CN106451307B - The method that 10KV distribution overhead lines are taken shelter from the thunder - Google Patents

The method that 10KV distribution overhead lines are taken shelter from the thunder Download PDF

Info

Publication number
CN106451307B
CN106451307B CN201610983328.9A CN201610983328A CN106451307B CN 106451307 B CN106451307 B CN 106451307B CN 201610983328 A CN201610983328 A CN 201610983328A CN 106451307 B CN106451307 B CN 106451307B
Authority
CN
China
Prior art keywords
circuit
lightning
shaft tower
height
distribution
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610983328.9A
Other languages
Chinese (zh)
Other versions
CN106451307A (en
Inventor
王善良
黄健
丁文彬
安海涛
王栋
赵鹏
宋俊山
朱爱东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Donga Power Supply Company State Grid Shandong Electric Power Co
State Grid Corp of China SGCC
Original Assignee
Donga Power Supply Company State Grid Shandong Electric Power Co
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Donga Power Supply Company State Grid Shandong Electric Power Co, State Grid Corp of China SGCC filed Critical Donga Power Supply Company State Grid Shandong Electric Power Co
Priority to CN201610983328.9A priority Critical patent/CN106451307B/en
Publication of CN106451307A publication Critical patent/CN106451307A/en
Application granted granted Critical
Publication of CN106451307B publication Critical patent/CN106451307B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G13/00Installations of lightning conductors; Fastening thereof to supporting structure

Abstract

The invention belongs to a kind of methods that distribution network construction field more particularly to 10KV distribution overhead lines are taken shelter from the thunder.A, the information of 10KV distribution overhead lines is collected first, and the information of the distribution line includes the dielectric level of the height of shaft tower, the distance of shaft tower, the height of lightning conducter, the installation site of arrester and circuit;B, it according to collecting come the information of 10KV distribution overhead lines, establishes relevant model using PSCAD and EMTDC and constructs the circuit of 7 base shaft towers;C, the flashover number of circuit both sides is calculated;D, influence and line insulation level of the shaft tower height to tripping rate with lightning strike are calculated to tripping rate with lightning strike according to line flashover number, and then choose the shaft tower and insulator of proper height, the present invention has the purpose for being optimal lightning-arrest effect with least cost, this method is easy to operate, it is all operable for those skilled in the art, large-scale promotion is suitble to use.

Description

The method that 10KV distribution overhead lines are taken shelter from the thunder
Technical field
The invention belongs to a kind of methods that distribution network construction field more particularly to 10KV distribution overhead lines are taken shelter from the thunder.
Background technology
With the continuous development of science and technology, people’s lives are supplied electricity to and bring variation with rapid changepl. never-ending changes and improvements, in order to make people It can be protected in terms of electricity consumption, the construction of power distribution network dominated by State Grid Corporation of China and Southern Power Grid Company is such as fire Such as the progress of the bitter edible plant, 10KV distribution lines with the distribution line of user's end in contact in the construction of entire power distribution network as directly occupying Very important status, however, since the features such as distribution of 10KV distribution lines is wide, dielectric level is low also becomes power distribution network tripping The most circuit of number, main cause are exactly to be struck by lightning, lightning stroke not only can distribution line interrupt, also result in controller switching equipment and use Family equipment damage or even personal injury is caused, heavy losses are brought to industrial and agricultural production.
In order to solve the problem of lightning of 10KV distribution overhead lines, there has been proposed various methods, for example, installation Arrester, lightning conducter, the insulativity etc. for improving circuit, although however, these above-mentioned methods can be to a certain extent Lightning-arrest effect is played, still, with certain blindness, in order to reach lightning-arrest effect, people generally can be by these equipment Setting, and then the cost of distribution network construction is improved, and effectively cannot provide a kind of rational method for circuit, make to take shelter from the thunder Expense achievees the effect that best lightning-arrest in the case of minimum.
Invention content
The present invention there is technical issues that for above-mentioned 10KV distribution overhead lines on lightning measure, propose one The method that the good and lightning-arrest 10KV distribution overhead lines at low cost of simple, the lightning-arrest effect of kind reasonable design, method are taken shelter from the thunder.
In order to achieve the above object, the technical solution adopted by the present invention is the side that a kind of 10KV distribution overhead lines are taken shelter from the thunder Method, including following effective procedure:
A, the information of 10KV distribution overhead lines is collected first, and the information of the distribution line includes the height of shaft tower, bar The distance of tower, the height of lightning conducter, the installation site of arrester and circuit dielectric level;
B, according to collecting come the information of 10KV distribution overhead lines, relevant model and structure are established using PSCAD and EMTDC Make the circuit of 7 base shaft towers;
C, the flashover number of both sides circuit is calculated, calculation formula is:
Wherein, NiIt is calculated every year according to 24 thunderstorm days for 100km circuits, the flashover number of circuit is caused by lightning stroke, P is Annual thunderstorm day is more than 20 days regional lightning current distribution probabilities, and hd is conducting wire away from ground level, and γ is according to DL/T620- The lightning strike density of 1997 values, S are the distance of lightning strike spot and circuit, and d is the distance of lightning strike spot and shaft tower central point;
D, to calculate influence and line insulation level of the shaft tower height to tripping rate with lightning strike according to the flashover number of circuit right Tripping rate with lightning strike, and then choose the shaft tower and insulator of proper height;
Wherein, in the step c,Wherein,Wherein, when Imin is flickered for circuit Minimum flicker electric current;Arrester is set up on the circuit of Ni≤8, the ground resistance of shaft tower is controlled to be less than 30 ' Ω, in Ni≤8 Lightning conducter is set up on circuit, the height apart from head of mast of the lightning conducter is 0.3m.
Compared with prior art, the advantages and positive effects of the present invention are,
1st, the present invention provides a kind of method that 10KV distribution overhead lines are taken shelter from the thunder, be effectively combined lightning strike spot, flicker electric current, The factors such as the height of conducting wire with reference to the formula of optimization, provide a kind of optimization method, with most to the erection of 10KV distribution overhead lines Low cost is optimal the purpose of lightning-arrest effect, and this method is easy to operate, is that those skilled in the art are all operable, is suitble to big rule Mould is promoted the use of.
Specific embodiment
To better understand the objects, features and advantages of the present invention, with reference to embodiment to this hair It is bright to be described further.It should be noted that in the absence of conflict, the feature in embodiments herein and embodiment can To be combined with each other.
Many details are elaborated in the following description to facilitate a thorough understanding of the present invention, still, the present invention may be used also With using implementing different from other modes described here, therefore, the present invention is not limited to the specific of specification is described below The limitation of embodiment.
Embodiment 1, the present embodiment provides a kind of method that 10KV distribution overhead lines are taken shelter from the thunder, specifically using Donga County as Example, the annual thunderstorm day of Donga County is 24 days, and the Donga County electric company service small towns of Donga County 10,1 provincial economy are opened Area, 507 administrative villages, 130,000 clients are sent out, by the end of the year 2015, Donga possesses 220 kv substation 2,110 kilovolts of changes within the border 9, power station, 35 kv substations 16;Possess 35 kilovolts and 265.84 km of above power transmission and transformation line, 10 KV line 906.04 kms, 0.4 KV line, 956.64 km.
In the present embodiment, by taking the line of Donga County Dongcheng city as an example, Dongcheng line use LJ-70 conducting wires, safety coefficient K= 2.5, overall length 5.06km, institute are plains region through section, and totally 48 base shafts, are Pre-stressed pole, wherein, angle pole and tension-resistant rod Totally 3 base, in addition to 1 bar is using 15m bars, using 12m bars, span is larger for other, completely common completely using S-210/Z porcelain pole arms Zinc-Oxide Arrester 6 is installed, all fronts conducting wire is by the way of rounded projections arranged.
According to the data collected, one 7 base shaft tower of relevant model and construction are established using PSCAD and EMTDC Circuit, PSCAD are responsible for interface figure, and EMTDC is responsible for simulation and calculates, and PSCAD and EMTDC have been applied 30 years in power industry , therefore, in the present embodiment, it is not added with detailed description.
In model calculating process, the height of conducting wire is 11m, and the parameters such as the inductance and capacitance of conducting wire take high frequency 106HZ When parameter, the electrical parameter of conducting wire calculated using existing route parameter calculation program, and pole tower ground resistance is taken as 30 ' Ω, shaft tower inductance are taken as 0.84 μ H/m.Since circuit whole process uses S-210/Z porcelain pole arms, when lightning induced voltage Ug surpasses 50% discharge voltage of line insulator is crossed, flashover will occur for insulator, with reference to electromagnetic field method, the minimum flashover current for calculating to be struck by lightning Relationship between the horizontal distance of circuit isDue to S2≧hd2, therefore formula also may be used To be reduced to Imin=α .S, whereinThe amplitude of lightning current used at present in general area according to China is more than I Probability curve, selected empirical equation lgp=-I/88 derivesP is more than for annual thunderstorm day 20 days regional lightning current distribution probabilities, according to formulaWherein, NiFor 100km circuits (24 thunderstorm days) causes line flashover number due to being struck by lightning every year, and P is more than 20 days regional lightning currents for annual thunderstorm day Distribution probability, hd are conducting wire away from ground level, and γ is lightning strike density (according to DL/T620-1997 values), in the present embodiment, γ values are the distance that 0.07, S is lightning strike spot and circuit, and d is the distance of lightning strike spot and shaft tower central point, by final formula Derivation can be calculated,
With a height of 15 meters of bar, for conducting wire to the average distance hd=11m on ground, N is calculated in α=0.76i=9.5, with bar A height of 12 meters, for conducting wire to the average distance hd=9.5m on ground, N is calculated in α=0.88i=8.1, at 15 meters high compared with bar, thunder Trip-out rate low 14% is hit, with a height of 10 meters of bar, to the average distance hd=7.8m on ground, α=1.07 of calculation calculate conducting wire Go out Ni=6.8, at 15 meters high compared to bar, tripping rate with lightning strike low 28% is to sum up calculated it is found that Donga County 10KV power grids are maked somebody a mere figurehead Highly preferred 10 meters of shaft tower, and under this height, arrester and lightning conducter can not be set.
Due in the present embodiment, S-210/Z porcelain pole arms that insulator is selected, when insulator selects S-280/Z porcelain pole arms When, flashover number is calculated,
With a height of 15 meters of bar, conducting wire calculates α=280/25hd=1.01, calculates to the average distance hd=11m on ground Go out Ni=7.1, with a height of 12 meters of bar, conducting wire calculates α=280/25hd=1.17, meter to the average distance hd=9.5m on ground Calculate Ni=6.1, tripping rate with lightning strike low 14%.
It to sum up calculates it is found that in Donga County electric company 10KV overhead transmission lines, the preferred 10m electric poles of shaft tower, insulator is preferred S-280/Z porcelain pole arms, in this case, 100km lightning strokes cause line flashover number to reach minimum, the reduction of flashover number is also Mean the best of lightning-arrest effect.
The above described is only a preferred embodiment of the present invention, being not that the invention has other forms of limitations, appoint What those skilled in the art changed and be modified as possibly also with the technology contents of the disclosure above equivalent variations etc. It imitates embodiment and is applied to other fields, but it is every without departing from technical solution of the present invention content, technical spirit according to the present invention To any simple modification, equivalent variations and remodeling that above example is made, the protection domain of technical solution of the present invention is still fallen within.

Claims (1)

1. a kind of method that 10KV distribution overhead lines are taken shelter from the thunder, which is characterized in that including following effective procedure:
A, the information of 10KV distribution overhead lines is collected first, the information of the distribution line includes the height of shaft tower, shaft tower The dielectric level of distance, the height of lightning conducter, the installation site of arrester and circuit;
B, according to collecting come the information of 10KV distribution overhead lines, relevant model and construction one are established using PSCAD and EMTDC The circuit of 7 base shaft tower of item;
C, the flashover number of both sides circuit is calculated, calculation formula is:
Wherein, NiIt is calculated every year according to 24 thunderstorm days for 100km circuits, the flashover number of circuit is caused by lightning stroke, P is put down for year Equal thunderstorm day is more than 20 days regional lightning current distribution probabilities, and hd is conducting wire away from ground level, and γ is according to DL/T620-1997 The lightning strike density of value, S are the distance of lightning strike spot and circuit, and d is the distance of lightning strike spot and shaft tower central point;
D, influence and line insulation level of the shaft tower height to tripping rate with lightning strike are calculated to lightning stroke according to the flashover number of circuit Trip-out rate, and then choose the shaft tower and insulator of proper height;
Wherein, in the step c,Wherein, α=Imin/ S, wherein, minimum sudden strain of a muscle when Imin is flickered for circuit Bright electric current;Arrester is set up on the circuit of Ni≤8, the ground resistance of shaft tower is controlled to be less than 30 ' Ω, on the circuit of Ni≤8 Lightning conducter is set up, the height apart from head of mast of the lightning conducter is 0.3m.
CN201610983328.9A 2016-11-09 2016-11-09 The method that 10KV distribution overhead lines are taken shelter from the thunder Expired - Fee Related CN106451307B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610983328.9A CN106451307B (en) 2016-11-09 2016-11-09 The method that 10KV distribution overhead lines are taken shelter from the thunder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610983328.9A CN106451307B (en) 2016-11-09 2016-11-09 The method that 10KV distribution overhead lines are taken shelter from the thunder

Publications (2)

Publication Number Publication Date
CN106451307A CN106451307A (en) 2017-02-22
CN106451307B true CN106451307B (en) 2018-06-22

Family

ID=58207993

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610983328.9A Expired - Fee Related CN106451307B (en) 2016-11-09 2016-11-09 The method that 10KV distribution overhead lines are taken shelter from the thunder

Country Status (1)

Country Link
CN (1) CN106451307B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107832969B (en) * 2017-11-24 2021-09-21 广东电网有限责任公司清远供电局 Economic analysis method for 10kV distribution line overhead line erection

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8232472B1 (en) * 2010-06-25 2012-07-31 Alltec Corporation Early streamer emission terminal
CN103001153B (en) * 2012-12-20 2016-06-01 诸暨市供电局 A kind of distribution network lightning protection method of economical rationality
CN103887756A (en) * 2014-03-14 2014-06-25 国家电网公司 Electric transmission line straight line angle tower lightning protection measure collocation method
CN105244836A (en) * 2015-11-16 2016-01-13 国网山东寿光市供电公司 Differentiation lightning protection method of urban area 10KV distribution line

Also Published As

Publication number Publication date
CN106451307A (en) 2017-02-22

Similar Documents

Publication Publication Date Title
CN106099753B (en) Weight ice-covering area without lightning conducter Transmission Line Design method
CN203423465U (en) Power distribution overhead power transmission line lightning-induced overvoltage lightning protection device
CN101499638B (en) Method for improving lightning protection capability of ultra- extra-high voltage transmission line
CN105631175B (en) A kind of modification method of extra high voltage line operation voltage equivalence wind speed
Sirad et al. Optimization of grounding resistance to minimize transient currents at 150 kV SULSELRABAR system
CN106451307B (en) The method that 10KV distribution overhead lines are taken shelter from the thunder
CN103078318A (en) Overvoltage improvement method on basis of historical data of overhead power transmission line
CN204257304U (en) A kind of glass insulator lightning protection hardware
CN205303080U (en) Resistant bar -shaped suspension type composite insulator of lightning impulse
CN102882176B (en) Method for selecting erection height of lightning conductor of 10kV overhead distribution line
Zhou et al. Research on Optimal Configuration of Line Lightning Arrester Considering Terrain and Flashover Cost
CN203165582U (en) Super /extra high tension AC composite insulator umbrella shape structure
CN203166445U (en) Device using coupling ground line to reduce lightning trip-out rate of transmission line
CN105894208A (en) Low-voltage distribution line lightning stroke risk assessment method and apparatus
Huang et al. Assessment of lightning backflash outage rate of quadruple-circuit transmission lines due to subsequent strokes
CN205004117U (en) Composite insulator
CN104682305A (en) Method for differentiated lightning protection of urban 10 kV distribution line
CN104358465A (en) Tower head capable of preventing windage yaw
CN216082989U (en) Bird droppings prevention insulating sheath test platform
CN204186125U (en) A kind of wind-deviation tower head
CN113742895B (en) 10kV distribution network composite cross arm lightning protection simulation method
CN107546639B (en) A kind of distribution transmission line of electricity remodeling method and device
CN203632182U (en) Lightning protection device of 20kV overhead line
CN117892462A (en) MATLAB-ATP combined simulation platform-based lightning protection decision reconstruction method for power transmission line
Tserensambuu et al. Transient Overvoltage Simulation on Wind Farm in Mongolia Under Lightning Strokes

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Wang Shanliang

Inventor after: Huang Jian

Inventor after: Ding Wenbin

Inventor after: An Haitao

Inventor after: Wang Dong

Inventor after: Zhao Peng

Inventor after: Song Junshan

Inventor after: Zhu Aidong

Inventor before: Wang Shanliang

Inventor before: Zhu Aidong

Inventor before: Wang Dong

Inventor before: Wang Zongbo

Inventor before: Si Daofeng

Inventor before: Liu Xiaofeng

Inventor before: Song Junshan

Inventor before: Shao Hongling

Inventor before: Qin Bin

Inventor before: Xiao Gang

Inventor before: Liu Minghu

CB03 Change of inventor or designer information
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180622

Termination date: 20181109

CF01 Termination of patent right due to non-payment of annual fee