CN106426721A - Distributor boom component for polyurethane insulation board serial production line and manufacturing method of distributor boom component - Google Patents
Distributor boom component for polyurethane insulation board serial production line and manufacturing method of distributor boom component Download PDFInfo
- Publication number
- CN106426721A CN106426721A CN201611106600.1A CN201611106600A CN106426721A CN 106426721 A CN106426721 A CN 106426721A CN 201611106600 A CN201611106600 A CN 201611106600A CN 106426721 A CN106426721 A CN 106426721A
- Authority
- CN
- China
- Prior art keywords
- material outlet
- outlet pipe
- discharging rod
- insulation board
- transverse support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C44/00—Shaping by internal pressure generated in the material, e.g. swelling or foaming ; Producing porous or cellular expanded plastics articles
- B29C44/34—Auxiliary operations
- B29C44/36—Feeding the material to be shaped
- B29C44/46—Feeding the material to be shaped into an open space or onto moving surfaces, i.e. to make articles of indefinite length
- B29C44/461—Feeding the material to be shaped into an open space or onto moving surfaces, i.e. to make articles of indefinite length dispensing apparatus, e.g. dispensing foaming resin over the whole width of the moving surface
Landscapes
- Casting Or Compression Moulding Of Plastics Or The Like (AREA)
Abstract
The invention discloses a distributor boom component for a polyurethane insulation board serial production line and a manufacturing method of the distributor boom component. The distributor boom component comprises a material sprinkling head component and a material sprinkling rack. The material sprinkling head component comprises a middle discharge rod, a first end discharge rod and a second end discharge rod which are detachable. A plurality of first material discharge pipes are connected to the middle discharge rod, a plurality of second material discharge pipes are connected to the first end discharge rod, and a plurality of third material discharge pipes are connected to the second end discharge rod. The axes of the first material discharge pipes, the second material discharge pipes and the third material discharge pipes are located on the same plane, the first material discharge pipes are longer than the second material discharge pipes/the third material discharge pipes, and the second material discharge pipes and the third material discharging pipes are symmetrical by using the first material discharge pipes as centers. The distributor boom component is even in material distribution, fast to mount, convenient to clean, simple in structure and low in manufacturing cost.
Description
Technical field
The present invention relates to polyurethane thermal insulation board tinuous production technical field, specifically, is to be related to polyurethane thermal insulation board
Tinuous production cloth bar assembly and preparation method thereof.
Background technology
Polyurethane material with its excellent fire prevention, the performance such as fire-retardant, moistureproof, high temperature resistant, be widely used in building heat preservation,
The fields such as central air-conditioning, couveuse, chemical tank.It is particularly its performance for taking into account insulation, fire prevention and construction and causes extensive weight
Depending on being widely popularized as best building thermal insulation material.
Traditional polyurethane thermal insulation board continuous lines production method, using all-in-one-piece boom, i.e., beats on a straight tube
Go out some apertures to be distributed material, while swinging back and forth realizing continuous cloth using boom.The shortcoming of the method is, cloth
Material is uneven, if there are the phenomenons such as hollowing, folding line, it is impossible to the state of on-line control boom.And as urethane raw is easy to
Foaming forms solid, if the material for therefore remaining in boom is cleaned just not in time easily blocks cloth passage.Simultaneously as
The urethane raw for having reacted belongs to the material of extremely difficult cleaning, and the cleaning of traditional monoblock type boom is bothered very much, and easily
There is residual, affect use next time.
Content of the invention
The technical problem to be solved is, for existing polyurethane thermal insulation board tinuous production boom group
The deficiency that part is present, provides that a kind of cloth is uniform, quick for installation, easy to clean, simple structure, cheap polyurethane heat-insulation
Plate tinuous production cloth bar assembly.
To achieve these goals, the technical solution adopted in the present invention is:A kind of polyurethane thermal insulation board tinuous production
Cloth bar assembly is used, and bin is spilt including spilling stub bar component and with spilling stub bar component and being adapted with what stub bar component was spilt in fixation.Described
Spilling bin includes one first transverse support bar, one second transverse support bar and the longitudinally connected bar of Duo Gen, first cross-brace
Bar is be arranged in parallel with second transverse support bar, many longitudinally connected bars be arranged in parallel and be connected to the first transverse support bar with
Between second transverse support bar.The stub bar component that spills includes that middle part discharging rod, first end discharging rod and the second end go out
Material bar;The middle part discharging rod is the tee Ts with an entrance, two outlets, is also associated with many first on the tee T
Material outlet pipe;Described first end discharging rod one end is connected and the relative threeway with a wherein mouth rotation of the tee T
Pipe can be dismantled, be also associated with many second materials and go out on the other end connection one first plug, and the first end discharging rod
Pipe;Described the second end discharging rod one end connects with another mouth rotation of the tee T and the relative tee T can be torn open
Unload, the other end connection one second plug, and the second end discharging rod on be also associated with many 3 material outlet pipes;Described
The axis of one material outlet pipe, the second material outlet pipe and the 3 material outlet pipe three is in the same plane, described
The length of first material outlet pipe is more than the length of the second material outlet pipe/3 material outlet pipe, and the second material
Outlet pipe is symmetrical arranged centered on the first material outlet pipe with the 3 material outlet pipe.
Above-mentioned polyurethane thermal insulation board tinuous production cloth bar assembly, wherein, first transverse support bar and institute
State between the second transverse support bar with gap, the first material outlet pipe, the second material outlet pipe and the 3 material
Outlet pipe is fastened between first transverse support bar and second transverse support bar corresponding to the gap, and described first
The axis of material outlet pipe, the second material outlet pipe and the 3 material outlet pipe three and first transverse support bar and
Second transverse support bar is vertical.
Above-mentioned polyurethane thermal insulation board tinuous production cloth bar assembly, wherein, many first material outlet pipes
Length is identical.
Above-mentioned polyurethane thermal insulation board tinuous production cloth bar assembly, wherein, many second material outlet pipes
Length is gradually successively decreased from close first material outlet pipe side toward close first plug side.
Above-mentioned polyurethane thermal insulation board tinuous production cloth bar assembly, wherein, many 3 material outlet pipes
Length is gradually successively decreased from close first material outlet pipe side toward close second plug side.
Above-mentioned polyurethane thermal insulation board tinuous production cloth bar assembly, wherein, described first end discharging rod one end
Coordinate with the outlet gap of the tee T for docking, the other end is coordinated with the first plug gap.
Above-mentioned polyurethane thermal insulation board tinuous production cloth bar assembly, wherein, described the second end discharging rod one end
Coordinate with the outlet gap of the tee T for docking, the other end is coordinated with the second plug gap.
Above-mentioned polyurethane thermal insulation board tinuous production cloth bar assembly, wherein, the first material outlet pipe, described
The periphery of two material outlet pipes and the 3 material outlet pipe is all provided with multiple reinforcements.
Further, the present invention provides a kind of making side of above-mentioned polyurethane thermal insulation board tinuous production cloth bar assembly
Method, comprises the steps:
Prepare to spill bin;
Prepare middle part discharging rod, first end discharging rod, the second end discharging rod, the first plug and the second plug;
In the middle part of grafting, discharging rod, first end discharging rod, the second end discharging rod, the first plug and the second plug are formed and are spilt
Stub bar component;
Fixation spills stub bar component in spilling on bin.
Above-mentioned manufacture method, wherein, when stub bar component is spilt in formation, also comprises the steps:Guarantee that first material goes out
The axis of pipe, second material outlet pipe and 3 material outlet pipe three is in the same plane.
After technique scheme, the invention has the advantages that compared with the prior art,:
1st, by the setting of many first material outlet pipes, many second material outlet pipes and Duo Gen 3 material outlet pipe, can be equal
Even is cast in material on distributing platform, and based on the setting for spilling bin will can spill stub bar component be fixedly installed to be formed fixation spill
Material mode, so that cloth process stabilization, it is ensured that the stability of product;
2nd, each several part is detachable, it is easy to clean, so as to solve the problems, such as the difficult cleaning of polyurethane cloth system, and structure
Simply, ease of assembly, cheap.
Describe the present invention below in conjunction with the drawings and specific embodiments, but not as a limitation of the invention.
Description of the drawings
Fig. 1 is the front view of the polyurethane thermal insulation board tinuous production cloth bar assembly of the present invention;
Fig. 2 is the front view for spilling stub bar component in Fig. 1;
Fig. 3 is the front view for spilling bin in Fig. 1;
Fig. 4 is the partial bottom view of the polyurethane thermal insulation board tinuous production cloth bar assembly of the present invention.
Wherein, reference is:
10 spill stub bar component
11 middle part discharging rods
111 first material outlet pipes
1111 reinforcements
12 first end discharging rods
121 second material outlet pipes
1211 reinforcements
13 the second end discharging rods
131 3 material outlet pipes
1311 reinforcements
14 first plugs
15 second plugs
20 spill bin
21 first transverse support bar
22 second transverse support bar
23 longitudinally connected bars
Specific embodiment
With specific embodiment, technical solution of the present invention is described in detail below in conjunction with the accompanying drawings, to be further understood that
The purpose of the present invention, scheme and effect, but it is not intended as the restriction of scope of the appended claims of the present invention.
As shown in figure 1, the polyurethane thermal insulation board tinuous production cloth bar assembly of the present invention, including spilling stub bar component 10
And bin 20 is spilt with spilling stub bar component and being adapted with what stub bar component was spilt in fixation.
In conjunction with Fig. 3 is referred to, spilling bin 20 includes that one first transverse support bar 21, one second transverse support bar 22 and Duo Gen are vertical
To connecting rod 23, the first transverse support bar 21 is be arranged in parallel with the second transverse support bar 22, and many longitudinally connected bars 23 are parallel to be set
Put and be connected between the first transverse support bar 21 and the second transverse support bar 22, the first transverse support bar 21 and second is laterally propped up
Strut 22 is not against setting, but has gap 24 between the two, and the effect in the gap 24 is to fix for convenience to spill stub bar
How component 10, specifically fix, and will illustrate in subsequent content.
In conjunction with Fig. 2 is referred to, spilling stub bar component 10 includes middle part discharging rod 11, first end discharging rod 12 and the second end
Discharging rod 13.Middle part discharging rod 11 is the tee Ts with an entrance, two outlets, is also associated with many first things on tee T
Material outlet pipe 111.12 one end of first end discharging rod connects with a wherein mouth rotation of tee T and relative tee T can be torn open
Unload, the other end connects one first plug 14, and is also associated with many second material outlet pipes 121 on first end discharging rod 12.The
Two end discharging rods, 13 one end is connected with another mouth rotation of tee T and relative tee T can be dismantled, other end connection one
Second plug 15, and on the second end discharging rod 13, it is also associated with many 3 material outlet pipes 131.In order to ensure the direction that discharges
Concordance, the axis of first material outlet pipe 111, second material outlet pipe 121 and 131 three of 3 material outlet pipe is preferably located at together
In one plane.In order to be able to meet the needs of polyurethane thermal insulation board tinuous production, the length of first material outlet pipe 111 is more than second
The length of 121/ 3 material outlet pipe 131 of material outlet pipe, and second material outlet pipe 121 and 3 material outlet pipe 131 are with the first thing
Material outlet pipe 111 centered on be symmetrical arranged, so, production when, the outlet of first material outlet pipe 111 with from below cloth bar assembly
Through the distance between shaping foam plate will less than 121/ 3 material outlet pipe 131 of second material outlet pipe with from cloth bar assembly
The distance between shaping foam plate that lower section is passed through, as material is fluid, can be to shaping foam plate endwall flow, based on above-mentioned
Arrange, uniformly material can be cast on distributing platform.
In conjunction with Fig. 4 is referred to, stub bar component 10, first material outlet pipe 111, second material outlet pipe 121 are spilt in fixation for convenience
And 3 material outlet pipe 131 is fastened between the first transverse support bar 21 and the second transverse support bar 22 corresponding to gap 24, and
The axis of first material outlet pipe 111, second material outlet pipe 121 and 131 three of 3 material outlet pipe and the first transverse support bar
21 and second transverse support bar 22 vertical.
In the present embodiment, the length of many first material outlet pipes 111 is identical, although the first material outlet pipe that in figure is given
111 quantity is two, but in actual use, the quantity of first material outlet pipe 111 is not limited to two, can be according to reality
Border needs to be configured.The length of many second material outlet pipes 121 is near first material outlet pipe side toward near the first plug
Side is gradually successively decreased, it is preferred that spaced set between many second material outlet pipes 121.The length of many 3 material outlet pipes 131
Degree gradually successively decreases from close first material outlet pipe side toward close second plug side, it is preferred that many 3 material outlet pipes 131
Between spaced set.
Spill the assembling of stub bar component 10 for convenience, 12 one end of first end discharging rod between the outlet of the tee T for docking
Gap coordinates, and the other end and 14 gap of the first plug coordinate.13 one end of the second end discharging rod between the outlet of the tee T for docking
Gap coordinates, and the other end and 15 gap of the second plug coordinate.
Further, the periphery of first material outlet pipe 111 is provided with multiple reinforcements 1111, second material outlet pipe 121
Periphery be provided with multiple reinforcements 1211, the periphery of 3 material outlet pipe 131 is provided with multiple reinforcements 1311.
In the present invention, middle part discharging rod 11, first end discharging rod 12, the second end discharging rod 13,14 and of the first plug
Second plug 15 all adopts plastic material, by injection mo(u)lding.
The polyurethane thermal insulation board tinuous production of present invention cloth bar assembly comprises the steps when making:
Prepare to spill bin 20;
In the middle part of preparing, discharging rod 11, first end discharging rod 12, the second end discharging rod 13, the first plug 14 and second are stifled
15;
In the middle part of grafting, discharging rod 11, first end discharging rod 12, the second end discharging rod 13, the first plug 14 and second are stifled
15 form and spill stub bar component 10;
Fixation spills stub bar component 10 in spilling on bin 20.
When stub bar component is spilt in formation, also comprise the steps:Guarantee first material outlet pipe 111, second material outlet pipe 121
In the same plane with the axis of 131 three of 3 material outlet pipe.
Certainly, the present invention can also have other various embodiments, in the case of without departing substantially from present invention spirit and its essence, ripe
Know those skilled in the art and work as and various corresponding changes and deformation can be made according to the present invention, but these change and change accordingly
Shape should all belong to the protection domain of appended claims of the invention.
Claims (10)
1. a kind of polyurethane thermal insulation board tinuous production cloth bar assembly, it is characterised in that including spill stub bar component and with spill
Stub bar component is adapted the bin that spills for spilling stub bar component with fixation, wherein,
The bin that spills includes one first transverse support bar, one second transverse support bar and the longitudinally connected bar of Duo Gen, described first
Transverse support bar is be arranged in parallel with second transverse support bar, and many longitudinally connected bars be arranged in parallel and to be connected to first horizontal
Between support bar and the second transverse support bar;
The stub bar component that spills includes middle part discharging rod, first end discharging rod and the second end discharging rod;The middle part goes out
Material bar is the tee Ts with an entrance, two outlets, is also associated with many first material outlet pipes on the tee T;Described
One end discharging rod one end is connected with a wherein mouth rotation of the tee T and the relative tee T can be dismantled, another
Many second material outlet pipes are also associated with end connection one first plug, and the first end discharging rod;The second end
Discharging rod one end is connected with another mouth rotation of the tee T and the relative tee T can be dismantled, other end connection one
Many 3 material outlet pipes are also associated with second plug, and the second end discharging rod;The first material outlet pipe, described
The axis of second material outlet pipe and the 3 material outlet pipe three is in the same plane, the length of the first material outlet pipe
Degree is more than the length of the second material outlet pipe/3 material outlet pipe, and the second material outlet pipe and the 3rd thing
Material outlet pipe is symmetrical arranged centered on the first material outlet pipe.
2. polyurethane thermal insulation board tinuous production cloth bar assembly as claimed in claim 1, it is characterised in that described first
With gap between transverse support bar and second transverse support bar, the first material outlet pipe, the second material outlet pipe
First transverse support bar is fastened on second transverse support bar with the 3 material outlet pipe corresponding to the gap
Between, and the axis of the first material outlet pipe, the second material outlet pipe and the 3 material outlet pipe three with described
First transverse support bar and second transverse support bar are vertical.
3. polyurethane thermal insulation board tinuous production cloth bar assembly as claimed in claim 1, it is characterised in that described many
The length of first material outlet pipe is identical.
4. polyurethane thermal insulation board tinuous production cloth bar assembly as claimed in claim 1, it is characterised in that described many
The length of second material outlet pipe is gradually successively decreased from close first material outlet pipe side toward close first plug side.
5. polyurethane thermal insulation board tinuous production cloth bar assembly as claimed in claim 1, it is characterised in that described many
The length of 3 material outlet pipe is gradually successively decreased from close first material outlet pipe side toward close second plug side.
6. polyurethane thermal insulation board tinuous production cloth bar assembly as claimed in claim 1, it is characterised in that described first
End discharging rod one end is coordinated with the outlet gap of the tee T for docking, and the other end is coordinated with the first plug gap.
7. polyurethane thermal insulation board tinuous production cloth bar assembly as claimed in claim 1, it is characterised in that described second
End discharging rod one end is coordinated with the outlet gap of the tee T for docking, and the other end is coordinated with the second plug gap.
8. the polyurethane thermal insulation board tinuous production cloth bar assembly as described in any one in claim 1-7, its feature
It is, the periphery of the first material outlet pipe, the second material outlet pipe and the 3 material outlet pipe is all provided with multiple adding
Strong muscle.
9. the polyurethane thermal insulation board tinuous production manufacture method of cloth bar assembly described in a kind of claim 1, its feature
It is, comprises the steps:
Prepare to spill bin;
Prepare middle part discharging rod, first end discharging rod, the second end discharging rod, the first plug and the second plug;
In the middle part of grafting, discharging rod, first end discharging rod, the second end discharging rod, the first plug and the second plug are formed and spill stub bar
Component;
Fixation spills stub bar component in spilling on bin.
10. manufacture method according to claim 9, it is characterised in that when stub bar component is spilt in formation, also include following step
Suddenly:Guarantee that the axis of first material outlet pipe, second material outlet pipe and 3 material outlet pipe three is in the same plane.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611106600.1A CN106426721A (en) | 2016-12-05 | 2016-12-05 | Distributor boom component for polyurethane insulation board serial production line and manufacturing method of distributor boom component |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611106600.1A CN106426721A (en) | 2016-12-05 | 2016-12-05 | Distributor boom component for polyurethane insulation board serial production line and manufacturing method of distributor boom component |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106426721A true CN106426721A (en) | 2017-02-22 |
Family
ID=58223963
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611106600.1A Pending CN106426721A (en) | 2016-12-05 | 2016-12-05 | Distributor boom component for polyurethane insulation board serial production line and manufacturing method of distributor boom component |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106426721A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2021195014A1 (en) * | 2020-03-26 | 2021-09-30 | Dow Global Technologies Llc | Foaming mixture dispensing apparatus and method |
CN113997472A (en) * | 2021-12-03 | 2022-02-01 | 湖南精正设备制造有限公司 | Open type pouring device of laminating machine for fixing sprinkling rod |
WO2022246592A1 (en) * | 2021-05-24 | 2022-12-01 | 万华化学集团股份有限公司 | Distribution rod for continuous production and use thereof |
-
2016
- 2016-12-05 CN CN201611106600.1A patent/CN106426721A/en active Pending
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2021195014A1 (en) * | 2020-03-26 | 2021-09-30 | Dow Global Technologies Llc | Foaming mixture dispensing apparatus and method |
WO2022246592A1 (en) * | 2021-05-24 | 2022-12-01 | 万华化学集团股份有限公司 | Distribution rod for continuous production and use thereof |
CN113997472A (en) * | 2021-12-03 | 2022-02-01 | 湖南精正设备制造有限公司 | Open type pouring device of laminating machine for fixing sprinkling rod |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106426721A (en) | Distributor boom component for polyurethane insulation board serial production line and manufacturing method of distributor boom component | |
CN103906608B (en) | Slurry dispense system and method | |
CN103402726A (en) | Method and device for applying liquid reaction mixtures to a cover layer | |
CN105222564A (en) | Dispellable mould casting drying room | |
CN206326794U (en) | Polyurethane thermal insulation board tinuous production cloth bar assembly | |
CN206326793U (en) | Polyurethane thermal insulation board tinuous production cloth bar assembly | |
CN208996290U (en) | Ceiling structure | |
CN106626216A (en) | Distributor boom assembly for continuous product line of polyurethane heat preservation board and manufacturing method thereof | |
CN110843189A (en) | Micro-foaming forming equipment for wood-plastic door plate and using method thereof | |
CN107549237B (en) | A kind of sheet fried food spray taste machine | |
CN107206420A (en) | Cast bar for manufacturing composite plate | |
CN205037718U (en) | Baking house for lost pattern casting disappears | |
CN106928271A (en) | Continuous synthesis O, the method and its device of O dimethyl thiophosphoryl chlorides | |
CN209138454U (en) | A kind of automatic preparation facilities of solution of anti-conglomeration | |
CN213311890U (en) | Side surface integral temperature control system in sterilization pot | |
CN207170057U (en) | A kind of forming machine, spraying equipment and the multi-fluid distributor of MULTILAYER COMPOSITE object | |
CN216018995U (en) | Automatic spraying device for vermicelli workshop | |
CN110524778A (en) | A kind of more component polyurethane mixing material feeding pipette tips of refrigerator | |
CN218604823U (en) | Bread air knife air blowing loosening vibration device | |
US3342143A (en) | Method and apparatus for forming an edible product | |
CN203805137U (en) | Foaming slurry mixer | |
CN204100888U (en) | A kind of cooling tower efficient fabric hydrophone | |
CN207465708U (en) | A kind of uniform polyurethane foaming device of batch mixing | |
CN212925209U (en) | Electroplating diamond wire sand blasting device | |
CN211794215U (en) | Cleaning equipment of raw materials for preserved fruit processing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170222 |