CN106436725B - With the construction method of the cutting stereoscopic protective structure of high polymer grouting reinforcement waterproof - Google Patents

With the construction method of the cutting stereoscopic protective structure of high polymer grouting reinforcement waterproof Download PDF

Info

Publication number
CN106436725B
CN106436725B CN201610995288.XA CN201610995288A CN106436725B CN 106436725 B CN106436725 B CN 106436725B CN 201610995288 A CN201610995288 A CN 201610995288A CN 106436725 B CN106436725 B CN 106436725B
Authority
CN
China
Prior art keywords
slip casting
slope
pipe
high polymer
side slope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610995288.XA
Other languages
Chinese (zh)
Other versions
CN106436725A (en
Inventor
刘凯
黄思路
卢林
王芳
张祥
李瑶
张明伟
谢泓州
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei Luyang Technology Innovation Group Co.,Ltd.
Original Assignee
Hefei University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei University of Technology filed Critical Hefei University of Technology
Priority to CN201610995288.XA priority Critical patent/CN106436725B/en
Publication of CN106436725A publication Critical patent/CN106436725A/en
Application granted granted Critical
Publication of CN106436725B publication Critical patent/CN106436725B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/06Methods or arrangements for protecting foundations from destructive influences of moisture, frost or vibration
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/003Injection of material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Architecture (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses a kind of construction method of the cutting stereoscopic protective structure with high polymer grouting reinforcement waterproof, it is characterized in that road surface safeguard structure is high polymer breakstone water-proof layer, splash guard, buffer transition layer and supercrust of the making on ground from bottom to top;Cutting slope defending structure is the laying geotextile tube net on cut slope;By Grouting Pipe, the slip casting into geotechnological pipe network forms slip casting geotechnique's pipe network to high polymer slurry, also by slurry pipe is crossed to slip casting in the post holes in cut slope is formed in, is formed along cut slope from slope foot up spaced multiple rows of reinforced column.The present invention can prevent underground water is counter to gush erosion pavement structure, and the reinforcing side slope soil body long-term effectively so that side slope is more stablized, and ensures the stabilization of side slope in work progress, guarantee is provided for the safety of construction personnel.

Description

With the construction method of the cutting stereoscopic protective structure of high polymer grouting reinforcement waterproof
Technical field
The present invention relates to field of road more particularly to a kind of cutting stereoscopic protectives with high polymer grouting reinforcement waterproof The construction method of structure.
Background technology
Pavement structure is directly exposed among air, undergos the influence of natural environment, the intensity and stabilization of pavement structure Property depend greatly on the humidity of local environment, excess surface water caused by rainfall and underground water intrusion can all make road surface Disease is generated, there are many factor for forming disease, and the effect of underground water is one of its principal element.The danger of underground water road pavement structure The main performance of evil:First, causing purt mud at the seam of cement concrete pavement and curb, traffic safety is influenced, it is strong to reduce road surface Degree;Second is that erosion of the underground water to bituminous paving so that pitch causes disease from stone surface peeling, influences the pavement usage longevity Life;Third, under Moving Loads caused purt mud and high pressure water wash away cause sub-surface bearing capacity decline.Therefore road surface The Lock gate of well-formed is not only pavement strength and the important guarantee of stability, and can be that prolonging service life of pavement is created Make advantage.
Road project is closely related with natural environment, and project scale is big, project is more, involves a wide range of knowledge, and native stone fills out digging A large amount of native stone bare side slopings that engineering is formed, destroy existing vegetation, are affected to local environment, previous generally use Simple engineering protection, it is a series of that these engineering measures result in original vegetation destruction, soil erosion, landslide, slope instability etc. Ecological environment and engineering problem.
In order to ensure the stabilized soil pavement of cut slope, protection is carried out for cut slope and reinforcing is necessary engineering Technical measures.As the raising of category of roads reduces highway distress to safeguard normal communications and transportation, it is ensured that traffic safety is protected It holds highway with natural environment to coordinate, the protection and reinforcing of cut slope are equally of great significance.
In the prior art, for the construction of cutting, there are following main problems:
1, cutting water burst is a kind of relatively common geological disease form of expression, and cutting water burst can corrode pavement structure, make Obtaining pavement strength reduces, and influences service life of road surface.The measure of existing waterproof is mainly laid with compound water-proof or composite earth The measures such as work film, hot asphalt or concrete.But these common methods can not have the function that long-term waterproof.Composite water-proof The seam of plate or composite geotextile often becomes penetrating passage;Meanwhile the quality control requirement of hot asphalt is very high, price is not It is luxuriant and rich with fragrance;Concrete is fragile material, slightly breathing, is easy for cracking, loses waterproof action.
2, the soil body mainly is fixed using exterior protection structure for the protection of High Cut Slope in the prior art, does not examine Consider side slope structure itself to be reinforced, this mode is difficult big high, and fastness and stability are unsatisfactory.
Invention content
The present invention is provided a kind of with high polymer grouting reinforcement waterproof to avoid above-mentioned deficiency of the prior art Cutting stereoscopic protective structure and construction method, on the one hand prevent because underground water is counter gush caused by road pavement structure etch, keep road The permanently effective waterproof effect in face;On the other hand reinforcement protection is carried out to cut slope using reinforcement measure, reinforces cut slope Stability and fastness, avoid slope instability slump.
The present invention is to solve technical problem to adopt the following technical scheme that:
The present invention is with the characteristics of construction method of the cutting stereoscopic protective structure of high polymer grouting reinforcement waterproof:Setting institute It includes road surface safeguard structure and cutting slope defending structure to state stereoscopic protective structure;
The road surface safeguard structure is high polymer breakstone water-proof layer of the making on ground, splash guard, buffering from bottom to top Transition zone and supercrust;The high polymer breakstone water-proof layer is by being arranged on splash guard, and the slip casting for penetrating through splash guard is logical Road injects the waterproof construction of polyurethane formation into metalling;
The cutting slope defending structure is the laying geotextile tube net on cut slope;Geotechnique's pipe network, is by pvc pipe The rectangular mesh being arranged in array constituted, the pvc pipe in rectangular mesh are interconnected;Be provided in the geotechnological pipe network to On the Grouting Pipe that protrudes out and exhaust pipe, and there is what is protruded out downwards to cross slurry pipe, high polymer slurry is by the Grouting Pipe to geotextile tube Slip casting forms slip casting geotechnique's pipe network in net, and the high polymer slurry starches pipe to the column being formed in cut slope also by described cross Slip casting in hole is formed along cut slope from slope foot up spaced multiple rows of reinforced column;
The construction method is to carry out as follows:
Step 1:Positioning drilling:After completing cutting excavation by design requirement, the setting position of reinforcing pile is pressed on cut slope Drilling is set, post holes, mark post holes position are formed;
Step 2:Implement side slope protection by following different form:
Form one:It is not more than 8 meters of side slope for height
(1.1), geotextile tube net is laid in side slope, one by one by the post holes crossed on slurry hole and corresponding position in geotechnological pipe network Docking fixes geotechnological pipe network using bail, the earthing of one layer of 16mm~20mm, and manual compaction is filled on the net in geotextile tube;
(1.2), slip casting is carried out by Grouting Pipe (17), slip casting process is carried out successively by sequence from bottom to top, is passed through Inlet pipe positioned at slip casting geotextile tube upper surface injects high polymer grouting material, completes side slope protection;
Form two:The side slope for being 8-20 meters for height
Broken-up laying geotechnique pipe network from bottom to top, every section of geotechnological pipe network is 4~5 meters along the upward length of side slope, for every One section of geotechnological pipe network is constructed by the same procedure of step (1.1)-step (1.2), completes each section of side slope protection;
Form three:It is more than 20 meters of side slope for height
Platform is set by 8 meters of vertical separation in side slope, forms Slope with multi-step;Be directed to from bottom to top every grade of side slope together with Platform in every grade of side slope is constructed by the same procedure of step (1.1)-step (1.2) step by step, completes Slope with multi-step protection;
Step 3, place is peaceful roll after the completion of, slip casting baffle is fixed on ground upper edge width of roadway direction, by noting The graded broken stone that filling-up thickness is 200mm in the space that slurry baffle surrounds, sets splash guard, on splash guard on graded broken stone upper berth Backfilling thickness is the earthing of 20mm~30mm and is compacted, as buffer transition layer, slip casting channel be kept to protrude from buffer transition layer simultaneously It is unimpeded, the confined space where graded broken stone is collectively formed with splash guard, slip casting baffle and both sides side slope;
High polymer slurries are carried out slip casting into the confined space where graded broken stone by step 4 by slip casting channel, once Injection forming removes slip casting baffle after high polymer slurries reach intensity;
Step 5 repeats step 3- steps 4, along the longitudinal construction paragraph by paragraph of road, until completing high polymer rubble in entire road The making of waterproof layer, splash guard and buffer transition layer;
Gutter is arranged in step 6, the surfacing layer on buffer transition layer, road surface drainage is realized using gutter, on cutting side Linked network alien earth sparging is arranged on slope to protect.
The present invention is lain also in the characteristics of construction method of the cutting stereoscopic protective structure of high polymer grouting reinforcement waterproof: In the step 4, it is by the dosage V of the high polymer slurries of position of volume
Wherein, a is the expansion multiplying power of high polymer slurries, and value is:10~25;B is excessive slip casting coefficient, and value is: 1.05~1.10;V1For the capacity of the confined space where graded broken stone, V2For the volume of graded broken stone,Wherein m is Graded broken stone quality, ρ are graded broken stone density;
The present invention is lain also in the characteristics of construction method of the cutting stereoscopic protective structure of high polymer grouting reinforcement waterproof:
Be arranged slip casting baffle be height be 260mm, the plank that thickness 30mm, length are 2-3m, along width of roadway side Upward slip casting baffle is subsection setup, is with notch and the mutually matched bell and spigot frame of socket between adjacent slip casting baffle; The top surface of slip casting baffle is equipped with top margin notch, and A-frame is arranged in side;
The thickness that splash guard is arranged is 10mm, is to match the socket joint knot mutually coordinated with notch and socket between adjacent splash guard The grafting width of structure, bell and spigot frame is 50mm, and the bottom of the splash guard is provided with fin, is in fin and the slip casting of both sides The top margin notch socket joint of baffle coordinates, and the fin in other positions is formed with high polymer breakstone water-proof layer and consolidated.
The present invention is lain also in the characteristics of construction method of the cutting stereoscopic protective structure of high polymer grouting reinforcement waterproof:
A diameter of 20~25 millimeters of the pvc pipe, increase, adjacent pvc pipe with the increase of the angle of cut slope Spacing be 400~500 millimeters, reduce with the increase of the angle of cut slope;
Cross slurry pipe a diameter of 14~18 millimeters, it is 50 millimeters to cross slurry hole and protrude from the length of pvc pipe bottom surface;
A diameter of 14~18 millimeters of the Grouting Pipe, the length that Grouting Pipe protrudes from pvc pipe top surface are 100 millimeters;
A diameter of 1~2 millimeter of the exhaust pipe, the length that exhaust pipe protrudes from pvc pipe top surface are 20 millimeters.
The top end of the reinforced column is on the site position of the rectangular mesh of geotechnological pipe network, and the length of reinforced column is 4000~5000 millimeters, reinforced column is vertical with the slope surface of side slope, a diameter of 16~20 millimeters of reinforced column.
Compared with the prior art, the present invention has the beneficial effect that:
1, the present invention effectively avoids underground water by the way that high polymer breakstone water-proof layer and splash guard is arranged in pavement structure bottom It is counter gush caused by road pavement erosion, good water-proof effect, waterproof effective time are long, can permanently effective barrier underground water to road Face is counter to gush.
2, the present invention carries out reinforcement protection, the note after the completion of constructing using slip casting geotechnique pipe network and reinforcing pile to cut slope Puddled soil work pipe network and reinforcing pile and cut slope form integral structure, avoid the stability failure and slide of cut slope, improve driving Safety.Compared to traditional slope protection structure, for the present invention in the work progress of reinforcing pile, high polymer slurries pass through the soil body Crack is penetrated into and strengthens slope soil so that side slope is more stablized.
3, the metalling filled in the present invention is in skeleton structure, has high intensity, is conducive to the stabilization of pavement structure, simultaneously Hole between rubble skeleton provides the channel of high polymer slurries diffusion.
4, the present invention can often complete one section of geotextile tube according to slope height in side slope by geotechnological pipe network broken-up laying Slip casting is carried out immediately after the laying of net, be ensure that the stability of side slope in work progress, is provided for the safety of construction personnel It ensures.
5, geotechnological pipe network is integrally formed in the present invention, and mortar depositing construction is quick, convenient.
Description of the drawings
Fig. 1 is cutting stereoscopic protective structural schematic diagram of the present invention;
Fig. 2 is the geotechnological pipe network structure schematic diagram of the present invention;
Fig. 3 is the online Grouting Pipe distribution schematic diagram of geotextile tube in the present invention;
Fig. 4 is that geotechnological pipe network reinforces association structure schematic diagram in the present invention;
Fig. 5 is slip casting baffle arrangement schematic diagram in the present invention;
Fig. 6 is another structural schematic diagram of slip casting baffle in the present invention;
Fig. 7 is the structural schematic diagram of the splash guard of the present invention
Figure label:1 high polymer breakstone water-proof layer, 2 splash guards, 3 buffer transition layers, 4 supercrusts, 5 cut slopes, 6 soil Work pipe network, 7 reinforced columns, 8 fins, 9 slip casting baffles, 10 top margin notches, 11 slip casting channels, 12 sockets, 13 notches, 14 triangle branch Frame, 15 be pvc pipe, and 16 cross slurry pipe, 17 Grouting Pipes, 18 exhaust pipes, 19 steel wires, 20 partition boards, 21 bails.
Specific implementation mode
Referring to Fig. 1, in the present embodiment with the cutting stereoscopic protective structure of high polymer grouting reinforcement waterproof include road surface protection Structure and cutting slope defending structure.
As shown in Figure 1, road surface safeguard structure is high polymer breakstone water-proof layer 1 of the making on ground, waterproof from bottom to top Plate 2, buffer transition layer 3 and supercrust 4;High polymer breakstone water-proof layer 1 is by being arranged on splash guard 2, and penetrating through splash guard 2 Slip casting channel 11 injected into metalling polyurethane formation waterproof construction.This structure type can effectively avoid underground water anti- The erosion of road pavement caused by gushing.
Shown in Fig. 1, cutting slope defending structure is that geotextile tube net 6 is laid on cut slope 5;Geotechnological pipe network 6, be by The rectangular mesh being arranged in array that pvc pipe 15 is constituted, the pvc pipe in rectangular mesh are interconnected;It is arranged in geotechnological pipe network Have the Grouting Pipe 17 protruded upward and exhaust pipe 18, and there is what is protruded out downwards to cross slurry pipe 16, high polymer slurry by Grouting Pipe 7 to Slip casting forms slip casting geotechnique's pipe network in geotechnological pipe network 6, and high polymer slurry starches pipe 6 to the column being formed in cut slope also by mistake Slip casting in hole forms along cut slope from slope foot up spaced multiple rows of reinforced column 7, makes slip casting geotechnique pipe network and reinforcing pile And cut slope forms integral structure, stable side slope.
As shown in Figure 2, Figure 3 and Figure 4, geotechnological pipe network 6 is the global formation pipe network using PVC as material, in geotechnological pipe network 6 Partition board 20 is distributed with, geotechnological pipe network 6 is divided into mutually independent each region using partition board 20, being included at least in each region has One Grouting Pipe 17, equally distributed multiple exhaust pipes 18, and cross slurry pipe 16 by the multiple of setting position distribution;In geotechnological pipe network It is provided with steel wire 19 in 6 rectangular mesh, is contacted using steel wire 19 as reinforcement in rectangular mesh;Cross slurry pipe 16 and slip casting Pipe 7 is arranged on the site position of the rectangular mesh of geotechnological pipe network 6.
In specific implementation, a diameter of 20~25 millimeters of pvc pipe 15, increase with the increase of the angle of cut slope, The spacing of adjacent pvc pipe 15 is 400~500 millimeters, is reduced with the increase of the angle of cut slope;Cross the diameter of slurry pipe 16 It it is 14~18 millimeters, it is 50 millimeters to cross slurry hole 16 and protrude from the length of pvc pipe bottom surface;A diameter of 14~18 milli of Grouting Pipe 17 Rice, the length that Grouting Pipe 17 protrudes from pvc pipe top surface are 100 millimeters;A diameter of 1~2 millimeter of exhaust pipe 18, exhaust pipe 18 is convex Length for pvc pipe top surface is 20 millimeters;The top end of reinforced column 7 is in the site position of the rectangular mesh of geotechnological pipe network 6 On, the length of reinforced column 7 is 4000~5000 millimeters, and reinforced column 7 is vertical with the slope surface of side slope, reinforced column 7 a diameter of 16~ 20 millimeters.
With the construction method of the cutting stereoscopic protective structure of high polymer grouting reinforcement waterproof it is by following step in the present embodiment It is rapid to carry out:
Step 1:Positioning drilling:After completing cutting excavation by design requirement, the setting of reinforcing pile 7 is pressed on cut slope 5 Position drills, and forms post holes, mark post holes position.
Step 2:Implement side slope protection by following different form.
Form one:It is not more than 8 meters of side slope for height
1.1, it is laid with geotextile tube net 6 in side slope, slurry hole 16 and the post holes one on corresponding position will be crossed in geotechnological pipe network 6 One docking, fixes geotechnological pipe network 6 using bail 21, the earthing of one layer of 16mm~20mm is filled on geotechnological pipe network 6, and manually press It is real.
1.2, slip casting is carried out by Grouting Pipe 17, slip casting process is carried out successively by sequence from bottom to top, by being located at The inlet pipe 17 of 15 upper surface of slip casting geotextile tube injects high polymer grouting material, completes side slope protection.
Form two:The side slope for being 8-20 meters for height
Broken-up laying geotechnique pipe network 6 from bottom to top, every section of geotechnological pipe network 6 are 4~5 meters along the upward length of side slope, for Each section of geotechnological pipe network 6 is constructed by the same procedure of step 1.1- steps 1.2, completes each section of side slope protection.
Form three:It is more than 20 meters of side slope for height
Platform is set by 8 meters of vertical separation in side slope, forms Slope with multi-step;Be directed to from bottom to top every grade of side slope together with Platform in every grade of side slope is constructed by the same procedure of step 1.1- steps 1.2 step by step, completes Slope with multi-step protection.
Step 3, place is peaceful roll after the completion of, slip casting baffle 9 is fixed on ground upper edge width of roadway direction, by noting The graded broken stone that filling-up thickness is 200mm in the space that slurry baffle 9 surrounds, sets splash guard 2, in splash guard on graded broken stone upper berth Backfilling thickness is the earthing of 20mm~30mm and is compacted, as buffer transition layer 3, keep slip casting channel 11 to protrude from buffered on 2 Layer 3 and unimpeded is crossed, the confined space where graded broken stone is collectively formed with splash guard 2, slip casting baffle 9 and both sides side slope.
High polymer slurries are carried out slip casting into the confined space where graded broken stone by step 4 by slip casting channel 11, and one Secondary injection forming removes slip casting baffle 9 after high polymer slurries reach intensity;Using volume as the dosage of the high polymer slurries of position V isWherein, a is the expansion multiplying power of high polymer slurries, and value is:10~25;B is excessive slip casting coefficient, is taken Value is:1.05~1.10;V1For the capacity of the confined space where graded broken stone, V2For the volume of graded broken stone,Its Middle m is graded broken stone quality, and ρ is graded broken stone density.
Step 5 repeats step 3- steps 4, along the longitudinal construction paragraph by paragraph of road, until completing high polymer rubble in entire road The making of waterproof layer 1, splash guard 2 and buffer transition layer 3.
Gutter is arranged in step 6, the surfacing layer 4 on buffer transition layer 3, road surface drainage is realized using gutter, in cutting Linked network alien earth sparging is arranged in side slope to protect.
It is highly 260mm, thickness 30mm, length that slip casting baffle 9 is arranged as shown in Fig. 5, Fig. 6 and Fig. 7, in the present embodiment to be Degree is the plank of 2-3m, is subsection setup in the slip casting baffle 9 on width of roadway direction, be between adjacent slip casting baffle 9 with 12 mutually matched bell and spigot frame of notch 13 and socket;It is equipped with top margin notch 10 in the top surface of slip casting baffle 9, triangle is arranged in side Holder 14;It is 20mm that splash guard 2, which uses polyvinyl chloride panel, the thickness of splash guard 2, be between adjacent splash guard 2 with notch and Socket matches the bell and spigot frame mutually coordinated, and the grafting width of bell and spigot frame is 50mm, and the bottom of splash guard 2 is provided with fin 8, is located Coordinate in the fin of both sides and 10 socket joint of top margin notch of slip casting baffle 9, the fin in other positions and high polymer breakstone water-proof Layer 1 forms consolidation.

Claims (4)

1. a kind of construction method of cutting stereoscopic protective structure with high polymer grouting reinforcement waterproof, it is characterized in that:Described in setting Stereoscopic protective structure includes road surface safeguard structure and cutting slope defending structure;
The road surface safeguard structure is high polymer breakstone water-proof layer (1) of the making on ground, splash guard (2), slow from bottom to top Rush transition zone (3) and supercrust (4);The high polymer breakstone water-proof layer (1) is noted into metalling by slip casting channel (11) Enter the waterproof construction of polyurethane formation, the slip casting channel (11) is arranged in splash guard (2), and penetrates through splash guard (2);
The cutting slope defending structure is that geotextile tube net (6) is laid on cut slope (5);It is described geotechnique pipe network (6) be by The rectangular mesh being arranged in array that pvc pipe (15) is constituted, the pvc pipe (15) in rectangular mesh are interconnected;In the geotechnique It is provided with the Grouting Pipe (17) protruded upward and exhaust pipe (18) in pipe network, and has what is protruded out downwards to cross slurry pipe (16), high polymer By the Grouting Pipe (17), the slip casting into geotechnological pipe network (6) forms slip casting geotechnique's pipe network to slurry, and the high polymer slurry also leads to It crosses the slurry of crossing and manages (16) slip casting into the post holes being formed in cut slope, formation, which is up spaced along cut slope from slope foot, to be set The multiple rows of reinforced column (7) set;
The construction method is to carry out as follows:
Step 1:Positioning drilling:After completing cutting excavation by design requirement, the setting of reinforcing pile (7) is pressed on cut slope (5) Position drills, and forms post holes, mark post holes position;
Step 2:Implement side slope protection by following different form:
Form one:It is not more than 8 meters of side slope for height
(1.1), it is laid with geotextile tube net (6) in side slope, slurry pipe (16) and the column on corresponding position will be crossed in geotechnological pipe network (6) Hole is docked one by one, and using the fixed geotechnological pipe network (6) of bail (21), covering for one layer of 16mm~20mm is filled on geotechnological pipe network (6) Soil, and manual compaction;
(1.2), slip casting is carried out by Grouting Pipe (17), slip casting process is carried out successively by sequence from bottom to top, by being located at The Grouting Pipe (17) of pvc pipe (15) upper surface injects high polymer grouting material, completes side slope protection;
Form two:The side slope for being 8-20 meters for height
Broken-up laying geotechnique pipe network (6) from bottom to top, every section of geotechnological pipe network (6) they are 4~5 meters along the upward length of side slope, for Each section of geotechnological pipe network (6) is constructed by the same procedure of step (1.1)-step (1.2), completes each section of side slope protection;
Form three:It is more than 20 meters of side slope for height
Platform is set by 8 meters of vertical separation in side slope, forms Slope with multi-step;It is directed to every grade of side slope from bottom to top together with every grade Platform in side slope is constructed by the same procedure of step (1.1)-step (1.2) step by step, completes Slope with multi-step protection;
Step 3, place is peaceful roll after the completion of, slip casting baffle (9) is fixed on ground upper edge width of roadway direction, by slip casting Filling-up thickness is the graded broken stone of 200mm in the space that baffle (9) surrounds, and splash guard (2) is set on graded broken stone upper berth, in waterproof Backfilling thickness is the earthing of 20mm~30mm and is compacted, as buffer transition layer (3), keep slip casting channel (11) protrusion on plate (2) In buffer transition layer (3) and unimpeded, where collectively forming graded broken stone with splash guard (2), slip casting baffle (9) and both sides side slope Confined space;
High polymer slurries are carried out slip casting into the confined space where graded broken stone by step 4 by slip casting channel (11), once Injection forming removes slip casting baffle (9) after high polymer slurries reach intensity;
Step 5 repeats step 3- steps 4, along the longitudinal construction paragraph by paragraph of road, until completing high polymer breakstone water-proof in entire road The making of layer (1), splash guard (2) and buffer transition layer (3);
Gutter is arranged in step 6, the surfacing layer (4) on buffer transition layer (3), road surface drainage is realized using gutter, in cutting Linked network alien earth sparging is arranged in side slope to protect.
2. the construction method of the cutting stereoscopic protective structure according to claim 1 with high polymer grouting reinforcement waterproof, It is characterized in:In the step 4, the dosage volume V of the high polymer slurries is:
Wherein, a is the expansion multiplying power of high polymer slurries, and value is:10~25;B is excessive slip casting coefficient, and value is:1.05~ 1.10;V1For the capacity of the confined space where graded broken stone, V2For the volume of graded broken stone,Wherein m is that grading is broken Stone quality, ρ are graded broken stone density.
3. the construction method of the cutting stereoscopic protective structure according to claim 1 with high polymer grouting reinforcement waterproof, It is characterized in:
Be arranged slip casting baffle (9) be height be 260mm, the plank that thickness 30mm, length are 2-3m, along width of roadway direction On slip casting baffle (9) be subsection setup, be mutually matched with notch (13) and socket (12) between adjacent slip casting baffle (9) Bell and spigot frame;It is equipped with top margin notch (10) in the top surface of slip casting baffle (9), A-frame (14) is arranged in side;
The thickness that splash guard (2) is arranged is 10mm, is to match the socket joint mutually coordinated with notch and socket between adjacent splash guard (2) The grafting width of structure, bell and spigot frame is 50mm, and the bottom of the splash guard (2) is provided with fin (8), is in the convex of both sides Top margin notch (10) socket joint of rib and slip casting baffle (9) coordinates, the fin in other positions and high polymer breakstone water-proof layer (1) shape At consolidation.
4. the construction method of the cutting stereoscopic protective structure according to claim 1 with high polymer grouting reinforcement waterproof, It is characterized in:
A diameter of 20~25 millimeters of the pvc pipe (15), increase, adjacent pvc pipe with the increase of the angle of cut slope (15) spacing is 400~500 millimeters, is reduced with the increase of the angle of cut slope;
Cross slurry pipe (16) a diameter of 14~18 millimeters, it is 50 millimeters to cross slurry pipe (16) and protrude from the length of pvc pipe bottom surface;
A diameter of 14~18 millimeters of the Grouting Pipe (17), the length that Grouting Pipe (17) protrudes from pvc pipe top surface are 100 millis Rice;
A diameter of 1~2 millimeter of the exhaust pipe (18), the length that exhaust pipe (18) protrudes from pvc pipe top surface are 20 millimeters;
On the site position for the rectangular mesh that the top end of the reinforced column (7) is in geotechnological pipe network (6), the length of reinforced column (7) Degree is 4000~5000 millimeters, and reinforced column (7) is vertical with the slope surface of side slope, a diameter of 16~20 millimeters of reinforced column (7).
CN201610995288.XA 2016-11-11 2016-11-11 With the construction method of the cutting stereoscopic protective structure of high polymer grouting reinforcement waterproof Active CN106436725B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610995288.XA CN106436725B (en) 2016-11-11 2016-11-11 With the construction method of the cutting stereoscopic protective structure of high polymer grouting reinforcement waterproof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610995288.XA CN106436725B (en) 2016-11-11 2016-11-11 With the construction method of the cutting stereoscopic protective structure of high polymer grouting reinforcement waterproof

Publications (2)

Publication Number Publication Date
CN106436725A CN106436725A (en) 2017-02-22
CN106436725B true CN106436725B (en) 2018-08-03

Family

ID=58208344

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610995288.XA Active CN106436725B (en) 2016-11-11 2016-11-11 With the construction method of the cutting stereoscopic protective structure of high polymer grouting reinforcement waterproof

Country Status (1)

Country Link
CN (1) CN106436725B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114855831B (en) * 2022-04-26 2023-04-07 南京工业大学 Equipment for laying plastic geotextile and construction method thereof
CN115217126B (en) * 2022-07-22 2023-05-02 中铁四局集团第五工程有限公司 Road slope construction reinforcing equipment and use method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100340723C (en) * 2005-05-23 2007-10-03 邓敬森 Method for slope reinforcement
KR101136837B1 (en) * 2009-08-05 2012-04-19 미래이엔씨주식회사 Polycarbonate form for lining anti-corroding moltal on marine steel pile
CN202658537U (en) * 2012-03-07 2013-01-09 中铁第四勘察设计院集团有限公司 Drainage prevention system for railroad bed in groundwater development slope district
CN205276243U (en) * 2015-12-18 2016-06-01 南昌天高环保科技股份有限公司 Stretch -proofing geogrid
CN105735075B (en) * 2016-02-02 2017-11-17 浙江大学 The temporary construction subgrade electric osmose solidification processing method of hydraulic reclamation soil site

Also Published As

Publication number Publication date
CN106436725A (en) 2017-02-22

Similar Documents

Publication Publication Date Title
CN106013191B (en) Environment-friendly type grass planting Concrete Highway protective slope structure and construction method
CN103883328B (en) The dark construction method of half lid half of high steep V-type coombe biased segment is worn under separate tunnel
CN109403332B (en) Method for combined excavation of layered bench sections of deep foundation pit of sandy cobble thick covering layer wide shallow valley
CN106436725B (en) With the construction method of the cutting stereoscopic protective structure of high polymer grouting reinforcement waterproof
CN106400643B (en) With the cutting stereoscopic protective structure of high polymer grouting reinforcement waterproof
CN101768960B (en) Bored concrete pile construction method of permafrost layer
CN116537221A (en) Highway tunnel portal section collapse sliding body slope protection reinforcing structure and construction method
CN111441789A (en) High-steep-terrain bridge-tunnel connection foam concrete filling-first and digging-second transition structure and construction method
CN110777817A (en) Side slope protection structure of underground water development section
CN216920384U (en) Highway tunnel entrance to a cave section landslide body side slope protection additional strengthening that collapses
CN206873466U (en) One kind is used for footrill flume section safeguard structure
CN109811612A (en) Coombe processing is faced forever in conjunction with sidewalk structure and its construction method
CN211571744U (en) Underground water development section side slope protective structure
CN109235468A (en) A kind of slope protection structure for In A Crushed Rock cut slope
CN212130501U (en) Foam concrete transition structure is filled earlier and then excavated in high and steep topography bridge tunnel connection
CN106917388A (en) The check dam and construction method of a kind of use Fill Reinforced With Geogrids modified cement soil clad
CN112878403A (en) Pipeline laying method
CN207295348U (en) Railway karst ground treatment anti-pollution structure near a kind of I grade of potable water source district
CN112523272A (en) Anti-floating blind ditch for strongly weathered rock stratum and construction method thereof
CN109736175A (en) A kind of factories and miness rock salt road and its construction method
CN207958883U (en) A kind of Cold And Frozen-soil Regions roadbed anti-sedimentation structure
Coats et al. The Kielder Headworks.
Forbes Landslide investigation and correction
Prisk et al. Delivering Wadi Dayqah, Oman's tallest dam
CN214657200U (en) Protective system for abandoned soil field of river beach in steep mountain area

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220113

Address after: 230001 floor 6, block B, blue diamond Shangjie, No. 335, Suixi Road, Bozhou road street, Luyang District, Hefei City, Anhui Province

Patentee after: Hefei Luyang Technology Innovation Group Co.,Ltd.

Address before: Tunxi road in Baohe District of Hefei city of Anhui Province, No. 193 230009

Patentee before: Hefei University of Technology