CN106425336B - A kind of processing technology of large hydraulic plate shearing machine rack - Google Patents

A kind of processing technology of large hydraulic plate shearing machine rack Download PDF

Info

Publication number
CN106425336B
CN106425336B CN201611192832.3A CN201611192832A CN106425336B CN 106425336 B CN106425336 B CN 106425336B CN 201611192832 A CN201611192832 A CN 201611192832A CN 106425336 B CN106425336 B CN 106425336B
Authority
CN
China
Prior art keywords
wallboard
welded
welding
axis hole
processing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611192832.3A
Other languages
Chinese (zh)
Other versions
CN106425336A (en
Inventor
王大进
严长贵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANHUI JINDAJIN HEAVY INDUSTRY MACHINE TOOL Co Ltd
Original Assignee
ANHUI JINDAJIN HEAVY INDUSTRY MACHINE TOOL Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANHUI JINDAJIN HEAVY INDUSTRY MACHINE TOOL Co Ltd filed Critical ANHUI JINDAJIN HEAVY INDUSTRY MACHINE TOOL Co Ltd
Priority to CN201611192832.3A priority Critical patent/CN106425336B/en
Publication of CN106425336A publication Critical patent/CN106425336A/en
Application granted granted Critical
Publication of CN106425336B publication Critical patent/CN106425336B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23DPLANING; SLOTTING; SHEARING; BROACHING; SAWING; FILING; SCRAPING; LIKE OPERATIONS FOR WORKING METAL BY REMOVING MATERIAL, NOT OTHERWISE PROVIDED FOR
    • B23D33/00Accessories for shearing machines or shearing devices

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

The invention discloses a kind of processing technologys of large hydraulic plate shearing machine rack, belong to plate shearing machine manufacture field.The procedure of processing of plate shearing machine rack in the present invention are as follows: step 1, processing wallboard, front panel;Step 2, weld brackets, and processing datum;Step 3, welding wallboard and front panel;Step 4 is welded to connect top support beam between two wallboards;Bracket is welded and fixed in step 5, discontinuous;It is cooling after step 6, flame heating, eliminate deformation;Step 7 carries out welding machine to bracket again;Step 8, whole machining.For the present invention by control welding method, flame straightening and whole mach processing technology, the deformation quantity of rack, improves dimensional accuracy when reducing welding processing, is conducive to the raising of the product processing quality and service life of plate shearing machine.

Description

A kind of processing technology of large hydraulic plate shearing machine rack
Technical field
The present invention relates to shear field of machining technology, more specifically to a kind of large hydraulic plate shearing machine rack Processing technology.
Background technique
Plate shearing machine is indispensable in the field of metal processing at present, and plate shearing machine is divided into hydraulic plate shears and electricity according to power type Dynamic plate shearing machine, electric plate shearer power foot is high-efficient, but vibration is larger, and noise is big, and energy shearing width is limited;Hydraulic shear Machine drives upper tool post movement mainly by two hydraulic cylinders, thus realize the shearing of plate, with stable performance, and can Wider plate is sheared, at present using relatively broad.
But in the production process of hydraulic plate shears, the method that welding either mechanical package can be used welds each section To being formed together rack, but since the distance between the two sides wallboard of large hydraulic plate shearing machine is longer, can produce during welding Raw biggish thermal stress causes pressure plate to deform, and then will affect the installation accuracy of upper tool post and lower tool apron, influences processing quality; And then the error that will appear in installation accuracy is larger, can have internal stress in the rack after welding installation, in plate shearing machine work It will lead to rack cracking damage, or even cutter distortion can be made, seriously affect the service life of plate shearing machine.
Find there is using being mechanically bolted the technical side for connecting rack each section in existing patent by retrieval Case, such as Chinese Patent Application No.: 201220444783.9, the applying date: on September 4th, 2012, this application discloses one kind to cut Trigger rack, including a column, preceding binder beam, workbench, upper support beam and lower support beam, column, preceding binder beam, work Making platform, rami posterior superior support crossbeam and rami posterior inferior support crossbeam is body structure, and upper support beam and lower support beam are located at and cut The upper and lower side of trigger fuselage afterbody, workbench are located at the downside of plate shearing machine fore-body, preceding binder beam both ends and workbench both ends The upper and lower part of a column, upper support beam both ends, lower support beam both ends, preceding binder beam are located in by flat key respectively Both ends and workbench both ends are fixedly connected into one with a column respectively by multiple fastening screws.
For another example China Patent No.: 201220457641.6, authorized announcement date: on March 27th, 2013, which discloses A kind of hydraulic plate shears assembled frame, it is equipped with left risers, binder panel, hydraulic oil container, right risers and workbench;Zuo Li Plate, right risers, binder panel and workbench junction be equipped with sets of holes and screw hole, workbench, binder panel be in sets of holes and At screw hole using swollen bolt and screw respectively in left risers, right risers sets of holes and screw hole constitute and connect;Left risers and right risers It is equipped with otic placode positioned at the junction of hydraulic oil container, is respectively arranged below with two pieces of connecting plates at left and right sides of hydraulic oil container, it is hydraulic Fuel tank is to be constituted connection with two pieces of otic placodes in left risers and right risers respectively with two pieces of connecting plates and using screw.
Above-mentioned two pieces patent formula is that front panel and worktable panel are connected using bolt, although being connected by screw bolts Thermal stress deformation will not be generated, but is easy to loosen in use, influences machining accuracy;Furthermore the front panel of plate shearing machine and two The wallboard thickness of side is smaller, and intensity is insufficient after opening up bolt hole, and plate is be easy to cause to tear.
Summary of the invention
1. technical problems to be solved by the inivention
It is an object of the invention to overcome in the prior art large hydraulic plate shearing machine processing when easily-deformable, precision be difficult to control System is insufficient, provides a kind of processing technology of large hydraulic plate shearing machine rack, technical solution of the present invention, by controlling welding side Method, flame straightening and whole mach processing technology, the deformation quantity of rack, improves size when reducing welding processing Precision is conducive to the raising of the product processing quality and service life of plate shearing machine.
2. technical solution
In order to achieve the above objectives, technical solution provided by the invention are as follows:
A kind of processing technology of large hydraulic plate shearing machine rack of the invention, procedure of processing are as follows:
Two step 1, processing wallboards, and upper roller axis hole and bottom roller axis hole are processed on wallboard, on the front panel plus Work transverse-roller axis hole, the reserved 0.5~1.5mm surplus of 3 kinds of idler wheel axis holes;And binder seat is welded together with front panel;
Worktable panel and main supporting plate, auxiliary supporting plate are welded together to form bracket, main supporting plate, auxiliary supporting plate by step 2 It is each perpendicular to worktable panel;Then mounting surface is cut to desired size on processing work deck plate;
The first wallboard in step 3, fixed wallboard, front panel and the first wallboard split, and spot welding positions;Then it lifts Second wallboard makes itself and front panel split, spot welding positioning;Then front panel and two wallboards are welded and fixed;
Step 4 is welded to connect top support beam between two wallboards, forms rack framework;
Step 5 is lifted into the bracket welded in step 2 on the plummer on front side of wallboard, and adjusts bracket locations, in work The wallboard outer surface junction spot welding for making deck plate and rack framework two sides positions, then using discontinuous welding method bracket It is welded and fixed;
Step 6, the straightness for examining front panel, mark deformation region, with the middle part in flame gun heat distortion region to 650 ~700 DEG C, water-spraying control;
Step 7, the weld seam welded along discontinuous, again weld whole weld seam of the junction of bracket and wallboard;
Rack after welding is transported to machining center by step 8, by worktable panel cut mounting surface on the basis of into Row machining.
As further improvement of the present invention, the wallboard outer surface in step 1 corresponds to upper roller axis hole and bottom roller It is welded with thickening plate at the position of axis hole, which is circle, and is coaxially disposed with idler wheel axis hole.
As further improvement of the present invention, in step 2, tool apron adjustable plate is first welded on worktable panel, then will Worktable panel, main supporting plate and auxiliary supporting plate weld together.
As further improvement of the present invention, spot welding tab order in step 3 are as follows: plate is contacted with the first wallboard in front Top position at spot welding, be then divided to two sections of spot welding in the outside of stitching portion, every section of spot welding length is 60~120mm;Then it presses According to same the second wallboard of sequence spot welding and front panel.
Welding sequence as further improvement of the present invention, in step 3 after the spot welding of front panel two sides are as follows: in the past Panel and the inside of the first wallboard stitching portion are welded from the bottom to top;Then from the inside of front panel and the second wallboard stitching portion under Supreme welding;According to same welding sequence, welded from the bottom to top from the outside of front panel and the first wallboard, the second wallboard stitching portion It connects.
As further improvement of the present invention, after having welded top support beam in step 4, welded between two wallboards Pushing rod, the pushing rod are located at the bottom of wallboard.
As further improvement of the present invention, it is welded and fixed in step 5 with carrying out discontinuous to the mode of welded corner joint, it is right Welded corner joint sequence are as follows: the junction of main supporting plate and the first wallboard is first welded, then to the junction of auxiliary supporting plate and the second wallboard It is welded, then successively the junction of main supporting plate and the second wallboard, auxiliary supporting plate and the first wallboard is welded.
As further improvement of the present invention, when being processed in step 6 with flame gun, if front panel is recessed inwardly, from The heating of inside flame;If front panel outwardly protrudes, heated from outside flame;And in the vertical direction from deformation region it is big one The heating of side spray fire.
As further improvement of the present invention, the welding of whole weld seam is carried out in step 7 using diagonal welding manner.
As further improvement of the present invention, machining sequence in step 8 are as follows:
The lateral surface of S1, the upper roller axis hole for processing the first wallboard and bottom roller axis hole, make its lateral surface vertical plane;
S2, the upper roller axis hole for processing the first wallboard and bottom roller axis hole make idler wheel to desired height and internal diameter The axis of axis hole is vertical with its lateral surface;
S3, processing make its lateral surface perpendicular to datum level close to the lateral surface of the transverse-roller axis hole of the first wallboard side;
S4, cross machine idler wheel axis hole to desired height and internal diameter, the axis of transverse-roller axis hole and its outside Face is vertical;
S5, the other end of rack is processed according to the step of S1~S4.
3. beneficial effect
Using technical solution provided by the invention, compared with prior art, have the following beneficial effects:
(1) processing technology of a kind of large hydraulic plate shearing machine rack of the invention reasonably arranges welding processing work before this Then skill, rack framework at assembling eliminate welding deformation using the method for flame heating;Finally in the way of overall processing pair Mounting hole in rack is processed, and so as to effectively control the deformation quantity of rack, eliminates micro deformation using postwelding processing Influence to dimensional accuracy substantially increases the machining accuracy of rack, facilitates the raising of plate shearing machine service life;
(2) processing technology of a kind of large hydraulic plate shearing machine rack of the invention, in weld brackets, using to welded corner joint Mode be welded and fixed, facilitate eliminate deformation dislocation;It is first to weld main supporting plate when carrying out every time to fillet welding, main branch Plate plays main support to worktable panel, and auxiliary supporting plate only further increases structural strength, therefore, it is necessary to be first to weld Main supporting plate, it is ensured that its positional accuracy and structural stability, and then guarantee the position precision of worktable panel or more tool apron, it improves Integral solder quality;
(3) processing technology of a kind of large hydraulic plate shearing machine rack of the invention has been welded carrying out discontinuous to bracket The global shape of Bi Hou, rack are fixed, and cooling method carries out straightening after being heated at this time by flame, for front panel It is smaller with the influence of worktable panel;Then the welding for carrying out whole weld seam to bracket again, ensure that base on worktable panel The precision in quasi- face.
Detailed description of the invention
Fig. 1 is the flow diagram of frame processing method in the present invention;
Fig. 2 by the present invention processing rack side structure schematic diagram;
Fig. 3 by the present invention processing rack positive structure schematic;
Fig. 4 by the present invention processing bracket structural schematic diagram;
Fig. 5 is the spot welding sequential schematic of front panel and the first wallboard stitching portion in the present invention;
Fig. 6 is the method schematic diagram that sheet deformation is eliminated in flame heating in the present invention.
Label declaration in schematic diagram: 11, the first wallboard;12, the second wallboard;13, top support beam;14, pushing rod; 15, upper roller axis hole;16, bottom roller axis hole;17, thickening plate;21, front panel;22, transverse-roller axis hole;23, binder seat;24, Feeding pressure mechanism;31, tool apron adjustable plate;32, lower tool apron;33, lower knife body;41, worktable panel;42, main supporting plate;43, auxiliary branch Plate;44, yoke crosstie;441, mounting surface is cut;45, lightening hole.
Specific embodiment
To further appreciate that the contents of the present invention, the present invention is described in detail in conjunction with the accompanying drawings and embodiments.
Embodiment 1
In conjunction with Fig. 2, Fig. 3, hydraulic plate shears includes the first wallboard 11 and the second wallboard 12, front panel 21, has workbench The bracket of panel 41, the first wallboard 11 and the second wallboard 12 are distributed in the two sides of rack, play the role of main support, and therein One, second differentiation description is simply facilitated, the practical structures of plate shearing machine is not specifically limited.Before front panel 21 is located at rack Side, for fixing feeding pressure mechanism 24, which is bolted in binder seat 23 the binder seat 23 of 21 lower section of front panel On, for pushing down plate when shear.The rear side of rack is equipped with top support beam 13, which can further increase The structural strength of rack.
It for hydraulic plate shears, during welding, inevitably will appear deformation, cut due to commonly middle-size and small-size Trigger deformation is smaller, and most enterprises can take the measure of amplification reserve to solve deformation problems, but this method can reduce processing Precision.For large-scale plate shearing machine, since the front plate is longer, deformation quantity is more prominent, is not overcome, can serious shadow Ring the product processing quality of plate shearing machine and the service life of itself.
In view of the above-mentioned problems, present embodiments provide a kind of processing technology of large hydraulic plate shearing machine rack, in conjunction with Fig. 1, Its procedure of processing are as follows:
Two step 1, processing wallboards, and upper roller axis hole 15 and bottom roller axis hole 16 are processed on wallboard;Plate in front Cross machine idler wheel axis hole 22 on 21, and binder seat 23 and front panel 21 are welded together.The processing of wallboard and front panel can It carries out, is independent of each other between the two respectively.But in processing upper roller axis hole 15, bottom roller axis hole 16 and transverse-roller axis hole 22 When, 0.5~1.5mm surplus is reserved, reserved 1mm surplus may be selected, other numerical value also may be selected, select according to specific needs, do not have There is concrete restriction.
Step 2 is welded together to form worktable panel 41 and main supporting plate 42, auxiliary supporting plate 43 bracket, main supporting plate 42, Auxiliary supporting plate 43 is each perpendicular to worktable panel 41;Then mounting surface 441 is cut to requiring ruler on processing work deck plate 41 It is very little.
The working face of worktable panel 41 will be used as machining benchmark, it is necessary to the precision of working face after guarantee welding, and plate Material welding when easily generate thermal deformation, therefore, how welding when guarantee worktable panel 41 machining accuracy it is particularly significant.
The main function of bracket is to provide bottom bearing capacity when shearing, mainly by worktable panel 41,42 and of main supporting plate Supporting plate 43 is assisted to form.When welding, tool apron adjustable plate 31 is first welded on worktable panel 41, then by worktable panel 41, main Supporting plate 42 and auxiliary supporting plate 43 weld together.After the completion of welding, the upper surface of processing work deck plate 41 makes worktable panel Mounting surface 441 is cut to desired size on 41, and surface is horizontal plane.Mounting surface 441 is cut for installing lower 32 He of tool apron Lower knife body 33.
As shown in Figure 4, main supporting plate 42 is vertically arranged, and auxiliary supporting plate 43 is vertically arranged.In order to increase structural strength, in master The bottom position of supporting plate 41 and auxiliary supporting plate 43 is connected with yoke crosstie 44, the yoke crosstie 44 main supporting plate when can prevent from welding 42 and auxiliary the internally deformation of supporting plate 43, have certain thermal deformation supporting role.Also loss of weight can be opened up on auxiliary supporting plate 43 Auxiliary 43 structural strength of supporting plate is reinforced in hole 45.
Common mode in order to facilitate processing, in many cases can first processing work face, then be welded to connect, lead to bracket Inside is there are thermal stress, the service life of deformation quantity meeting serious curtailment plate shearing machine when using in the later period.And in the present embodiment first Welding, then processed, the influence so as to avoid welding deformation to working face precision, help to improve the processing essence of complete machine Degree.
The first wallboard 11 in step 3, fixed wallboard, 11 split of front panel 21 and the first wallboard, and spot welding positions;So After lift the second wallboard 12 and make itself and 21 split of front panel, spot welding positioning;Then front panel 21 and two wallboards are welded and fixed; Feeding pressure mechanism 24 can be mounted on 23 lower surface of binder seat after welding.
Weld spot welding tab order when wallboard are as follows: point at the top position that first plate 21 is contacted with the first wallboard 11 in front Then weldering is divided to two sections of spot welding in the outside of stitching portion, every section of spot welding length is 80mm;In conjunction with Fig. 5, first 1. locate spot welding in position, Front panel is prevented to be detached from, Primary Location;Then 2. locate to weld positioning section, weld length 80mm in position;Then position 3. Place's welding positioning section, weld length 80mm.
Then according to same the second wallboard of sequence spot welding 12 and front panel 21, front panel 21 is made to be fixed on the first wallboard 11 and second between wallboard 12, and three position is determined.
Welding sequence when specific welding are as follows: welded from the bottom to top from front panel 21 and the inside of 11 stitching portion of the first wallboard It connects;Then it is welded from the bottom to top from front panel 21 and the inside of 12 stitching portion of the second wallboard;According to same welding sequence, in the past Panel 21 and the outside of 11 stitching portion of the first wallboard are welded from the bottom to top;From the outside of 12 stitching portion of front panel 21 and the second wallboard It welds from the bottom to top.
Due to first carrying out segmented welding positioning on the outside, when being welded from inside, it can avoid front panel 21 and misplace;This Outside, after front panel 21 and wallboard inside are welded, front panel can have a degree of deformation, can pass through control front panel 21 at this time Open area is spread to offset deformation with the leg of stitching portion on the outside of wallboard, is reduced thermal deformation, is obtained preferable welding quality.
Step 4 is welded to connect top support beam 13 between two wallboards, forms rack framework.
Since hydraulic plate shears does not need the lateral long axis of setting, before being only located on front side of wallboard between two wallboards Panel, is easy to appear deformation on rear side of wallboard, i.e. the left part of Fig. 2 deadlight is easy to appear deformation, and the top braces of welding Beam 13 is located at the upper left quarter of wallboard, to realize that side is fixed before and after wallboard, improves the structural strength of rack.
Step 5 is lifted into the bracket welded in step 2 on the plummer on front side of wallboard, and adjusts bracket locations, in work The wallboard outer surface junction spot welding for making deck plate 41 and rack framework two sides positions, then using discontinuous welding method support Frame is welded and fixed.
Since the mounting surface 441 that cuts on worktable panel 41 will be as machining benchmark, the main point of bracket welding exists The precision of mounting surface 441, strict control deformation are cut in guarantee.Therefore, it needs to process rack framework two sides before mounting bracket Wallboard plummer upper surface, be located at same level height.
Wherein discontinuous welding refers to welds multistage in same contact line, rather than directly welds whole weldering Seam, as in Fig. 5 position 2. and position 3. between interruption welding manner.It is general only locally to generate shape since interruption is welded Become, will not influence entire main supporting plate and auxiliary supporting plate.
It is worth noting that carrying out discontinuous welding by the way of to welded corner joint, main supporting plate 42 and the first wall are first welded Then the junction of plate 11 welds auxiliary supporting plate 43 and the junction of the second wallboard 12, then weld main supporting plate 42 and the Two wallboards, 12 junction, finally welding assists the junction of supporting plate 43 and the first wallboard 11.
The mounting surface 441 that cuts of worktable panel will be as the benchmark of following process, it is necessary to guarantee the welding essence of bracket Degree.By welding to angie type, the thermal deformation generated when welding can be made to cancel out each other;And main supporting plate plays main support work With first welding main supporting plate can guarantee its support strength, then weld diagonal auxiliary supporting plate, eliminate thermal deformation;And in Small-sized hydraulic plate shearing machine, length is shorter, by that can control deformation quantity within the allowable range to welded corner joint, ensure that welding essence Degree, to provide guarantee for subsequent machining.
Step 6, the straightness for examining front panel 21, mark deformation region, extremely with the middle part in flame gun heat distortion region 650~700 DEG C, water-spraying control;
When being processed with flame gun, if front panel is recessed inwardly, heated from inside flame;If front panel outwardly protrudes, It is heated from outside flame;Flame region is located at the middle part of recess or protruding parts, and big from deformation region in the vertical direction The heating of side flame.As shown in Figure 6, it since plate deformation position protrudes outward, is heated according to the direction of arrow A from outside; Since lower section deformation is greater than top deflection, according to the lower section of the direction flame heating from bottom to top plate of arrow B.Add It only needs the region between the two lines at middle part to heat when hot, is heated to 680 DEG C, spray water immediately to heating part cold But, due to panel shrinkage, eliminate or reduce deformation.
Step 7, the weld seam welded along discontinuous, again weld whole weld seam of the junction of bracket and wallboard.
The mounting surface 441 that cuts of worktable panel on bracket will be as mach datum level, it then becomes necessary to guarantee Its precision just can make following process, installation accuracy be protected, and after the welding of first time discontinuous, entire rack is positioned and fixed, It is heated by flame after eliminating deformation, then carries out secondary welding, completed the welding processing of whole seam, on the one hand can be avoided deformation Accumulation, on the other hand can reduce partial shape variable when secondary welding, fully ensure that the precision of datum level.
Rack after welding is transported to machining center by step 8, is with the mounting surface 441 that cuts on worktable panel 41 Benchmark is machined out, manufacturing procedure are as follows:
The lateral surface of S1, the upper roller axis hole 15 for processing the first wallboard 11 and bottom roller axis hole 16 keep its lateral surface perpendicular It faces directly;
S2, the upper roller axis hole 15 for processing the first wallboard 11 and bottom roller axis hole 16 to desired height and internal diameter, Keep the axis of idler wheel axis hole vertical with its lateral surface;
S3, processing make its lateral surface perpendicular to base close to the lateral surface of the transverse-roller axis hole 22 of 11 side of the first wallboard Quasi- face;
S4, cross machine idler wheel axis hole 22 to desired height and internal diameter, the axis of transverse-roller axis hole 22 and its Lateral surface is vertical;
S5, the other end of rack is processed according to the step of S1~S4.
Frame processing is carried out using the complete machine processing method after welding, can further eliminate micro deformation to machining accuracy It influences, upper roller axis hole, bottom roller axis hole and transverse-roller axis hole can guarantee the installation accuracy of upper tool post, on the other hand can protect Upper tool post is demonstrate,proved to move in vertical direction.Further, since the raising of precision, plate shearing machine existing deformation reduction when working, facilitate Improve the service life of plate shearing machine.
Embodiment 2
A kind of processing technology of large hydraulic plate shearing machine rack of the present embodiment, basic process and 1 phase of embodiment Together, the difference is that: wallboard outer surface in step 1 corresponds at the position of upper roller axis hole 15 and bottom roller axis hole 16 It is welded with thickening plate 17, which is circle, and is coaxially disposed with idler wheel axis hole.Due to the wallboard of small-sized plate shearing machine two sides Relatively thin, the thickening plate 17 of welding helps to improve structural strength, and facilitates whole machine operations in step 8.
After having welded top support beam 13 in step 4, pushing rod 14 is welded between two wallboards, which is located at The bottom of wallboard, further increases structural strength.
Flame heating temperature in step 6 is 700 DEG C, then can water-spraying control.
The lateral surface of the upper roller axis hole 15 and bottom roller axis hole 16 processed in step 8 is in the same plane, then once Feed can complete the processing of entire surface, high-efficient.
Embodiment 3
A kind of processing technology of large hydraulic plate shearing machine rack of the present embodiment, basic process and 2 phase of embodiment Together, further: the welding of whole weld seam is carried out using diagonal welding manner.It is welded from bottom to top when welding, welding sequence It is identical as discontinuous welding sequence, it may be assumed that first weld the junction of main supporting plate 42 and the first wallboard 11, then to auxiliary supporting plate 43 with The junction of second wallboard 12 is welded, then welds 12 junction of main supporting plate 42 and the second wallboard, finally welding auxiliary supporting plate 43 and first wallboard 11 junction.
In conjunction with above embodiments, the present invention reasonably arranges technique for welding before this, and rack framework at assembling is then sharp Welding deformation is eliminated with the method that flame heats;Finally the mounting hole in rack is processed in the way of overall processing, So as to effectively control the deformation quantity of rack, influence of the micro deformation to dimensional accuracy is eliminated using postwelding processing, is mentioned significantly The high machining accuracy of rack, facilitates the raising of plate shearing machine service life.
Schematically the present invention and embodiments thereof are described above, description is not limiting, institute in attached drawing What is shown is also one of embodiments of the present invention, and actual structure is not limited to this.So if the common skill of this field Art personnel are enlightened by it, without departing from the spirit of the invention, are not inventively designed and the technical solution Similar frame mode and embodiment, are within the scope of protection of the invention.

Claims (7)

1. a kind of processing technology of large hydraulic plate shearing machine rack, which is characterized in that its procedure of processing are as follows:
Step 1 processes two wallboards, and upper roller axis hole (15) and bottom roller axis hole (16) are processed on wallboard, in front plate (21) cross machine idler wheel axis hole (22) on, the reserved 0.5~1.5mm surplus of 3 kinds of idler wheel axis holes;And binder seat (23) with before Panel (21) welds together;Wallboard outer surface, which corresponds at upper roller axis hole (15) and the position of bottom roller axis hole (16), welds There are thickening plate (17), which is circle, and is coaxially disposed with idler wheel axis hole;
Worktable panel (41) and main supporting plate (42), auxiliary supporting plate (43) are welded together to form bracket, main supporting plate by step 2 (42), auxiliary supporting plate (43) is each perpendicular to worktable panel (41);Then mounting surface is cut on processing work deck plate (41) (441) to desired size;Tool apron adjustable plate (31) first are welded on worktable panel (41), then by worktable panel (41), main Supporting plate (42) and auxiliary supporting plate (43) weld together;
The first wallboard (11) in step 3, fixed wallboard, front panel (21) and the first wallboard (11) split, and spot welding positions; Then lifting the second wallboard (12) makes itself and front panel (21) split, spot welding positioning;Then front panel (21) and two wallboards It is welded and fixed;
Step 4 is welded to connect top support beam (13) between two wallboards, forms rack framework;
Step 5 is lifted into the bracket welded in step 2 on the plummer on front side of wallboard, and adjusts bracket locations, in workbench The wallboard outer surface junction spot welding of panel (41) and rack framework two sides positions, then using discontinuous welding method bracket It is welded and fixed;Be welded and fixed with discontinuous is carried out to the mode of welded corner joint, diagonal welding sequence are as follows: first weld main supporting plate (42) with The junction of first wallboard (11), then to auxiliary supporting plate (43) and the junction of the second wallboard (12) weld, then according to It is secondary that main supporting plate (42) and the second wallboard (12), auxiliary supporting plate (43) and the junction of the first wallboard (11) are welded;
Step 6, the straightness for examining front panel (21), mark deformation region, with the middle part in flame gun heat distortion region to 650 ~700 DEG C, water-spraying control;
Step 7, the weld seam welded along discontinuous, again weld whole weld seam of the junction of bracket and wallboard;
Rack after welding is transported to machining center by step 8, is with the mounting surface (441) that cuts on worktable panel (41) Benchmark is machined out.
2. a kind of processing technology of large hydraulic plate shearing machine rack according to claim 1, it is characterised in that: in step 3 Spot welding tab order are as follows: spot welding at the top position that plate (21) is contacted with the first wallboard (11) in front, then in stitching portion Be divided to two sections of spot welding in outside, and every section of spot welding length is 60~120mm;Then according to same the second wallboard of sequence spot welding (12) with before Panel (21).
3. a kind of processing technology of large hydraulic plate shearing machine rack according to claim 2, it is characterised in that: in step 3 Welding sequence after front panel (21) two sides spot welding are as follows: from the inside of front panel (21) and the first wallboard (11) stitching portion by Under supreme welding;Then it is welded from the bottom to top from front panel (21) and the inside of the second wallboard (12) stitching portion;According to same Welding sequence is welded from the bottom to top from front panel (21) and the outside of the first wallboard (11), the second wallboard (12) stitching portion.
4. a kind of processing technology of large hydraulic plate shearing machine rack according to claim 3, it is characterised in that: in step 4 After having welded top support beam (13), pushing rod (14) are welded between two wallboards, which is located at the bottom of wallboard Portion.
5. a kind of processing technology of large hydraulic plate shearing machine rack according to claim 3, it is characterised in that: in step 6 When being processed with flame gun, if front panel is recessed inwardly, heated from inside flame;If front panel outwardly protrudes, from outer side spray Fire heating;And it is heated in the vertical direction from the big side flame of deformation region.
6. a kind of processing technology of large hydraulic plate shearing machine rack according to claim 3, it is characterised in that: in step 7 The welding of whole weld seam is carried out using diagonal welding manner.
7. a kind of processing technology of large hydraulic plate shearing machine rack, feature described according to claim 1~any one of 6 exist In: machining sequence in step 8 are as follows:
The lateral surface of S1, the upper roller axis hole (15) for processing the first wallboard (11) and bottom roller axis hole (16), make its lateral surface Vertical plane;
The height and internal diameter ruler that S2, the upper roller axis hole (15) for processing the first wallboard (11) and bottom roller axis hole (16) extremely require It is very little, keep the axis of idler wheel axis hole vertical with its lateral surface;
S3, processing make its lateral surface perpendicular to base close to the lateral surface of the transverse-roller axis hole (22) of the first wallboard (11) side Quasi- face;
S4, cross machine idler wheel axis hole (22) to require height and internal diameter, the axis of transverse-roller axis hole (22) and its Lateral surface is vertical;
S5, the other end of rack is processed according to the step of S1~S4.
CN201611192832.3A 2016-12-21 2016-12-21 A kind of processing technology of large hydraulic plate shearing machine rack Active CN106425336B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611192832.3A CN106425336B (en) 2016-12-21 2016-12-21 A kind of processing technology of large hydraulic plate shearing machine rack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611192832.3A CN106425336B (en) 2016-12-21 2016-12-21 A kind of processing technology of large hydraulic plate shearing machine rack

Publications (2)

Publication Number Publication Date
CN106425336A CN106425336A (en) 2017-02-22
CN106425336B true CN106425336B (en) 2019-03-19

Family

ID=58215191

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611192832.3A Active CN106425336B (en) 2016-12-21 2016-12-21 A kind of processing technology of large hydraulic plate shearing machine rack

Country Status (1)

Country Link
CN (1) CN106425336B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109807547B (en) * 2017-11-22 2020-11-06 苏州市艾西依钣金制造有限公司 Welding, polishing and wire drawing method of stainless steel wire drawing plate
CN112091466B (en) * 2020-09-24 2022-03-29 兰州兰石重工有限公司 Welding process method and flow for integrated frame of DDS (direct digital synthesizer) structure manipulator frame
CN113385888B (en) * 2021-05-31 2024-01-19 苏州美达王钢铁制品有限公司 Machining process of lower frame and rotating surface integrated machine of medium-sized excavator

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3612812A (en) * 1969-07-25 1971-10-12 Kettenfabrik Renz Wacker & Co Machine for producing resistance welded trimetallic contacts
CN202527775U (en) * 2012-04-10 2012-11-14 泰安华鲁锻压机床有限公司 Multifunctional plate shearing machine capable of shearing weld grooves
CN202622040U (en) * 2012-02-25 2012-12-26 安徽中德机床股份有限公司 Rear dumping device of hydraulic pressure plate shearing machine
CN202763164U (en) * 2012-09-04 2013-03-06 沃得数控机床(江苏)有限公司 Machine frame of plate shearing machine
CN202825229U (en) * 2012-09-10 2013-03-27 黄石华信机械设备有限公司 Assembly type machine frame of hydraulic plate shearing machine
CN103170806A (en) * 2013-04-11 2013-06-26 仲积明 Machining process for welding-type balance-axis bracket
CN104416214A (en) * 2013-08-29 2015-03-18 黄石华信机械设备有限公司 Two-position adjustable blade bearing plate shearing machine
CN204277065U (en) * 2014-12-25 2015-04-22 安徽华东机床制造有限公司 A kind of swing-type plate shears
CN105081439A (en) * 2015-08-07 2015-11-25 安徽欧瑞达电器科技有限公司 Panel shearing device for panel of air energy water heater
CN204912895U (en) * 2015-07-21 2015-12-30 杭州中欣不锈钢制品有限公司 Sheet shearing machine

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102198539A (en) * 2011-05-16 2011-09-28 芜湖中能机械制造有限公司 Digital control hydraulic brake type plate shearing machine
CN103240566B (en) * 2012-02-01 2016-08-24 江苏群业电工有限公司 A kind of production method of tipper

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3612812A (en) * 1969-07-25 1971-10-12 Kettenfabrik Renz Wacker & Co Machine for producing resistance welded trimetallic contacts
CN202622040U (en) * 2012-02-25 2012-12-26 安徽中德机床股份有限公司 Rear dumping device of hydraulic pressure plate shearing machine
CN202527775U (en) * 2012-04-10 2012-11-14 泰安华鲁锻压机床有限公司 Multifunctional plate shearing machine capable of shearing weld grooves
CN202763164U (en) * 2012-09-04 2013-03-06 沃得数控机床(江苏)有限公司 Machine frame of plate shearing machine
CN202825229U (en) * 2012-09-10 2013-03-27 黄石华信机械设备有限公司 Assembly type machine frame of hydraulic plate shearing machine
CN103170806A (en) * 2013-04-11 2013-06-26 仲积明 Machining process for welding-type balance-axis bracket
CN104416214A (en) * 2013-08-29 2015-03-18 黄石华信机械设备有限公司 Two-position adjustable blade bearing plate shearing machine
CN204277065U (en) * 2014-12-25 2015-04-22 安徽华东机床制造有限公司 A kind of swing-type plate shears
CN204912895U (en) * 2015-07-21 2015-12-30 杭州中欣不锈钢制品有限公司 Sheet shearing machine
CN105081439A (en) * 2015-08-07 2015-11-25 安徽欧瑞达电器科技有限公司 Panel shearing device for panel of air energy water heater

Also Published As

Publication number Publication date
CN106425336A (en) 2017-02-22

Similar Documents

Publication Publication Date Title
CN106425336B (en) A kind of processing technology of large hydraulic plate shearing machine rack
CN104551508B (en) The welding tooling of a kind of station boiler steel structure great plate beam and method
CN101693336B (en) Technique for processing circular ring box type beam of lifting tool
CN102744580B (en) Furnace body manufacturing method of polycrystalline ingot furnace
CN101758333A (en) Control method of digging machine movable arm welding predeformation
CN103406674A (en) Method for manufacturing and welding wave web box type section beam and diaphragms
CN102962593A (en) Welding process of group establishment stage intervention interchangeable part
CN102922096A (en) On-site assembly welding method for large aluminum tower
CN106514025B (en) A kind of integral processing method of Frame of hydraulic steel plate shearer
CN208291487U (en) A kind of aircraft engine supporting structure
CN102556085B (en) Technological method for assembling stainless steel subway cab
CN202258390U (en) Device for shielding nuclear radiation
CN111571072A (en) Welding precision control method for box-type slender beam
CN201712670U (en) Heavy-duty forklift chassis and left and right oil tanks
CN209239352U (en) A kind of adjusting plate element solder reversible deformation control mould
CN210756083U (en) Main end beam combined tool with adjusting support
CN201923142U (en) Stainless steel vehicle body structure of subway driver cab
CN204676905U (en) The assembled shipping platform of nuclear power CB20 module whole
CN105715055B (en) A kind of nuclear power station large size penetration piece adjustable tool and adjusting method
CN103481003B (en) A kind of connecting rod welding system
CN208423717U (en) A kind of enclosed busbar bridge of quick Fabrication installation
CN109590675B (en) Method for manufacturing steel frame overlapped type large plate beam of tower boiler
CN208329151U (en) A kind of assemble welding formula steel construction
CN102019512B (en) Butt welding construction method for T-shaped column
CN217501108U (en) Supporting steel beam quick-assembly and quick-disassembly type connecting joint for jacking transfer

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant