CN106447178A - Distribution network transformation and construction analyzing and planning system - Google Patents

Distribution network transformation and construction analyzing and planning system Download PDF

Info

Publication number
CN106447178A
CN106447178A CN201610820594.XA CN201610820594A CN106447178A CN 106447178 A CN106447178 A CN 106447178A CN 201610820594 A CN201610820594 A CN 201610820594A CN 106447178 A CN106447178 A CN 106447178A
Authority
CN
China
Prior art keywords
planning
distribution network
module
load
control subsystem
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610820594.XA
Other languages
Chinese (zh)
Inventor
冯磊
王文玺
李鹏飞
杨涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN TDQS ELECTRIC NEW TECHNOLOGY Co Ltd
Yunnan Power Grid Co Ltd
Original Assignee
TIANJIN TDQS ELECTRIC NEW TECHNOLOGY Co Ltd
Yunnan Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN TDQS ELECTRIC NEW TECHNOLOGY Co Ltd, Yunnan Power Grid Co Ltd filed Critical TIANJIN TDQS ELECTRIC NEW TECHNOLOGY Co Ltd
Priority to CN201610820594.XA priority Critical patent/CN106447178A/en
Publication of CN106447178A publication Critical patent/CN106447178A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06315Needs-based resource requirements planning or analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply

Abstract

The invention provides a distribution network transformation and construction analyzing and planning system, which comprises a stage control subsystem, a mode control subsystem, a method control subsystem and a technology control subsystem. The distribution network transformation and construction analyzing and planning system dynamically controls the stage of management planning through the stage control subsystem, controls the transformation and construction mode through the mode control subsystem controls the specific procedures of the planning through the method control subsystem, and select the appropriate technical model in the planning through the technology control subsystem to form a closed-loop whole-process planning management. By the distribution network transformation and construction analyzing and planning system, the planning of design of the distribution network is led and proceeded in order. Urban and rural overall development and supply are guaranteed. The system is unified in standard, safe, economic, intelligent, environment-friendly, upgraded, and innovative.

Description

Planning system is analyzed in a kind of distribution network transform construction
Technical field
The invention belongs to field of distribution network, especially relate to a kind of distribution network transform construction analysis planning system.
Background technology
Distribution network planning basic principle is, is the overall principle according to " three is unified, three coordinate, three meet ", high voltage distribution network The pattern powered according to burst, relatively independent under normal mode between each county, city, possess certain mutual support under accident conditions The prcgramming ideas of ability;Low and medium voltage distribution network, according to urban electricity supply unit and administrative village, analyzes the problem of power distribution network, pin from face Solution is proposed to problem, solution meets the prcgramming ideas of multinomial problem overall solution as far as possible.C class and region below Mainly solve rural area load development, low-voltage, for the purpose of potential safety hazard, according to pool electrical network capital construction and technological transformation, once with secondary Project, Yi Yi village one scheme, grassroot project should be employed new technology standard or specification, and existing equipment or project are meeting safe matter Amount and power supply capacity in the case of, can continuation use, it is to avoid tear open greatly build in large scale principle development planning.
Existing distribution network planning, there are the following problems:
1st, exist between planning and O&M and disconnect, planning personnel does not know about operation/maintenance data, operation maintenance personnel is not involved in planning and compiles System;
2nd, inadequate to the attention degree of distribution network planning;
3rd, the collection of electrical network present situation basic data is not comprehensive, inaccurate;
4th, planning personnel's level is uneven, lack training or planning personnel's rotation is frequent, incoming planning personnel couple Planning does not know about;
5th, level power supply unit in district thinks little of to planning;
6th, arrange power network construction project lack of targeted, lack project planning analysis method.
Therefore, need a kind of distribution network transform construction analysis planning system with typical module badly, improve distribution network planning The quality of work.
Content of the invention
In view of this, the present invention proposes a kind of distribution network transform construction analysis planning system, is carried out many using plateform system Dimensional analysis and planning, improve the quality of distribution network planning work.
For reaching above-mentioned purpose, the technical scheme of the invention is realized in:
Planning system is analyzed in a kind of distribution network transform construction, including:Stage control subsystem, Schema control subsystem, side Method control subsystem, technical controlling subsystem;
Described stage control subsystem is used for the reform strengthening to power distribution network for the Dynamic Programming stage by stage;
Described Schema control subsystem is used for controlling urban power distribution network, Rural Power Distribution Network and quickly sends out for load growth The transformation of town and country power distribution network of exhibition, construction mode;
Methods described control subsystem is used for using the basic data of electrical network as foundation, and the present situation carrying out distribution network system is divided Analysis, improve Electric Power Network Planning load prediction precision, improve user's access scheme be connected with power network planning scheme between linking;
Described technical controlling subsystem is used for proposing distribution network transform, building skill from rack adaptability, equipment application aspect Art pattern, and low-voltage process for comprehensively treating and Distribution Automation Technology are individually discussed;
The rank that planning system passes through the planning of stage control subsystem dynamic control and management is analyzed in described distribution network transform construction Section, is controlled to transformation, construction mode by Schema control subsystem, concrete by method control subsystem controlling planning Flow process, by the technology mode being suitable in technical controlling subsystem disjunctive programming, forms the overall process planning management of closed loop.
Further, described stage control subsystem includes grading planning module, corporate planning module, and otherness is advised Draw module, standardize planning module, Dynamic Programming stage by stage is carried out with grading planning module, in conjunction with corporate planning module, Otherness planning module, standardization planning module, carry out the property planned as a whole, otherness, standardization control to each stage.
Further, described Schema control subsystem includes urban power distribution network module, Rural Power Distribution Network module, town and country distribution Net module, is managed to the Planning Model of urban power distribution network, Rural Power Distribution Network, town and country power distribution network respectively.
Further, described urban power distribution network module includes gridding planning unit, Load Characteristic Analysis unit, to join Power grid be fundamental plan unit, with power grid for minimum access unit, with power supply reliability as target, with systematization load It is predicted as foundation, the city power distribution including rack, site, passage, communication, automation, protection and informationization is formed with this Net pattern.
Preferably, described gridding planning unit includes need for electricity prediction subelement, distribution stress and strain model subelement, net Lattice feature coding subelement, power distribution network bulk transmission grid plans subelement, and distribution grid plans subelement, and typical scenario storehouse is single Unit, in units of district, based on urban land_use plan, is divided into " distribution, function, electricity consumption " three-layer network lattice power distribution network, in net On the basis of lattice divide, planning forms power supply unit.
Preferably, described lotus specificity analysis unit includes region peak load prediction subelement and the prediction of distant view distributed load Subelement, peak load prediction subelement in described region is used for asking method to carry out region using the superposition of black peak peak load in vain Big load prediction.
Further, methods described control subsystem includes Base data platform module, As-Is analysis module, load prediction Module, User Access Module, with the data of Base data platform module as foundation, carry out present situation by As-Is analysis module and divide Analysis, carries out load prediction by load prediction module, improves user's access scheme by User Access Module.
Further, described technical controlling subsystem includes grid structure module, exemplary apparatus module, low-voltage Synthetic Reason module, distribution automation module, described grid structure module is used for controlling the technology mode of rack adaptability aspect, Dian Xingshe Standby module is used for the technology mode of Application of control device aspect, and low-voltage comprehensive regulation module is used for controlling the low-voltage comprehensive regulation Technology mode, distribution automation module is used for controlling Distribution Automation Technology pattern.
Further, described distribution network transform construction analysis planning system also includes Future Development Model subsystem, is used for Power distribution network, user are constantly accessed to the quality of power supply, power supply reliability according to automation, informationalized high speed development, distributed power source Property the lifting of requirement the Future Development Model of power distribution network is planned.
Further, described Future Development Model subsystem includes active distribution network planning module, intelligent distribution system Planning module.
With respect to prior art, distribution network transform construction analysis planning system of the present invention has the advantage that:
(1) planning leads, advance to perfect order.By first planning, rear build, conscientiously strengthen the scientific, authoritative of planning and Seriousness.Science formulates distant view power distribution network target, and distance combines, implements step by step.
(2) urban-rural, secures an adequate supply.Unified town and country distribution network construction, realizes integrative development.Adhere to construction and upgrading Develop simultaneously, lift power supply supportability and Electric Power Universal Service level.
(3) seek unity of standard, safety economy.Uniform technical standards, implement power supply reliability and assets life cycle management theory, Suit measures to local conditions to carry out modularized design and Standardization Construction.Build simple orderly, rational in infrastructure, safe and reliable, economical and efficient by force Distribution network.
(4) intelligent environment protection, upgrading innovation.Use of the new technology, new product, new technology, improve equipment, propulsion is intelligent Upgrading, adapts to Energy restructuring needs.Explore the depth integration of intelligent power distribution net and internet, make great efforts to create novel energy Produce, provide and deliver and Consumption System.
Brief description
The accompanying drawing constituting the part of the present invention is used for providing a further understanding of the present invention, the schematic reality of the present invention Apply example and its illustrate, for explaining the present invention, not constituting inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is the structural representation of the present invention.
Specific embodiment
It should be noted that in the case of not conflicting, the feature in embodiments of the invention and embodiment can be mutual Combination.
To describe the present invention below with reference to the accompanying drawings and in conjunction with the embodiments in detail.
As shown in figure 1, the present invention includes:Stage control subsystem, Schema control subsystem, method control subsystem, skill Art control subsystem;
Described stage control subsystem is used for the reform strengthening to power distribution network for the Dynamic Programming stage by stage;
Described Schema control subsystem is used for controlling urban power distribution network, Rural Power Distribution Network and quickly sends out for load growth The transformation of town and country power distribution network of exhibition, construction mode;
Methods described control subsystem is used for using the basic data of electrical network as foundation, and the present situation carrying out distribution network system is divided Analysis, improve Electric Power Network Planning load prediction precision, improve user's access scheme be connected with power network planning scheme between linking;
Described technical controlling subsystem is used for proposing distribution network transform, building skill from rack adaptability, equipment application aspect Art pattern, and low-voltage process for comprehensively treating and Distribution Automation Technology are individually discussed;
The rank that planning system passes through the planning of stage control subsystem dynamic control and management is analyzed in described distribution network transform construction Section, is controlled to transformation, construction mode by Schema control subsystem, concrete by method control subsystem controlling planning Flow process, by the technology mode being suitable in technical controlling subsystem disjunctive programming, forms the overall process planning management of closed loop.
Described stage control subsystem includes grading planning module, corporate planning module, otherness planning module, mark Standardization planning module, carries out Dynamic Programming stage by stage with grading planning module, in conjunction with corporate planning module, otherness planning Module, standardization planning module, carry out the property planned as a whole, otherness, standardization control to each stage.
Described Schema control subsystem includes urban power distribution network module, Rural Power Distribution Network module, town and country power distribution network module, divides The other Planning Model to urban power distribution network, Rural Power Distribution Network, town and country power distribution network is managed.
Wherein, described urban power distribution network module includes gridding planning unit, Load Characteristic Analysis unit, with distribution grid For fundamental plan unit, with power grid, for minimum access unit, with power supply reliability as target, with systematization load prediction it is Foundation, forms the urban power distribution network pattern including rack, site, passage, communication, automation, protection and informationization with this.
Wherein, described gridding planning unit includes need for electricity prediction subelement, distribution stress and strain model subelement, grid Feature coding subelement, power distribution network bulk transmission grid planning subelement, distribution grid planning subelement, typical scenario storehouse subelement, In units of district, based on urban land_use plan, power distribution network is divided into " distribution, function, electricity consumption " three-layer network lattice, draws in grid On the basis of point, planning forms power supply unit.
Wherein, described lotus specificity analysis unit includes region peak load prediction subelement and distant view distributed load prediction Unit, peak load prediction subelement in described region is used for asking method to carry out region maximum using the superposition of black peak peak load in vain Load prediction.
Methods described control subsystem includes Base data platform module, As-Is analysis module, load prediction module, user AM access module, with the data of Base data platform module as foundation, carries out As-Is analysis by As-Is analysis module, by load Prediction module carries out load prediction, improves user's access scheme by User Access Module.
Described technical controlling subsystem includes grid structure module, exemplary apparatus module, low-voltage comprehensive regulation module, joins Automation module, described grid structure module is used for controlling the technology mode of rack adaptability aspect, and exemplary apparatus module is used In the technology mode of Application of control device aspect, low-voltage comprehensive regulation module is used for controlling low-voltage process for comprehensively treating mould Formula, distribution automation module is used for controlling Distribution Automation Technology pattern.
Described distribution network transform construction analysis planning system also includes Future Development Model subsystem, described future development mould Subsystem includes active distribution network planning module, and intelligent distribution system planning module, for according to automation, informationalized height Speed development, distributed power source constantly access power distribution network, user to the quality of power supply, the requirement of power supply reliability lifting to power distribution network Future Development Model planned.
With the system apply Yunnan Province's power distribution network distribution network transform build case as specific embodiment, this is set forth below The physical planning of embodiment:
Distribution network construction is divided into three phases and joins by the historical development in conjunction with the power distribution network and future requirement to power distribution network Power network development present situation stage, active distribution network and intelligent distribution network.In the requirement to power distribution network for the different developing stage and research Hold all different, all kinds of power source plannings, Electric Power Network Planning etc. are included electric power development overall planning and plans as a whole research, solve power planning " fragmentation " problem;According to the regional administrative grade of south electric network five province (area), city importance, economic status and load density It is divided into level Four etc. condition, wherein city (containing county-level city) is divided into three-level, county is the fourth stage, power supply zone is divided into six classes, Referred to as " 4 grade of 6 class " service area's taxonomic hierarchies;According to regional economic development level, according to reliability requirement and the important journey of load Degree, is aided with load density, and power supply area is subdivided into A+, A, B, C, D, E six class, and corresponding construction criteria and development are formulated in classification Emphasis.A+, A class power supply area hoisting device level and power distribution automation level, meet international metropolis's high reliability electricity consumption Demand;B, C class power supply area improves distribution net work structure, and raising turns band and mutually supplies ability;The newly-increased transformer station of D, E class power supply area appropriateness Layout, solve the problems, such as county domain grid contact weakness, isolated power grid, meet basic electricity demand.
One:Urban distribution network planning model study
(1) distribution gridding planning and designing model (" 131 model ")
With county (area) as unit, based on urban land_use plan (" 1 "), power distribution network is divided into " distribution, function, electricity consumption " three Layer grid (" 3 "), on the basis of stress and strain model, planning forms power supply unit (" 1 "):
【Explanation】
Distribution grid:In grid structure, distribution grid is the relatively independent distribution subregion of a middle pressure network frame, is to make To carry out the elementary cell that power distribution network " special " is planned for isolated area.
Use power grid:In geographical distribution, it is that several are adjacent, power supply grade is identical or close, right with power grid Power supply reliability requires basically identical plot (or user) combination.Electricity consumption grid embodies final power consumer to power supply reliability Differentiation require, be can the independent setting object of planning (power supply reliability) minimum for () electric unit.
Function grid:Function grid be one between distribution grid and with power grid between intermediate mesh, be one auxiliary Distributed load prediction and grid structure allocation plan is helped to set up, have certain class common trait (or purposes), size appropriateness , geographical space is continuous, can give the power supply area appropriately named.Under normal circumstances, in function grid and urban planning Function division corresponds to.
Piece is got in touch between standing:According to power transformation station location and power load distributing, build for the object of planning by distant view " simply connected network between standing " Circuit contact layout between vertical transformer station and power supply area.
Power supply unit:Power supply unit is one and can independently undertake this region normal power supply task (not crossfeed, and having Have autonomous self-healing ability), (generally 1 group standard wiring, no more than 2 groups) power supply area of moderate scale, be one on ground The combination of upper several access units continuous of reason distribution.
(2) distribution gridding planning system design
According to definition, " distribution grid " is the relatively independent electric power distribution network system of middle pressure network frame it is intended to strengthening distribution " autonomous self-healing " ability in grid.After introducing " distribution grid " concept, power distribution network has just been simplified to one by several tools The simple network system being made up of " autonomous self-healing " ability, relatively independent " distribution grid ", distribution net work structure obtains comprehensively Simplify.Simultaneously as relative independentability, " distribution grid " is also one and can carry out " special " rule of power distribution network as isolated area The planning unit drawn, thus, the also planning for power distribution network (containing electrical network, communication, automation, informationization etc.), construction, scheduling, fortune Row brings brand-new idea of development.
According to existing power system management system, " send out, defeated, become, join, using " five links are divided into generatings, and (generating collects Group), defeated change (grid company), three levels of distribution (electric company), in terms of planning angle, respectively corresponding power planning, major network Planning, distribution planning three parts, wherein, distribution is planned after gridding, is decomposed into " power distribution network bulk transmission grid planning (high pressure Power distribution network and the middle pressure interconnection of power distribution network compartment) " and " distribution grid plans (low and medium voltage distribution network within distribution grid) " Two parts, thus, distribution network planning system (process and content) can be adjusted to:
1) need for electricity prediction (according to sectorization):With municipal development plan (total rule, regulatory control) as foundation, with function division For unit, to each function division need for electricity (land character, saturation loading density, year by year load growth rate, power supply reliability will Ask) it is predicted, as the Main Basiss of stress and strain model;
2) distribution stress and strain model:Plan that (power distribution), function are divided with power distribution network present situation (middle pressure network frame independence), major network Based on area's (need for electricity), by distribution grid and function mesh definition, in region-wide scope, consider as a whole, universal formulation Distribution grid and function grid, and Unified number is carried out to grid;
3) grid search-engine coding:With " distribution network planning designing technique directive/guide " as foundation, predicted (by work(according to need for electricity Can subregion), distribution and function grid division result, by power supply area classification, the attribute such as saturation loading density, load maturity, Each grid search-engine is encoded, forms the system file of region-wide distribution network planning, be " special " planning of distribution including work done in the manner of a certain author The distribution grid inventory of establishment, and define planned range and the planning depth of " planning of power distribution network bulk transmission grid ";
4) power distribution network bulk transmission grid planning:With the middle pressure interconnection of region-wide high voltage distribution network and power distribution network compartment with do not examine The low and medium voltage distribution network that the distribution grid that distribution " special " is planned is made in worry is planned range, and with safe operation of electric network, power supply can It is target by property etc., power distribution network bulk transmission grid rule based on power distribution, power balance, passage/institute's resource reservation of standing for the establishment Draw;
5) distribution grid planning:With distribution grid as elementary cell, by electricity consumption mesh definition division power grid;With electricity consumption Grid " differentiation " need for electricity is guiding, and with power supply reliability as target, establishment includes circuit contact, channel layout, communication Mode, Automated condtrol, relaying configuration are in interior complete mesolow power supply plan;
6) " gridding " typical scenario storehouse:Intend unified organizational system, become with territorial classification of powering, saturation loading density, load The grid search-engine such as ripe degree are applicability mark, modular, standardized typical design solution.
(3) Load Characteristic Analysis
Classified according to based model for load duration load nature of electricity consumed, electric load can be divided into:Continuous type of production (two, three class industrial lands), Commerce services type (containing lands used such as commercial facility, culture, physical culture, universities and colleges), public service-oriented (health care, transport hub Land used), residential (residential estate), routine work type (the other lands used outside above-mentioned 4 classes) 5 big class,
" residential " and " routine work type " plot electricity consumption have good electricity consumption and avoid the peak hour phenomenon.Meanwhile, from corresponding When load characteristic curve can be seen that " residential " peak, " routine work type " load only has the 40% of peak load;And " day During often work type " peak, " residential " load only has the 20% of peak load.
(4) region peak load Forecasting Methodology
According to load curve indicatrix, the load peak in a region must be occurred when day or night two is big One of section, therefore, the needs that calculated with peak load in conjunction with planning, when we can calculate daytime and two peaks of evening respectively The region peak load of section, and its maximum is taken as the planning calculating peak load value of one's respective area according to result.
" method is sought in black peak peak load superposition in vain " specific formula for calculation is as follows:
Pmax=MAX (P is white, and P is black)
Wherein:
P is white=∑ (the white i of Psumi*K) (i=1,5, i is " continuing load nature of electricity consumed type ")
P is black=∑ (the black i of Psumi*K) (i=1,5, i is " continuing load nature of electricity consumed type ")
Psumi=∑ (Pj) (j=0, n, j are the plot " continuing load nature of electricity consumed type " for i in region);
Pj=plot j distant view load value;
The white i of K:I continues load nature of electricity consumed type daytime period load correction factor;
The black i of K:I continues load nature of electricity consumed type load correction factor the period in the evening.
According to typical load indicatrix, each " black period corrected parameter in vain " continuing load nature of electricity consumed type is as following table institute State:
Table 1:Each " black period corrected parameter in vain " continuing load nature of electricity consumed type
Sequence number Continue load nature of electricity consumed K is white K is black
1 Continuous type of production 1 0.9
2 Commerce services type 0.8 1
3 Public service-oriented 1 0.6
4 Residential 0.2 1
5 Routine work type 1 0.4
(5) distant view distributed load Forecasting Methodology
Advised in detail according to land used (total advise), and choose the load density target of respective horizontal and simultaneity factor is calculated distant view and divides Cloth load prediction, collects the future load forecast result obtaining this region, large user in region is individually considered simultaneously.
The computing formula having the plot distant view load of planned land use is:
P=load density target * block area (without large user) * plot ratio * demand factor * simultaneity factor+∑ P large user I (i=0, n, i are intramassif large user's sequence number).
Two:Town and country (tourist district) distribution network planning pattern
Distribution network planning method emphasis based on tourist attraction, in 10kV and following power distribution network, adopts side from bottom to top Method, by analysis of problems in planning region low and medium voltage distribution network present situation, in conjunction with the need for electricity that planning year is actual, choosing The load forecasting method taking appropriate suitable middle low voltage network construction is calculated actual power load, it is then determined that mesolow Construction project, and ensure that project lands the raising of rate by many kinds of measures, and then improve the power quality of user.
Using point load prediction from bottom to top, in conjunction with the load character of Yunnan Province's tourist attraction, according to inn, food and drink And the finding of resident living load, in conjunction with the amount of platform area attaching load type, it is calculated present situation Nian Getai area not Actual need for electricity when being affected by the factor such as ration the power supply, recent platform area load prediction results are negative with newly-increased by existing load growth Lotus sum obtains, and platform area at a specified future date load prediction results are obtained by Spatial Load Forecasting result, the then confession according to 10kV circuit Electric scope, determines the 10kV circuit that Ge Tai area accesses, and then obtains load and the power load distributing situation of each time 10kV circuit, thus There is provided reference frame for the load supply situation of transformer station to a certain extent.
Concrete grammar is on the basis of present situation year peak load, is according to it is considered to former load to apply to install load present situation year Natural increase, apply to install load and be converted into the factors such as actual load, with applying to install load predication method to maximum load year by year in the recent period It is predicted.Applying to install load predication method specific formula for calculation is:
Public distribution transforming planning yearly maximum load=distribution transforming present situation year actual load × (1+ natural growth)+apply to install load × Demand factor × simultaneity factor;
For the special distribution transforming on 10kV circuit, because its in first stage of construction basic consideration the utilization rate of equipment, and special The development potentiality that user's later stage of distribution transforming increases load is not very big, therefore 60% its load of consideration according to its capacity of distribution transform.
Finally according to distribute-electricity transformer district load prediction results, carry out load according to the public and special distribution transforming situation of circuit attaching and divide Join, obtain the maximum load of refoulement 10kV circuit.
Spatial Load Forecasting method, for the region possessing regulatory plan, can adopt Spatial Load Forecasting side Method carries out corresponding to the carry calculation work in time.Provide each block load density and power load distributing situation, targetedly to not Carry out Electric Power Network Planning with subregion positioning.
Predict the outcome according to point load, platform area supply district and Administration partition situation, reasonably divide power supply unit;In conjunction with The public quantity becoming and existing capacity situation in power supply unit, according to load prediction results, after the power supply unit internal loading development asked Ensure that the capacity vacancy year by year of power supply unit Nei Tai area's economical operation;Feelings are distributed according to capacity vacancy situation year by year, platform area Condition, platform area are powered amount situation, platform area radius of electricity supply and platform area land used stressful situation, the increasing in reasonable arrangement power supply unit Nei Tai area Hold and newly-built.After the completion of platform area layouts, in conjunction with existing medium-voltage line distribution situation, medium-voltage line conductor cross-section and engineering construction bar Part, carries out plant-grid connection to newly-built area, analyzes whether its medium-voltage line meets later stage operation demand to increase-volume platform area, to can not The part meeting is transformed.Finally the result that above combing completes is carried out project to enumerate, be later stage electrical network warehouse-in and construction Carry out deposit work.
Public change and predicting the outcome of specially becoming in the first prediction according to point load, the power balance of medium-voltage line in analyzed area, Thus obtaining the vacancy situation of the capacity requirement of medium-voltage line;In conjunction with high voltage substation, program results, region internal loading are sent out year by year Exhibition focus, existing network situation and planning year power network development trend, the grid structure pattern in the year that sets objectives.According to target net Push back power grid construction situation year by year, situation is accessed year by year according to the construction situation of electrical network medium-voltage line, distribute-electricity transformer district year by year and carries out The verification of medium-voltage line power balance, meanwhile, according to medium-voltage line construction situation year by year, in conjunction with the distribution of platform area, rational division The supply district of circuit, and determine the contact point of circuit, and verify turning for electric energy under electrical network normal operation.Passing through After repeatedly verifying, a set of medium-voltage line construction project storehouse meeting Electric Power Network Planning year operation demand of combing.
3rd, Rural Power Distribution Network Planning Model
To at village level electric network data quantitative analysis, assess each village's distribution network reliability, quality of power supply, from planning, build If, the link such as management start with, quantitative analysis understands that specific power supply reliability is poor, " low-voltage " origin cause of formation, and therefrom finds key Factor, formulates transformation, construction scheme for each village's power distribution network powerup issue, is renovated, strengthen at village level electricity from root The scientific guidance that net is built, is estimated to the effect after electrical network project construction enforcement simultaneously.
One village one scheme planning methods are the angles from the overall situation such as transformer station, 10kV circuit, distribution transforming, low-voltage circuit, overall Consider a problem solution, single-point solve problem different from the past, can effectively avoid tearing open greatly build in large scale, repeated construction etc. is asked Topic, on the basis of solve problem, improves the economic benefit of electrical network.Concentrate and key village power distribution network is carried out with unified planning, applies Work and management, lifting Supply Security and the quality of power supply further.Improve the power infrastructures level of rural area, actively take It is engaged in new urbanization, agricultural modernization, provide powerful support for the industry developments such as rural tourism.
Wherein, by method control subsystem, the research of Yunnan distribution network transform, building method, finds out and deposits because of the present circumstance In problem, with problem for guiding, supplement and propose new transformation, building method typical module.
The integrality of Yunnan Province's basic data is inadequate, promptness is inadequate, bore is numerous, and authenticity not, therefore passes through base Plinth data platform module sets up global basis data, identification Statistical Criteria, trace back data source.
Identification Statistical Criteria includes:Standard year, political divisions, power supply zone, city rural power grids etc. are easy to electrical network statistical at different levels Analysis.
Trace back data source is mainly the responsibility which professional, each specialty explicit data derives from.
As-Is analysis module carries out As-Is analysis on the basis of data platform, and step includes:
(1) transforming plant main transformer load analysis;
(2) main transformer n-1 analysis;
(3) the uneven analysis of main transformer;
(4) transforming plant main transformer and outlet scale analysis;
(5) 10kV line load analysis;
(6) 10kV circuit can turn for analysis;
(7) 10kV circuit attaching capacity of distribution transform analysis;
(8) 10kV distribution transforming load analysis;
(9) platform area low-voltage analysis.
The step carrying out load prediction by load prediction module is as follows:
1st, the load prediction of big electric load user;
2nd, the load prediction of point load;
3rd, the customer charge prediction of component voltage grade;
4th, many scene prediction;
5th, the incoordination of overall control and urban planning;
6th, representative region load prediction.
User's access scheme is improved by User Access Module, step is as follows:
1st, step one:The load nature of electricity consumed analysis of distribution network users
Determine that distribution network users are commercial power, commercial power, or situations such as resident living power utility.
2nd, step 2:With planning be connected analysis
(1) according to the 10kV line powering scope under target net and target net, determine the access point of distribution network users (the 10kV circuit that can access) and its attaching capacity of distribution transform controlling value.
(2) according to present situation rack with regard to the 10kV line powering scope under present situation rack, determine the access point of distribution network users (the 10kV circuit that can access) and its distribution transforming attaching volume controlled value.
In conjunction with the 10kV circuit attaching capacity of distribution transform controlling value of various loads composition, various Connection Mode, following two table institutes Show.(JKLYJ-240 is chosen in overhead line conductor section, and YJV chosen by cable run conductor cross-section22-300)
The attaching capacity of distribution transform controlling value of the 10kV circuit of each Connection Mode under the single load of table 2
The attaching capacity of distribution transform controlling value of the 10kV circuit of each Connection Mode under 3 two kinds of loads of table
3rd, step 3:Judge that can distribution network users access
According to step 2 determine 10kV circuit attaching capacity of distribution transform controlling value, the attaching of 10kV circuit capacity of distribution transform Value and distribution network users access capacity, judge that can distribution network users access the access point of present situation.
If can not access, provide interim power supply plan, so as to target net transition;If it is desirable, then arranging Enter the planned project of Second Year.
4th, step 4:Power distribution network subscriber access mode selects
The point that can be accessed according to present situation, selects the pattern that distribution network users can access.
Main access module has:The reliability of the common access of distribution network users and distribution network users accesses.
5th, step 5:Determine the alternative access scheme of distribution network users
The access module that can be selected according to distribution network users, determines the alternative access scheme of distribution network users.
6th, step 6:Distribution network users access alternative comprehensive analysis
Distribution network users are accessed with alternative reliability, economy, terminal voltage level and line loss are analyzed.
7th, step 7:Distribution network users access alternative overall merit
Access the reliability of alternative, the analysis knot of economy, terminal voltage level and line loss according to distribution network users Really, overall merit is carried out to it.
8th, step 8:Distribution network users access scheme conclusion
According to the result of overall merit, provide the recommendation sequence of distribution network users access scheme.
In the technology mode planning management that technical controlling subsystem is carried out:
The atypia wiring issue existing for Yunnan power distribution network, grid structure module planning proposes the expansion of typical wiring Pattern, such as city net switchgear house are as follows:
(1) 10kV side is single mother partition wiring, each one distribution transforming of bus belt, and low pressure 0.4kV side is single mother partition wiring,
(2) 10kV side is single bus scheme, each one distribution transforming of bus belt, and low pressure 0.4kV side is single mother partition wiring,
(3) 10kV side is line change group wiring, one distribution transforming of band of each loop line road, and low pressure 0.4kV side is single mother partition wiring.
Seasonal strong, load peak-valley difference for rural area load is big, and exemplary apparatus module planning proposes:
1st, use loaded capacity-regulated transformer;
2nd, use high overload transformer.
With Yunnan Power Grid Company's distributed energy (distributed energy resource, DER) permeability by Step improves, and power distribution network is put forward higher requirement, Future Development Model subsystem is to active distribution network and intelligent distribution system Planned,
For the receiving of active distribution network, in the planning stage, planing method need to just consider that it is likely encountered when running various Uncertain operating mode.For example, when in the face of bi-directional current it could even be possible to consider by power distribution network from open loop radial to closed loop net Shape topological structure transition, and with the communication of rational expense integrated information and power electronics commutation technique, and be more than simply examining Consider and access new energy form and energy storage device.With the raising of DER permeability, ADN planning also needs to consider the association of all power supplys Adjust optimization problem, the such as coordination problem with major network power supply.
For intelligent distribution system, planning it is critical only that:
1st, new distribution equipment
(1) distributed power source, distributed energy storage and all kinds of controllable burden, is the capital equipment in intelligent distribution system;
(2) it is used for the servicing unit of optimal control intelligent distribution system, including sense measuring device, communicator, control Device and power electronic equipment etc..
2nd, planning and designing key technology
(1) due to the access of various novel device devices, the network structure of intelligent distribution system and the operation side of each several part Formula is flexible and changeable so as to planning and designing problem and operation problem have strong coupling it is necessary to taking into full account in planning and designing and being System operation reserve and the impact of operating mode;
(2) access of renewable distributed energy and Demand-side make systematic uncertainty significantly increase with the interaction of electrical network in a large number By force, bring new difficulty to Spatial Load Forecasting or even whole planning design work;
(3) in addition to traditional electricity optimization planning and network optimization planning, intelligent distribution system planning also needs to solve to include Distributed power source and energy storage are in the addressing constant volume problem of interior all kinds of distributed energies, and consider novel auxiliary device, intelligence simultaneously Energy power distribution automation and the planning problem of measurement information system;
(4) in addition to traditional security, reliability and economy objectives, intelligent distribution system also needs to consider to be lifted comprehensive simultaneously Close efficiency of energy utilization, maximize green energy resource utilization, minimize environmental pollution impact, maximize other planning such as social benefit Target.
3rd, optimize and run key technology
Many distributed power sources in intelligent distribution system and novel auxiliary device have very strong flexibility and controllability, More technological means can be provided for the running optimizatin of system.
4th, network analysis key technology
(1) intelligent distribution system is alternating current-direct current hybrid network, containing a large amount of novel devices based on power electronic equipment, same Shi Hanyou distributed power source, energy storage and controllable burden etc., need to propose new model and method;
(2) access of a large amount of distributed power sources and novel device device makes the scale of intelligent distribution system correlation analysis problem Greatly increase, simultaneously as the switching of network reconfiguration, distributed energy, the electric automobile reason such as mobile in a network, intelligence The change of distribution system topological structure and parameter is very frequently it is therefore desirable to develop more quick systematic analytic method with dynamic The state of analysis and evaluation intelligent distribution system;
(3) traditional Load flow calculation is decoupling between different time section, but the access due to energy storage device, intelligent power distribution In system there is certain coupled relation in the trend of different time section each other, therefore needs development time under some scenes Sequence trend is used for network analysis and assessment;
5th, user side demand response key technology;
6th, New technical use:
(1) big data technology;
(2) technology of Internet of things;
(3) information physical system technology.
The above, the planning platform invented by plate, analysis draw Yunnan distribution network transform, construction mode concrete Programme, carries out multi dimensional analysis and planning using plateform system, improves the quality of distribution network planning work.
The foregoing is only presently preferred embodiments of the present invention, not in order to limit the present invention, all essences in the present invention Within god and principle, any modification, equivalent substitution and improvement made etc., should be included within the scope of the present invention.

Claims (10)

1. a kind of distribution network transform construction analysis planning system is it is characterised in that include:Stage control subsystem, Schema control Subsystem, method control subsystem, technical controlling subsystem;
Described stage control subsystem is used for the reform strengthening to power distribution network for the Dynamic Programming stage by stage;
Described Schema control subsystem is used for controlling urban power distribution network, Rural Power Distribution Network and fast-developing for load growth The transformation of town and country power distribution network, construction mode;
Methods described control subsystem is used for using the basic data of electrical network as foundation, carries out the As-Is analysis of distribution network system, Improve Electric Power Network Planning load prediction precision, improve user's access scheme be connected with power network planning scheme between linking;
Described technical controlling subsystem is used for proposing distribution network transform, construction technique mould from rack adaptability, equipment application aspect Formula, and low-voltage process for comprehensively treating and Distribution Automation Technology are individually discussed;
The stage that planning system passes through the planning of stage control subsystem dynamic control and management is analyzed in described distribution network transform construction, leads to Cross Schema control subsystem transformation, construction mode are controlled, by the idiographic flow of method control subsystem controlling planning, By the technology mode being suitable in technical controlling subsystem disjunctive programming, form the overall process planning management of closed loop.
2. a kind of distribution network transform construction according to claim 1 analyzes planning system it is characterised in that the described stage is controlled Subsystem includes grading planning module, corporate planning module, otherness planning module, standardizes planning module, to divide Stage planning module carries out Dynamic Programming stage by stage, in conjunction with corporate planning module, otherness planning module, standardization planning mould Block, carries out the property planned as a whole, otherness, standardization control to each stage.
3. a kind of distribution network transform construction analysis planning system according to claim 1 is it is characterised in that described pattern control Subsystem includes urban power distribution network module, Rural Power Distribution Network module, and town and country power distribution network module, respectively to urban power distribution network, agriculture Village's power distribution network, the Planning Model of town and country power distribution network are managed.
4. a kind of distribution network transform construction analysis planning system according to claim 3 is it is characterised in that described city is joined Electrical network module includes gridding planning unit, Load Characteristic Analysis unit, with distribution grid for fundamental plan unit, with electrical network Lattice are minimum access unit, with power supply reliability as target, with systematization load prediction as foundation, with this formed including rack, Site, passage, communication, automation, protection and informationization are in interior urban power distribution network pattern.
5. a kind of distribution network transform construction analysis planning system according to claim 4 is it is characterised in that described gridding Planning unit includes need for electricity prediction subelement, distribution stress and strain model subelement, grid search-engine coded sub-units, power distribution network bone Dry space truss project subelement, distribution grid plans subelement, typical scenario storehouse subelement, in units of district, is used based on city Ground planning, is divided into " distribution, function, electricity consumption " three-layer network lattice power distribution network, and on the basis of stress and strain model, it is single that planning forms power supply Unit.
6. a kind of distribution network transform construction analysis planning system according to claim 4 is it is characterised in that described lotus characteristic Analytic unit includes region peak load prediction subelement and distant view distributed load prediction subelement, and described region peak load is pre- Survey subelement to be used for asking method to carry out region peak load prediction using the superposition of black peak peak load in vain.
7. a kind of distribution network transform construction analysis planning system according to claim 1 is it is characterised in that methods described control Subsystem includes Base data platform module, As-Is analysis module, load prediction module, User Access Module, with basic number Data according to console module is foundation, carries out As-Is analysis by As-Is analysis module, carries out load by load prediction module Prediction, improves user's access scheme by User Access Module.
8. a kind of distribution network transform construction analysis planning system according to claim 1 is it is characterised in that described technology control Subsystem includes grid structure module, exemplary apparatus module, low-voltage comprehensive regulation module, and distribution automation module is described Grid structure module is used for controlling the technology mode of rack adaptability aspect, and exemplary apparatus module is used for Application of control device aspect Technology mode, low-voltage comprehensive regulation module is used for controlling low-voltage process for comprehensively treating pattern, and distribution automation module is used In control Distribution Automation Technology pattern.
9. a kind of distribution network transform construction analysis planning system according to claim 1 is it is characterised in that described power distribution network Reform strengthening analysis planning system also include Future Development Model subsystem, for according to automation, informationalized high speed development, Distributed power source constantly accesses power distribution network, the future being lifted to power distribution network to the quality of power supply, the requirement of power supply reliability for the user Development model is planned.
10. a kind of distribution network transform construction analysis planning system according to claim 1 will be it is characterised in that described future Development model subsystem includes active distribution network planning module, intelligent distribution system planning module.
CN201610820594.XA 2016-09-13 2016-09-13 Distribution network transformation and construction analyzing and planning system Pending CN106447178A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610820594.XA CN106447178A (en) 2016-09-13 2016-09-13 Distribution network transformation and construction analyzing and planning system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610820594.XA CN106447178A (en) 2016-09-13 2016-09-13 Distribution network transformation and construction analyzing and planning system

Publications (1)

Publication Number Publication Date
CN106447178A true CN106447178A (en) 2017-02-22

Family

ID=58168851

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610820594.XA Pending CN106447178A (en) 2016-09-13 2016-09-13 Distribution network transformation and construction analyzing and planning system

Country Status (1)

Country Link
CN (1) CN106447178A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107145969A (en) * 2017-04-13 2017-09-08 天津天大求实电力新技术股份有限公司 A kind of development zone distribution network planning method and system
CN108280574A (en) * 2018-01-19 2018-07-13 国家电网公司 A kind of evaluation method and device of distribution net work structure maturity
CN109888789A (en) * 2019-03-08 2019-06-14 国网陕西省电力公司 A kind of high voltage substation power supply capacity calculation method
CN110571702A (en) * 2019-10-17 2019-12-13 国网山西省电力公司阳泉供电公司 Method for transforming power distribution network in rural alley
CN112417631A (en) * 2020-12-01 2021-02-26 中国能源建设集团浙江省电力设计院有限公司 Full-voltage-level power grid disaster prevention and resistance planning method
CN115392795A (en) * 2022-10-27 2022-11-25 国网浙江省电力有限公司宁波市北仑区供电公司 Transformation assessment method, system, equipment and medium for power distribution network

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103914741A (en) * 2014-04-04 2014-07-09 上海君世电气科技有限公司 Line loss intelligent evaluation and assistant decision-making system for power distribution network
CN105303259A (en) * 2015-11-06 2016-02-03 国网上海市电力公司 Gridding concept based power distribution network planning management method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103914741A (en) * 2014-04-04 2014-07-09 上海君世电气科技有限公司 Line loss intelligent evaluation and assistant decision-making system for power distribution network
CN105303259A (en) * 2015-11-06 2016-02-03 国网上海市电力公司 Gridding concept based power distribution network planning management method

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107145969A (en) * 2017-04-13 2017-09-08 天津天大求实电力新技术股份有限公司 A kind of development zone distribution network planning method and system
CN108280574A (en) * 2018-01-19 2018-07-13 国家电网公司 A kind of evaluation method and device of distribution net work structure maturity
CN108280574B (en) * 2018-01-19 2024-04-16 国家电网公司 Evaluation method and device for structural maturity of power distribution network
CN109888789A (en) * 2019-03-08 2019-06-14 国网陕西省电力公司 A kind of high voltage substation power supply capacity calculation method
CN109888789B (en) * 2019-03-08 2023-09-26 国网陕西省电力公司 Power supply capacity calculation method for high-voltage transformer substation
CN110571702A (en) * 2019-10-17 2019-12-13 国网山西省电力公司阳泉供电公司 Method for transforming power distribution network in rural alley
CN112417631A (en) * 2020-12-01 2021-02-26 中国能源建设集团浙江省电力设计院有限公司 Full-voltage-level power grid disaster prevention and resistance planning method
CN112417631B (en) * 2020-12-01 2024-03-29 中国能源建设集团浙江省电力设计院有限公司 Disaster prevention and resistance planning method for full-voltage-class power grid
CN115392795A (en) * 2022-10-27 2022-11-25 国网浙江省电力有限公司宁波市北仑区供电公司 Transformation assessment method, system, equipment and medium for power distribution network

Similar Documents

Publication Publication Date Title
CN106447178A (en) Distribution network transformation and construction analyzing and planning system
CN107038530A (en) A kind of power distribution network overall planning method and system
CN101930563B (en) Block supply-based distribution network planning design method
Esmaili et al. Multi-objective optimal charging of plug-in electric vehicles in unbalanced distribution networks
Singh et al. Distributed power generation planning for distribution networks using electric vehicles: Systematic attention to challenges and opportunities
CN104766140A (en) Layered and segmented modularized power grid scheduling method
CN102708425B (en) Based on electric automobile service network coordinated control system and the method for Multi-Agent system
Xiao et al. Hydrogen filling station design for fuel cell vehicles
CN108122068A (en) A kind of power distribution network risk-averse retailer method and system
CN106127377A (en) A kind of intelligent grid multiple-energy-source comprehensive coordination level evaluation method
CN107330564A (en) A kind of electric automobile Optimal Operation Model based on the double yardsticks of space-time
CN103761690A (en) Evaluation method based on voltage reactive power control system in grid system
CN104281892B (en) A kind of power distribution network capital equipment is newly-built with Re-construction planning cooperative optimization method
CN103903192B (en) A kind of method for building up in power distribution network powering mode storehouse
CN102063563A (en) Network-province-local integrative bus load predicting method
CN102522752A (en) Optimization method for electric distribution network contract structure for improving power supply capacity
CN111900753B (en) Emergency optimal regulation and control method for urban energy storage emergency vehicle
CN103093391A (en) City power distribution network arranging method
CN105069700A (en) Layered and partitioned power distribution network frame programming method
Sanchis et al. The Corridors of Power: A Pan-European\" Electricity Highway\" System for 2050
De Lima et al. A specialized long-term distribution system expansion planning method with the integration of distributed energy resources
CN111950106A (en) Power supply grid and unit optimization partitioning method based on global overall planning
CN110053508A (en) Energy internet cluster traffic control method and system based on car networking platform
CN109934481A (en) Project preference ordering method in a kind of planning of distribution net gridding
Zhang et al. Architecture design and demand analysis on application layer of standard system for ubiquitous power Internet of Things

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170222

RJ01 Rejection of invention patent application after publication