CN106422607B - A kind of mining train loading station dust-extraction unit and dust removal method - Google Patents

A kind of mining train loading station dust-extraction unit and dust removal method Download PDF

Info

Publication number
CN106422607B
CN106422607B CN201610937448.5A CN201610937448A CN106422607B CN 106422607 B CN106422607 B CN 106422607B CN 201610937448 A CN201610937448 A CN 201610937448A CN 106422607 B CN106422607 B CN 106422607B
Authority
CN
China
Prior art keywords
aqueous vapor
feed device
vapor atomizer
swingable
train
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610937448.5A
Other languages
Chinese (zh)
Other versions
CN106422607A (en
Inventor
郭建珠
樊智慧
高云峰
田国政
赵晓兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Zhongyongtong Electromechanical Equipment Manufacturing Co Ltd
Original Assignee
Shanxi Zhongyongtong Electromechanical Equipment Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Zhongyongtong Electromechanical Equipment Manufacturing Co Ltd filed Critical Shanxi Zhongyongtong Electromechanical Equipment Manufacturing Co Ltd
Priority to CN201610937448.5A priority Critical patent/CN106422607B/en
Publication of CN106422607A publication Critical patent/CN106422607A/en
Application granted granted Critical
Publication of CN106422607B publication Critical patent/CN106422607B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D47/00Separating dispersed particles from gases, air or vapours by liquid as separating agent
    • B01D47/06Spray cleaning

Abstract

A kind of mining train loading station dust-extraction unit and dust removal method, belong to dust-extraction unit and method field, it is characterized in that one kind is using aqueous vapor atomizing fluids as dedusting energy, compressed gas is that main energy sources realize the dedusting in restriction space, its moisture influences filled material very little, the air water atomization density wave of formation had both enclosed coaling during coal dust from the path of train open topped diffusion And Movement, new dedusting energy is had accumulated again along the density wave divergence principal direction constantly dedusting repeatedly, the convenient device of simple-to-maintain is installed, which solves urgent problems in the prior art, it is that one kind realizing dedusting in restriction space, reliability is high, do not generate secondary pollution, a kind of mining train loading station dust-extraction unit and method of the strong round-the-clock non-maintaining long-term stable operation of exploitativeness.The present invention is widely used in the systems such as mine, agricultural, petrochemical industry, metallurgy, electric power, pharmacy, environmental protection and industry.

Description

A kind of mining train loading station dust-extraction unit and dust removal method
Technical field
A kind of mining train loading station dust-extraction unit of the present invention and dust removal method, belong to dust-extraction unit and method field, more In particular it relates to a kind of mining train loading station dust-extraction unit and dust removal method.
Background technology
During taking out material dress train from warehouse for finished product, the transportational process of material is continuous, in order to enable material Open compartment is smoothly packed into need material being previously charged into one higher than the silo property of compartment and bottom equipped with chute device Loading apparatus, in order to adapt to material entrucking usually chute lower part along train direction of travel be equipped with swingable feed device with Material entrucking is better achieved in guarantee, and dust motive power source is mainly that the kinetic energy mutually collided in potential energy and dropping process determines , since rigidly good feature determines that the bounce that material collision four wall of compartment and bottom generate is also dust production to compartment One of the main reason for raw, causes a large amount of mine dust to be diffused into working space from compartment open topped, forms mine dust pollution and danger Evil is endangered often due to the mine dust caused by above-mentioned production link promptly and accurately cannot be eliminated comprehensively, is not taken in time Measure, cause working site dust pollution severely exceed the phenomenon that, which had both seriously compromised the body of field personnel Health again pollutes adjacent working environment, and the destruction that mineral dust explosion forms greater degree easily occurs for mine dust pollution Effect.
There are some design schemes for the device and method of dedusting in the prior art, for example, CN105642639A [in Text]
A kind of denomination of invention -- dust-extraction unit for bagged cement entrucking, including top dust hood, total blast pipe, suction Wind conduit and the lifting assembly of lifting for adjusting the air draught conduit;The top dust hood is set to total air inlet The air inlet of pipe, the air draught conduit are slideably positioned in total blast pipe;The top dust hood and the air draught are led Pipe is respectively connected to total blast pipe;The lifting assembly is connect with the air draught conduit.The dust-extraction unit not only can be with The dust of disperse when removing effectively entrucking, it is energy saving and reduce cost, ensure operating personnel's safety work;Denomination of invention -- the device and method of superfine particulate matter in removing fire coal boiler fume
CN105597477A [Chinese] CN105597477A [English] denomination of invention -- removing fire coal boiler fume The device and method of middle superfine particulate matter, it is characterised in that the device is along flow of flue gas direction according to technological process in desulphurization plant Set gradually flue gas vapors injector, steam phase transforming reunion room, turbulent flow reunion room and demister later, the exit of demister with Electrostatic precipitator connects.
However, further research, the above-mentioned prior art still have defect or deficiency below:Above-mentioned existing dedusting Device need to occupy prodigious working space, and, poor operability big to original system repacking, use condition is harsh, be easy to cause two Secondary pollution, and dust removing effects are undesirable, cannot meet continuous production process dust and successively generate this objective process.
Invention content
A kind of mining train loading station dust-extraction unit of the present invention and dust removal method purpose are:To solve the above-mentioned prior art Middle urgent problem, to disclose a kind of vortex wave and multiphase flow composite wave collective effect, with aqueous vapor atomizing fluids and pressure Contracting gas is that dedusting energy is limiting the device and dust removal method that eddy dust-removing is realized in space.
A kind of mining train loading station dust-extraction unit of the present invention, it is characterised in that be a kind of vortex wave and multiphase flow composite wave Collective effect is limiting the device that eddy dust-removing is realized in space using aqueous vapor atomizing fluids and compressed gas as dedusting energy, should Device is by train opened type compartment 1, the installation of left side spray for dust suppression and air water distributor 2, the installation of right side spray for dust suppression and air water Swingable feed device 6, left side aqueous vapor after swingable feed device 5, material before distributor 3, material chute 4 to be installed, material Swingable feed device before atomizer group 7, right side aqueous vapor atomizer group 8, pressure supply mains 9, pressure gas manifold 10, material Swingable feeding fills after aqueous vapor atomizer 12, material on the right side of swingable feed device before left side aqueous vapor atomizer 11, material Set after left side aqueous vapor atomizer 13, material aqueous vapor atomizer 14, spraying intelligent controlling device on the right side of swingable feed device 15, entrucking structures 16 form, and train opened type compartment 1 navigates on train rail, with 1 direction of travel of train opened type compartment The orientation that intersects vertically is disposed with entrucking structures 16, which ensures that train can smoothly pass through thereunder;The structures exist A diameter of 1 meter material chute 4 to be installed, distance from bottom train opened type compartment are disposed with above train direction of travel center line 1 1.8 meters of open topped plan range;With 4 phase airtight connection of material chute to be installed, the front and back width that is respectively provided with is 0.8 meter, height It it is 0.3 meter, length is swingable feed device 6 after swingable feed device 5 before 2.8 meters of material and material;It can be put before material At left and right sides of dynamic 5 material outlet of feed device it is 150 millimeters external away from boxhole at center be respectively provided with swingable before material give Swingable feed device right side aqueous vapor atomizer 12 before material device left side aqueous vapor atomizer 11 and material, pressure supply mains 9 Easy to use and do not influence train and advance, the swingable feed device before material that is installed on entrucking structures 16 with pressure gas manifold 10 Aqueous vapor atomizer 12 passes through pressure supply mains 9 and pressure on the right side of swingable feed device before left side aqueous vapor atomizer 11 and material Strength manifold 10 is connected with spraying intelligent controlling device 15;It is outer at left and right sides of 6 material outlet of swingable feed device after material Center is respectively provided with swingable feed device left side aqueous vapor atomizer 13 and material after material at 150 millimeters away from boxhole of portion Aqueous vapor atomizer 14 on the right side of swingable feed device afterwards, aqueous vapor atomizer 13 and object on the left of swingable feed device after material Aqueous vapor atomizer 14 passes through pressure supply mains 9 and pressure gas manifold 10 and spraying intelligence control on the right side of swingable feed device after material Device 15 processed is connected;460 millimeters away from left side rail diatom, 1 open topped plan range 300 of distance from bottom train opened type compartment Millimeter, which is on entrucking structures 16, is fixedly mounted left side spray for dust suppression installation and air water distributor 2, total by pressure water Pipe 9 and pressure gas manifold 10 are connected with spraying intelligent controlling device 15, and there are four nozzles to constitute left side aqueous vapor mist for installation thereon Change nozzle group 7, for limiting the dedusting work in range on the left of 1 open topped plane of train opened type compartment;Away from right rail 460 millimeters of line, 300 millimeters of 1 open topped plan range of distance from bottom train opened type compartment are on entrucking structures 16 solid The spray for dust suppression installation of Dingan County dress right side and air water distributor 3 pass through pressure supply mains 9 and pressure gas manifold 10 and spraying intelligence Energy control device 15 is connected, and there are four nozzles to constitute right side aqueous vapor atomizer group 8 for installation thereon, for train opened type vehicle The dedusting work in range is limited on the right side of 1 open topped plane of compartment.
A kind of dust removal method of above-mentioned mining train loading station dust-extraction unit, it is characterised in that:
1)After train opened type compartment 1, which rests against 4 lower section of material chute to be installed, carries out entrucking preparation, intelligent control of spraying Device 15 is started to work, and is installed by left side spray for dust suppression by pressure supply mains 9 and pressure gas manifold 10 and air water distribution fills It sets aqueous vapor atomizer group 7 on the left of 2 entrance, installed by right side spray for dust suppression by pressure supply mains 9 and pressure gas manifold 10 And air water distributor 3 enters swingable feed device left side aqueous vapor atomizer before right side aqueous vapor atomizer group 8, material 11, aqueous vapor atomization spray on the left of swingable feed device after aqueous vapor atomizer 12, material on the right side of swingable feed device before material First 13, vapor multi-phase flow is atomized into multiphase flow wave by aqueous vapor atomizer 14 on the right side of swingable feed device after material, with train Opened type compartment 1 constitutes dedusting and limits working space together, is acted on by repeated multiple times depositing dust and consumes the kinetic energy of dirt, and pacified Surely get off to realize dedusting;
2)Swingable feed device right side aqueous vapor before swingable feed device left side aqueous vapor atomizer 11, material before material Swingable feed device right side water after swingable feed device left side aqueous vapor atomizer 13, material after atomizer 12, material The aqueous vapor atomization multiphase flow wave that aerosolization nozzle 14 generates not only limits the dirt that the outflow of boxhole material generates in a certain range, Make its stable secondary dirt master that gets off, but also material can be rebounded to 1 four wall of train opened type compartment and bottom generation Lead left side aqueous vapor atomizer group 7,8 collective effect of right side aqueous vapor atomizer group of effect, 7 structure of left side aqueous vapor atomizer group At nozzle number 3-8, right side aqueous vapor atomizer group 8 constitutes nozzle number 3-8, and the fluctuation for increasing dirt makes dirt be more easy to eliminate With it is stable;
3)Using aqueous vapor atomizing fluids as dedusting energy, compressed gas is that main energy sources realization removes in restriction space Dirt, moisture influence very little, pressure water 2.5-4.2kgf/cm to filled material2, pneumatically operated pressure model It encloses for 3.5-6kgf/cm2, aqueous vapor volume ratio is 100:3—100:0.05, secondary pollution is not generated, the dedusting implementation time is short, can Strong operability, by intelligent controlling device 15 can by the actual conditions of live dirt, it is flexible and convenient take countermeasure and Means;
4)Left side aqueous vapor atomizer group 7,8 collective effect of right side aqueous vapor atomizer group are on train opened type compartment 1 Portion forms and is higher by open compartment 10-350 millimeters, covers 1 top air water atomization density wave of entire opened type compartment, which expands It is to be run on 1 top of train opened type compartment and to lower part to dissipate principal direction, and air water atomization density wave both encloses the process of coalingging Middle coal dust has accumulated new dedusting energy along the density from the path of 1 open topped diffusion And Movement of train opened type compartment The constantly dedusting repeatedly of wave divergence principal direction.
A kind of mining train loading station dust-extraction unit of the present invention and dust removal method, the advantage is that:
1, the present invention passes through swingable feeding before left side aqueous vapor atomizer group 7, right side aqueous vapor atomizer group 8, material It is swingable after aqueous vapor atomizer 12, material on the right side of swingable feed device before aqueous vapor atomizer 11, material on the left of device to send Expect on the left of device after aqueous vapor atomizer 13, material on the right side of swingable feed device aqueous vapor atomizer 14 by vapor multi-phase flow mist It is melted into multiphase flow wave, can conveniently constitute dedusting together with train opened type compartment 1 limits working space.
2, dust removal mechanism of the present invention is eddy dust-removing, is vortex wave and multiphase flow composite wave collective effect high dust collection efficiency, The dedusting implementation time is short, and operability is strong.
3, using aqueous vapor atomizing fluids as dedusting energy, compressed gas is that main energy sources realization removes in restriction space Dirt, moisture are very little on the influence of filled material, and air water volume ratio can be 100:3—100:0.05, do not generate two Secondary pollution.
4, a kind of mining train loading station dust-extraction unit of the present invention realize waterproof and dustproof, installation it is simple, small, can , in the presence of a harsh environment round-the-clock non-maintaining long-term stable operation high by property.
5, it is of the invention limit realize that dedusting, reliability is high in space, do not generate secondary pollution, that exploitativeness is strong is complete A kind of mining train loading station dust-extraction unit and method of the non-maintaining long-term stable operation of weather.The executive device of the present invention is extensive Various open material transportations suitable for the systems such as mine, agricultural, petrochemical industry, metallurgy, electric power, pharmacy, environmental protection and industry Need of work.
Description of the drawings
Fig. 1 is a kind of composition frame chart of mining train loading station dust-extraction unit of the present invention
1, train opened type compartment 2, the installation of left side spray for dust suppression and air water distributor
3, the installation of right side spray for dust suppression and air water distributor
4, swingable feed device before material chute 5 to be installed, material
6, swingable feed device 7, left side aqueous vapor atomizer group after material
8, right side aqueous vapor atomizer group 9, pressure supply mains 10, pressure gas manifold
11, swingable feed device left side aqueous vapor atomizer before material
12, swingable feed device right side aqueous vapor atomizer before material
13, swingable feed device left side aqueous vapor atomizer after material
14, swingable feed device right side aqueous vapor atomizer after material
15, spraying intelligent controlling device 16, entrucking structures.
Specific implementation mode
Embodiment 1:
The device is by train opened type compartment 1, the installation of left side spray for dust suppression and air water distributor 2, right side spray for dust suppression Swingable feed device after swingable feed device 5, material before installation and air water distributor 3, material chute 4 to be installed, material 6, it can be put before left side aqueous vapor atomizer group 7, right side aqueous vapor atomizer group 8, pressure supply mains 9, pressure gas manifold 10, material It can after aqueous vapor atomizer 12, material on the right side of swingable feed device before aqueous vapor atomizer 11, material on the left of dynamic feed device Swingable feed device right side aqueous vapor atomizer 14, spraying intelligence after swing material feeder left side aqueous vapor atomizer 13, material Energy control device 15, entrucking structures 16 form, and train opened type compartment 1 navigates on train rail, with train opened type vehicle 1 direction of travel of the compartment orientation that intersects vertically is disposed with entrucking structures 16, which ensures that train can smoothly pass through thereunder; The structures are disposed with a diameter of 1 meter material chute 4 to be installed, distance from bottom train above train direction of travel center line 1.8 meters of 1 open topped plan range of opened type compartment;With 4 phase airtight connection of material chute to be installed, the front and back width that is respectively provided with is 0.8 meter, be highly 0.3 meter, and length is swingable feed device 6 after swingable feed device 5 before 2.8 meters of material and material; Center is respectively provided with material at 150 millimeters away from boxhole of outside at left and right sides of 5 material outlet of swingable feed device before material Aqueous vapor atomizer 12 on the right side of swingable feed device, is pressed before preceding swingable feed device left side aqueous vapor atomizer 11 and material It is easy to use and do not influence train traveling that power supply mains 9 and pressure gas manifold 10 are installed on entrucking structures 16, can put before material Aqueous vapor atomizer 12 passes through pressure on the right side of swingable feed device before dynamic feed device left side aqueous vapor atomizer 11 and material Supply mains 9 and pressure gas manifold 10 are connected with spraying intelligent controlling device 15;6 material outlet of swingable feed device after material Center is respectively provided with swingable feed device left side aqueous vapor atomization spray after material at 150 millimeters away from boxhole outside the left and right sides First 13 and material after aqueous vapor atomizer 14 on the right side of swingable feed device, aqueous vapor atomization on the left of swingable feed device after material After nozzle 13 and material on the right side of swingable feed device aqueous vapor atomizer 14 by pressure supply mains 9 and pressure gas manifold 10 with Spraying intelligent controlling device 15 is connected;460 millimeters away from left side rail diatom, 1 open topped of distance from bottom train opened type compartment 300 millimeters of plan range, which is on entrucking structures 16, is fixedly mounted left side spray for dust suppression installation and air water distributor 2, leads to Excess pressure supply mains 9 and pressure gas manifold 10 are connected with spraying intelligent controlling device 15, and there are four nozzles to constitute for installation thereon Left side aqueous vapor atomizer group 7, for limiting the dedusting work in range on the left of 1 open topped plane of train opened type compartment; 460 millimeters away from right side rail diatom, 300 millimeters of 1 open topped plan range of distance from bottom train opened type compartment is in entrucking structure It builds and right side spray for dust suppression installation and air water distributor 3 is fixedly mounted on object 16, pass through pressure supply mains 9 and pressure gas manifold 10 are connected with spraying intelligent controlling device 15, and there are four nozzles to constitute right side aqueous vapor atomizer group 8 for installation thereon, for arranging The dedusting work in range is limited on the right side of 1 open topped plane of vehicle opened type compartment.When train opened type compartment 1 rest against it is to be installed After entrucking preparation is carried out in 4 lower section of material chute, spraying intelligent controlling device 15 is started to work, and pressure supply mains 9 and pressure are passed through Gas manifold 10 is installed by left side spray for dust suppression and air water distributor 2 enters left side aqueous vapor atomizer group 7, by pressure water Manifold 9 and pressure gas manifold 10 is installed by right side spray for dust suppression and air water distributor 3 enters right side aqueous vapor atomizer group 8, aqueous vapor atomizer on the right side of swingable feed device before aqueous vapor atomizer 11, material on the left of swingable feed device before material 12, aqueous vapor atomization spray on the right side of swingable feed device after aqueous vapor atomizer 13, material on the left of swingable feed device after material Vapor multi-phase flow is atomized into multiphase flow wave by first 14, is constituted dedusting together with train opened type compartment 1 and is limited working space, passes through The effect of repeated multiple times depositing dust consumes the kinetic energy of dirt, and stable gets off to realize dedusting;
Swingable feed device right side aqueous vapor mist before swingable feed device left side aqueous vapor atomizer 11, material before material Swingable feed device right side aqueous vapor after swingable feed device left side aqueous vapor atomizer 13, material after change nozzle 12, material The aqueous vapor atomization multiphase flow wave that atomizer 14 generates not only limits the dirt that the outflow of boxhole material generates in a certain range, makes Its is stable to get off, but also the secondary dirt generated to 1 four wall of train opened type compartment and bottom that material can be rebounded rise it is leading Left side aqueous vapor atomizer group 7,8 collective effect of right side aqueous vapor atomizer group of effect, left side aqueous vapor atomizer group 7 are constituted Nozzle number is 8, and it is 8 that right side aqueous vapor atomizer group, which constitutes nozzle number, and the fluctuation for increasing dirt makes dirt be more easy to disappear It removes and stabilizes;
Using aqueous vapor atomizing fluids as dedusting energy, compressed gas is that main energy sources realize the dedusting in restriction space, Its moisture influences very little, pressure water 4.2kgf/cm to filled material2, pneumatically operated pressure limit is 6kgf/ cm2, aqueous vapor volume ratio is 100:0.05, secondary pollution is not generated, the dedusting implementation time is short, and operability is strong, passes through intelligent control Device 15 processed can be by the actual conditions of live dirt, and flexible and convenient takes countermeasure and means;
Left side aqueous vapor atomizer group 7,8 collective effect of right side aqueous vapor atomizer group are on 1 top of train opened type compartment Formation is higher by 350 millimeters of open compartment, covers 1 top air water atomization density wave of entire opened type compartment, density wave divergence master Coal during direction is coaling on 1 top of train opened type compartment and to lower part operation, air water atomization density wave had both enclosed Dirt has accumulated new dedusting energy and expands along the density wave from the path of 1 open topped diffusion And Movement of train opened type compartment The constantly dedusting repeatedly of scattered principal direction.
Embodiment 2:
It is 5 that left side aqueous vapor atomizer group 7, which constitutes nozzle number, and right side aqueous vapor atomizer group 8 constitutes nozzle number It is 5, pressure water 3.5kgf/cm2, pneumatically operated pressure limit is 4kgf/cm2, aqueous vapor volume ratio is 100:2, right side water 8 collective effect of aerosolization nozzle group forms on 1 top of train opened type compartment and is higher by 200 millimeters of open compartment, other with implementation Mode 1.
Embodiment 3:
It is 6 that left side aqueous vapor atomizer group 7, which constitutes nozzle number, and right side aqueous vapor atomizer group 8 constitutes nozzle number It is 6, pressure water 2.5kgf/cm2, pneumatically operated pressure limit is 3.5kgf/cm2, aqueous vapor volume ratio is 100:3, right side 8 collective effect of aqueous vapor atomizer group forms on 1 top of train opened type compartment and is higher by 10 millimeters of open compartment, other with implementation Mode 1.
Embodiment 4:
It is 7 that left side aqueous vapor atomizer group 7, which constitutes nozzle number, and right side aqueous vapor atomizer group 8 constitutes nozzle number It is 7, pressure water 3kgf/cm2, pneumatically operated pressure limit is 5kgf/cm2, aqueous vapor volume ratio is 100:1, right side aqueous vapor 8 collective effect of atomizer group forms on 1 top of train opened type compartment and is higher by 100 millimeters of open compartment, other same embodiment party Formula 1.
Embodiment 5:
It is 3 that left side aqueous vapor atomizer group 7, which constitutes nozzle number, and right side aqueous vapor atomizer group 8 constitutes nozzle number It is 3, pressure water 3.5kgf/cm2, pneumatically operated pressure limit is 3kgf/cm2, aqueous vapor volume ratio is 100:1.5, right side 8 collective effect of aqueous vapor atomizer group forms on 1 top of train opened type compartment and is higher by 50 millimeters of open compartment, other with implementation Mode 1.

Claims (1)

1. a kind of mining train loading station dust-extraction unit, it is characterised in that be that a kind of vortex wave and multiphase flow composite wave are made jointly With, limiting the device that eddy dust-removing is realized in space by dedusting energy of aqueous vapor atomizing fluids and compressed gas, the device by Train opened type compartment(1), left side spray for dust suppression installation and air water distributor(2), the installation of right side spray for dust suppression and air water point With device(3), material chute to be installed(4), swingable feed device before material(5), swingable feed device after material(6), it is left Side aqueous vapor atomizer group(7), right side aqueous vapor atomizer group(8), pressure supply mains(9), pressure gas manifold(10), before material Aqueous vapor atomizer on the left of swingable feed device(11), aqueous vapor atomizer on the right side of swingable feed device before material(12), Aqueous vapor atomizer on the left of swingable feed device after material(13), aqueous vapor atomizer on the right side of swingable feed device after material (14), spraying intelligent controlling device(15)With entrucking structures(16)Composition, train opened type compartment(1)Navigate on train rail On, with train opened type compartment(1)The direction of travel orientation that intersects vertically is disposed with entrucking structures(16), structures guarantee row Vehicle can smoothly pass through thereunder;Entrucking structures(16)A diameter of 1 meter is disposed with above train direction of travel center line Material chute to be installed(4), distance from bottom train opened type compartment(1)1.8 meters of open topped plan range;It is slipped with material to be installed Road(4)Phase airtight connection, the front and back width that is respectively provided with is 0.8 meter, is highly 0.3 meter, swingable before the material that length is 2.8 meters Feed device(5)With swingable feed device after material(6);Swingable feed device before material(5)At left and right sides of material outlet Center is respectively provided with swingable feed device left side aqueous vapor atomizer before material at 150 millimeters away from boxhole of outside(11)With Aqueous vapor atomizer on the right side of swingable feed device before material(12), pressure supply mains(9)With pressure gas manifold(10) it is installed on Entrucking structures (16) are easy to use and do not influence train traveling, swingable feed device before material(5)Left side aqueous vapor atomization spray Aqueous vapor atomizer (12) passes through pressure supply mains (9) and pressure gas on the right side of swingable feed device (5) before head (11) and material Manifold (10) is connected with spraying intelligent controlling device (15);After material at left and right sides of swingable feed device (6) material outlet At 150 millimeters away from boxhole of outside center be respectively provided with after material on the left of swingable feed device aqueous vapor atomizer (13) and Aqueous vapor atomizer (14) on the right side of swingable feed device after material, aqueous vapor atomizer on the left of swingable feed device after material (13) and after material aqueous vapor atomizer (14) passes through pressure supply mains (9) and pressure gas manifold on the right side of swingable feed device (10) it is connected with spraying intelligent controlling device (15);460 millimeters away from left side rail diatom, distance from bottom train opened type compartment (1) 300 millimeters of open topped plan range, which is on entrucking structures (16), is fixedly mounted left side spray for dust suppression installation and air water Distributor (2) is connected by pressure supply mains (9) and pressure gas manifold (10) with spraying intelligent controlling device (15), There are four nozzles to constitute left side aqueous vapor atomizer group (7) for installation thereon, is used for train opened type compartment (1) open topped plane Left side limits the dedusting work in range;460 millimeters away from right side rail diatom, distance from bottom train opened type compartment (1) top is spacious 300 millimeters of plan range of mouth, which is on entrucking structures (16), is fixedly mounted right side spray for dust suppression installation and air water distributor (3), it is connected with spraying intelligent controlling device (15) by pressure supply mains (9) and pressure gas manifold (10), is installed thereon There are four nozzles to constitute right side aqueous vapor atomizer group (8), for being limited on the right side of train opened type compartment (1) open topped plane Dedusting work in range;Implementation process is:1)It is done below material chute (4) to be installed when train opened type compartment (1) rests against After good entrucking prepares, spraying intelligent controlling device (15) is started to work, logical by pressure supply mains (9) and pressure gas manifold (10) It crosses left side spray for dust suppression installation and air water distributor (2) enters left side aqueous vapor atomizer group (7), by pressure supply mains (9) and pressure gas manifold (10) is installed by right side spray for dust suppression and air water distributor (3) enters right side aqueous vapor atomizer Swingable feed device right side aqueous vapor mist before swingable feed device left side aqueous vapor atomizer (11), material before group (8), material After change nozzle (12), material after swingable feed device left side aqueous vapor atomizer (13), material on the right side of swingable feed device Vapor multi-phase flow is atomized into multiphase flow wave by aqueous vapor atomizer (14), constitutes dedusting limit together with train opened type compartment (1) Determine working space, acted on by repeated multiple times depositing dust and consume the kinetic energy of dirt, and stable gets off to realize dedusting; 2)Before material Swingable feed device right side aqueous vapor atomizer (12 before aqueous vapor atomizer (11), material on the left of swingable feed device), Aqueous vapor atomizer on the left of swingable feed device after material(13), aqueous vapor atomizer on the right side of swingable feed device after material (14)The aqueous vapor atomization multiphase flow wave of generation not only limits the dirt that the outflow of boxhole material generates in a certain range, keeps its stable Get off, but also material can be rebounded to train opened type compartment(1)The secondary dirt that four walls and bottom generate plays a leading role Left side aqueous vapor atomizer group(7), right side aqueous vapor atomizer group(8)Collective effect, left side aqueous vapor atomizer group(7)Structure At nozzle number 4, right side aqueous vapor atomizer group(8)Constitute nozzle number 4, increase dirt fluctuation make dirt be more easy to eliminate and It is stable;3) using aqueous vapor atomizing fluids as dedusting energy, compressed gas is that main energy sources realize the dedusting in restriction space, Moisture influences very little, pressure water 2.5-4.2kgf/cm to filled material2, pneumatically operated pressure limit is 3.5-6kgf/cm2, aqueous vapor volume ratio is 100:3—100:0.05, secondary pollution is not generated, the dedusting implementation time is short, operable Property is strong;Pass through intelligent controlling device(15)Can be by the actual conditions of live dirt, flexible and convenient takes countermeasure and hand Section;
4) left side aqueous vapor atomizer group(7), right side aqueous vapor atomizer group(8)Collective effect is in train opened type compartment(1) Top forms and is higher by open compartment 10-350 millimeters, covers entire opened type compartment(1)Top air water is atomized density wave, the density Wave divergence principal direction is in train opened type compartment(1)Top is run to lower part, and air water atomization density wave, which both enclosed, coalings Coal dust is from train opened type compartment in the process(1)The path of open topped diffusion And Movement, but have accumulated new dedusting energy along The density wave divergence principal direction constantly dedusting repeatedly.
CN201610937448.5A 2016-10-25 2016-10-25 A kind of mining train loading station dust-extraction unit and dust removal method Active CN106422607B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610937448.5A CN106422607B (en) 2016-10-25 2016-10-25 A kind of mining train loading station dust-extraction unit and dust removal method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610937448.5A CN106422607B (en) 2016-10-25 2016-10-25 A kind of mining train loading station dust-extraction unit and dust removal method

Publications (2)

Publication Number Publication Date
CN106422607A CN106422607A (en) 2017-02-22
CN106422607B true CN106422607B (en) 2018-11-13

Family

ID=58178308

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610937448.5A Active CN106422607B (en) 2016-10-25 2016-10-25 A kind of mining train loading station dust-extraction unit and dust removal method

Country Status (1)

Country Link
CN (1) CN106422607B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109233874A (en) * 2018-10-30 2019-01-18 山西中永通机电设备制造有限公司 Dustiness controlling device in a kind of discharge of quenching tower water vapour

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4487615A (en) * 1983-06-13 1984-12-11 Conoco Inc. Method of reducing mine dust
CN2576682Y (en) * 2002-09-09 2003-10-01 徐亚丽 Random-spraying dust-settling and dust-removing device for impeller coal feeder
CN201610328U (en) * 2010-01-25 2010-10-20 杭州华新机电工程有限公司 Nickel ore discharge hopper with chute
CN201961860U (en) * 2010-12-22 2011-09-07 鞍钢金属结构有限公司 Dust-free loading device for powdery material
CN102191935A (en) * 2011-04-14 2011-09-21 淮北矿业股份有限公司 Water vapor rotating jet dust settling device for comprehensive driving working face
CN202290702U (en) * 2011-09-15 2012-07-04 广东省电力设计研究院 Aerosol dust removal system
CN103046945A (en) * 2013-01-18 2013-04-17 山西潞安华信科技发展有限公司 Wind/water linkage spraying and dust falling device
CN104061012A (en) * 2014-06-25 2014-09-24 太原理工大学 Mining air mist dust settling device in restricted space and application method of mining air mist dust settling device
CN203877553U (en) * 2014-01-17 2014-10-15 北京精诚博桑科技有限公司 Dust suppression apparatus for ship unloader
CN104373124A (en) * 2014-09-11 2015-02-25 山东科技大学 Dust preventing device of machine digging surface and dust preventing method
CN204173619U (en) * 2014-10-28 2015-02-25 泰富重工制造有限公司 A kind of grab bucket discharge system with suppressing dust with dry mist device
CN105149209A (en) * 2015-09-28 2015-12-16 太原理工大学 Mining vibration screen dust removing device and application method
CN105233597A (en) * 2015-09-28 2016-01-13 华中科技大学 Mine dust removing apparatus and mine dust removing method
CN205076510U (en) * 2015-10-21 2016-03-09 泰富重工制造有限公司 Transfer post with dry fog dust suppression device
CN105642176A (en) * 2016-01-05 2016-06-08 山西中永通机电设备制造有限公司 Water-gas vortex generation device and application method

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4487615A (en) * 1983-06-13 1984-12-11 Conoco Inc. Method of reducing mine dust
CN2576682Y (en) * 2002-09-09 2003-10-01 徐亚丽 Random-spraying dust-settling and dust-removing device for impeller coal feeder
CN201610328U (en) * 2010-01-25 2010-10-20 杭州华新机电工程有限公司 Nickel ore discharge hopper with chute
CN201961860U (en) * 2010-12-22 2011-09-07 鞍钢金属结构有限公司 Dust-free loading device for powdery material
CN102191935A (en) * 2011-04-14 2011-09-21 淮北矿业股份有限公司 Water vapor rotating jet dust settling device for comprehensive driving working face
CN202290702U (en) * 2011-09-15 2012-07-04 广东省电力设计研究院 Aerosol dust removal system
CN103046945A (en) * 2013-01-18 2013-04-17 山西潞安华信科技发展有限公司 Wind/water linkage spraying and dust falling device
CN203877553U (en) * 2014-01-17 2014-10-15 北京精诚博桑科技有限公司 Dust suppression apparatus for ship unloader
CN104061012A (en) * 2014-06-25 2014-09-24 太原理工大学 Mining air mist dust settling device in restricted space and application method of mining air mist dust settling device
CN104373124A (en) * 2014-09-11 2015-02-25 山东科技大学 Dust preventing device of machine digging surface and dust preventing method
CN204173619U (en) * 2014-10-28 2015-02-25 泰富重工制造有限公司 A kind of grab bucket discharge system with suppressing dust with dry mist device
CN105149209A (en) * 2015-09-28 2015-12-16 太原理工大学 Mining vibration screen dust removing device and application method
CN105233597A (en) * 2015-09-28 2016-01-13 华中科技大学 Mine dust removing apparatus and mine dust removing method
CN205076510U (en) * 2015-10-21 2016-03-09 泰富重工制造有限公司 Transfer post with dry fog dust suppression device
CN105642176A (en) * 2016-01-05 2016-06-08 山西中永通机电设备制造有限公司 Water-gas vortex generation device and application method

Also Published As

Publication number Publication date
CN106422607A (en) 2017-02-22

Similar Documents

Publication Publication Date Title
CN104828519B (en) A kind of Multifunction dust removing device and its dust removal method
CN102580517A (en) Fume desulfurization system and method by adopting dried alkali electrostatic spraying and fume humidifying cooling method
CN102874614A (en) Dust suppressing and falling system of dumper for dumping high-dust materials
CN106422607B (en) A kind of mining train loading station dust-extraction unit and dust removal method
CN108671715A (en) A kind of coal-fired flue-gas sulfur trioxide removing means and its application method and application
CN111042854A (en) Underground dust suppression device for coal mine
CN203175600U (en) Mechanical type remote mist spraying and dust removing device of full-automatic spray pipe under mine shaft
CN104801165A (en) Three-stage dust removal and desulphurization device
CN203237759U (en) Coal-conveying transfer station square curve flow guidance dust suppression device
CN112392535A (en) Method for treating dust on coal mine tunneling working face by using aerial fog turbulent flow fluid
CN202762312U (en) Waste gas pre-dedusting ammonia spraying disc semiconductor control rectifier (SCR) denitration device of power plant
CN103820167A (en) Synthetic gas outlet device of gasification furnace
CN105569721A (en) Air-spray linkage type annular jetting dust-removal system for mining
CN205240631U (en) Belt feeder micron order dry fog dust suppression device
CN105233597B (en) A kind of mine dust removing device and method
CN202078821U (en) Flue gas scrubber tower
CN205076510U (en) Transfer post with dry fog dust suppression device
CN201092455Y (en) Transfer blanking device
CN208340492U (en) A kind of coal-fired flue-gas sulfur trioxide removing means based on quenched trona
CN109135776B (en) Application method of dust content treatment device in coke quenching tower steam discharge
CN204294067U (en) Microkinetic dirt air separation
CN210012335U (en) Solid particle positive pressure automatic blowing equipment
CN107321157A (en) A kind of horizontal wet desulphurization device
CN202880508U (en) Dust suppression and dust falling system for materials with high dust produced when tippler turns over materials
CN203486517U (en) Dry fog dust suppression device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant