CN106402988A CN201610790351.6A CN201610790351A CN106402988A CN 106402988 A CN106402988 A CN 106402988A CN 201610790351 A CN201610790351 A CN 201610790351A CN 106402988 A CN106402988 A CN 106402988A
Authority
CN
China
Prior art keywords
water
heating
hot
steam
tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610790351.6A
Other languages
Chinese (zh)
Other versions
CN106402988B (en
Inventor
周成军
师新峰
张国军
李卫东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Shenhua Energy Co Ltd
Shenhua Shendong Coal Group Co Ltd
Original Assignee
China Shenhua Energy Co Ltd
Shenhua Shendong Coal Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Shenhua Energy Co Ltd, Shenhua Shendong Coal Group Co Ltd filed Critical China Shenhua Energy Co Ltd
Priority to CN201610790351.6A priority Critical patent/CN106402988B/en
Publication of CN106402988A publication Critical patent/CN106402988A/en
Application granted granted Critical
Publication of CN106402988B publication Critical patent/CN106402988B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D9/00Central heating systems employing combinations of heat transfer fluids covered by two or more of groups F24D1/00 - F24D7/00
    • F24D9/02Hot water and steam systems
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D19/00Details
    • F24D19/10Arrangement or mounting of control or safety devices
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D2220/00Components of central heating installations excluding heat sources
    • F24D2220/04Sensors
    • F24D2220/042Temperature sensors

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Steam Or Hot-Water Central Heating Systems (AREA)

Abstract

The invention discloses a steam heating and water heating system. The steam heating and water heating system comprises a steam boiler, a steam header, a condensate water tank, condensate water pressurizing pumps and a water supplementing tank and further comprises a water heating water tank, a communication pipe, a water heating circulation water pump, a water heating water feeding pipe, a water heating water returning manifold, a first water heating water returning branch pipe and a second water heating water returning branch pipe. The water heating water tank communicates with the bottom of the condensate water tank through the communication pipe. The water heating circulation water pump supplies warm water of the water heating water tank to the water heating place through the water heating water feeding pipe. Cold water obtained after the warm water is used in the water heating place flows into the water heating water returning manifold. The water heating water returning manifold is branched into the first water heating water returning branch pipe and the second water heating water returning branch pipe, the first water heating water returning branch pipe communicates with the water heating water tank, and the second water heating water returning branch pipe communicates with a condensate water returning pipe. By means of the steam heating and water heating system, the condensate water utilization rate can be increased, and serious dead steam waste is avoided.

Description

Steam heating and water-heating system
Technical field
The present invention relates to field of heating, more particularly, to a kind of steam heating and water-heating system.
Background technology
The phenomenon that northern coal mine winter heating is coexisted using steam heating and hot-water heating in a large number.Coal life in northern mine During product, heat supply heating need to be carried out to grass building, mine air intake, worker's bathing etc. using Industrial Boiler.Due to coal Charcoal enterprise surface production building is as larger in the thermic load such as coal preparation plant's heating, mine air intake heating, typically all adopts steam heating, that is, Air heating plant in factory building heating equipment and pit shaft room heats for steam, and the thermic load such as colliery office is put smaller, adopts Use hot-water heating.
As shown in figure 1, existing steam heating and water-heating system include steam boiler 1 ', gas-distributing cylinder 3 ', heat exchanger 5 ', adopt Warm water circulating pump 6 ', condensation water tank 10 ', condensed water force (forcing) pump 12 ' and water supply tank 13 '.The steam of steam boiler 1 ' is through undue vapour Cylinder 3 ', a part of steam directly feeds the steam heating such as industrial premises place 9 ', another steam through heat exchanger 5 ' heating water, There is provided hot-water heating for the hot-water heating such as office building place 7 '.Steam condensation after steam heating place 9 ' uses is condensed water, and condensed water enters Enter in condensation water tank 10 ', and be that water supply tank 13 ' supplies water by condensed water force (forcing) pump 12 ', water supply tank 13 ' is steam boiler 1 ' Supply water.Wherein, condensation water tank 10 ' is provided with exhaust steam evacuated tube 11 '.2 ', 4 ', 8 ' is jet chimney, and 14 ' is condensate ruturn pipe Road (in figure dotted portion all condensate returns pipeline).
Steam, after heat exchange cooling, becomes condensed water.Water in condensing water conduit collects generally gravity stream, for ensureing water Smoothness is led to and steam-water separation, and pipeline need to have certain gradient;For preventing steam from scurrying in backwater, in the water outlet of heating equipment Drain valve, drain valve nor have larger back pressure are installed, so in the case that area of heat-supply service is larger, collecting terminal and boiler The discrepancy in elevation in room is with regard to larger it is difficult to be arranged on collecting water tank in boiler room.Generally, condensed water eventually flows to minimum point Condensing hot air furnace water tank, connects booster station in water tank bottom by pipeline, by force (forcing) pump, condensed water is transmitted back to boiler room, gives Boiler replenishing water.
The traditional conveying hydraulic art of booster pump chamber is:Using automatic water conveying mode, installation height water-level gauge in water tank.? During high water level, water pump automatic, condensed water is transported in boiler room water supply tank;When condensate water level drops to low water level, Water pump is out of service.In traditional water delivery technique, flash-off steam (also referred to as exhaust steam) that condensed water produces after drain valve is arranged to big Gas.
The effect of drain valve is to separate steam, and condensed water can pass through, pressure before by drain valve for the condensed water Pressure with vapour system is identical, by after water tank is flowed to by gravity, pressure is reduced to normal pressure.Because condensed water is by dredging It is high-temperature high pressure water before water valve, flass necessarily occurs after drain valve reduced pressure, produce more flash-off steam, dodge Steam steam to be arranged to air from the evacuated tube on water tank wall.
Traditional water delivery processing disadvantages are more obvious, predominantly:Condensate temperature is high, and pump cavitation phenomenon is more serious;Defeated Send condensed water discontinuous, unbalanced, boiler room water supply tank need to have very big buffer capacity;Exhaust steam wastes serious.
Content of the invention
It is an object of the invention to overcoming the deficiencies in the prior art, providing and a kind of can improve the utilization rate of condensed water, keep away Exempt from exhaust steam and waste serious steam heating and water-heating system.
Technical scheme provides a kind of steam heating and water-heating system, including steam boiler, gas-distributing cylinder, condensed water Case, condensed water force (forcing) pump and water supply tank, are connected by jet chimney between described steam boiler and described gas-distributing cylinder, described point of vapour Cylinder passes through steam heating pipeline and steam is supplied steam heating place, and described steam is condensed into condensation in described steam heating place Enter in described condensation water tank by condensate ruturn pipe after water, the described condensed water in described condensation water tank passes through condensed water Force (forcing) pump is flowed in described water supply tank, and described water supply tank is that described steam boiler supplies water,
Also include hot-water heating water tank, communicating pipe, hot-water heating water circulating pump, hot-water heating feed pipe, hot-water heating return main, hot-water heating backwater One branched pipe and hot-water heating backwater second branched pipe;
Described hot-water heating water tank is connected by described communicating pipe with the bottom of described condensation water tank;
The warm water of described hot-water heating water tank is supplied to hot-water heating place by described hot-water heating feed pipe by described hot-water heating water circulating pump, Cold water after described hot-water heating place uses flows in described hot-water heating return main;
Described hot-water heating return main separates described hot-water heating backwater first branched pipe and described hot-water heating backwater second branched pipe, institute State hot-water heating backwater first branched pipe to connect with described hot-water heating water tank, described hot-water heating backwater second branched pipe and described condensate return Pipe connects.
Further, persevering water level VFC water-level gauge is set in described condensation water tank, and described condensed water force (forcing) pump is Variable frequency pump.
Further, described perseverance water level VFC water-level gauge is arranged on the 1/2-2/3 of described condensation water tank short transverse Position.
Further, it is provided with the first regulating valve, described hot-water heating backwater second branch in described hot-water heating backwater first branched pipe It is provided with the second regulating valve in pipe.
Further, it is provided with locking between described first regulating valve and described second regulating valve, when one of regulating valve During standard-sized sheet, another regulating valve could reduce aperture.
Further, it is provided with cooling-water temperature sensor in described hot-water heating water tank, described steam heating and water-heating system also include room Outer air-temperature sensor, the testing result according to described cooling-water temperature sensor and described outdoor air temperature sensor come adjust described first tune Section valve and described second regulating valve.
Further, in described condensate ruturn pipe with the tie point of described hot-water heating backwater second branched pipe after be provided with mixed Hinge wheel.
Further, the top of described hot-water heating water tank is provided with evacuated tube, the top of described hot-water heating water tank and described condensation water tank Portion passes through to empty communicating pipe connection.
Further, it is provided with spray equipment in described evacuated tube.
Further, partly described condensed water is directly fed described steam boiler by described condensed water force (forcing) pump.
After technique scheme, have the advantages that:
The present invention is connected with condensation water tank due to increased hot-water heating water tank, hot-water heating water tank, and condensed water higher for temperature is supplied The warm place of feedwater, improves the utilization rate of condensed water.Cold-water reflux after hot-water heating place uses has arrived hot-water heating water tank and condensed water In case, for adjusting the water temperature in hot-water heating water tank, and reduce the water temperature in condensation water tank, reduce the product of exhaust steam in condensation water tank Raw.
Brief description
Referring to accompanying drawing, the disclosure will be easier to understand.It should be understood that:These accompanying drawings are merely illustrative Purpose, and be not intended to protection scope of the present invention is construed as limiting.In figure:
Fig. 1 is the structural representation of existing steam heating and water-heating system;
Fig. 2 is the structural representation of steam heating and water-heating system in one embodiment of the invention.
The reference table of comparisons:
1 '-steam boiler, 2 '-jet chimney, 3 '-gas-distributing cylinder
4 '-jet chimney, 5 '-heat exchanger, 6 '-heating circulation pump
7 '-hot-water heating place, 8 '-jet chimney, 9 '-steam heating place
10 '-condensation water tank, 11 '-exhaust steam evacuated tube 12 '-condensed water force (forcing) pump
13 '-water supply tank, 14 '-condensate return pipeline
1- steam boiler 2- jet chimney 3- gas-distributing cylinder
4- steam heating pipeline 5- steam heating place 6- hot-water heating return main
7- hot-water heating place 8- hot-water heating feed pipe 10- communicating pipe
11- hot-water heating water circulating pump 12- hot-water heating water tank 13- condensation water tank
14- emptying communicating pipe 15- condensed water force (forcing) pump 16- evacuated tube
17- condensate ruturn pipe 18- water supply tank 19- mixing impeller
61- hot-water heating backwater the first branched pipe 62- hot-water heating backwater second branched pipe
91- the first regulating valve 92- the second regulating valve
Specific embodiment
To further illustrate the specific embodiment of the present invention below in conjunction with the accompanying drawings.
Easy to understand, technology according to the present invention scheme, under not changing true spirit, the general skill of this area Art personnel can mutually the various structures mode of replacement and implementation.Therefore, detailed description below and accompanying drawing are only Exemplary illustration to technical scheme, and be not to be construed as the whole of the present invention or be considered as to inventive technique scheme Define or limit.
The up, down, left, right, before and after mentioning in this manual or may mention, front, the back side, top, bottom etc. Orientation term is to be defined with respect to the construction shown in each accompanying drawing, and they are relative concepts, it is therefore possible to can root Correspondingly changed according to diverse location residing for it, different use state.So, also should not be by these or others side Position term is construed to restricted term.
As shown in Fig. 2 steam heating and water-heating system, including steam boiler 1, gas-distributing cylinder 3, condensation water tank 13, condensed water Force (forcing) pump 15 and water supply tank 18, are connected by jet chimney 2 between steam boiler 1 and gas-distributing cylinder 3, gas-distributing cylinder 3 is supplied by steam Steam is supplied steam heating place 5 by heating coil road 4, and steam is returned by condensed water after steam heating place 5 is condensed into condensed water Water pipe 17 enters in condensation water tank 13, and the condensed water in condensation water tank 13 is flowed into water supply tank 18 by condensed water force (forcing) pump 15 In, water supply tank 18 supplies water for steam boiler 1, also includes hot-water heating water tank 12, communicating pipe 19, hot-water heating water circulating pump 11, hot-water heating feedwater Pipe 8, hot-water heating return main 6, hot-water heating backwater the first branched pipe 61 and hot-water heating backwater second branched pipe 62;Hot-water heating water tank 12 and condensation The bottom of water tank 13 is by connecting communicating pipe 10;The warm water of hot-water heating water tank 12 is passed through hot-water heating feed pipe 8 by hot-water heating water circulating pump 11 It is supplied to hot-water heating place 7, the cold water after hot-water heating place 7 uses flows in hot-water heating return main 6;Hot-water heating return main 6 separates water Warm backwater the first branched pipe 61 and hot-water heating backwater second branched pipe 62, hot-water heating backwater the first branched pipe 61 is with hot-water heating water tank 12 even Logical, hot-water heating backwater second branched pipe 62 is connected with condensate ruturn pipe 17.
Steam heating in the present invention and water-heating system include steam heating and hot-water heating heating, and wherein steam heating is passed through to steam Boiler furnace 1 produces steam, and steam enters jet chimney 2, enters back into gas-distributing cylinder 3, is flowed into respectively eventually through steam heating pipeline 4 Individual steam heating place 5.Due to coal enterprise's surface production building as the thermic load such as coal preparation plant's heating, mine air intake heating relatively Greatly, typically all adopt steam heating, that is, the air heating plant in factory building heating equipment and pit shaft room heats for steam.
Hot-water heating heating is then that the heat of the condensed water collected using steam heating place 5 is heated for hot-water heating place 7, specifically For:Condensed water is entered in condensation water tank 13 by condensate ruturn pipe 17.Because hot-water heating water tank 12 is passed through with condensation water tank 13 Communicating pipe 10 connects, and by entering into communicating pipe 10 in hot-water heating water tank 12, hot-water heating water tank 12 passes through water to the condensed water of higher temperature Warm water circulating pump 11 pumps into hot water in hot-water heating feed pipe 8, finally flows into each hot-water heating place 7, the thermic load such as colliery office Put smaller and then adopt hot-water heating.
After hot-water heating place 7 has utilized, hot water becomes the backwater of lower temperature, and backwater is flowed out by hot-water heating return main 6, water Warm return main 6 separates Liang Tiao branch, including hot-water heating backwater the first branched pipe 61 and hot-water heating backwater second branched pipe 62.So, A part of backwater has been flowed back in hot-water heating water tank 12 by hot-water heating backwater the first branched pipe 61, because the temperature of condensed water is for hot-water heating Still higher for heating, therefore colder backwater flows in hot-water heating water tank 12, is conducive to adjusting the water temperature in hot-water heating water tank 12; And another part backwater is collected with condensate ruturn pipe 17 by hot-water heating backwater second branched pipe 62, finally flow into condensation water tank 13 In, the colder backwater of this part serves the effect reducing condensed water, prevents or reduce the generation of exhaust steam.
Condensed water flows in water supply tank 18 also by condensed water force (forcing) pump 15, and water supply tank 18 supplies water for steam boiler 1, reaches Collection utilization to condensed water.In Fig. 2, dotted line is condensate ruturn pipe.
In the present invention, hot-water heating heating is not directly to provide from the thermal source of steam boiler 1, but make use of higher temperatures The heat of the condensed water of degree heats for hot-water heating, improves the utilization rate of condensed water.
Meanwhile, in the present invention, because the backwater of lower temperature is back in hot-water heating water tank, regulation hot-water heating water tank can be played Temperature effect.
Further, since condensed water is the direct phase transformation of heating steam, temperature is higher and more fixing, and this required in the winter During the heating of Ji Caiyong condensed water, the temperature of condensed water is adjusted.The backwater of lower temperature is also back in condensation water tank, energy Enough reduce the temperature of condensed water, prevent or reduce the generation of exhaust steam.
In addition, the present invention adopts double water tank to design, communicating pipe between two water tanks, is used to connect in water tank bottom.One water tank is special Door is used for heating, and another water tank is condensation water collection water tank, and heating is formed a relatively independent cyclic system with condensed water System, in order to adjust the temperature that condensate temperature needs to heating.
Generally, each Workplace of plant area adopts steam heating, and office building, apartment etc. are hot-water heating, hot-water heating thermic load It is less than condensed water heating load, cause condensate temperature may be much higher than the supply water temperature of water-heating system.As by frequency conversion Mode reduces the heating water yield, is likely to result in office building each indoor heating inequality it is impossible to reach heating requirement again, so should be by hot-water heating Water tank is isolated with condensation water tank.
Alternatively, condensed water force (forcing) pump 15 has two, the using and the reserved;Hot-water heating water circulating pump 11 also has two, the using and the reserved.
It is preferred that arranging persevering water level VFC water-level gauge in condensation water tank 12, condensed water force (forcing) pump 11 is frequency conversion water Pump.Permanent water level variable mode is taken to send condensed water back to water supply tank 18.
Alternatively, permanent water level VFC water-level gauge is arranged on the position of the 1/2-2/3 of condensation water tank 12 short transverse.
The benefit that the permanent water level of VFC is arranged on condensation water tank 12 middle and upper part is, condensed water force (forcing) pump 15 inflow entrance Bear the pressure of supply water of height of water level in condensation water tank 12, cavitation phenomenons is relatively light even can be avoided completely, and condensed water is pressurizeed The infringement of pump is less.
In the present embodiment, as shown in Fig. 2 being provided with the first regulating valve 91, hot-water heating backwater in hot-water heating backwater the first branched pipe 61 It is provided with the second regulating valve 92 in second branched pipe 62.
It is preferred that being provided with cooling-water temperature sensor in hot-water heating water tank 12, steam heating and water-heating system also include outside air temperature and pass Sensor, the testing result according to cooling-water temperature sensor and outdoor air temperature sensor is adjusting the first regulating valve 91 and the second regulating valve 92.
The flow of hot-water heating water circulating pump 11 is typically constant, and in the winter time because temperature Change is larger, heating supply water temperature is general It is adjusted according to the height of outside air temperature, there are heating water temperature and outside air temperature corresponding relation in heating boiler room under normal circumstances Curve, when outside air temperature is low, heating supply water temperature is high, and when temperature is high, supply water temperature is low, thus ensureing suitable heating room temperature degree.
This is accomplished by being adjusted by the aperture adjusting the first regulating valve 91 and the second regulating valve 92 and enters into hot-water heating water tank 12 and condensation water tank 13 in cold water flow, finally play adjust hot-water heating water tank 12 in temperature effect.
When the temperature that the temperature of hot-water heating water tank 12 gives less than curve leads to heating amount not enough, increase the second regulating valve 92 Valve opening, or reduce the first regulating valve 91 valve opening.Colder backwater flows into condensed water by condensation return pipt 17 The backwater amount of case 13 increases, and flows into the discharge reduction that returns of hot-water heating water tank 12, and high-temperature condensation water just passes through the communicating pipe of two water tanks 10 inflow hot-water heating water tanks 12, the coolant-temperature gage of hot-water heating water tank 12 raises, and heating supply water temperature also accordingly raises.Wherein, due to hot-water heating Water tank 12 constantly supplies water to hot-water heating place 8, and the water temperature in hot-water heating water tank 12 is consistently lower than the water level in condensation water tank 13, therefore cold Solidifying water only can flow into hot-water heating water tank 12 by communicating pipe 10 from condensation water tank 13, and can not possibly reflux.
As reduced heating supply water temperature, then direction of operating is contrary.
It is preferred that being provided with locking between the first regulating valve 91 and the second regulating valve 92, when one of regulating valve standard-sized sheet, Another regulating valve could reduce aperture.
For avoid two valve contract fullys or entirely half-open cause pipeline obstructed or resistance increase, should arrange between two valves Locking, during only one arm valve wide open, another arm valve can reduce aperture.
It is preferred that the first regulating valve 91 and the second regulating valve 92 can be motor regulated valve, it is controlled by boiler room.
Alternatively, also dependent on the shunting to two arms when the heat capacity of hot-water heating heating load and condensed water and valveless Amount (being considered as of substantially equal), only arranges valve on an arm wherein.When being more or less the same as both, the backwater overwhelming majority should mix with Mixing, should install control valve additional on hot-water heating backwater the first branched pipe 61;As heating amount is much smaller than condensed water heating load, should be by valve Door is arranged in hot-water heating backwater second branched pipe 62.
Operation setting can be program controlled mode, be obtained according to sensor (cooling-water temperature sensor and outdoor air temperature sensor) Outside air temperature and temperature, water temperature relation curve, draw hot-water heating tank hot water's temperature requirement value, and with hot-water heating water tank water temperature pair According to automatically adjusting electrically operated valve so that hot-water heating water tank water temperature is identical with required value.
In the present embodiment, as shown in Fig. 2 in condensate ruturn pipe 17 with the tie point of hot-water heating backwater second branched pipe 62 after It is provided with mixing impeller 19.
For strengthening mixed effect in pipeline for the high-low-temperature, in condensate ruturn pipe 17, high-low-temperature mixing point is (cold Solidifying water return pipe 17 and the tie point of hot-water heating backwater second branched pipe 62) install mixing impeller 19 afterwards, under the effect such as waterpower Mixing impeller 19 is driven to rotate, thus high-low-temperature is sufficiently mixed.
In the present embodiment, as shown in Fig. 2 the top of hot-water heating water tank 12 is provided with evacuated tube 16, hot-water heating water tank 12 and condensed water The top of case 13 is passed through emptying and is connected communicating pipe 14.
Because condensation water tank 13 is closed tank, by emptying communicating pipe 14 and evacuated tube 16, exclusion is that may be present few Amount air, such as system operation initial stage;When water temperature is higher, exclude a small amount of exhaust steam;When water temperature is relatively low, limit condensation water surface Contact velocity with air;Condensation water tank 13 internal gas pressure is consistent with atmospheric pressure.
It is preferred that being provided with spray equipment (not shown) in evacuated tube 16.A small part in hot-water heating water tank 12 is introduced spray In device, to reclaim the exhaust steam that decent evacuated tube 16 is escaped.So through supercooling and recovery, the actual escape amount pole of exhaust steam Micro-, negligible.
Alternatively, partial condensation water is directly fed steam boiler 1 by condensed water force (forcing) pump 15.
Because steam heating and water-heating system are totally-enclosed system circulation system, after heat release cooling, water quality is still for condensed water The direct water supply quality requirement of general steam boiler so can be met, the condensed water that can convey condensed water force (forcing) pump 15 is directly to steaming Boiler furnace 1 supplies water.In this way, should convey and connect arm by water pipe, and connect on side motor regulated valve is installed on arm, will Unnecessary water supply sends into water supply tank 18 through arm.
Above-described be only the present invention principle and preferred embodiment.It should be pointed out that the common skill for this area For art personnel, on the basis of the principle of the invention, some other modifications can also be made, also should be regarded as the protection model of the present invention Enclose.

Claims (10)

1. a kind of steam heating and water-heating system, including steam boiler, gas-distributing cylinder, condensation water tank, condensed water force (forcing) pump and moisturizing Case, is connected by jet chimney between described steam boiler and described gas-distributing cylinder, and described gas-distributing cylinder passes through steam heating pipeline will Steam supplies steam heating place, and described steam passes through condensate ruturn pipe after described steam heating place is condensed into condensed water Enter in described condensation water tank, the described condensed water in described condensation water tank is flowed into described moisturizing by condensed water force (forcing) pump In case, described water supply tank be described steam boiler supply water it is characterised in that
Also include hot-water heating water tank, communicating pipe, hot-water heating water circulating pump, hot-water heating feed pipe, hot-water heating return main, first point of hot-water heating backwater Arm and hot-water heating backwater second branched pipe;
Described hot-water heating water tank is connected by described communicating pipe with the bottom of described condensation water tank;
The warm water of described hot-water heating water tank is supplied to hot-water heating place by described hot-water heating feed pipe by described hot-water heating water circulating pump, described Cold water after hot-water heating place uses flows in described hot-water heating return main;
Described hot-water heating return main separates described hot-water heating backwater first branched pipe and described hot-water heating backwater second branched pipe, described water Warm backwater first branched pipe is connected with described hot-water heating water tank, and described hot-water heating backwater second branched pipe is with described condensate ruturn pipe even Logical.
2. steam heating according to claim 1 and water-heating system are it is characterised in that arrange persevering in described condensation water tank Water level VFC water-level gauge, described condensed water force (forcing) pump is variable frequency pump.
3. steam heating according to claim 2 and water-heating system are it is characterised in that described perseverance water level VFC water level Meter is arranged on the position of the 1/2-2/3 of described condensation water tank short transverse.
4. steam heating according to claim 1 and water-heating system are it is characterised in that described hot-water heating backwater first branched pipe In be provided with the first regulating valve, be provided with the second regulating valve in described hot-water heating backwater second branched pipe.
5. steam heating according to claim 4 and water-heating system are it is characterised in that described first regulating valve and described the It is provided with locking, when one of regulating valve standard-sized sheet, another regulating valve could reduce aperture between two regulating valves.
6. steam heating according to claim 4 and water-heating system are it is characterised in that be provided with water temperature in described hot-water heating water tank Sensor, described steam heating and water-heating system also include outdoor air temperature sensor, according to described cooling-water temperature sensor and described room The testing result of outer air-temperature sensor is adjusting described first regulating valve and described second regulating valve.
7. the steam heating according to any one of claim 1-6 and water-heating system are it is characterised in that described condensate return It is provided with mixing impeller after the tie point of hot-water heating backwater second branched pipe described in Guan Zhongyu.
8. the steam heating according to any one of claim 1-6 and water-heating system are it is characterised in that described hot-water heating water tank Top is provided with evacuated tube, and described hot-water heating water tank is connected by emptying with the top of described condensation water tank communicating pipe.
9. steam heating according to claim 8 and water-heating system are it is characterised in that be provided with spray dress in described evacuated tube Put.
10. the steam heating according to any one of claim 1-6 and water-heating system are it is characterised in that described condensed water adds Partly described condensed water is directly fed described steam boiler by press pump.
CN201610790351.6A 2016-08-31 2016-08-31 Steam heating and water-heating system Active CN106402988B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610790351.6A CN106402988B (en) 2016-08-31 2016-08-31 Steam heating and water-heating system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610790351.6A CN106402988B (en) 2016-08-31 2016-08-31 Steam heating and water-heating system

Publications (2)

Publication Number Publication Date
CN106402988A true CN106402988A (en) 2017-02-15
CN106402988B CN106402988B (en) 2019-11-12

Family

ID=58001309

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610790351.6A Active CN106402988B (en) 2016-08-31 2016-08-31 Steam heating and water-heating system

Country Status (1)

Country Link
CN (1) CN106402988B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110594833A (en) * 2019-09-29 2019-12-20 呼伦贝尔驰宏矿业有限公司 System and method for recycling condensate return water heat source

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1065718A (en) * 1992-04-29 1992-10-28 肇东市制油厂 Steam heat supply closed circulation equipment
EP0838632A2 (en) * 1996-10-22 1998-04-29 KULLENDORFF, Anders Method and device for production of steam power
RU2140043C1 (en) * 1998-06-24 1999-10-20 Санкт-Петербургский государственный морской технический университет Heat and water supply system
CN201074871Y (en) * 2007-06-15 2008-06-18 淄博建龙化工有限公司 Device for auxiliary heating using low pressure steam
CN201218558Y (en) * 2008-05-05 2009-04-08 洛阳九暖热力设备科技有限公司 Thermal energy utilization apparatus for cooling circulating water of thermoelectric plant condenser
CN201621682U (en) * 2010-03-29 2010-11-03 大庆石油学院 Assembled steam system energy-saving device
CN102967074A (en) * 2012-11-15 2013-03-13 信天翁微电子能源(大连)有限公司 Steam waste heat recycling device and control method thereof
CN203615317U (en) * 2013-12-25 2014-05-28 大东科技材料(昆山)有限公司 Steam waste heat recovery system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1065718A (en) * 1992-04-29 1992-10-28 肇东市制油厂 Steam heat supply closed circulation equipment
EP0838632A2 (en) * 1996-10-22 1998-04-29 KULLENDORFF, Anders Method and device for production of steam power
RU2140043C1 (en) * 1998-06-24 1999-10-20 Санкт-Петербургский государственный морской технический университет Heat and water supply system
CN201074871Y (en) * 2007-06-15 2008-06-18 淄博建龙化工有限公司 Device for auxiliary heating using low pressure steam
CN201218558Y (en) * 2008-05-05 2009-04-08 洛阳九暖热力设备科技有限公司 Thermal energy utilization apparatus for cooling circulating water of thermoelectric plant condenser
CN201621682U (en) * 2010-03-29 2010-11-03 大庆石油学院 Assembled steam system energy-saving device
CN102967074A (en) * 2012-11-15 2013-03-13 信天翁微电子能源(大连)有限公司 Steam waste heat recycling device and control method thereof
CN203615317U (en) * 2013-12-25 2014-05-28 大东科技材料(昆山)有限公司 Steam waste heat recovery system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110594833A (en) * 2019-09-29 2019-12-20 呼伦贝尔驰宏矿业有限公司 System and method for recycling condensate return water heat source
CN110594833B (en) * 2019-09-29 2024-02-13 呼伦贝尔驰宏矿业有限公司 System and method for recycling condensation backwater heat source

Also Published As

Publication number Publication date
CN106402988B (en) 2019-11-12

Similar Documents

Publication Publication Date Title
CN106440404B (en) A kind of solar water heat pump system
CN103808178B (en) A kind of sub-control phase-change heat exchange system based on hierarchical composition heat exchange and heat-exchange method
CN109654580A (en) Heating system based on low pressure (LP) cylinder optical axis
CN208222561U (en) A kind of heat supply network is hydrophobic with steam air heater UTILIZATION OF VESIDUAL HEAT IN energy conserving system
CN106402988A (en) Steam heating and water heating system
CN108131709A (en) A kind of increasing steam turbine steam exhaust recycling pumps combining heating system with full hydro-thermal
CN104748415A (en) Circular ring pipe auxiliary heating double-liner-type solar-energy air-energy water heater water tank
CN207132324U (en) Steam power plant's condensation water recovery and use system
CN209688959U (en) Heating system based on low pressure (LP) cylinder optical axis
CN208595591U (en) A kind of air source heat pump assists the device of solar heating and offer domestic water
CN207299123U (en) A kind of steam Waste heat heating device
CN206803294U (en) A kind of high back pressure heating system of absorption heat pump in parallel
CN206291511U (en) A kind of novel solar water heating system
CN205619406U (en) A compound heat source system for heating of height district and heating system who constitutes thereof
CN114754400A (en) Combined heat and power generation system and method with absorption heat pump
CN204786723U (en) Flash -off steam heat recovery does not have water tank and prepares hydrothermal device of life in twinkling of an eye
CN208983651U (en) A kind of solar energy heating water system
CN207335169U (en) Vapour-water coke slurry type thermal storage electric boiler
CN207146486U (en) A kind of central water heating system
CN202328511U (en) Atmospheric-pressure type vapor-liquid heat exchanger
CN207980447U (en) The thermal energy step for being air-dried wet salt as medium heating using salt manufacturing condensed water utilizes device
CN205592634U (en) Outdoor box oil pump station of hot water heating
CN212841516U (en) Steam heating condensate water recycling system
CN202521716U (en) House non-cycle concentrated solar instant indirect hot-water system
CN110107332A (en) A kind of low windage mine air-lack takes heat heating well head inlet air stream winterization system and method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant