CN106443302A - Large-scale hydro-generator stator earth fault safe finding method - Google Patents

Large-scale hydro-generator stator earth fault safe finding method Download PDF

Info

Publication number
CN106443302A
CN106443302A CN201610940461.6A CN201610940461A CN106443302A CN 106443302 A CN106443302 A CN 106443302A CN 201610940461 A CN201610940461 A CN 201610940461A CN 106443302 A CN106443302 A CN 106443302A
Authority
CN
China
Prior art keywords
branch
earth fault
bar
current
open
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610940461.6A
Other languages
Chinese (zh)
Other versions
CN106443302B (en
Inventor
张强
邹科
王鹏宇
俸梅
李平
邓晓春
敖富荣
刘斌
黄天寿
郑立理
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Longtan Hydropower Development Co Ltd Longtan Hydropower Plant
Original Assignee
Longtan Hydropower Development Co Ltd Longtan Hydropower Plant
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Longtan Hydropower Development Co Ltd Longtan Hydropower Plant filed Critical Longtan Hydropower Development Co Ltd Longtan Hydropower Plant
Priority to CN201610940461.6A priority Critical patent/CN106443302B/en
Publication of CN106443302A publication Critical patent/CN106443302A/en
Application granted granted Critical
Publication of CN106443302B publication Critical patent/CN106443302B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/50Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/34Testing dynamo-electric machines
    • G01R31/346Testing of armature or field windings

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Control Of Eletrric Generators (AREA)
  • Protection Of Generators And Motors (AREA)

Abstract

The invention discloses a large-scale hydro-generator stator earth fault safe finding method. The method comprises connecting a DC power circuit, correcting connection direction of open-type CTs and ammeters, determining the ground fault phase according to insulation resistance, determining ground fault branches in sequence according to current direction, and determining a ground fault point. The method is simple and practical, and can find the generator stator earth fault point safely, accurately and quickly through a safe current smaller than 1 A; and in the whole fault finding process, the tail end of each branch winding bar does not needed to be sawed off, thereby reducing a lot of workload of sawing off and welding, and preventing risk caused by welding heat.

Description

A kind of safe lookup method of large-sized water turbine generator Stator ground fault
Technical field
The present invention relates to a kind of safe lookup method of large-sized water turbine generator Stator ground fault.
Background technology
In electric power enterprise production, generator stator ground is a typical fault of electromotor.
The big wiring complexity of large-sized water turbine generator stator volume(As certain 700MW electromotor machine stator diameter 16m, high 3.3m, Bar 1248, every 8 branch of phase), grain of rice size earth point will be accurately found, traditional method is the ground connection electricity for being applied more than 5A Stream, allows earth point to produce big smog to find earth point.
《Generator transformer relay protection application》Show etc. data, the safety that 1A electric current is grounded for Generator Stator Electric current, stator grounding electric current is more than the safety that may threaten generator iron-core after 1A.
Conventional electric generators stator grounding searches method 5A electric current, it is possible to scaling loss stator core.The country is connect due to searching stator Earth fault and scaling loss stator core event occasionally has generation, cause bigger loss.Particularly large-sized water turbine generator, repairs ferrum The direct and consequential damage of core and electric quantity loss can exceed that hundred million yuan.Therefore, large-sized water turbine generator Stator ground fault is searched must Must perfectly safe, be perfectly safe.
In addition, the lookup method having at present needs sawed-off each branch's tail end to reduce fault coverage, high-rating generator is typically every 8 branches of phase or so, after branch's tail end is sawed-off, welding job amount is big, time-consuming many again, while also having that welded when recovering acutely to send out Heat may destroy the risk of bar insulation.
Content of the invention
Present invention aims to problems of the prior art and defect, there is provided a kind of simple and practical, logical Cross the safe current less than 1A and just can safely, accurately and fast find the large-sized water turbine of generator stator ground trouble point and send out The safe lookup method of motor stator earth fault.
To achieve these goals, technical scheme below present invention employs:
A kind of safe lookup method of large-sized water turbine generator Stator ground fault, sets large-sized water turbine generator per 3 branches of phase, 10 bars of each branch, and number consecutively 1,2 ..., 9,10(Every general 8 or so, the phase branch of large-sized water turbine generator, Per branch's about 52 bars of bar, it is assumed herein that being for clear narration technical solution of the present invention, the restriction of protection domain is not done, In actual implementation process, can be numbered according to practical situation);Comprise the following steps:
(1)Prepare 50V DC source, 200 Ω current-limiting resistances, three 0.25A ammeters, a switch and two with Open C T that electromotor bar size matches(Current transformer);Described open C T is provided with 25 layers of iron core, secondary side coiling 15 circles;
(2)Untie generator outlet A, B, C three-phase head end to be flexible coupling, pull open neutral point isolating switch, untie electromotor A, B, C three-phase tail End is flexible coupling;Using each phase insulation resistance of 2500V megameter measurement electromotor, earth fault phase is determined;
(3)Connect DC power supply circuit in the head end of earth fault phase, specially:The positive terminal of 50V DC source is connect The head end of earth fault phase, the negative pole end of 50V DC source, switch, current-limiting resistance, the negative terminal of a 0.25A ammeter are gone here and there successively Connection;The positive ending grounding of 0.25A ammeter(Ground connection can be treated as being connected with fault ground herein);
(4)The secondary side line of two open C T is connected with two other 0.25A ammeter respectively, then the two is open CT is placed into the upper end of branch's Line 1 rod of earth fault phase, closes the switch of DC power supply circuit, observes the two Whether the pointer deflection of 0.25A ammeter is consistent, if inconsistent, by secondary side line and the 0.25A of one of open C T The wiring of ammeter is exchanged, and is partial to the pointer of the two 0.25A ammeters consistent, is then glued on the top of the two open C T Patch red-label;
(5)Using step(4)Open C T that adjusts mutually carries out detection and searches at earth fault, specially to earth fault:
First, the two open C T are individually positioned at Line 1 rod and No. 10 line rod of one of branch, observe and opening The pointer deflection of the 0.25A ammeter that CT is connected, determines earth fault branch;
Between the odd number bar of the non-faulting branch in earth fault phase, the sense of current is consistent, the sense of current one between even number bar Cause, the sense of current between odevity bar conversely, thus can determine that, when the sense of current of Line 1 rod and No. 10 line rod is contrary, should Ungrounded fault branch is branched into, conversely, this branches into earth fault branch;
Then, it is determined that after earth fault branch, one of open C T is placed in other bars, observation is with open C T-phase even The pointer deflection of the 0.25A ammeter for connecing, determines earth point according to following logic:
1. in earth fault branch, the odd number bar in branch and the inconsistent person of the Line 1 rod sense of current, then earth point is at this Before individual bar;Odd number bar in branch person identical with the Line 1 rod sense of current, then earth point is after this bar Face;
2. in earth fault branch, the even number bar in branch and the inconsistent person of the Line 1 rod sense of current, then earth point is at this After individual bar;Even number bar in branch person identical with the Line 1 rod sense of current, then earth point is before this bar Face;
3., in earth fault branch, certain bar upper end is with the bottom sense of current conversely, then bar ground connection;
4., in earth fault branch, while downwards, then their bottom is grounded certain 2 adjacent bar upper and lower end parts electric currents;
5., in earth fault branch, while upwards, then their upper end is grounded certain 2 adjacent bar upper and lower end parts electric currents.
Advantages of the present invention:
1. employing 50V DC source and detection electric current is provided, the electric current of stator bar is flowed through less than 1A, it is possible to safe, smart Really, generator stator ground trouble point is quickly found.
2. search in failure process whole, it is not necessary to sawed-off each branch's bar tail end, reduce sawed-off, welding extensive work Amount, can also avoid welding the risk that heating brings.
Description of the drawings
Fig. 1 is the structural representation of one embodiment of the invention split shed CT.
Fig. 2 is the circuit diagram being grounded in the middle part of bar in one embodiment of the invention.
Fig. 3 is the circuit diagram of bar bottom ground connection in one embodiment of the invention.
Fig. 4 is the circuit diagram of bar upper end ground connection in one embodiment of the invention.
In figure arrow is the sense of current.
Specific embodiment
The present invention is further described with reference to the accompanying drawings and examples.
Embodiment:
A kind of safe lookup method of large-sized water turbine generator Stator ground fault, as illustrated, set large-sized water turbine generator per 3 branches of phase, 10 bars of each branch, and number consecutively 1,2 ..., 9,10(Large-sized water turbine generator is per phase branch one As 8 or so, per branch about 52 bars of bar, it is assumed herein that being for clear narration technical solution of the present invention, do not protect The restriction of scope, in actual implementation process, can be numbered according to practical situation);Comprise the following steps:
(1)Prepare 50V DC source, 200 Ω current-limiting resistances, three 0.25A ammeters, a switch and two with Open C T that electromotor bar size matches(Current transformer);Described open C T is provided with 25 layers of iron core, secondary side coiling 15 circles;
(2)Untie generator outlet A, B, C three-phase head end to be flexible coupling, pull open neutral point isolating switch, untie electromotor A, B, C three-phase tail End is flexible coupling;Using each phase insulation resistance of 2500V megameter measurement electromotor, earth fault phase is determined;
(3)Connect DC power supply circuit in the head end of earth fault phase, specially(As shown in Figure 2, Figure 3, Figure 4):By 50V direct current The head end of the positive terminal connection earth fault phase of power supply, the negative pole end of 50V DC source, switch, current-limiting resistance, a 0.25A The negative terminal of ammeter is sequentially connected in series;The positive ending grounding of 0.25A ammeter(Ground connection can be treated as being connected with fault ground herein);
(4)The secondary side line of two open C T is connected with two other 0.25A ammeter respectively, then the two is open CT is placed into the upper end of branch's Line 1 rod of earth fault phase(At A in Fig. 2), the switch of DC power supply circuit is closed, Whether the pointer deflection for observing the two 0.25A ammeters is consistent, if inconsistent, by the secondary side of one of open C T Line is exchanged with the wiring of 0.25A ammeter, is partial to the pointer of the two 0.25A ammeters consistent, is then open at the two Red-label is pasted on the top of CT;
(5)Using step(4)Open C T that adjusts mutually carries out detection and searches at earth fault, specially to earth fault:
First, the two open C T are individually positioned at Line 1 rod and No. 10 line rod of one of branch, observe and opening The pointer deflection of the 0.25A ammeter that CT is connected, determines earth fault branch;
Between the odd number bar of the non-faulting branch in earth fault phase, the sense of current is consistent, the sense of current one between even number bar Cause, the sense of current between odevity bar conversely, thus can determine that, when the sense of current of Line 1 rod and No. 10 line rod is contrary, should Ungrounded fault branch is branched into, conversely, this branches into earth fault branch;
Then, it is determined that after earth fault branch, one of open C T is placed in other bars, observation is with open C T-phase even The pointer deflection of the 0.25A ammeter for connecing, determines earth point according to following logic:
1. in earth fault branch, the odd number bar in branch and the inconsistent person of the Line 1 rod sense of current, then earth point is at this Before individual bar;Odd number bar in branch person identical with the Line 1 rod sense of current, then earth point is after this bar Face;
2. in earth fault branch, the even number bar in branch and the inconsistent person of the Line 1 rod sense of current, then earth point is at this After individual bar;Even number bar in branch person identical with the Line 1 rod sense of current, then earth point is before this bar Face;
3., in earth fault branch, certain bar upper end is with the bottom sense of current conversely, then bar ground connection, such as Fig. 2 Shown;
4., in earth fault branch, while downwards, then their bottom is grounded certain 2 adjacent bar upper and lower end parts electric currents, As shown in Figure 3;
5., in earth fault branch, while upwards, then their upper end is grounded certain 2 adjacent bar upper and lower end parts electric currents, As shown in Figure 4.

Claims (1)

1. a kind of safe lookup method of large-sized water turbine generator Stator ground fault, sets large-sized water turbine generator per 3 points of phase , 10 bars of each branch, and number consecutively 1,2 ..., 9,10;Characterized in that, comprising the following steps:
(1)Prepare 50V DC source, 200 Ω current-limiting resistances, three 0.25A ammeters, a switch and two with Open C T that electromotor bar size matches;Described open C T is provided with 25 layers of iron core, 15 circle of secondary side coiling;
(2)Untie generator outlet A, B, C three-phase head end to be flexible coupling, pull open neutral point isolating switch, untie electromotor A, B, C three-phase tail End is flexible coupling;Using each phase insulation resistance of 2500V megameter measurement electromotor, earth fault phase is determined;
(3)Connect DC power supply circuit in the head end of earth fault phase, specially:The positive terminal of 50V DC source is connect The head end of earth fault phase, the negative pole end of 50V DC source, switch, current-limiting resistance, the negative terminal of a 0.25A ammeter are gone here and there successively Connection;The positive ending grounding of 0.25A ammeter;
(4)The secondary side line of two open C T is connected with two other 0.25A ammeter respectively, then the two is open CT is placed into the upper end of branch's Line 1 rod of earth fault phase, closes the switch of DC power supply circuit, observes the two Whether the pointer deflection of 0.25A ammeter is consistent, if inconsistent, by secondary side line and the 0.25A of one of open C T The wiring of ammeter is exchanged, and is partial to the pointer of the two 0.25A ammeters consistent, is then glued on the top of the two open C T Patch red-label;
(5)Using step(4)Open C T that adjusts mutually carries out detection and searches at earth fault, specially to earth fault:
First, the two open C T are individually positioned at Line 1 rod and No. 10 line rod of one of branch, observe and opening The pointer deflection of the 0.25A ammeter that CT is connected, determines earth fault branch;
Between the odd number bar of the non-faulting branch in earth fault phase, the sense of current is consistent, the sense of current one between even number bar Cause, the sense of current between odevity bar conversely, thus can determine that, when the sense of current of Line 1 rod and No. 10 line rod is contrary, should Ungrounded fault branch is branched into, conversely, this branches into earth fault branch;
Then, it is determined that after earth fault branch, one of open C T is placed in other bars, observation is with open C T-phase even The pointer deflection of the 0.25A ammeter for connecing, determines earth point according to following logic:
1. in earth fault branch, the odd number bar in branch and the inconsistent person of the Line 1 rod sense of current, then earth point is at this Before individual bar;Odd number bar in branch person identical with the Line 1 rod sense of current, then earth point is after this bar Face;
2. in earth fault branch, the even number bar in branch and the inconsistent person of the Line 1 rod sense of current, then earth point is at this After individual bar;Even number bar in branch person identical with the Line 1 rod sense of current, then earth point is before this bar Face;
3., in earth fault branch, certain bar upper end is with the bottom sense of current conversely, then bar ground connection;
4., in earth fault branch, while downwards, then their bottom is grounded certain 2 adjacent bar upper and lower end parts electric currents;
5., in earth fault branch, while upwards, then their upper end is grounded certain 2 adjacent bar upper and lower end parts electric currents.
CN201610940461.6A 2016-11-02 2016-11-02 A kind of safe lookup method of large-sized water turbine generator Stator ground fault Expired - Fee Related CN106443302B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610940461.6A CN106443302B (en) 2016-11-02 2016-11-02 A kind of safe lookup method of large-sized water turbine generator Stator ground fault

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610940461.6A CN106443302B (en) 2016-11-02 2016-11-02 A kind of safe lookup method of large-sized water turbine generator Stator ground fault

Publications (2)

Publication Number Publication Date
CN106443302A true CN106443302A (en) 2017-02-22
CN106443302B CN106443302B (en) 2019-09-06

Family

ID=58179143

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610940461.6A Expired - Fee Related CN106443302B (en) 2016-11-02 2016-11-02 A kind of safe lookup method of large-sized water turbine generator Stator ground fault

Country Status (1)

Country Link
CN (1) CN106443302B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110618343A (en) * 2019-09-30 2019-12-27 广西桂冠电力股份有限公司 Device and method for searching generator stator bar ground fault point
CN111650533A (en) * 2020-06-15 2020-09-11 国家电网有限公司 Searching method of rotor magnetic pole grounding point searching instrument

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7253634B1 (en) * 2006-03-31 2007-08-07 General Electric Company Generator protection methods and systems self-tuning to a plurality of characteristics of a machine
CN101295004A (en) * 2007-04-24 2008-10-29 许继集团有限公司 Method for judging single-phase grounding fault point position of generator stator winding
CN101719657A (en) * 2009-12-24 2010-06-02 中国电力科学研究院 System and method for simulating internal fault of electric generator
CN102508119A (en) * 2011-12-09 2012-06-20 江苏镇安电力设备有限公司 Method for positioning earth faults of parallel loop of IT (Isolation-Terre) power system
CN102692583A (en) * 2012-06-19 2012-09-26 国电大渡河检修安装有限公司 Finding method of multi-branch-circuit power generator stator winding grounded short circuit point
CN103529348A (en) * 2013-10-15 2014-01-22 林生得 Fault monitoring method for high-voltage cable
US9236726B2 (en) * 2012-08-21 2016-01-12 Alliant Energy Corporate Services, Inc. Methods for providing generator stator winding ground fault protection

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7253634B1 (en) * 2006-03-31 2007-08-07 General Electric Company Generator protection methods and systems self-tuning to a plurality of characteristics of a machine
CN101295004A (en) * 2007-04-24 2008-10-29 许继集团有限公司 Method for judging single-phase grounding fault point position of generator stator winding
CN101719657A (en) * 2009-12-24 2010-06-02 中国电力科学研究院 System and method for simulating internal fault of electric generator
CN102508119A (en) * 2011-12-09 2012-06-20 江苏镇安电力设备有限公司 Method for positioning earth faults of parallel loop of IT (Isolation-Terre) power system
CN102692583A (en) * 2012-06-19 2012-09-26 国电大渡河检修安装有限公司 Finding method of multi-branch-circuit power generator stator winding grounded short circuit point
US9236726B2 (en) * 2012-08-21 2016-01-12 Alliant Energy Corporate Services, Inc. Methods for providing generator stator winding ground fault protection
CN103529348A (en) * 2013-10-15 2014-01-22 林生得 Fault monitoring method for high-voltage cable

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李平: "水轮发电机定子一点接地故障查找", 《广西电力》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110618343A (en) * 2019-09-30 2019-12-27 广西桂冠电力股份有限公司 Device and method for searching generator stator bar ground fault point
CN111650533A (en) * 2020-06-15 2020-09-11 国家电网有限公司 Searching method of rotor magnetic pole grounding point searching instrument

Also Published As

Publication number Publication date
CN106443302B (en) 2019-09-06

Similar Documents

Publication Publication Date Title
Nandi et al. Novel frequency-domain-based technique to detect stator interturn faults in induction machines using stator-induced voltages after switch-off
CN101799518B (en) Online monitoring and grounding protection methods of insulation of generator stator core tightening screw rods
CN102692583B (en) Finding method of multi-branch-circuit power generator stator winding grounded short circuit point
CN108092312B (en) Temporary complete set of starting system under unfinished matched output engineering
CN114047411A (en) Method and device for detecting cross interconnection state of high-voltage power cable lines
CN102435970A (en) Test scheme for line selection function of small-current ground system single-phase ground fault line selection device
CN202916384U (en) Improved voltage transformer zero sequence circuit system capable of improving precision of line selection and fault positioning
Sahraoui et al. Modelling and detection of inter-turn short circuits in stator windings of induction motor
CN101551442B (en) A generator rotor insulation on-line monitoring grounding locating method and device
CN106443302A (en) Large-scale hydro-generator stator earth fault safe finding method
CN207650356U (en) Experiment power supply for large capacity mesolow dc circuit breaker short circuit switching test
CN104078936B (en) Injection type stator ground protection method adapting to pump storage group variable frequency starting
CN109239513A (en) A kind of phase-selecting method of generator stator winding single-phase earthing failure
CN107748311A (en) A kind of short-circuit ability to bear checking system of power transformer
CN106650075A (en) Method based on ferromagnetic resonance overvoltage mechanism for assessing the frangibility of distribution network
CN104267276B (en) Method high-tension motor longitudinal differential protection checked with low pressure locked rotor current
CN110618343B (en) Equipment and method for searching generator stator bar grounding fault point
US6577487B2 (en) Reduction of harmonics in AC machines
CN101692115A (en) Polarity tester for current transformer at transformer neutral point
CN202133724U (en) Error test device of zero sequence voltage transformers
Lv et al. A Diagnosis Method for Inter-turn Short-circuit Fault of A Nine-phase Permanent Magnet Synchronous Motor Based on Search Coil
CN109655677B (en) Multifunctional test device, test method and manufacturing method of current-limiting reactor
Priambodo et al. Root cause analysis of transformer and generator stator failure on hydropower plant in indonesia
CN206038722U (en) A experimental fastener for relay protection testing
CN117294086A (en) Hydraulic generator ground fault repairing method, system and computer equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190906