:In the route map of train of the uniform departing time interval of completion prepared in advance, according to the train arrival moment
The current station of sequential search matching train groups;
The matching train groups include the first train and the second train, and first train and the second train are at current station
Opposite traveling, first train reach the arrival time at the current station and the second train dispatching a car at current station
The absolute value of the difference at moment is less than the second predetermined threshold value;
It should be noted that sent out during the matching train groups at each station are searched, it is necessary to search at current station
The car moment earlier than or be later than the second train of first the second predetermined threshold value of train arrival time.In actual applications, can be by second
Predetermined threshold value is arranged to 1 minute, the second predetermined threshold value can be also adjusted according to being actually needed, and the present invention is not limited this
System.
S12:The frequency of the second train described in the route map of train is adjusted, so that first train arrives at a station
The difference of the frequency of moment and second train is the first predetermined threshold value, and first train is in first predetermined threshold value
Interior completion skidding, second train are completed to accelerate to start in first predetermined threshold value;
It should be noted that the purpose of the frequency of the second train of adjustment is to make the frequency of the second train earlier than the
The due in of one train, the period for the train deceleration that arrives at a station at utmost overlap with the Acceleration of starting period of departing trains,
Realize that the energy for the train brake that arrives at a station is transferred directly in the acceleration of departing trains.In actual applications, can be by the first default threshold
Value is arranged to 6s, the first predetermined threshold value can be also adjusted according to being actually needed, the invention is not limited in this regard.
The train diagram establishment method of the embodiment of the present invention, in the uniform departing time interval of completion prepared in advance
In route map of train, according to the matching train groups at the current station of the sequential search at train arrival moment;In adjustment matching train groups
The frequency of departing trains, so that the frequency of the arrival time and departing trains for the train that arrived at a station in the matching train groups
Departing trains completed in first predetermined threshold value accelerate start.The embodiment of the present invention with the frequency at station for approaching
With station to due in train number, by adjusting frequency so that frequency is earlier than to due in, arrive at a station row
The period that car slows down at utmost overlaps with the Acceleration of starting period of departing trains, realizes that the energy for the train brake that arrives at a station is straight
Switch through in the acceleration for moving on to departing trains, energy by energy-recuperation system, does not avoid energy loss, while can also be maximum
Passenger's number at station is detained in the reduction of degree.
Similar with the method in Fig. 1 in a kind of preferred embodiment of the embodiment of the present invention, step S11 is included (such as
Shown in Fig. 2):
Arrival time of each train number at current station is ranked up according to the sequencing at train arrival moment, generated
Arrival time queue;
Search pair of each element of the arrival time queue successively from queue header element according to the route map of train
Answer the matching train groups of train.
Further, methods described also includes:
If matching train groups are not present in the corresponding train of the queue header element of the arrival time queue, by the queue
Header element is deleted.
Further, methods described also includes:
If the arrival time queue is sky, the prompt message for not finding matching train groups is exported.
Specifically, step S12 includes:
Determine the target frequency of second train, the arrival time of first train and second train
The difference of target frequency is the first predetermined threshold value;
Judge second train in the parking at the current station according to the target frequency of second train
Between whether be less than the 3rd predetermined threshold value;
If being less than, sending for second train is adjusted to the target frequency constantly.
If it should be noted that adjustment frequency so that frequency is earlier than to due in, arrive at a station train deceleration
Period at utmost overlapped with the Acceleration of starting period of departing trains and cause the second train in the parking at current station
Between be more than the maximum dwell time (the 3rd predetermined threshold value), then the frequency of the second train is not adjusted (as shown in Figure 3).
Below by taking swallow room line route map of train as an example, illustrate the train diagram establishment method of the embodiment of the present invention.
By taking the service chart of swallow room line as an example, in the route map of train of the uniform departing time interval of completion prepared in advance
In, from left to right (i.e. with the order of due in morning and evening), begun look for from the first bus time of departure, find upstream or downstream side
To first train to arrive at a station, if this train be from care for eight way stations dispatch a car 6:43:36 reach the up platform in Star City station,
So look over whether the descending platform in Star City station has train departure (to pay attention in previous minute or latter minute:One minute is to set
The fixed adjustable time).If not provided, so continue from left to right to search 6 by service chart:43:It is leftmost after 36
First train to arrive at a station.If so, if this is 6 from Star City station to the train of eight way stations of Gu:43:01 sends out at Star City station
Car, then postpone time of departure of train to 6:43:30 (pay attention to:Here set 6 seconds is when dispatching a car overlapping with arrival train
Between, i.e., in 6 seconds, deceleration train can accelerate train can be from the operation of static acceleration in 6 seconds from braking is started to coming to a complete stop
Speed).Continued search in the service chart of swallow room line, until the last bus off-running time.
Fig. 4 is the structural representation of the train diagram establishment device of one embodiment of the invention.As shown in figure 4, this hair
The train diagram establishment device of bright embodiment includes matching train groups searching unit 41 and train diagram establishment unit 42, tool
Body:
Match train groups searching unit 41, the train operation for the uniform departing time interval in completion prepared in advance
In figure, according to the matching train groups at the current station of the sequential search at train arrival moment;The matching train groups include first row
Car and the second train, first train travel in opposite directions with the second train at current station, and first train reaches described and worked as
The absolute value of the difference of the frequency of the arrival time at preceding station and second train at current station is less than the second default threshold
Value;
Train diagram establishment unit 42, for adjusting the frequency of the second train described in the route map of train,
So that the difference of the frequency of the arrival time of first train and second train is the first predetermined threshold value, described first
Train completes skidding in first predetermined threshold value, and second train is completed to accelerate in first predetermined threshold value
Start.
Further, matching train groups searching unit 41 includes:
Arrival time queue generation module, for the sequencing according to the train arrival moment by each train number in current vehicle
The arrival time stood is ranked up, and generates arrival time queue;
Train groups searching modul is matched, for arriving at a station described in being searched successively from queue header element according to the route map of train
The matching train groups of the corresponding train of each element of moment queue.
The device also includes:
Queue header element deletes unit, and the corresponding train for the queue header element when the arrival time queue is not present
When matching train groups, then the queue header element is deleted.
The device also includes:
Prompt message output unit, for being space-time when the arrival time queue, then export and do not find matching train groups
Prompt message.
Further, train diagram establishment unit 42 includes:
Target frequency determining module, for determining the target frequency of second train, first train
Arrival time and the difference of target frequency of second train be the first predetermined threshold value;
Judge module, for judging second train described current according to the target frequency of second train
Whether the down time at station is less than the 3rd predetermined threshold value;
Target frequency adjusting module, judge described second according to the target frequency of second train for working as
When down time of the train at the current station is less than three predetermined threshold values, then the sending for the second train is adjusted constantly
For the target frequency.
The device of the embodiment of the present invention can be used for performing above method embodiment, and its principle is similar with technique effect, this
Place repeats no more.
Train diagram establishment method and device provided in an embodiment of the present invention, uniform in completion prepared in advance are dispatched a car
In the route map of train of time interval, according to the matching train groups at the current station of the sequential search at train arrival moment;Adjustment
Frequency with departing trains in train groups, so that the arrival time and departing trains of the train that arrived at a station in the matching train groups
Frequency departing trains completed in first predetermined threshold value accelerate start.The embodiment of the present invention is for the hair with station
The car moment close to station to due in train number, by adjusting frequency so that frequency is earlier than to arrival
Moment, the period for the train deceleration that arrives at a station at utmost overlap with the Acceleration of starting period of departing trains, realize the train that arrives at a station
The energy of brake is transferred directly in the acceleration of departing trains, and energy by energy-recuperation system, does not avoid energy loss, together
When can also farthest reduce be detained station passenger's number.
It should be understood by those skilled in the art that, embodiments of the invention can be provided as method, system or computer program
Product.Therefore, the present invention can use the reality in terms of complete hardware embodiment, complete software embodiment or combination software and hardware
Apply the form of example.Moreover, the present invention can use the computer for wherein including computer usable program code in one or more
The computer program production that usable storage medium is implemented on (including but is not limited to magnetic disk storage, CD-ROM, optical memory etc.)
The form of product.
The present invention is the flow with reference to method according to embodiments of the present invention, equipment (system) and computer program product
Figure and/or block diagram describe.It should be understood that can be by every first-class in computer program instructions implementation process figure and/or block diagram
Journey and/or the flow in square frame and flow chart and/or block diagram and/or the combination of square frame.These computer programs can be provided
The processors of all-purpose computer, special-purpose computer, Embedded Processor or other programmable data processing devices is instructed to produce
A raw machine so that produced by the instruction of computer or the computing device of other programmable data processing devices for real
The device for the function of being specified in present one flow of flow chart or one square frame of multiple flows and/or block diagram or multiple square frames.
It should be noted that term " comprising ", "comprising" or its any other variant are intended to the bag of nonexcludability
Contain, so that process, method, article or equipment including a series of elements not only include those key elements, but also including
The other element being not expressly set out, or also include for this process, method, article or the intrinsic key element of equipment.
In the absence of more restrictions, the key element limited by sentence "including a ...", it is not excluded that including the key element
Process, method, other identical element also be present in article or equipment.
In the specification of the present invention, numerous specific details are set forth.Although it is understood that embodiments of the invention can
To be put into practice in the case of these no details.In some instances, known method, structure and skill is not been shown in detail
Art, so as not to obscure the understanding of this description.Similarly, it will be appreciated that disclose in order to simplify the present invention and helps to understand respectively
One or more of individual inventive aspect, in the description to the exemplary embodiment of the present invention above, each spy of the invention
Sign is grouped together into single embodiment, figure or descriptions thereof sometimes.However, should not be by the method solution of the disclosure
Release and be intended in reflection is following:I.e. the present invention for required protection requirement is than the feature that is expressly recited in each claim more
More features.More precisely, as the following claims reflect, inventive aspect is to be less than single reality disclosed above
Apply all features of example.Therefore, it then follows thus claims of embodiment are expressly incorporated in the embodiment,
Wherein each claim is in itself as separate embodiments of the invention.
Above example is merely to illustrate technical scheme, rather than its limitations;Although with reference to the foregoing embodiments
The present invention is described in detail, it will be understood by those within the art that:It still can be to foregoing each implementation
Technical scheme described in example is modified, or carries out equivalent substitution to which part technical characteristic;And these are changed or replaced
Change, the essence of appropriate technical solution is departed from the spirit and scope of various embodiments of the present invention technical scheme.
Claims (10)
- A kind of 1. train diagram establishment method, it is characterised in that including:In the route map of train of the uniform departing time interval of completion prepared in advance, looked into according to the order at train arrival moment Look for the matching train groups at current station;The matching train groups include the first train and the second train, first train and the Two trains travel in opposite directions at current station, and first train reaches the arrival time at the current station and second train It is less than the second predetermined threshold value in the absolute value of the difference of the frequency at current station;The frequency of the second train described in the route map of train is adjusted, so that the arrival time of first train and institute The difference for stating the frequency of the second train is the first predetermined threshold value, and first train is completed to stop in first predetermined threshold value Car is braked, and second train is completed to accelerate to start in first predetermined threshold value.
- 2. train diagram establishment method according to claim 1, it is characterised in that described according to the train arrival moment The matching train groups at the current station of sequential search, including:Arrival time of each train number at current station is ranked up according to the sequencing at train arrival moment, generation is arrived at a station Moment queue;Search the respective column of each element of the arrival time queue successively from queue header element according to the route map of train The matching train groups of car.
- 3. train diagram establishment method according to claim 2, it is characterised in that methods described also includes:If matching train groups are not present in the corresponding train of the queue header element of the arrival time queue, by the first member of the queue Element is deleted.
- 4. train diagram establishment method according to claim 3, it is characterised in that methods described also includes:If the arrival time queue is sky, the prompt message for not finding matching train groups is exported.
- 5. train diagram establishment method according to claim 1, it is characterised in that the adjustment route map of train Described in the frequency of the second train include:Determine the target frequency of second train, the target of the arrival time of first train and second train The difference of frequency is the first predetermined threshold value;Judge that down time of second train at the current station is according to the target frequency of second train It is no to be less than the 3rd predetermined threshold value;If being less than, sending for second train is adjusted to the target frequency constantly.
- A kind of 6. train diagram establishment device, it is characterised in that including:Train groups searching unit is matched, in the route map of train of the uniform departing time interval of completion prepared in advance, According to the matching train groups at the current station of the sequential search at train arrival moment;The matching train groups include the first train and the Two trains, first train travel in opposite directions with the second train at current station, and first train reaches the current station The absolute value of difference of frequency at current station of arrival time and second train be less than the second predetermined threshold value;Train diagram establishment unit, for adjusting the frequency of the second train described in the route map of train, so that institute The difference for stating the arrival time of the first train and the frequency of second train is the first predetermined threshold value, and first train exists Skidding is completed in first predetermined threshold value, second train is completed to accelerate to start in first predetermined threshold value.
- 7. train diagram establishment device according to claim 6, it is characterised in that the matching train groups searching unit Including:Arrival time queue generation module, for the sequencing according to the train arrival moment by each train number at current station Arrival time is ranked up, and generates arrival time queue;Train groups searching modul is matched, for searching the arrival time successively from queue header element according to the route map of train The matching train groups of the corresponding train of each element of queue.
- 8. train diagram establishment device according to claim 7, it is characterised in that described device also includes:Queue header element deletes unit, and matching is not present in the corresponding train for the queue header element when the arrival time queue During train groups, then the queue header element is deleted.
- 9. train diagram establishment device according to claim 8, it is characterised in that described device also includes:Prompt message output unit, for being space-time when the arrival time queue, then export and do not find carrying for matching train groups Show information.
- 10. train diagram establishment device according to claim 6, it is characterised in that the train diagram establishment list Member includes:Target frequency determining module, for determining the target frequency of second train, first train arrives The difference of target frequency of moment and second train of standing is the first predetermined threshold value;Judge module, for judging second train at the current station according to the target frequency of second train Down time whether be less than the 3rd predetermined threshold value;Target frequency adjusting module, second train is judged according to the target frequency of second train for working as When down time at the current station is less than three predetermined threshold values, then sending for second train is adjusted to institute constantly State target frequency.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610894455.1A CN106476854B (en) | 2016-10-13 | 2016-10-13 | A kind of train diagram establishment method and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610894455.1A CN106476854B (en) | 2016-10-13 | 2016-10-13 | A kind of train diagram establishment method and device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106476854A CN106476854A (en) | 2017-03-08 |
CN106476854B true CN106476854B (en) | 2018-03-27 |
Family
ID=58269953
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610894455.1A Active CN106476854B (en) | 2016-10-13 | 2016-10-13 | A kind of train diagram establishment method and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106476854B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110910012B (en) * | 2019-11-20 | 2022-08-12 | 通号城市轨道交通技术有限公司 | Method and device for detecting train operation diagram overrun rationality |
CN111791923B (en) * | 2020-05-21 | 2021-06-29 | 北京交通大学 | Energy-saving-oriented single-track railway train scheduling method and system |
CN114132368B (en) * | 2021-11-23 | 2022-12-20 | 交控科技股份有限公司 | Vehicle control method, device and equipment and readable storage medium |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3347286B2 (en) * | 1998-04-15 | 2002-11-20 | 三菱電機株式会社 | Train operation control device |
US6144900A (en) * | 1998-04-17 | 2000-11-07 | General Electric Company | Automatic serialization of an array of wireless nodes based on coupled oscillator model |
JP4170520B2 (en) * | 1999-06-10 | 2008-10-22 | 東武鉄道株式会社 | Train operation management system operation management system |
TWI276560B (en) * | 2002-01-31 | 2007-03-21 | Toshiba Corp | Automatic train operation device and train operation assisting device |
CN102194162A (en) * | 2011-03-25 | 2011-09-21 | 上海磁浮交通发展有限公司 | Method for realizing automatic drawing of running chart of magnetic-levitation train |
CN104875774B (en) * | 2015-06-16 | 2017-01-25 | 北京交通大学 | Train delay adjusting method and system based on urban rail transit working diagram |
-
2016
- 2016-10-13 CN CN201610894455.1A patent/CN106476854B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN106476854A (en) | 2017-03-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106476854B (en) | A kind of train diagram establishment method and device | |
CN105835912B (en) | Urban track traffic operating simulation system and method | |
CN105460048B (en) | Comprehensive energy-saving control method and method integrating optimized manipulation and traffic scheduling for urban rail transit | |
CN102514602B (en) | Method and system for planning and controlling train travelling speed | |
CN105930937B (en) | A kind of train operation scheduling Integrated Optimization considering subway speed line | |
CN104464276B (en) | A kind of dispatching method preventing bus concentration from arriving at a station based on GPS technology | |
CN106340190B (en) | For determining the method, apparatus and system of traffic lights timing scheme | |
WO2018000313A1 (en) | Lane scheduling method, lane information acquisition method, vehicle and management device | |
CN102194162A (en) | Method for realizing automatic drawing of running chart of magnetic-levitation train | |
CN112581747B (en) | Vehicle-road cooperative cargo vehicle fleet organization method, device and system | |
CN109598927A (en) | Right of way distribution method, system, equipment and storage medium based on V2X technology | |
CN103903472B (en) | A kind of real-time BRT vehicle pull-in optimization, platform passenger flow guidance system and method | |
CN113844507B (en) | Train simulation operation system construction method based on digital twin | |
CN106740998A (en) | Urban track traffic CBTC system onboard ATO energy-conservation control methods | |
CN105741585A (en) | Fuel-economizing-oriented vehicle track smoothing control method based on Internet-of-vehicles | |
Chen et al. | An energy-efficient operation approach based on the utilization of regenerative braking energy among trains | |
Suzuki et al. | Evaluating Green Light Optimum Speed Advisory (GLOSA) system in traffic flow with information distance variations | |
Nguyen et al. | Scheduling problem for bus rapid transit routes | |
KR101160184B1 (en) | Train running management system and method for energy consumption optimization in electric passenger railway | |
CN109612490A (en) | A kind of method and apparatus judging travel route based on travel speed | |
CN109724604A (en) | A kind of method and apparatus of automobile networking programme path | |
CN109612491A (en) | A kind of method and apparatus judging travel route | |
CN109798908A (en) | A kind of method and apparatus of vehicle platform programme path | |
CN108805402A (en) | A kind of shared bicycle scheduling system based on ectoskeleton | |
CN213365781U (en) | Test system for autonomous vehicles at airports |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |