CN106452884B - Data distributing method and device in block catenary system - Google Patents

Data distributing method and device in block catenary system Download PDF

Info

Publication number
CN106452884B
CN106452884B CN201610921727.2A CN201610921727A CN106452884B CN 106452884 B CN106452884 B CN 106452884B CN 201610921727 A CN201610921727 A CN 201610921727A CN 106452884 B CN106452884 B CN 106452884B
Authority
CN
China
Prior art keywords
value
node
assets
accumulative
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610921727.2A
Other languages
Chinese (zh)
Other versions
CN106452884A (en
Inventor
陈剑雄
孙文锋
方欣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Kerui Cloud Technology Co Ltd
Original Assignee
Beijing Kerui Cloud Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Kerui Cloud Technology Co Ltd filed Critical Beijing Kerui Cloud Technology Co Ltd
Priority to CN201610921727.2A priority Critical patent/CN106452884B/en
Publication of CN106452884A publication Critical patent/CN106452884A/en
Application granted granted Critical
Publication of CN106452884B publication Critical patent/CN106452884B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/02Standardisation; Integration
    • H04L41/0246Exchanging or transporting network management information using the Internet; Embedding network management web servers in network elements; Web-services-based protocols
    • H04L41/0266Exchanging or transporting network management information using the Internet; Embedding network management web servers in network elements; Web-services-based protocols using meta-data, objects or commands for formatting management information, e.g. using eXtensible markup language [XML]
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • G06Q30/0207Discounts or incentives, e.g. coupons or rebates
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/08Configuration management of networks or network elements
    • H04L41/0803Configuration setting
    • H04L41/0823Configuration setting characterised by the purposes of a change of settings, e.g. optimising configuration for enhancing reliability
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/10Protocols in which an application is distributed across nodes in the network
    • H04L67/1097Protocols in which an application is distributed across nodes in the network for distributed storage of data in networks, e.g. transport arrangements for network file system [NFS], storage area networks [SAN] or network attached storage [NAS]

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Business, Economics & Management (AREA)
  • Accounting & Taxation (AREA)
  • Development Economics (AREA)
  • Strategic Management (AREA)
  • Finance (AREA)
  • Game Theory and Decision Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Complex Calculations (AREA)
  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

The present invention provides the data distributing method and device in a kind of block catenary system, wherein method includes the following steps: determining the data to be distributed and relation chain in block catenary system;It include multiple nodes in the relation chain;Determine that each node is to the control parameter for having held data in relation chain;According to data to be distributed, each node to the control parameter for having held data, the data value for distributing to each node is determined.Since the program determines the data value for distributing to each node in the manner described above, newly-increased total assets value can rationally and effectively be distributed, real promoter is made to obtain effectively excitation.

Description

Data distributing method and device in block catenary system
Technical field
Data distributing method and dress the present invention relates to data distribution technology field, in particular in a kind of block catenary system It sets.
Background technique
Internet finance high speed development, block chain (block chain is actually the user endpoints of a group dispersion, And the distributed data base being made of All Activity person, it is the record to all bit coin transactions histories) as the digital goods of encryption The basis of coin and core, are paid much attention to.The quantity of node and dealer become increasing as time goes by, basis Facility allows for handling such extension under the premise of not leading to performance degradation.It is opened from founder's bit coin of digital cash Begin, in order to guarantee the robustness of decentralization network, there is enough node to participate in, has been specifically designed out " digging mine " behavior and right The reward mechanism answered, so-called " digging mine " is substantially to solve a complicated mathematical problem with computer, to guarantee bit coin net The consistency of network distribution accounting system, so-called " reward mechanism " are exactly the bit coin conduct of the newly-generated certain value of bit coin network Money reward, reward obtain the people of answer.Reward mechanism first has to accomplish transparent, can followed by self-growth be promoted to need.But respectively The reward mechanism of kind digital cash, development all make speculator grasp a large amount of weights to a certain extent, and real promoter can not Effectively excitation is obtained, so as to cause digital cash is necessarily weak and disagreement.For example the early stage big mine masters of bit coin have held and have surpassed 80% calculation power is crossed, (it is unfavorable to them that the big mine masters of weight veto so that the subsequent advanced iteration of bit coin cannot achieve It improves).
Summary of the invention
The embodiment of the invention provides the data distributing methods in a kind of block catenary system, can effectively distribute newly-increased Assets value makes real promoter obtain effectively excitation.This method comprises:
Determine the data to be distributed and relation chain in block catenary system;It include multiple nodes in the relation chain;
Determine that each node is to the control parameter for having held data in relation chain;
According to data to be distributed, each node to the control parameter for having held data, the number for distributing to each node is determined According to value.
In one embodiment, the data to be distributed is newly-increased total assets value;
Each node includes: each node holding effectively to holding assets value to the control parameter for having held data Force value and promotion efficiency value.
In one embodiment, determine that each node holds effect value to holding assets value as follows:
Each node holds the value of holding assets and hold duration that effect value is each node to holding assets value Product.
In one embodiment, determine each node to the promotion efficiency value of holding assets value as follows:
When the child node that a father node in multiple nodes is not connected, the promotion efficiency value of the father node is 0;
When a father node in multiple nodes has connected child node, the promotion efficiency value of the father node is all phases The accumulative assets processing costs sum of child node even;The accumulative assets processing costs is to save to the son being connected with the father node The accumulative assets value of point determines after being handled;
The accumulation assets value of node is determined as follows:
When the child node that a father node in multiple nodes is not connected, the accumulation assets value of the father node is the father The holding assets value of node;
When a father node in multiple nodes has connected child node, the accumulation assets value of the father node is father section The value of holding assets of point provides total production value with the accumulation of all child nodes being connected.
In one embodiment, the accumulative assets value for the child node being connected with the father node is handled, comprising:
Determine the maximum value in the accumulative assets value of all connected child nodes of the father node;
Exponent arithmetic is carried out to the accumulative assets value of the corresponding child node of accumulative assets value maximum value;
The accumulative assets value of remaining child node is compared with preset threshold, when being less than preset threshold, to corresponding The accumulative assets value of child node carries out product calculation;When being greater than preset threshold, to the accumulative assets value of corresponding child node into Row linear operation;
Exponent arithmetic is carried out to the accumulative assets value of the corresponding child node of accumulative assets value maximum value as follows:
Product calculation: the second default value of T* is carried out to the accumulative assets value of corresponding child node as follows;
Linear operation: T+ third default value is carried out to the accumulative assets value of corresponding child node as follows;
Wherein, T is the accumulative assets value of corresponding child node.
In one embodiment, according to data to be distributed, each node to the control parameter for having held data, according to as follows Formula determines the data value for distributing to each node:
Wherein, BNew iFor the data value of i-th of node in relation chain;
SiHold effect value, S for i-th node in relation chaini=Bi*Ai, BiIt has been held for i-th node in relation chain There are assets value, AiHold duration for i-th node in relation chain;
PiFor the promotion efficiency value of i-th of node in relation chain;
BAlwaysTo increase total assets value newly;
N is the number of relation chain interior joint, and n is integer.
The embodiment of the invention also provides the data distribution device in a kind of block catenary system, which includes:
Data to be distributed and relation chain determining module, for determining data to be distributed and relation chain in block catenary system; It include multiple nodes in the relation chain;
Control parameter determining module, for determining that each node is to the control parameter for having held data in relation chain;
Distribution module, for, to the control parameter for having held data, determination to be distributed to according to data to be distributed, each node The data value of each node.
In one embodiment, the data to be distributed is newly-increased total assets value;
Each node includes: each node holding effectively to holding assets value to the control parameter for having held data Force value and promotion efficiency value.
In one embodiment, the control parameter determining module is specifically used for:
Determine that each node holds effect value to holding assets value as follows:
Each node holds the value of holding assets and hold duration that effect value is each node to holding assets value Product.
In one embodiment, the control parameter determining module is specifically used for:
Determine each node to the promotion efficiency value of holding assets value as follows:
When the child node that a father node in multiple nodes is not connected, the promotion efficiency value of the father node is 0;
When a father node in multiple nodes has connected child node, the promotion efficiency value of the father node is all phases The accumulative assets processing costs sum of child node even;The accumulative assets processing costs is to save to the son being connected with the father node The accumulative assets value of point determines after being handled;
The accumulation assets value of node is determined as follows:
When the child node that a father node in multiple nodes is not connected, the accumulation assets value of the father node is the father The holding assets value of node;
When a father node in multiple nodes has connected child node, the accumulation assets value of the father node is father section The value of holding assets of point provides total production value with the accumulation of all child nodes being connected.
In one embodiment, the control parameter determining module is specifically used for:
The accumulative assets value for the child node being connected with the father node is handled, comprising:
Determine the maximum value in the accumulative assets value of all connected child nodes of the father node;
Exponent arithmetic is carried out to the accumulative assets value of the corresponding child node of accumulative assets value maximum value;
The accumulative assets value of remaining child node is compared with preset threshold, when being less than preset threshold, to corresponding The accumulative assets value of child node carries out product calculation;When being greater than preset threshold, to the accumulative assets value of corresponding child node into Row linear operation;
Exponent arithmetic is carried out to the accumulative assets value of the corresponding child node of accumulative assets value maximum value as follows:
Product calculation: the second default value of T* is carried out to the accumulative assets value of corresponding child node as follows;
Linear operation: T+ third default value is carried out to the accumulative assets value of corresponding child node as follows;
Wherein, T is the accumulative assets value of corresponding child node.
In one embodiment, the distribution module is specifically used for:
The data value for distributing to each node is determined according to following formula:
Wherein, BNew iFor the data value of i-th of node in relation chain;
SiHold effect value, S for i-th node in relation chaini=Bi*Ai, BiIt has been held for i-th node in relation chain There are assets value, AiHold duration for i-th node in relation chain;
PiFor the promotion efficiency value of i-th of node in relation chain;
BAlwaysTo increase total assets value newly;
N is the number of relation chain interior joint, and n is integer.
In embodiments of the present invention, it is necessary first to determine data to be distributed (newly-increased total assets value) in block catenary system and Relation chain;It include multiple nodes in the relation chain;Then determine that each node joins the control for having held data in relation chain Number;The data for distributing to each node are finally determined to the control parameter for having held data according to data to be distributed, each node Value determines the data value for distributing to each node in the manner described above in this way, newly-increased total assets value can be carried out rationally effective Ground distribution makes real promoter obtain effectively excitation.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with It obtains other drawings based on these drawings.
Fig. 1 is the data distributing method flow chart in a kind of block catenary system provided in an embodiment of the present invention;
Fig. 2 is that a kind of promotion efficiency provided in an embodiment of the present invention is worth calculation method instance graph;
Fig. 3 is the data distribution device schematic diagram in a kind of block catenary system provided in an embodiment of the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that the described embodiment is only a part of the embodiment of the present invention, instead of all the embodiments.Based on this Embodiment in invention, every other reality obtained by those of ordinary skill in the art without making creative efforts Example is applied, shall fall within the protection scope of the present invention.
In embodiments of the present invention, the data distributing method in a kind of block catenary system is provided, as shown in Figure 1, the party Method includes:
Step 101: determining the data to be distributed and relation chain in block catenary system;It include multiple sections in the relation chain Point;
Step 102: determining that each node is to the control parameter for having held data in relation chain;
Step 103: according to data to be distributed, each node to the control parameter for having held data, determination is distributed to each The data value of node.
When it is implemented, this method has used for reference PoW (Proof Of Work, proof of work mechanism) and PoS (Proof Of Stake, equity prove mechanism) common recognition mechanism the advantages of, the method for the present invention realize two purposes: as block chain bottom Common recognition mechanism guarantees high efficiency and safety;As incentive system guarantee promote node honest gain, promote dot-com boom and The robustness of chain.It as the digital asset built in block catenary system, can periodically be increased according to about fixed cycle, increase and present Gradually attenuation trend, to prevent inflation.What the method for the present invention to be done be exactly distribute growth assets it is big to popularizing action Node on.In order to reach arousal effect, the method for the present invention is mainly examined in terms of holding effect (stack) and promotion efficiency two Amount.Wherein, hold size (Balance) * that effect (stack) is defined as and hold duration (AssertAge), with this Stack value It participates in the distribution as weight.Promotion efficiency (Promotion) is defined as the relation chain by being formed after the nodes recommendations, and should Liveness in relation chain.Holding assets value can be described as intrinsic assets value/amount.
Specifically, " newly-increased total assets value " that " data to be distributed " described in step 101 just refers to, increases total assets value newly It is to be generated by block catenary system, increasing total assets value newly is not a determining numerical value.
It is formed, is also possible to through back-end server data when it is implemented, relation chain can be the dominant way of recommendation Excavate the stealthy relationship established.For example, just becoming the father node of B account, B account when A account first is given B account transfer Family is exactly the child node of A account, and B account gives C account transfer, and B account is the father node of C account, and C account is exactly the son of B account Node, and so on, A, B, C are just at relation chain.
When it is implemented, after relation chain has been determined by step 101, so that it may to each node in relation chain into Row traversal, finds all adjacent nodes of the node, determines each node to the control parameter for having held data, wherein each node It may include: that each node holds effect value and promotion efficiency to holding assets value to the control parameter for having held data Value.
Specifically, determining that each node holds effect value to holding assets value as follows:
Each node holds the value of holding assets and hold duration that effect value is each node to holding assets value Product.
Specifically, determining each node to the promotion efficiency value of holding assets value as follows:
When the child node that a father node in multiple nodes is not connected, the promotion efficiency value of the father node is 0;
When a father node in multiple nodes has connected child node, the promotion efficiency value of the father node is all phases The accumulative assets processing costs sum of child node even;The accumulative assets processing costs is to save to the son being connected with the father node The accumulative assets value of point determines after being handled;
The accumulation assets value of node is determined as follows:
When the child node that a father node in multiple nodes is not connected, the accumulation assets value of the father node is the father The holding assets value of node;
When a father node in multiple nodes has connected child node, the accumulation assets value of the father node is father section The value of holding assets of point provides total production value with the accumulation of all child nodes being connected.
Specifically, the accumulative assets value to the child node being connected with the father node is handled, comprising:
Determine the maximum value in the accumulative assets value of all connected child nodes of the father node;
Exponent arithmetic is carried out to the accumulative assets value of the corresponding child node of accumulative assets value maximum value;
The accumulative assets value of remaining child node is compared with preset threshold, when being less than preset threshold, to corresponding The accumulative assets value of child node carries out product calculation;When being greater than preset threshold, to the accumulative assets value of corresponding child node into Row linear operation;
Exponent arithmetic is carried out to the accumulative assets value of the corresponding child node of accumulative assets value maximum value as follows:
Product calculation: the second default value of T* is carried out to the accumulative assets value of corresponding child node as follows;
Linear operation: T+ third default value is carried out to the accumulative assets value of corresponding child node as follows;
Wherein, T is the accumulative assets value of corresponding child node.
Wherein, the first default value can be 3, and the second default value can be 10, and third default value can be 9000. Specifically, the determination principle of the first default value, the second default value, third default value is mainly in few new of holding assets It is balanced between user and the old user for holding more assets, the relatively figure of merit obtained by numerical simulation.
Hold the calculating process of effect and promotion efficiency below by illustration.
For example, as shown in Fig. 2, including a root node, child node A, B, C for being connect with root node in relation chain, with son Sun Jiedian C1, the C2 of node C connection.Wherein, relation chain will not be overlapped, and the root node in each relation chain is one.
1) the holding assets size * that effect value is node that holds of node holds the time.
2) the promotion efficiency value of node calculates as follows:
Since Sun Jiedian C1, C2 and child node A, B are without child node, so the accumulation assets value T (c1) of Sun Jiedian C1 It is the value of the holding assets B (c2) of itself for the value of the holding assets B (c1) of itself, the accumulation assets value T (c2) of Sun Jiedian C2, The accumulation assets value T (a) of child node A is the holding assets value B (a) of itself, and the accumulation assets value T (b) of child node B is itself Holding assets value B (b), promotion efficiency value V (c1)=V (c2)=V (a)=V (b) of Sun Jiedian C1, C2 and child node A, B =0.
Sun Jiedian C1, the C2 of child node C connection, the then accumulation that the accumulation assets value T (c) of child node C is Sun Jiedian C1 provide The adduction of the holding assets value B (c) of output value T (c1), the accumulation assets value T (c2) of Sun Jiedian C2 and child node C itself, i.e. T (c)=T (c1)+T (c2)+B (c).Then the accumulation assets value T (c1) of Sun Jiedian C1, the accumulation assets value T of Sun Jiedian C2 are determined (c2) size, it is determined here that the accumulation assets value T (c1) of Sun Jiedian C1 is greater than the accumulation assets value T (c2) of Sun Jiedian C2, then Exponent arithmetic is carried out (for example, T (c1) to the accumulation assets value T (c1) of Sun Jiedian C11/3), by the accumulation assets value T of Sun Jiedian C2 (c2) it is compared with preset threshold (artificially providing 10000), it is determined here that the accumulation assets value T (c2) of Sun Jiedian C2 is less than in advance If threshold value, then multiplying (for example, T (c2) * 10) is carried out to the accumulation assets value T (c2) of Sun Jiedian C2, after having been calculated, really Promotion efficiency value V (c)=T (c1) exponent arithmetic+T (c2) multiplying of stator node C.
Root node includes three child nodes A, B, C, accumulation assets value T (root)=T (a)+T (b)+T (c)+B of root node (root), B (root) is the holding assets value of root node itself.Then the size of T (a), T (b) and T (c) are determined, herein really Determine grandson T (b) maximum, then exponent arithmetic is carried out to T (b), T (a) and T (c) are compared with preset threshold, it is determined here that T (a) Less than preset threshold, T (c) is greater than preset threshold, then carries out multiplying to T (a), carries out linear operation (for example, T to T (c) (c) after+9000), having been calculated, promotion efficiency value V (root)=T (b) exponent arithmetic+T (a) multiplying of root node is determined + T (c) linear operation.
Specifically, the accumulation assets value to node carries out exponent arithmetic, the node that stack value can be inhibited big is conducive to The small node of stack value;It multiplying is carried out to the accumulation assets value of node, can space out, it is big to be conducive to stack value Node.It to which type of operation is the accumulation assets value of node carry out is determined according to different business needs.
When it is implemented, according to above method calculate egress hold effect value and promotion efficiency value after, according to such as Lower formula determines the data value for distributing to each node:
Wherein, BNew iFor the data value of i-th of node in relation chain;
SiHold effect value, S for i-th node in relation chaini=Bi*Ai, BiIt has been held for i-th node in relation chain There are assets value, AiHold duration for i-th node in relation chain;
PiFor the promotion efficiency value of i-th of node in relation chain;
BAlwaysTo increase total assets value newly;
N is the number of relation chain interior joint, and n is integer.
Based on the same inventive concept, the data distribution dress in a kind of block catenary system is additionally provided in the embodiment of the present invention It sets, as described in the following examples.The principle and block linkwork solved the problems, such as due to the data distribution device in block catenary system Data distributing method in system is similar, therefore the implementation of the data distribution device in block catenary system may refer to block catenary system In data distributing method implementation, overlaps will not be repeated.Used below, term " unit " or " module " can be with Realize the combination of the software and/or hardware of predetermined function.Although device described in following embodiment is preferably come with software real It is existing, but the realization of the combination of hardware or software and hardware is also that may and be contemplated.
Fig. 3 is a kind of structural block diagram of the data distribution device in the block catenary system of the embodiment of the present invention, such as Fig. 3 institute Show, comprising:
Data to be distributed and relation chain determining module 301, for determining data to be distributed and relationship in block catenary system Chain;It include multiple nodes in the relation chain;
Control parameter determining module 302, for determining that each node is to the control parameter for having held data in relation chain;
Distribution module 303, for, to the control parameter for having held data, determining and dividing according to data to be distributed, each node The data value of each node of dispensing.
The structure is illustrated below.
When it is implemented, described data to be distributed is newly-increased total assets value;Described each node is to having held data Control parameter include: that each node holds effect value and promotion efficiency value to holding assets value.
When it is implemented, control parameter determining module 302 is specifically used for:
Determine that each node holds effect value to holding assets value as follows:
Each node holds the value of holding assets and hold duration that effect value is each node to holding assets value Product.
When it is implemented, control parameter determining module 302 is specifically used for:
Determine each node to the promotion efficiency value of holding assets value as follows:
When the child node that a father node in multiple nodes is not connected, the promotion efficiency value of the father node is 0;
When a father node in multiple nodes has connected child node, the promotion efficiency value of the father node is all phases The accumulative assets processing costs sum of child node even;The accumulative assets processing costs is to save to the son being connected with the father node The accumulative assets value of point determines after being handled;
The accumulation assets value of node is determined as follows:
When the child node that a father node in multiple nodes is not connected, the accumulation assets value of the father node is the father The holding assets value of node;
When a father node in multiple nodes has connected child node, the accumulation assets value of the father node is father section The value of holding assets of point provides total production value with the accumulation of all child nodes being connected.
When it is implemented, control parameter determining module 302 is specifically used for:
The accumulative assets value for the child node being connected with the father node is handled, comprising:
Determine the maximum value in the accumulative assets value of all connected child nodes of the father node;
Exponent arithmetic is carried out to the accumulative assets value of the corresponding child node of accumulative assets value maximum value;
The accumulative assets value of remaining child node is compared with preset threshold, when being less than preset threshold, to corresponding The accumulative assets value of child node carries out product calculation;When being greater than preset threshold, to the accumulative assets value of corresponding child node into Row linear operation;
Exponent arithmetic is carried out to the accumulative assets value of the corresponding child node of accumulative assets value maximum value as follows:
Product calculation: the second default value of T* is carried out to the accumulative assets value of corresponding child node as follows;
Linear operation: T+ third default value is carried out to the accumulative assets value of corresponding child node as follows;
Wherein, T is the accumulative assets value of corresponding child node.
When it is implemented, distribution module 303 is specifically used for:
The data value for distributing to each node is determined according to following formula:
Wherein, BNew iFor the data value of i-th of node in relation chain;
SiHold effect value, S for i-th node in relation chaini=Bi*Ai, BiIt has been held for i-th node in relation chain There are assets value, AiHold duration for i-th node in relation chain;
PiFor the promotion efficiency value of i-th of node in relation chain;
BAlwaysTo increase total assets value newly;
N is the number of relation chain interior joint, and n is integer.
In conclusion the method for the present invention be according to node hold effect and promotion efficiency two in terms of codetermine, simultaneously It ensure that the contribution margin of participation (holding efficiency) and popularization degree (promotion efficiency).By this method can by newly-increased total assets value into Row rationally and effectively distributes, and real promoter is made to obtain effectively excitation.User's participation can be increased by this method and glued Property, while enhancing user node relationship, form huge network, complete digital asset can value transmission, guarantee value flowing, promote It is maintained on level of security (failure of part of nodes will not cause system unavailable) into number of network node, ensures internet The stalwartness and stabilization of financial decentralization network.This method ensure that the efficiency for consistency of reaching common understanding simultaneously, improve block The transaction of catenary system is handled up value (i.e. TPS), provides floor layer technology framework to financial field development for block chain.
It should be understood by those skilled in the art that, the embodiment of the present invention can provide as method, system or computer program Product.Therefore, complete hardware embodiment, complete software embodiment or reality combining software and hardware aspects can be used in the present invention Apply the form of example.Moreover, it wherein includes the computer of computer usable program code that the present invention, which can be used in one or more, The computer program implemented in usable storage medium (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.) produces The form of product.
The present invention be referring to according to the method for the embodiment of the present invention, the process of equipment (system) and computer program product Figure and/or block diagram describe.It should be understood that every one stream in flowchart and/or the block diagram can be realized by computer program instructions The combination of process and/or box in journey and/or box and flowchart and/or the block diagram.It can provide these computer programs Instruct the processor of general purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to produce A raw machine, so that being generated by the instruction that computer or the processor of other programmable data processing devices execute for real The device for the function of being specified in present one or more flows of the flowchart and/or one or more blocks of the block diagram.
These computer program instructions, which may also be stored in, is able to guide computer or other programmable data processing devices with spy Determine in the computer-readable memory that mode works, so that it includes referring to that instruction stored in the computer readable memory, which generates, Enable the manufacture of device, the command device realize in one box of one or more flows of the flowchart and/or block diagram or The function of being specified in multiple boxes.
These computer program instructions also can be loaded onto a computer or other programmable data processing device, so that counting Series of operation steps are executed on calculation machine or other programmable devices to generate computer implemented processing, thus in computer or The instruction executed on other programmable devices is provided for realizing in one or more flows of the flowchart and/or block diagram one The step of function of being specified in a box or multiple boxes.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field For art personnel, the embodiment of the present invention can have various modifications and variations.All within the spirits and principles of the present invention, made Any modification, equivalent substitution, improvement and etc. should all be included in the protection scope of the present invention.

Claims (6)

1. the data distributing method in a kind of block catenary system characterized by comprising
Determine the data to be distributed and relation chain in block catenary system;It include multiple nodes in the relation chain;
Determine that each node is to the control parameter for having held data in relation chain;
According to data to be distributed, each node to the control parameter for having held data, the data value for distributing to each node is determined;
The data to be distributed is newly-increased total assets value;
Each node includes: that each node holds effect value to holding assets value to the control parameter for having held data With promotion efficiency value;
Each node holds the value of holding assets and hold multiplying for duration that effect value is each node to holding assets value Product;
Determine each node to the promotion efficiency value of holding assets value as follows:
When the child node that a father node in multiple nodes is not connected, the promotion efficiency value of the father node is 0;
When a father node in multiple nodes has connected child node, the promotion efficiency value of the father node is all connected The accumulative assets processing costs sum of child node;The accumulative assets processing costs is to the child node being connected with the father node Accumulative assets value determines after being handled;
The accumulation assets value of node is determined as follows:
When the child node that a father node in multiple nodes is not connected, the accumulation assets value of the father node is the father node Holding assets value;
When a father node in multiple nodes has connected child node, the accumulation assets value of the father node is the father node Holding assets value provides total production value with the accumulation of all child nodes being connected;
The accumulative assets value for the child node being connected with the father node is handled, comprising:
Determine the maximum value in the accumulative assets value of all connected child nodes of the father node;
Exponent arithmetic is carried out to the accumulative assets value of the corresponding child node of accumulative assets value maximum value;
The accumulative assets value of remaining child node is compared with preset threshold, when being less than preset threshold, to corresponding sub- section The accumulative assets value of point carries out product calculation;When being greater than preset threshold, line is carried out to the accumulative assets value of corresponding child node Property operation.
2. the data distributing method in block catenary system as described in claim 1, which is characterized in that as follows to accumulative The accumulative assets value of the corresponding child node of assets value maximum value carries out exponent arithmetic:
Product calculation: the second default value of T* is carried out to the accumulative assets value of corresponding child node as follows;
Linear operation: T+ third default value is carried out to the accumulative assets value of corresponding child node as follows;
Wherein, T is the accumulative assets value of corresponding child node.
3. the data distributing method in block catenary system as described in claim 1, which is characterized in that according to data to be distributed, Each node determines the data value for distributing to each node according to following formula to the control parameter for having held data:
Wherein, BNew iFor the data value of i-th of node in relation chain;
SiHold effect value, S for i-th node in relation chaini=Bi*Ai, BiMoney is held for i-th node in relation chain The output value, AiHold duration for i-th node in relation chain;
PiFor the promotion efficiency value of i-th of node in relation chain;
BAlwaysTo increase total assets value newly;
N is the number of relation chain interior joint, and n is integer.
4. the data distribution device in a kind of block catenary system characterized by comprising
Data to be distributed and relation chain determining module, for determining data to be distributed and relation chain in block catenary system;It is described It include multiple nodes in relation chain;
Control parameter determining module, for determining that each node is to the control parameter for having held data in relation chain;
Distribution module, for, to the control parameter for having held data, determination to be distributed to each according to data to be distributed, each node The data value of node;
The data to be distributed is newly-increased total assets value;
Each node includes: that each node holds effect value to holding assets value to the control parameter for having held data With promotion efficiency value;
The control parameter determining module is specifically used for:
Determine that each node holds effect value to holding assets value as follows:
Each node holds the value of holding assets and hold multiplying for duration that effect value is each node to holding assets value Product;
Determine each node to the promotion efficiency value of holding assets value as follows:
When the child node that a father node in multiple nodes is not connected, the promotion efficiency value of the father node is 0;
When a father node in multiple nodes has connected child node, the promotion efficiency value of the father node is all connected The accumulative assets processing costs sum of child node;The accumulative assets processing costs is to the child node being connected with the father node Accumulative assets value determines after being handled;
The accumulation assets value of node is determined as follows:
When the child node that a father node in multiple nodes is not connected, the accumulation assets value of the father node is the father node Holding assets value;
When a father node in multiple nodes has connected child node, the accumulation assets value of the father node is the father node Holding assets value provides total production value with the accumulation of all child nodes being connected;
The accumulative assets value for the child node being connected with the father node is handled, comprising:
Determine the maximum value in the accumulative assets value of all connected child nodes of the father node;
Exponent arithmetic is carried out to the accumulative assets value of the corresponding child node of accumulative assets value maximum value;
The accumulative assets value of remaining child node is compared with preset threshold, when being less than preset threshold, to corresponding sub- section The accumulative assets value of point carries out product calculation;When being greater than preset threshold, line is carried out to the accumulative assets value of corresponding child node Property operation.
5. the data distribution device in block catenary system as claimed in claim 4, which is characterized in that the control parameter determines Module is specifically used for:
Exponent arithmetic is carried out to the accumulative assets value of the corresponding child node of accumulative assets value maximum value as follows:
Product calculation: the second default value of T* is carried out to the accumulative assets value of corresponding child node as follows;
Linear operation: T+ third default value is carried out to the accumulative assets value of corresponding child node as follows;
Wherein, T is the accumulative assets value of corresponding child node.
6. the data distribution device in block catenary system as claimed in claim 4, which is characterized in that the distribution module is specific For:
The data value for distributing to each node is determined according to following formula:
Wherein, BNew iFor the data value of i-th of node in relation chain;
SiHold effect value, S for i-th node in relation chaini=Bi*Ai, BiMoney is held for i-th node in relation chain The output value, AiHold duration for i-th node in relation chain;
PiFor the promotion efficiency value of i-th of node in relation chain;
BAlwaysTo increase total assets value newly;
N is the number of relation chain interior joint, and n is integer.
CN201610921727.2A 2016-10-21 2016-10-21 Data distributing method and device in block catenary system Expired - Fee Related CN106452884B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610921727.2A CN106452884B (en) 2016-10-21 2016-10-21 Data distributing method and device in block catenary system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610921727.2A CN106452884B (en) 2016-10-21 2016-10-21 Data distributing method and device in block catenary system

Publications (2)

Publication Number Publication Date
CN106452884A CN106452884A (en) 2017-02-22
CN106452884B true CN106452884B (en) 2019-06-25

Family

ID=58176337

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610921727.2A Expired - Fee Related CN106452884B (en) 2016-10-21 2016-10-21 Data distributing method and device in block catenary system

Country Status (1)

Country Link
CN (1) CN106452884B (en)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106897906B (en) * 2017-02-28 2021-02-12 北京众享比特科技有限公司 Incentive content distribution method and system
CN108171493A (en) * 2017-11-14 2018-06-15 北京欧链科技有限公司 The data processing method and device of block chain
CN108171606A (en) * 2018-01-11 2018-06-15 北京欧链科技有限公司 The distribution method and device of block chain assets
CN108460596B (en) * 2018-02-27 2020-08-25 周伟 Quantization value distribution transfer method based on block chain
CN108470277A (en) * 2018-02-28 2018-08-31 深圳市网心科技有限公司 Reward settlement method, system, readable storage medium storing program for executing and the computing device of block chain
CN108712468B (en) * 2018-04-19 2021-01-08 上海分布信息科技有限公司 Block chain profit distribution method and distribution system
CN108616427B (en) * 2018-05-11 2021-07-30 北京奇虎科技有限公司 Speed measurement capability determination method, device and system
CN108712487B (en) * 2018-05-11 2021-07-02 北京奇虎科技有限公司 Block chain-based evidence distribution method, device and equipment
CN109165092B (en) * 2018-07-10 2021-07-20 矩阵元技术(深圳)有限公司 Consensus method, device and system based on effective computing power contribution
CN110705973B (en) * 2018-07-10 2023-05-16 深圳市红砖坊技术有限公司 Common identification method applied to miner nodes in blockchain system and blockchain system
CN109446278A (en) * 2018-09-21 2019-03-08 贵州途遇旅行网科技有限公司 A kind of big data management platform system based on block chain
CN110474974A (en) * 2019-08-09 2019-11-19 全链通有限公司 Memory space processing method, equipment and computer readable storage medium

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014051455A1 (en) * 2012-09-26 2014-04-03 Obschestvo S Ogranichennoy Otvetstvennostyu "Colloware" Method and system for storing graph data
CN105844505A (en) * 2016-03-17 2016-08-10 深圳市新世纪启航科技开发有限公司 Method of carrying out digital currency trading through block chain technology

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014051455A1 (en) * 2012-09-26 2014-04-03 Obschestvo S Ogranichennoy Otvetstvennostyu "Colloware" Method and system for storing graph data
CN105844505A (en) * 2016-03-17 2016-08-10 深圳市新世纪启航科技开发有限公司 Method of carrying out digital currency trading through block chain technology

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
区块链技术发展现状与展望;袁勇 等;《自动化学报》;20160430;全文
区块链技术在资本市场的应用;凯文•比勒 等;《投融资与贸易》;20160228;全文

Also Published As

Publication number Publication date
CN106452884A (en) 2017-02-22

Similar Documents

Publication Publication Date Title
CN106452884B (en) Data distributing method and device in block catenary system
Xu et al. Sok: Decentralized exchanges (dex) with automated market maker (amm) protocols
WO2020107919A1 (en) Distributed network and ecosystem based on innovative proof-of-reputation consensus protocol
CN105550927A (en) Bank credit system risk assessment method and device
Moniruzzaman et al. Blockchain and cooperative game theory for peer-to-peer energy trading in smart grids
Bloch Coalitions and networks in industrial organization
CN108470277A (en) Reward settlement method, system, readable storage medium storing program for executing and the computing device of block chain
Foti et al. Viability analysis of a decentralized energy market based on blockchain
CN110348991A (en) Assess the method, apparatus and electronic equipment of user's accrediting amount upper limit
Gans et al. More (or less) economic limits of the blockchain
Eisele et al. Blockchains for transactive energy systems: Opportunities, challenges, and approaches
Hu et al. Social welfare–based concession model for build/operate/transfer contracts
CN107181284A (en) The method of adjustment and device of a kind of out-of-limit electricity of circuit
Oprea et al. A motivational local trading framework with 2-round auctioning and settlement rules embedded in smart contracts for a small citizen energy community
CN111582864A (en) Block chain data volume certification consensus protocol
Liu et al. Decentralization is vulnerable under the gap game
Adeyanju et al. Semi-decentralized and fully decentralized multiarea economic dispatch considering participation of local private aggregators using meta-heuristic method
WO2020011010A1 (en) Computing power transaction method and computing channel
Kasahara Performance modeling of Bitcoin blockchain: Mining mechanism and transaction-confirmation process
Scheid et al. Policy-based blockchain selection
CN115689747A (en) Encryption method and device for transaction information in market transaction process of power system
CN107122303A (en) A kind of method of testing and device
Liu et al. Auction based rewards distribution method in pool mining
Bin et al. Construction financing problem of local government in China
Chen et al. Pricing real-time stochastic storage operations

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190625

CF01 Termination of patent right due to non-payment of annual fee