CN106447541A CN201610856002.XA CN201610856002A CN106447541A CN 106447541 A CN106447541 A CN 106447541A CN 201610856002 A CN201610856002 A CN 201610856002A CN 106447541 A CN106447541 A CN 106447541A
Authority
CN
China
Prior art keywords
compound
water
cement
moisture content
theoretical calculation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610856002.XA
Other languages
Chinese (zh)
Inventor
商玉田
姜则才
姜世波
王智刚
孙红霞
于舰
刘敏
王永录
童宝强
苗付伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Triumph Construction Engineering Corp Ltd Of China Petrochemical Industry
Sinopec Oilfield Service Corp
Original Assignee
Triumph Construction Engineering Corp Ltd Of China Petrochemical Industry
Sinopec Oilfield Service Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Triumph Construction Engineering Corp Ltd Of China Petrochemical Industry, Sinopec Oilfield Service Corp filed Critical Triumph Construction Engineering Corp Ltd Of China Petrochemical Industry
Priority to CN201610856002.XA priority Critical patent/CN106447541A/en
Publication of CN106447541A publication Critical patent/CN106447541A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Abstract

The invention discloses a theoretical calculation method for the water content of a mixed material of a cement stabilized macadam road pavement, and aims to determine an optimal water content of the mixed material of the cement stabilized macadam road pavement, and the optimal water content of the mixed material can be relatively precisely and reasonably determined with comparison with an indoor testing result. The theoretical calculation method comprises the following steps: performing theoretical calculation on the standard water rate of cement in a test part used in an indoor test, the water absorption rate of an aggregate and the water rate of a middle gap of the mixed material, converting calculated results into the water amount of the cement in the test part, the water absorption amount of the aggregate and the water amount of the middle gap of the mixed material so as to determine an actual optimal water amount of the mixed material, and further converting the optimal water amount of the mixed material into the optimal water content of the mixed material. By adopting the theoretical calculation method, the situation that the optimal water content of the mixed material can be only determined by using an indoor testing method can be changed, the proportioning rate of the water content of the mixed material of the cement stabilized macadam road pavement can be relatively and reasonably designed, the construction quality can be improved, rework can be avoided, and the production cost can be lowered.

Description

The theoretical calculation method of cement stabilized macadam highway pavement compound moisture content
Technical field
The present invention relates in highway structure compound moisture content computational methods, particularly cement stabilized macadam highway pavement The theoretical calculation method of compound moisture content, for the determination of cement stabilized macadam highway pavement compound optimum moisture content, energy Enough compare with laboratory test results, make cement stabilized macadam highway pavement compound optimum moisture content determination is more accurate and conjunction Reason.
Background technology
Domestic current at present《Highway road surface construction technique normalizing》(JTJ034-2000)Regulation:Mixture Ratio Design moisture content must pass through test method and determines.But difference can be produced during test operation indoors, lead to test number According to there is certain deviation.If result of the test is applied to reality, its fluctuation deviation is just bigger.During practice of construction, If optimum moisture content is low, easily loose, pavement strength reduction in the road crust of molding.If design is most preferably aqueous Rate is higher, and the pavement strength of molding is too high, pavement crack easily, and water easily causes road surface local failure once entering road surface.Always It, the deviation in mix proportion design moisture content is larger,Easily cause road quality to decline, be to use in the highway later stage to bury matter Amount hidden danger.And there is presently no the method that other can evaluate laboratory test, production scene needs a kind of auxiliary computational methods, with Laboratory test evaluates the design of cement stabilized macadam highway pavement compound moisture content jointly.
Content of the invention
It is an object of the invention to provide the theoretical calculation method of cement stabilized macadam highway pavement compound moisture content, can The correctness of the Mixture Ratio moisture content of auxiliary checking laboratory test design, improves laboratory test mixing in current design criteria The degree of accuracy of material match ratio moisture content, improves the quality of cement stabilized macadam highway pavement.
The technical solution of the present invention is:The theoretical calculation method of cement stabilized macadam highway pavement compound moisture content, be Utility rate of water in cement standard utility rate of water in the test specimen that laboratory test is used, aggregate water absorption and compound intermediate gap enters Row Theoretical Calculation, and be converted into cement water consumption in test specimen, gather materials in water absorption and compound according to the result calculating above Water consumption in gap is determining the optimum moisture content of actual compound, then the optimum moisture content of compound is converted into compound Optimum moisture content.
The remarkable result of the present invention is:The present invention is to calculate the standard water of wherein cement respectively according to the weight of test specimen Required water amount sum in amount, the water absorption and compound intermediate gap gathered materials is determining the optimum moisture content of compound and optimal Moisture content, can solve problems with this theory:
1st, solve the present situation individually determining compound moisture content at present according to test, after avoiding the occurrence of deviation, find reason again Defect, prevents from delaying the engineering time.
2nd, the optimum moisture content of cement stabilized macadam class highway pavement cement stabilizing class formation can effectively be determined, can be fast Speed cooperation laboratory test accurately determines, is a kind of effective method.
3rd, this method is by needed in gap between the standard water consumption of cement and the water absorption gathered materials and compound Three's sum of water consumption, as the design basis of optimum moisture content and optimum moisture content, is to pass through to calculate according to current specifications The data going out, computational methods are reasonable, practical.
4th, laboratory test can be assisted using the present invention, jointly complete the calculating of mix proportion design moisture content, make The selection of its moisture content is more reasonable.
The present invention has stronger theoretical property, changes and is only capable of at present relying on Experimental Method in Laboratory to determine that compound is optimal The way of moisture content, simple and easy to do, it is that one kind is simple, compound optimum moisture content can be calculated in advance and check simultaneously The method of laboratory test.The present invention can make the mix-design more adduction of cement stabilized macadam highway pavement compound moisture content Reason, is a kind of beneficial complement to existing laboratory test.The quality of cement stabilized macadam highway pavement can be improved, it is to avoid return Work, shortens the construction period, reduces production cost, has significant economic benefit and social benefit.
Specific embodiment
With reference to embodiments in detail the present invention is described in detail, not limits the scope of the invention, the design of all use present invention The improvement that thinking draws belongs to the protection category of the present invention.
The theoretical calculation method of cement stabilized macadam highway pavement compound moisture content, is the test specimen that laboratory test is used In cement standard utility rate of water, the utility rate of water in aggregate water absorption and compound intermediate gap carry out Theoretical Calculation, and according to On the water consumption that is converted in cement water consumption in test specimen, water absorption of gathering materials and compound intermediate gap of the result that calculates determining The optimum moisture content of actual compound, then the optimum moisture content of compound is converted into the optimum moisture content of compound.
The mensure of cement standard utility rate of water is according to " highway engineering cement and cement concrete testing regulationss JTGE30- The method of T0505-2005 in 2005 " is carried out, and determines the normal consistency of cement with this:
1st, modulate cement paste sample, must accomplish before test:
(1) the metal bar of Vicat apparatus can be slidably.
(2) when adjusting the bar of Vicat apparatus to contact glass plate upper surface, by height pointer zero adjustment.
(3) agitator for cement mortar normal operation.
2nd, cement paste mixing
Stirred with agitator for cement mortar, agitated kettle and stirring vane are first nuzzled up with wet cloth, mixing water are poured in agitated kettle, so Carefully the 500g weighing up cement is added to the water in 5s-10 s afterwards, prevents water and cement from spilling;When mixing and stirring, first agitated kettle is pacified It is attached on the pot seat of blender, then agitated kettle is risen to blender stirring vane bottom, start blender.Stirring at low speed 120s, Stop 15s, the cement mortar on stirring vane and agitated kettle pot wall is scraped in the middle of pot simultaneously, then high-speed stirred 120 s shuts down.
3rd, the determination step of cement standard utility rate of water
(1), after mix terminates, immediately cement paste good for mixing is loaded in the die trial put on a glass, inserted with pocket knife Smash, gently vibrate for several times, scrape off unnecessary net slurry.
(2) rapidly die trial and glass plate are moved on on Vicat apparatus, and the center of die trial is aligned in Vicat apparatus after putting down On bar, reduce bar until contacting with cement paste surface, after tightening screw 1s-2 s, loosen suddenly, make bar vertical certainly Sunk in cement paste by ground.When bar stops sinking to or discharging bar 30s, record bar, to the distance of glass plate, rises examination After bar, clean immediately.
(3) whole operation should complete in 1.5min after agitation.Net slurry is sunk to and away from glass plate 6mm ± 1mm's with bar Cement paste is starched only for normal consistency, and its batched water is the consumptive use of water normal consistence of this cement.
(4) when bar is less than 5mm away from glass plate, should suitable diminishing, the mixing of repetition cement mortar and said process;If When distance is more than 7mm, then should suitably add water, the mixing of rehydration of laying equal stress on mud and said process.
The calculating of the utility rate of water in compound intermediate gap includes:
In A, highway pavement cement stabilized macadam, the related initial data of constituent material measures
According to<<Highway road surface construction technique normalizing>>(JTJ034-2000)Method in code uses to Practical Project Material is sampled, test coarse aggregate, the density of fine aggregate, and carries out sieve test, measures the particle diameter group that all size gathers materials Become.
B, determine the usage ratio gathered materials of each shelves that test specimen uses
The screening result being gathered materials according to each shelves, according to<<Highway road surface construction technique normalizing>>(JTJ034-2000)Code In method, using calculating method or diagram method, the material that method uses to Practical Project according to the rules is sampled, test rough set Material, the density of fine aggregate, and carry out sieve test, measure the particle diameter composition that all size gathers materials.Determine the use that each specification is gathered materials Amount ratio, tries to achieve the formate gradation composition of compound.The formate gradation composition curve of compound has to comply with the requirement of design grading limit, no Must there is excessive interlocking.When through repeatedly adjust still have plural sieve aperture to exceed design grading limit when it is necessary to right Raw material, that is, highway pavement Cement Treated Material be adjusted or change raw material, redesign.
C, the usage ratio gathered materials according to shelves each in test specimen, calculate the maximum relative theory density of compound in test specimen simultaneously Estimate the residual clearance rate of actual compound;
D, with compound saturation as foundation, calculate the utility rate of water in compound intermediate gap, the span of saturation value sets It is scheduled between 50%-70%, any number between 50%-70% can be used, such as 55%, 58%, 61%, 66% etc..The saturation number of degrees The value of value is 60% or by laboratory test, saturation value is verified and adjust.
The optimum moisture content of compound is to calculate the standard water consumption of wherein cement respectively, gather materials according to the weight of test specimen Water consumption in water absorption and compound intermediate gap, is compound with the above-mentioned summation calculating divided by the weight gathered materials Optimum moisture content.The data in utility rate of water in the standard utility rate of water of cement, the water absorption rate gathering materials and compound intermediate gap is complete Portion is converted to mass unit in grams, uses water in cement standard utility rate of water, aggregate water absorption and compound intermediate gap Rate is the percentage ratio with the not compound gross mass of cement for the water consumption of each ingredient above-mentioned, the number obtaining after calculating Value.Fine aggregate moisture content in gathering materials be saturation is in the clearance gap of surface of aggregate, the micro- moistening state in surface is Calculating benchmark, the quality of the Free water moisture film that outer in clearance gap of gathering materials, surface of aggregate free-flowing water is formed is not as meter Calculate the content of the moisture content that gathers materials.
Illustrate the specific design main points of the present invention below with design embodiments.
Design embodiments one
The present embodiment adopts geo-compaction instrument vibration moulding method to test specimen, and wherein cement stabilized macadam highway pavement compound is related The initial data of constituent material measures numerical value,As following table one.
Table one, the actual-structure measurement table of performance of gathering materials
In upper table:The normal consistency of cement is 27.2%.
1st, calculate, according to after the design proportion mixing gathered materials, the maximum relative theory density 2.706 gathered materials;
The maximum relative theory density of compound when the 2nd, calculating cement:
100 ÷(96 ÷ 2.706+4.0 ÷ 3.1)=2.719
In formula:96 is shared ratio in compound of gathering materials;2.706 is according to the phase gathered materials after the design proportion mixing of building stones To solid density;4.0 is the shared ratio in compound of cement;3.1 is the relative density of cement.
3rd, calculate the comprehensive water absorption rate gathering materials by upper table table one(%)
40 × 0.4 ÷ 100+35 × 0.4 ÷ 100+15 × 0.7 ÷ 100+10 × 2.2 ÷ 100
=0.625
4th, calculate the volume of test specimen under maximum theory density(Cm3
15cm × 15cm × 15cm × 3.14 ÷ 4=2651cm3
5th, estimate the residual clearance of actual test specimen
The maximum dry density of actual test specimen is 2.35g/cm3;See table two with reference to value:
Table two maximum dry density value reference table
Residual clearance rate(%):(1-2.35 ÷ 2.719)× 100=13.6
In formula:2.35 is the maximum dry density of actual test specimen;2.719 is the maximum relative theory density of compound during cement.
6th, estimate the percentage rate of Free water between compound
During using geo-compaction instrument heavy compaction, saturation value adopts the upper limit 70%, using during vibrating forming machine molding, numerical value Using lower limit 50%, the data between 50%-70% can be chosen according to the operation level of experimenter, status of equipment, chooses Data see table three.
Table three saturation data chooses numerical tabular
13.6 ×(100-50)× 1 ÷ 100=6.8 (%)
Calculate the water consumption in compound intermediate gap:2651 × 6.8 ÷ 100=180.27(g)
7th, after detecting, cement standard utility rate of water is 27.2%
8th, estimate the weight of compound:6500(G)
9th, calculate the quality of P.O42.5 normal silicate slow setting cement:6500×0.04=260(g)
10th, calculate the water consumption of cement:260 × 0.272=70.2(g)
11st, calculate the water absorption gathered materials:6500 × 0.625 ÷ 100=40.63(G)
12nd, calculate the total water consumption needed for compound:40.6+70.2+180.3=291.1(g)
13rd, calculate the moisture content needed for compound:291.1÷(6500-291.1-260)×100=4.9(%)
Estimated data is compared as follows with indoor experimental data:
1st, laboratory test surveys the moisture content 5.1% of test specimen, and cement dose is 3.8%, and maximum dry density is 2.33g/cm3.
2nd, using the estimated data that the inventive method calculates to test specimen it is:The moisture content 4.9% of test specimen, cement dose is 4.0%, maximum dry density is 2.35g/cm3.
The model that error compliant between the above-mentioned every test specimen data estimated and the indoor experimental data of reality requires Enclose.
Design embodiments two
The present embodiment, using the test specimen of material identical with embodiment one, using geotechnological instrument heavy compaction method, designs compound aqueous Rate.
In the design embodiment, the initial data of cement stabilized macadam highway pavement compound correlation constituent material measures number Value,As upper table one:
1st, calculate, according to after the design proportion mixing gathered materials, the maximum relative theory density 2.706 gathered materials;
The maximum relative theory density of compound when the 2nd, calculating cement:
100 ÷(96 ÷ 2.706+4.0 ÷ 3.1)=2.719
In formula:96 is shared ratio in compound of gathering materials;2.706 is according to the phase gathered materials after the design proportion mixing of building stones To solid density;4.0 is the shared ratio in compound of cement;3.1 is the relative density of cement.
3rd, calculate the comprehensive water absorption rate gathering materials by upper table table one(%)
40 × 0.4 ÷ 100+35 × 0.4 ÷ 100+15 × 0.7 ÷ 100+10 × 2.2 ÷ 100
=0.625
4th, calculate the volume of test specimen under maximum theory density(Cm3
15cm × 15cm × 15cm × 3.14 ÷ 4=2651cm3
5th, estimate the residual clearance of actual test specimen
Compound maximum dry density and the maximum dry density warp of vibration moulding instrument vibration moulding method that geotechnological instrument heavy compaction method is surveyed Testing transformation ratio is:0.97:
The maximum dry density of actual test specimen is 2.35 × 0.97=2.28g/cm3
Residual clearance rate(%):(1-2.28 ÷ 2.719)× 100=16.1
In formula:The maximum dry density of the actual test specimen of 2.28 geotechnological instrument heavy compaction method designs;2.719 is compound during cement Maximum relative theory density.
6th, estimate the percentage rate of Free water between compound:
The present embodiment adopts geo-compaction instrument heavy compaction method, and saturation value is chosen data and seen the above table three, the saturation of selection Numerical parameter is 64%.
16.1 × 64 ÷ 100=10.3 (%)
Choose the surface of test piece coefficient of roughness:Geo-compaction instrument heavy compaction method:0.8-0.85;0.98- during vibrating forming machine molding 1.00;
Calculate the water consumption in compound intermediate gap:2651×0.103×0.8=218.4(g)
7th, after detecting, cement standard utility rate of water is 27.2%
8th, estimate the weight of compound:6500(G)
9th, calculate the quality of P.O42.5 normal silicate slow setting cement:6500×0.04=260(g)
10th, calculate the water consumption of cement:260 × 0.272=70.7(g)
11st, calculate the water absorption gathered materials:6500 × 0.625 ÷ 100=40.6(G)
12nd, calculate the total water consumption needed for compound:40.6+70.7+218.4=329.7(g)
13rd, calculate moisture content 329.7 ÷ needed for compound(6500-260-329.7)×100=5.6%
Estimated data is compared as follows with indoor heavy compaction method test data:
1st, laboratory test surveys the moisture content 5.4% of test specimen, and cement dose is 4.0%, and maximum dry density is 2.28g/cm3.
2nd, using the estimated data that the inventive method calculates to test specimen it is:The moisture content 5.6% of test specimen, cement dose is 4.0%, maximum dry density is 2.28g/cm3.
The every test specimen data estimated by two kinds of geo-compaction instrument forming methods in above-mentioned two embodiment with actual The scope that error compliant between indoor experimental data requires.From above design example it can be deduced that meter with the present invention It is feasible that calculation method estimates test specimen.

Claims (6)

1. the theoretical calculation method of cement stabilized macadam highway pavement compound moisture content, is in the test specimen that laboratory test is used Cement standard utility rate of water, the utility rate of water in aggregate water absorption and compound intermediate gap carry out Theoretical Calculation, and according to more than The water consumption that the result calculating is converted in cement water consumption in test specimen, water absorption of gathering materials and compound intermediate gap is determining reality The optimum moisture content of border compound, then the optimum moisture content of compound is converted into the optimum moisture content of compound.
2. the theoretical calculation method of cement stabilized macadam highway pavement compound moisture content as claimed in claim 1, its feature It is that the calculating of the utility rate of water in described compound intermediate gap includes:
In A, highway pavement cement stabilized macadam, the related initial data of constituent material measures;
B, determine the usage ratio gathered materials of each shelves that test specimen uses;
C, the usage ratio gathered materials according to shelves each in test specimen, calculate in test specimen the maximum relative theory density of compound and estimate The residual clearance rate of actual compound;
D, with compound saturation as foundation, calculate the utility rate of water in compound intermediate gap, the span of saturation value sets It is scheduled between 50%-70%.
3. the theoretical calculation method of cement stabilized macadam highway pavement compound moisture content as claimed in claim 2, its feature It is that the value of described saturation value is 60% or by laboratory test, saturation value is verified and adjust.
4. the theoretical calculation method of cement stabilized macadam highway pavement compound moisture content as claimed in claim 1 or 2, it is special Levying is, the optimum moisture content of compound is to calculate the standard water consumption of wherein cement, the suction gathered materials respectively according to the weight of test specimen Water consumption in the water yield and compound intermediate gap, is compound with the above-mentioned summation calculating divided by the weight gathered materials Optimum moisture content.
5. the theoretical calculation method of cement stabilized macadam highway pavement compound moisture content as claimed in claim 1, its feature It is that the data in utility rate of water in the standard utility rate of water of described cement, the water absorption rate gathering materials and compound intermediate gap is all changed For mass unit in grams, on the utility rate of water in cement standard utility rate of water, aggregate water absorption and compound intermediate gap is State the water consumption of each ingredient and the percentage ratio of the not compound gross mass of cement, the numerical value obtaining after calculating.
6. the theoretical calculation method of cement stabilized macadam highway pavement compound moisture content as claimed in claim 5, its feature Be, described gather materials in fine aggregate moisture content be that saturation, the micro- moistening shape in surface are in the clearance gap of surface of aggregate State is calculating benchmark, and the quality of the Free water moisture film that outer in clearance gap of gathering materials, surface of aggregate free-flowing water is formed is not made For calculating the content of the moisture content that gathers materials.
CN201610856002.XA 2016-09-27 2016-09-27 Theoretical calculation method for water content of mixed material of cement stabilized macadam road pavement Pending CN106447541A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610856002.XA CN106447541A (en) 2016-09-27 2016-09-27 Theoretical calculation method for water content of mixed material of cement stabilized macadam road pavement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610856002.XA CN106447541A (en) 2016-09-27 2016-09-27 Theoretical calculation method for water content of mixed material of cement stabilized macadam road pavement

Publications (1)

Publication Number Publication Date
CN106447541A true CN106447541A (en) 2017-02-22

Family

ID=58170502

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610856002.XA Pending CN106447541A (en) 2016-09-27 2016-09-27 Theoretical calculation method for water content of mixed material of cement stabilized macadam road pavement

Country Status (1)

Country Link
CN (1) CN106447541A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111831961A (en) * 2020-07-30 2020-10-27 山东大学 Cement dose estimation method and system for skeleton compact type cement stabilized macadam

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101653967A (en) * 2009-09-17 2010-02-24 长安大学 Crack resistance type cement stabilized macadam proportioning design method based on vibration test method

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101653967A (en) * 2009-09-17 2010-02-24 长安大学 Crack resistance type cement stabilized macadam proportioning design method based on vibration test method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
于新等: "考虑集料吸水率的水泥稳定碎石最大干密度及最佳含水量理论计算方法", 《公路交通科技》 *
张晓宇: "确定水泥稳定碎石最佳含水量和最大干密度的方法探讨", 《路基工程》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111831961A (en) * 2020-07-30 2020-10-27 山东大学 Cement dose estimation method and system for skeleton compact type cement stabilized macadam

Similar Documents

Publication Publication Date Title
CN104230223A (en) High-strength and vibration-free self-compacting concrete prepared from machine-made sand
CN106007579A (en) Concrete containing machine-processed gravel powder and dust collection stone powder and preparation method thereof
CN105040543B (en) A kind of asphalt void in mineral aggregate size sequence predictor method
CN109884285A (en) A kind of test method for Under Concrete isolation degree of vibrating
CN102241495A (en) Ultrafine mixed sand concrete by using additive
CN110041027A (en) A kind of clear-water concrete material and preparation method
CN110482988A (en) A kind of weak expansion slime analog material and preparation method thereof
CN106738205A (en) A kind of cement stabilizing crushing gravel mixing proportion design method based on vibration test
CN104961366A (en) Designing method for dense grading of asphalt mixture framework
CN113997408A (en) Preparation method of ultrahigh pumping machine-made sand high-strength concrete
CN109574602A (en) A kind of recycled fine aggregate gravity flowing levelling mortar and its preparation
JP5753242B2 (en) Soil wet density test method
CN109809739A (en) A kind of function regulator and preparation method thereof for the compound fine aggregate of concrete
CN106447541A (en) Theoretical calculation method for water content of mixed material of cement stabilized macadam road pavement
CN102040358B (en) Mortar detection method for concrete bleeding
CN104215573A (en) Method for measuring cohesiveness of cement-based building mortar
CN109265110A (en) A kind of highway engineering high-performance machine-made sand concrete preparation method
CN112710782B (en) Performance test evaluation method of concrete foam control agent
CN101717224B (en) Direct shearing test structural surface simulation rock and production process
CN102825648A (en) Preparation method of porous concrete for plant growth
CN1033246C (en) Method and equipment for quick test of concrete proportioning
CN106079071B (en) A kind of recycling and reusing method of remaining slurry in tubulose cement concrete product
CN106977166B (en) A kind of plasticizing gypsum and preparation method thereof
CN105152614B (en) A kind of superpower gypsum material porcelain skill stone and preparation method thereof
CN110423312A (en) A kind of low adsorption type high efficiency water reducing agent and preparation method thereof for the concrete containing porous aggregate

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170222