CN106413108B - Resource regulating method and device - Google Patents

Resource regulating method and device Download PDF

Info

Publication number
CN106413108B
CN106413108B CN201510458442.5A CN201510458442A CN106413108B CN 106413108 B CN106413108 B CN 106413108B CN 201510458442 A CN201510458442 A CN 201510458442A CN 106413108 B CN106413108 B CN 106413108B
Authority
CN
China
Prior art keywords
scheduling
srs
resource
channel
time difference
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510458442.5A
Other languages
Chinese (zh)
Other versions
CN106413108A (en
Inventor
武海燕
杨晓
尚政
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huawei Technologies Co Ltd
Original Assignee
Huawei Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huawei Technologies Co Ltd filed Critical Huawei Technologies Co Ltd
Priority to CN201510458442.5A priority Critical patent/CN106413108B/en
Publication of CN106413108A publication Critical patent/CN106413108A/en
Application granted granted Critical
Publication of CN106413108B publication Critical patent/CN106413108B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/12Wireless traffic scheduling
    • H04W72/121Wireless traffic scheduling for groups of terminals or users
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/50Allocation or scheduling criteria for wireless resources
    • H04W72/56Allocation or scheduling criteria for wireless resources based on priority criteria
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/50Allocation or scheduling criteria for wireless resources
    • H04W72/56Allocation or scheduling criteria for wireless resources based on priority criteria
    • H04W72/566Allocation or scheduling criteria for wireless resources based on priority criteria of the information or information source or recipient
    • H04W72/569Allocation or scheduling criteria for wireless resources based on priority criteria of the information or information source or recipient of the traffic information

Abstract

The present invention relates to a kind of resource regulating method and devices, belong to field of communication technology.The described method includes: determining scheduling of resource priority of the user equipment (UE) at current time, UE is that base station needs to carry out any UE in the UE of scheduling of resource;Acquisition current time and UE the last time send time difference at the time of detection reference signal SRS;The scheduling weight of UE is determined according to the time difference of UE, scheduling weight and time difference are negatively correlated;Using UE in the scheduling of resource priority at current time and the product of scheduling weight as the updated scheduling of resource priority of UE;Scheduling of resource is carried out to UE according to updated scheduling of resource priority.The present invention solves the problems, such as that resource utilization is lower in the related technology by the scheduling weight to UE setting and time difference negative correlation, and using the product of the scheduling weight and priority as the updated scheduling of resource priority of UE;The higher effect of resource utilization is reached.

Description

Resource regulating method and device
Technical field
The present invention relates to field of communication technology, in particular to a kind of resource regulating method and device.
Background technique
A kind of network system mainly includes base station and user equipment (English: User Equipment;Referred to as: UE), base station The transmission of business datum is able to carry out between UE.In the network system, scheduling of resource is usually carried out by base station.
There is a kind of resource regulating method in the related technology, in the method, base station, which obtains, needs it to carry out scheduling of resource The various channel parameters that multiple UE are reported, such as channel quality instruction (English: Channel Quality Indicator;Referred to as: CQI) and detection reference signal is (English: Sounding Reference Signal;Referred to as: SRS) etc., base station can be according to this A little channel parameters calculate the scheduling of resource priority of each UE, and (scheduling request of the high UE of scheduling of resource priority can preferential quilt Meet), and priority list is generated, scheduling of resource is carried out according to the priority list later.
In the implementation of the present invention, discovery aforesaid way at least has following defects that in aforesaid way inventor SRS is base station to be periodically sent to by UE, and at the time of the acquisition SRS of base station and base station generates priority list according to SRS At the time of (SRS at the moment may change) there may be the time difference, this will lead to the resource tune of UE in priority list Degree priority accuracy is lower, and the resource utilization for then carrying out scheduling of resource according to the priority list is low.
Summary of the invention
In order to solve the problems, such as that resource utilization is low in the related technology, the embodiment of the invention provides a kind of scheduling of resource sides Method and device.The technical solution is as follows:
In a first aspect, providing a kind of resource regulating method, it is used in base station, this method comprises:
User equipment (UE) is determined in the scheduling of resource priority at current time, the UE is that the base station needs to carry out resource Any UE in the UE of scheduling;
Obtain the current time and time difference at the time of described UE the last time sends detection reference signal SRS;
The scheduling weight of the UE, the scheduling weight and the time difference negative are determined according to the time difference of the UE It closes;
The UE is updated in the scheduling of resource priority at current time and the product of the scheduling weight as the UE Scheduling of resource priority afterwards;
Scheduling of resource is carried out to the UE according to the updated scheduling of resource priority.
With reference to first aspect, in the first possible embodiment of first aspect, the time according to the UE Difference determines the scheduling weight of the UE, comprising:
The channel quality at the current time is estimated according to the variation of the channel quality of the last SRS sending cycle of the UE;
By the ratio of the channel quality in the channel quality at the current time and the SRS of the current SRS sending cycle of the UE It is worth the scheduling weight as the UE.
The possible embodiment of with reference to first aspect the first, in second of possible embodiment of first aspect In, the channel quality at the current time is estimated in the variation of the channel quality according to the last SRS sending cycle of the UE, packet It includes:
The current SRS of channel quality and the UE obtained in the SRS that the last SRS sending cycle of the UE is sent sends week Channel quality in the SRS of phase;
The channel quality at the current time, the channel estimation formula are estimated according to channel estimation formula are as follows:
Wherein, the QnFor the channel quality at the current time, the n is the time difference, and the P is the UE's The length of SRS sending cycle, the QendFor the channel quality in the SRS of the current SRS sending cycle of the UE, the QbeginFor Channel quality in the SRS of the last SRS sending cycle of UE.
With reference to first aspect, in the third possible embodiment of first aspect, the time according to the UE Difference determines the scheduling weight of the UE, comprising:
The Channel Impulse of the last SRS sending cycle of the UE is obtained according to the SRS that the last SRS sending cycle of the UE is sent Response;
The Channel Impulse of the current SRS sending cycle of the UE is obtained according to the SRS that the current SRS sending cycle of the UE is sent Response;
The channel variation amount of the UE, the channel variation formula are obtained according to channel variation formula are as follows:
Wherein, the HΔnFor the channel variation amount, the n is the time difference, and the SRS that the P is the UE is sent The length in period, the H0For the channel impulse response of the current SRS sending cycle of the UE, the H1For the last SRS hair of the UE Send the channel impulse response in period;
The scheduling weight of the UE is determined according to the channel variation amount, the scheduling weight and the channel variation amount are negative It is related.
With reference to first aspect, in the 4th kind of possible embodiment of first aspect, the time according to the UE Difference determines the scheduling weight of the UE, comprising:
Obtain the time difference for the UE that the base station needs to carry out in the UE of scheduling of resource in addition to the UE;
Normalizing is carried out according to time difference of the time difference of each UE in the UE for needing to carry out scheduling of resource to the UE Change processing, obtains the time difference corresponding normalized value of the UE, the normalized value belongs to [0,1];
Using the inverse of the time difference of the UE corresponding normalized value as the scheduling weight of the UE.
Second aspect provides a kind of resource scheduling device, in base station, described device to include:
List acquiring unit, for determining user equipment (UE) in the scheduling of resource priority at current time, the UE is institute It states base station and needs to carry out any UE in the UE of scheduling of resource;
Time difference acquiring unit sends detection reference signal for obtaining the current time and described UE the last time Time difference at the time of SRS;
Determination unit, for determining the scheduling weight of the UE, the scheduling weight and institute according to the time difference of the UE State time difference negative correlation;
Priority update unit, for by the UE at current time scheduling of resource priority and the scheduling weight Product is as the updated scheduling of resource priority of the UE;
Scheduling unit, for carrying out scheduling of resource to the UE according to the updated scheduling of resource priority.
In conjunction with second aspect, in the first possible embodiment of second aspect, the determination unit, comprising:
Quality estimation unit, for working as according to the variation of the channel quality of the last SRS sending cycle of UE estimation The channel quality at preceding moment;
First weight determination unit, for by the channel quality at the current time and the current SRS sending cycle of the UE SRS in channel quality scheduling weight of the ratio as the UE.
In conjunction with the first possible embodiment of second aspect, in second of possible embodiment of second aspect In, the quality estimation unit, comprising:
Quality obtains module, for obtaining channel quality and institute in the SRS that the last SRS sending cycle of the UE is sent State the channel quality in the SRS of the current SRS sending cycle of UE;
Quality estimation module, for estimating the channel quality at the current time, the channel according to channel estimation formula Estimation formulas are as follows:
Wherein, the QnFor the channel quality at the current time, the n is the time difference, and the P is the UE's The length of SRS sending cycle, the QendFor the channel quality in the SRS of the current SRS sending cycle of the UE, the QbeginFor Channel quality in the SRS of the last SRS sending cycle of UE.
In conjunction with second aspect, in the third possible embodiment of second aspect, the determination unit, comprising:
First response acquiring unit, it is last that the SRS for being sent according to the last SRS sending cycle of the UE obtains the UE The channel impulse response of SRS sending cycle;
Second response acquiring unit, it is current that the SRS for being sent according to the current SRS sending cycle of the UE obtains the UE The channel impulse response of SRS sending cycle;
Change acquiring unit, for obtaining the channel variation amount of the UE, the channel variation according to channel variation formula Formula are as follows:
Wherein, the HΔnFor the channel variation amount, the n is the time difference, and the SRS that the P is the UE is sent The length in period, the H0For the channel impulse response of the current SRS sending cycle of the UE, the H1For the last SRS hair of the UE Send the channel impulse response in period;
Second weight determination unit, for determining the scheduling weight of the UE, the scheduling according to the channel variation amount Weight and the channel variation amount are negatively correlated.
In conjunction with second aspect, in the 4th kind of possible embodiment of second aspect, the determination unit, comprising:
Acquiring unit needs to carry out the time of the UE in the UE of scheduling of resource in addition to the UE for obtaining the base station Difference;
Processing unit, for according to time difference of each UE in the UE for needing to carry out scheduling of resource to the UE when Between difference be normalized, obtain the time difference corresponding normalized value of the UE, the normalized value belongs to [0,1];
Third weight determination unit, for using the inverse of the time difference of the UE corresponding normalized value as the UE's Dispatch weight.
In conjunction with second aspect the first possible embodiment into the 4th kind of possible embodiment of second aspect Either formula, described device be located at base station.
Technical solution provided in an embodiment of the present invention can include the following benefits:
By to the UE for needing to carry out scheduling of resource be arranged with the scheduling weight of time difference negative correlation, and by the scheduling weight Product with the scheduling of resource priority at current time is as the updated scheduling of resource priority of the UE, and wherein the time difference is to work as Preceding moment and the UE the last time send difference at the time of SRS, solve the problems, such as that resource utilization is low in the related technology;It reaches Need to carry out the accuracy of the scheduling of resource priority of the UE of scheduling of resource to raising, and excellent according to updated scheduling of resource First grade carries out the higher effect of resource utilization of scheduling of resource to UE.
It should be understood that above general description and following detailed description be only it is exemplary and explanatory, not It can the limitation present invention.
Detailed description of the invention
The drawings herein are incorporated into the specification and forms part of this specification, and shows and meets implementation of the invention Example, and be used to explain the principle of the present invention together with specification.
Fig. 1 is the schematic diagram for the implementation environment that each embodiment of the present invention is related to;
Fig. 2 is a kind of flow chart of resource regulating method shown in the embodiment of the present invention;
Fig. 3-1 is the flow chart of another resource regulating method shown in the embodiment of the present invention;
Fig. 3-2 is the schematic diagram of time difference in Fig. 3-1 illustrated embodiment;
Fig. 3-3 is the flow chart that current time channel quality is estimated in Fig. 3-1 illustrated embodiment;
Fig. 3-4 is the schematic diagram of SRS sending cycle in Fig. 3-1 illustrated embodiment;
Fig. 4 is the flow chart of another resource regulating method shown in the embodiment of the present invention;
Fig. 5 is the flow chart of another resource regulating method shown in the embodiment of the present invention;
Fig. 6-1 is a kind of block diagram of resource scheduling device shown in the embodiment of the present invention;
Fig. 6-2 is a kind of block diagram of determination unit in resource scheduling device shown in Fig. 6-1;
Fig. 6-3 is the block diagram of quality estimation unit in resource scheduling device shown in Fig. 6-1;
Fig. 6-4 is the block diagram of another determination unit in resource scheduling device shown in Fig. 6-1;
Fig. 6-5 is the block diagram of another determination unit in resource scheduling device shown in Fig. 6-1;
Fig. 7 is a kind of block diagram of resource scheduling device shown in the embodiment of the present invention.
Through the above attached drawings, it has been shown that the specific embodiment of the present invention will be hereinafter described in more detail.These attached drawings It is not intended to limit the scope of the inventive concept in any manner with verbal description, but is by referring to specific embodiments Those skilled in the art illustrate idea of the invention.
Specific embodiment
Example embodiments are described in detail here, and the example is illustrated in the accompanying drawings.Following description is related to When attached drawing, unless otherwise indicated, the same numbers in different drawings indicate the same or similar elements.Following exemplary embodiment Described in embodiment do not represent all embodiments consistented with the present invention.On the contrary, they be only with it is such as appended The example of device and method being described in detail in claims, some aspects of the invention are consistent.
Fig. 1 is the schematic diagram for the implementation environment that each embodiment of the present invention is related to, which may include: base station 110 and UE120.
Base station 110 is a kind of with radio resource management function, including radio bearer control, wireless access control, connection The equipment of the functions such as mobility control, the uplink and downlink dynamic resource allocation of UE, the base station 110 can be long term evolution (English: Long Term Evolution;Evolved base station (English: evolved Node B referred to as: LTE) in system;Referred to as: eNB)。
UE120 can be user equipment terminal, for example, mobile phone, intelligent terminal, multimedia equipment or stream media equipment etc. Deng.
Base station 110 and UE120 can pass through wireless network connection.In addition, this implementation environment does not make the number of UE120 Limitation.
Fig. 2 is a kind of flow chart of resource regulating method shown in the embodiment of the present invention, and the present embodiment is with the scheduling of resource It is illustrated in the base station 110 that method is applied in implementation environment shown in fig. 1.The resource regulating method may include as follows Several steps:
Step 201, user equipment (UE) is determined in the scheduling of resource priority at current time, and UE is that base station needs to carry out resource Any UE in the UE of scheduling.
Step 202, the time difference of current time and UE the last time at the time of send detection reference signal SRS is obtained.
Step 203, the scheduling weight of UE is determined according to the time difference of UE, scheduling weight and time difference are negatively correlated.
Step 204, UE is updated as UE in the scheduling of resource priority at current time and the product of scheduling weight Scheduling of resource priority.
Step 205, scheduling of resource is carried out to UE according to updated scheduling of resource priority.
In conclusion resource regulating method provided in an embodiment of the present invention, by needing the UE for carrying out scheduling of resource to set Set the scheduling weight with time difference negative correlation, and using the product of the scheduling weight and the scheduling of resource priority at current time as The updated scheduling of resource priority of the UE, wherein the time difference is at the time of sending current time and the UE the last time SRS Difference solves the problems, such as that resource utilization is low in the related technology;The resource for improving the UE for needing to carry out scheduling of resource is reached The accuracy of dispatching priority, and according to updated scheduling of resource priority to UE carry out scheduling of resource resource utilization compared with High effect.
Fig. 3-1 is a kind of flow chart of resource regulating method shown in the embodiment of the present invention, and the present embodiment is with the resource tune Degree method is applied to illustrate in implementation environment shown in fig. 1.The resource regulating method may include the following steps:
Step 301, UE sends the measurement data such as SRS to base station.
When using resource regulating method provided in an embodiment of the present invention, SRS and CQI can be sent from UE to base station first Etc. measurement data.
Step 302, base station obtains priority list according to measurement data such as SRS, and priority list is needed for recording base station Carry out the scheduling of resource priority of each UE in the UE of scheduling of resource.
After obtaining various measurement data, such as CQI and SRS, base station can be according to the ginseng in these data for base station Number calculates the scheduling of resource priority of each UE for needing to carry out scheduling of resource, and base station can be by these scheduling of resource priority It charges in priority list, scheduling of resource can be carried out according to the priority list later, and it is excellent preferentially to meet scheduling of resource The high UE of first grade, in this way can be with the resource utilization of maximization network system.
It should be noted that base station is excellent according to the scheduling of resource that various parameters calculate each UE for needing to carry out scheduling of resource The algorithm of first grade can be determined that the algorithm of the base station of different vendor's production may be different by base station.
Step 303, base station obtains the time difference of current time and each UE the last time at the time of send SRS.
After obtaining priority list, base station available current time and each UE the last time send SRS's The time difference at moment.At the time of current time is that base station will carry out scheduling of resource.Since the measurement amount in SRS is sent from UE With time change at the time of SRS, thus the time difference can react the variation journey of the measurement amount in SRS to a certain extent Degree.
It should be noted that UE can periodically to base station send SRS, the SRS sending cycle can by base station come into Row setting, and after the SRS sending cycle of base station sets UE, usually all no longer change before UE and base station are disconnected.
It should be noted that base station may send different at the time of SRS from UE at the time of receiving SRS, but base station can be from The sending instant of the SRS is obtained in received SRS.
In addition, SRS sending cycle is longer, then base station be able to carry out the UE of scheduling quantity it is more, the measurement result of SRS Timeliness it is weaker;SRS sending cycle is shorter, and the timeliness of the measurement result of SRS is stronger, but SRS sending cycle compared with In short-term, when thering are other UE to need access base station, since, there may be influence, base station may just need between the SRS of different UE transmission It adjusts the SRS sending cycle of existing UE or refuses the access of the UE.
Illustratively, as shown in figure 3-2, illustrating schematic diagram for the time difference, each small box represents a subframe, Length is 1 millisecond (ms), needs to carry out the UE of scheduling of resource1And UE2SRS sending cycle be 10ms, then current time 13 away from From UE112 time difference is 2ms, 13 distance UE of current time at the time of the last time sends SRS2The last time send SRS when The time difference for carving 11 is 7ms, 13 distance UE of current time214 time difference is 3ms at the time of sending SRS next time.
Step 304, base station estimates the channel matter at current time according to the variation of the channel quality of the last SRS sending cycle of UE Amount.
It base station, can be according to any UE upper after obtaining each UE corresponding time difference for needing to be scheduled The channel quality at current time of the UE in this SRS sending cycle is estimated in variation in a SRS sending cycle, wherein channel matter Amount is a measurement amount changed over time in SRS.
As shown in Fig. 3-3, this step may include following two sub-step:
Sub-step 3041, base station obtains channel quality in the SRS that the last SRS sending cycle of UE is sent and UE is current Channel quality in the SRS of SRS sending cycle.
Channel quality of any UE of the base station in the UE that estimation needs to carry out scheduling of resource in last SRS sending cycle When variation, channel quality and the UE current SRS of the UE in the SRS that last SRS sending cycle is sent can be obtained first Channel quality in the SRS of sending cycle.
Wherein, which is base station in the SRS of the last SRS sending cycle SRS sent and the current SRS sending cycle of the UE It is obtained before current time.Base station receive UE send SRS in channel quality be UE when sending SRS to channel into It is obtained after row measurement.
It as shown in Figure 3-4, is the schematic diagram of SRS sending cycle, wherein the moment 13 is current time, and the moment 11 is on UE At the time of a SRS sending cycle sends SRS, at the time of the moment 12 is that the current SRS sending cycle of UE sends SRS, the moment 14 is UE Next SRS sending cycle (does not arrive the moment also) at the time of sending SRS, is that last SRS sends week between moment 11 and moment 12 Phase T1, it is current SRS sending cycle T between moment 12 and moment 142, current time 13 is located at current SRS sending cycle T2In.
Sub-step 3042, base station estimate the channel quality at current time according to channel estimation formula.
Base station is obtaining letter of any UE for needing to carry out scheduling of resource in the SRS that last SRS sending cycle is sent After channel quality in the SRS of road quality and the current SRS sending cycle of the UE, can be estimated according to channel estimation formula should The channel quality at UE current time, channel estimation formula can be with are as follows:
Wherein, QnFor the channel quality at current time, n is the time difference, and P is the length of the SRS sending cycle of the UE, Qend For the channel quality in the SRS of the current SRS sending cycle of the UE, QbeginFor the channel in the SRS of the last SRS sending cycle of the UE Quality.It indicates in the last SRS sending cycle of the UE, the linear change mean value of channel quality.
Base station can be estimated according to sub-step 3041 and sub-step 3042 each needs the UE for carrying out scheduling of resource to work as The channel quality at preceding moment, this estimated value is more compared to channel quality of the UE in the SRS that current SRS sending cycle is sent Accurately.
Step 305, base station is by the channel quality in the SRS of the channel quality at current time and the current SRS sending cycle of UE Scheduling weight of the ratio as UE.
It base station, can be by current time after the channel quality for obtaining the UE current time for needing to carry out scheduling of resource Scheduling weight of the ratio of channel quality and the channel quality in the SRS of the current SRS sending cycle of UE as UE.The scheduling weight It can be with are as follows:
Wherein wnTo dispatch weight.Base station can need to carry out the every of scheduling of resource according to step 304 and step 305 acquisition The scheduling weight of a UE.
Step 306, base station is using the scheduling of resource priority of each UE with the product of corresponding scheduling weight as each UE Updated scheduling of resource priority, the priority list after being adjusted.
Base station after obtaining the scheduling weight of each UE, can by the scheduling of resource priority of each UE with it is corresponding Dispatch priority list of the product of weight as the updated scheduling of resource priority of each UE, after being adjusted.It is exemplary , needing the UE for carrying out scheduling of resource includes UE1、UE2、UE3And UE4, the priority list of this 4 UE can be as shown in table 1:
Table 1
User equipment Scheduling of resource priority
UE1 U1
UE2 U2
UE3 U3
UE4 U4
In table 1, the first behavior gauge outfit, for illustrating two column informations in table 1, the left side one is classified as user equipment column, right Side one is classified as scheduling of resource priority column, illustratively, the second row UE1Scheduling of resource priority be U1
And using the scheduling of resource priority of each UE with the product of corresponding scheduling weight as the updated money of each UE Source dispatching priority, obtained priority list adjusted can be as shown in table 2:
Table 2
In table 2, the first behavior gauge outfit, for illustrating that four column informations in table 2, left number first are classified as user equipment column, Left number second is classified as scheduling of resource priority column, and left several thirds are classified as the scheduling weight column of UE, and rightmost one is classified as the money of UE The updated scheduling of resource priority column that source dispatching priority is multiplied with scheduling weight.Base station can be obtained according to the table The updated scheduling of resource priority of each UE, the updated scheduling of resource priority is compared to the money in priority list Source dispatching priority is more accurate.In addition, base station can re-start drop according to the updated scheduling of resource priority of each UE Sequence arrangement, the priority list after being adjusted.
It should be noted that the channel of UE can be time varying channel in the embodiment of the present invention, constant channel when being also possible to, When the channel of UE is when constant channel, the scheduling weight of each UE is 1.
It should be noted that scheduling power can also be arranged to the scheduling of resource priority of UE according to other measurement amounts in base station Value or base station can combine several measurement amounts and come to the scheduling of resource priority setting scheduling weight of UE, the embodiment of the present invention It does not restrict.
Step 307, base station sends scheduling information to UE according to priority list adjusted, and scheduling information is for being provided Source scheduling.
It base station, can be according to the priority list adjusted come to UE after obtaining priority list adjusted Scheduling information is sent, UE can carry out the transmission of business datum according to the scheduling information with base station.Illustratively, base station can be with The resource request for preferentially meeting the UE of updated scheduling of resource highest priority in priority list adjusted, is there is residue When resource, it can according to circumstances meet the resource request of other UE.
It should be noted that the scheduling of resource priority of each UE is more accurate in priority list, according to priority list The resource utilization for sending scheduling information progress scheduling of resource is higher, thus base station is sent according to priority list adjusted The utilization rate of resource in network system can be improved in scheduling information.
Step 308, base station and UE carry out the transmission of business datum.
Base station can carry out the transmission of business datum after sending scheduling information to UE with UE.
It should be noted that channel involved in the embodiment of the present invention is the channel of UE uplink.
It should be added that resource regulating method provided in an embodiment of the present invention, by last SRS sending cycle Channel quality changes to estimate the channel quality at current time, and the resource of UE is adjusted according to the channel quality at current time Dispatching priority has achieved the effect that the accuracy for the scheduling of resource priority for improving UE.
In conclusion resource regulating method provided in an embodiment of the present invention, by needing the UE for carrying out scheduling of resource to set Set the scheduling weight with time difference negative correlation, and using the product of the scheduling weight and the scheduling of resource priority at current time as The updated scheduling of resource priority of the UE, wherein the time difference is at the time of sending current time and the UE the last time SRS Difference solves the problems, such as that resource utilization is low in the related technology;The resource for improving the UE for needing to carry out scheduling of resource is reached The accuracy of dispatching priority, and according to updated scheduling of resource priority to UE carry out scheduling of resource resource utilization compared with High effect.
Fig. 4 is a kind of flow chart of resource regulating method shown in the embodiment of the present invention, and the present embodiment is with the scheduling of resource It is illustrated in the base station 110 that method is applied in implementation environment shown in fig. 1.The resource regulating method may include as follows Several steps:
Step 401, priority list is obtained, priority list needs to carry out in the UE of scheduling of resource often for recording base station The scheduling of resource priority of a UE.
Base station can first obtain various measuring signals when using resource regulating method provided in an embodiment of the present invention, than Such as CQI and SRS, base station can calculate each UE's for needing to carry out scheduling of resource according to the parameter in these signals later Scheduling of resource priority, base station can charge to these scheduling of resource priority in priority list, later can be excellent according to this First grade list carries out scheduling of resource, and preferentially meets the high UE of scheduling of resource priority, in this way can be with maximization network system Resource utilization.
It should be noted that base station is excellent according to the scheduling of resource that various parameters calculate each UE for needing to carry out scheduling of resource The algorithm of first grade can be determined that the algorithm of the base station of different vendor's production may be different by base station.
Step 402, the time difference of current time and each UE the last time at the time of send SRS is obtained.
After obtaining priority list, base station available current time and each UE the last time send SRS's The time difference at moment.At the time of current time is that base station will carry out scheduling of resource.Since the measurement amount in SRS is sent from UE With time change at the time of SRS, thus the time difference can react the variation journey of the measurement amount in SRS to a certain extent Degree.
It should be noted that UE can periodically to base station send SRS, the SRS sending cycle can by base station come into Row setting, and after the SRS sending cycle of base station sets UE, usually all no longer change before UE and base station are disconnected.
In addition, SRS sending cycle is longer, then UE be able to carry out scheduling UE quantity it is more, the measurement result of SRS when Effect property is weaker;SRS sending cycle is shorter, and the timeliness of the measurement result of SRS is stronger, but when SRS sending cycle is shorter, When thering are other UE to need access base station, since, there may be influence, base station just needs to adjust existing between the SRS of different UE transmission The SRS sending cycle of UE or the access for refusing other UE.
Step 403, the Channel Impulse of the last SRS sending cycle of UE is obtained according to the SRS that the last SRS sending cycle of UE is sent Response.
Base station can according to need the SRS that any UE in the UE for carrying out scheduling of resource was sent in last SRS sending cycle In measurement amount obtain the channel impulse response of the last SRS sending cycle of the UE.
Channel can signal generation effect (such as weakening, change frequency etc.) to process, different channel function and effect are not Equally, channel impulse response can be understood as inputting a unit-pulse signal, the sound of the channel output to channel input terminal Answer the ratio of output signal Yu the unit-pulse signal.
Step 404, the Channel Impulse of the current SRS sending cycle of UE is obtained according to the SRS that the current SRS sending cycle of UE is sent Response.
Base station can according to need the SRS that any UE in the UE for carrying out scheduling of resource is sent in current SRS sending cycle In measurement amount obtain the channel impulse response of the current SRS sending cycle of the UE.
It should be noted that this step can be performed simultaneously with step 403, alternatively, this step can also step 403 it Preceding execution, the embodiment of the present invention do not restrict this.
Step 405, the channel variation amount of UE is obtained according to channel variation formula.
Base station any UE in obtaining the UE for needing to carry out scheduling of resource is rung in the Channel Impulse of last SRS sending cycle It answers and the UE is after the channel impulse response of current SRS sending cycle, the UE can be obtained according to channel variation formula Channel variation amount.
Channel variation formula can be with are as follows:
Wherein, HΔnFor channel variation amount, n is the time difference, and P is the length of the SRS sending cycle of UE, H0For the current SRS of UE The channel impulse response of sending cycle, H1For the channel impulse response of the last SRS sending cycle of UE.
Step 406, the scheduling weight of UE is determined according to channel variation amount, scheduling weight and channel variation amount are negatively correlated.
It base station, can be according to the letter in obtaining the UE for needing to carry out scheduling of resource after the channel variation amount of any UE The scheduling of resource priority setting scheduling weight that road variable quantity is the UE, and keep the scheduling weight and channel variation amount negatively correlated, That is channel variation amount is bigger, dispatches weight with regard to smaller.
Base station can determine the scheduling weight of each UE according to step 403 to step 406.
Step 407, it is updated the scheduling of resource priority of each UE with the product of corresponding scheduling weight as each UE Scheduling of resource priority afterwards, the priority list after being adjusted.
Base station can adjust the scheduling of resource priority of each UE with corresponding after determining the scheduling weight of each UE Spend priority list of the product of weight as the updated scheduling of resource priority of each UE, after being adjusted.
Step 408, scheduling of resource is carried out according to priority list adjusted.
Base station can be provided after obtaining priority list adjusted according to the priority list adjusted Source scheduling, optionally, base station can send scheduling information to UE according to priority list to carry out scheduling of resource, and UE can basis The scheduling information to carry out the transmission of business datum with base station.Illustratively, base station is carrying out scheduling of resource by scheduling information When, it can preferentially meet the resource request of the UE of scheduling of resource highest priority in priority list adjusted, there is residue When resource, it can according to circumstances meet the resource request of other UE.
It should be noted that base station carries out scheduling of resource according to priority list adjusted, network system can be improved The utilization rate of middle resource.
It should also be noted that, channel involved in the embodiment of the present invention is the channel of UE uplink.
It should be added that resource regulating method provided in an embodiment of the present invention, by the channel variation amount of UE come It determines the scheduling weight of UE, and adjusts the scheduling of resource priority of UE according to the scheduling weight, reached the resource for improving UE The effect of the accuracy of dispatching priority.
In conclusion resource regulating method provided in an embodiment of the present invention, by needing the UE for carrying out scheduling of resource to set Set the scheduling weight with time difference negative correlation, and using the product of the scheduling weight and the scheduling of resource priority at current time as The updated scheduling of resource priority of the UE, wherein the time difference is at the time of sending current time and the UE the last time SRS Difference solves the problems, such as that resource utilization is low in the related technology;The resource for improving the UE for needing to carry out scheduling of resource is reached The accuracy of dispatching priority, and according to updated scheduling of resource priority to UE carry out scheduling of resource resource utilization compared with High effect.
Fig. 5 is a kind of flow chart of resource regulating method shown in the embodiment of the present invention, and the present embodiment is with the scheduling of resource It is illustrated in the base station 110 that method is applied in implementation environment shown in fig. 1.The resource regulating method may include as follows Several steps:
Step 501, determine UE in the scheduling of resource priority at current time.
Base station can first obtain various measuring signals when using resource regulating method provided in an embodiment of the present invention, than Such as CQI and SRS, base station can determine that UE is preferential in the scheduling of resource at current time according to the parameter in these signals later Grade.Base station can determine each UE for needing to carry out scheduling of resource in the scheduling of resource priority at current time according to this step.
Step 502, the time difference of current time and UE the last time at the time of send SRS is obtained.
After obtaining priority list, base station available current time and each UE the last time send SRS's The time difference at moment.At the time of current time is that base station will carry out scheduling of resource.Since the measurement amount in SRS is sent from UE With time change at the time of SRS, thus the time difference can react the variation journey of the measurement amount in SRS to a certain extent Degree.
It should be noted that UE can periodically to base station send SRS, the SRS sending cycle can by base station come into Row setting, and after the SRS sending cycle of base station sets UE, usually all no longer change before UE and base station are disconnected.
In addition, SRS sending cycle is longer, then UE be able to carry out scheduling UE quantity it is more, the measurement result of SRS when Effect property is weaker;SRS sending cycle is shorter, and the timeliness of the measurement result of SRS is stronger, but when SRS sending cycle is shorter, When thering are other UE to need access base station, since, there may be influence, base station just needs to adjust existing between the SRS of different UE transmission The SRS sending cycle of UE or the access for refusing other UE.
Base station can also obtain the time difference of each UE in the UE for needing to carry out scheduling of resource in addition to the UE.
Step 503, the time difference of UE is normalized, obtains the time difference corresponding normalized value of UE.
It base station, can be to the time difference of each UE after the time difference for obtaining each UE for needing to carry out scheduling of resource It is normalized, obtains the time difference corresponding normalized value of each UE, wherein each normalized value belongs to [0,1], and Needing to carry out the sum of normalized value of time difference of UE of scheduling of resource is 1.
Wherein normalized process can be with are as follows: sets that need the UE for carrying out scheduling of resource include UE1、UE2And UE3, UE1When Between difference be a, UE2Time difference be b, UE3Time difference be c, then UE1Normalized value g1=a/ (a+b+c), UE2Normalization Value g2=b/ (a+b+c), UE3Normalized value g3=c/ (a+b+c).Illustratively, UE1Time difference be 2ms, UE2Time Difference is 3ms, UE3Time difference be 5ms, then UE1Normalized value g1=2/ (2+3+5)=0.2, UE2Normalized value g2=3/ (2+3+5)=0.3, UE3Normalized value g3=5/ (2+3+5)=0.5.
It should be noted that base station can also be normalized the time difference of each UE by other methods, The embodiment of the present invention does not restrict.
Step 504, using the inverse of the time difference of UE corresponding normalized value as the scheduling weight of the UE.
It base station, can be by the normalizing of each UE after the normalized value for obtaining each UE for needing to carry out scheduling of resource Scheduling weight of the inverse of change value as each UE.Base station can obtain the scheduling power of each UE according to step 501 to step 504 Value.
Step 505, using the scheduling of resource priority of UE with the product of corresponding scheduling weight as the updated money of the UE Source dispatching priority.
Base station after obtaining the scheduling weight of each UE, can by the scheduling of resource priority of each UE with it is corresponding The product of weight is dispatched as the updated scheduling of resource priority of each UE.
Step 506, scheduling of resource is carried out to UE according to updated scheduling of resource priority.
It base station, can be excellent according to the updated scheduling of resource after obtaining the updated scheduling of resource priority of UE First grade carries out scheduling of resource to UE.
It should be noted that base station carries out scheduling of resource to UE according to updated scheduling of resource priority, can be improved The utilization rate of resource in network system.
It should be added that resource regulating method provided in an embodiment of the present invention, by by the time difference of each UE Normalized value scheduling weight of the inverse as each UE, and according to the scheduling weight to the scheduling of resource priority of each UE It is adjusted, has achieved the effect that the accuracy for the scheduling of resource priority for improving UE.
In conclusion resource regulating method provided in an embodiment of the present invention, by needing the UE for carrying out scheduling of resource to set Set the scheduling weight with time difference negative correlation, and using the product of the scheduling weight and the scheduling of resource priority at current time as The updated scheduling of resource priority of the UE, wherein the time difference is at the time of sending current time and the UE the last time SRS Difference solves the problems, such as that resource utilization is low in the related technology;The resource for improving the UE for needing to carry out scheduling of resource is reached The accuracy of dispatching priority, and according to updated scheduling of resource priority to UE carry out scheduling of resource resource utilization compared with High effect.
Following is apparatus of the present invention embodiment, can be used for executing embodiment of the present invention method.For apparatus of the present invention reality Undisclosed details in example is applied, embodiment of the present invention method is please referred to.
Fig. 6-1 is a kind of block diagram of resource scheduling device 600 shown in the embodiment of the present invention, the resource scheduling device 600 It being implemented in combination with as the part of base station 110 in implementation environment shown in Fig. 1 or complete by software, hardware or both Portion.The resource scheduling device 600 may include:
List acquiring unit 610, for determining user equipment (UE) in the scheduling of resource priority at current time, UE is base station Need to carry out any UE in the UE of scheduling of resource.
Time difference acquiring unit 620, for obtain current time and UE the last time send detection reference signal SRS when The time difference at quarter.
Determination unit 630 determines the scheduling weight of UE, scheduling weight and time difference negative for the time difference according to UE It closes.
Priority update unit 640, for by UE current time scheduling of resource priority and scheduling weight product As the updated scheduling of resource priority of UE.
Scheduling unit 650, for carrying out scheduling of resource to UE according to updated scheduling of resource priority.
Optionally, as in fig. 6-2, determination unit 630, comprising:
Current time is estimated in quality estimation unit 631, the variation for the channel quality according to the last SRS sending cycle of UE Channel quality.
First weight determination unit 632, for by the SRS of the channel quality at current time and the current SRS sending cycle of UE In channel quality scheduling weight of the ratio as UE.
Optionally, as shown in Fig. 6-3, quality estimation unit 631, comprising:
Quality obtains module 6311, for obtaining channel quality and UE in the SRS that the last SRS sending cycle of UE is sent Channel quality in the SRS of current SRS sending cycle.
Quality estimation module 6312, for estimating the channel quality at current time, channel estimation according to channel estimation formula Formula are as follows:
Wherein, QnFor the channel quality at current time, n is the time difference, and P is the length of the SRS sending cycle of UE, QendFor Channel quality in the SRS of the current SRS sending cycle of UE, QbeginFor the channel quality in the SRS of the last SRS sending cycle of UE.
Optionally, as shown in Fig. 6-4, determination unit 630, comprising:
First response acquiring unit 633, the SRS for being sent according to the last SRS sending cycle of UE obtain the last SRS of UE and send out Send the channel impulse response in period.
Second response acquiring unit 634, the SRS for being sent according to the last SRS sending cycle of UE obtain the last SRS of UE and send out Send the channel impulse response in period.
Change acquiring unit 635, for obtaining the channel variation amount of UE, channel variation formula according to channel variation formula Are as follows:
Wherein, HΔnFor channel variation amount, n is the time difference, and P is the length of the SRS sending cycle of UE, H0For the current SRS of UE The channel impulse response of sending cycle, H1For the channel impulse response of the last SRS sending cycle of UE.
Second weight determination unit 636 dispatches weight and channel for determining the scheduling weight of UE according to channel variation amount Variable quantity is negatively correlated.
Optionally, as shown in Fig. 6-5, determination unit 630, comprising:
Acquiring unit 637 needs to carry out the time difference of the UE in the UE of scheduling of resource in addition to UE for obtaining base station.
Processing unit 638, time difference of the time difference of each UE to UE in the UE for carrying out scheduling of resource as needed It is normalized, obtains the time difference corresponding normalized value of UE, normalized value belongs to [0,1].
Third weight determination unit 639, for using the inverse of the time difference of UE corresponding normalized value as the scheduling of UE Weight.
It should be noted that device provided in an embodiment of the present invention, can be located at base station.
It should be added that resource scheduling device provided in an embodiment of the present invention, by by the time difference of each UE Normalized value scheduling weight of the inverse as each UE, and according to the scheduling weight to the scheduling of resource priority of each UE It is adjusted, has achieved the effect that the accuracy for the scheduling of resource priority for improving UE.
It should be added that resource scheduling device provided in an embodiment of the present invention, by the channel variation amount of UE come It determines the scheduling weight of UE, and adjusts the scheduling of resource priority of UE according to the scheduling weight, reached the resource for improving UE The effect of the accuracy of dispatching priority.
It should be added that resource scheduling device provided in an embodiment of the present invention, by last SRS sending cycle Channel quality changes to estimate the channel quality at current time, and the resource of UE is adjusted according to the channel quality at current time Dispatching priority has achieved the effect that the accuracy for the scheduling of resource priority for improving UE.
In conclusion resource scheduling device provided in an embodiment of the present invention, by needing the UE for carrying out scheduling of resource to set Set the scheduling weight with time difference negative correlation, and using the product of the scheduling weight and the scheduling of resource priority at current time as The updated scheduling of resource priority of the UE, wherein the time difference is at the time of sending current time and the UE the last time SRS Difference solves the problems, such as that resource utilization is low in the related technology;The resource for improving the UE for needing to carry out scheduling of resource is reached The accuracy of dispatching priority, and according to updated scheduling of resource priority to UE carry out scheduling of resource resource utilization compared with High effect.
As shown in fig. 7, the block diagram of resource scheduling device provided by one embodiment of the present invention.The resource scheduling device can be with Applied to the base station 110 in scene shown in FIG. 1, which may include: processor 701.
Processor 701, for determine user equipment (UE) in the scheduling of resource priority at current time, UE be base station need into Any UE in the UE of row scheduling of resource.
Processor 701, the time for obtaining current time and at the time of UE the last time sends detection reference signal SRS Difference.
Processor 701 determines the scheduling weight of UE for the time difference according to UE, and scheduling weight and time difference are negatively correlated.
Processor 701, for using UE current time scheduling of resource priority and scheduling weight product as UE more Scheduling of resource priority after new.
Processor 701, for carrying out scheduling of resource to UE according to updated scheduling of resource priority.
Processor 701, for the channel according to variation estimation current time of the channel quality of the last SRS sending cycle of UE Quality.
Processor 701, for by the channel matter in the SRS of the channel quality at current time and the current SRS sending cycle of UE Scheduling weight of the ratio of amount as UE.
Processor 701, for obtaining channel quality and the current SRS of UE in the SRS that the last SRS sending cycle of UE is sent Channel quality in the SRS of sending cycle.
Processor 701, for estimating the channel quality at current time, channel estimation formula according to channel estimation formula are as follows:
Wherein, QnFor the channel quality at current time, n is the time difference, and P is the length of the SRS sending cycle of UE, QendFor Channel quality in the SRS of the current SRS sending cycle of UE, QbeginFor the channel quality in the SRS of the last SRS sending cycle of UE.
Processor 701, the SRS for being sent according to the last SRS sending cycle of UE obtain the letter of the last SRS sending cycle of UE Road shock response.
Processor 701, the SRS for being sent according to the current SRS sending cycle of UE obtain the letter of the current SRS sending cycle of UE Road shock response.
Processor 701, for obtaining the channel variation amount of UE, channel variation formula according to channel variation formula are as follows:
Wherein, HΔnFor channel variation amount, n is the time difference, and P is the length of the SRS sending cycle of UE, H0For the current SRS of UE The channel impulse response of sending cycle, H1For the channel impulse response of the last SRS sending cycle of UE.
Processor 701, for determining the scheduling weight of UE, scheduling weight and channel variation amount negative according to channel variation amount It closes
Processor 701 needs to carry out the time difference of the UE in the UE of scheduling of resource in addition to UE for obtaining base station.
Processor 701, in the UE for carrying out scheduling of resource as needed the time difference of each UE to time difference of UE into Row normalized, obtains the time difference corresponding normalized value of UE, and normalized value belongs to [0,1].
Processor 701, for using the inverse of the time difference of UE corresponding normalized value as the scheduling weight of UE.
It should be added that resource scheduling device provided in an embodiment of the present invention, by by the time difference of each UE Normalized value scheduling weight of the inverse as each UE, and according to the scheduling weight to the scheduling of resource priority of each UE It is adjusted, has achieved the effect that the accuracy for the scheduling of resource priority for improving UE.
It should be added that resource scheduling device provided in an embodiment of the present invention, by the channel variation amount of UE come It determines the scheduling weight of UE, and adjusts the scheduling of resource priority of UE according to the scheduling weight, reached the resource for improving UE The effect of the accuracy of dispatching priority.
It should be added that resource scheduling device provided in an embodiment of the present invention, by last SRS sending cycle Channel quality changes to estimate the channel quality at current time, and the resource of UE is adjusted according to the channel quality at current time Dispatching priority has achieved the effect that the accuracy for the scheduling of resource priority for improving UE.
In conclusion resource scheduling device provided in an embodiment of the present invention, by needing the UE for carrying out scheduling of resource to set Set the scheduling weight with time difference negative correlation, and using the product of the scheduling weight and the scheduling of resource priority at current time as The updated scheduling of resource priority of the UE, wherein the time difference is at the time of sending current time and the UE the last time SRS Difference solves the problems, such as that resource utilization is low in the related technology;The resource for improving the UE for needing to carry out scheduling of resource is reached The accuracy of dispatching priority, and according to updated scheduling of resource priority to UE carry out scheduling of resource resource utilization compared with High effect.
About the device in above-described embodiment, wherein modules execute the concrete mode of operation in related this method Embodiment in be described in detail, no detailed explanation will be given here.
The foregoing is merely presently preferred embodiments of the present invention, is not intended to limit the invention, it is all in spirit of the invention and Within principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (5)

1. a kind of resource regulating method, which is characterized in that in base station, which comprises
User equipment (UE) is determined in the scheduling of resource priority at current time, the UE is that the base station needs to carry out scheduling of resource UE in any UE;
Obtain the current time and time difference at the time of described UE the last time sends detection reference signal SRS;
The scheduling weight of the UE is determined according to the time difference of the UE, the scheduling weight and the time difference are negatively correlated;
The UE is updated as the UE in the scheduling of resource priority at current time and the product of the scheduling weight Scheduling of resource priority;
Scheduling of resource is carried out to the UE according to the updated scheduling of resource priority;
Wherein, the time difference according to the UE determines the scheduling weight of the UE, comprising:
The channel quality at the current time is estimated according to the variation of the channel quality of the last SRS sending cycle of the UE;
The ratio of channel quality in the channel quality at the current time and the SRS of the current SRS sending cycle of the UE is made For the scheduling weight of the UE;
Alternatively, the time difference according to the UE determines the scheduling weight of the UE, comprising:
It is rung according to the Channel Impulse that the SRS that the last SRS sending cycle of the UE is sent obtains the last SRS sending cycle of the UE It answers;
It is rung according to the Channel Impulse that the SRS that the current SRS sending cycle of the UE is sent obtains the current SRS sending cycle of the UE It answers;
The channel variation amount of the UE, the channel variation formula are obtained according to channel variation formula are as follows:
Wherein, describedFor the channel variation amount, the n is the time difference, and the SRS that the P is the UE sends week The length of phase, the H0For the channel impulse response of the current SRS sending cycle of the UE, the H1It is sent for the last SRS of the UE The channel impulse response in period;
The scheduling weight of the UE, the scheduling weight and the channel variation amount negative are determined according to the channel variation amount It closes;
Alternatively, the time difference according to the UE determines the scheduling weight of the UE, comprising:
Obtain the time difference for the UE that the base station needs to carry out in the UE of scheduling of resource in addition to the UE;
Place is normalized to the time difference of the UE according to the time difference for needing each UE in the UE for carrying out scheduling of resource Reason, obtains the time difference corresponding normalized value of the UE, the normalized value belongs to [0,1];
Using the inverse of the time difference of the UE corresponding normalized value as the scheduling weight of the UE.
2. the method according to claim 1, wherein the channel according to the last SRS sending cycle of the UE The channel quality at the current time is estimated in the variation of quality, comprising:
Obtain channel quality in the SRS that the last SRS sending cycle of the UE is sent and the current SRS sending cycle of the UE Channel quality in SRS;
The channel quality at the current time, the channel estimation formula are estimated according to channel estimation formula are as follows:
Wherein, the QnFor the channel quality at the current time, the n is the time difference, and the SRS that the P is the UE is sent out Send the length in period, the QendFor the channel quality in the SRS of the current SRS sending cycle of the UE, the QbeginFor the UE Channel quality in the SRS of last SRS sending cycle.
3. a kind of resource scheduling device, which is characterized in that in base station, described device to include:
List acquiring unit, for determining user equipment (UE) in the scheduling of resource priority at current time, the UE is the base Station needs to carry out any UE in the UE of scheduling of resource;
Time difference acquiring unit sends detection reference signal SRS's for obtaining the current time and described UE the last time The time difference at moment;
Determination unit, for determining the scheduling weight of the UE according to the time difference of the UE, the scheduling weight and it is described when Between difference it is negatively correlated;
Priority update unit, for by the UE current time scheduling of resource priority and it is described scheduling weight product As the updated scheduling of resource priority of the UE;
Scheduling unit, for carrying out scheduling of resource to the UE according to the updated scheduling of resource priority;
Wherein, the determination unit, comprising:
Quality estimation unit, for it is described current according to the variation estimation of the channel quality of the last SRS sending cycle of the UE when The channel quality at quarter;
First weight determination unit, for by the SRS of the channel quality at the current time and the current SRS sending cycle of the UE In channel quality scheduling weight of the ratio as the UE;
Alternatively, the determination unit, comprising:
First response acquiring unit, the SRS for being sent according to the last SRS sending cycle of the UE obtain the last SRS of UE The channel impulse response of sending cycle;
Second response acquiring unit, the SRS for being sent according to the current SRS sending cycle of the UE obtain the current SRS of UE The channel impulse response of sending cycle;
Change acquiring unit, for obtaining the channel variation amount of the UE, the channel variation formula according to channel variation formula Are as follows:
Wherein, describedFor the channel variation amount, the n is the time difference, and the SRS that the P is the UE sends week The length of phase, the H0For the channel impulse response of the current SRS sending cycle of the UE, the H1It is sent for the last SRS of the UE The channel impulse response in period;
Second weight determination unit, for determining the scheduling weight of the UE, the scheduling weight according to the channel variation amount It is negatively correlated with the channel variation amount;
Alternatively, the determination unit, comprising:
Acquiring unit needs to carry out the time difference of the UE in the UE of scheduling of resource in addition to the UE for obtaining the base station;
Processing unit, for the time difference according to time difference of each UE in the UE for needing to carry out scheduling of resource to the UE It is normalized, obtains the time difference corresponding normalized value of the UE, the normalized value belongs to [0,1];
Third weight determination unit, for using the inverse of the time difference of the UE corresponding normalized value as the scheduling of the UE Weight.
4. device according to claim 3, which is characterized in that the quality estimation unit, comprising:
Quality obtains module, for obtaining channel quality and the UE in the SRS that the last SRS sending cycle of the UE is sent Channel quality in the SRS of current SRS sending cycle;
Quality estimation module, for estimating the channel quality at the current time, the channel estimation according to channel estimation formula Formula are as follows:
Wherein, the QnFor the channel quality at the current time, the n is the time difference, and the SRS that the P is the UE is sent out Send the length in period, the QendFor the channel quality in the SRS of the current SRS sending cycle of the UE, the QbeginFor the UE Channel quality in the SRS of last SRS sending cycle.
5. device according to claim 3 or 4, which is characterized in that described device is located at base station.
CN201510458442.5A 2015-07-30 2015-07-30 Resource regulating method and device Active CN106413108B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510458442.5A CN106413108B (en) 2015-07-30 2015-07-30 Resource regulating method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510458442.5A CN106413108B (en) 2015-07-30 2015-07-30 Resource regulating method and device

Publications (2)

Publication Number Publication Date
CN106413108A CN106413108A (en) 2017-02-15
CN106413108B true CN106413108B (en) 2019-10-25

Family

ID=58009162

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510458442.5A Active CN106413108B (en) 2015-07-30 2015-07-30 Resource regulating method and device

Country Status (1)

Country Link
CN (1) CN106413108B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107846697B (en) * 2017-10-18 2021-03-30 京信通信系统(中国)有限公司 SRS scheduling method and system
CN111935841B (en) * 2019-04-24 2022-03-22 大唐移动通信设备有限公司 UE scheduling method and device

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101610551B (en) * 2008-06-20 2011-12-07 普天信息技术研究院有限公司 Resource scheduling method for HSUPA
CN101790215B (en) * 2009-12-30 2016-03-30 华为技术有限公司 Resource regulating method, device and base station
CN102149204B (en) * 2011-02-01 2013-10-02 华为技术有限公司 Method and system for scheduling channel resources and base station
CN104023407B (en) * 2014-05-23 2017-09-29 大唐移动通信设备有限公司 Upper line frequency selection scheduling method and device
CN105323860B (en) * 2014-07-28 2019-05-24 电信科学技术研究院 The implementation method and device of UE sequence

Also Published As

Publication number Publication date
CN106413108A (en) 2017-02-15

Similar Documents

Publication Publication Date Title
JP5280514B2 (en) Sounding reference signal transfer method
CN106209277A (en) The method of a kind of channel condition information measurement and subscriber equipment
US8611916B2 (en) Reference signal design for distributed antenna systems
CN108810903A (en) A kind of configuration of data transmission and data transmission method and device
CN105142227B (en) A kind of determination method and apparatus of MCS grade
CN103716828B (en) A kind of interference measurement, control method and user equipment, dispatching method and base station
EP3206426B1 (en) Inter-cell interference processing method, device and computer program product
CN105228234B (en) Interference control method and equipment, base station
Bakri et al. Data-driven RAN slicing mechanisms for 5G and beyond
CN104581749B (en) A kind of prediction technique and device of mobile network data service traffic
CN111224762A (en) Sounding reference signal resource allocation method and device
CN106656280A (en) Feedback and control method and device of channel state information (CSI)
CN105850049A (en) Method and apparatus for adaptive band selection in heterogeneous networks
CN106413108B (en) Resource regulating method and device
Kim et al. Mathematical model of operation of a cell of a mobile communication network with adaptive modulation schemes and handover of mobile users
CN106465351B (en) A kind of method and device configuring pilot tone
CN102461308A (en) Base station, communication system, communication control method, and program
CN108834214B (en) Time slot resource allocation method and device based on uplink and downlink queue balance
US10764761B2 (en) Devices and method for the simulation of a mobile telecommunications network
CN102223687A (en) Transmitting method and equipment for interference coordination request
CN102740480B (en) Method and device for interference suppression of paired users
CN112398514B (en) Channel estimation method and device
WO2019040059A1 (en) Methods and apparatus to enable spatial reuse in a wireless network
CN106559884A (en) A kind of transmission method and equipment of CSI aperiodic
CN104685915B (en) A kind of report method and device of PHR

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant