CN106451414A - Dynamic partition-based large power grid emergency state control auxiliary decision method - Google Patents

Dynamic partition-based large power grid emergency state control auxiliary decision method Download PDF

Info

Publication number
CN106451414A
CN106451414A CN201610511345.2A CN201610511345A CN106451414A CN 106451414 A CN106451414 A CN 106451414A CN 201610511345 A CN201610511345 A CN 201610511345A CN 106451414 A CN106451414 A CN 106451414A
Authority
CN
China
Prior art keywords
bus
scheme
dynamic partition
overload
collection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610511345.2A
Other languages
Chinese (zh)
Other versions
CN106451414B (en
Inventor
汤奕
蔡明明
任先成
徐泰山
鲍颜红
夏小琴
严明辉
赵红明
黄晓红
王丽
贾爱飞
魏旭锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Southeast University
State Grid Jiangsu Electric Power Co Ltd
Nari Technology Co Ltd
Nanjing NARI Group Corp
Changzhi Power Supply Co of State Grid Shanxi Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Southeast University
State Grid Jiangsu Electric Power Co Ltd
Nari Technology Co Ltd
Nanjing NARI Group Corp
Changzhi Power Supply Co of State Grid Shanxi Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Southeast University, State Grid Jiangsu Electric Power Co Ltd, Nari Technology Co Ltd, Nanjing NARI Group Corp, Changzhi Power Supply Co of State Grid Shanxi Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201610511345.2A priority Critical patent/CN106451414B/en
Publication of CN106451414A publication Critical patent/CN106451414A/en
Application granted granted Critical
Publication of CN106451414B publication Critical patent/CN106451414B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/001Methods to deal with contingencies, e.g. abnormalities, faults or failures

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Tourism & Hospitality (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Public Health (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Water Supply & Treatment (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The present invention discloses a dynamic partition-based large power grid emergency state control auxiliary decision method, and belongs to the electric power system operation control technology field. The method of the present invention is characterized by automatically obtaining the feasible dynamic partition schemes, and aiming at the plurality of feasible schemes, quantitatively evaluating an index system according to the dynamic partition, thereby obtaining an optimal control scheme. The method cooperatively considers the economy, the reliability and the safety, gives out the optimal dynamic partition control scheme rapidly and accurately aiming at a current state and the single and various emergency states of a power grid under the preconceived faults, can give out the correct auxiliary decision suggestions, and guarantees the safe and stable operation of the power grid.

Description

A kind of bulk power grid emergency state control aid decision-making method based on dynamic partition
Technical field
The invention belongs to technical field of power system operation control, it particularly relates to a kind of big based on dynamic partition Electrical network emergency state control aid decision-making method.
Background technology
Put into operation with building up of extra-high voltage alternating current-direct current circuit, the general layout of the transregional transmission of electricity of Large Copacity gradually forms.Transregional interconnection Electrical network makes the dynamical couple characteristic between each regional power grid further enhance, and partial electric grid fault is to large regional grid security and stability Impact is bigger.When electrical network enters the state of emergency, if not implementing in time to take control measure it would be possible to cause cascading failure, make Become the generation of large-scale blackout.
The operation control device of electrical network classification two class from implementation at present, a class is to be gone out by changing generator Power and workload demand dynamically adjust power system operating mode, and a class is to change trend distribution using power electronic equipment.Cut with the machine of cutting The two traditional three lines of defence measures such as load, off-the-line are compared, and load transfer only changes the topological structure of network in a small range, just Can largely reduce to subtract and supply load proportion, effect is significant, reliability is high, has caused the pass of domestic and international researcher Note.
In this context, can be using the dynamic partition skill including load transfer when electrical network is in a state of emergency Art, carries out Reasonable adjustment, and then controls the trend of related elements, voltage etc., make electrical network exit urgent shape to partition network structure State is to keep safety and stability to have certain meaning in holding electrical network.Currently for apparatus overload, voltage out-of-limit problem, engineering should Use and how to be solved by measures such as generator output adjustment, switching capacitive reactances.It is contemplated that from network topology structure, Introduce Dynamic partitioning techniques, provide the dynamic partition Adjusted Option coordinating the targets such as security, economy, to solve equipment mistake The unitary class state of emergency such as load, voltage out-of-limit, safeguards the stable operation of electrical network.
Content of the invention
The present invention seeks to:A kind of bulk power grid emergency state control aid decision-making method based on dynamic partition is provided, with Realize when the problems such as voltage out-of-limit, apparatus overload in electrical network under current state or forecast failure, start dynamic partition in time Aid decision calculates, and provides correct control strategy suggestion for dispatcher.
Specifically, the present invention employs the following technical solutions realization, comprises the following steps:
1) according to power system operation mode and corresponding model and parameter, calculated online, after obtaining forecast failure System load flow data, enter step 2);
2) Voltage security margin is less than and sets threshold value ηv,thr1It is less than with Voltage security margin after forecast failure and set door Threshold value ηv,thr2Bus be added separately to out-of-limit bus collection and bus collection to be controlled, by overload nargin be less than set threshold value ηp,thr1It is less than with overload nargin after forecast failure and set threshold value ηp,thr2Equipment be added separately to overload prevention device collection and Apparatus to be controlled collection, wherein out-of-limit bus collection and bus collection to be controlled are referred to as bus and investigate collection, overload prevention device collection and apparatus to be controlled collection The equipment that is referred to as investigates collection;
If out-of-limit bus collection and overload prevention device collection are sky, there is not apparatus overload under electrical network current state or voltage is got over Limit, then method ends;Otherwise, enter step 3) the emergency state control aid decision calculating based on dynamic partition for the startup;
Described equipment refers to circuit and transformer;
Described dynamic partition refers to, when bulk power grid enters the state of emergency, by carrying out switching to part circuit, change Topological structure of electric, so that the state of emergency is mitigated or eliminated, including the solution cyclization of load transfer and electromagnetic looped network;
3) set the dynamic partition scheme switching number of lines, screening can switching circuit, formed alternative space, enter step Rapid 4);
4) if out-of-limit bus collection and the equal non-NULL of overload prevention device collection, show under current state electrical network occur the multiclass state of emergency and There is apparatus overload and voltage out-of-limit simultaneously, be then directed to each the dynamic partition scheme in alternative space, calculate it comprehensive Performance indications Re,i, integrated performance index is more than and sets threshold value Re,i,threScheme add to treat check scheme concentrate, enter step Rapid 5);
If out-of-limit bus collection is empty and overload prevention device collection non-NULL, show that under current state, electrical network occurs the urgent shape of unitary class , there is apparatus overload in state, then be directed to each the dynamic partition scheme in alternative space, calculate its integrated performance index ωp,i, integrated performance index is more than and sets threshold value ωp,i,threScheme add to treat check scheme concentrate, enter step 5);
If out-of-limit bus collection non-NULL and overload prevention device collection are sky, that is, under current state there is the unitary class state of emergency in electrical network, Have that busbar voltage is out-of-limit, be then directed to each the dynamic partition scheme in alternative space, calculate its integrated performance index ωu,i, integrated performance index is more than and sets threshold value ωu,i,threScheme add to treat check scheme concentrate, enter step 5);
Re,i、ωp,iAnd ωu,i, for characterizing i-th kind of dynamic partition scheme to institute under electrical network current state or forecast failure The improvement degree of the specific state of emergency occurring, its value is bigger, and effect is better;
5) if treating check scheme collection non-NULL, for each the dynamic partition scheme treating that check scheme is concentrated, using exchange tide After stream calculation dynamic partition scheme is implemented, bus investigates the Voltage security margin concentrating each bus and the equipment investigation each equipment of concentration Overload nargin, if the overload nargin of the Voltage security margin of each bus and equipment be all higher than set threshold value, should Scheme adds feasible program to concentrate;Enter step 6);
If treating, check scheme collection is sky, judges whether switching circuit number has reached the upper limit, if the not up to upper limit, increases Circuit switching bar number, redefines alternative space, enters step 3);If switching circuit number has reached the upper limit, terminate This method;
6) if feasible program collection non-NULL, for multiple dynamic partition schemes of feasible program concentration, based on dynamic partition Quantitatively evaluating index system, carries out overall merit, selects optimum control scheme, method ends;If feasible program collection is sky, Each scheme treating check scheme concentration is ranked up by the size of integrated performance index, takes maximum the moving of integrated performance index State partition scheme is as last control program, method ends.
Technique scheme is further characterized by, described step 2) in, calculate bus according to formula (1)~(2) Voltage security margin:
In formula:ηv,iVoltage security margin for bus i;UiVoltage magnitude for bus i;WithIt is respectively its upper limit And lower limit;
Described equipment includes circuit and transformer, calculates the overload of circuit and transformer respectively according to formula (3) and (4) Margin of safety:
In formula:ηpl,iOverload nargin for circuit i;IliCurrent value for circuit i;Ili.limThermally-stabilised for circuit i Limit value;
In formula:ηpt,iOverload nargin for transformer i;StiApparent energy for transformer i;Sti.limFor transformer i Rated capacity.
Technique scheme is further characterized by, described step 3) in, according to the alternative of switching circuit formation Space, need to follow following principle:Switching for 220kV circuit;The circuit putting into is to be in the line stopped transport and overhaul done state Road;Folding scheme need to ensure power supply reliability it is ensured that isolated network will not be formed;Need to arrange switching circuit according to electrical network actual conditions The upper limit.
Technique scheme is further characterized by, described step 4) in, R is calculated according to formula (5)e,i
In formula:Re,iIt is the integrated performance index of i-th kind of dynamic partition scheme for voltage out-of-limit and apparatus overload;I= 1,2 ..., I, I investigate the number of devices concentrated, j=1 for equipment, and 2 ..., J, J investigate the bus number concentrated, η ' for busp,iWith η′v,jIt is respectively the apparatus overload margin of safety after dynamic partition scheme is implemented and busbar voltage margin of safety, kpvFor overload Conversion coefficient between nargin and Voltage security margin, shows the attention degrees different with voltage out-of-limit to apparatus overload;In phase Equipment is answered to be η during circuitp,iEqual to ηpl,i, the η when relevant device is for transformerp,iEqual to ηpt,i
ω is calculated according to formula (6)u,i
In formula:ωu,iIt is the integrated performance index of i-th kind of dynamic partition scheme for voltage out-of-limit;V investigates for bus Collection, including out-of-limit bus collection and bus collection to be controlled;γvImportance modifying factor for different electric pressure buses;N is current shape The bus number of voltage out-of-limit, λ under statei,j,vVoltage security margin for wherein j-th bus;Si,j,vDynamic for implementing i-th kind The Voltage security margin variable quantity of j-th bus after partition scheme;W is the sum of forecast failure, NkFor under wherein k-th fault There is the bus number of voltage out-of-limit, λi,l,k,vVoltage security margin for l-th bus under k-th fault;Si,l,k,vFor i-th Plant the variable quantity of the Voltage security margin of l-th bus under k-th fault after dynamic partition scheme is implemented;
ω is calculated according to formula (7)p,i
In formula:ωp,iIt is the integrated performance index of i-th kind of dynamic partition scheme for apparatus overload;V investigates for equipment Collection, that is, the equipment intersection transshipped;γvImportance modifying factor for different electric pressure equipment;N is overload under current state Equipment number, θi,j,vOverload nargin for wherein j-th equipment;μi,j,vFor implementing jth after i-th kind of dynamic partition scheme The variable quantity of the overload nargin of individual equipment;W is the sum of forecast failure, NkFor there is overload under wherein k-th fault Equipment number, θi,l,k,vOverload nargin for l-th equipment under k-th fault;μi,l,k,vFor i-th kind of dynamic partition scheme The variable quantity of the overload nargin of l-th equipment under k-th fault after enforcement.
Technique scheme is further characterized by, described step 6) in, based on dynamic partition quantitatively evaluating index body The dynamic partition scheme that system concentrates to feasible program carries out overall merit, carries out in the following manner:
For each scheme, it is first determined the weight of its index at different levels, and then obtained by certain mathematical algorithms The comprehensive evaluation index of upper level index, successively calculates upwards, finally obtains the comprehensive evaluation result of dynamic partition scheme;Dynamically Zonal quantization assessment indicator system includes security, reliability and economy three class index, as follows:
The first kind, safety indexes:
Line load index xL
In formula:I=1,2 ..., nl;ηpl,iOverload nargin for circuit i;nlFor the number of lines;αliImportant for circuit Property modifying factor;
Transformer load index xT
In formula:I=1,2 ..., nt;ηpt,iOverload nargin for transformer i;ntFor transformer number;αtiFor transformation Device importance modifying factor;
Voltage levvl index λU
In formula:I=1,2 ..., nu;nuFor bus quantity;ηv,iVoltage security margin for bus i;αuiFor busbar voltage Importance modifying factor;
Short circuit current level index xI
In formula:I=1,2 ..., nsc;nscFor short trouble number;Ii,scFor the short-circuit current value under i-th short trouble; Ii,sc.limThe minimum of a value of the rupturing capacity of the breaker being connected for short-circuit busbar;
Equations of The Second Kind, reliability index:
Current supply circuit number SM
In formula:SiFor being not more than the capacity of the 220kV end transformer station of two supplying channels;
Spinning reserve index xre
In formula:PSRFor active spinning reserve capacity;PSR.limMinimum limit value for active spinning reserve capacity;
3rd class, economic index:
System losses index Sloss
Sloss=∑ PG-∑PD(14)
In formula:PGFor generating capacity;PDFor load capacity;
Operation cost index Fc
In formula:N is the number of times of circuit folding;fiThe operating cost producing for each folding, cost and the use with switch Life-span is relevant.
Beneficial effects of the present invention are as follows:The present invention has taken into full account that under electrical network current state and forecast failure, electrical network may The voltage out-of-limit occurring and apparatus overload problem, relate to Corrective control and prevention and control.In addition, the present invention be based on dynamic Partitioning technique (includes falling load, the solution cyclization of electromagnetic looped network), and with circuit switching as core, dynamic adjustment runs the topology of rack Structure, speed is fast and controls cost little.Finally, the present invention dynamically divides to feasible according to dynamic partition quantitatively evaluating index system Area's control program carries out preferentially, considering the impact to electric network security, economy and reliability for each scheme, selecting optimal Control program.
Brief description
Fig. 1 is the FB(flow block) of the present invention.
Fig. 2 is the quantitatively evaluating index system of dynamic partition scheme.
Specific embodiment
Simultaneously referring to the drawings the present invention is described in further detail with reference to embodiment.
Embodiment 1:
One embodiment of the present of invention, its step is as shown in Figure 1:
In Fig. 1, step 1 describes, and according to power system operation mode and corresponding model and parameter, is counted online Calculate, obtain the system load flow data after forecast failure, enter step 2);
In Fig. 1, step 2 describes, and 2) Voltage security margin is less than setting threshold value ηv,thr1With electricity after forecast failure Pressure margin of safety is less than and sets threshold value ηv,thr2Bus be added separately to out-of-limit bus collection, bus collection to be controlled, by overload Nargin is less than and sets threshold value ηp,thr1It is less than with overload nargin after forecast failure and set threshold value ηp,thr2Equipment respectively It is added to overload prevention device collection, apparatus to be controlled collection, wherein out-of-limit bus collection and bus collection to be controlled are referred to as bus and investigate collection, and overload sets Standby collection and apparatus to be controlled collection are referred to as equipment and investigate collection;
If out-of-limit bus collection and overload prevention device collection are sky, there is not apparatus overload under electrical network current state or voltage is got over Limit, then terminate to settle accounts;Otherwise, start the emergency state control aid decision based on dynamic partition to calculate, enter step 3);
Described equipment refers to circuit and transformer.
Described dynamic partition refers to, when bulk power grid enters the state of emergency, by carrying out switching to part circuit, change Topological structure of electric, to be mitigated or eliminated the technology of the state of emergency.Dynamic partitioning techniques specifically include two kinds, and one is that load turns For two is the solution cyclization of electromagnetic looped network.
The busbar voltage margin of safety of described electrical network, apparatus overload margin of safety computational methods as follows:
The state of emergency that the present invention considers includes two aspects:One is voltage out-of-limit under current state, apparatus overload;Two It is voltage out-of-limit and apparatus overload to occur after forecast failure, relate separately to Corrective control and the prevention and control of electrical network.According to formula (1)~(2) calculate the Voltage security margin of bus.
In formula:ηv,iVoltage security margin for bus i;UiVoltage magnitude for bus i;WithIt is respectively its upper limit And lower limit.
Calculate the overload nargin of circuit and transformer according to formula (3) and (4) respectively.
In formula:ηpl,iThe overload nargin of circuit i;IliCurrent value for circuit i;Ili.limThermally-stabilised limit for circuit i Value.
In formula:ηpt,iOverload nargin for transformer i;StiApparent energy for transformer i;Sti.limFor transformer i Rated capacity.
In Fig. 1, step 3 describes, set the dynamic partition scheme switching number of lines, screening can switching circuit, formation can Select solution space, enter step 4);
The formulation in the described alternative space being formed by switching circuit need to follow following principle:
(1) circuit of switching is 220kV circuit;
(2) circuit putting into is to be in the circuit stopped transport and overhaul done state;
(3) folding scheme need to ensure power supply reliability it is ensured that isolated network will not be formed;
(4) consider that only relying on dynamic partition scheme possibly cannot be fully solved the electrical network state of emergency, and as switching simultaneously Circuit number excessive, not only can increase amount of calculation, and actual schedule is difficult to operate it is therefore desirable to actual according to electrical network in running Situation arranges the upper limit of switching circuit;
Typically initial switching circuit number is set to 1, incremented by successively on this basis.
In Fig. 1, step 4 describes, if out-of-limit bus collection and the equal non-NULL of overload prevention device collection, that is, under current state, electrical network is same When there is apparatus overload and voltage out-of-limit, then be directed to alternative space in each dynamic partition scheme, calculate it comprehensive Can index Re,i, integrated performance index is more than and sets threshold value Re,i,threScheme add to treat check scheme concentrate, enter step 5);If out-of-limit bus collection is sky, overload prevention device collection non-NULL, that is, under current state, electrical network there occurs apparatus overload, then be directed to optional Each dynamic partition scheme in solution space, calculates its integrated performance index ωp,i, integrated performance index is more than and sets door Threshold value ωp,i,threScheme add to treat check scheme concentrate, enter step 5);If out-of-limit bus collection non-NULL, overload prevention device collection is Sky, that is, under current state, electrical network there occurs that busbar voltage is out-of-limit, then be directed to each the dynamic partition scheme in alternative space, Calculate its integrated performance index ωu,i, integrated performance index is more than and sets threshold value ωu,i,threScheme add to and treat check side Case is concentrated, and enters step 5);
Described integrated performance index (Re、ωu,iAnd ωp,i) characterize i-th kind of dynamic partition scheme to current state or anticipation The improvement degree of the specific state of emergency being occurred under fault, its value is bigger, and effect is better.
There is the multiclass state of emergency in electrical network, when that is, voltage out-of-limit and apparatus overload simultaneously in electrical network, counted according to formula (5) Calculate a set of dynamic partition scheme to the effect improving the multiclass state of emergency.
In formula:Re,iIntegrated performance index for voltage out-of-limit and i-th kind of dynamic partition scheme of apparatus overload;I=1, 2 ..., I, I investigate the number of devices concentrated, j=1 for equipment, and 2 ..., J, J investigate the bus number concentrated, η ' for busp,iWith η 'v,j It is respectively the apparatus overload margin of safety after dynamic partition scheme is implemented and busbar voltage margin of safety, kpvFor overload nargin Conversion coefficient and Voltage security margin between, shows that the attention degrees different with voltage out-of-limit to apparatus overload (typically take 0.5 Between~1.5).The η when relevant device is for circuitp,iEqual to ηpl,i, the η when relevant device is for transformerp,iEqual to ηpt,i.
There is the unitary class state of emergency in electrical network, when that is, voltage out-of-limit or apparatus overload in electrical network, respectively according to formula (6), formula (7) calculates the improvement to the state of emergency for the dynamic partition scheme.
In formula:ωu,iIt is the integrated performance index of i-th kind of dynamic partition scheme for voltage out-of-limit;V investigates for bus Collection, including out-of-limit bus collection and bus collection to be controlled;γvImportance modifying factor for different electric pressure buses;N is current shape The bus number of voltage out-of-limit, λ under statei,j,vVoltage security margin for wherein j-th bus;Si,j,vDynamic for implementing i-th kind The Voltage security margin variable quantity of j-th bus after partition scheme;W is the sum of forecast failure, NkFor under wherein k-th fault There is the bus number of voltage out-of-limit, λi,l,k,vVoltage security margin for l-th bus under k-th fault;Si,l,k,vFor i-th Plant the variable quantity of the Voltage security margin of l-th bus under k-th fault after dynamic partition scheme is implemented.
In formula:ωp,iIt is the integrated performance index of i-th kind of dynamic partition scheme for apparatus overload;V investigates for equipment Collection, that is, equipment (circuit/transformer) intersection transshipped;γvImportance modifying factor for different electric pressure equipment;N is to work as The equipment number of overload, θ under front statei,j,vOverload nargin for wherein j-th equipment;μi,j,vDynamic for implementing i-th kind The variable quantity of the overload nargin of j-th equipment after partition scheme;W is the sum of forecast failure, NkFor wherein k-th event The lower equipment number that overload occurs of barrier, θi,l,k,vOverload nargin for l-th equipment under k-th fault;μi,l,k,vFor i-th Plant the variable quantity of the overload nargin of l-th equipment under k-th fault after dynamic partition scheme is implemented.
In Fig. 1, step 5 describes, if treating check scheme collection non-NULL, for treat check scheme concentrate each dynamically divide Area scheme, after being implemented using AC power flow calculating dynamic partition scheme, bus is investigated and is concentrated the Voltage security margin of each bus and set Appendix examines the overload nargin concentrating each equipment, if the overload nargin of the Voltage security margin of each bus and equipment is all higher than setting Set threshold value, then add feasible program to concentrate the program.Enter step 6).
If treating, check scheme collection is sky, judges whether switching circuit number has reached the upper limit, if the not up to upper limit, increases Circuit switching bar number, redefines alternative space, enters step 3);If switching circuit number has reached the upper limit, terminate Calculate;
In Fig. 1, step 6 describes, if feasible program collection non-NULL, for multiple dynamic point that feasible program is concentrated Area scheme, based on dynamic partition quantitatively evaluating index system, carries out overall merit, selects optimum control scheme, terminates to calculate;If Feasible program collection is sky, then be ranked up each scheme treating check scheme concentration by the size of integrated performance index, take comprehensive Close the maximum dynamic partition scheme of performance indications as last control program, terminate to calculate.
The method that the described dynamic partition scheme to feasible program concentration carries out overall merit is as follows:
Based on dynamic partition quantitatively evaluating index system, for each scheme, it is first determined the weight of its index at different levels, enter And the comprehensive evaluation index of upper level index is obtained by certain mathematical algorithms, successively calculate upwards, finally obtain dynamic The comprehensive evaluation result of state partition scheme.
Dynamic partition quantitatively evaluating index system includes security, reliability and economy three class index, as shown in Fig. 2 Specific targets are as follows:
The first kind, safety indexes:
(1) line load index xL
In formula:I=1,2 ..., nl;ηpl,iOverload nargin for circuit i;nlFor the number of lines;αliImportant for circuit Property modifying factor.
(2) transformer load index xT
In formula:I=1,2 ..., nt;ηpl,iOverload nargin for transformer i;ntFor transformer number;αtiFor transformation Device importance modifying factor.
(3) voltage levvl index λU
In formula:I=1,2 ..., nu;nuFor bus quantity;ηv,iVoltage security margin for bus i;αuiFor busbar voltage Importance modifying factor.
(4) short circuit current level index xI
In formula:I=1,2 ..., nsc;nscFor short trouble number;Ii,scFor the short-circuit current value under i-th short trouble. Ii,sc.limThe minimum of a value of the rupturing capacity of the breaker being connected for short-circuit busbar.
Equations of The Second Kind, reliability index:
(1) current supply circuit number SM
In formula:SiFor being not more than the capacity of the 220kV end transformer station of two supplying channels.
(2) spinning reserve index xre
In formula:PSRFor active spinning reserve capacity;PSR.limMinimum limit value for active spinning reserve capacity.
《National grid safety and stability computing technique specification》Point out that the general actual load by no more than 2%~5% determines Active spinning reserve.Therefore, PSR.limThe 2% of desirable system peak load.
3rd class, economic index:
(1) system losses index Sloss
Sloss=∑ PG-ΣPDFormula (14)
In formula:PGFor generating capacity;PDFor load capacity.
(2) operate cost index Fc
In formula:N is the number of times of circuit folding;fiThe operating cost producing for each folding, cost and the use with switch Life-span is relevant.
The determination of the weight of index is the core of comprehensive evaluation algorithm, typically has subjective weighting method, objective weighted model and comprehensive Close enabling legislation.The present embodiment determines the weight of indexs at different levels using the analytic hierarchy process (AHP) being under the jurisdiction of subjective weighting method.
The index being comprised in view of the present invention carried state zonal quantization assessment indicator system is type index less than normal, that is, Index evaluation value is lower, and Criterion Attribute is better, single evaluation index is being carried out assigning temporary, should be assigned to even more important index Lower weight.
After weight determines, the comprehensive evaluation index of every grade of index can be determined by operation methods such as fuzzy mathematicses.This reality Apply the method acquisition comprehensive evaluation result that example is considered as linear weighted function, can be designated as:
In formula:Weight for each index set;βjWeight for single index in each index set;xjFor the list in index set Individual index;N is each index set middle finger target number.
In sum, the big I according to comprehensive evaluation result carries out trap queuing to multiple dynamic partition schemes, comprehensive Evaluation result its feasibility less is better.
Although the present invention is open as above with preferred embodiment, embodiment is not for limiting the present invention's.Not Depart from the spirit and scope of the present invention, any equivalence changes done or retouching, also belong to the protection domain of the present invention.Cause The content that this protection scope of the present invention should be defined with claims hereof is as standard.

Claims (5)

1. a kind of bulk power grid emergency state control aid decision-making method based on dynamic partition is it is characterised in that include following walking Suddenly:
1) according to power system operation mode and corresponding model and parameter, calculated online, obtain forecast failure after be System flow data, enters step 2);
2) Voltage security margin is less than and sets threshold value ηv,thr1It is less than with Voltage security margin after forecast failure and set threshold value ηv,thr2Bus be added separately to out-of-limit bus collection and bus collection to be controlled, by overload nargin be less than set threshold value ηp,thr1 It is less than with overload nargin after forecast failure and set threshold value ηp,thr2Equipment be added separately to overload prevention device collection and to be controlled set Standby collection, wherein out-of-limit bus collection and bus collection to be controlled are referred to as bus and investigate collection, and overload prevention device collection and apparatus to be controlled collection are referred to as Equipment investigates collection;
If out-of-limit bus collection and overload prevention device collection are sky, there is not apparatus overload or voltage out-of-limit under electrical network current state, Then method ends;Otherwise, enter step 3) the emergency state control aid decision calculating based on dynamic partition for the startup;
Described equipment refers to circuit and transformer;
Described dynamic partition refers to, when bulk power grid enters the state of emergency, by part circuit is carried out with switching, change electrical network Topological structure, so that the state of emergency is mitigated or eliminated, including the solution cyclization of load transfer and electromagnetic looped network;
3) set the dynamic partition scheme switching number of lines, screening can switching circuit, formed alternative space, enter step 4);
4) if out-of-limit bus collection and the equal non-NULL of overload prevention device collection, show under current state that electrical network occurs the multiclass state of emergency and simultaneously There is apparatus overload and voltage out-of-limit, be then directed to each the dynamic partition scheme in alternative space, calculate its combination property Index Re,i, integrated performance index is more than and sets threshold value Re,i,threScheme add to treat check scheme concentrate, enter step 5);
If out-of-limit bus collection is empty and overload prevention device collection non-NULL, shows that under current state, electrical network occurs the unitary class state of emergency, deposit In apparatus overload, then it is directed to each the dynamic partition scheme in alternative space, calculates its integrated performance index ωp,i, will be comprehensive Close performance indications and be more than setting threshold value ωp,i,threScheme add to treat check scheme concentrate, enter step 5);
If out-of-limit bus collection non-NULL and overload prevention device collection are sky, that is, under current state there is the unitary class state of emergency in electrical network, exists Busbar voltage is out-of-limit, then be directed to each the dynamic partition scheme in alternative space, calculate its integrated performance index ωu,i, will Integrated performance index is more than setting threshold value ωu,i,threScheme add to treat check scheme concentrate, enter step 5);
Re,i、ωp,iAnd ωu,i, occurred for i-th kind of dynamic partition scheme of sign is lower to electrical network current state or forecast failure The specific state of emergency improvement degree, its value is bigger, and effect is better;
5) if treating check scheme collection non-NULL, for each the dynamic partition scheme treating that check scheme is concentrated, using AC power flow meter Calculating bus investigation after dynamic partition scheme is implemented concentrates the Voltage security margin of each bus and equipment to investigate the mistake concentrating each equipment Carry margin of safety, if the overload nargin of the Voltage security margin of each bus and equipment is all higher than setting threshold value, by the program Feasible program is added to concentrate;Enter step 6);
If treating, check scheme collection is sky, judges whether switching circuit number has reached the upper limit, if the not up to upper limit, increases circuit Switching bar number, redefines alternative space, enters step 3);If switching circuit number has reached the upper limit, terminate we Method;
6) if feasible program collection non-NULL, for multiple dynamic partition schemes of feasible program concentration, quantified based on dynamic partition Assessment indicator system, carries out overall merit, selects optimum control scheme, method ends;If feasible program collection is sky, will treat Each scheme that check scheme is concentrated is ranked up by the size of integrated performance index, takes dynamic point that integrated performance index is maximum Area scheme is as last control program, method ends.
2. the bulk power grid emergency state control aid decision-making method based on dynamic partition according to claim 1, its feature It is, described step 2) in, the Voltage security margin of bus is calculated according to formula (1)~(2):
In formula:ηv,iVoltage security margin for bus i;UiVoltage magnitude for bus i;WithBe respectively its upper limit and under Limit;
Described equipment includes circuit and transformer, calculates the overload of circuit and transformer respectively according to formula (3) and (4) Nargin:
In formula:ηpl,iOverload nargin for circuit i;IliCurrent value for circuit i;Ili.limThermally-stabilised limit for circuit i Value;
In formula:ηpt,iOverload nargin for transformer i;StiApparent energy for transformer i;Sti.limVolume for transformer i Constant volume.
3. the bulk power grid emergency state control aid decision-making method based on dynamic partition according to claim 1, its feature It is, described step 3) in, according to the alternative space of switching circuit formation, following principle need to be followed:Switching for 220kV Circuit;The circuit putting into is to be in the circuit stopped transport and overhaul done state;Folding scheme need to ensure power supply reliability it is ensured that not Isolated network can be formed;Need to arrange the upper limit of switching circuit according to electrical network actual conditions.
4. the bulk power grid emergency state control aid decision-making method based on dynamic partition according to claim 1, its feature It is, described step 4) in, R is calculated according to formula (5)e,i
In formula:Re,iIt is the integrated performance index of i-th kind of dynamic partition scheme for voltage out-of-limit and apparatus overload;I=1, 2 ..., I, I investigate the number of devices concentrated, j=1 for equipment, and 2 ..., J, J investigate the bus number concentrated, η ' for busp,iWith η 'v,j It is respectively the apparatus overload margin of safety after dynamic partition scheme is implemented and busbar voltage margin of safety, kpvFor overload nargin Conversion coefficient and Voltage security margin between, shows the attention degrees different with voltage out-of-limit to apparatus overload;Accordingly setting Standby for η during circuitp,iEqual to ηpl,i, the η when relevant device is for transformerp,iEqual to ηpt,i
ω is calculated according to formula (6)u,i
In formula:ωu,iIt is the integrated performance index of i-th kind of dynamic partition scheme for voltage out-of-limit;V investigates collection, bag for bus Include out-of-limit bus collection and bus collection to be controlled;γvImportance modifying factor for different electric pressure buses;N is under current state The bus number of voltage out-of-limit, λi,j,vVoltage security margin for wherein j-th bus;Si,j,vFor implementing i-th kind of dynamic partition The Voltage security margin variable quantity of j-th bus after scheme;W is the sum of forecast failure, NkFor occurring under wherein k-th fault The bus number of voltage out-of-limit, λi,l,k,vVoltage security margin for l-th bus under k-th fault;Si,l,k,vDynamic for i-th kind The variable quantity of the Voltage security margin of l-th bus under k-th fault after the enforcement of state partition scheme;
ω is calculated according to formula (7)p,i
In formula:ωp,iIt is the integrated performance index of i-th kind of dynamic partition scheme for apparatus overload;V investigates collection for equipment, that is, The equipment intersection of overload;γvImportance modifying factor for different electric pressure equipment;N is the equipment of overload under current state Number, θi,j,vOverload nargin for wherein j-th equipment;μi,j,vFor implementing to set for j-th after i-th kind of dynamic partition scheme The variable quantity of standby overload nargin;W is the sum of forecast failure, NkFor there is the equipment transshipping under wherein k-th fault Number, θi,l,k,vOverload nargin for l-th equipment under k-th fault;μi,l,k,vImplement for i-th kind of dynamic partition scheme Afterwards under k-th fault the overload nargin of l-th equipment variable quantity.
5. the bulk power grid emergency state control aid decision-making method based on dynamic partition according to claim 1, its feature It is, described step 6) in, based on dynamic partition quantitatively evaluating index system, the dynamic partition scheme that feasible program is concentrated is entered Row overall merit, is carried out in the following manner:
For each scheme, it is first determined the weight of its index at different levels, and then obtain upper one by certain mathematical algorithms The comprehensive evaluation index of level index, successively calculates upwards, finally obtains the comprehensive evaluation result of dynamic partition scheme;Dynamic partition Quantitatively evaluating index system includes security, reliability and economy three class index, as follows:
The first kind, safety indexes:
Line load index xL
In formula:I=1,2 ..., nl;ηpl,iOverload nargin for circuit i;nlFor the number of lines;αliRepair for circuit importance Positive divisor;
Transformer load index xT
In formula:I=1,2 ..., nt;ηpt,iOverload nargin for transformer i;ntFor transformer number;αtiThink highly of for transformation The property wanted modifying factor;
Voltage levvl index λU
λ U = 1 n u Σ i = 1 n u α u i ( 1 - η v , i ) - - - ( 10 )
In formula:I=1,2 ..., nu;nuFor bus quantity;ηv,iVoltage security margin for bus i;αuiFor busbar voltage importance Modifying factor;
Short circuit current level index xI
x I = 1 n s c Σ i = 1 n s c I i , s c I i , s c , lim - - - ( 11 )
In formula:I=1,2 ..., nsc;nscFor short trouble number;Ii,scFor the short-circuit current value under i-th short trouble; Ii,sc.limThe minimum of a value of the rupturing capacity of the breaker being connected for short-circuit busbar;
Equations of The Second Kind, reliability index:
Current supply circuit number SM
S M = Σ i ∈ R S i - - - ( 12 )
In formula:SiFor being not more than the capacity of the 220kV end transformer station of two supplying channels;
Spinning reserve index xre
x r e = P S R . lim P S R - - - ( 13 )
In formula:PSRFor active spinning reserve capacity;PSR.limMinimum limit value for active spinning reserve capacity;
3rd class, economic index:
System losses index Sloss
Sloss=∑ PG-∑PD(14)
In formula:PGFor generating capacity;PDFor load capacity;
Operation cost index Fc
F c = Σ i = 1 n f i - - - ( 15 )
In formula:N is the number of times of circuit folding;fiThe operating cost producing for each folding, is had with the cost of switch and service life Close.
CN201610511345.2A 2016-06-30 2016-06-30 A kind of bulk power grid emergency state control aid decision-making method based on dynamic partition Active CN106451414B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610511345.2A CN106451414B (en) 2016-06-30 2016-06-30 A kind of bulk power grid emergency state control aid decision-making method based on dynamic partition

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610511345.2A CN106451414B (en) 2016-06-30 2016-06-30 A kind of bulk power grid emergency state control aid decision-making method based on dynamic partition

Publications (2)

Publication Number Publication Date
CN106451414A true CN106451414A (en) 2017-02-22
CN106451414B CN106451414B (en) 2019-01-25

Family

ID=58183358

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610511345.2A Active CN106451414B (en) 2016-06-30 2016-06-30 A kind of bulk power grid emergency state control aid decision-making method based on dynamic partition

Country Status (1)

Country Link
CN (1) CN106451414B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108493979A (en) * 2018-03-28 2018-09-04 国电南瑞科技股份有限公司 A kind of extra-high voltage direct-current access provincial power network partition zone optimizing progress control method
CN108695878A (en) * 2018-05-04 2018-10-23 国网重庆市电力公司 A kind of regional power grid height flexible direct current emergency control method and system under by electric ratio
CN109672171A (en) * 2018-12-06 2019-04-23 国网天津市电力公司 Eliminate the Automatic Control Strategy of 500kV transformer overload
CN111404163A (en) * 2020-05-11 2020-07-10 国网湖南省电力有限公司 Electromagnetic looped network open-loop method
CN112487624A (en) * 2020-11-23 2021-03-12 特变电工衡阳变压器有限公司 Power transformer low-voltage winding short-circuit resistance safety evaluation method based on instability theory

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102222162A (en) * 2011-05-24 2011-10-19 国网电力科学研究院 Prevention control and emergent state aid decision-making method for multiple safety and stability constrains
CN102542355A (en) * 2011-11-19 2012-07-04 国网电力科学研究院 Operation planning part load method
CN103337904A (en) * 2013-04-24 2013-10-02 南京南瑞集团公司 Emergency control method for power grid voltage out-of-limit and equipment overload based on multi-source data

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102222162A (en) * 2011-05-24 2011-10-19 国网电力科学研究院 Prevention control and emergent state aid decision-making method for multiple safety and stability constrains
CN102542355A (en) * 2011-11-19 2012-07-04 国网电力科学研究院 Operation planning part load method
CN103337904A (en) * 2013-04-24 2013-10-02 南京南瑞集团公司 Emergency control method for power grid voltage out-of-limit and equipment overload based on multi-source data

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
ANSI WANG ET AL.: "An Adaptive Emergency Control Method for Interconnected Power Grids against Frequency Decline and System Blackout", 《IEEE IPEC》 *
WEI SHAO ET AL.: "BIP-Based OPF for Line and Bus-bar Switching to Relieve Overloads and Voltage Violations", 《PSCE》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108493979A (en) * 2018-03-28 2018-09-04 国电南瑞科技股份有限公司 A kind of extra-high voltage direct-current access provincial power network partition zone optimizing progress control method
CN108695878A (en) * 2018-05-04 2018-10-23 国网重庆市电力公司 A kind of regional power grid height flexible direct current emergency control method and system under by electric ratio
CN109672171A (en) * 2018-12-06 2019-04-23 国网天津市电力公司 Eliminate the Automatic Control Strategy of 500kV transformer overload
CN109672171B (en) * 2018-12-06 2022-02-22 国网天津市电力公司 Automatic control strategy for eliminating 500kV transformer overload
CN111404163A (en) * 2020-05-11 2020-07-10 国网湖南省电力有限公司 Electromagnetic looped network open-loop method
CN112487624A (en) * 2020-11-23 2021-03-12 特变电工衡阳变压器有限公司 Power transformer low-voltage winding short-circuit resistance safety evaluation method based on instability theory

Also Published As

Publication number Publication date
CN106451414B (en) 2019-01-25

Similar Documents

Publication Publication Date Title
Sakar et al. Increasing PV hosting capacity in distorted distribution systems using passive harmonic filtering
CN106451414A (en) Dynamic partition-based large power grid emergency state control auxiliary decision method
CN104882905B (en) A kind of new energy for considering transient security constraint receives capability assessment method
Calderaro et al. Reactive power control for improving voltage profiles: A comparison between two decentralized approaches
CN103020853B (en) Method for checking short-term trade plan safety
CN108418255A (en) A kind of extra-high voltage direct-current suitable for the new energy containing high permeability sends Electric power network planning method and system outside
CN104852399B (en) Light stores up the stored energy capacitance dynamic optimization method of micro-grid system
CN105914753A (en) Active distribution network (ADN) voltage real-time fuzzy control method
CN107492908A (en) A kind of feeder line Method for optimized planning based on distributed power source access
CN106875287A (en) A kind of power system switched-mode power supply capacity judging method
Salman et al. Implementation optimal location and sizing of UPFC on Iraqi power system grid (132 kV) using genetic algorithm
Benachaiba et al. Smart control of UPCQ within microgrid energy system
CN110896231A (en) Distributed photovoltaic capacity receiving calculation method and system for power distribution network in poverty alleviation area
CN108711868A (en) It is a kind of meter and islet operation voltage security GA for reactive power optimization planing method
CN109167368B (en) User voltage optimization and regulation method and system with distributed photovoltaic
Siddiqui et al. Optimal capacitor placement to reduce losses in distribution system
Ushasurendra et al. Congestion management in deregulated power sector using fuzzy based optimal location technique for series flexible alternative current transmission system (FACTS) device
CN110460061A (en) Trend quick calculation method and system after a kind of failure
Abapour et al. Application of active management on distribution network with considering technical issues
CN105406485B (en) Based on the transformer station's dynamic reactive power optimization method and system for improving bat algorithm
CN113962159A (en) Method for evaluating maximum photovoltaic access capacity of power distribution network based on reasonable light abandonment
CN110783913B (en) Group-based optimal power grid topology online optimization method considering expected accident set
Khoshkhoo et al. A remedial action scheme to prevent mid/long-term voltage instabilities
Ahilan Wind connected distribution system with intelligent controller based compensators for power quality issues mitigation
CN109787266A (en) Extra-high voltage direct-current complex fault on-line analysis decision-making technique and system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant