CN106410646A - Fault rapid determining and processing operation method of AC-DC-AC high-voltage frequency converter - Google Patents

Fault rapid determining and processing operation method of AC-DC-AC high-voltage frequency converter Download PDF

Info

Publication number
CN106410646A
CN106410646A CN201610975594.7A CN201610975594A CN106410646A CN 106410646 A CN106410646 A CN 106410646A CN 201610975594 A CN201610975594 A CN 201610975594A CN 106410646 A CN106410646 A CN 106410646A
Authority
CN
China
Prior art keywords
turning
switch
turn
motor
check
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610975594.7A
Other languages
Chinese (zh)
Other versions
CN106410646B (en
Inventor
宗亮
卢朝晖
申建新
李屹松
李玉冰
张中建
谭立伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Handan Handan Iron And Steel Group Fengda Metallurgical Raw Materials Co ltd
HBIS Co Ltd Handan Branch
Original Assignee
HBIS Co Ltd Handan Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HBIS Co Ltd Handan Branch filed Critical HBIS Co Ltd Handan Branch
Priority to CN201610975594.7A priority Critical patent/CN106410646B/en
Publication of CN106410646A publication Critical patent/CN106410646A/en
Application granted granted Critical
Publication of CN106410646B publication Critical patent/CN106410646B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B3/00Apparatus specially adapted for the manufacture, assembly, or maintenance of boards or switchgear

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Power Engineering (AREA)
  • Tests Of Circuit Breakers, Generators, And Electric Motors (AREA)

Abstract

The invention discloses a fault rapid determining and processing operation method of an AC-DC-AC high-voltage frequency converter. The method comprises the steps of maintenance of auxiliary equipment, maintenance of an excitation loop of a synchronization motor, maintenance of a high-voltage frequency conversion cabinet, maintenance of an inlet wire switch of a high-voltage frequency converter, air inlet temperature standard-exceeding alarm processing and replacement of a power unit. According to the fault determining and processing method of the high-voltage frequency converter, provided by the invention, a fault of the frequency converter is determined according to different features of a starting process and processing operation is performed according to the type of the fault, such that the accident processing time is shortened, and good economic benefits are created.

Description

A kind of quick judgement of fault handing over orthogonal high voltage converter and process operational approach
Technical field
The present invention relates to a kind of fault of high voltage converter is quick and judging and process operational approach, more particularly, to a kind of friendship is straight Hand over the quick judgement of fault of high voltage converter and process operational approach, belong to the fault diagnosis technology field of high voltage converter.
Background technology
1,2,3,4, No. 5 high voltage converter is the nucleus equipment of mair motor on factory's steel rolling line, their operation quality, Directly affect the yield of production line, because high voltage converter is high voltage, high current, the equipment of high-intensity magnetic field, always runs dimension Difficult point in shield, each fault needs to stop production to wait and causes very big production loss, for this reason, according to oneself maintenance and life The accident occurring in product, is summarized, thus allowing everybody accident can be had one compare clearly thinking, according to high voltage variable The feature of the fault of frequency device, according to different time, different feedbacks, summarize the judgement of fault and process operational approach, thus pole The big process time that improve accident, improves equipment utilization rule it is ensured that producing.
Content of the invention
The technical problem to be solved in the present invention is to provide a kind of quick judgement of fault handing over orthogonal high voltage converter and process Operational approach.
For solving above-mentioned technical problem, the technical solution used in the present invention is:
A kind of quick judgement of fault handing over orthogonal high voltage converter and process operational approach, comprise the following steps:
Step 1:Auxiliary equipment(7)Maintenance:It is made up of step by step following:
Step 1-1:Start the auxiliary equipment handing over orthogonal high voltage converter(7), judge to start auxiliary equipment(7)Whether can normal work Make, if it is, turning to step 2;Otherwise, turn to step 1-2;
Step 1-2:Check whether water cooling unit works, if it is, turning to step 1-4;Otherwise, turn to step 1-3;
Step 1-3:Process water cooling unit fault;Turn to step 1-2;
Step 1-4:Check whether the cooling blower that high-voltage motor (6) two is surveyed works, if it is, turning to step 1-8;Otherwise, turn To step 1-5;
Step 1-5:Check whether the on and off switch of cooling blower trips, and whether catalyst control loop is normal, if it is, turning To step 1-6, otherwise turn to step 1-8;
Step 1-6:Detect cooling blower motor with low pressure megger, if insulation is less than 0.5 megaohm, change the cooling blower damaging Motor;If cooling blower insulation is good, detect cooling blower inlet wire insulating resistance of cable with low pressure megger, check inlet wire electricity Whether cable insulation against ground is less than 0.5 megaohm, if turning to step 1-7;Otherwise turn to step 1-8;
Step 1-7:Change the inlet wire cable of cooling fan;
Step 1-8:Check whether the cooling fan in frequency conversion tank works, whether air quantity is normal, if turning to step 1, otherwise Turn to step 1-7;
Step 1-9:Change cooling fan in frequency conversion tank, or check in frequency conversion tank, whether air quantity detecting element damages and air quantity inspection Whether survey time road opens a way, and changes PT100 air volume test element in time, recovers measuring loop;
Step 2:The energized circuit maintenance of synchronous motor, including step in detail below:
Step 2-1:Check whether the energized circuit of synchronous motor works, and whether field switch TCMLC closes;If it is, turning To step 3, otherwise, turn to step 2-2;
Step 2-2:Check excitation service entrance switch on low-voltage distribution cabinet(1)Whether close, if it is, turning to step 2-4, otherwise, Turn to step 2-3;
Step 2-3:Close excitation service entrance switch on low-voltage distribution cabinet(1);Turn to step 2-1;
Step 2-4:Checking switch whether action in excitation cubicle, if it is, turning to step 2-6, otherwise, turning to step 2-5;
Step 2-5:Inspection switch and the motor-operating mechanism of switch, whether the coil of motor-operating mechanism is short-circuit, open circuit, machine Whether structure connection piece is threaded off or is deformed, and the coil of replacement operation mechanism, corrects and recover the mechanism of motor-operating mechanism In flakes, if Switch main body damages, be changed;
Step 2-6:Check excitation rectifier device(2)Whether working, if turning to step 2-8, otherwise turning to step 2-7;
Step 2-7:Maintenance excitation rectifier device, controls whether power supply has electricity, and whether communication board work is normal, and whether card is empty Connect or damage, whether cooling fan works, whether have short circuit phenomenon, whether internal insurance, because Damage by Short Circuit, is changed corresponding Element;
Step 2-8:Checking motor brush whether fault, if turning to step 2-9, otherwise going to step 2-9;
Step 2-9:Change brush, before replacing, contact surface polish corresponding radian, once change less than sum three/ One;
Step 2-10:Check whether motor sliding ring surface is good, if oxide-film is destroyed, grinding process to be carried out, brush brush Whether frame loosens and is retightened, and whether slip ring wiring loosens and fastened;
Step 3:High-pressure frequency-conversion cabinet overhauls:Including step in detail below:
Step 3-1:Check whether high-pressure frequency-conversion cabinet enters line precharge:After 30 second charging interval, whether observe DC bus-bar voltage Reaching 4800V, if it is, turning to step 4, otherwise turning to step 3-2;
Step 3-2:Operation high voltage converter stops, and high pressure inlet wire handcart is withdrawn into testing position, and wait DC bus-bar voltage is After 36V, change pre-charge resistance, change preliminary filling insurance, eliminate All Alerts;
Step 3-3:High pressure inlet wire handcart is advanced to run location, turns to step 1;
Step 4:High voltage converter service entrance switch overhauls:Including step in detail below:
Step 4-1:Check high-voltage wire inlet switch(3)Whether close a floodgate, if it is, turning to step 5, if not otherwise turning to step 4-2;
Step 4-2:Operation high voltage converter stops, and high pressure inlet wire handcart is withdrawn into testing position, checks that high-voltage handcart closes a floodgate back Whether road works, if it is, turning to step 4-4, otherwise turns to step 4-3;
Step 4-3:Change the fault element in high-voltage handcart closing coil loop;
Step 4-4:Checking whether tank circuit works, if it is, turning to step 4-6, otherwise turning to step 4-5;
Step 4-5:Change the fault element in tank circuit;
Step 4-6:Check whether high-voltage switch gear divide-shut brake auxiliary contact feedback is normal, if it is, turning to step 4-8, otherwise turns To step 4-7;
Step 4-7:Change high-voltage switch gear divide-shut brake auxiliary contact;
Step 4-8:Checking whether the motor-operating mechanism of high-voltage switch gear is good, if it is, turning to step 4-10, otherwise turning to step Rapid 4-9;
Step 4-9:Operating mechanism, inspection operation mechanism powered part and the mechanical part of examination and repair for high-pressure switch, powered part line Whether circle opens a way or short circuit, armature whether jam, and whether pin comes off mechanical part, bearing damage, and connecting rod deforms, gear Oil starvation, changes corresponding damage part;
Step 4-10:High pressure inlet wire handcart is advanced to run location, turns to step 1;
Step 5:Disconnecting switch under motor(5)Maintenance:Including step in detail below:
Step 5-1:Check disconnecting switch under motor(5)Handcart whether normally close a floodgate, if it is, turn to step 5-3, otherwise, Turn to step 5-2;
Step 5-2:Lower disconnecting switch(5)Handcart exit and change, change after lower disconnecting switch(5)Deliver to operation Position;
Step 5-3:The lower disconnecting switch of operation(5)Close a floodgate;
Step 6:The exceeded alert process of intake air temperature:Including step in detail below:
Step 6-1:Judge whether that display exceeded warning of intake air temperature is shut down, if it is, turning to step 6-2;Otherwise, turn to Step 6-3;
Step 6-2:Force F01K13 the or F01K23 relay inside pressing main transmission assist control cabinet, the time divides for 1-2 Clock, motor cooling fan catalyst, so that motor radiating fan is worked, report to the police and eliminate rear steering step 1;
Step 6-3:Confirm that high voltage converter stops, operation high pressure inlet wire handcart is withdrawn into testing position, waits 15 minutes direct currents Busbar voltage be less than 36V after, check frequency conversion tank internal power unit module whether report to the police, judge whether high-voltage power unit damages Bad, if it is, turning to step 6-4, otherwise turn to step 7;
Step 6-4:Change IGCT unit, close IGCT water inlet and flowing water Valve, open joint, put well below waterpipe jointing and connect Basin, prevents from metalling run out, and takes apart and controls power outage in the dividing plate in the middle of cabinet door, IGCT power unit cabinet, extracts touching on IGCT Luminous grid 4, dismantle triggering power supply terminal 8,4 foundation bolts of constant power unit, and the fixation that busbar connects 2, bolt, the connecting bolt of 3 busbars 8,4, the bolt of output, special both sides 2 Slide tool is respectively installed to Above IGCT, notice that each screw gently hangs up.Two exclusive guideways are separately inserted inside Slide tool recited above, two Side respectively fills one, is then fixed on cabinet by full dog point socket set above, is just now fixed the bolt of guide rail, before and after both sides Synchronization is tightened, and at this moment can see that IGCT module is slight from firm banking and lift 2-3MM, IGCT power cell is pulled outwardly Go out, be put on special lift truck, lifting lift truck, so that IGCT power cell is not stressed, pull down fixing IGCT power cell Screw on slideway, unloads IGCT, turns to step 1;
Step 7:Terminate.
Using having technical effect that acquired by technique scheme:
The invention provides a kind of breakdown judge of high voltage converter and processing method, according to the different characteristics judgement of start-up course The fault of converter, the type according to fault carries out processing operation, shortens the accident treatment time, creates good economic effect Benefit.
Brief description
The present invention is further detailed explanation with reference to the accompanying drawings and detailed description.
Fig. 1 is the flow chart of the present invention;
Fig. 2 is the circuit theory diagrams handing over orthogonal high voltage converter;
Wherein:1- excitation service entrance switch, 2- excitation rectifier device, 3- high-voltage wire inlet switch, 4- high-pressure frequency-conversion cabinet, keep apart under 5- Close, 6- high-voltage motor, 7- auxiliary equipment.
Specific embodiment
Embodiment 1:
A kind of quick judgement of fault handing over orthogonal high voltage converter and process operational approach, comprise the following steps:
Step 1:Auxiliary equipment(7)Maintenance:It is made up of step by step following:
Step 1-1:Start the auxiliary equipment handing over orthogonal high voltage converter(7), judge to start auxiliary equipment(7)Whether can normal work Make, if it is, turning to step 2;Otherwise, turn to step 1-2;
Step 1-2:Check whether water cooling unit works, if it is, turning to step 1-4;Otherwise, turn to step 1-3;
Step 1-3:Process water cooling unit fault;Turn to step 1-2;
Step 1-4:Check whether the cooling blower that high-voltage motor (6) two is surveyed works, if it is, turning to step 1-8;Otherwise, turn To step 1-5;
Step 1-5:Check whether the on and off switch of cooling blower trips, and whether catalyst control loop is normal, if it is, turning To step 1-6, otherwise turn to step 1-8;
Step 1-6:Detect cooling blower motor with low pressure megger, if insulation is less than 0.5 megaohm, change the cooling blower damaging Motor;If cooling blower insulation is good, detect cooling blower inlet wire insulating resistance of cable with low pressure megger, check inlet wire electricity Whether cable insulation against ground is less than 0.5 megaohm, if turning to step 1-7;Otherwise turn to step 1-8;
Step 1-7:Change the inlet wire cable of cooling fan;
Step 1-8:Check whether the cooling fan in frequency conversion tank works, whether air quantity is normal, if turning to step 1, otherwise Turn to step 1-7;
Step 1-9:Change cooling fan in frequency conversion tank, or check in frequency conversion tank, whether air quantity detecting element damages and air quantity inspection Whether survey time road opens a way, and changes PT100 air volume test element in time, recovers measuring loop;
Step 2:The energized circuit maintenance of synchronous motor, including step in detail below:
Step 2-1:Check whether the energized circuit of synchronous motor works, and whether field switch TCMLC closes;If it is, turning To step 3, otherwise, turn to step 2-2;
Step 2-2:Check excitation service entrance switch on low-voltage distribution cabinet(1)Whether close, if it is, turning to step 2-4, otherwise, Turn to step 2-3;
Step 2-3:Close excitation service entrance switch on low-voltage distribution cabinet(1);Turn to step 2-1;
Step 2-4:Checking switch whether action in excitation cubicle, if it is, turning to step 2-6, otherwise, turning to step 2-5;
Step 2-5:Inspection switch and the motor-operating mechanism of switch, whether the coil of motor-operating mechanism is short-circuit, open circuit, machine Whether structure connection piece is threaded off or is deformed, and the coil of replacement operation mechanism, corrects and recover the mechanism of motor-operating mechanism In flakes, if Switch main body damages, be changed;
Step 2-6:Check excitation rectifier device(2)Whether working, if turning to step 2-8, otherwise turning to step 2-7;
Step 2-7:Maintenance excitation rectifier device, controls whether power supply has electricity, and whether communication board work is normal, and whether card is empty Connect or damage, whether cooling fan works, whether have short circuit phenomenon, whether internal insurance, because Damage by Short Circuit, is changed corresponding Element;
Step 2-8:Checking motor brush whether fault, if turning to step 2-9, otherwise going to step 2-9;
Step 2-9:Change brush, before replacing, contact surface polish corresponding radian, once change less than sum three/ One;
Step 2-10:Check whether motor sliding ring surface is good, if oxide-film is destroyed, grinding process to be carried out, brush brush Whether frame loosens and is retightened, and whether slip ring wiring loosens and fastened;
Step 3:High-pressure frequency-conversion cabinet overhauls:Including step in detail below:
Step 3-1:Check whether high-pressure frequency-conversion cabinet enters line precharge:After 30 second charging interval, whether observe DC bus-bar voltage Reaching 4800V, if it is, turning to step 4, otherwise turning to step 3-2;
Step 3-2:Operation high voltage converter stops, and high pressure inlet wire handcart is withdrawn into testing position, and wait DC bus-bar voltage is After 36V, change pre-charge resistance, change preliminary filling insurance, eliminate All Alerts;
Step 3-3:High pressure inlet wire handcart is advanced to run location, turns to step 1;
Step 4:High voltage converter service entrance switch overhauls:Including step in detail below:
Step 4-1:Check high-voltage wire inlet switch(3)Whether close a floodgate, if it is, turning to step 5, if not otherwise turning to step 4-2;
Step 4-2:Operation high voltage converter stops, and high pressure inlet wire handcart is withdrawn into testing position, checks that high-voltage handcart closes a floodgate back Whether road works, if it is, turning to step 4-4, otherwise turns to step 4-3;
Step 4-3:Change the fault element in high-voltage handcart closing coil;
Step 4-4:Checking whether tank circuit works, if it is, turning to step 4-6, otherwise turning to step 4-5;
Step 4-5:Change the fault element in tank circuit;
Step 4-6:Check whether high-voltage switch gear divide-shut brake auxiliary contact feedback is normal, if it is, turning to step 4-8, otherwise turns To step 4-7;
Step 4-7:Change high-voltage switch gear divide-shut brake auxiliary contact;
Step 4-8:Checking whether the motor-operating mechanism of high-voltage switch gear is good, if it is, turning to step 4-10, otherwise turning to step Rapid 4-9;
Step 4-9:Operating mechanism, inspection operation mechanism powered part and the mechanical part of examination and repair for high-pressure switch, powered part line Whether circle opens a way or short circuit, armature whether jam, and whether pin comes off mechanical part, bearing damage, and connecting rod deforms, gear Oil starvation, changes corresponding damage part;
Step 4-10:High pressure inlet wire handcart is advanced to run location, turns to step 1;
Step 5:Disconnecting switch under motor(5)Maintenance:Including step in detail below:
Step 5-1:Check disconnecting switch under motor(5)Handcart whether normally close a floodgate, if it is, turn to step 5-3, otherwise, Turn to step 5-2;
Step 5-2:Lower disconnecting switch(5)Handcart exit and change, change after lower disconnecting switch(5)Deliver to operation Position;
Step 5-3:The lower disconnecting switch of operation(5)Close a floodgate;
Step 6:The exceeded alert process of intake air temperature:Including step in detail below:
Step 6-1:Judge whether that display exceeded warning of intake air temperature is shut down, if it is, turning to step 6-2;Otherwise, turn to Step 6-3;
Step 6-2:Force F01K13 the or F01K23 relay inside pressing main transmission assist control cabinet, the time divides for 1-2 Clock, motor cooling fan catalyst, so that motor radiating fan is worked, report to the police and eliminate rear steering step 1;
Step 6-3:Confirm that high voltage converter stops, operation high pressure inlet wire handcart is withdrawn into testing position, waits 15 minutes direct currents Busbar voltage be less than 36V after, check frequency conversion tank internal power unit module whether report to the police, judge whether high-voltage power unit damages Bad, if it is, turning to step 6-4, otherwise turn to step 7;
Step 6-4:Change IGCT unit, close IGCT water inlet and flowing water Valve, open joint, put well below waterpipe jointing and connect Basin, prevents from metalling run out, and takes apart and controls power outage in the dividing plate in the middle of cabinet door, IGCT power unit cabinet, extracts touching on IGCT Luminous grid 4, dismantle triggering power supply terminal 8,4 foundation bolts of constant power unit, and the fixation that busbar connects 2, bolt, the connecting bolt of 3 busbars 8,4, the bolt of output, special both sides 2 Slide tool is respectively installed to Above IGCT, notice that each screw gently hangs up.Two exclusive guideways are separately inserted inside Slide tool recited above, two Side respectively fills one, is then fixed on cabinet by full dog point socket set above, is just now fixed the bolt of guide rail, before and after both sides Synchronization is tightened, and at this moment can see that IGCT module is slight from firm banking and lift 2-3MM, IGCT power cell is pulled outwardly Go out, be put on special lift truck, lifting lift truck, so that IGCT power cell is not stressed, pull down fixing IGCT power cell Screw on slideway, unloads IGCT, turns to step 1;
Step 7:Terminate.
According to this operational approach, the calculating of 12 hours off-times can be reduced annual, that is, 0.5 day, minimizing caused Loss:4000 tons of * 0.5=2000 tons of daily yield, 200 yuan of ton steel profit.Loss of income reduces 400,000 yuan.
Embodiment described above is only that the preferred embodiment of the present invention is described, the not structure to the present invention Think and scope is defined.On the premise of without departing from design concept of the present invention, the technology to the present invention for this area ordinary person Various modifications and improvement that scheme is made, all should drop into protection scope of the present invention.

Claims (1)

1. a kind of fault handing over orthogonal high voltage converter quick judge and process operational approach it is characterised in that:Walk including following Suddenly:
Step 1:Auxiliary equipment(7)Maintenance:It is made up of step by step following:
Step 1-1:Start the auxiliary equipment handing over orthogonal high voltage converter(7), judge to start auxiliary equipment(7)Whether can normal work Make, if it is, turning to step 2;Otherwise, turn to step 1-2;
Step 1-2:Check whether water cooling unit works, if it is, turning to step 1-4;Otherwise, turn to step 1-3;
Step 1-3:Process water cooling unit fault;Turn to step 1-2;
Step 1-4:Check whether the cooling blower that high-voltage motor (6) two is surveyed works, if it is, turning to step 1-8;Otherwise, turn To step 1-5;
Step 1-5:Check whether the on and off switch of cooling blower trips, and whether catalyst control loop is normal, if it is, turning To step 1-6, otherwise turn to step 1-8;
Step 1-6:Detect cooling blower motor with low pressure megger, if insulation is less than 0.5 megaohm, change the cooling blower damaging Motor;If cooling blower insulation is good, detect cooling blower inlet wire insulating resistance of cable with low pressure megger, check inlet wire electricity Whether cable insulation against ground is less than 0.5 megaohm, if turning to step 1-7;Otherwise turn to step 1-8;
Step 1-7:Change the inlet wire cable of cooling fan;
Step 1-8:Check whether the cooling fan in frequency conversion tank works, whether air quantity is normal, if turning to step 1, otherwise Turn to step 1-7;
Step 1-9:Change cooling fan in frequency conversion tank, or check in frequency conversion tank, whether air quantity detecting element damages and air quantity inspection Whether survey time road opens a way, and changes PT100 air volume test element in time, recovers measuring loop;
Step 2:The energized circuit maintenance of synchronous motor, including step in detail below:
Step 2-1:Check whether the energized circuit of synchronous motor works, and whether field switch TCMLC closes;If it is, turning To step 3, otherwise, turn to step 2-2;
Step 2-2:Check excitation service entrance switch on low-voltage distribution cabinet(1)Whether close, if it is, turning to step 2-4, otherwise, Turn to step 2-3;
Step 2-3:Close excitation service entrance switch on low-voltage distribution cabinet(1);Turn to step 2-1;
Step 2-4:Checking switch whether action in excitation cubicle, if it is, turning to step 2-6, otherwise, turning to step 2-5;
Step 2-5:Inspection switch and the motor-operating mechanism of switch, whether the coil of motor-operating mechanism is short-circuit, open circuit, machine Whether structure connection piece is threaded off or is deformed, and the coil of replacement operation mechanism, corrects and recover the mechanism of motor-operating mechanism In flakes, if Switch main body damages, be changed;
Step 2-6:Check excitation rectifier device(2)Whether working, if turning to step 2-8, otherwise turning to step 2-7;
Step 2-7:Maintenance excitation rectifier device, controls whether power supply has electricity, and whether communication board work is normal, and whether card is empty Connect or damage, whether cooling fan works, whether have short circuit phenomenon, whether internal insurance, because Damage by Short Circuit, is changed corresponding Element;
Step 2-8:Checking motor brush whether fault, if turning to step 2-9, otherwise going to step 2-9;
Step 2-9:Change brush, before replacing, contact surface polish corresponding radian, once change less than sum three/ One;
Step 2-10:Check whether motor sliding ring surface is good, if oxide-film is destroyed, grinding process to be carried out, brush brush Whether frame loosens and is retightened, and whether slip ring wiring loosens and fastened;
Step 3:High-pressure frequency-conversion cabinet overhauls:Including step in detail below:
Step 3-1:Check whether high-pressure frequency-conversion cabinet enters line precharge:After 30 second charging interval, whether observe DC bus-bar voltage Reaching 4800V, if it is, turning to step 4, otherwise turning to step 3-2;
Step 3-2:Operation high voltage converter stops, and high pressure inlet wire handcart is withdrawn into testing position, and wait DC bus-bar voltage is After 36V, change pre-charge resistance, change preliminary filling insurance, eliminate All Alerts;
Step 3-3:High pressure inlet wire handcart is advanced to run location, turns to step 1;
Step 4:High voltage converter service entrance switch overhauls:Including step in detail below:
Step 4-1:Check high-voltage wire inlet switch(3)Whether close a floodgate, if it is, turning to step 5, if not otherwise turning to step 4-2;
Step 4-2:Operation high voltage converter stops, and high pressure inlet wire handcart is withdrawn into testing position, checks that high-voltage handcart closes a floodgate back Whether road works, if it is, turning to step 4-4, otherwise turns to step 4-3;
Step 4-3:Change the fault element in high-voltage handcart closing circuit;
Step 4-4:Checking whether tank circuit works, if it is, turning to step 4-6, otherwise turning to step 4-5;
Step 4-5:Fault element in energy loop;
Step 4-6:Check whether high-voltage switch gear divide-shut brake auxiliary contact feedback is normal, if it is, turning to step 4-8, otherwise turns To step 4-7;
Step 4-7:Change high-voltage switch gear divide-shut brake auxiliary contact;
Step 4-8:Checking whether the motor-operating mechanism of high-voltage switch gear is good, if it is, turning to step 4-10, otherwise turning to step Rapid 4-9;
Step 4-9:Operating mechanism, inspection operation mechanism powered part and the mechanical part of examination and repair for high-pressure switch, powered part line Whether circle opens a way or short circuit, armature whether jam, and whether pin comes off mechanical part, bearing damage, and connecting rod deforms, gear Oil starvation, changes corresponding damage part;
Step 4-10:High pressure inlet wire handcart is advanced to run location, turns to step 1;
Step 5:Disconnecting switch under motor(5)Maintenance:Including step in detail below:
Step 5-1:Check disconnecting switch under motor(5)Handcart whether normally close a floodgate, if it is, turn to step 5-3, otherwise, Turn to step 5-2;
Step 5-2:Lower disconnecting switch(5)Handcart exit and change, change after lower disconnecting switch(5)Deliver to operation Position;
Step 5-3:The lower disconnecting switch of operation(5)Close a floodgate;
Step 6:The exceeded alert process of intake air temperature:Including step in detail below:
Step 6-1:Judge whether that display exceeded warning of intake air temperature is shut down, if it is, turning to step 6-2;Otherwise, turn to Step 6-3;
Step 6-2:Force F01K13 the or F01K23 relay inside pressing main transmission assist control cabinet, the time divides for 1-2 Clock, motor cooling fan catalyst, so that motor radiating fan is worked, report to the police and eliminate rear steering step 1;
Step 6-3:Confirm that high voltage converter stops, operation high pressure inlet wire handcart is withdrawn into testing position, waits 15 minutes direct currents Busbar voltage be less than 36V after, check frequency conversion tank internal power unit module whether report to the police, judge whether high-voltage power unit damages Bad, if it is, turning to step 6-4, otherwise turn to step 7;
Step 6-4:Change IGCT unit, close IGCT water inlet and flowing water Valve, open joint, put well below waterpipe jointing and connect Basin, prevents from metalling run out, and takes apart and controls power outage in the dividing plate in the middle of cabinet door, IGCT power unit cabinet, extracts touching on IGCT Luminous grid 4, dismantle triggering power supply terminal 8,4 foundation bolts of constant power unit, and the fixation that busbar connects 2, bolt, the connecting bolt of 3 busbars 8,4, the bolt of output, special both sides 2 Slide tool is respectively installed to Above IGCT, notice that each screw gently hangs up, two exclusive guideways are separately inserted inside Slide tool recited above, two Side respectively fills one, is then fixed on cabinet by full dog point socket set above, is just now fixed the bolt of guide rail, before and after both sides Synchronization is tightened, and at this moment can see that IGCT module is slight from firm banking and lift 2-3MM, IGCT power cell is pulled outwardly Go out, be put on special lift truck, lifting lift truck, so that IGCT power cell is not stressed, pull down fixing IGCT power cell Screw on slideway, unloads IGCT, turns to step 1;
Step 7:Terminate.
CN201610975594.7A 2016-11-07 2016-11-07 A kind of failure for handing over orthogonal high voltage converter quickly judges and processing operating method Expired - Fee Related CN106410646B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610975594.7A CN106410646B (en) 2016-11-07 2016-11-07 A kind of failure for handing over orthogonal high voltage converter quickly judges and processing operating method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610975594.7A CN106410646B (en) 2016-11-07 2016-11-07 A kind of failure for handing over orthogonal high voltage converter quickly judges and processing operating method

Publications (2)

Publication Number Publication Date
CN106410646A true CN106410646A (en) 2017-02-15
CN106410646B CN106410646B (en) 2018-02-06

Family

ID=58015232

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610975594.7A Expired - Fee Related CN106410646B (en) 2016-11-07 2016-11-07 A kind of failure for handing over orthogonal high voltage converter quickly judges and processing operating method

Country Status (1)

Country Link
CN (1) CN106410646B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107942153A (en) * 2017-03-31 2018-04-20 大唐三门峡发电有限责任公司 The lookup method of Li Dehuafu frequency converter failures
CN110567740A (en) * 2019-07-31 2019-12-13 邯郸钢铁集团有限责任公司 operation method for searching and rapidly processing high-voltage variable-frequency starting fault according to time sequence
CN113701809A (en) * 2021-08-20 2021-11-26 株洲华梁电气有限公司 IGCT crimping test device

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109541337B (en) * 2018-10-16 2021-02-19 苏州汇川技术有限公司 Frequency converter fault detection method, system, equipment and computer readable storage medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101051581A (en) * 2007-02-15 2007-10-10 国电南瑞科技股份有限公司 Interlocking reverse overflow relay protective plan
US7948203B2 (en) * 2007-06-29 2011-05-24 Andreas Siemes Device for the control of a smooth starting or ending of a three phase current motor, so-called soft starter
CN103066575A (en) * 2012-12-24 2013-04-24 上海电力学院 Control method of rapidly finding fault
CN103777108A (en) * 2013-10-24 2014-05-07 黄政 Method for quickly searching grounding fault point of electrical equipment
CN104821247A (en) * 2015-04-22 2015-08-05 淮北朔里矿业有限责任公司 Method for debugging and calibrating vacuum contactor in explosion-proof switch

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101051581A (en) * 2007-02-15 2007-10-10 国电南瑞科技股份有限公司 Interlocking reverse overflow relay protective plan
US7948203B2 (en) * 2007-06-29 2011-05-24 Andreas Siemes Device for the control of a smooth starting or ending of a three phase current motor, so-called soft starter
CN103066575A (en) * 2012-12-24 2013-04-24 上海电力学院 Control method of rapidly finding fault
CN103777108A (en) * 2013-10-24 2014-05-07 黄政 Method for quickly searching grounding fault point of electrical equipment
CN104821247A (en) * 2015-04-22 2015-08-05 淮北朔里矿业有限责任公司 Method for debugging and calibrating vacuum contactor in explosion-proof switch

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107942153A (en) * 2017-03-31 2018-04-20 大唐三门峡发电有限责任公司 The lookup method of Li Dehuafu frequency converter failures
CN110567740A (en) * 2019-07-31 2019-12-13 邯郸钢铁集团有限责任公司 operation method for searching and rapidly processing high-voltage variable-frequency starting fault according to time sequence
CN110567740B (en) * 2019-07-31 2021-02-26 邯郸钢铁集团有限责任公司 Operation method for searching and rapidly processing high-voltage variable-frequency starting fault according to time sequence
CN113701809A (en) * 2021-08-20 2021-11-26 株洲华梁电气有限公司 IGCT crimping test device
CN113701809B (en) * 2021-08-20 2024-04-09 株洲华梁电气有限公司 IGCT crimping test device

Also Published As

Publication number Publication date
CN106410646B (en) 2018-02-06

Similar Documents

Publication Publication Date Title
CN106410646B (en) A kind of failure for handing over orthogonal high voltage converter quickly judges and processing operating method
CN105717404A (en) Method and device for detecting insulation fault of power battery system
CN102209648B (en) Device and method for limiting the rail potential in a DC railway
CN106992496A (en) Earth leakage protecting method for Feeding System of Urban Rail Transit
CN106274620A (en) A kind of scalable, upset and the compartment of horizontal sliding
CN105425066A (en) Special capacitor ripple current detection main circuit for flexible direct-current power transmission
CN210222122U (en) Ground wire device for circuit insulation test
CN205453283U (en) Incessant UPS power supply unit
CN109586192A (en) A kind of failure of high-voltage large current high-intensity magnetic field frequency converter quickly judges and processing method
KR100984115B1 (en) The syn-controller of a pannel of in a generator in case of emergency
CN206281932U (en) A kind of transforming plant DC ground detection device
CN206117305U (en) A power supply loop for communication power supply
CN106340954A (en) Method for identifying line breaking of power supply line and switching to standby power supply
CN109245291A (en) The maintenance safety measure method for arranging of the double sectional power supply systems of substation's double-bus
CN104638617A (en) Protection device for output end of generator car DC600V rectifier cabinet
CN111458595B (en) On-line monitoring and identifying device for transformer fault induced by oil-submerged pump
CN103163415B (en) Adopt the DC power system insulation monitoring and warning device of eccentric bridge technology
CN209389768U (en) Simple type emergency power supply Quick access device
CN203178394U (en) Direct current source system insulation monitoring device employing eccentric bridge technology
CN111697587A (en) AC/DC power supply device
CN207388882U (en) Pure electric coach high voltage distribution installation
CN207503490U (en) The multi-functional installation wiring training device of electric energy meter, mutual inductor
CN106707083A (en) Substation direct current grounding detecting device
KR100966126B1 (en) The digital controller pannel
CN201541147U (en) Direct current power supply system for substations

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190308

Address after: No. 232, Fuxing Road, Fuxing District, Handan, Hebei Province

Co-patentee after: Handan Handan Iron and Steel Group Fengda Metallurgical Raw Materials Co.,Ltd.

Patentee after: Handan Branch of Hegang Co.,Ltd.

Address before: No. 232, Fuxing Road, Fuxing District, Handan, Hebei Province

Patentee before: Handan Branch of Hegang Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180206