- Publication number
- CN106412012A CN106412012A CN201610775092.XA CN201610775092A CN106412012A CN 106412012 A CN106412012 A CN 106412012A CN 201610775092 A CN201610775092 A CN 201610775092A CN 106412012 A CN106412012 A CN 106412012A
- Authority
- CN
- China
- Prior art keywords
- bank
- provincial
- power supply
- end processor
- power
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network arrangements or protocols for supporting network services or applications
- H04L67/01—Protocols
- H04L67/12—Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L63/00—Network architectures or network communication protocols for network security
- H04L63/02—Network architectures or network communication protocols for network security for separating internal from external traffic, e.g. firewalls
- H04L63/0227—Filtering policies
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L63/00—Network architectures or network communication protocols for network security
- H04L63/04—Network architectures or network communication protocols for network security for providing a confidential data exchange among entities communicating through data packet networks
- H04L63/0428—Network architectures or network communication protocols for network security for providing a confidential data exchange among entities communicating through data packet networks wherein the data content is protected, e.g. by encrypting or encapsulating the payload
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network arrangements or protocols for supporting network services or applications
- H04L67/01—Protocols
- H04L67/10—Protocols in which an application is distributed across nodes in the network
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Computer Security & Cryptography (AREA)
- Computing Systems (AREA)
- Computer Hardware Design (AREA)
- General Engineering & Computer Science (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Medical Informatics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention belongs to the field of a power grid marketing system and especially relates to a multilayer scalable provincial centralized bank networked electric charge collection system and method. The system comprises bank side power supply networked front-end processors located at bank ports, a provincial power supply external network communication system and a provincial centrally deployed data center. The bank side power supply networked front-end processors are arranged in a bank system and are connected with a bank internal network. Multiple power supply side bank and power supply networked front-end processors which are deployed in a distributed mode according to a provincial level and a city level are arranged in the provincial power supply external network communication system. The bank side power supply networked front-end processors and the power supply side bank and power supply networked front-end processors are connected through DDN channels. The provincial centrally deployed data center is in communication connection with the bank side power supply networked front-end processors through the provincial power supply external network communication system. According to the system and the method, existing network infrastructure resources are utilized fully, construction investment is greatly reduced, the service adjustment flexibility is improved, and the increase and expansion of a system scale can be effectively coped with.
Description
Technical field
The invention belongs to electrical network marketing system field and in particular at many levels telescopic provincial concentration bank networking generation
Collect charges for electricity system and method.
Background technology
South electric network marketing system is built with prefecture-level unit for main body for a long time, networking pay electricity fee system of bank
Problem faced by system is relatively easy, and overall business scale is also relatively small.
After south electric network marketing system adopts provincial concentration deployment mode, one side electrical network business scale is increased dramatically, phase
There is more than ten times of lifting for main part, marketing system is necessary to ensure that these increasings of timely, stable process when prefecture-level unit is affixed one's name to
Plus business;Simultaneously need to the increase further looked ahead with marketing system service data amount, marketing system should have relatively
Strong extensibility.The situation of another aspect bank also becomes complicated, and some banks can be directly in provincial branch and electricity
Net docking, some prefecture-level banks do not have organization it is impossible to network with provincial machine room of powering, these banks will in provincial capital
Carry out pay electricity fee business of networking, network insertion need to be solved the problems, such as.The provincial machine room if the new access via telephone line of direct construction is powered
Need to consume substantial amounts of construction investment.
Traditional marketing system Zhong Ge bank uses unified communications protocol, needs when business changes or develops new business
Communications protocol is modified it is impossible to being adjusted for Single Ag row or customizing it is necessary to the harmonious unification of all banks
Modification program, this still coordinates in the case that bank quantity is fewer, but difficult to realize after provincial concentration deployment.
Content of the invention
In order to solve to solve after provincial concentration deployment in prior art, prefecture-level bank cannot be with provincial machine room of powering
Networking, and problem unit bank cannot being adjusted in Traditional Marketing system, the present invention provides scalable at many levels
Provincial concentration bank networking pay electricity fee system and method, can advantageously by prefecture-level bank access power provincial machine
Room, and the communication protocol for multi-bank easy to adjust it is also possible in time, stably processing business increases.
For achieving the above object, the present invention is achieved by the following technical solutions:
The present invention provides bank's networking pay electricity fee system of telescopic provincial concentration at many levels, and it is characterized in that, bag
Including positioned at the bank side of bank port power networking front end processor, be located at provincial supply port provincial power supply outbound communication system with
And provincial concentrate deployment data center, wherein bank side power networking front end processor be arranged in banking system and with bank's in-house network
Network is set up and is connected, and is provided with the supply side bank-power intranet of the two-stage distributed setting of multiple provinces and cities in provincial power supply outbound communication system
Front end processor, bank side power networking front end processor be attached by DDN passage with supply side bank-power intranet front end processor;Provincial concentration
Deployment data center is passed through powered with bank side front end processor of networking of provincial power supply outbound communication system and is communicatively coupled.
Further, provincial concentration disposes the application service cluster being provided with compatible marketing management system in data center,
Business object in application service cluster is passed to supply side bank-power intranet front end processor by provincial concentration deployment data center.
Further, the banking system of networking front end processor of powering with bank side is divided into banking system directly under the provincial Party committee and local bank
System, when for banking system directly under the provincial Party committee, bank side power networking front end processor directly and supply port provincial power supply outbound communication
System sets up communication port, and accesses provincial concentration deployment data center;When for local bank's system, bank side powers networking
Office of the districts and cities electric power system that front end processor is located by it accesses provincial concentration and disposes data center.
Further, the bank side in local bank's system power networking front end processor be located in office of districts and cities electric power system with it
Districts and cities' supply side bank-power intranet front end processor be connected, office of districts and cities electric power system concentrates deployment data center to pass through comprehensive number with provincial
According to Network Communication.
Further, the supply side bank-power intranet in provincial power supply outbound communication system and districts and cities' electric power system is preposition
Machine be provided with multiple, each supply side bank-power intranet front end processor all access to provincial concentrate deployment data center.
The present invention also provides bank's networking pay electricity fee method of telescopic provincial concentration at many levels, and its special character exists
In:
It is responsible for carrying out the provincial power supply outbound communication system of service interaction with provincial bank in the deployment of province center of supply outer net machine room,
Carry out office of the districts and cities electric power system of service interaction in the machine room deployment of power supply administration of districts and cities with local bank, in province center of supply machine room portion
Administration is provided with the provincial concentration deployment data center of application service cluster, from provincial bank data directly by provincial power supply
Outbound communication system concentrates deployment data center to carry out service interaction with provincial, and the data from local bank is powered by districts and cities
Office's electric power system accesses provincial concentration deployment data center and carries out service interaction.
Further, the data of provincial bank directly concentrates deployment data by provincial power supply outbound communication system with provincial
Center carries out service interaction, and concrete implementation process is:
Step 1, the client positioned at provincial bank send data request packet, carry the message number of encryption in data request packet
Exchanged by bank's internal network according to, data request packet and power networking front end processor to bank side, fallen to province by firewall filtering
Level center unsafe data message, afterwards by DDN passage again pass by provincial in intracardiac fire wall verified, obtain
Provincial center accreditation as supplier of electricity;
Data request packet after step 2, safety verification is sent in provincial power supply outbound communication system by router and is in work
Make the supply side bank-power intranet front end processor of state, if now there being the supply side bank-power intranet being in fault or service mode preposition
Machine, then send data request packet to standby supply side bank-power intranet front end processor, again pass by the checking of fire wall, data
Request bag reaches in the provincial application service cluster concentrated and dispose data center, data request packet is decrypted, realizes business
Process;
When step 3, the data for supplier of electricity are transferred to provincial bank side, according to the path of data is activation, backtracking.
Further, when provincial bank carries out service interaction with supplier of electricity, different types of provincial bank is each
By the bank side being arranged within banking system power networking front end processor access in the application service cluster of supplier of electricity.
Further, the data of local bank passes through electric power system access provincial concentration deployment data center of power supply administration of districts and cities
Carry out service interaction, concrete implementation process is:
Step 1, the client positioned at local bank send data request packet, carry the message number of encryption in data request packet
Exchanged by local bank's internal network according to, data request packet and power networking front end processor to the bank side of local bank, by ground
The feeder ear firewall filtering of the bank end of Fang Yinhang and local power supply administration falls unsafe data message to provincial center, obtains
To power supply administration of the districts and cities accreditation as supplier of electricity, the data request packet after safety verification is sent to districts and cities' intra-office by router
In running order supply side bank-power intranet front end processor;
If step 2 now local power supply intra-office, there is the supply side bank-power intranet front end processor being in fault or service mode, then will
Data request packet sends to the bank-power intranet front end processor of stand-by power supply side, again passes by the checking of fire wall, and data request packet is led to
Cross integrated data network to reach in the provincial application service cluster concentrated and dispose data center, data request packet is decrypted, real
The process of existing business;
When step 3, the data for supplier of electricity are transferred to local bank side, according to the path of data is activation, backtracking.
Further, when local bank carries out service interaction with power supply administration of districts and cities, different types of local bank
Access to the supply side silver of local power supply intra-office each via the bank side being arranged within banking system networking front end processor of powering
After the net front end processor of Electricity Federation, then access to provincial concentration deployment data center.
The present invention compared with prior art it is beneficial that:
1st, service level.System is logically separated into access service and application service two-layer, and access service layer is responsible for and bank
Carry out communication interaction, the specific Business Processing completing is responsible in application service.
2nd, access service multimachine, distributed deployment.It is deployed in respectively on province center and the front end processor of districts and cities.Bank of districts and cities
Supply network is accessed by districts and cities' front end processor, then accesses the center service system that saves by supply network, solution saves ground two-stage bank
Access problem, provides the access of economic and reliable for region bank.This mode can be continuing with original bank special line, it is to avoid
The construction investment of great number, significantly saves investment.
3rd, application service clustering, expansible, High Availabitity.Application service adopts distributed deployment, possesses horizontal extension
Ability, can tackle sustainable growth business datum amount simply by increasing clustered node.Successfully manage business scale lifting
Problem, can reliably process the electricity charges of the whole province in time, simultaneously tackle future services sustainable growth.
4th, communications protocol versioned, scalable.The protocol version that bank specifies use can be individually for, real by upgraded version
Existing business reorganization.By separation and the upgrading of agreement, each bank can adjust business at any time or develop new business, successfully manage
The new demand that marketing system proposes.
Brief description
Fig. 1 is the structured flowchart of the present invention.
Specific embodiment
In order that the object, technical solutions and advantages of the present invention are clearer, below in conjunction with accompanying drawing the present invention is made into
One step ground, describes in detail.
Embodiment 1:
It is divided into supplier of electricity, bank side in the present embodiment, there is provincial bank, local bank in bank side, in power marketing system
System carries out after bank's networking pay electricity fee using the deployment of provincial concentration, and provincial bank and local bank are under new system architecture
The pattern accessing supplier of electricity also changes.
Provincial bank in bank side directly carries out service interfacing with the Electric Power Marketing System after provincial deployment, including being located at
The bank side of bank port power networking front end processor, be located at the provincial power supply outbound communication system of provincial supply port and provincial
Concentrate deployment data center, wherein bank side networking front end processor of powering is arranged in the banking system of provincial bank, and and bank
Internal network is set up and is connected, and has the supply side bank-power intranet front end processor of 2 distributed settings in provincial power supply outbound communication system,
It is responsible for carrying out service interaction with provincial bank, main business pays situation, clearing of fund etc. for the electricity charge.Bank side supplies Electricity Federation
Net front end processor is attached by DDN passage with supply side bank-power intranet front end processor, and DDN passage is private line of communication, in order to meet
The business demand of bank side and supplier of electricity and set up, the bank side of provincial bank power networking front end processor access provincial power supply system
Need before supply side bank-power intranet front end processor in system to arrange fire wall in provincial banking system, for increasing safe plan
Slightly, in turn, in provincial electric power system, it is also equipped with the fire wall being connected with DDN passage, the security of business of going bail for.
Provincial concentration disposes the application service cluster being provided with compatible marketing management system in data center, in the middle part of provincial collection
Business object in application service cluster is passed to supply side bank-power intranet front end processor by data center of administration.Application cluster is exactly electricity
The core business cluster of power marketing system, supports archives, the Business Processing of each module such as check meter, adjust, charging, and business object exists
Bank-power intranet field includes subscriber arrearage information, CAMEL-Subscription-Information, reconciliation information, signing bank etc..Provincial concentration is disposed in data
Powered by provincial power supply outbound communication system and the bank side in provincial banking system front end processor of networking of the heart is communicated
Connect, be also equipped with fire wall between provincial power supply outbound communication system and provincial concentration deployment data center, further ensure that
The provincial security concentrating deployment data center in provincial electric power system.By arranging application service cluster, can also be in bank
And when the increase of electrical network business amount, by increasing node, to solve the problems, such as that data increases, and in application service cluster
Change the configuration to data, can easily realize the supplier of electricity modification unified with bank side's agreement.Application service cluster, front end processor
Cluster all can increase clustered node by simple with elastic telescopic, with the expansion of grid company portfolio
To lift the traffic handing capacity of cluster.
Local bank in bank side carries out service interfacing it is impossible to directly pass through with the Electric Power Marketing System after provincial deployment
DDN passage is engaged in the dialogue with provincial electric power system, and it is had any different in the access point of bank side and supplier of electricity.When for local bank being
During system, the bank side in local bank's system powers office of the districts and cities electric power system provincial collection of access that networking front end processor is located by it
Middle deployment data center.
Bank side in local bank's system power networking front end processor with its be located in office of districts and cities electric power system districts and cities confession
Electric side bank-power intranet front end processor is connected, and the communication between them also will be provided with fire wall to guarantee in bank side and supplier of electricity
The security of data, districts and cities' supply side bank-power intranet front end processor of office of districts and cities electric power system through office of districts and cities internal network with provincial
Concentrate deployment data center to pass through integrated data Network Communication, concentrate deployment data center also to set in office of districts and cities electric power system with provincial
It is equipped with the fire wall guaranteeing secure communication.
Whole system is in service level in the present embodiment.System is logically separated into access service and application service two
Layer, access service layer is that the bank side in provincial power supply outbound communication system powers networking front end processor, and is located at districts and cities
Districts and cities' supply side bank-power intranet front end processor in office's electric power system, Access Layer is responsible for carrying out communication interaction, application service with bank
Layer is to concentrate deployment data center by application service cluster positioned at provincial, is responsible for completing specific Business Processing.
System access service multimachine in the present embodiment, distributed deployment.Distributed deployment is embodied in province center and ground
On the front end processor in city.Bank of districts and cities passes through in the supply network that districts and cities' front end processor accesses in whole electric power system, then by power supply
The provincial operation system concentrating deployment data center of network insertion.This mode can be multiplexed original bank special line, it is to avoid
The construction investment of great number.
Application service clustering in the present embodiment, expansible, High Availabitity.Application service adopts distributed deployment, possesses water
The ability of flat extension, can tackle sustainable growth business datum amount simply by increasing clustered node.
The communications protocol versioned of banking system, scalable.The protocol version that bank specifies use can be individually for, by rising
Level version realizes business reorganization.In the system of the present embodiment, the program of arbitrary bank is changed all without other banks of impact
Service interaction in the entire system, because different bank is respectively arranged with the front end processor oneself accessing in whole system, both may be used
Individually to be changed it is also possible to be adjusted to banking system by application service cluster unification in bank side.
For in the present embodiment at many levels the bank of telescopic provincial concentration network the implementing of pay electricity fee system
Flow process, specific as follows.
In province center of supply outer net machine room, that is, provincial power supply outbound communication system, dispose 2 supply side bank-power intranet
Front end processor, is responsible for carrying out service interaction with provincial bank.
In power supply administration of districts and cities machine room, that is, office of districts and cities electric power system, dispose 2 tableland city supply side bank-power intranet front end processors
Front end processor, is responsible for carrying out service interaction with the local bank of this districts and cities.
In province center of supply machine room, that is, provincial concentration disposes data center, and deployment system application service cluster, at this
In application service cluster, compatibility has marketing management system, is responsible for the process of whole pay electricity fee business.
Front end processor in province center of supply outer net machine room, power supply administration of districts and cities machine room, province center of supply machine room, application service
As long as the effective node of cluster one exists ensures that being normally carried out of business.
Bank side power networking front end processor banking system be divided into banking system directly under the provincial Party committee and local bank's system, when for save
During straight banking system, bank side powers, and networking front end processor is direct to be communicated with the provincial power supply outbound communication system foundation of supply port
Passage, and access provincial concentration deployment data center;Client positioned at provincial bank sends data request packet, in request of data
Message data with encryption in bag, data request packet is exchanged by bank's internal network and powers networking front end processor to bank side,
Unsafe data message to provincial center is fallen by firewall filtering, afterwards by DDN passage again pass by provincial in intracardiac
Fire wall verified, obtain the provincial center accreditation as supplier of electricity, the data request packet after safety verification passed through road
In running order supply side bank-power intranet front end processor in provincial power supply outbound communication system is sent to by device.If now there being place
In the supply side bank-power intranet front end processor of fault or service mode, then data request packet is sent to another supply side bank-power intranet
In front end processor, again pass by the checking of fire wall, data request packet reaches the provincial application service collection concentrating deployment data center
In group, data request packet is decrypted, realizes the process of related service.
When provincial bank and supplier of electricity carry out service interaction, different types of provincial bank is each via being arranged on
Bank side within banking system power networking front end processor access in the application service cluster of supplier of electricity.Number for supplier of electricity
During according to being transferred to provincial bank side, according to the path of data is activation, backtracking.
When for local bank's system, local bank's system because provincial center cannot be directly accessed the problems such as cost, such as
Provincial concentrate deployment data center be located at Shenzhen City, Guangdong Province Guangzhou, for the agricultural bank in Shenzhen Guangdong Province, industrial and commercial bank, in
The sweeping provincial bank such as bank of state, Construction Bank then can by the bank side in respective bank power networking front end processor with
The provincial concentration deployment data center in the Guangdong center of supply sets up communication connection.And it is located at the local bank in Foshan, such as in Foshan
Agriculture firm, business bank and other small-scale business banks, bank side powers the office of districts and cities that networking front end processor is located by it
Electric power system accesses provincial concentration and disposes data center.The big bank referring to provincial bank directly interacting with provincial center,
Such as four big row and the large-scale business bank of some other comparison, these banks all pass through center bank of province in the business of the whole province
To process, including their prefecture-level bank;Local bank refers to the region bank not having provincial center bank, typically such as
Agriculture firm.
Client positioned at local bank sends data request packet, carries the message data of encryption in data request packet,
Data request packet is exchanged by bank's internal network and powers networking front end processor to bank side, anti-by bank end and feeder ear
Wall with flues filters out unsafe data message to provincial center, obtains power supply administration of the districts and cities accreditation as supplier of electricity, safety is tested
Data request packet after card is sent to the in running order supply side bank-power intranet front end processor of districts and cities' intra-office by router.If
Now there is the supply side bank-power intranet front end processor being in fault or service mode, then send data request packet to another supply side
In bank-power intranet front end processor, again pass by the checking of fire wall, data request packet is reached in the middle part of provincial collection by integrated data network
In the application service cluster of data center of administration, data request packet is decrypted, realizes the process of related service.
When local bank and supplier of electricity carry out service interaction, different types of local bank is each via being arranged on
Bank side within banking system powers after networking front end processor accesses to the supply side bank-power intranet front end processor of local power supply intra-office,
Access to provincial concentration again and dispose data center.When being transferred to local bank side for the data of supplier of electricity, according to data is activation
Path, backtracking.
It is obvious to a person skilled in the art that the invention is not restricted to the details of above-mentioned one exemplary embodiment, Er Qie
In the case of the spirit or essential attributes of the present invention, the present invention can be realized in other specific forms.Therefore, no matter
From the point of view of which point, embodiment all should be regarded as exemplary, and be nonrestrictive, the scope of the present invention is by appended power
Profit requires rather than described above limits, it is intended that all in the implication and scope of the equivalency of claim by falling
Change is included in the present invention.
Moreover, it will be appreciated that although this specification is been described by according to embodiment, not each embodiment comprises
One independent technical scheme, only for clarity, those skilled in the art should be by for this narrating mode of specification
As an entirety, the technical scheme in each embodiment can also be through appropriately combined, and forming those skilled in the art can for specification
With the other embodiment understanding.
Claims (10)
1. at many levels telescopic provincial concentration bank networking pay electricity fee system it is characterised in that:Including positioned at bank end
Mouthful bank side power networking front end processor, be located at provincial supply port provincial power supply outbound communication system, be located at prefecture-level confession
The prefecture-level power supply outbound communication system of electric port and provincial concentration deployment data center, wherein bank side power networking preposition
Machine is arranged in banking system and is set up with bank internal network and is connected, is provided with multiple provinces in provincial outbound communication system of powering
The supply side bank-power intranet front end processor of the two-stage distributed setting in city, bank side powers before networking front end processor and supply side bank-power intranet
Machine of putting is attached by DDN passage;Provincial concentration disposes data center by provincial power supply outbound communication system and bank side
Power supply networking front end processor is communicatively coupled.
2. bank's networking pay electricity fee system of telescopic provincial concentration at many levels as claimed in claim 1, its feature exists
In:Provincial concentration disposes the application service cluster being provided with compatible marketing management system in data center, and provincial concentration disposes number
According to center, the business object in application service cluster is passed to supply side bank-power intranet front end processor.
3. bank's networking pay electricity fee system of telescopic provincial concentration at many levels as claimed in claim 2, its feature exists
In:It is divided into banking system directly under the provincial Party committee and local bank's system with the power banking system of networking front end processor of bank side, when for directly under the provincial Party committee
During banking system, bank side powers, and networking front end processor is direct to be communicated with the provincial power supply outbound communication system foundation of supply port
Road, and access provincial concentration deployment data center;When for local bank's system, bank side powers networking front end processor by its institute
Office of districts and cities electric power system access and provincial concentrate deployment data center.
4. bank's networking pay electricity fee system of telescopic provincial concentration at many levels as claimed in claim 3, its feature exists
In:Bank side in the local bank's system districts and cities supply side that networking front end processor is located in office of districts and cities electric power system with it of powering is silver-colored
Electricity Federation net front end processor is connected, and office of districts and cities electric power system concentrates deployment data center to pass through integrated data Network Communication with provincial.
5. bank's networking pay electricity fee system of telescopic provincial concentration at many levels as claimed in claim 4, its feature exists
In:Supply side bank-power intranet front end processor in provincial power supply outbound communication system and districts and cities' electric power system is provided with many
Individual, each supply side bank-power intranet front end processor all accesses to provincial concentration and disposes data center.
6. at many levels telescopic provincial concentration bank networking pay electricity fee method it is characterised in that:
It is responsible for carrying out the provincial power supply outbound communication system of service interaction with provincial bank in the deployment of province center of supply outer net machine room,
Carry out office of the districts and cities electric power system of service interaction in the machine room deployment of power supply administration of districts and cities with local bank, in province center of supply machine room portion
Administration is provided with the provincial concentration deployment data center of application service cluster, from provincial bank data directly by provincial power supply
Outbound communication system concentrates deployment data center to carry out service interaction with provincial, and the data from local bank is powered by districts and cities
Office's electric power system accesses provincial concentration deployment data center and carries out service interaction.
7. bank's networking pay electricity fee method of telescopic provincial concentration at many levels as claimed in claim 6, its feature exists
In:The data of provincial bank directly concentrates deployment data center to carry out business friendship by provincial power supply outbound communication system with provincial
Mutually, concrete implementation process is:
Step 1, be located at provincial bank bank side power networking front end processor send data request packet, carry in data request packet
The message data of encryption, data request packet is passed through bank's internal network and exchanges to power networking front end processor to bank side, by preventing fires
Wall filters out unsafe data message to provincial center, afterwards by DDN passage again pass by provincial in intracardiac fire wall
Verified, obtained the provincial center accreditation as supplier of electricity;
Data request packet after step 2, safety verification is sent in provincial power supply outbound communication system by router and is in work
Make the supply side bank-power intranet front end processor of state, if now there being the supply side bank-power intranet being in fault or service mode preposition
Machine, then send data request packet to standby supply side bank-power intranet front end processor, again pass by the checking of fire wall, data
Request bag reaches in the provincial application service cluster concentrated and dispose data center, data request packet is decrypted, realizes business
Process;
When step 3, the data for supplier of electricity are transferred to provincial bank side, according to the path of data is activation, backtracking.
8. bank's networking pay electricity fee method of telescopic provincial concentration at many levels as claimed in claim 7, its feature exists
In:When provincial bank and supplier of electricity carry out service interaction, different types of provincial bank is each via being arranged on bank
The bank side of internal system power networking front end processor access in the application service cluster of supplier of electricity.
9. bank's networking pay electricity fee method of telescopic provincial concentration at many levels as claimed in claim 6, its feature exists
In:The data of local bank accesses provincial concentration deployment data center by power supply administration of districts and cities electric power system and carries out service interaction,
Concrete implementation process is:
Step 1, the client positioned at local bank send data request packet, carry the message number of encryption in data request packet
Exchanged by local bank's internal network according to, data request packet and power networking front end processor to the bank side of local bank, by ground
The feeder ear firewall filtering of the bank end of Fang Yinhang and local power supply administration falls unsafe data message to provincial center, obtains
To power supply administration of the districts and cities accreditation as supplier of electricity, the data request packet after safety verification is sent to districts and cities' intra-office by router
In running order supply side bank-power intranet front end processor;
If step 2 now local power supply intra-office, there is the supply side bank-power intranet front end processor being in fault or service mode, then will
Data request packet sends to the bank-power intranet front end processor of stand-by power supply side, again passes by the checking of fire wall, and data request packet is led to
Cross integrated data network to reach in the provincial application service cluster concentrated and dispose data center, data request packet is decrypted, real
The process of existing business;
When step 3, the data for supplier of electricity are transferred to local bank side, according to the path of data is activation, backtracking.
10. bank's networking pay electricity fee method of telescopic provincial concentration at many levels as claimed in claim 9, its feature exists
In:When local bank and power supply administration of districts and cities carry out service interaction, different types of local bank is each via being arranged on
Bank side within banking system powers after networking front end processor accesses to the supply side bank-power intranet front end processor of local power supply intra-office,
Access to provincial concentration again and dispose data center.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610775092.XA CN106412012A (en) | 2016-08-31 | 2016-08-31 | Multilayer scalable provincial centralized bank networked electric charge collection system and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610775092.XA CN106412012A (en) | 2016-08-31 | 2016-08-31 | Multilayer scalable provincial centralized bank networked electric charge collection system and method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106412012A true CN106412012A (en) | 2017-02-15 |
Family
ID=58002330
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610775092.XA Pending CN106412012A (en) | 2016-08-31 | 2016-08-31 | Multilayer scalable provincial centralized bank networked electric charge collection system and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106412012A (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1737839A (en) * | 2005-07-18 | 2006-02-22 | 仲俊杰 | China communication value-added service card system |
CN1932875A (en) * | 2006-10-09 | 2007-03-21 | 杭州东信金融技术服务有限公司 | Prepositional system based on finance industry |
CN102486882A (en) * | 2010-12-03 | 2012-06-06 | 河南省电力公司南阳供电公司 | Electric power self-help payment terminal system |
CN203457183U (en) * | 2013-09-30 | 2014-02-26 | 国家电网公司 | Integrated system of bank-and-power-company network |
-
2016
- 2016-08-31 CN CN201610775092.XA patent/CN106412012A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1737839A (en) * | 2005-07-18 | 2006-02-22 | 仲俊杰 | China communication value-added service card system |
CN1932875A (en) * | 2006-10-09 | 2007-03-21 | 杭州东信金融技术服务有限公司 | Prepositional system based on finance industry |
CN102486882A (en) * | 2010-12-03 | 2012-06-06 | 河南省电力公司南阳供电公司 | Electric power self-help payment terminal system |
CN203457183U (en) * | 2013-09-30 | 2014-02-26 | 国家电网公司 | Integrated system of bank-and-power-company network |
Non-Patent Citations (2)
Title |
---|
裘炜浩等: ""新一代银电联网系统的应用"", 《华东电力》 * |
陈红燕等: ""省级集中银电联网收费平台的研究和实现"", 《电力信息化》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20190089788A1 (en) | Intelligent Household Energy Internet of Things System for Intelligent City System | |
CN108063829A (en) | A kind of new gauze urban track traffic comprehensive monitoring system | |
CN110444001A (en) | A kind of ubiquitous electric power data transmission of internet of things system | |
CN102932399B (en) | Dispatching of power netwoks cloud disaster recovery and backup systems | |
CN107666480A (en) | Wisdom cell energy management system, hardware structure and information interacting method | |
CN201616710U (en) | Telescopic terminal concurrency access and load balancing system framework | |
CN108615149A (en) | Flexible block chain method of payment, device and the electronic equipment of multi-signature | |
CN202816025U (en) | Power charge intelligent system | |
CN110111092A (en) | A kind of compatible system of payment channel | |
CN106059918B (en) | A kind of energy internet-based control layer architecture and dispatching method based on SDN | |
CN207851895U (en) | A kind of bank's intelligent Trade route system | |
CN107979651A (en) | A kind of new city rail traffic ticket automatic selling and checking system based on cloud platform | |
CN110718947A (en) | Fill electric pile group control distribution timesharing system | |
Rao | ICT and e-Governance for Rural Development | |
CN106200389A (en) | A kind of intelligent electric energy meter based on embedded system | |
CN109547239A (en) | Strange land cloud data center management system based on three-layer network framework | |
CN106412012A (en) | Multilayer scalable provincial centralized bank networked electric charge collection system and method | |
CN107730973A (en) | Ground lock system and intelligent parking space management system based on bluetooth | |
CN106920048A (en) | A kind of global train crew dormitory all-purpose card management of repast system | |
CN102281334A (en) | Management control method and system thereof for wired terminal and access server | |
CN202495968U (en) | Enterprise integration information platform | |
CN105913641A (en) | Remote automatic meter reading system | |
CN108718245A (en) | A kind of mobile network issues an order system and application method | |
CN109863661A (en) | Storage unit and storage system for consumer | |
CN202502538U (en) | Intelligent fee-paying system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |