CN106412012A - Multilayer scalable provincial centralized bank networked electric charge collection system and method - Google Patents

Multilayer scalable provincial centralized bank networked electric charge collection system and method Download PDF

Info

Publication number
CN106412012A
CN106412012A CN201610775092.XA CN201610775092A CN106412012A CN 106412012 A CN106412012 A CN 106412012A CN 201610775092 A CN201610775092 A CN 201610775092A CN 106412012 A CN106412012 A CN 106412012A
Authority
CN
China
Prior art keywords
bank
provincial
power supply
end processor
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610775092.XA
Other languages
Chinese (zh)
Inventor
詹卫许
钱正浩
沈宇红
唐国亮
杜礼锋
魏龙高
萧展辉
董灿
李若明
杨劲锋
公绪成
许文玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YANTAI HAIYI SOFTWARE CO Ltd
China Southern Power Grid Co Ltd
Original Assignee
YANTAI HAIYI SOFTWARE CO Ltd
China Southern Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YANTAI HAIYI SOFTWARE CO Ltd, China Southern Power Grid Co Ltd filed Critical YANTAI HAIYI SOFTWARE CO Ltd
Priority to CN201610775092.XA priority Critical patent/CN106412012A/en
Publication of CN106412012A publication Critical patent/CN106412012A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/12Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L63/00Network architectures or network communication protocols for network security
    • H04L63/02Network architectures or network communication protocols for network security for separating internal from external traffic, e.g. firewalls
    • H04L63/0227Filtering policies
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L63/00Network architectures or network communication protocols for network security
    • H04L63/04Network architectures or network communication protocols for network security for providing a confidential data exchange among entities communicating through data packet networks
    • H04L63/0428Network architectures or network communication protocols for network security for providing a confidential data exchange among entities communicating through data packet networks wherein the data content is protected, e.g. by encrypting or encapsulating the payload
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/10Protocols in which an application is distributed across nodes in the network

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Computer Security & Cryptography (AREA)
  • Computing Systems (AREA)
  • Computer Hardware Design (AREA)
  • General Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Medical Informatics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention belongs to the field of a power grid marketing system and especially relates to a multilayer scalable provincial centralized bank networked electric charge collection system and method. The system comprises bank side power supply networked front-end processors located at bank ports, a provincial power supply external network communication system and a provincial centrally deployed data center. The bank side power supply networked front-end processors are arranged in a bank system and are connected with a bank internal network. Multiple power supply side bank and power supply networked front-end processors which are deployed in a distributed mode according to a provincial level and a city level are arranged in the provincial power supply external network communication system. The bank side power supply networked front-end processors and the power supply side bank and power supply networked front-end processors are connected through DDN channels. The provincial centrally deployed data center is in communication connection with the bank side power supply networked front-end processors through the provincial power supply external network communication system. According to the system and the method, existing network infrastructure resources are utilized fully, construction investment is greatly reduced, the service adjustment flexibility is improved, and the increase and expansion of a system scale can be effectively coped with.

Description

Bank's networking pay electricity fee system and method for telescopic provincial concentration at many levels
Technical field
The invention belongs to electrical network marketing system field and in particular at many levels telescopic provincial concentration bank networking generation Collect charges for electricity system and method.
Background technology
South electric network marketing system is built with prefecture-level unit for main body for a long time, networking pay electricity fee system of bank Problem faced by system is relatively easy, and overall business scale is also relatively small.
After south electric network marketing system adopts provincial concentration deployment mode, one side electrical network business scale is increased dramatically, phase There is more than ten times of lifting for main part, marketing system is necessary to ensure that these increasings of timely, stable process when prefecture-level unit is affixed one's name to Plus business;Simultaneously need to the increase further looked ahead with marketing system service data amount, marketing system should have relatively Strong extensibility.The situation of another aspect bank also becomes complicated, and some banks can be directly in provincial branch and electricity Net docking, some prefecture-level banks do not have organization it is impossible to network with provincial machine room of powering, these banks will in provincial capital Carry out pay electricity fee business of networking, network insertion need to be solved the problems, such as.The provincial machine room if the new access via telephone line of direct construction is powered Need to consume substantial amounts of construction investment.
Traditional marketing system Zhong Ge bank uses unified communications protocol, needs when business changes or develops new business Communications protocol is modified it is impossible to being adjusted for Single Ag row or customizing it is necessary to the harmonious unification of all banks Modification program, this still coordinates in the case that bank quantity is fewer, but difficult to realize after provincial concentration deployment.
Content of the invention
In order to solve to solve after provincial concentration deployment in prior art, prefecture-level bank cannot be with provincial machine room of powering Networking, and problem unit bank cannot being adjusted in Traditional Marketing system, the present invention provides scalable at many levels Provincial concentration bank networking pay electricity fee system and method, can advantageously by prefecture-level bank access power provincial machine Room, and the communication protocol for multi-bank easy to adjust it is also possible in time, stably processing business increases.
For achieving the above object, the present invention is achieved by the following technical solutions:
The present invention provides bank's networking pay electricity fee system of telescopic provincial concentration at many levels, and it is characterized in that, bag Including positioned at the bank side of bank port power networking front end processor, be located at provincial supply port provincial power supply outbound communication system with And provincial concentrate deployment data center, wherein bank side power networking front end processor be arranged in banking system and with bank's in-house network Network is set up and is connected, and is provided with the supply side bank-power intranet of the two-stage distributed setting of multiple provinces and cities in provincial power supply outbound communication system Front end processor, bank side power networking front end processor be attached by DDN passage with supply side bank-power intranet front end processor;Provincial concentration Deployment data center is passed through powered with bank side front end processor of networking of provincial power supply outbound communication system and is communicatively coupled.
Further, provincial concentration disposes the application service cluster being provided with compatible marketing management system in data center, Business object in application service cluster is passed to supply side bank-power intranet front end processor by provincial concentration deployment data center.
Further, the banking system of networking front end processor of powering with bank side is divided into banking system directly under the provincial Party committee and local bank System, when for banking system directly under the provincial Party committee, bank side power networking front end processor directly and supply port provincial power supply outbound communication System sets up communication port, and accesses provincial concentration deployment data center;When for local bank's system, bank side powers networking Office of the districts and cities electric power system that front end processor is located by it accesses provincial concentration and disposes data center.
Further, the bank side in local bank's system power networking front end processor be located in office of districts and cities electric power system with it Districts and cities' supply side bank-power intranet front end processor be connected, office of districts and cities electric power system concentrates deployment data center to pass through comprehensive number with provincial According to Network Communication.
Further, the supply side bank-power intranet in provincial power supply outbound communication system and districts and cities' electric power system is preposition Machine be provided with multiple, each supply side bank-power intranet front end processor all access to provincial concentrate deployment data center.
The present invention also provides bank's networking pay electricity fee method of telescopic provincial concentration at many levels, and its special character exists In:
It is responsible for carrying out the provincial power supply outbound communication system of service interaction with provincial bank in the deployment of province center of supply outer net machine room, Carry out office of the districts and cities electric power system of service interaction in the machine room deployment of power supply administration of districts and cities with local bank, in province center of supply machine room portion Administration is provided with the provincial concentration deployment data center of application service cluster, from provincial bank data directly by provincial power supply Outbound communication system concentrates deployment data center to carry out service interaction with provincial, and the data from local bank is powered by districts and cities Office's electric power system accesses provincial concentration deployment data center and carries out service interaction.
Further, the data of provincial bank directly concentrates deployment data by provincial power supply outbound communication system with provincial Center carries out service interaction, and concrete implementation process is:
Step 1, the client positioned at provincial bank send data request packet, carry the message number of encryption in data request packet Exchanged by bank's internal network according to, data request packet and power networking front end processor to bank side, fallen to province by firewall filtering Level center unsafe data message, afterwards by DDN passage again pass by provincial in intracardiac fire wall verified, obtain Provincial center accreditation as supplier of electricity;
Data request packet after step 2, safety verification is sent in provincial power supply outbound communication system by router and is in work Make the supply side bank-power intranet front end processor of state, if now there being the supply side bank-power intranet being in fault or service mode preposition Machine, then send data request packet to standby supply side bank-power intranet front end processor, again pass by the checking of fire wall, data Request bag reaches in the provincial application service cluster concentrated and dispose data center, data request packet is decrypted, realizes business Process;
When step 3, the data for supplier of electricity are transferred to provincial bank side, according to the path of data is activation, backtracking.
Further, when provincial bank carries out service interaction with supplier of electricity, different types of provincial bank is each By the bank side being arranged within banking system power networking front end processor access in the application service cluster of supplier of electricity.
Further, the data of local bank passes through electric power system access provincial concentration deployment data center of power supply administration of districts and cities Carry out service interaction, concrete implementation process is:
Step 1, the client positioned at local bank send data request packet, carry the message number of encryption in data request packet Exchanged by local bank's internal network according to, data request packet and power networking front end processor to the bank side of local bank, by ground The feeder ear firewall filtering of the bank end of Fang Yinhang and local power supply administration falls unsafe data message to provincial center, obtains To power supply administration of the districts and cities accreditation as supplier of electricity, the data request packet after safety verification is sent to districts and cities' intra-office by router In running order supply side bank-power intranet front end processor;
If step 2 now local power supply intra-office, there is the supply side bank-power intranet front end processor being in fault or service mode, then will Data request packet sends to the bank-power intranet front end processor of stand-by power supply side, again passes by the checking of fire wall, and data request packet is led to Cross integrated data network to reach in the provincial application service cluster concentrated and dispose data center, data request packet is decrypted, real The process of existing business;
When step 3, the data for supplier of electricity are transferred to local bank side, according to the path of data is activation, backtracking.
Further, when local bank carries out service interaction with power supply administration of districts and cities, different types of local bank Access to the supply side silver of local power supply intra-office each via the bank side being arranged within banking system networking front end processor of powering After the net front end processor of Electricity Federation, then access to provincial concentration deployment data center.
The present invention compared with prior art it is beneficial that:
1st, service level.System is logically separated into access service and application service two-layer, and access service layer is responsible for and bank Carry out communication interaction, the specific Business Processing completing is responsible in application service.
2nd, access service multimachine, distributed deployment.It is deployed in respectively on province center and the front end processor of districts and cities.Bank of districts and cities Supply network is accessed by districts and cities' front end processor, then accesses the center service system that saves by supply network, solution saves ground two-stage bank Access problem, provides the access of economic and reliable for region bank.This mode can be continuing with original bank special line, it is to avoid The construction investment of great number, significantly saves investment.
3rd, application service clustering, expansible, High Availabitity.Application service adopts distributed deployment, possesses horizontal extension Ability, can tackle sustainable growth business datum amount simply by increasing clustered node.Successfully manage business scale lifting Problem, can reliably process the electricity charges of the whole province in time, simultaneously tackle future services sustainable growth.
4th, communications protocol versioned, scalable.The protocol version that bank specifies use can be individually for, real by upgraded version Existing business reorganization.By separation and the upgrading of agreement, each bank can adjust business at any time or develop new business, successfully manage The new demand that marketing system proposes.
Brief description
Fig. 1 is the structured flowchart of the present invention.
Specific embodiment
In order that the object, technical solutions and advantages of the present invention are clearer, below in conjunction with accompanying drawing the present invention is made into One step ground, describes in detail.
Embodiment 1:
It is divided into supplier of electricity, bank side in the present embodiment, there is provincial bank, local bank in bank side, in power marketing system System carries out after bank's networking pay electricity fee using the deployment of provincial concentration, and provincial bank and local bank are under new system architecture The pattern accessing supplier of electricity also changes.
Provincial bank in bank side directly carries out service interfacing with the Electric Power Marketing System after provincial deployment, including being located at The bank side of bank port power networking front end processor, be located at the provincial power supply outbound communication system of provincial supply port and provincial Concentrate deployment data center, wherein bank side networking front end processor of powering is arranged in the banking system of provincial bank, and and bank Internal network is set up and is connected, and has the supply side bank-power intranet front end processor of 2 distributed settings in provincial power supply outbound communication system, It is responsible for carrying out service interaction with provincial bank, main business pays situation, clearing of fund etc. for the electricity charge.Bank side supplies Electricity Federation Net front end processor is attached by DDN passage with supply side bank-power intranet front end processor, and DDN passage is private line of communication, in order to meet The business demand of bank side and supplier of electricity and set up, the bank side of provincial bank power networking front end processor access provincial power supply system Need before supply side bank-power intranet front end processor in system to arrange fire wall in provincial banking system, for increasing safe plan Slightly, in turn, in provincial electric power system, it is also equipped with the fire wall being connected with DDN passage, the security of business of going bail for.
Provincial concentration disposes the application service cluster being provided with compatible marketing management system in data center, in the middle part of provincial collection Business object in application service cluster is passed to supply side bank-power intranet front end processor by data center of administration.Application cluster is exactly electricity The core business cluster of power marketing system, supports archives, the Business Processing of each module such as check meter, adjust, charging, and business object exists Bank-power intranet field includes subscriber arrearage information, CAMEL-Subscription-Information, reconciliation information, signing bank etc..Provincial concentration is disposed in data Powered by provincial power supply outbound communication system and the bank side in provincial banking system front end processor of networking of the heart is communicated Connect, be also equipped with fire wall between provincial power supply outbound communication system and provincial concentration deployment data center, further ensure that The provincial security concentrating deployment data center in provincial electric power system.By arranging application service cluster, can also be in bank And when the increase of electrical network business amount, by increasing node, to solve the problems, such as that data increases, and in application service cluster Change the configuration to data, can easily realize the supplier of electricity modification unified with bank side's agreement.Application service cluster, front end processor Cluster all can increase clustered node by simple with elastic telescopic, with the expansion of grid company portfolio To lift the traffic handing capacity of cluster.
Local bank in bank side carries out service interfacing it is impossible to directly pass through with the Electric Power Marketing System after provincial deployment DDN passage is engaged in the dialogue with provincial electric power system, and it is had any different in the access point of bank side and supplier of electricity.When for local bank being During system, the bank side in local bank's system powers office of the districts and cities electric power system provincial collection of access that networking front end processor is located by it Middle deployment data center.
Bank side in local bank's system power networking front end processor with its be located in office of districts and cities electric power system districts and cities confession Electric side bank-power intranet front end processor is connected, and the communication between them also will be provided with fire wall to guarantee in bank side and supplier of electricity The security of data, districts and cities' supply side bank-power intranet front end processor of office of districts and cities electric power system through office of districts and cities internal network with provincial Concentrate deployment data center to pass through integrated data Network Communication, concentrate deployment data center also to set in office of districts and cities electric power system with provincial It is equipped with the fire wall guaranteeing secure communication.
Whole system is in service level in the present embodiment.System is logically separated into access service and application service two Layer, access service layer is that the bank side in provincial power supply outbound communication system powers networking front end processor, and is located at districts and cities Districts and cities' supply side bank-power intranet front end processor in office's electric power system, Access Layer is responsible for carrying out communication interaction, application service with bank Layer is to concentrate deployment data center by application service cluster positioned at provincial, is responsible for completing specific Business Processing.
System access service multimachine in the present embodiment, distributed deployment.Distributed deployment is embodied in province center and ground On the front end processor in city.Bank of districts and cities passes through in the supply network that districts and cities' front end processor accesses in whole electric power system, then by power supply The provincial operation system concentrating deployment data center of network insertion.This mode can be multiplexed original bank special line, it is to avoid The construction investment of great number.
Application service clustering in the present embodiment, expansible, High Availabitity.Application service adopts distributed deployment, possesses water The ability of flat extension, can tackle sustainable growth business datum amount simply by increasing clustered node.
The communications protocol versioned of banking system, scalable.The protocol version that bank specifies use can be individually for, by rising Level version realizes business reorganization.In the system of the present embodiment, the program of arbitrary bank is changed all without other banks of impact Service interaction in the entire system, because different bank is respectively arranged with the front end processor oneself accessing in whole system, both may be used Individually to be changed it is also possible to be adjusted to banking system by application service cluster unification in bank side.
For in the present embodiment at many levels the bank of telescopic provincial concentration network the implementing of pay electricity fee system Flow process, specific as follows.
In province center of supply outer net machine room, that is, provincial power supply outbound communication system, dispose 2 supply side bank-power intranet Front end processor, is responsible for carrying out service interaction with provincial bank.
In power supply administration of districts and cities machine room, that is, office of districts and cities electric power system, dispose 2 tableland city supply side bank-power intranet front end processors Front end processor, is responsible for carrying out service interaction with the local bank of this districts and cities.
In province center of supply machine room, that is, provincial concentration disposes data center, and deployment system application service cluster, at this In application service cluster, compatibility has marketing management system, is responsible for the process of whole pay electricity fee business.
Front end processor in province center of supply outer net machine room, power supply administration of districts and cities machine room, province center of supply machine room, application service As long as the effective node of cluster one exists ensures that being normally carried out of business.
Bank side power networking front end processor banking system be divided into banking system directly under the provincial Party committee and local bank's system, when for save During straight banking system, bank side powers, and networking front end processor is direct to be communicated with the provincial power supply outbound communication system foundation of supply port Passage, and access provincial concentration deployment data center;Client positioned at provincial bank sends data request packet, in request of data Message data with encryption in bag, data request packet is exchanged by bank's internal network and powers networking front end processor to bank side, Unsafe data message to provincial center is fallen by firewall filtering, afterwards by DDN passage again pass by provincial in intracardiac Fire wall verified, obtain the provincial center accreditation as supplier of electricity, the data request packet after safety verification passed through road In running order supply side bank-power intranet front end processor in provincial power supply outbound communication system is sent to by device.If now there being place In the supply side bank-power intranet front end processor of fault or service mode, then data request packet is sent to another supply side bank-power intranet In front end processor, again pass by the checking of fire wall, data request packet reaches the provincial application service collection concentrating deployment data center In group, data request packet is decrypted, realizes the process of related service.
When provincial bank and supplier of electricity carry out service interaction, different types of provincial bank is each via being arranged on Bank side within banking system power networking front end processor access in the application service cluster of supplier of electricity.Number for supplier of electricity During according to being transferred to provincial bank side, according to the path of data is activation, backtracking.
When for local bank's system, local bank's system because provincial center cannot be directly accessed the problems such as cost, such as Provincial concentrate deployment data center be located at Shenzhen City, Guangdong Province Guangzhou, for the agricultural bank in Shenzhen Guangdong Province, industrial and commercial bank, in The sweeping provincial bank such as bank of state, Construction Bank then can by the bank side in respective bank power networking front end processor with The provincial concentration deployment data center in the Guangdong center of supply sets up communication connection.And it is located at the local bank in Foshan, such as in Foshan Agriculture firm, business bank and other small-scale business banks, bank side powers the office of districts and cities that networking front end processor is located by it Electric power system accesses provincial concentration and disposes data center.The big bank referring to provincial bank directly interacting with provincial center, Such as four big row and the large-scale business bank of some other comparison, these banks all pass through center bank of province in the business of the whole province To process, including their prefecture-level bank;Local bank refers to the region bank not having provincial center bank, typically such as Agriculture firm.
Client positioned at local bank sends data request packet, carries the message data of encryption in data request packet, Data request packet is exchanged by bank's internal network and powers networking front end processor to bank side, anti-by bank end and feeder ear Wall with flues filters out unsafe data message to provincial center, obtains power supply administration of the districts and cities accreditation as supplier of electricity, safety is tested Data request packet after card is sent to the in running order supply side bank-power intranet front end processor of districts and cities' intra-office by router.If Now there is the supply side bank-power intranet front end processor being in fault or service mode, then send data request packet to another supply side In bank-power intranet front end processor, again pass by the checking of fire wall, data request packet is reached in the middle part of provincial collection by integrated data network In the application service cluster of data center of administration, data request packet is decrypted, realizes the process of related service.
When local bank and supplier of electricity carry out service interaction, different types of local bank is each via being arranged on Bank side within banking system powers after networking front end processor accesses to the supply side bank-power intranet front end processor of local power supply intra-office, Access to provincial concentration again and dispose data center.When being transferred to local bank side for the data of supplier of electricity, according to data is activation Path, backtracking.
It is obvious to a person skilled in the art that the invention is not restricted to the details of above-mentioned one exemplary embodiment, Er Qie In the case of the spirit or essential attributes of the present invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, embodiment all should be regarded as exemplary, and be nonrestrictive, the scope of the present invention is by appended power Profit requires rather than described above limits, it is intended that all in the implication and scope of the equivalency of claim by falling Change is included in the present invention.
Moreover, it will be appreciated that although this specification is been described by according to embodiment, not each embodiment comprises One independent technical scheme, only for clarity, those skilled in the art should be by for this narrating mode of specification As an entirety, the technical scheme in each embodiment can also be through appropriately combined, and forming those skilled in the art can for specification With the other embodiment understanding.

Claims (10)

1. at many levels telescopic provincial concentration bank networking pay electricity fee system it is characterised in that:Including positioned at bank end Mouthful bank side power networking front end processor, be located at provincial supply port provincial power supply outbound communication system, be located at prefecture-level confession The prefecture-level power supply outbound communication system of electric port and provincial concentration deployment data center, wherein bank side power networking preposition Machine is arranged in banking system and is set up with bank internal network and is connected, is provided with multiple provinces in provincial outbound communication system of powering The supply side bank-power intranet front end processor of the two-stage distributed setting in city, bank side powers before networking front end processor and supply side bank-power intranet Machine of putting is attached by DDN passage;Provincial concentration disposes data center by provincial power supply outbound communication system and bank side Power supply networking front end processor is communicatively coupled.
2. bank's networking pay electricity fee system of telescopic provincial concentration at many levels as claimed in claim 1, its feature exists In:Provincial concentration disposes the application service cluster being provided with compatible marketing management system in data center, and provincial concentration disposes number According to center, the business object in application service cluster is passed to supply side bank-power intranet front end processor.
3. bank's networking pay electricity fee system of telescopic provincial concentration at many levels as claimed in claim 2, its feature exists In:It is divided into banking system directly under the provincial Party committee and local bank's system with the power banking system of networking front end processor of bank side, when for directly under the provincial Party committee During banking system, bank side powers, and networking front end processor is direct to be communicated with the provincial power supply outbound communication system foundation of supply port Road, and access provincial concentration deployment data center;When for local bank's system, bank side powers networking front end processor by its institute Office of districts and cities electric power system access and provincial concentrate deployment data center.
4. bank's networking pay electricity fee system of telescopic provincial concentration at many levels as claimed in claim 3, its feature exists In:Bank side in the local bank's system districts and cities supply side that networking front end processor is located in office of districts and cities electric power system with it of powering is silver-colored Electricity Federation net front end processor is connected, and office of districts and cities electric power system concentrates deployment data center to pass through integrated data Network Communication with provincial.
5. bank's networking pay electricity fee system of telescopic provincial concentration at many levels as claimed in claim 4, its feature exists In:Supply side bank-power intranet front end processor in provincial power supply outbound communication system and districts and cities' electric power system is provided with many Individual, each supply side bank-power intranet front end processor all accesses to provincial concentration and disposes data center.
6. at many levels telescopic provincial concentration bank networking pay electricity fee method it is characterised in that:
It is responsible for carrying out the provincial power supply outbound communication system of service interaction with provincial bank in the deployment of province center of supply outer net machine room, Carry out office of the districts and cities electric power system of service interaction in the machine room deployment of power supply administration of districts and cities with local bank, in province center of supply machine room portion Administration is provided with the provincial concentration deployment data center of application service cluster, from provincial bank data directly by provincial power supply Outbound communication system concentrates deployment data center to carry out service interaction with provincial, and the data from local bank is powered by districts and cities Office's electric power system accesses provincial concentration deployment data center and carries out service interaction.
7. bank's networking pay electricity fee method of telescopic provincial concentration at many levels as claimed in claim 6, its feature exists In:The data of provincial bank directly concentrates deployment data center to carry out business friendship by provincial power supply outbound communication system with provincial Mutually, concrete implementation process is:
Step 1, be located at provincial bank bank side power networking front end processor send data request packet, carry in data request packet The message data of encryption, data request packet is passed through bank's internal network and exchanges to power networking front end processor to bank side, by preventing fires Wall filters out unsafe data message to provincial center, afterwards by DDN passage again pass by provincial in intracardiac fire wall Verified, obtained the provincial center accreditation as supplier of electricity;
Data request packet after step 2, safety verification is sent in provincial power supply outbound communication system by router and is in work Make the supply side bank-power intranet front end processor of state, if now there being the supply side bank-power intranet being in fault or service mode preposition Machine, then send data request packet to standby supply side bank-power intranet front end processor, again pass by the checking of fire wall, data Request bag reaches in the provincial application service cluster concentrated and dispose data center, data request packet is decrypted, realizes business Process;
When step 3, the data for supplier of electricity are transferred to provincial bank side, according to the path of data is activation, backtracking.
8. bank's networking pay electricity fee method of telescopic provincial concentration at many levels as claimed in claim 7, its feature exists In:When provincial bank and supplier of electricity carry out service interaction, different types of provincial bank is each via being arranged on bank The bank side of internal system power networking front end processor access in the application service cluster of supplier of electricity.
9. bank's networking pay electricity fee method of telescopic provincial concentration at many levels as claimed in claim 6, its feature exists In:The data of local bank accesses provincial concentration deployment data center by power supply administration of districts and cities electric power system and carries out service interaction, Concrete implementation process is:
Step 1, the client positioned at local bank send data request packet, carry the message number of encryption in data request packet Exchanged by local bank's internal network according to, data request packet and power networking front end processor to the bank side of local bank, by ground The feeder ear firewall filtering of the bank end of Fang Yinhang and local power supply administration falls unsafe data message to provincial center, obtains To power supply administration of the districts and cities accreditation as supplier of electricity, the data request packet after safety verification is sent to districts and cities' intra-office by router In running order supply side bank-power intranet front end processor;
If step 2 now local power supply intra-office, there is the supply side bank-power intranet front end processor being in fault or service mode, then will Data request packet sends to the bank-power intranet front end processor of stand-by power supply side, again passes by the checking of fire wall, and data request packet is led to Cross integrated data network to reach in the provincial application service cluster concentrated and dispose data center, data request packet is decrypted, real The process of existing business;
When step 3, the data for supplier of electricity are transferred to local bank side, according to the path of data is activation, backtracking.
10. bank's networking pay electricity fee method of telescopic provincial concentration at many levels as claimed in claim 9, its feature exists In:When local bank and power supply administration of districts and cities carry out service interaction, different types of local bank is each via being arranged on Bank side within banking system powers after networking front end processor accesses to the supply side bank-power intranet front end processor of local power supply intra-office, Access to provincial concentration again and dispose data center.
CN201610775092.XA 2016-08-31 2016-08-31 Multilayer scalable provincial centralized bank networked electric charge collection system and method Pending CN106412012A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610775092.XA CN106412012A (en) 2016-08-31 2016-08-31 Multilayer scalable provincial centralized bank networked electric charge collection system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610775092.XA CN106412012A (en) 2016-08-31 2016-08-31 Multilayer scalable provincial centralized bank networked electric charge collection system and method

Publications (1)

Publication Number Publication Date
CN106412012A true CN106412012A (en) 2017-02-15

Family

ID=58002330

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610775092.XA Pending CN106412012A (en) 2016-08-31 2016-08-31 Multilayer scalable provincial centralized bank networked electric charge collection system and method

Country Status (1)

Country Link
CN (1) CN106412012A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1737839A (en) * 2005-07-18 2006-02-22 仲俊杰 China communication value-added service card system
CN1932875A (en) * 2006-10-09 2007-03-21 杭州东信金融技术服务有限公司 Prepositional system based on finance industry
CN102486882A (en) * 2010-12-03 2012-06-06 河南省电力公司南阳供电公司 Electric power self-help payment terminal system
CN203457183U (en) * 2013-09-30 2014-02-26 国家电网公司 Integrated system of bank-and-power-company network

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1737839A (en) * 2005-07-18 2006-02-22 仲俊杰 China communication value-added service card system
CN1932875A (en) * 2006-10-09 2007-03-21 杭州东信金融技术服务有限公司 Prepositional system based on finance industry
CN102486882A (en) * 2010-12-03 2012-06-06 河南省电力公司南阳供电公司 Electric power self-help payment terminal system
CN203457183U (en) * 2013-09-30 2014-02-26 国家电网公司 Integrated system of bank-and-power-company network

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
裘炜浩等: ""新一代银电联网系统的应用"", 《华东电力》 *
陈红燕等: ""省级集中银电联网收费平台的研究和实现"", 《电力信息化》 *

Similar Documents

Publication Publication Date Title
US20190089788A1 (en) Intelligent Household Energy Internet of Things System for Intelligent City System
CN108063829A (en) A kind of new gauze urban track traffic comprehensive monitoring system
CN110444001A (en) A kind of ubiquitous electric power data transmission of internet of things system
CN102932399B (en) Dispatching of power netwoks cloud disaster recovery and backup systems
CN107666480A (en) Wisdom cell energy management system, hardware structure and information interacting method
CN201616710U (en) Telescopic terminal concurrency access and load balancing system framework
CN108615149A (en) Flexible block chain method of payment, device and the electronic equipment of multi-signature
CN202816025U (en) Power charge intelligent system
CN110111092A (en) A kind of compatible system of payment channel
CN106059918B (en) A kind of energy internet-based control layer architecture and dispatching method based on SDN
CN207851895U (en) A kind of bank's intelligent Trade route system
CN107979651A (en) A kind of new city rail traffic ticket automatic selling and checking system based on cloud platform
CN110718947A (en) Fill electric pile group control distribution timesharing system
Rao ICT and e-Governance for Rural Development
CN106200389A (en) A kind of intelligent electric energy meter based on embedded system
CN109547239A (en) Strange land cloud data center management system based on three-layer network framework
CN106412012A (en) Multilayer scalable provincial centralized bank networked electric charge collection system and method
CN107730973A (en) Ground lock system and intelligent parking space management system based on bluetooth
CN106920048A (en) A kind of global train crew dormitory all-purpose card management of repast system
CN102281334A (en) Management control method and system thereof for wired terminal and access server
CN202495968U (en) Enterprise integration information platform
CN105913641A (en) Remote automatic meter reading system
CN108718245A (en) A kind of mobile network issues an order system and application method
CN109863661A (en) Storage unit and storage system for consumer
CN202502538U (en) Intelligent fee-paying system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170215