CN106454950A - Load balancing method based on WiFi chip television white spectrum communication system - Google Patents
Load balancing method based on WiFi chip television white spectrum communication system Download PDFInfo
- Publication number
- CN106454950A CN106454950A CN201610915734.1A CN201610915734A CN106454950A CN 106454950 A CN106454950 A CN 106454950A CN 201610915734 A CN201610915734 A CN 201610915734A CN 106454950 A CN106454950 A CN 106454950A
- Authority
- CN
- China
- Prior art keywords
- honeycomb
- message
- crowded
- factor
- load
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W28/00—Network traffic management; Network resource management
- H04W28/02—Traffic management, e.g. flow control or congestion control
- H04W28/08—Load balancing or load distribution
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W28/00—Network traffic management; Network resource management
- H04W28/02—Traffic management, e.g. flow control or congestion control
- H04W28/06—Optimizing the usage of the radio link, e.g. header compression, information sizing, discarding information
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
The invention discloses a load balancing method based on a WiFi chip television white spectrum communication system. The method comprises when receiving a load balancing message, pre-estimating flow during crowding, predicating rush hours and recording the message and crowding value and the like. The method realizes load balance and high availability of a terminal in a network, prevents large single-node pressure and resource waste of other nodes and improves whole performance and stability of the system.
Description
Technical field
The invention belongs to DTV and wireless communication technology field.Specifically related to a kind of based on the white frequency of WiFi chip TV
The load-balancing method of spectrum communication system.
Background technology
Terminal in a network has mobility.Accordingly, it would be desirable to automatically process the switching between adjacent cell, but need to examine
Consider some following factors:1. when a more crowded and adjacent honeycomb of honeycomb is not but crowded.2. ought insert in a network
New honeycomb.Under normal circumstances, network is the level for not knowing each terminal, does not therefore also just know and moves to other honeycombs
The impact of Shi Zaocheng.Therefore network can only suggested terminals using which type of configure.Network is the crowded journey for knowing each base station
Degree.When a base station appearance is crowded, adjacent base station portion is crowded, and network will carry out load balancing operation.Believed by control
Breath notifies the terminal being attached on crowded base station to be attached on not crowded base station.Terminal is with regard to oneself decision-making, if be attached to
On adjacent base station, whether whether this have reasonable covering depending on adjacent base station and have in following several hours
Preferably flow can be used.Such as, typically intelligent electric meter will not be handed over to a new honeycomb, because, the letter being related to
Order may be higher than sending the cost of message.So it is equal to need a kind of load based on the white spectrum system of WiFi chip TV badly
Weighing apparatus method is solving the above problems.
Content of the invention
The invention aims to overcoming above-mentioned not enough one kind that provides based on the white spectrum system of WiFi chip TV
Load-balancing method.
A kind of load-balancing method based on the white spectrum system of WiFi chip TV, comprises the following steps:Work as reception
During to a load balance message, the flow of crowded period is just estimated, the rush hours, record message and crowded numerical value is predicted,
If the flow of crowded period is less than the signalling loads from a honeycomb to another honeycomb, action command is not sent, such as
The flow of really crowded period is more than or equal to the signalling loads from a honeycomb to another honeycomb, then turn next step;Test
The signal level of adjacent cell, estimates the spreading factor of two honeycombs, and calculates spreading factor difference;To move to all of
Honeycomb, check SPF tree, select the honeycomb of maximum SPF tree;If the SPF tree of maximum>0.9 just switched in 5 minutes at random,
If maximum SPF tree<0.3, then do not switch over.
When the maximum SPF tree is between 0.3-0.9, switching time is calculated according to below equation:Switching time=pre-
Survey the rush hours * (1-SPF tree), the SPF tree=crowding factor × message factor/spreading factor difference, wherein:When crowded<50%
When, crowding factor=1, when crowded>When 90%, crowding factor=0, when crowded between 50%-90% when, crowding factor=1-
((crowded -0.5) × 2.5), work as message>During 1500bits, the message factor=1, work as message<During 150bits, the message factor=0,
When message is between 150bits-1500bits, the message factor=(message -150) × (150/135)).
When there are multiple frequencies a base station, load balancing is carried out on different frequencies.
If new honeycomb is added in existing network, only former terminal is added without new terminal, terminal
Still it is attached on existing honeycomb, rather than is attached on new honeycomb, all terminals in honeycomb is forced to carry out new
Scanning, was carried out once per 24 hours.
The time started of the prediction the rush hours is that processing from starting state is elected in node, then obtains
Other process the load capacity information of node and carry out the distribution of data processing task, the termination time of the prediction the rush hours
It is each process node historical responses temporal summation.
Present invention achieves the load balancing of terminal in network and high availability, it is to avoid single-unit point pressure is big, other
Node resource is wasted, and is improved the overall performance of system and is stablized.
Specific embodiment
Below in conjunction with specific embodiment, the present invention is further illustrated:
A kind of load-balancing method based on the white spectrum system of WiFi chip TV, comprises the following steps:Work as reception
During to a load balance message, the flow of crowded period is just estimated, the rush hours, record message and crowded numerical value is predicted,
If the flow of crowded period is less than the signalling loads from a honeycomb to another honeycomb, action command is not sent, such as
The flow of really crowded period is more than or equal to the signalling loads from a honeycomb to another honeycomb, then turn next step;Test
The signal level of adjacent cell, estimates the spreading factor of two honeycombs, and calculates spreading factor difference;To move to all of
Honeycomb, check SPF tree, select the honeycomb of maximum SPF tree;If the SPF tree of maximum>0.9 just switched in 5 minutes at random,
If maximum SPF tree<0.3, then do not switch over.
When the maximum SPF tree is between 0.3-0.9, switching time is calculated according to below equation:Switching time=pre-
Survey the rush hours * (1-SPF tree), the SPF tree=crowding factor × message factor/spreading factor difference, wherein:When crowded<50%
When, crowding factor=1, when crowded>When 90%, crowding factor=0, when crowded between 50%-90% when, crowding factor=1-
((crowded -0.5) × 2.5), work as message>During 1500bits, the message factor=1, work as message<During 150bits, the message factor=0,
When message is between 150bits-1500bits, the message factor=(message -150) × (150/135)).
When there are multiple frequencies a base station, load balancing is carried out on different frequencies.
If new honeycomb is added in existing network, only former terminal is added without new terminal, terminal
Still it is attached on existing honeycomb, rather than is attached on new honeycomb, all terminals in honeycomb is forced to carry out new
Scanning, was carried out once per 24 hours.
The time started of the prediction the rush hours is that processing from starting state is elected in node, then obtains
Other process the load capacity information of node and carry out the distribution of data processing task, the termination time of the prediction the rush hours
It is each process node historical responses temporal summation.
In this step, the network terminal can be realized by WiFi to the real-time monitoring of honeycomb.Cellular abscess when system
After changing, partly belong to the process task in the node for changing originally and will be unable to continue executing with, the network terminal listens to this
Abnormal, the equilibrium assignment of waiting task is re-started according to remaining honeycomb.
Increase some honeycombs in system newly, for the process resource of these newly-increased honeycombs not idle and system effectiveness is improved, institute
State the network terminal also can be according to re-starting the equilibrium assignment of waiting task to realize more preferable load according to remaining honeycomb
Balanced.
In the present embodiment, by the network terminal, honeycomb is monitored in real time, and added new honeycomb in system, divided again
Join waiting task.
Each honeycomb works independently, and the network terminal is monitored, to determine whether the network terminal sends connection request.?
In the case of listening to network terminal transmission connection request, it is to ensure the request load balancing on each honeycomb, can is that basis is many
The connection request order that individual user sends, according to arriving first the order that first processes.
Claims (5)
1. a kind of load-balancing method based on the white spectrum system of WiFi chip TV, it is characterised in that including following step
Suddenly:The flow of crowded period when a load balance message is received, is just estimated, the rush hours is predicted, record message and gather around
Crowded numerical value, if the flow of crowded period is less than the signalling loads from a honeycomb to another honeycomb, does not send dynamic
Instruct, if the flow of crowded period is more than or equal to the signalling loads from a honeycomb to another honeycomb, under turning
One step;The signal level of test adjacent cell, estimates the spreading factor of two honeycombs, and calculates spreading factor difference;To all
Honeycomb to be moved to, check SPF tree, select the honeycomb of maximum SPF tree;If the SPF tree of maximum>0.9 just in 5 minutes
Random switching, if maximum SPF tree<0.3, then do not switch over.
2. the load-balancing method based on the white spectrum system of WiFi chip TV according to claim 1, its feature
It is that switching time is calculated according to below equation when the maximum SPF tree is between 0.3-0.9:Switching time=prediction is gathered around
Find time * (1-SPF tree), the SPF tree=crowding factor × message factor/spreading factor difference, wherein:When crowded<When 50%, gather around
The crowded factor=1, when crowded>When 90%, crowding factor=0, when crowded between 50%-90% when, crowding factor=1- ((crowded-
0.5) × 2.5), work as message>During 1500bits, the message factor=1, work as message<During 150bits, the message factor=0, work as message
Between 150bits-1500bits when, the message factor=(message -150) × (150/135)).
3. the load-balancing method based on the white spectrum system of WiFi chip TV according to claim 1, its feature
It is, when there are multiple frequencies a base station, to carry out load balancing on different frequencies.
4. the load-balancing method based on the white spectrum system of WiFi chip TV according to claim 1, its feature
It is if new honeycomb is added in existing network, only former terminal is added without new terminal, and terminal remains unchanged
It is attached on existing honeycomb, rather than is attached on new honeycomb, all terminals in honeycomb is forced new scanning is carried out,
Carried out once per 24 hours.
5. the load-balancing method based on the white spectrum system of WiFi chip TV according to claim 1, its feature
It is that the time started for predicting the rush hours is that processing from starting state is elected in node, then obtains other
Process the load capacity information of node and the distribution of data processing task is carried out, the termination time of the prediction the rush hours is every
Node historical responses temporal summation is processed described in one.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610915734.1A CN106454950B (en) | 2016-10-20 | 2016-10-20 | Load balancing method based on WiFi chip television white spectrum communication system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610915734.1A CN106454950B (en) | 2016-10-20 | 2016-10-20 | Load balancing method based on WiFi chip television white spectrum communication system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106454950A true CN106454950A (en) | 2017-02-22 |
CN106454950B CN106454950B (en) | 2020-02-14 |
Family
ID=58175550
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610915734.1A Active CN106454950B (en) | 2016-10-20 | 2016-10-20 | Load balancing method based on WiFi chip television white spectrum communication system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106454950B (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1350374A (en) * | 2000-10-19 | 2002-05-22 | 华为技术有限公司 | Multiple-job load monitoring and forecasting device in CDMA cellular communication system and its calculation method |
CN102905307A (en) * | 2012-09-12 | 2013-01-30 | 北京邮电大学 | System for realizing joint optimization of neighbor cell list and load balance |
US20150105083A1 (en) * | 2012-01-24 | 2015-04-16 | Broadcom Corporation | Modified Measurement Procedures for User Equipments |
CN105188091A (en) * | 2015-09-17 | 2015-12-23 | 山东财经大学 | Load balancing method based on forced switching in heterogeneous wireless network system |
CN105992296A (en) * | 2015-01-28 | 2016-10-05 | 中国移动通信集团公司 | Terminal switching method and device |
-
2016
- 2016-10-20 CN CN201610915734.1A patent/CN106454950B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1350374A (en) * | 2000-10-19 | 2002-05-22 | 华为技术有限公司 | Multiple-job load monitoring and forecasting device in CDMA cellular communication system and its calculation method |
US20150105083A1 (en) * | 2012-01-24 | 2015-04-16 | Broadcom Corporation | Modified Measurement Procedures for User Equipments |
CN102905307A (en) * | 2012-09-12 | 2013-01-30 | 北京邮电大学 | System for realizing joint optimization of neighbor cell list and load balance |
CN105992296A (en) * | 2015-01-28 | 2016-10-05 | 中国移动通信集团公司 | Terminal switching method and device |
CN105188091A (en) * | 2015-09-17 | 2015-12-23 | 山东财经大学 | Load balancing method based on forced switching in heterogeneous wireless network system |
Non-Patent Citations (2)
Title |
---|
肖清华,韩蕾,汤建东,汪丁鼎: "基于邻区集的LTE负载均衡算法", 《邮电设计技术》 * |
裴雪兵: "新型无线网络的资源管理与负载均衡策略研究", 《中国博士学位论文全文数据库》 * |
Also Published As
Publication number | Publication date |
---|---|
CN106454950B (en) | 2020-02-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP3844968B2 (en) | Call admission control apparatus and method | |
CN103313324B (en) | The object cell selection method of LTE system and eNB | |
US11071092B2 (en) | Response message transmission method and apparatus | |
US9220035B2 (en) | Radio control base station and method of determining connection-target switching center | |
WO2016011752A1 (en) | Load balancing method and device | |
US20160050602A1 (en) | Mobility optimization method, user equipment and access network equipment | |
CN107852622B (en) | Gap selection method and device | |
CN109587734B (en) | Communication method and device of double-frequency repeater | |
CN104023357A (en) | Load balancing method of concentrated-type wireless local area network and access controller | |
US10257759B2 (en) | Load balancing among wireless access points | |
CN113364682B (en) | Data transmission method and device, storage medium and electronic device | |
CN114095956B (en) | Network optimization method, device and storage medium | |
CN109862589B (en) | Public and private network switching method, terminal equipment and storage medium | |
CN109309942B (en) | Network switching method and device | |
CN104836612A (en) | Self-adaption satellite channel dynamic access method | |
CN104581855A (en) | Method and system for optimizing inter-operation of 3G network and 4G network | |
CN105657749B (en) | A kind of method, apparatus of LTE inter-cell load equilibrium and base station | |
CN104704904B (en) | A kind of method and user equipment of selection access network | |
CN107465609A (en) | A kind of terminal route selection method and internet-of-things terminal based on Internet of Things | |
CN104469902A (en) | Method and device for controlling RRC (radio resource control) connection status between UE (user equipment) and network side | |
US20160360523A1 (en) | Access system, device and method | |
CN105873223A (en) | Service scheduling method, service scheduling device, wireless network controller and base station | |
US9094866B2 (en) | Method and radio base station in a wireless communication network | |
CN106454950A (en) | Load balancing method based on WiFi chip television white spectrum communication system | |
CN107426777B (en) | Method for monitoring paging by terminal, paging method, terminal and network side equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20200201 Address after: 610000 No.203, floor 2, No.22, Jinsi street, Qingyang District, Chengdu City, Sichuan Province Applicant after: Chengdu Jingyuan network technology partnership (limited partnership) Address before: 610000 Sichuan city of Chengdu province Chengdu Tianfu Avenue in the middle of the 666 No. 2 Building 8 floor No. 802 Applicant before: Chengdu Feng Feng Communication Technology Co., Ltd. |