CN106469329A - A kind of intelligent management system and approaches to IM - Google Patents

A kind of intelligent management system and approaches to IM Download PDF

Info

Publication number
CN106469329A
CN106469329A CN201610796475.5A CN201610796475A CN106469329A CN 106469329 A CN106469329 A CN 106469329A CN 201610796475 A CN201610796475 A CN 201610796475A CN 106469329 A CN106469329 A CN 106469329A
Authority
CN
China
Prior art keywords
server
information
harvester
data
data transmission
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610796475.5A
Other languages
Chinese (zh)
Inventor
孔祥明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
This Industrial Co.
Original Assignee
Sichuan Chuang Neng Electric Power Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Chuang Neng Electric Power Engineering Co Ltd filed Critical Sichuan Chuang Neng Electric Power Engineering Co Ltd
Priority to CN201610796475.5A priority Critical patent/CN106469329A/en
Publication of CN106469329A publication Critical patent/CN106469329A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/12Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • General Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Theoretical Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • General Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Marketing (AREA)
  • General Health & Medical Sciences (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Water Supply & Treatment (AREA)
  • Public Health (AREA)
  • Medical Informatics (AREA)
  • Computing Systems (AREA)
  • Signal Processing (AREA)
  • Primary Health Care (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

Intelligent management system and approaches to IM that the present invention provides, data transmission device is uploaded to by the information that harvester gathers power equipment, send this information to second server by data transmission device to be parsed, then the data is activation after parsing is carried out to first server by statistical analysiss by second server.Described first server can be according to the real-time status monitoring information of the data genaration power equipment receiving, and management and control (as controlled the power supply of power equipment, closing or power equipment being monitored with early warning etc.) is implemented according to the result of statistical analysiss to power equipment, and it is prompted to management personnel in time when power equipment breaks down or maintainer is keeped in repair monitoring.Additionally, this first server can also return to user terminal according to the result corresponding statistical report form of generation (as the moon, season or year electricity consumption statistical report form) of statistical analysiss or according to the project statistics request corresponding statistical report form of generation of user.

Description

A kind of intelligent management system and approaches to IM
Technical field
The present invention relates to internet of things field, in particular to a kind of intelligent management system and its information management side Method.
Background technology
At present, most enterprises or family do not possess professional power equipment managing and control system, can only be by traditional meter Amount equipment (as ammeter) knows energy consumption data, and power equipment occurs user when exception or fault cannot know also do not have in time Specialized maintenance personnel are had to carry out on-call maintenance.
Content of the invention
In view of this, it is an object of the invention to provide a kind of intelligent management system and approaches to IM, on improving State problem.
Present pre-ferred embodiments provide a kind of intelligent management system, and for management and control power equipment, this system includes first Server, second server, data transmission device and at least one be used for gathering the adopting of power information of described power equipment Storage, wherein:
Described second server and described first server and data transmission device communication connection, described data transmission device Electrically connect with each harvester, the information that this data transmission device is used for collecting harvester sends to described second service Device, carries out parsing by this second server to the information receiving and obtains corresponding data, and sends the data to described One server, so that this first server carries out statistical analysiss to the data receiving.
Preferably, described first server is additionally operable to judge that power equipment whether there is event according to the result of statistical analysiss Barrier, if there is fault, generates early warning information to point out management personnel.
Preferably, this system also includes communicating to connect with described first server and the management of the user list that is stored with is whole End, this management terminal is used for receiving and showing the early warning letter of user in the described user list of correspondence that described first server sends Breath is to point out maintainer to process this early warning information.
Preferably, this system also includes the user terminal with the communication connection of described first server, for receiving and showing The monitor in real time information of data genaration that the basis that described first server sends receives and according to the knot after statistical analysiss The statistical report form of the multiple statistical items of inclusion that fruit generates.
Another preferred embodiment of the present invention provides a kind of approaches to IM, is applied to including first server, the second clothes The intelligent management system of business device, data transmission device and at least one harvester, this intelligent management system is used for management and control electric power Equipment, wherein, described first server is stored with and one includes the unique identification information of multiple data transmission devices and each is unique The data base of the harvester list corresponding to identification information, described harvester is used for gathering the power information of described power equipment, The method includes:
Described first server receives the data transfer being connected that second server sends with the foundation of this second server The unique identification information of device;
Described first server inquires about described data base according to the unique identification information receiving, if this unique identification information In described data, then return the harvester list extremely described second server corresponding to this unique identification information;And
Described first server receives the described harvester row after the parsing of this second server that second server sends The information that each harvester in table is collected, and statistical analysiss are carried out to the data after the parsing receiving.
Intelligent management system and approaches to IM that the present invention provides, are gathered in the information of power equipment by harvester Reach data transmission device, second server is sent this information to by data transmission device and is parsed, then by second service Data is activation after parsing is carried out statistical analysiss to first server by device.Described first server can be according to the data receiving Generate the real-time status monitoring information of power equipment, and management and control is implemented (as controlled to power equipment according to the result of statistical analysiss The power supply of power equipment processed, closing or power equipment is monitored with early warning etc.), and when monitoring power equipment and breaking down It is prompted to management personnel in time or maintainer is keeped in repair.Additionally, this first server can also be according to the knot of statistical analysiss Fruit generates corresponding statistical report form (as the moon, season or year electricity consumption statistical report form) or is generated according to the project statistics request of user corresponding Statistical report form return to user terminal.
Brief description
In order to be illustrated more clearly that the technical scheme of the embodiment of the present invention, below will be attached to use required in embodiment Figure is briefly described it will be appreciated that the following drawings illustrate only certain embodiments of the present invention, and it is right to be therefore not construed as The restriction of scope, for those of ordinary skill in the art, on the premise of not paying creative work, can also be according to this A little accompanying drawings obtain other related accompanying drawings.
A kind of block diagram of intelligent management system that Fig. 1 provides for present pre-ferred embodiments;
The block diagram of another kind of intelligent management system that Fig. 2 provides for present pre-ferred embodiments;
The block diagram of another kind of intelligent management system that Fig. 3 provides for present pre-ferred embodiments;
A kind of approaches to IM being applied to described intelligent management system that Fig. 4 provides for present pre-ferred embodiments Flow chart;
The flow chart of another kind of described information management method that Fig. 5 provides for present pre-ferred embodiments;
The flow chart of another kind of described information management method that Fig. 6 provides for present pre-ferred embodiments.
Reference:
Intelligent management system 100
First server 110
Second server 120
Data transmission device 130
Harvester 140
Management terminal 150
User terminal 160
Specific embodiment
Purpose, technical scheme and advantage for making the embodiment of the present invention are clearer, below in conjunction with the embodiment of the present invention In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described it is clear that described embodiment is The a part of embodiment of the present invention, rather than whole embodiments.The present invention generally described and illustrated in accompanying drawing herein is implemented The assembly of example can be arranged with various different configurations and design.
It should be noted that:Similar label and letter represent similar terms in following accompanying drawing, therefore, once a certain Xiang Yi It is defined in individual accompanying drawing, then do not need it to be defined further and explains in subsequent accompanying drawing.
In describing the invention in addition it is also necessary to explanation, unless otherwise clearly defined and limited, term " setting ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected, or is integrally connected;Can be It is mechanically connected or electrically connect;Can be to be joined directly together it is also possible to be indirectly connected to by intermediary, can be two The connection of element internal.For the ordinary skill in the art, above-mentioned term can be understood in the present invention with concrete condition In concrete meaning.
Therefore, below the detailed description of the embodiments of the invention providing in the accompanying drawings is not intended to limit claimed The scope of the present invention, but be merely representative of the selected embodiment of the present invention.Based on the embodiment in the present invention, this area is common The every other embodiment that technical staff is obtained under the premise of not making creative work, broadly falls into the model of present invention protection Enclose.
Fig. 1 is a kind of block diagram of intelligent management system 100 that present pre-ferred embodiments provide.As shown in figure 1, This intelligent management system 100 include first server 110, second server 120, data transmission device 130 and at least one Harvester 140.Wherein, described second server 120 and described first server 110 and data transmission device 130 are by wired Communication or communication communication connection.Described data transmission device 130 is electrically connected with described harvester 140.Described first Server 110, second server 120 can be single servers, may also be the server set being made up of multiple servers Group, wherein, first server 110 is used for interacting and process the data of second server 120 submission, institute with other-end State second server 120 and be used for managing collecting device (including described data processing equipment 130 and harvester 140) and to adopting The data that collection equipment collects is parsed and is uploaded to first server 110.This system is mainly used in power equipment is carried out Intelligent management and control, for example, can be applicable to the energy consumption of intelligent road-lamp, hydrologic monitoring, enterprises equipment, wired home electrical equipment etc. Monitoring and monitoring and early warning.
Specifically, described harvester 140 gathers the power information of power equipment and is uploaded to the information collecting described Described information is sent by this data transmission device 130 and is parsed to described second server 120 by data transmission device 130. This second server 120 carries out parsing and obtains sending after corresponding data to described first server 110, by this to described information First server 110 carries out statistical analysiss, carries out management and control with the result according to statistical analysiss to power equipment.
Selectively, described first server 110 is carried out to the power supply of power equipment or closing according to statistic analysis result Control, and early warning is monitored to power equipment.When monitoring that power equipment breaks down, first server 110 will be given birth to Become early warning information to point out management personnel to arrange maintainer to be keeped in repair.
Additionally, described first server 110 can also be according to the real-time status prison of the data genaration power equipment receiving Electric power energy consumption form in measurement information, and certain time, the such as moon, season, year electricity consumption form.When this intelligent management system of application When 100 user reaches some, described first server 110 can also carry out big data according to the data receiving and divide Analysis, obtains the relevant statistics of electricity consumption industry, such as average energy consumption, the high energy consumption period, Regional Distribution, power equipment spoilage or Fault rate etc..
Fig. 2 is the block diagram of another kind of intelligent management system 100 that present pre-ferred embodiments provide.As Fig. 2 institute Show, unlike those described above is that this intelligent management system 100 also includes whole with the management of described first server 110 communication connection End 150.The user of this management terminal 150 is maintainer, and its storage inside has this maintainer that answerable user is arranged Table.When the power equipment that first server 110 monitors a certain user breaks down, can by the early warning information of generation send to It is responsible for the management terminal 150 of the maintainer of this user, to point out maintainer to be processed in time.
It is preferred that in the present embodiment, when maintainer is processed to fault, needing to be taken pictures in scene and submitted to place Reason result is to first server 110, so that corresponding process time, maintainer, result etc. are believed by first server 110 Breath is recorded.In addition, first server 110 can send accordingly according to different unit types, fault category or fault rank Treatment advice to maintainer, help maintainer timely and effectively to carry out maintenance process to power equipment.
Furthermore, in the present embodiment, the power equipment of the user that maintainer can also be responsible for it carries out regular visit. Can achieve ground, user's power distribution room is provided with Quick Response Code, and maintainer scans this Quick Response Code and enters the corresponding interface of this user, takes pictures simultaneously Typing is uploaded to first server 110 and is recorded after patrolling and examining information.
Fig. 3 is the block diagram of another kind of intelligent management system 100 that present pre-ferred embodiments provide.As Fig. 3 institute Show, unlike those described above is that this intelligent management system 100 also includes whole with the user of described first server 110 communication connection End 160.The user of this user terminal 160 is the user of described power equipment.
Selectively, the statistical report form that described first server 110 generates, real-time status monitoring information send to user eventually End 160 is shown, so that user grasps knows the electricity consumption situation of oneself.In other embodiment, user also can pass through user Terminal 160 sends project statistics request to described first server 110, so that first server 110 is according to the project system receiving The meter corresponding data of acquisition request carries out statistical analysiss, generates corresponding form and is back to user terminal 160 and is supplied to user and looks into See.Wherein, described project statistics request includes the selected project category of user and beginning and ending time, and such as user can initiate to count certain The Monday of one week to the air conditioning electricity consumption on Sunday request.
This user terminal 160 can be additionally used in the letter such as synchronous early warning record, breakdown maintenance record with described first server 110 Breath.Wherein, described early warning record includes but is not limited to time of failure, fault type and fault rank of power equipment etc., Described breakdown maintenance record includes but is not limited to breakdown maintenance time, maintainer, method for maintaining, equipment photo of maintenance etc.. After user checks breakdown maintenance record, the process of maintainer can be scored and be uploaded to first server 110 and carried out Record.
Additionally, the patrol record that maintainer carries out being uploaded to first server 110 during regular visit to power equipment is same Sample may synchronize to described user terminal 160, so that user knows the ruuning situation of power equipment.
Fig. 4 is a kind of flow chart of approaches to IM that another preferred embodiment of the present invention provides, and is applied to including the One server 110, the intelligent management system of second server 120, data transmission device 130 and at least one harvester 140 100.This intelligent management system 100 be used for management and control power equipment, wherein, described first server 110 be stored with one include multiple The data base of harvester 140 list corresponding to the unique identification information of data transmission device 130 and each unique identification information, Described harvester 140 is used for gathering the power information of described power equipment.It should be noted that, the present invention provide method not with The order of Fig. 4 and described below is to limit.Concrete steps shown in Fig. 4 will be described in detail below.
Step S101, described first server 110 receive that second server 120 sends with this second server 120 Set up the unique identification information of the data transmission device 130 connecting.
In the present embodiment, after electricity on described data transmission device 130, connect described second server 120 and send itself Unique identification information to this second server 120.Wherein, described unique identification information may be, but not limited to, and this data passes The numbering of defeated device 130, MAC Address etc..Described second server 120 sends the unique identification information receiving to described again First server 110.
Step S103, described first server 110 inquires about described data base according to the unique identification information receiving, and judges Whether described unique identification information is located in described data base, if being located at, execution step S105, if being not located at, terminates this Stream process.
Step S105, harvester 140 list corresponding to described first server 110 this unique identification information of return is to institute State second server 120.
Step S107, described first server 110 receives solving through this second server 120 of second server 120 transmission The information that each harvester 140 in described harvester 140 list after analysis is collected, and to the data after the parsing receiving Carry out statistical analysiss.
In the present embodiment, described second server 120 is receiving the harvester 140 that described first server 110 returns After list, interval Preset Time sends information gathering instruction to described data transmission device 130, so that data transmission device 130 This information gathering instruction is sent each harvester 140 to the list of described harvester 140.Described each harvester 140 returns and adopts The information collecting, to described data transmission device 130, is sent described information to the described second clothes by this data transmission device 130 Business device 120, finally carries out parsing by described second server 120 to the information receiving again and obtains corresponding data, and should Data is activation is to described first server 110.Described first server 110 carries out statistical analysiss according to the data receiving, with Management and control is carried out to power equipment according to analysis result.
In other embodiment, according to statistic analysis result, described first server 110 can also judge that described electric power sets For whether breaking down, if breaking down, generate corresponding early warning information to point out management personnel to arrange professional in time Keeped in repair.
Fig. 5 is the flow chart of another kind of approaches to IM that present pre-ferred embodiments provide.With the method shown in Fig. 4 Except for the difference that, in the present embodiment, described intelligent management system 100 also includes the pipe with the communication connection of described first server 110 Reason terminal 150, the method also includes:
Step S109, this step can execute after step S107, and this step is described first server 110 according to statistical Analysis result and the configuration of power equipment, judge whether power equipment breaks down, if breaking down, execution step S111, and no Then, terminate this stream process.
And step S111, generate corresponding early warning information, and send to described management terminal 150.
In the present embodiment, the user of described management terminal 150 is maintainer, is stored with this maintainer and is born The user list of duty.Described first server 110 by the early warning information of the power equipment of a certain for the correspondence of generation user send to It is responsible for the management terminal 150 of the maintainer of this user, to point out maintainer to process in time.
Fig. 6 is the flow chart of another kind of approaches to IM that present pre-ferred embodiments provide.With the method shown in Fig. 4 Except for the difference that, in the present embodiment, described intelligent management system 100 also includes the use with the communication connection of described first server 110 Family terminal 160, the method also includes:
Step S113, this step can execute after step S107, and this step receives described use for described first server 110 The project statistics request that family terminal 160 sends, wherein this project statistics request includes project category and beginning and ending time.
And step S115, described first server 110 counts the corresponding data of acquisition request carrying out according to described project Statistical analysiss, generate corresponding statistical report form and are back to described user terminal 160.
In the present embodiment, user can send project statistics request by user terminal 160 to described first server 110, So that first server 110 carries out statistical analysiss according to the project statistics corresponding data of acquisition request receiving, generate corresponding Form is back to user terminal 160 and is supplied to user to be checked.Wherein, described project statistics request includes the selected project of user Classification and beginning and ending time, such as user can initiate to count the request of the Monday in a certain week to the air conditioning electricity consumption on Sunday.
It should be noted that the function with regard to intelligent management system 100 NM in described information management method can be joined According to the above-mentioned content to Fig. 1, Fig. 2 and Fig. 3 description, will not be described here.
In the embodiment of the present invention, described first server 110 and second server 120 may be, but not limited to, web (net Network) server, database server, ftp (file transfer protocol, file transfer protocol (FTP)) server etc..Described Management terminal 150 and user terminal 160 may be, but not limited to, PC (personal computer, PC), flat board electricity Brain, smart mobile phone, personal digital assistant (personal digital assistant, PDA), mobile internet surfing equipment (mobile Internet device, MID) etc..
The terms " inclusion ", "comprising" or its any other variant are intended to comprising of nonexcludability, thus So that including a series of process of key elements, method, article or equipment not only include those key elements, but also include not clearly Other key elements listed, or also include for this process, method, article or the intrinsic key element of equipment.Not more Limit in the case of, the key element that limited by sentence "including a ..." is it is not excluded that in process, the side including described key element Also there is other identical element in method, article or equipment.
The above, the only specific embodiment of the present invention, but protection scope of the present invention is not limited thereto, and any Those familiar with the art the invention discloses technical scope in, change or replacement can be readily occurred in, all should contain Cover within protection scope of the present invention.Therefore, protection scope of the present invention should be defined by described scope of the claims.

Claims (10)

1. a kind of intelligent management system, for management and control power equipment it is characterised in that this system include first server, second Server, data transmission device and at least one harvester for gathering the power information of described power equipment, wherein:
Described second server and described first server and data transmission device communication connection, described data transmission device with every Individual harvester electrical connection,
The information that this data transmission device is used for collecting harvester sends to described second server, by this second server Parsing is carried out to the information receiving and obtains corresponding data, and send the data to described first server so that this One server carries out statistical analysiss to the data receiving.
2. intelligent management system according to claim 1 is it is characterised in that described first server is additionally operable to according to statistics The result of analysis judges that power equipment whether there is fault, if there is fault, generates early warning information to point out management personnel.
3. intelligent management system according to claim 2 is it is characterised in that this system also includes and described first server Communicate to connect and be stored with the management terminal of user list, and this management terminal is used for receiving and show that described first server sends The described user list of correspondence in user early warning information to point out maintainer to process this early warning information.
4. intelligent management system according to claim 1 is it is characterised in that this system also includes and described first server The user terminal of communication connection, for receiving and showing the reality of the data genaration that the basis that described first server sends receives When monitoring information and according to after statistical analysiss result generate inclusion multiple statistical items statistical report form.
5. a kind of approaches to IM is it is characterised in that be applied to including first server, second server, data transfer dress Put and at least one harvester intelligent management system, this intelligent management system is used for management and control power equipment, wherein, described the One server storage has corresponding to a unique identification information including multiple data transmission devices and each unique identification information The data base of harvester list, described harvester is used for gathering the power information of described power equipment, and the method includes:
Described first server receives the data transmission device being connected that second server sends with the foundation of this second server Unique identification information;
Described first server inquires about described data base according to the unique identification information receiving, if this unique identification information is located at In described data base, then return the harvester list extremely described second server corresponding to this unique identification information;And
Described first server receives in the described harvester list after the parsing of this second server that second server sends The information that collected of each harvester, and statistical analysiss are carried out to the data after the parsing receiving.
6. approaches to IM according to claim 5 is it is characterised in that the method also includes:
According to the result after statistical analysiss, described first server judges that described power equipment whether there is fault, if there is event Barrier, then generate corresponding early warning information to point out management personnel.
7. approaches to IM according to claim 6 it is characterised in that described intelligent management system also include with described The management terminal of first server communication connection, the method also includes:
Described first server sends to described management terminal the early warning information of generation to point out maintainer to process this early warning Information.
8. approaches to IM according to claim 5 it is characterised in that described intelligent management system also include with described The user terminal of first server communication connection, the method also includes:
Described first server receives the project statistics request that described user terminal sends, and wherein this project statistics request includes item Mesh classification and beginning and ending time;
Described first server counts the corresponding data of acquisition request according to described project and carries out statistical analysiss, generates corresponding Statistical report form is back to described user terminal.
9. approaches to IM according to claim 5 is it is characterised in that described first server receives second server The step having set up the unique identification information of the data transmission device being connected with this second server sending includes:
Described data transmission device sends the unique identification information of itself to the second server having established a connection;And
Described second server sends the described unique identification information receiving to described first server.
10. approaches to IM according to claim 5 is it is characterised in that described first server receives second service The step of the information that each harvester in the described harvester list after the parsing of this second server that device sends is collected Including:
Described second server interval Preset Time sends information gathering instruction to described data transmission device;
This information gathering instruction is sent each harvester to described harvester list by described data transmission device;
Described each harvester returns the information collecting to described data transmission device, by this data transmission device by described information Send to described second server;And
Described second server carries out parsing to the information receiving and obtains corresponding data, and sends the data to described One server.
CN201610796475.5A 2016-08-31 2016-08-31 A kind of intelligent management system and approaches to IM Pending CN106469329A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610796475.5A CN106469329A (en) 2016-08-31 2016-08-31 A kind of intelligent management system and approaches to IM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610796475.5A CN106469329A (en) 2016-08-31 2016-08-31 A kind of intelligent management system and approaches to IM

Publications (1)

Publication Number Publication Date
CN106469329A true CN106469329A (en) 2017-03-01

Family

ID=58230331

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610796475.5A Pending CN106469329A (en) 2016-08-31 2016-08-31 A kind of intelligent management system and approaches to IM

Country Status (1)

Country Link
CN (1) CN106469329A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107273983A (en) * 2017-06-23 2017-10-20 深圳市盛路物联通讯技术有限公司 A kind of equipment maintenance and management method and system based on Internet of Things
CN107294204A (en) * 2017-06-20 2017-10-24 国网山东省电力公司济南市历城区供电公司 Power alarm management system
CN107948608A (en) * 2017-12-15 2018-04-20 沈阳首视科技有限责任公司 Data transmission device, monitoring system and monitoring method based on ultrasonic wave
CN109448333A (en) * 2018-12-14 2019-03-08 中煤航测遥感集团有限公司 Pipeline management method and system
CN110610307A (en) * 2019-08-30 2019-12-24 江苏能电科技有限公司 Electric brake management system and method
CN111114671A (en) * 2019-11-08 2020-05-08 上海钧正网络科技有限公司 Early warning method, system, device, equipment and storage medium
CN116165956A (en) * 2023-03-09 2023-05-26 中建照明有限公司 Intelligent building network control system and method based on Internet of things

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101625790A (en) * 2009-08-14 2010-01-13 深圳市科陆电子科技股份有限公司 Method for alarming electric power event
CN102914761A (en) * 2012-11-14 2013-02-06 浙江省电力公司电力科学研究院 System and method for monitoring quality of intelligent electric energy meter
CN105375631A (en) * 2015-11-24 2016-03-02 国网北京市电力公司 Underground cable monitoring system for power grid
CN105791349A (en) * 2014-12-23 2016-07-20 中兴通讯股份有限公司 Data analysis method, device and system, terminal and server

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101625790A (en) * 2009-08-14 2010-01-13 深圳市科陆电子科技股份有限公司 Method for alarming electric power event
CN102914761A (en) * 2012-11-14 2013-02-06 浙江省电力公司电力科学研究院 System and method for monitoring quality of intelligent electric energy meter
CN105791349A (en) * 2014-12-23 2016-07-20 中兴通讯股份有限公司 Data analysis method, device and system, terminal and server
CN105375631A (en) * 2015-11-24 2016-03-02 国网北京市电力公司 Underground cable monitoring system for power grid

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107294204A (en) * 2017-06-20 2017-10-24 国网山东省电力公司济南市历城区供电公司 Power alarm management system
CN107273983A (en) * 2017-06-23 2017-10-20 深圳市盛路物联通讯技术有限公司 A kind of equipment maintenance and management method and system based on Internet of Things
WO2018232847A1 (en) * 2017-06-23 2018-12-27 深圳市盛路物联通讯技术有限公司 Internet of things-based device maintenance management method and system
CN107948608A (en) * 2017-12-15 2018-04-20 沈阳首视科技有限责任公司 Data transmission device, monitoring system and monitoring method based on ultrasonic wave
CN109448333A (en) * 2018-12-14 2019-03-08 中煤航测遥感集团有限公司 Pipeline management method and system
CN110610307A (en) * 2019-08-30 2019-12-24 江苏能电科技有限公司 Electric brake management system and method
CN111114671A (en) * 2019-11-08 2020-05-08 上海钧正网络科技有限公司 Early warning method, system, device, equipment and storage medium
CN116165956A (en) * 2023-03-09 2023-05-26 中建照明有限公司 Intelligent building network control system and method based on Internet of things
CN116165956B (en) * 2023-03-09 2023-10-31 中建照明有限公司 Intelligent building network control system and method based on Internet of things

Similar Documents

Publication Publication Date Title
CN106469329A (en) A kind of intelligent management system and approaches to IM
CN106469328A (en) A kind of intelligent management system and approaches to IM
CN103684817B (en) The monitoring method and system of data center
CN105159964B (en) A kind of log monitoring method and system
CN104123134B (en) Intelligent electricity use data management method and system based on AMI and J2EE
CN108762210A (en) A kind of industrial intelligent manufaturing data harvester and method based on Internet of Things
CN107037800B (en) Fault diagnosis method based on remote fault diagnosis system of client-side oxygen generating equipment
CN108880847A (en) A kind of method and device of positioning failure
CN106026405A (en) Relay protection on-line monitoring and analyzing system based on EMS system
CN107422714A (en) Ring ingot intelligence spinning management system and management method
CN107168197A (en) Intelligent grid secondary device remote-control method
CN102354198A (en) Method and device for monitoring machine room
CN201878170U (en) Radio frequency identification device (RFID) handheld information acquisition and network management system
CN106100884A (en) The alarm method of supervisory control of substation equipment operation exception
CN106815373A (en) Big data methods of exhibiting and system are rushed to repair in distribution based on BI analyses
CN104574219A (en) System and method for monitoring and early warning of operation conditions of power grid service information system
CN107862392A (en) A kind of Unit account of plant management-control method based on power distribution network intelligence O&M control platform
CN112163297A (en) Equipment health prediction system
CN206962861U (en) A kind of wisdom computer room management system
CN106200542A (en) Slag drying machine remote online monitoring analyzes system and method
CN104460610B (en) Hospital infection equipment remote monitoring management system and method
CN107918273A (en) A kind of application system of mobile technology of Internet of things on halved belt sorter
CN108256770A (en) Photo-voltaic power generation station O&M managing and control system based on mobile application
CN102811139B (en) Management system of broadband internet equipment
CN211086454U (en) Enterprise production state monitoring system based on NB-IOT

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20170621

Address after: 201900, room 8, No. 803, Lane 1501-61, Shuangcheng Road, Shanghai, Baoshan District

Applicant after: Shanghai Chuang Neng Industrial Co., Ltd.

Address before: 618000 Deyang City, Mount Lu, Sichuan City Road seed company, the 2 floor of the 1 2-1-2

Applicant before: Sichuan Chuang Neng Electric Power Engineering Co., Ltd.

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20170712

Address after: 610000 Sichuan city in Chengdu Province, Wuhou District Road No. 99 North grass

Applicant after: This Industrial Co.

Address before: 201900, room 8, No. 803, Lane 1501-61, Shuangcheng Road, Shanghai, Baoshan District

Applicant before: Shanghai Chuang Neng Industrial Co., Ltd.

TA01 Transfer of patent application right
RJ01 Rejection of invention patent application after publication

Application publication date: 20170301