CN106436725B - With the construction method of the cutting stereoscopic protective structure of high polymer grouting reinforcement waterproof - Google Patents
With the construction method of the cutting stereoscopic protective structure of high polymer grouting reinforcement waterproof Download PDFInfo
- Publication number
- CN106436725B CN106436725B CN201610995288.XA CN201610995288A CN106436725B CN 106436725 B CN106436725 B CN 106436725B CN 201610995288 A CN201610995288 A CN 201610995288A CN 106436725 B CN106436725 B CN 106436725B
- Authority
- CN
- China
- Prior art keywords
- slip casting
- slope
- pipe
- high polymer
- side slope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/20—Securing of slopes or inclines
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C3/00—Foundations for pavings
- E01C3/06—Methods or arrangements for protecting foundations from destructive influences of moisture, frost or vibration
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
- E02D15/02—Handling of bulk concrete specially for foundation or hydraulic engineering purposes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/003—Injection of material
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0004—Synthetics
- E02D2300/0018—Cement used as binder
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/60—Planning or developing urban green infrastructure
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Architecture (AREA)
- Road Paving Structures (AREA)
Abstract
The invention discloses a kind of construction method of the cutting stereoscopic protective structure with high polymer grouting reinforcement waterproof, it is characterized in that road surface safeguard structure is high polymer breakstone water-proof layer, splash guard, buffer transition layer and supercrust of the making on ground from bottom to top;Cutting slope defending structure is the laying geotextile tube net on cut slope;By Grouting Pipe, the slip casting into geotechnological pipe network forms slip casting geotechnique's pipe network to high polymer slurry, also by slurry pipe is crossed to slip casting in the post holes in cut slope is formed in, is formed along cut slope from slope foot up spaced multiple rows of reinforced column.The present invention can prevent underground water is counter to gush erosion pavement structure, and the reinforcing side slope soil body long-term effectively so that side slope is more stablized, and ensures the stabilization of side slope in work progress, guarantee is provided for the safety of construction personnel.
Description
Technical field
The present invention relates to field of road more particularly to a kind of cutting stereoscopic protectives with high polymer grouting reinforcement waterproof
The construction method of structure.
Background technology
Pavement structure is directly exposed among air, undergos the influence of natural environment, the intensity and stabilization of pavement structure
Property depend greatly on the humidity of local environment, excess surface water caused by rainfall and underground water intrusion can all make road surface
Disease is generated, there are many factor for forming disease, and the effect of underground water is one of its principal element.The danger of underground water road pavement structure
The main performance of evil:First, causing purt mud at the seam of cement concrete pavement and curb, traffic safety is influenced, it is strong to reduce road surface
Degree;Second is that erosion of the underground water to bituminous paving so that pitch causes disease from stone surface peeling, influences the pavement usage longevity
Life;Third, under Moving Loads caused purt mud and high pressure water wash away cause sub-surface bearing capacity decline.Therefore road surface
The Lock gate of well-formed is not only pavement strength and the important guarantee of stability, and can be that prolonging service life of pavement is created
Make advantage.
Road project is closely related with natural environment, and project scale is big, project is more, involves a wide range of knowledge, and native stone fills out digging
A large amount of native stone bare side slopings that engineering is formed, destroy existing vegetation, are affected to local environment, previous generally use
Simple engineering protection, it is a series of that these engineering measures result in original vegetation destruction, soil erosion, landslide, slope instability etc.
Ecological environment and engineering problem.
In order to ensure the stabilized soil pavement of cut slope, protection is carried out for cut slope and reinforcing is necessary engineering
Technical measures.As the raising of category of roads reduces highway distress to safeguard normal communications and transportation, it is ensured that traffic safety is protected
It holds highway with natural environment to coordinate, the protection and reinforcing of cut slope are equally of great significance.
In the prior art, for the construction of cutting, there are following main problems:
1, cutting water burst is a kind of relatively common geological disease form of expression, and cutting water burst can corrode pavement structure, make
Obtaining pavement strength reduces, and influences service life of road surface.The measure of existing waterproof is mainly laid with compound water-proof or composite earth
The measures such as work film, hot asphalt or concrete.But these common methods can not have the function that long-term waterproof.Composite water-proof
The seam of plate or composite geotextile often becomes penetrating passage;Meanwhile the quality control requirement of hot asphalt is very high, price is not
It is luxuriant and rich with fragrance;Concrete is fragile material, slightly breathing, is easy for cracking, loses waterproof action.
2, the soil body mainly is fixed using exterior protection structure for the protection of High Cut Slope in the prior art, does not examine
Consider side slope structure itself to be reinforced, this mode is difficult big high, and fastness and stability are unsatisfactory.
Invention content
The present invention is provided a kind of with high polymer grouting reinforcement waterproof to avoid above-mentioned deficiency of the prior art
Cutting stereoscopic protective structure and construction method, on the one hand prevent because underground water is counter gush caused by road pavement structure etch, keep road
The permanently effective waterproof effect in face;On the other hand reinforcement protection is carried out to cut slope using reinforcement measure, reinforces cut slope
Stability and fastness, avoid slope instability slump.
The present invention is to solve technical problem to adopt the following technical scheme that:
The present invention is with the characteristics of construction method of the cutting stereoscopic protective structure of high polymer grouting reinforcement waterproof:Setting institute
It includes road surface safeguard structure and cutting slope defending structure to state stereoscopic protective structure;
The road surface safeguard structure is high polymer breakstone water-proof layer of the making on ground, splash guard, buffering from bottom to top
Transition zone and supercrust;The high polymer breakstone water-proof layer is by being arranged on splash guard, and the slip casting for penetrating through splash guard is logical
Road injects the waterproof construction of polyurethane formation into metalling;
The cutting slope defending structure is the laying geotextile tube net on cut slope;Geotechnique's pipe network, is by pvc pipe
The rectangular mesh being arranged in array constituted, the pvc pipe in rectangular mesh are interconnected;Be provided in the geotechnological pipe network to
On the Grouting Pipe that protrudes out and exhaust pipe, and there is what is protruded out downwards to cross slurry pipe, high polymer slurry is by the Grouting Pipe to geotextile tube
Slip casting forms slip casting geotechnique's pipe network in net, and the high polymer slurry starches pipe to the column being formed in cut slope also by described cross
Slip casting in hole is formed along cut slope from slope foot up spaced multiple rows of reinforced column;
The construction method is to carry out as follows:
Step 1:Positioning drilling:After completing cutting excavation by design requirement, the setting position of reinforcing pile is pressed on cut slope
Drilling is set, post holes, mark post holes position are formed;
Step 2:Implement side slope protection by following different form:
Form one:It is not more than 8 meters of side slope for height
(1.1), geotextile tube net is laid in side slope, one by one by the post holes crossed on slurry hole and corresponding position in geotechnological pipe network
Docking fixes geotechnological pipe network using bail, the earthing of one layer of 16mm~20mm, and manual compaction is filled on the net in geotextile tube;
(1.2), slip casting is carried out by Grouting Pipe (17), slip casting process is carried out successively by sequence from bottom to top, is passed through
Inlet pipe positioned at slip casting geotextile tube upper surface injects high polymer grouting material, completes side slope protection;
Form two:The side slope for being 8-20 meters for height
Broken-up laying geotechnique pipe network from bottom to top, every section of geotechnological pipe network is 4~5 meters along the upward length of side slope, for every
One section of geotechnological pipe network is constructed by the same procedure of step (1.1)-step (1.2), completes each section of side slope protection;
Form three:It is more than 20 meters of side slope for height
Platform is set by 8 meters of vertical separation in side slope, forms Slope with multi-step;Be directed to from bottom to top every grade of side slope together with
Platform in every grade of side slope is constructed by the same procedure of step (1.1)-step (1.2) step by step, completes Slope with multi-step protection;
Step 3, place is peaceful roll after the completion of, slip casting baffle is fixed on ground upper edge width of roadway direction, by noting
The graded broken stone that filling-up thickness is 200mm in the space that slurry baffle surrounds, sets splash guard, on splash guard on graded broken stone upper berth
Backfilling thickness is the earthing of 20mm~30mm and is compacted, as buffer transition layer, slip casting channel be kept to protrude from buffer transition layer simultaneously
It is unimpeded, the confined space where graded broken stone is collectively formed with splash guard, slip casting baffle and both sides side slope;
High polymer slurries are carried out slip casting into the confined space where graded broken stone by step 4 by slip casting channel, once
Injection forming removes slip casting baffle after high polymer slurries reach intensity;
Step 5 repeats step 3- steps 4, along the longitudinal construction paragraph by paragraph of road, until completing high polymer rubble in entire road
The making of waterproof layer, splash guard and buffer transition layer;
Gutter is arranged in step 6, the surfacing layer on buffer transition layer, road surface drainage is realized using gutter, on cutting side
Linked network alien earth sparging is arranged on slope to protect.
The present invention is lain also in the characteristics of construction method of the cutting stereoscopic protective structure of high polymer grouting reinforcement waterproof:
In the step 4, it is by the dosage V of the high polymer slurries of position of volume
Wherein, a is the expansion multiplying power of high polymer slurries, and value is:10~25;B is excessive slip casting coefficient, and value is:
1.05~1.10;V1For the capacity of the confined space where graded broken stone, V2For the volume of graded broken stone,Wherein m is
Graded broken stone quality, ρ are graded broken stone density;
The present invention is lain also in the characteristics of construction method of the cutting stereoscopic protective structure of high polymer grouting reinforcement waterproof:
Be arranged slip casting baffle be height be 260mm, the plank that thickness 30mm, length are 2-3m, along width of roadway side
Upward slip casting baffle is subsection setup, is with notch and the mutually matched bell and spigot frame of socket between adjacent slip casting baffle;
The top surface of slip casting baffle is equipped with top margin notch, and A-frame is arranged in side;
The thickness that splash guard is arranged is 10mm, is to match the socket joint knot mutually coordinated with notch and socket between adjacent splash guard
The grafting width of structure, bell and spigot frame is 50mm, and the bottom of the splash guard is provided with fin, is in fin and the slip casting of both sides
The top margin notch socket joint of baffle coordinates, and the fin in other positions is formed with high polymer breakstone water-proof layer and consolidated.
The present invention is lain also in the characteristics of construction method of the cutting stereoscopic protective structure of high polymer grouting reinforcement waterproof:
A diameter of 20~25 millimeters of the pvc pipe, increase, adjacent pvc pipe with the increase of the angle of cut slope
Spacing be 400~500 millimeters, reduce with the increase of the angle of cut slope;
Cross slurry pipe a diameter of 14~18 millimeters, it is 50 millimeters to cross slurry hole and protrude from the length of pvc pipe bottom surface;
A diameter of 14~18 millimeters of the Grouting Pipe, the length that Grouting Pipe protrudes from pvc pipe top surface are 100 millimeters;
A diameter of 1~2 millimeter of the exhaust pipe, the length that exhaust pipe protrudes from pvc pipe top surface are 20 millimeters.
The top end of the reinforced column is on the site position of the rectangular mesh of geotechnological pipe network, and the length of reinforced column is
4000~5000 millimeters, reinforced column is vertical with the slope surface of side slope, a diameter of 16~20 millimeters of reinforced column.
Compared with the prior art, the present invention has the beneficial effect that:
1, the present invention effectively avoids underground water by the way that high polymer breakstone water-proof layer and splash guard is arranged in pavement structure bottom
It is counter gush caused by road pavement erosion, good water-proof effect, waterproof effective time are long, can permanently effective barrier underground water to road
Face is counter to gush.
2, the present invention carries out reinforcement protection, the note after the completion of constructing using slip casting geotechnique pipe network and reinforcing pile to cut slope
Puddled soil work pipe network and reinforcing pile and cut slope form integral structure, avoid the stability failure and slide of cut slope, improve driving
Safety.Compared to traditional slope protection structure, for the present invention in the work progress of reinforcing pile, high polymer slurries pass through the soil body
Crack is penetrated into and strengthens slope soil so that side slope is more stablized.
3, the metalling filled in the present invention is in skeleton structure, has high intensity, is conducive to the stabilization of pavement structure, simultaneously
Hole between rubble skeleton provides the channel of high polymer slurries diffusion.
4, the present invention can often complete one section of geotextile tube according to slope height in side slope by geotechnological pipe network broken-up laying
Slip casting is carried out immediately after the laying of net, be ensure that the stability of side slope in work progress, is provided for the safety of construction personnel
It ensures.
5, geotechnological pipe network is integrally formed in the present invention, and mortar depositing construction is quick, convenient.
Description of the drawings
Fig. 1 is cutting stereoscopic protective structural schematic diagram of the present invention;
Fig. 2 is the geotechnological pipe network structure schematic diagram of the present invention;
Fig. 3 is the online Grouting Pipe distribution schematic diagram of geotextile tube in the present invention;
Fig. 4 is that geotechnological pipe network reinforces association structure schematic diagram in the present invention;
Fig. 5 is slip casting baffle arrangement schematic diagram in the present invention;
Fig. 6 is another structural schematic diagram of slip casting baffle in the present invention;
Fig. 7 is the structural schematic diagram of the splash guard of the present invention
Figure label:1 high polymer breakstone water-proof layer, 2 splash guards, 3 buffer transition layers, 4 supercrusts, 5 cut slopes, 6 soil
Work pipe network, 7 reinforced columns, 8 fins, 9 slip casting baffles, 10 top margin notches, 11 slip casting channels, 12 sockets, 13 notches, 14 triangle branch
Frame, 15 be pvc pipe, and 16 cross slurry pipe, 17 Grouting Pipes, 18 exhaust pipes, 19 steel wires, 20 partition boards, 21 bails.
Specific implementation mode
Referring to Fig. 1, in the present embodiment with the cutting stereoscopic protective structure of high polymer grouting reinforcement waterproof include road surface protection
Structure and cutting slope defending structure.
As shown in Figure 1, road surface safeguard structure is high polymer breakstone water-proof layer 1 of the making on ground, waterproof from bottom to top
Plate 2, buffer transition layer 3 and supercrust 4;High polymer breakstone water-proof layer 1 is by being arranged on splash guard 2, and penetrating through splash guard 2
Slip casting channel 11 injected into metalling polyurethane formation waterproof construction.This structure type can effectively avoid underground water anti-
The erosion of road pavement caused by gushing.
Shown in Fig. 1, cutting slope defending structure is that geotextile tube net 6 is laid on cut slope 5;Geotechnological pipe network 6, be by
The rectangular mesh being arranged in array that pvc pipe 15 is constituted, the pvc pipe in rectangular mesh are interconnected;It is arranged in geotechnological pipe network
Have the Grouting Pipe 17 protruded upward and exhaust pipe 18, and there is what is protruded out downwards to cross slurry pipe 16, high polymer slurry by Grouting Pipe 7 to
Slip casting forms slip casting geotechnique's pipe network in geotechnological pipe network 6, and high polymer slurry starches pipe 6 to the column being formed in cut slope also by mistake
Slip casting in hole forms along cut slope from slope foot up spaced multiple rows of reinforced column 7, makes slip casting geotechnique pipe network and reinforcing pile
And cut slope forms integral structure, stable side slope.
As shown in Figure 2, Figure 3 and Figure 4, geotechnological pipe network 6 is the global formation pipe network using PVC as material, in geotechnological pipe network 6
Partition board 20 is distributed with, geotechnological pipe network 6 is divided into mutually independent each region using partition board 20, being included at least in each region has
One Grouting Pipe 17, equally distributed multiple exhaust pipes 18, and cross slurry pipe 16 by the multiple of setting position distribution;In geotechnological pipe network
It is provided with steel wire 19 in 6 rectangular mesh, is contacted using steel wire 19 as reinforcement in rectangular mesh;Cross slurry pipe 16 and slip casting
Pipe 7 is arranged on the site position of the rectangular mesh of geotechnological pipe network 6.
In specific implementation, a diameter of 20~25 millimeters of pvc pipe 15, increase with the increase of the angle of cut slope,
The spacing of adjacent pvc pipe 15 is 400~500 millimeters, is reduced with the increase of the angle of cut slope;Cross the diameter of slurry pipe 16
It it is 14~18 millimeters, it is 50 millimeters to cross slurry hole 16 and protrude from the length of pvc pipe bottom surface;A diameter of 14~18 milli of Grouting Pipe 17
Rice, the length that Grouting Pipe 17 protrudes from pvc pipe top surface are 100 millimeters;A diameter of 1~2 millimeter of exhaust pipe 18, exhaust pipe 18 is convex
Length for pvc pipe top surface is 20 millimeters;The top end of reinforced column 7 is in the site position of the rectangular mesh of geotechnological pipe network 6
On, the length of reinforced column 7 is 4000~5000 millimeters, and reinforced column 7 is vertical with the slope surface of side slope, reinforced column 7 a diameter of 16~
20 millimeters.
With the construction method of the cutting stereoscopic protective structure of high polymer grouting reinforcement waterproof it is by following step in the present embodiment
It is rapid to carry out:
Step 1:Positioning drilling:After completing cutting excavation by design requirement, the setting of reinforcing pile 7 is pressed on cut slope 5
Position drills, and forms post holes, mark post holes position.
Step 2:Implement side slope protection by following different form.
Form one:It is not more than 8 meters of side slope for height
1.1, it is laid with geotextile tube net 6 in side slope, slurry hole 16 and the post holes one on corresponding position will be crossed in geotechnological pipe network 6
One docking, fixes geotechnological pipe network 6 using bail 21, the earthing of one layer of 16mm~20mm is filled on geotechnological pipe network 6, and manually press
It is real.
1.2, slip casting is carried out by Grouting Pipe 17, slip casting process is carried out successively by sequence from bottom to top, by being located at
The inlet pipe 17 of 15 upper surface of slip casting geotextile tube injects high polymer grouting material, completes side slope protection.
Form two:The side slope for being 8-20 meters for height
Broken-up laying geotechnique pipe network 6 from bottom to top, every section of geotechnological pipe network 6 are 4~5 meters along the upward length of side slope, for
Each section of geotechnological pipe network 6 is constructed by the same procedure of step 1.1- steps 1.2, completes each section of side slope protection.
Form three:It is more than 20 meters of side slope for height
Platform is set by 8 meters of vertical separation in side slope, forms Slope with multi-step;Be directed to from bottom to top every grade of side slope together with
Platform in every grade of side slope is constructed by the same procedure of step 1.1- steps 1.2 step by step, completes Slope with multi-step protection.
Step 3, place is peaceful roll after the completion of, slip casting baffle 9 is fixed on ground upper edge width of roadway direction, by noting
The graded broken stone that filling-up thickness is 200mm in the space that slurry baffle 9 surrounds, sets splash guard 2, in splash guard on graded broken stone upper berth
Backfilling thickness is the earthing of 20mm~30mm and is compacted, as buffer transition layer 3, keep slip casting channel 11 to protrude from buffered on 2
Layer 3 and unimpeded is crossed, the confined space where graded broken stone is collectively formed with splash guard 2, slip casting baffle 9 and both sides side slope.
High polymer slurries are carried out slip casting into the confined space where graded broken stone by step 4 by slip casting channel 11, and one
Secondary injection forming removes slip casting baffle 9 after high polymer slurries reach intensity;Using volume as the dosage of the high polymer slurries of position
V isWherein, a is the expansion multiplying power of high polymer slurries, and value is:10~25;B is excessive slip casting coefficient, is taken
Value is:1.05~1.10;V1For the capacity of the confined space where graded broken stone, V2For the volume of graded broken stone,Its
Middle m is graded broken stone quality, and ρ is graded broken stone density.
Step 5 repeats step 3- steps 4, along the longitudinal construction paragraph by paragraph of road, until completing high polymer rubble in entire road
The making of waterproof layer 1, splash guard 2 and buffer transition layer 3.
Gutter is arranged in step 6, the surfacing layer 4 on buffer transition layer 3, road surface drainage is realized using gutter, in cutting
Linked network alien earth sparging is arranged in side slope to protect.
It is highly 260mm, thickness 30mm, length that slip casting baffle 9 is arranged as shown in Fig. 5, Fig. 6 and Fig. 7, in the present embodiment to be
Degree is the plank of 2-3m, is subsection setup in the slip casting baffle 9 on width of roadway direction, be between adjacent slip casting baffle 9 with
12 mutually matched bell and spigot frame of notch 13 and socket;It is equipped with top margin notch 10 in the top surface of slip casting baffle 9, triangle is arranged in side
Holder 14;It is 20mm that splash guard 2, which uses polyvinyl chloride panel, the thickness of splash guard 2, be between adjacent splash guard 2 with notch and
Socket matches the bell and spigot frame mutually coordinated, and the grafting width of bell and spigot frame is 50mm, and the bottom of splash guard 2 is provided with fin 8, is located
Coordinate in the fin of both sides and 10 socket joint of top margin notch of slip casting baffle 9, the fin in other positions and high polymer breakstone water-proof
Layer 1 forms consolidation.
Claims (4)
1. a kind of construction method of cutting stereoscopic protective structure with high polymer grouting reinforcement waterproof, it is characterized in that:Described in setting
Stereoscopic protective structure includes road surface safeguard structure and cutting slope defending structure;
The road surface safeguard structure is high polymer breakstone water-proof layer (1) of the making on ground, splash guard (2), slow from bottom to top
Rush transition zone (3) and supercrust (4);The high polymer breakstone water-proof layer (1) is noted into metalling by slip casting channel (11)
Enter the waterproof construction of polyurethane formation, the slip casting channel (11) is arranged in splash guard (2), and penetrates through splash guard (2);
The cutting slope defending structure is that geotextile tube net (6) is laid on cut slope (5);It is described geotechnique pipe network (6) be by
The rectangular mesh being arranged in array that pvc pipe (15) is constituted, the pvc pipe (15) in rectangular mesh are interconnected;In the geotechnique
It is provided with the Grouting Pipe (17) protruded upward and exhaust pipe (18) in pipe network, and has what is protruded out downwards to cross slurry pipe (16), high polymer
By the Grouting Pipe (17), the slip casting into geotechnological pipe network (6) forms slip casting geotechnique's pipe network to slurry, and the high polymer slurry also leads to
It crosses the slurry of crossing and manages (16) slip casting into the post holes being formed in cut slope, formation, which is up spaced along cut slope from slope foot, to be set
The multiple rows of reinforced column (7) set;
The construction method is to carry out as follows:
Step 1:Positioning drilling:After completing cutting excavation by design requirement, the setting of reinforcing pile (7) is pressed on cut slope (5)
Position drills, and forms post holes, mark post holes position;
Step 2:Implement side slope protection by following different form:
Form one:It is not more than 8 meters of side slope for height
(1.1), it is laid with geotextile tube net (6) in side slope, slurry pipe (16) and the column on corresponding position will be crossed in geotechnological pipe network (6)
Hole is docked one by one, and using the fixed geotechnological pipe network (6) of bail (21), covering for one layer of 16mm~20mm is filled on geotechnological pipe network (6)
Soil, and manual compaction;
(1.2), slip casting is carried out by Grouting Pipe (17), slip casting process is carried out successively by sequence from bottom to top, by being located at
The Grouting Pipe (17) of pvc pipe (15) upper surface injects high polymer grouting material, completes side slope protection;
Form two:The side slope for being 8-20 meters for height
Broken-up laying geotechnique pipe network (6) from bottom to top, every section of geotechnological pipe network (6) they are 4~5 meters along the upward length of side slope, for
Each section of geotechnological pipe network (6) is constructed by the same procedure of step (1.1)-step (1.2), completes each section of side slope protection;
Form three:It is more than 20 meters of side slope for height
Platform is set by 8 meters of vertical separation in side slope, forms Slope with multi-step;It is directed to every grade of side slope from bottom to top together with every grade
Platform in side slope is constructed by the same procedure of step (1.1)-step (1.2) step by step, completes Slope with multi-step protection;
Step 3, place is peaceful roll after the completion of, slip casting baffle (9) is fixed on ground upper edge width of roadway direction, by slip casting
Filling-up thickness is the graded broken stone of 200mm in the space that baffle (9) surrounds, and splash guard (2) is set on graded broken stone upper berth, in waterproof
Backfilling thickness is the earthing of 20mm~30mm and is compacted, as buffer transition layer (3), keep slip casting channel (11) protrusion on plate (2)
In buffer transition layer (3) and unimpeded, where collectively forming graded broken stone with splash guard (2), slip casting baffle (9) and both sides side slope
Confined space;
High polymer slurries are carried out slip casting into the confined space where graded broken stone by step 4 by slip casting channel (11), once
Injection forming removes slip casting baffle (9) after high polymer slurries reach intensity;
Step 5 repeats step 3- steps 4, along the longitudinal construction paragraph by paragraph of road, until completing high polymer breakstone water-proof in entire road
The making of layer (1), splash guard (2) and buffer transition layer (3);
Gutter is arranged in step 6, the surfacing layer (4) on buffer transition layer (3), road surface drainage is realized using gutter, in cutting
Linked network alien earth sparging is arranged in side slope to protect.
2. the construction method of the cutting stereoscopic protective structure according to claim 1 with high polymer grouting reinforcement waterproof,
It is characterized in:In the step 4, the dosage volume V of the high polymer slurries is:
Wherein, a is the expansion multiplying power of high polymer slurries, and value is:10~25;B is excessive slip casting coefficient, and value is:1.05~
1.10;V1For the capacity of the confined space where graded broken stone, V2For the volume of graded broken stone,Wherein m is that grading is broken
Stone quality, ρ are graded broken stone density.
3. the construction method of the cutting stereoscopic protective structure according to claim 1 with high polymer grouting reinforcement waterproof,
It is characterized in:
Be arranged slip casting baffle (9) be height be 260mm, the plank that thickness 30mm, length are 2-3m, along width of roadway direction
On slip casting baffle (9) be subsection setup, be mutually matched with notch (13) and socket (12) between adjacent slip casting baffle (9)
Bell and spigot frame;It is equipped with top margin notch (10) in the top surface of slip casting baffle (9), A-frame (14) is arranged in side;
The thickness that splash guard (2) is arranged is 10mm, is to match the socket joint mutually coordinated with notch and socket between adjacent splash guard (2)
The grafting width of structure, bell and spigot frame is 50mm, and the bottom of the splash guard (2) is provided with fin (8), is in the convex of both sides
Top margin notch (10) socket joint of rib and slip casting baffle (9) coordinates, the fin in other positions and high polymer breakstone water-proof layer (1) shape
At consolidation.
4. the construction method of the cutting stereoscopic protective structure according to claim 1 with high polymer grouting reinforcement waterproof,
It is characterized in:
A diameter of 20~25 millimeters of the pvc pipe (15), increase, adjacent pvc pipe with the increase of the angle of cut slope
(15) spacing is 400~500 millimeters, is reduced with the increase of the angle of cut slope;
Cross slurry pipe (16) a diameter of 14~18 millimeters, it is 50 millimeters to cross slurry pipe (16) and protrude from the length of pvc pipe bottom surface;
A diameter of 14~18 millimeters of the Grouting Pipe (17), the length that Grouting Pipe (17) protrudes from pvc pipe top surface are 100 millis
Rice;
A diameter of 1~2 millimeter of the exhaust pipe (18), the length that exhaust pipe (18) protrudes from pvc pipe top surface are 20 millimeters;
On the site position for the rectangular mesh that the top end of the reinforced column (7) is in geotechnological pipe network (6), the length of reinforced column (7)
Degree is 4000~5000 millimeters, and reinforced column (7) is vertical with the slope surface of side slope, a diameter of 16~20 millimeters of reinforced column (7).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610995288.XA CN106436725B (en) | 2016-11-11 | 2016-11-11 | With the construction method of the cutting stereoscopic protective structure of high polymer grouting reinforcement waterproof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610995288.XA CN106436725B (en) | 2016-11-11 | 2016-11-11 | With the construction method of the cutting stereoscopic protective structure of high polymer grouting reinforcement waterproof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106436725A CN106436725A (en) | 2017-02-22 |
CN106436725B true CN106436725B (en) | 2018-08-03 |
Family
ID=58208344
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610995288.XA Active CN106436725B (en) | 2016-11-11 | 2016-11-11 | With the construction method of the cutting stereoscopic protective structure of high polymer grouting reinforcement waterproof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106436725B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114855831B (en) * | 2022-04-26 | 2023-04-07 | 南京工业大学 | Equipment for laying plastic geotextile and construction method thereof |
CN115217126B (en) * | 2022-07-22 | 2023-05-02 | 中铁四局集团第五工程有限公司 | Road slope construction reinforcing equipment and use method |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100340723C (en) * | 2005-05-23 | 2007-10-03 | 邓敬森 | Method for slope reinforcement |
KR101136837B1 (en) * | 2009-08-05 | 2012-04-19 | 미래이엔씨주식회사 | Polycarbonate form for lining anti-corroding moltal on marine steel pile |
CN202658537U (en) * | 2012-03-07 | 2013-01-09 | 中铁第四勘察设计院集团有限公司 | Drainage prevention system for railroad bed in groundwater development slope district |
CN205276243U (en) * | 2015-12-18 | 2016-06-01 | 南昌天高环保科技股份有限公司 | Stretch -proofing geogrid |
CN105735075B (en) * | 2016-02-02 | 2017-11-17 | 浙江大学 | The temporary construction subgrade electric osmose solidification processing method of hydraulic reclamation soil site |
-
2016
- 2016-11-11 CN CN201610995288.XA patent/CN106436725B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN106436725A (en) | 2017-02-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106013191B (en) | Environment-friendly type grass planting Concrete Highway protective slope structure and construction method | |
CN103883328B (en) | The dark construction method of half lid half of high steep V-type coombe biased segment is worn under separate tunnel | |
CN109403332B (en) | Method for combined excavation of layered bench sections of deep foundation pit of sandy cobble thick covering layer wide shallow valley | |
CN106436725B (en) | With the construction method of the cutting stereoscopic protective structure of high polymer grouting reinforcement waterproof | |
CN106400643B (en) | With the cutting stereoscopic protective structure of high polymer grouting reinforcement waterproof | |
CN101768960B (en) | Bored concrete pile construction method of permafrost layer | |
CN116537221A (en) | Highway tunnel portal section collapse sliding body slope protection reinforcing structure and construction method | |
CN111441789A (en) | High-steep-terrain bridge-tunnel connection foam concrete filling-first and digging-second transition structure and construction method | |
CN110777817A (en) | Side slope protection structure of underground water development section | |
CN216920384U (en) | Highway tunnel entrance to a cave section landslide body side slope protection additional strengthening that collapses | |
CN206873466U (en) | One kind is used for footrill flume section safeguard structure | |
CN109811612A (en) | Coombe processing is faced forever in conjunction with sidewalk structure and its construction method | |
CN211571744U (en) | Underground water development section side slope protective structure | |
CN109235468A (en) | A kind of slope protection structure for In A Crushed Rock cut slope | |
CN212130501U (en) | Foam concrete transition structure is filled earlier and then excavated in high and steep topography bridge tunnel connection | |
CN106917388A (en) | The check dam and construction method of a kind of use Fill Reinforced With Geogrids modified cement soil clad | |
CN112878403A (en) | Pipeline laying method | |
CN207295348U (en) | Railway karst ground treatment anti-pollution structure near a kind of I grade of potable water source district | |
CN112523272A (en) | Anti-floating blind ditch for strongly weathered rock stratum and construction method thereof | |
CN109736175A (en) | A kind of factories and miness rock salt road and its construction method | |
CN207958883U (en) | A kind of Cold And Frozen-soil Regions roadbed anti-sedimentation structure | |
Coats et al. | The Kielder Headworks. | |
Forbes | Landslide investigation and correction | |
Prisk et al. | Delivering Wadi Dayqah, Oman's tallest dam | |
CN214657200U (en) | Protective system for abandoned soil field of river beach in steep mountain area |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20220113 Address after: 230001 floor 6, block B, blue diamond Shangjie, No. 335, Suixi Road, Bozhou road street, Luyang District, Hefei City, Anhui Province Patentee after: Hefei Luyang Technology Innovation Group Co.,Ltd. Address before: Tunxi road in Baohe District of Hefei city of Anhui Province, No. 193 230009 Patentee before: Hefei University of Technology |