CN106426036B - A kind of construction iron nail storing unit - Google Patents

A kind of construction iron nail storing unit Download PDF

Info

Publication number
CN106426036B
CN106426036B CN201611116541.6A CN201611116541A CN106426036B CN 106426036 B CN106426036 B CN 106426036B CN 201611116541 A CN201611116541 A CN 201611116541A CN 106426036 B CN106426036 B CN 106426036B
Authority
CN
China
Prior art keywords
nail
arc
slot
backboard
iron nail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611116541.6A
Other languages
Chinese (zh)
Other versions
CN106426036A (en
Inventor
李丰刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Group Co Ltd
Beijing Construction Technology Co Ltd of China Railway Construction Group Co Ltd
Original Assignee
China Railway Construction Group Co Ltd
Beijing Construction Technology Co Ltd of China Railway Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Group Co Ltd, Beijing Construction Technology Co Ltd of China Railway Construction Group Co Ltd filed Critical China Railway Construction Group Co Ltd
Priority to CN201611116541.6A priority Critical patent/CN106426036B/en
Publication of CN106426036A publication Critical patent/CN106426036A/en
Application granted granted Critical
Publication of CN106426036B publication Critical patent/CN106426036B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25HWORKSHOP EQUIPMENT, e.g. FOR MARKING-OUT WORK; STORAGE MEANS FOR WORKSHOPS
    • B25H3/00Storage means or arrangements for workshops facilitating access to, or handling of, work tools or instruments

Abstract

A kind of construction iron nail storing unit of the present invention discloses a kind of portable, and the device of iron nail can be orderly taken in building construction process.It is characterized in that the two sides of bottom plate are equipped with side plate respectively, the bottom of arc backboard is connected with bottom plate, two sides are connected with side plate respectively, arc backboard is the backboard with weak magnetic, drop-preventing cover side is placed on the top edge of arc backboard by arc connection sheet, there is certain distance between drop-preventing cover and the top edge of arc backboard, front apron is articulated on the other side of drop-preventing cover, the lower edge of front apron, which extends to, takes nail slot upper edge, two bandages are respectively placed in the two sides of arc backboard, multiple arcs snap-gauge is equidistantly equipped between two side plates, the bottom of arc snap-gauge is placed on bottom plate, bail slot is equipped between two adjacent arc snap-gauges.

Description

A kind of construction iron nail storing unit
Technical field
A kind of construction iron nail storing unit of the present invention is related to a kind of iron nail used when construction storage storage dress It sets, belongs to Architectural Equipment field.In particular to a kind of portable, iron nail can be orderly taken in building construction process Device.
Background technique
In building construction process, the fixation of pipeline, the installation of support frame are required using iron nail, but in construction, by It is easy to stab operator in tip one end of iron nail, so the carrying and storage of iron nail seem critically important, existing in construction Iron nail storage use cloth bag, since nail is more, and than sharp, therefore, often using after several days, cloth bag will be followed closely Son is pricked thoroughly, and bundle is rotten, if nail is fallen high aerial, is easy to bring danger to lower work personnel, and part is sub using wooden case As the tool that holds of nail, on the one hand this wooden case is not easy to carry, and on the other hand, also than cumbersome, is unfavorable for Worker's aloft operation.And use iron sheet case, although be not easy to be pricked by nail it is bad, than cumbersome, for a long time carry in waist Between, it is easy to weigh the waist of worker wounded.And simple plastic barrel or paint kettle are used, construction personnel, which puts his hand into, takes iron nail in bucket When, because of the placement that iron nail is unordered, the tip of iron nail can pass through gloves and stab finger, and to construction, personnel are damaged, together When, be easy to take more iron nails out of since iron nail is staggeredly unordered, when taking, cause iron nail to fall, cause to waste, and plastic barrel or The service life of paint kettle is short, and iron nail collision friction in bucket can prick bucket wall saturating.
Summary of the invention
In order to improve above situation, a kind of construction iron nail storing unit of the present invention provide it is a kind of portable, The device of iron nail can be orderly taken in building construction process.Structure is simple, convenient and practical.
A kind of construction iron nail storing unit of the present invention is achieved in that a kind of construction iron nail storage of the present invention Device by bandage, front apron, arc backboard, drop-preventing cover, arc connection sheet, side plate, bottom plate, elastic block piece, take nail slot, bail slot It is formed with arc snap-gauge, the two sides of bottom plate are equipped with side plate respectively, and the bottom of arc backboard is connected with bottom plate, and two sides are respectively and side Plate connection, the arc backboard are the backboard with weak magnetic, and the drop-preventing cover side is placed in arc by arc connection sheet and carries on the back On the top edge of plate, there is certain distance between the drop-preventing cover and the top edge of arc backboard, the front apron is articulated with anti-lost On the other side of lid, the lower edge of the front apron, which extends to, takes nail slot upper edge, and two bandages are respectively placed in arc backboard Two sides, be equidistantly equipped with multiple arcs snap-gauge between described two side plates, the bottom of the arc snap-gauge is placed on bottom plate, phase It is equipped with bail slot between two adjacent arc snap-gauges, the bottom of the bail slot, which is equipped with, takes nail slot, takes nail slot by adjacent two The semi-circular groove that bottom between arc snap-gauge has, in addition the gap between two arc snap-gauges collectively forms, it is described The width of bail slot is slightly larger than the diameter of stand-by iron nail, and is less than the diameter of the stand-by head of a nail, and taking nail slot is circular trough, described to take nail The diameter of slot is slightly larger than the diameter of the stand-by head of a nail, and the elastic block piece is placed between two side plates, and elastic block piece will take nail slot Lower half portion shelters from, and the upper edge of elastic block piece part corresponding with nail slot is taken is provided with semi-circular groove, the semicircle The diameter of slot is equal to the diameter of stand-by iron nail.
In use, making the ailhead of stand-by iron nail first upward, front apron is overturn, then from the upper of drop-preventing cover and arc backboard In gap between edge, the stand-by iron nail head of a nail is put into vertically in the bail slot between arc snap-gauge, and make the rivet nut of iron nail Along corresponding bail slot ordered arrangement, the iron nail head of a nail can be stuck in corresponding bail slot, then be sent out this by two bandages It is bright to be bundled on the body of construction personnel, when taking iron nail, the ailhead for taking the iron nail in nail slot need to be only pinched, iron nail is taken away Afterwards, the stand-by iron nail in bail slot can move down under gravity, continue to fall in take and follow closely in slot, take convenient for next time, Iron nail can constantly be taken out repeatedly, the magnetic design of arc back panel straps is able to solve nail in bail slot, Because gravity moves down, the head of a nail is caused to be superimposed, it is difficult to the problem of taking, and the design of weak magnetic, and will not influence iron nail Movement under gravity can be such that iron nail preferably moves down along bail slot, and the design of the drop-preventing cover is able to solve worker and exists When leaning to one side or stand upside down, the problem of causing nail to fall from bail slot, the top edge of the drop-preventing cover and arc backboard Between have the design of certain distance, can be put into bail slot and be more convenient in nail, the design of the front apron can not only be into one Step prevents nail from falling from bail slot, moreover it is possible to which when solving worker and take nail from top to bottom, hand first encounters upside nail, causes Hand scratch the problem of, while worker face a danger fall or other problems occur when, also iron nail can be prevented direct Human body is punctured, the design for taking nail slot is more convenient to take after nail can be made to slide from bail slot, the elastic block piece Design, nail can be made to skid off from taking in nail slot, and do not hinder taking for nail, the semi-circular groove on the elastic block piece Design, the nail that bottom can be made to be taken preferably take out, and the design of the bandage can be as needed by curved body Case is bundled in any position of worker's body, and the design of the arc backboard also can prevent from weighing wounded when with The waist of people achievees the purpose that take iron nail convenient for construction personnel.
Beneficial effect.
One, structure is simple, convenient and practical.
Two, low in cost, it is easy to spread.
Detailed description of the invention
Attached drawing 1 is a kind of three-dimensional structure diagram of construction iron nail storing unit of the present invention.
In attached drawing
Wherein part are as follows: bandage 1, front apron 2, arc backboard 3, drop-preventing cover 4, arc connection sheet 5, side plate 6, bottom plate 7, bullet Property baffle 8, take nail slot 9, bail slot 10, arc snap-gauge 11.
Specific embodiment:
A kind of construction iron nail storing unit of the present invention is achieved in that in use, making the nail of stand-by iron nail first Head-up, overturning front apron 2 follows closely stand-by iron nail then in the gap between drop-preventing cover 4 and the top edge of arc backboard 3 Cap is put into vertically in the bail slot 10 between arc snap-gauge 11, and arranges the rivet nut of iron nail orderly along corresponding bail slot 10 Column, the iron nail head of a nail can be stuck in corresponding bail slot 10, then the present invention is bundled in the body of construction personnel by two bandages 1 On body, when taking iron nail, the ailhead for taking the iron nail in nail slot 9 need to be only pinched, it is stand-by in bail slot 10 after iron nail is taken away Iron nail can move down under gravity, continue to fall in take and follow closely in slot 9, take convenient for next time, repeatedly can be by iron Nail constantly takes out, and the arc backboard 3 is able to solve nail in bail slot 10 with magnetic design, because gravity moves down, The head of a nail is caused to be superimposed, it is difficult to the problem of taking, and the design of weak magnetic, and will not influence the shifting under iron nail gravity It is dynamic, iron nail can be made preferably to move down along bail slot 10, the design of the drop-preventing cover 4 is able to solve worker and is leaning to one side or falling When vertical, the problem of causing nail to fall from bail slot, have one between the drop-preventing cover 4 and the top edge of arc backboard 3 The design of set a distance can be put into bail slot 10 in nail and be more convenient, and the design of the front apron 2 can not only further be prevented Non-magnetic shim is fallen from bail slot 10, moreover it is possible to which when solving worker and take nail from top to bottom, hand first encounters upside nail, leads to hand Portion scratch the problem of, while worker face a danger fall or other problems occur when, also iron nail can be prevented directly right Human body punctures, the design for taking nail slot 9, more convenient to take after nail can be made to slide from bail slot 10, the elastic block piece 8 design can be such that nail skids off from taking in nail slot 9, and not hinder taking for nail, the semicircle on the elastic block piece 8 The design of slot, the nail that bottom can be made to be taken preferably take out, the design of the bandage 1, can be as needed by arc Shape main body case is bundled in any position of worker's body, the design of the arc backboard 3, also can when with, The waist for preventing from weighing wounded people achievees the purpose that take iron nail convenient for construction personnel.

Claims (5)

1. a kind of construction iron nail storing unit, it is characterized in that: being connected by bandage, front apron, arc backboard, drop-preventing cover, arc Contact pin, bottom plate, elastic block piece, takes nail slot, bail slot and arc snap-gauge composition at side plate, and the two sides of bottom plate are equipped with side plate, arc respectively The bottom of shape backboard is connected with bottom plate, and two sides are connected with side plate respectively, and drop-preventing cover side is placed in arc by arc connection sheet and carries on the back On the top edge of plate, there is certain distance between drop-preventing cover and the top edge of arc backboard, front apron is articulated with the another of drop-preventing cover On side, the lower edge of front apron, which extends to, takes nail slot upper edge, and two bandages are respectively placed in the two sides of arc backboard, two sides Multiple arcs snap-gauge is equidistantly equipped between plate, the bottom of arc snap-gauge is placed on bottom plate, between two adjacent arc snap-gauges It is equipped with bail slot, the bottom of bail slot, which is equipped with, takes nail slot, and elastic block piece is placed between two side plates, and elastic block piece will take nail slot Lower half portion shelters from, and the upper edge of elastic block piece part corresponding with nail slot is taken is provided with semi-circular groove, semi-circular groove Diameter is equal to the diameter of stand-by iron nail.
2. a kind of construction iron nail storing unit as described in claim 1, it is characterised in that the arc backboard be with The backboard of weak magnetic.
3. a kind of construction iron nail storing unit as described in claim 1, it is characterised in that the width of the bail slot omits Greater than the diameter of stand-by iron nail, and it is less than the diameter of the stand-by head of a nail.
4. a kind of construction iron nail storing unit as described in claim 1, it is characterised in that described to take nail slot by adjacent The semi-circular groove that bottom between two arc snap-gauges has, in addition the gap between two arc snap-gauges collectively forms.
5. a kind of construction iron nail storing unit as described in claim 1 or 4, it is characterised in that described to take nail slot for circle Slot takes the diameter of nail slot to be slightly larger than the diameter of the stand-by head of a nail.
CN201611116541.6A 2016-12-07 2016-12-07 A kind of construction iron nail storing unit Active CN106426036B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611116541.6A CN106426036B (en) 2016-12-07 2016-12-07 A kind of construction iron nail storing unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611116541.6A CN106426036B (en) 2016-12-07 2016-12-07 A kind of construction iron nail storing unit

Publications (2)

Publication Number Publication Date
CN106426036A CN106426036A (en) 2017-02-22
CN106426036B true CN106426036B (en) 2019-01-18

Family

ID=58217374

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611116541.6A Active CN106426036B (en) 2016-12-07 2016-12-07 A kind of construction iron nail storing unit

Country Status (1)

Country Link
CN (1) CN106426036B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110670887B (en) * 2019-09-06 2021-06-15 毛浩辰 Wire binding extractor for floor steel bar binding

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE29617764U1 (en) * 1996-10-12 1996-12-12 Gmeiner Erwin Holder for screws or nails or the like.
US7032748B2 (en) * 2003-05-28 2006-04-25 Conklin William M Portable dispensers for fastening means
CN201940993U (en) * 2011-03-03 2011-08-24 赵方朔 Screw storage device
CN204546479U (en) * 2015-03-31 2015-08-12 武汉建工集团股份有限公司 A kind of carpenter uses multi-purpose tool purse
CN204604291U (en) * 2015-05-13 2015-09-02 国家电网公司 The little gold utensil case of distribution operating maintenance

Also Published As

Publication number Publication date
CN106426036A (en) 2017-02-22

Similar Documents

Publication Publication Date Title
GB2495045A (en) An apparatus for processing a batched unit of work
CN106426036B (en) A kind of construction iron nail storing unit
CN204396036U (en) Rack for test tube
CN204221757U (en) Operation post
CN207528765U (en) A kind of testing base device for mobile phone screen
CN204214528U (en) Weighing device
CN104249836B (en) Slices of caprone feeds special stroke of bagging apparatus
CN105863491A (en) Book sorting ladder for library
CN205229170U (en) Portable pesticide residue detector
CN206643865U (en) A kind of multi-functional nail hitting device
CN206980003U (en) A kind of article-storable basketball stands
CN203912024U (en) Mobile phone clamp
CN207501942U (en) A kind of multi-functional cable inlet bracket
CN205146285U (en) Experiment operating platform
CN204050220U (en) Extension type finger-separating plate
CN202112483U (en) Tool bag
CN204466087U (en) A kind of container-type generator rack
CN205146966U (en) Return bend automatic checkout device
CN104339377A (en) Hand sleeve mechanism facilitating protective operation
CN209264698U (en) A kind of portable simple food detection device
CN212071804U (en) Temporary supporting table for overhauling and maintaining parts of instrument
CN204260032U (en) Portable electronic device protective sleeve
CN204433589U (en) A kind of drug taking device for pharmacy
CN205285403U (en) Portable aerial -working safety carpenter chu ding box
CN203483002U (en) Protective jacket of tablet electronic equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20181102

Address after: 230031 B-1014, 10 floor, business office building, Wo Ye garden, Shushan District, Hefei, Anhui.

Applicant after: HEFEI WISDOM LONGTUTENG INTELLECTUAL PROPERTY CO., LTD.

Address before: 221000 186 Li Shuang Lou, song Lou, Fengxian County, Xuzhou, Jiangsu.

Applicant before: Li Fenggang

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20181121

Address after: Room 501, 20 Shijingshan Road, Shijingshan District, Beijing 100043

Applicant after: Beijing China Iron and Construction Technology Co., Ltd.

Applicant after: Zhongtie Construction Group Corporation Limited

Address before: 230031 B-1014, 10 floor, business office building, Wo Ye garden, Shushan District, Hefei, Anhui.

Applicant before: HEFEI WISDOM LONGTUTENG INTELLECTUAL PROPERTY CO., LTD.

GR01 Patent grant
GR01 Patent grant