CN106451412A - Power supply traceability-based important load power protection decision technology and visual display method - Google Patents
Power supply traceability-based important load power protection decision technology and visual display method Download PDFInfo
- Publication number
- CN106451412A CN106451412A CN201610352513.8A CN201610352513A CN106451412A CN 106451412 A CN106451412 A CN 106451412A CN 201610352513 A CN201610352513 A CN 201610352513A CN 106451412 A CN106451412 A CN 106451412A
- Authority
- CN
- China
- Prior art keywords
- important load
- important
- power supply
- power
- tidal current
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/04—Circuit arrangements for ac mains or ac distribution networks for connecting networks of the same frequency but supplied from different sources
- H02J3/06—Controlling transfer of power between connected networks; Controlling sharing of load between connected networks
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2203/00—Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
- H02J2203/20—Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention relates to a power supply traceability-based important load power protection decision technology and visual display method. The method comprises the following steps of tracing the power supply paths of the important loads based on a graph theory breadth first algorithm, teasing the power supply channels of the important loads of a power grid, and forming a power protection channel and equipment set; displaying the power supply paths of the important loads based on a power flow diagram; real-timely monitoring the important loads, and verifying the safety of the important loads. According to the present invention, by tracing the power supply paths and teasing the power supply channels of the important loads, the power protection channel and equipment set is formed, and by combining a visual display mode, the real-time monitoring and the anti-maloperation verification are added for the important users, so that the technical guarantee is provided for the safe and stable operation of the power grid.
Description
Technical field
The invention belongs to dispatching automation of electric power systems field, be specifically related to protect electricity based on the important load of power supply backward and determine
Plan technology and visual display method.
Background technology
Recently as the advanced structure of urban planning, urban construction and economic construction are fast-developing, to urban electric power system
System high-quality, reliable power supply propose requirements at the higher level.Great guarantor's electricity task in city gets more and more, in order to allow electric power preferably service
In politics, economy, the people's livelihood, promoting the harmonious development of society, protecting electricity task every time all needs to formulate detailed guarantor's electricity scheme, to ensure
Satisfactorily complete to protect electricity task.The current electric grid mode of connection and the method for operation become increasingly complex, and electric load is more and more heavier, thus lead
The safety and stability of cause system is by increasingly acid test, and each power supply enterprise there is a need to the electricity consumption that emphasis protects electricity
Load, the loss of these important loads once interruption of power supply is serious, have a great responsibility, in consideration of it, be necessary to build electrical network important load
Protect electricity decision-making technic and visual display method.
Content of the invention
For the problems referred to above, the present invention proposes the practical operation situation of a kind of combination electrical network, solves the important use of power system
The important load based on power supply backward of family practical problem in current EMS system protects electricity decision-making technic and visualization display side
Method.
For solving the problems referred to above, the technical scheme that the present invention takes is:Protect electricity decision-making based on the important load of power supply backward
Technology and visual display method, comprise the steps:
Step one, review based on the supply path to important load for the graph theory width first traversal, to each heavy in electrical network
The supplying channels wanting load carries out combing and forms guarantor's electric channel and equipment collection;
Protect electric channel by combing and equipment integrates and strong technology can be provided to prop up as the power supply support mission of important load
Hold, help dispatching of power netwoks personnel to grasp electric network composition more fully, rapidly, for power grid security, stably operation offer technology
Ensure.
It step 2, is shown based on the supply path to important load for the tidal current chart;
Be shown the supply path of important load by means of tidal current chart, it is special to carry out the supply line of important load
Render coloring so that it is other supply lines being different from tidal current chart;To at the plant stand of important load place draw border circular areas with
Special sign, other plant stands being different from tidal current chart;Draw arrow to identify trend side on the supply path of important load
To;
Tidal current chart can be shown to combine with visualization by word and be powered path displaying, be dispatcher and side
Formula personnel provide information comprehensive, effective;Supporting that supply path flow process is shown, important load supply path flow chart is from high voltage
Grade is shown to low-voltage-grade, and exhibition information is well arranged, and structure understands.Supply circuit based on the important load of tidal current chart
Point-to-point supply path information between plant stand is shown in footpath, is shown the supply path of important load by means of tidal current chart, adopts
Use multi-layer image rendering technique, do not affect original graphical file information, on tidal current chart, to important load place plant stand and for circuit
Footpath is supported dynamically to render, cancel function, can freely arrange displaying color, and draw on important load supply path arrow with
Mark direction of tide.
It is shown based on the supply path to important load for the topological diagram in addition, may be otherwise, support with mutual (such as point
Hit) mode review voltage levels, obtain nodal information.
Step 3, important load is monitored and security verification in real time;
The real-time supervision to important load, after tripping fault occurs, the affected important load of Realtime Alerts, by tripping operation
Item is analyzed, and obtains trip switch, utilizes tidal current chart simulation to calculate affected important load after switch trip, draws to because of fault
The timely pop-up alarm prompt of important load power failure rising;
When tripping fault occurs, the responsible consumer that pop-up alarm prompt impacts, help dispatcher in time, rapidly
Grasp electric network information.
Security verification operation is carried out to important load, before switch straighforward operation, increases security verify in advance, by tide
Flow field simulation calculates affected important load after drawing road, the important load having a power failure after analyzing operation, evaluates the safety of this operation
Property, the important load preventing maloperation from causing has a power failure.
Whether the present invention mainly builds evaluation system from the angle of responsible consumer security, bring after being operated by analysis
Risk evaluates the security of operation.
Step one reviews end condition by setting and selects Path Terminator Node, the corresponding node of important load and termination
Path between node is supply path.Width first traversal is applied to during the supply path of power system device reviews,
Reviewing end condition such as 220kV bus by setting, power plant's bus selects Path Terminator Node.
The present invention reviews combing supplying channels by the supply path of important load, is formed and protects electric channel and equipment collection, and
In conjunction with visual exhibition method, increase monitoring in real time and anti-error verification to responsible consumer, carry for power grid security, stable operation
Supply technical guarantee.
Detailed description of the invention
Protect electricity decision-making technic and visual display method based on the important load of power supply backward, comprise the steps:
Step one, review based on the supply path to important load for the graph theory width first traversal, to each heavy in electrical network
The supplying channels wanting load carries out combing and forms guarantor's electric channel and equipment collection;Review end condition such as 220kV mother by setting
Line, power plant's bus selects Path Terminator Node, and the path between the corresponding node of important load and terminal node is for circuit
Footpath.Obtained guarantor's electric channel and bus, main transformer, the circuit etc. of important load to protect electricity set by the path tracing algorithm of important load
Standby, to help dispatching of power netwoks personnel to grasp electric network composition more fully, rapidly.
It step 2, is shown based on the supply path to important load for the tidal current chart;
Be shown the supply path of important load by means of tidal current chart, it is special to carry out the supply line of important load
Render coloring so that it is other supply lines being different from tidal current chart;To at the plant stand of important load place draw border circular areas with
Special sign, other plant stands being different from tidal current chart;Draw arrow to identify trend side on the supply path of important load
To;
Step 3, important load is monitored and security verification in real time;
The real-time supervision to important load, after tripping fault occurs, the affected important load of Realtime Alerts, by tripping operation
Item is analyzed, and obtains trip switch, utilizes tidal current chart simulation to calculate affected important load after switch trip, draws to because of fault
The timely pop-up alarm prompt of important load power failure rising;
Security verification operation is carried out to important load, before switch straighforward operation, increases security verify in advance, by tide
Flow field simulation calculates affected important load after drawing road, the important load having a power failure after analyzing operation, evaluates the safety of this operation
Property, the important load preventing maloperation from causing has a power failure.
Claims (2)
1. protect electricity decision-making technic and visual display method based on the important load of power supply backward, it is characterised in that include walking as follows
Suddenly:
Step one, review based on the supply path to important load for the graph theory width first traversal, to each important negative in electrical network
The supplying channels of lotus carries out combing and forms guarantor's electric channel and equipment collection;
It step 2, is shown based on the supply path to important load for the tidal current chart;
The supply path of important load is shown by means of tidal current chart, special rendering is carried out to the supply line of important load
Coloring so that it is other supply lines being different from tidal current chart;To drawing border circular areas at the plant stand of important load place with special
Indicate, other plant stands being different from tidal current chart;Draw arrow to identify direction of tide on the supply path of important load;
Step 3, important load is monitored and security verification in real time;
The real-time supervision to important load, after tripping fault occurs, the affected important load of Realtime Alerts, by tripping operation item
Analyze, obtain trip switch, utilize tidal current chart simulation to calculate affected important load after switch trip, to cause because of fault
The timely pop-up alarm prompt of important load power failure;
Security verification operation is carried out to important load, before switch straighforward operation, increases security verify in advance, by trend mould
Plan calculates affected important load after drawing road, the important load having a power failure after analyzing operation, evaluates the security of this operation, anti-
The important load that only maloperation causes has a power failure.
2. the important load based on power supply backward according to claim 1 protects electricity decision-making technic and visual display method,
It is characterized in that:Step one is reviewed end condition and is selected Path Terminator Node by setting, the corresponding node of important load and
Path between terminal node is supply path.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610352513.8A CN106451412B (en) | 2016-05-25 | 2016-05-25 | Important load based on power supply backward protects electric decision-making technic and visual display method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610352513.8A CN106451412B (en) | 2016-05-25 | 2016-05-25 | Important load based on power supply backward protects electric decision-making technic and visual display method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106451412A true CN106451412A (en) | 2017-02-22 |
CN106451412B CN106451412B (en) | 2019-02-15 |
Family
ID=58183430
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610352513.8A Active CN106451412B (en) | 2016-05-25 | 2016-05-25 | Important load based on power supply backward protects electric decision-making technic and visual display method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106451412B (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107171437A (en) * | 2017-05-18 | 2017-09-15 | 中国南方电网有限责任公司 | Net saves responsible consumer decompression monitoring method in the electricity consumption dispatch automated system that ground is cooperateed with |
CN108879792A (en) * | 2018-06-27 | 2018-11-23 | 国家电网有限公司 | A kind of integration auxiliary support system based on new energy management and running operation |
CN109063963A (en) * | 2018-07-03 | 2018-12-21 | 国电南瑞科技股份有限公司 | A kind of responsible consumer power supply methods of risk assessment based on unit style electricity distribution network model |
CN109473971A (en) * | 2018-04-10 | 2019-03-15 | 国网浙江省电力有限公司嘉兴供电公司 | Guarantor's electricity spare unit dispatching method based on GIS |
CN109472386A (en) * | 2018-04-10 | 2019-03-15 | 国网浙江省电力有限公司嘉兴供电公司 | A kind of determining method for protecting electric spare unit amount of purchase |
CN109472387A (en) * | 2018-04-10 | 2019-03-15 | 国网浙江省电力有限公司嘉兴供电公司 | A kind of electric spare unit demand predictor method of guarantor |
CN109508847A (en) * | 2018-04-10 | 2019-03-22 | 国网浙江省电力有限公司嘉兴供电公司 | A kind of electric spare unit method for early warning of guarantor |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101436789A (en) * | 2008-12-26 | 2009-05-20 | 北京市电力公司调度通信中心 | Method for implementing power supply backward in scheduling automatization system |
CN103066698A (en) * | 2012-12-17 | 2013-04-24 | 绍兴电力局 | Implement method for automatic generation of visible power grid trend chart in dispatching system |
CN103903185A (en) * | 2012-12-24 | 2014-07-02 | 天津市电力公司 | Plan and fault power failure range visualization method based on power grid GIS |
CN103955789A (en) * | 2014-04-18 | 2014-07-30 | 国电南瑞科技股份有限公司 | Power supply path analyzing method based on integrated model for allocation |
CN104914837A (en) * | 2015-05-26 | 2015-09-16 | 国家电网公司 | Intelligent dispatching visualization early warning system |
-
2016
- 2016-05-25 CN CN201610352513.8A patent/CN106451412B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101436789A (en) * | 2008-12-26 | 2009-05-20 | 北京市电力公司调度通信中心 | Method for implementing power supply backward in scheduling automatization system |
CN103066698A (en) * | 2012-12-17 | 2013-04-24 | 绍兴电力局 | Implement method for automatic generation of visible power grid trend chart in dispatching system |
CN103903185A (en) * | 2012-12-24 | 2014-07-02 | 天津市电力公司 | Plan and fault power failure range visualization method based on power grid GIS |
CN103955789A (en) * | 2014-04-18 | 2014-07-30 | 国电南瑞科技股份有限公司 | Power supply path analyzing method based on integrated model for allocation |
CN104914837A (en) * | 2015-05-26 | 2015-09-16 | 国家电网公司 | Intelligent dispatching visualization early warning system |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107171437A (en) * | 2017-05-18 | 2017-09-15 | 中国南方电网有限责任公司 | Net saves responsible consumer decompression monitoring method in the electricity consumption dispatch automated system that ground is cooperateed with |
CN107171437B (en) * | 2017-05-18 | 2020-01-03 | 中国南方电网有限责任公司 | Important user voltage loss monitoring method in power utilization dispatching automation system with network, province and region cooperation |
CN109473971A (en) * | 2018-04-10 | 2019-03-15 | 国网浙江省电力有限公司嘉兴供电公司 | Guarantor's electricity spare unit dispatching method based on GIS |
CN109472386A (en) * | 2018-04-10 | 2019-03-15 | 国网浙江省电力有限公司嘉兴供电公司 | A kind of determining method for protecting electric spare unit amount of purchase |
CN109472387A (en) * | 2018-04-10 | 2019-03-15 | 国网浙江省电力有限公司嘉兴供电公司 | A kind of electric spare unit demand predictor method of guarantor |
CN109508847A (en) * | 2018-04-10 | 2019-03-22 | 国网浙江省电力有限公司嘉兴供电公司 | A kind of electric spare unit method for early warning of guarantor |
CN109508847B (en) * | 2018-04-10 | 2022-07-01 | 国网浙江省电力有限公司嘉兴供电公司 | Electricity-protecting spare part early warning method |
CN109473971B (en) * | 2018-04-10 | 2022-07-22 | 国网浙江省电力有限公司嘉兴供电公司 | GIS-based power protection spare part scheduling method |
CN108879792A (en) * | 2018-06-27 | 2018-11-23 | 国家电网有限公司 | A kind of integration auxiliary support system based on new energy management and running operation |
CN109063963A (en) * | 2018-07-03 | 2018-12-21 | 国电南瑞科技股份有限公司 | A kind of responsible consumer power supply methods of risk assessment based on unit style electricity distribution network model |
Also Published As
Publication number | Publication date |
---|---|
CN106451412B (en) | 2019-02-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106451412A (en) | Power supply traceability-based important load power protection decision technology and visual display method | |
CN101789596B (en) | Automatic detection method of power grid failure | |
CN103607042B (en) | The distribution network failure processing method of long fault indicator for overhead lines towards outskirts of a town | |
CN105576660B (en) | Local distribution network in-circuit emulation analytical equipment and system | |
CN104573939B (en) | A kind of analysis method of power grid security and stability | |
CN103559654A (en) | Comprehensive analysis system and method of power distribution network | |
CN104218672B (en) | A kind of power distribution network operation risk early warning system evaluated based on real-time running state | |
CN104297616A (en) | 10kV distribution line breaking detection method based on multi-system information interaction | |
CN107844891A (en) | A kind of method for judging Power grid structure and changing and calculating schedule risk value | |
CN103543384A (en) | Method for determining bus ground faults | |
CN102983594A (en) | Control method of grid closed loop operation impact current | |
CN104331777A (en) | Error-preventing management system for county level power grid dispatching operation | |
CN104778632A (en) | Intelligent decision making aiding method and system for transfer power supply | |
CN104253421A (en) | Relay protection optimal configuration method for double-circuit lines on same pole based on substation area information sharing | |
CN102044021A (en) | Management method for power grid risk assessment | |
CN103560497B (en) | A kind of short circuit current method for limiting based on power network topology adjustment | |
CN104393602B (en) | Adjusting method and device for distributed energy resource network | |
CN106207999A (en) | The guard method of a kind of photovoltaic plant DC side circuit and device | |
CN105373893A (en) | Scheduling automation system model definition assistant decision-making and risk assessment method | |
CN102611085B (en) | Intertripping simulation analysis method | |
CN202383231U (en) | Undercurrent singlephase earth fault comprehensive line selection system | |
CN105896735B (en) | A kind of operation of power networks state real-time diagnosis method and system | |
CN106651113A (en) | Dispatcher operation risk evaluation method based on advanced N-1 analysis | |
CN111029914B (en) | Active first-aid repair system based on ubiquitous Internet of things construction | |
CN104299172A (en) | Power grid weak link comprehensive recognition method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |