CN106470503A - Method of attachment, connection equipment, user equipment and connection system - Google Patents

Method of attachment, connection equipment, user equipment and connection system Download PDF

Info

Publication number
CN106470503A
CN106470503A CN201510500416.4A CN201510500416A CN106470503A CN 106470503 A CN106470503 A CN 106470503A CN 201510500416 A CN201510500416 A CN 201510500416A CN 106470503 A CN106470503 A CN 106470503A
Authority
CN
China
Prior art keywords
base station
user equipment
connection
radio resource
enb1
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510500416.4A
Other languages
Chinese (zh)
Inventor
王海宁
杨峰义
毕奇
梅承力
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Telecom Corp Ltd
Original Assignee
China Telecom Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Telecom Corp Ltd filed Critical China Telecom Corp Ltd
Priority to CN201510500416.4A priority Critical patent/CN106470503A/en
Publication of CN106470503A publication Critical patent/CN106470503A/en
Pending legal-status Critical Current

Links

Landscapes

  • Mobile Radio Communication Systems (AREA)

Abstract

The present invention discloses a kind of method of attachment, connection equipment, user equipment and connection system, and the method includes:First base station is set up first with user equipment and is connected, and makes user equipment be attached to network by first base station;First base station after receiving the request setting up the second carrying, the Radio Resource situation information of dual link ability, first base station and the second base station according to user equipment, judge whether to need to set up the second connection for user equipment;If desired set up the second connection, resource is reserved for user equipment in the second base station, and the information needed setting up the second connection is sent to first base station;The information set up needed for the second connection is sent to first base station user equipment so that user equipment foundation is connected with the second of the second base station.The method of attachment of disclosure offer, substantially reduces the signaling step of modification second carrying, reduces the overall latency that dual link is set up, so that the problems such as load balancing of minizone, solution frequent switching realized for greater flexibility by user equipment.

Description

Method of attachment, connection equipment, user equipment and connection system
Technical field
The present invention relates to moving communicating field, more particularly, to a kind of method of attachment, connection equipment, use Family equipment and connection system.
Background technology
User equipment can be connected to network by little base station or macro base station, in prior art, in order to Improve the capacity of focus and covering, little base station dense deployment, thus bring a lot of Microcells with grand Power between cell is unbalanced, between interference and Microcell the problems such as frequent switching.
Therefore, it is necessary to propose a kind of method to solve above-mentioned technical problem.
Content of the invention
A disclosure technical problem to be solved is how to propose a kind of method of attachment so that terminal Two base stations can be connected to simultaneously, realize the load balancing of minizone for greater flexibility, reduce doubly-linked Connect the problems such as overall time delay of foundation, solution frequent switching.
Present disclose provides a kind of method of attachment, including:First base station eNB1 and user equipment UE sets up the first connection, makes user equipment (UE) be attached to network by first base station eNB1; First base station eNB1 after receiving the request setting up the second carrying, according to user equipment (UE) Dual link ability, the Radio Resource situation of first base station eNB1, the second base station eNB 2 wireless Resource situation information, judges whether to need to set up the second connection for user equipment (UE);If desired build Vertical second connection, the second base station eNB 2 reserves resource for user equipment (UE), and will set up second The information needed connecting is sent to first base station eNB1;First base station eNB1 will set up second even Connect required information and be sent to user equipment (UE) so that user equipment (UE) is set up and the second base station Second connection of eNB2.
Further, the information set up needed for the second connection is sent to user by first base station eNB1 Equipment UE so that user equipment (UE) set up the second base station eNB 2 second connection after, bag Include:Second base station eNB 2 confirms to have established with user equipment (UE) the to first base station eNB1 Two connections;First base station eNB1 sends second and carries foundation response, is that the second base station eNB 2 is built The second carrying founding core network gateway is so that user equipment (UE) connects by described first simultaneously Connect and network service with described second.
Further, first base station eNB1 is after receiving the request setting up the second carrying, according to The dual link ability of user equipment (UE), the Radio Resource situation of first base station eNB1, the second base Stand the Radio Resource situation information of eNB2, judge whether to need to set up second for user equipment (UE) Connect, including:After receiving the request setting up the second carrying, if user equipment (UE) possess double Concatenation ability, the Radio Resource anxiety of first base station eNB1 or load imbalance or user set When standby UE frequent switching connects, first base station eNB1 then judges to need to build with user equipment (UE) Vertical second connection, sends the second connection establishment request to the second base station eNB 2.
Further, first base station eNB1 sends the second connection establishment to the second base station eNB 2 and asks After asking, including:Second base station eNB 2 judges the Radio Resource situation of itself, if the second base station When the Radio Resource situation of eNB2 can meet the service quality QoS that user equipment (UE) is asked, For described user equipment (UE) distributing radio resource, and reply the second connection to first base station eNB1 Set up order;First base station eNB1 sends radio resource control RRC even to user equipment (UE) Connect reallocation message;First base station eNB1 receive user equipment UE is according to described wireless heterogeneous networks The radio resource control RRC that RRC replys after the completion of connecting reallocation message allocation radio resource connects Join completion message again.
The disclosure also provides a kind of method of attachment, including:User equipment (UE) and first base station ENB1 sets up the first connection, is attached to network by first base station eNB1;User equipment (UE) Receive the information set up needed for the second connection that first base station eNB1 sends, wherein, first base station ENB1 after receiving the request setting up the second carrying, according to the dual link energy of user equipment (UE) Power, the Radio Resource situation of first base station eNB1, the Radio Resource situation of the second base station eNB 2 Information, judges whether to need to set up the second connection for user equipment (UE);If desired set up second even Connect, the second base station eNB 2 reserves resource for user equipment (UE), and will set up the institute of the second connection Information is needed to be sent to first base station eNB1;User equipment (UE) is set up and the second base station eNB 2 Second connection.
Further, after user equipment (UE) is set up and is connected with the second of the second base station eNB 2, Including:Second base station eNB 2 sends second and carries foundation response, confirms to first base station eNB1 Establish with user equipment (UE) second be connected after, user equipment (UE) pass through first base station ENB1 be the second base station eNB 2 set up core network gateway second carrying be attached to network;With Family equipment UE connects by described first and described second connection and network service simultaneously.
Further, user equipment (UE) receives what first base station eNB1 was replied according to the second base station The radio resource control RRC that second connection establishment order sends connects reallocation message, wherein, the Two base station eNB2 judge the Radio Resource situation of itself, if the Radio Resource of the second base station eNB 2 When situation can meet the service quality QoS that described user equipment (UE) is asked, it is that described user sets Standby UE distributing radio resource, and reply the second connection establishment order to first base station eNB1;With Family equipment UE connects reallocation message allocation radio resource according to described radio resource control RRC, Configuration completes backward first base station eNB1 replys radio resource control RRC and connects to join again and complete to disappear Breath.
Present disclose provides a kind of connection equipment, including first base station eNB1 and the second base station ENB2, wherein:Described first base station eNB1 is connected for setting up first with user equipment (UE), User equipment (UE) is made to be attached to network;It is additionally operable to after receiving the request setting up the second carrying, According to the dual link ability of user equipment (UE), the Radio Resource situation of first base station eNB1, The Radio Resource situation information of two base station eNB2, judges whether to need to set up for user equipment (UE) Second connection;For the information set up needed for the second connection is sent to user equipment (UE) so that User equipment (UE) is set up and is connected with the second of the second base station eNB 2;Described second base station eNB 2 When described first base station eNB1 judges to need to set up the second connection, it is that user equipment (UE) is reserved Resource, and the information needed setting up the second connection is sent to described first base station eNB1.
Further, described second base station eNB 2 be used for first base station eNB1 confirm with Family equipment UE establishes the second connection;Described first base station eNB1 is used for transmission second carrying and builds After vertical response, it is that the second base station eNB 2 sets up the second carrying of core network gateway so that user Equipment UE connects by described first and described second connection and network service simultaneously.
Further, described first base station eNB1 be used for receive the request setting up the second carrying it Afterwards, if user equipment (UE) possesses dual link ability, the Radio Resource of first base station eNB1 is tight Or when load imbalance or user equipment (UE) frequent switching connect, then judge to need and use Family equipment UE sets up the second connection, sends the second connection establishment request to the second base station eNB 2; Connect reallocation message for sending radio resource control RRC to user equipment (UE);And also use In receive user equipment UE, reallocation message configuration is connected no according to described radio resource control RRC The radio resource control RRC replied after the completion of line resource connects and joins completion message again;Described second Base station eNB 2 is used for judging the Radio Resource situation of itself, if the wireless money of the second base station eNB 2 When source situation can meet the service quality QoS that user equipment (UE) is asked, it is described user equipment UE distributing radio resource, and reply the second connection establishment order to first base station eNB1.
Present disclose provides a kind of user equipment, including:First link block, for the first base The eNB1 that stands sets up the first connection, is attached to network by first base station eNB1;Second connection mode Block, for receive first base station eNB1 transmission the information set up needed for the second connection, set up with Second connection of the second base station eNB 2;Wherein, first base station eNB1 is set up second and is held receiving After the request carrying, according to the nothing of the dual link ability of user equipment (UE), first base station eNB1 Line resource situation, the Radio Resource situation information of the second base station eNB 2, judge whether that needs are use Family equipment UE sets up the second connection;If desired set up the second connection, the second base station eNB 2 is use Family equipment UE reserves resource, and the information needed setting up the second connection is sent to first base station eNB1.
Further, including:Described second link block is used for sending the in the second base station eNB 2 Two carry foundation response, confirm to establish second with user equipment (UE) to first base station eNB1 After connection, by first base station eNB1 be the second base station eNB 2 set up core network gateway Two carryings are attached to network;Pass through described first connection simultaneously and described second connection is led to network Letter.
Further, also include:Described second link block is used for receiving first base station eNB1 root Connect weight according to the radio resource control RRC that the second connection establishment order that the second base station is replied sends Join message, wherein, the second base station eNB 2 judges the Radio Resource situation of itself, if the second base station The Radio Resource situation of eNB2 can meet the service quality QoS that described user equipment (UE) is asked When, it is described user equipment (UE) distributing radio resource, and reply second to first base station eNB1 Connection establishment order;Described first link block is used for according to described radio resource control RRC even Connect reallocation message allocation radio resource, configuration completes backward first base station eNB1 and replys Radio Resource Control RRC to connect and join completion message again.
The disclosure also provides a kind of connection system, including connection equipment described above and described above User equipment.
The disclosure provides method of attachment, connects equipment, user equipment and connection system, there is provided A kind of method of dual link, user equipment (UE) can be simultaneously connected to two base stations, so that using Family equipment realizes the load balancing of minizone for greater flexibility, can substantially reduce modification second carrying Signaling step, reduces the overall latency that dual link is set up, so that user equipment is real for greater flexibility Show the problems such as load balancing of minizone, solution frequent switching.
Brief description
The flow chart that Fig. 1 illustrates the method for attachment of one embodiment of the invention.
The flow chart that Fig. 2 illustrates the method for attachment of another embodiment of the present invention.
The flow chart that Fig. 3 illustrates the method for attachment of another embodiment of the present invention.
The flow chart that Fig. 4 illustrates the method for attachment of further embodiment of the present invention.
The flow chart that Fig. 5 illustrates the method for attachment of another embodiment of the present invention.
Fig. 6 illustrates the structured flowchart of the connection equipment of one embodiment of the invention.
Fig. 7 illustrates the structured flowchart of the user equipment of one embodiment of the invention.
Specific embodiment
With reference to the accompanying drawings the present invention is described more fully, the example of the present invention is wherein described Property embodiment.
The flow chart that Fig. 1 illustrates the method for attachment of one embodiment of the invention.As shown in figure 1, should Method mainly includes:
Step 101, first base station (Evolved Node-B, eNB) and user equipment (User Equipment, UE) set up the first connection, make user equipment (UE) pass through first base station eNB1 It is attached to network.
Specifically, now, UE is attached to network by the first carrying that eNB1 sets up.
Step 102, first base station eNB1 after receiving the request setting up the second carrying, according to The dual link ability of user equipment (UE), the Radio Resource situation of first base station eNB1, the second base Stand the Radio Resource situation information of eNB2, judge whether to need to set up second for user equipment (UE) Connect.
First base station can be micro-base station in one embodiment, and the second base station can be macro base station, Or first base station can be macro base station, the second base station can be micro-base station, first base station and second It is all micro-base station or be all macro base station.
In one embodiment, the first carrying attachment that user equipment (UE) is set up by first base station During to network, first base station implements the connection status of monitoring UE and base station, judges whether occur even Connect unstable, overload, frequent switching the problems such as.After receiving the request setting up the second carrying, If user equipment (UE) possesses dual link ability, the Radio Resource of first base station eNB1 nervous or When load imbalance or user equipment (UE) frequent switching connect, first base station eNB1 then judges Needs are set up second with user equipment (UE) and are connected, and send the second connection to the second base station eNB 2 and build Vertical request.
In one embodiment, by judging the concatenation ability of UE and being currently at connection status Base station case determine whether to set up the second connection, if being currently at the money of the eNB1 of connection status Source is more nervous, then judge that surrounding whether there is other base stations, if it is multiple permissible around to there are other There is provided carry base station, then judge peripheral base station such as second base station eNB 2 resource situation, if Around base station resource situation take it easy, then judge under present case to pass through peripheral base station such as the The second connection is set up in two base stations.
Further, first base station eNB1 can be according to first base station eNB1 and the multiple base of surrounding The Radio Resource situation stood decides whether to set up the second connection, first base station can from Network Capture or The Radio Resource situation of itself real-time monitoring peripheral base station, and the nothing according to the peripheral base station getting Line resource situation carries out contrast sequence to peripheral base station availability, according to the Radio Resource of each base station Idle condition determine set up the second connection by other which base stations.
Method of attachment provided in an embodiment of the present invention, the first base station being in service state needs to collect Base station information around multiple, and the resource situation of the base station of surrounding is carried out calculate sequence, optimize Distribute the load of each macro base station or micro-base station, corresponding base station of the prior art, with better function Greatly, it is advantageously used for fast flexibly accessing network, be conducive to the load balancing between cell.
Step 103, if desired sets up the second connection, the second base station eNB 2 is user equipment (UE) Reserved resource, and the information needed setting up the second connection is sent to first base station eNB1.
In one embodiment, first base station eNB1 sends the second connection to the second base station eNB 2 After setting up request, the second base station eNB 2 judges the Radio Resource situation of itself, if the second base station When the Radio Resource situation of eNB2 can meet the service quality QoS that user equipment (UE) is asked, For user equipment (UE) distributing radio resource, and reply the second connection establishment to first base station eNB1 Order;First base station eNB1 sends wireless heterogeneous networks (Radio to user equipment (UE) Resource Control, RRC) connect reallocation message;First base station eNB1 receive user sets Standby UE replys after the completion of connecting reallocation message allocation radio resource according to radio resource control RRC Radio resource control RRC connect join completion message again.
Step 104, the information set up needed for the second connection is sent to user by first base station eNB1 Equipment UE is so that user equipment (UE) foundation is connected with the second of the second base station eNB 2.
In prior art, after first base station sets up the first carrying and the first connection, network side is initiated simultaneously Second carrying is set up by first base station, after first base station assists the second base station to set up the second connection, First base station just can be initiated to change the second carrying, and the first base station during second is carried is revised as second Base station, therefore prior art it is necessary to first pass through base station 1 complete the first carrying and second carrying build Vertical, carry to second again after resettling the second connection and modify.Double with respect to prior art Connection building process, the disclosure can be assisted by first base station during setting up the second carrying Complete the second connection establishment of user equipment and the second base station and user equipment to the second base station again Foundation to the second carrying of core network gateway.
Dual link method provided in an embodiment of the present invention, can be directly in the process setting up the second carrying In set up the second connection it is not necessary to change second to be again connected to the second carrying, modification can be substantially reduced The signaling step of the second carrying, reduces the overall latency that dual link is set up, so that user equipment Realize the problems such as load balancing of minizone, solution frequent switching for greater flexibility.
The flow chart that Fig. 2 illustrates the method for attachment of another embodiment of the present invention.As shown in Fig. 2 The method can also include:
Step 205, the second base station eNB 2 sends second and carries foundation response, to first base station ENB1 confirms that being established second with user equipment (UE) is connected;
Step 206, first base station eNB1 sends second and carries foundation response, is the second base station ENB2 sets up the second carrying of core network gateway so that user equipment (UE) passes through first simultaneously Connect and the second connection and network service.
In prior art, UE can select one of access according to the resource situation of peripheral base station To network side, and pass through this base station communication, if this base station resource is nervous, be switched to other bases Stand, by the preferable base station of other radio resource state and network-side communication.Prior art does not provide A kind of user equipment is made to be simultaneously connected to the dual link mode of network by two base stations.The present invention The method of attachment providing is provided, sets up dual link in network side by two base stations, can more adduction The utilization base station resource of reason, improves resource utilization between base station.
In one embodiment, user equipment can be connected to network side by least two base stations, UE or current base station according to current Radio Resource situation, by base stations multiple around relative analyses Signal, existing connect on the basis of, the one or more base stations selecting it neighbouring are built with network Vertical connect, the utilization rate of base station resource can be increased so that the more preferably more flexible access network of UE Resource is so that UE frequent switching need not can either use Internet resources.
The flow chart that Fig. 3 illustrates the method for attachment of another embodiment of the present invention.As shown in figure 3, The method mainly includes:
Step 301, user equipment (UE) is set up first with first base station eNB1 and is connected, by One base station eNB 1 is attached to network;
Step 302, what user equipment (UE) reception first base station eNB1 sent sets up the second connection Required information, wherein, first base station eNB1 after receiving the request setting up the second carrying, According to the dual link ability of user equipment (UE), the Radio Resource situation of first base station eNB1, The Radio Resource situation information of two base station eNB2, judges whether to need to set up for user equipment (UE) Second connection;Second base station eNB 2 reserves resource for user equipment (UE), and will set up second even The information needed connecing is sent to first base station eNB1.
Step 303, user equipment (UE) is set up and is connected with the second of the second base station eNB 2.
In one embodiment, user equipment (UE) receives first base station eNB1 according to the second base station The radio resource control RRC that the second connection establishment order replied sends connects reallocation message, its In, the second base station eNB 2 judges the Radio Resource situation of itself, if the nothing of the second base station eNB 2 When line resource situation can meet the service quality QoS that user equipment (UE) is asked, it is user equipment UE distributing radio resource, and reply the second connection establishment order to first base station eNB1;User Equipment UE connects reallocation message allocation radio resource according to radio resource control RRC, configures Become backward first base station eNB1 to reply radio resource control RRC connection and join completion message again.
The flow chart that Fig. 4 illustrates the method for attachment of further embodiment of the present invention.As shown in figure 4, The method can also include:
Step 404, sends second in the second base station eNB 2 and carries foundation response, to first base station ENB1 confirm to have established with user equipment (UE) second be connected after, user equipment (UE) passes through the The second carrying that one base station eNB 1 sets up core network gateway for the second base station eNB 2 is attached to net Network;
Step 405, user equipment (UE) passes through the first connection simultaneously and the second connection is led to network Letter.
The flow chart that Fig. 5 illustrates the method for attachment of another embodiment of the present invention.As shown in figure 5, The method includes:
Step 501, UE is attached to network by eNB1, sets up the first carrying.
Specifically, set up first between UE and eNB1 to be connected, by the first connection communication.
Step 502, if desired sets up the second carrying, public data network gateway (Public Data Network GateWay, PGW) send out to gateway (Serving GateWay, SGW) Send foundation to carry request, set up and in carrying request, carry UE mark international mobile subscriber identity (International Mobile Subscriber Identification Number, IMSI), hold Service quality (Quality of Service, the QoS) parameter of load, flow template, public data network The identification information that gateway PGW S5/S8 tunnel port mark, charging identifier, association carry.
Step 503, gateway SGW is to mobile controlled entity (Mobility Management Entity, MME) send to set up to carry and ask, wherein, this foundation carries in request and carries UE Mark IMSI, the Qos parameter carrying, flow template, SGW S1 tunnel port mark Know, associate the information such as the mark carrying.
Step 504, MME creates the session management request message of a Non-Access Stratum, this message In carry flow template, the qos parameter carrying, carry mark, the letter such as mark that association carries Breath, then sends to eNB1 to set up to carry and asks, this is set up bearing request message and includes carrying Mark, the qos parameter carrying, the session management request message of Non-Access Stratum, SGW S1 tunnel Port-mark.
Step 505, according to Radio Resource situation, eNB1 decides whether that the second connection is set up in foundation.
In one embodiment, when itself Radio Resource is nervous, or load imbalance or user set When standby UE frequent switching connects, then judge that needs are set up second with user equipment (UE) and are connected.
Step 506, eNB1 sends request to eNB2 and sets up the second connection, carries stream mould in request The information such as the mark that plate, the qos parameter carrying, carrying mark, association carry.
Step 507, the second base station eNB 2 judges the Radio Resource situation of itself, if the second base station When the Radio Resource situation of eNB2 can meet the service quality QoS that user equipment (UE) is asked, For user equipment (UE) distributing radio resource, and reply the second connection establishment to first base station eNB1 Order, wherein, carries the IP address and the of the second base station eNB 2 in the second connection establishment order The eNB2S1 tunnel port mark of two base stations, Radio Resource service quality QoS, radio bearer mark Knowledge, wireless access information etc..
Step 508, first base station eNB1 sends radio resource control RRC to user equipment (UE) Connect reallocation message, radio resource control RRC connects reallocation message and includes carrying Radio Resource clothes Business quality Q oS parameter, the session management request message of Non-Access Stratum, radio bearer identification, no Line access information etc..
Step 509, user equipment (UE) connects reallocation message according to radio resource control RRC and joins Put Radio Resource, configuration completes backward first base station eNB1 and replys radio resource control RRC even Connect and join completion message again.
Step 510, UE is synchronized to eNB2, sets up second with eNB2 and is connected.
Step 511, to eNB1, eNB2 confirms that the second connection establishment completes.
Step 512, eNB1 to MME reply carry set up response, carry carrying mark, The information such as eNB2S1 tunnel port mark.
Step 513, the session management response of Non-Access Stratum one Non-Access Stratum of establishment of UE disappears Breath, carries carrying mark, then sends direct-sending message to eNB2, carry non-in message in message The session management response message of Access Layer.
Step 514, eNB2 sends the second connection activate message to eNB1, carries non-in this message The session management response message of Access Layer.
Step 515, eNB1 sends up NAS to MME and transmits message, carries in this message The session management response message of Non-Access Stratum.
Step 516, the carrying that mobile controlled entity MME receives according to step S512 is set up and is rung The session management response in message and the up Non-Access Stratum NAS transmission message of step S515 is answered to disappear After breath, reply to carry to gateway SGW and set up response, carry carrying mark and the second base station ENB2S1 tunnel port identifies.
Step 517, SGW to PGW reply carry set up response, carry carrying mark, SGW S5/S8 Tunnel Identifier etc..
Step 517, UE passes through first and connects and the second connection and network service.
Fig. 6 illustrates the structured flowchart of the connection equipment of one embodiment of the invention.As shown in fig. 6, This equipment 600 mainly includes:First base station 601 and the second base station 602, wherein:First base station ENB1 is connected for setting up first with user equipment (UE), makes user equipment (UE) be attached to net Network;It is additionally operable to after receiving the request setting up the second carrying, according to the doubly-linked of user equipment (UE) Connect ability, the Radio Resource situation of first base station eNB1, the Radio Resource of the second base station eNB 2 Situation information, judges whether to need to set up the second connection for user equipment (UE);For will be set up Two connect required information is sent to user equipment (UE) so that user equipment (UE) is set up and second Second connection of base station eNB 2;In first base station eNB1, second base station eNB 2 judges that needs are built During vertical second connection, it is that user equipment (UE) reserves resource, and the required letter of the second connection will be set up Breath is sent to described first base station eNB1.
In one embodiment, the second base station eNB 2 be used for first base station eNB1 confirm with User equipment (UE) establishes the second connection;Described first base station eNB1 is used for sending the second carrying After setting up response, it is that the second base station eNB 2 sets up the second carrying of core network gateway so that using Family equipment UE is passed through first simultaneously and is connected and the second connection and network service.
In one embodiment, first base station eNB1 is used for receiving the request setting up the second carrying Afterwards, if user equipment (UE) possesses dual link ability, the Radio Resource of first base station eNB1 is tight Or when load imbalance or user equipment (UE) frequent switching connect, then judge to need and use Family equipment UE sets up the second connection, sends the second connection establishment request to the second base station eNB 2; Connect reallocation message for sending radio resource control RRC to user equipment (UE);And also use In receive user equipment UE, the wireless money of reallocation message configuration is connected according to radio resource control RRC The radio resource control RRC replied after the completion of source connects and joins completion message again;Second base station eNB 2 For judging the Radio Resource situation of itself, if the Radio Resource situation of the second base station eNB 2 can be full During the service quality QoS that sufficient user equipment (UE) is asked, being that user equipment (UE) distribution is wireless provides Source, and reply the second connection establishment order to first base station eNB1.
Fig. 7 illustrates the structured flowchart of the user equipment of one embodiment of the invention.As shown in fig. 7, This user equipment 700 mainly includes:
First link block 701, is connected for setting up first with first base station eNB1, by One base station eNB 1 is attached to network;
Second link block 702, for receive first base station eNB1 transmission set up the second connection Required information, sets up and is connected with the second of the second base station eNB 2;Wherein, first base station ENB1 after receiving the request setting up the second carrying, according to the dual link energy of user equipment (UE) Power, the Radio Resource situation of first base station eNB1, the Radio Resource situation of the second base station eNB 2 Information, judges whether to need to set up the second connection for user equipment (UE);If desired set up second even Connect, the second base station eNB 2 reserves resource for user equipment (UE), and will set up the institute of the second connection Information is needed to be sent to first base station eNB1.
In one embodiment, the second link block 702 is used in the second base station eNB 2 to first Base station eNB 1 confirm to establish with user equipment (UE) second be connected after, by first base station ENB1 be the second base station eNB 2 set up core network gateway second carrying be attached to network;With When by first connect and second connect and network service.
In one embodiment, the second link block 702 be used for receiving first base station eNB1 according to The radio resource control RRC that the second connection establishment order that second base station is replied sends connects joins again Message, wherein, the second base station eNB 2 judges the Radio Resource situation of itself, if the second base station When the Radio Resource situation of eNB2 can meet the service quality QoS that user equipment (UE) is asked, For user equipment (UE) distributing radio resource, and reply the second connection establishment to first base station eNB1 Order;First link block 701 is used for being joined according to radio resource control RRC connection reallocation message Put Radio Resource, configuration completes backward first base station eNB1 and replys radio resource control RRC even Connect and join completion message again.
Present invention also offers a kind of connection system, connect equipment and as above-mentioned including described above User equipment.
Description of the invention is given for the sake of example and description, and is not exhaustively Or limit the invention to disclosed form.Many modifications and variations are for the common skill of this area It is obvious for art personnel.Select and describe the principle that embodiment is in order to the present invention is more preferably described And practical application, and make those of ordinary skill in the art it will be appreciated that the present invention is thus design is suitable In the various embodiments with various modifications for the special-purpose.

Claims (14)

1. a kind of method of attachment is it is characterised in that include:
First base station eNB1 is set up first with user equipment (UE) and is connected, and so that user equipment (UE) is led to Cross first base station eNB1 and be attached to network;
First base station eNB1 after receiving the request setting up the second carrying, according to user equipment The dual link ability of UE, the Radio Resource situation of first base station eNB1, the second base station eNB 2 Radio Resource situation information, judge whether to need to set up the second connection for user equipment (UE);
If desired set up the second connection, the second base station eNB 2 reserves resource for user equipment (UE), And the information needed setting up the second connection is sent to first base station eNB1;
The information set up needed for the second connection is sent to user equipment (UE) by first base station eNB1, User equipment (UE) is set up be connected with the second of the second base station eNB 2.
2. method according to claim 1 will be it is characterised in that first base station eNB1 will The information needed for the second connection of setting up is sent to user equipment (UE) so that user equipment (UE) is set up After second connection of the second base station eNB 2, including:
Second base station eNB 2 confirms to have established with user equipment (UE) the to first base station eNB1 Two connections;
First base station eNB1 sends second and carries foundation response, is that the second base station eNB 2 is set up Second carrying of core network gateway is so that user equipment (UE) connects and institute by described first simultaneously State the second connection and network service.
3. method according to claim 1 and 2 is it is characterised in that first base station eNB1 After receiving the request setting up the second carrying, according to the dual link ability of user equipment (UE), The Radio Resource situation of one base station eNB 1, the Radio Resource situation information of the second base station eNB 2, Judge whether to need to set up the second connection for user equipment (UE), including:
After receiving the request setting up the second carrying, if user equipment (UE) possesses dual link energy Power, the Radio Resource anxiety of first base station eNB1 or load imbalance or user equipment (UE) When frequent switching connects, first base station eNB1 then judges to need to set up second with user equipment (UE) Connect, send the second connection establishment request to the second base station eNB 2.
4. method according to claim 3 it is characterised in that first base station eNB1 to After second base station eNB 2 sends the second connection establishment request, including:
Second base station eNB 2 judges the Radio Resource situation of itself, if the nothing of the second base station eNB 2 When line resource situation can meet the service quality QoS that user equipment (UE) is asked, it is described user Equipment UE distributing radio resource, and reply the second connection establishment order to first base station eNB1;
First base station eNB1 sends radio resource control RRC connection to user equipment (UE) and joins again Message;
First base station eNB1 receive user equipment UE is according to described radio resource control RRC even The radio resource control RRC replied after the completion of connecing reallocation message allocation radio resource connects has joined again Become message.
5. a kind of method of attachment is it is characterised in that include:
User equipment (UE) is set up first with first base station eNB1 and is connected, by first base station ENB1 is attached to network;
User equipment (UE) receives the letter set up needed for the second connection that first base station eNB1 sends Breath, wherein, first base station eNB1 after receiving the request setting up the second carrying, according to user The dual link ability of equipment UE, the Radio Resource situation of first base station eNB1, the second base station The Radio Resource situation information of eNB2, judges whether to need to set up second even for user equipment (UE) Connect;If desired set up the second connection, the second base station eNB 2 reserves resource for user equipment (UE), And the information needed setting up the second connection is sent to first base station eNB1;
User equipment (UE) is set up and is connected with the second of the second base station eNB 2.
6. method according to claim 5 is it is characterised in that user equipment (UE) is set up After being connected with the second of the second base station eNB 2, including:
Second base station eNB 2 sends second and carries foundation response, confirms to first base station eNB1 With user equipment (UE) establish second be connected after, user equipment (UE) pass through first base station eNB1 The second carrying setting up core network gateway for the second base station eNB 2 is attached to network;
User equipment (UE) connects by described first and described second connection and network service simultaneously.
7. the method according to claim 5 or 6 is it is characterised in that also include:
User equipment (UE) receives first base station eNB1 and is built according to the second connection that the second base station is replied The radio resource control RRC that vertical order sends connects reallocation message, wherein, the second base station eNB 2 Judge the Radio Resource situation of itself, if the Radio Resource situation of the second base station eNB 2 can meet institute When stating the service quality QoS that user equipment (UE) is asked, it is described user equipment (UE) distribution nothing Line resource, and reply the second connection establishment order to first base station eNB1;
It is wireless that user equipment (UE) connects reallocation message configuration according to described radio resource control RRC Resource, configuration completes backward first base station eNB1 reply radio resource control RRC connection and joins again Completion message.
8. a kind of connection equipment is it is characterised in that include first base station eNB1 and the second base station ENB2, wherein:
Described first base station eNB1 is connected for setting up first with user equipment (UE), so that user is set Standby UE is attached to network;It is additionally operable to after receiving the request setting up the second carrying, according to user The dual link ability of equipment UE, the Radio Resource situation of first base station eNB1, the second base station The Radio Resource situation information of eNB2, judges whether to need to set up second even for user equipment (UE) Connect;For the information set up needed for the second connection is sent to user equipment (UE) so that user sets Standby UE sets up and is connected with the second of the second base station eNB 2;
Described second base station eNB 2 judges to need to set up the second connection in described first base station eNB1 When, it is that user equipment (UE) reserves resource, and the information needed setting up the second connection is sent to institute State first base station eNB1.
9. equipment according to claim 8 is it is characterised in that also include:
Described second base station eNB 2 be used for first base station eNB1 confirm with user equipment (UE) Establish the second connection;
After described first base station eNB1 is used for sending the second carrying foundation response, it is the second base station ENB2 sets up the second carrying of core network gateway so that user equipment (UE) is simultaneously by described First connects and described second connection and network service.
10. equipment according to claim 8 or claim 9 is it is characterised in that also include:
Described first base station eNB1 is used for after receiving the request setting up the second carrying, if user Equipment UE possesses dual link ability, and the Radio Resource of first base station eNB1 is nervous or loads not When equilibrium or user equipment (UE) frequent switching connect, then judge to need to build with user equipment (UE) Vertical second connection, sends the second connection establishment request to the second base station eNB 2;For setting to user Standby UE sends radio resource control RRC and connects reallocation message;And be additionally operable to receive user and set After the completion of standby UE connects reallocation message allocation radio resource according to described radio resource control RRC The radio resource control RRC replied connects and joins completion message again;
Described second base station eNB 2 is used for judging the Radio Resource situation of itself, if the second base station When the Radio Resource situation of eNB2 can meet the service quality QoS that user equipment (UE) is asked, For described user equipment (UE) distributing radio resource, and reply the second connection to first base station eNB1 Set up order.
A kind of 11. user equipmenies are it is characterised in that include:
First link block, is connected for setting up first with first base station eNB1, by the first base The eNB1 that stands is attached to network;
Second link block, for receive first base station eNB1 transmission set up needed for the second connection Information, set up be connected with the second of the second base station eNB 2;Wherein, first base station eNB1 exists After receiving the request setting up the second carrying, according to the dual link ability of user equipment (UE), first The Radio Resource situation of base station eNB 1, the Radio Resource situation information of the second base station eNB 2, sentence Break and set up the second connection the need of for user equipment (UE);If desired set up the second connection, second Base station eNB 2 reserves resource for user equipment (UE), and the information needed setting up the second connection is sent out Give first base station eNB1.
12. user equipmenies according to claim 11 are it is characterised in that include:
Described second link block is used for sending the second carrying foundation response in the second base station eNB 2, To first base station eNB1 confirm established with user equipment (UE) second be connected after, by first The second carrying that base station eNB 1 sets up core network gateway for the second base station eNB 2 is attached to net Network;Connect by described first and described second connection and network service simultaneously.
13. user equipmenies according to claim 11 or 12 are it is characterised in that also wrap Include:
Described second link block is used for receiving that first base station eNB1 is replied according to the second base station The radio resource control RRC that two connection establishment orders send connects reallocation message, wherein, second Base station eNB 2 judges the Radio Resource situation of itself, if the Radio Resource feelings of the second base station eNB 2 When condition can meet the service quality QoS that described user equipment (UE) is asked, it is described user equipment UE distributing radio resource, and reply the second connection establishment order to first base station eNB1;
Described first link block is used for connecting reallocation message according to described radio resource control RRC Allocation radio resource, configuration completes backward first base station eNB1 and replys radio resource control RRC Connect and join completion message again.
A kind of 14. connection systems are it is characterised in that include as arbitrary described in claim 8-10 Connect equipment and as described user equipment arbitrary in claim 11-13.
CN201510500416.4A 2015-08-14 2015-08-14 Method of attachment, connection equipment, user equipment and connection system Pending CN106470503A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510500416.4A CN106470503A (en) 2015-08-14 2015-08-14 Method of attachment, connection equipment, user equipment and connection system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510500416.4A CN106470503A (en) 2015-08-14 2015-08-14 Method of attachment, connection equipment, user equipment and connection system

Publications (1)

Publication Number Publication Date
CN106470503A true CN106470503A (en) 2017-03-01

Family

ID=58214910

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510500416.4A Pending CN106470503A (en) 2015-08-14 2015-08-14 Method of attachment, connection equipment, user equipment and connection system

Country Status (1)

Country Link
CN (1) CN106470503A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107182132A (en) * 2017-06-15 2017-09-19 北京北方烽火科技有限公司 A kind of SRB method for building up, apparatus and system based on dual link
WO2019056325A1 (en) * 2017-09-22 2019-03-28 Oppo广东移动通信有限公司 Data processing method and related device
CN109565726A (en) * 2016-08-13 2019-04-02 高通股份有限公司 Method and apparatus for prothetic group station mobility
CN109802982A (en) * 2017-11-17 2019-05-24 中兴通讯股份有限公司 A kind of dual link implementation method, apparatus and system
CN111417110A (en) * 2019-01-04 2020-07-14 大唐移动通信设备有限公司 NSA-based cell configuration method and device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140335869A1 (en) * 2013-05-08 2014-11-13 Lg Electronics Inc. Method of configuring dual connectivity to ue in heterogeneous cell deployment
CN104219722A (en) * 2014-05-23 2014-12-17 中兴通讯股份有限公司 Double-connection radio bearer migration treatment method, double-connection radio bearer migration method and double-connection radio bearer migration device
EP2836047A1 (en) * 2013-08-09 2015-02-11 Alcatel Lucent Method and system for initiating data transmission, a primary node, secundary node, UE and computer program product
WO2015108291A1 (en) * 2014-01-17 2015-07-23 Lg Electronics Inc. Bearer setup method and apparatus in wierless communication system supporting dual connectivity

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140335869A1 (en) * 2013-05-08 2014-11-13 Lg Electronics Inc. Method of configuring dual connectivity to ue in heterogeneous cell deployment
EP2836047A1 (en) * 2013-08-09 2015-02-11 Alcatel Lucent Method and system for initiating data transmission, a primary node, secundary node, UE and computer program product
WO2015108291A1 (en) * 2014-01-17 2015-07-23 Lg Electronics Inc. Bearer setup method and apparatus in wierless communication system supporting dual connectivity
CN104219722A (en) * 2014-05-23 2014-12-17 中兴通讯股份有限公司 Double-connection radio bearer migration treatment method, double-connection radio bearer migration method and double-connection radio bearer migration device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
INTEL CORPORATION,R2-131403: "S1 versus X2 Approach for Dual Connectivity", 《3GPP TSG RAN WG2 MEETING #81BIS》 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109565726A (en) * 2016-08-13 2019-04-02 高通股份有限公司 Method and apparatus for prothetic group station mobility
CN107182132A (en) * 2017-06-15 2017-09-19 北京北方烽火科技有限公司 A kind of SRB method for building up, apparatus and system based on dual link
CN107182132B (en) * 2017-06-15 2020-07-03 武汉虹信通信技术有限责任公司 SRB establishing method, device and system based on double connections
WO2019056325A1 (en) * 2017-09-22 2019-03-28 Oppo广东移动通信有限公司 Data processing method and related device
CN111149418A (en) * 2017-09-22 2020-05-12 Oppo广东移动通信有限公司 Data processing method and related equipment
US11083006B2 (en) 2017-09-22 2021-08-03 Guangdong Oppo Mobile Telecommunications Corp., Ltd. Data processing method and related device
US11234261B2 (en) 2017-09-22 2022-01-25 Guangdong Oppo Mobile Telecommunications Corp., Ltd. Data processing method and related device
CN111149418B (en) * 2017-09-22 2024-02-23 Oppo广东移动通信有限公司 Data processing method and related equipment
CN109802982A (en) * 2017-11-17 2019-05-24 中兴通讯股份有限公司 A kind of dual link implementation method, apparatus and system
CN109802982B (en) * 2017-11-17 2021-04-20 中兴通讯股份有限公司 Dual-connection implementation method, device and system
CN111417110A (en) * 2019-01-04 2020-07-14 大唐移动通信设备有限公司 NSA-based cell configuration method and device

Similar Documents

Publication Publication Date Title
CN101409951B (en) Method for establishing load bearing and relevant apparatus
CN104797000B (en) Method for establishing wireless load-bearing and system in dual link network
CN109246746A (en) Foundation, UE access and the switching method and device of ongoing interface
CN104796948B (en) Radio bearer modification method and system in dual link network
CN109246747A (en) Method for building up, UE access method, UE switching method and the device of ongoing interface
CN104378793A (en) Switching method, master control base station and controlled base station
JP6626525B2 (en) Set up or modify data flow between dual connected user equipment
JP6294480B2 (en) Method and system for data flow setup or modification, primary node, secondary node, UE, and computer program product
CN106470503A (en) Method of attachment, connection equipment, user equipment and connection system
CN101990247A (en) Data transmission method and device and communication system
AU2013364674A2 (en) Method and apparatus for configuring aggregate maximum bit rate
JP2020511087A (en) Method for wireless communication and wireless communication device
CN110062467A (en) Radio station, control plane function node and its method
US20150139096A1 (en) Radio communication system, serving gateway, network, and logical path establishment method
CN101868001A (en) Method and system for controlling UE to access to network
JP2016500211A (en) Method and apparatus for improving gateway stability in LTE mode home base station system
US20130229946A1 (en) Method and device for configuring cell parameters of relay node
CN104797009A (en) Method of releasing radio bearer in dual-connection network and system
CN102595499A (en) Method for UE (User Equipment) to build hybrid bearers in multiple cells
CN101998549A (en) Method and system for configuring data carrying channel for user data by relay access system
CN102378181B (en) A kind of method and system of data exchange in coordinated multi-point communication technology
CN104581698B (en) Dual link user identifies determination method and macro cell base station and small-cell base station
CN104244330A (en) Method for balancing load of EPC (extended parity checking) gateway
CN105323853A (en) Service cell index value allocation method in dual-connection network
CN108617028A (en) A kind of method and system for establishing carrying

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170301

RJ01 Rejection of invention patent application after publication