CN106402928B - Coal gas electricity generation boiler oxygen-enriched combustion system - Google Patents

Coal gas electricity generation boiler oxygen-enriched combustion system Download PDF

Info

Publication number
CN106402928B
CN106402928B CN201610417767.3A CN201610417767A CN106402928B CN 106402928 B CN106402928 B CN 106402928B CN 201610417767 A CN201610417767 A CN 201610417767A CN 106402928 B CN106402928 B CN 106402928B
Authority
CN
China
Prior art keywords
boiler
oxygen
protection
urgency
during shutdown
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610417767.3A
Other languages
Chinese (zh)
Other versions
CN106402928A (en
Inventor
杨正荣
黄晓春
张波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lian Feng Steel (Zhangjiagang) Co., Ltd.
Original Assignee
Jiangsu Yonggang Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Yonggang Group Co Ltd filed Critical Jiangsu Yonggang Group Co Ltd
Priority to CN201610417767.3A priority Critical patent/CN106402928B/en
Publication of CN106402928A publication Critical patent/CN106402928A/en
Application granted granted Critical
Publication of CN106402928B publication Critical patent/CN106402928B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23NREGULATING OR CONTROLLING COMBUSTION
    • F23N1/00Regulating fuel supply
    • F23N1/02Regulating fuel supply conjointly with air supply
    • F23N1/025Regulating fuel supply conjointly with air supply using electrical or electromechanical means
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23NREGULATING OR CONTROLLING COMBUSTION
    • F23N5/00Systems for controlling combustion
    • F23N5/003Systems for controlling combustion using detectors sensitive to combustion gas properties
    • F23N5/006Systems for controlling combustion using detectors sensitive to combustion gas properties the detector being sensitive to oxygen
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/34Indirect CO2mitigation, i.e. by acting on non CO2directly related matters of the process, e.g. pre-heating or heat recovery

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Regulation And Control Of Combustion (AREA)
  • Control Of Steam Boilers And Waste-Gas Boilers (AREA)

Abstract

The invention discloses coal gas electricity generation boiler oxygen-enriched combustion systems,Including boiler urgency protection of boiler during shutdown period system,The oxygen pipeline being connected simultaneously with boiler furnace,Air pipe line,Smoke-exhaust pipeline,Gaspipe line equipped with coal gas fast cut valve,Oxygen conten analyser and air-introduced machine are successively arranged on smoke-exhaust pipeline,Pressure fan and air control valve are disposed on air pipe line,Oxygen regulating valve and oxygen fast cut valve are disposed on oxygen pipeline,The boiler urgency protection of boiler during shutdown period system simultaneously with coal gas fast cut valve,Oxygen fast cut valve,Pressure fan,Air-introduced machine and oxygen conten analyser electrical connection,The oxygen content of boiler exhaust gas in smoke-exhaust pipeline can be sent to boiler urgency protection of boiler during shutdown period system in real time by the oxygen conten analyser,When the oxygen content that boiler urgency protection of boiler during shutdown period system receives to obtain boiler exhaust gas is greater than oxygen content secure setting,Boiler urgency protection of boiler during shutdown period system, which can control, closes oxygen fast cut valve.The advantages of present invention has energy conservation and environmental protection and can improve the boiler furnace thermal efficiency.

Description

Coal gas electricity generation boiler oxygen-enriched combustion system
Technical field
The present invention relates to coal gas electricity generation boilers, and in particular to coal gas electricity generation boiler oxygen-enriched combustion system.
Background technique
In power plant's coal gas electricity generation boiler, used coal gas electricity generation boiler combustion system, including while and boiler at present Air pipe line that burner hearth is connected, smoke-exhaust pipeline, the gaspipe line equipped with coal gas fast cut valve, the folding of coal gas fast cut valve is by boiler Anxious protection of boiler during shutdown period system is controlled, and air-introduced machine is provided on smoke-exhaust pipeline, pressure fan is provided on air pipe line.It is above-mentioned The shortcomings that coal gas electricity generation boiler combustion system is:It, will be as the air of combustion-supporting gas and as fuel in gas fired-boiler work Coal gas be passed through boiler furnace simultaneously and burn, so that boiler is generated steam supply steam turbine generator and use, due to as combustion-supporting Oxygen content in air only accounts for 21%, and nitrogen accounts for 79%, on the one hand, nitrogen is not involved in burning in combustion, nitrogen with The tail gas that boiler combustion generates can take away amount of heat in boiler furnace when boiler being discharged together, reduce boiler furnace thermal effect Rate, and in boiler furnace high-temperature region, nitrogen reacts with oxygen, can generate a large amount of oxynitrides, these nitrogen oxidations are closed The tail gas that object is generated with boiler combustion will pollute environment when boiler being discharged together;While air-introduced machine and pressure fan are in the process of running The nitrogen work done in air is driven, a large amount of electric energy will be wasted, enterprise is improved and produces and uses cost.
Summary of the invention
The object of the present invention is to provide a kind of energy conservation and environmental protection and coal gas electricity generation boiler that the boiler furnace thermal efficiency can be improved it is rich Oxygen combustion system.
To achieve the above object, present invention employs following technical solutions:The coal gas electricity generation boiler oxygen-enriched combusting system System, the oxygen pipeline being connected including boiler urgency protection of boiler during shutdown period system, simultaneously with boiler furnace, smoke-exhaust pipeline, are set air pipe line There is the gaspipe line of coal gas fast cut valve, is disposed with oxygen conten analyser along boiler exhaust gas outgassing direction on smoke-exhaust pipeline And air-introduced machine, it is disposed with pressure fan and air control valve along air inlet direction on air pipe line, in oxygen pipeline On along oxygen airintake direction be disposed with oxygen regulating valve and oxygen fast cut valve, the boiler urgency protection of boiler during shutdown period system is simultaneously It is electrically connected with coal gas fast cut valve, oxygen fast cut valve, pressure fan, air-introduced machine and oxygen conten analyser, the oxygen conten analyser energy The oxygen content of boiler exhaust gas in smoke-exhaust pipeline is sent to boiler urgency protection of boiler during shutdown period system in real time, when boiler urgency protection of boiler during shutdown period system When system receives the oxygen content for obtaining boiler exhaust gas greater than oxygen content secure setting, boiler urgency protection of boiler during shutdown period system can control closing Oxygen fast cut valve.
Further, coal gas electricity generation boiler oxygen-enriched combustion system above-mentioned, wherein:When the described oxygen content secure setting 3~4%.
Further, coal gas electricity generation boiler oxygen-enriched combustion system above-mentioned, wherein:It is provided on air pipe line and boiler The first pressure transmitter of anxious protection of boiler during shutdown period system electrical connection, first pressure transmitter can be in real time by the outlet wind pressure of pressure fan It is sent to boiler urgency protection of boiler during shutdown period system, when the outlet wind pressure that boiler urgency protection of boiler during shutdown period system receives to obtain pressure fan is less than When 2.5KPa, boiler urgency protection of boiler during shutdown period system, which can control, closes oxygen fast cut valve.
Further, coal gas electricity generation boiler oxygen-enriched combustion system above-mentioned, wherein:In oxygen regulating valve and oxygen fast cut valve Between oxygen pipeline on be provided with second pressure transmitter, second pressure transmitter can be in real time by the pipeline pressure of oxygen pipeline Power is sent to boiler urgency protection of boiler during shutdown period system, when the loine pressure that boiler urgency protection of boiler during shutdown period system receives to obtain oxygen pipeline is less than When 0.25MPa, boiler urgency protection of boiler during shutdown period system, which can control, closes oxygen fast cut valve.
Further, coal gas electricity generation boiler oxygen-enriched combustion system above-mentioned, wherein:Oxygen hose after oxygen fast cut valve valve Road is provided with the flowmeter being electrically connected with boiler urgency protection of boiler during shutdown period system, and flowmeter can in real time will be oxygen-enriched on oxygen pipeline Flow is sent to boiler urgency protection of boiler during shutdown period system, when the oxygen-enriched flow that boiler urgency protection of boiler during shutdown period system receives to obtain oxygen pipeline is big In 3500m3When/h, boiler urgency protection of boiler during shutdown period system, which can control, closes oxygen fast cut valve.
Further, coal gas electricity generation boiler oxygen-enriched combustion system above-mentioned, wherein:Oxygen hose before oxygen regulating valve valve Road is provided with self-pressing type regulating valve, and the upstream pressure of self-pressing type regulating valve is not less than 0.7MPa, after the valve of self-pressing type regulating valve Pressure is not less than 0.35MPa.
Further, coal gas electricity generation boiler oxygen-enriched combustion system above-mentioned, wherein:It is adjusted in self-pressing type regulating valve and oxygen Hand stop valve is provided on oxygen pipeline between valve.
Further, coal gas electricity generation boiler oxygen-enriched combustion system above-mentioned, wherein:Oxygen pipeline and oxygen Oxygen venting processed system System is connected.
Through the implementation of the above technical solution, the beneficial effects of the invention are as follows:(1)Extraneous wave should be discharged into originally by being utilized The release oxygen taken, greatly reduces enterprise's production cost;And being mixed with the air after release oxygen has than normal air Burning velocity is faster, the flame temperature that generates is higher and advantage that radianting capacity is stronger, and then substantially increases boiler furnace Fuel is greatly saved in the thermal efficiency, while also greatly reducing the generation of oxynitrides, protects environment;(2)Utilize release oxygen After gas, the usage amount of air is greatly reduced, to reduce air-introduced machine and pressure fan drives nitrogen to do work in the process of running, greatly Electric energy has been saved greatly, enterprise has been reduced and produces and uses cost.
Detailed description of the invention
Fig. 1 is the operation principle schematic diagram of coal gas electricity generation boiler oxygen-enriched combustion system of the present invention.
Specific embodiment
The present invention will be further explained below with reference to the attached drawings and specific examples.
As shown in Figure 1, the coal gas electricity generation boiler oxygen-enriched combustion system, including boiler urgency protection of boiler during shutdown period system 1, simultaneously Oxygen pipeline 3, air pipe line 4, smoke-exhaust pipeline 5, the gaspipe line 7 equipped with coal gas fast cut valve 6 being connected with boiler furnace 2, It is disposed with oxygen conten analyser 8 and air-introduced machine 9 along flue gas outgassing direction on smoke-exhaust pipeline 5, it is suitable on air pipe line 4 Air inlet direction be disposed with pressure fan 10 and air control valve 11, along oxygen airintake direction on oxygen pipeline 3 Be disposed with oxygen regulating valve 12 and oxygen fast cut valve 13, the boiler urgency protection of boiler during shutdown period system 1 simultaneously with coal gas fast cut valve 6, oxygen fast cut valve 13, pressure fan 10, air-introduced machine 9 and oxygen conten analyser 8 are electrically connected, and the oxygen conten analyser 8 can be in real time The oxygen content of boiler exhaust gas in smoke-exhaust pipeline 5 is sent to boiler urgency protection of boiler during shutdown period system 1 by ground, when boiler urgency protection of boiler during shutdown period system When the oxygen content that 1 reception obtains boiler exhaust gas is greater than oxygen content secure setting, boiler urgency protection of boiler during shutdown period system 1 can control closing Oxygen fast cut valve 13 3~4% when the described oxygen content secure setting, can better ensure that pot in the present embodiment in this way The safe and stable operation of furnace;In the present embodiment, it is provided on air pipe line 4 and is electrically connected with boiler urgency protection of boiler during shutdown period system 1 First pressure transmitter 14, the outlet wind pressure of pressure fan 10 can be sent to boiler emergency stop in real time by first pressure transmitter 14 Furnace protects system 1, when boiler urgency protection of boiler during shutdown period system 1 receives the outlet wind pressure for obtaining pressure fan 10 less than 2.5KPa, boiler Anxious protection of boiler during shutdown period system 1, which can control, closes oxygen fast cut valve 13, can better ensure that the safe and stable operation of boiler in this way, mention The operation stability of high boiler;In the present embodiment, on the oxygen pipeline 3 between oxygen regulating valve 12 and oxygen fast cut valve 13 It is provided with second pressure transmitter 15, the loine pressure of oxygen pipeline 3 can be sent to pot in real time by second pressure transmitter 15 Furnace urgency protection of boiler during shutdown period system 1, when boiler urgency protection of boiler during shutdown period system 1 receives the loine pressure for obtaining oxygen pipeline 3 less than 0.25MPa When, boiler urgency protection of boiler during shutdown period system 1, which can control, closes oxygen fast cut valve 13, can further guarantee that the safety of boiler is steady in this way Fixed operation, further improves the operation stability of boiler;In the present embodiment, the oxygen pipeline after 13 valve of oxygen fast cut valve It is provided with the flowmeter 16 being electrically connected with boiler urgency protection of boiler during shutdown period system 1 on 3, flowmeter 16 can in real time will be on oxygen pipeline 3 Oxygen-enriched flow be sent to boiler urgency protection of boiler during shutdown period system 1, when boiler urgency protection of boiler during shutdown period system 1 reception obtain oxygen pipeline 3 Oxygen-enriched flow is greater than 3500m3When/h, boiler urgency protection of boiler during shutdown period system 1, which can control, closes oxygen fast cut valve 13, in this way can be into one Step ground guarantees the safe and stable operation of boiler, further improves the operation stability of boiler;In the present embodiment, in oxygen tune It is provided with self-pressing type regulating valve 17 on oxygen pipeline 3 before section 12 valve of valve, the upstream pressure of self-pressing type regulating valve 17 is not less than The downstream pressure of 0.7MPa, self-pressing type regulating valve 17 are not less than 0.35MPa, can further guarantee that the safety of boiler is steady in this way Fixed operation, further improves the operation stability of boiler;In the present embodiment, in self-pressing type regulating valve 17 and oxygen regulating valve It is provided with hand stop valve 18 on oxygen pipeline 3 between 12, can further guarantee the safe and stable operation of boiler in this way, Further improve the operation stability of boiler;In the present embodiment, oxygen pipeline is connected with oxygen Oxygen venting system 19 processed, The release oxygen that oxygen Oxygen venting system discharge processed can be made full use of in this way, effectively reduces enterprise's production cost;
Working principle of the present invention is as follows:
In use, the purity that oxygen Oxygen venting system 19 processed is discharged is led to up to 99.99% release oxygen through oxygen pipeline 3 Enter boiler furnace 2, while air is passed through boiler furnace 2 through air pipe line 4 using pressure fan 10, and simultaneously by coal gas through coal gas Pipeline 7 is passed through boiler furnace 2, and oxygen, air and coal gas is made to be sufficiently mixed burning in boiler furnace 2, due to introducing release Oxygen, on the one hand, the release oxygen that should be discharged into extraneous waste originally is utilized, greatly reduces enterprise's production cost;And Air after being mixed with release oxygen have than ordinary air combustion speed faster, generate flame temperature is higher and radianting capacity Stronger advantage, and then the thermal efficiency of boiler furnace is substantially increased, fuel is greatly saved, while also greatly reducing nitrogen oxidation The generation for closing object, protects environment;On the other hand, after using release oxygen, the usage amount of air is greatly reduced, to reduce Air-introduced machine 9 and pressure fan 10 drive nitrogen to do work in the process of running, and electric energy is greatly saved, and further reduced enterprise's production Use cost;In boiler running process, oxygen conten analyser 8 can be in real time by the oxygen content of boiler exhaust gas in smoke-exhaust pipeline 5 It is sent to anxious protection of boiler during shutdown period system 1, when boiler urgency protection of boiler during shutdown period system 1 receives the oxygen content for obtaining boiler exhaust gas greater than 4%, Boiler urgency protection of boiler during shutdown period system 1, which can control, closes oxygen fast cut valve 13, while first pressure transmitter 14 will can also be sent in real time The outlet wind pressure of blower 10 is sent to boiler urgency protection of boiler during shutdown period system 1, when the reception of boiler urgency protection of boiler during shutdown period system 1 obtains pressure fan When 10 outlet wind pressure is less than 2.5KPa, boiler urgency protection of boiler during shutdown period system 1, which can control, closes oxygen fast cut valve 13;Second pressure simultaneously The loine pressure of oxygen pipeline 3 also can be sent to boiler urgency protection of boiler during shutdown period system 1 in real time by power transmitter 15, when boiler emergency stop When furnace protection system 1 receives the loine pressure for obtaining oxygen pipeline 3 less than 0.25MPa, boiler urgency protection of boiler during shutdown period system 1 can be controlled Close oxygen fast cut valve 13;The oxygen-enriched flow on oxygen pipeline 3 also can be sent to boiler emergency stop in real time by flowmeter 16 simultaneously Furnace protects system 1, when boiler urgency protection of boiler during shutdown period system 1 receives the oxygen-enriched flow for obtaining oxygen pipeline 3 greater than 3500m3When/h, pot Furnace urgency protection of boiler during shutdown period system 1 can control closing oxygen fast cut valve 13 and further mention to ensure that the safe and stable operation of boiler The high operation stability of boiler.
It is an advantage of the invention that:(1)The release oxygen that should be discharged into extraneous waste originally, annual recoverable is utilized The up to release oxygen of 3978717 m3, the annual recycling value for diffusing oxygen greatly reduce enterprise up to 1,670,000 yuan Production cost;And be mixed with release oxygen after air have than ordinary air combustion speed faster, generate flame temperature Higher and stronger radianting capacity advantage, and then the thermal efficiency of boiler furnace is substantially increased, due to the raising of the thermal efficiency, every year The gas volume that up to 33864187 m3 can be saved, has saved about 3,390,000 yuan of coal gas usage charges, while also greatly reducing nitrogen The generation of oxygen compound, protects environment;(2)After release oxygen, the usage amount of air is greatly reduced, is drawn to reduce Blower and pressure fan drive nitrogen to do work in the process of running, and electric energy is greatly saved, and can save up to 265247.8 degree every year Electricity saves about 16.4 ten thousand yuan of the electricity charge, greatly reduces enterprise and produces and uses cost.

Claims (1)

1. coal gas electricity generation boiler oxygen-enriched combustion system, it is characterised in that:Including boiler urgency protection of boiler during shutdown period system while and Boiler Furnace Oxygen pipeline that thorax is connected, air pipe line, smoke-exhaust pipeline, the gaspipe line equipped with coal gas fast cut valve, it is suitable on smoke-exhaust pipeline Boiler exhaust gas outgassing direction be disposed with oxygen conten analyser and air-introduced machine, along air inlet direction on air pipe line It is disposed with pressure fan and air control valve, is disposed with oxygen regulating valve along oxygen airintake direction on oxygen pipeline And oxygen fast cut valve, the boiler urgency protection of boiler during shutdown period system simultaneously with coal gas fast cut valve, oxygen fast cut valve, pressure fan, air-introduced machine And oxygen conten analyser electrical connection, the oxygen conten analyser can in real time send the oxygen content of boiler exhaust gas in smoke-exhaust pipeline Boiler urgency protection of boiler during shutdown period system is given, when the oxygen content that boiler urgency protection of boiler during shutdown period system receives to obtain boiler exhaust gas is pacified greater than oxygen content When full setting value, boiler urgency protection of boiler during shutdown period system, which can control, closes oxygen fast cut valve, 3 when the described oxygen content secure setting~ 4%, the first pressure transmitter being electrically connected with boiler urgency protection of boiler during shutdown period system, first pressure pick-up are provided on air pipe line The outlet wind pressure of pressure fan can be sent to boiler urgency protection of boiler during shutdown period system in real time by device, when boiler urgency protection of boiler during shutdown period system receives When obtaining the outlet wind pressure of pressure fan less than 2.5KPa, boiler urgency protection of boiler during shutdown period system, which can control, closes oxygen fast cut valve, in oxygen Second pressure transmitter is provided on oxygen pipeline between gas regulating valve and oxygen fast cut valve, second pressure transmitter can be in real time The loine pressure of oxygen pipeline is sent to boiler urgency protection of boiler during shutdown period system by ground, when boiler urgency protection of boiler during shutdown period system receives to obtain oxygen When the loine pressure of air pipe is less than 0.25MPa, boiler urgency protection of boiler during shutdown period system, which can control, closes oxygen fast cut valve, fast in oxygen Be provided with the flowmeter being electrically connected with boiler urgency protection of boiler during shutdown period system on oxygen pipeline after cutting valve valve, flowmeter can in real time by Oxygen-enriched flow on oxygen pipeline is sent to boiler urgency protection of boiler during shutdown period system, when boiler urgency protection of boiler during shutdown period system receives to obtain oxygen The oxygen-enriched flow of pipeline is greater than 3500m3When/h, boiler urgency protection of boiler during shutdown period system, which can control, closes oxygen fast cut valve, in oxygen tune Self-pressing type regulating valve is provided on oxygen pipeline before section valve valve, the upstream pressure of self-pressing type regulating valve is not less than 0.7MPa, from The downstream pressure of pressure type regulating valve is not less than 0.35MPa, on the oxygen pipeline between self-pressing type regulating valve and oxygen regulating valve It is provided with hand stop valve, oxygen pipeline is connected with oxygen Oxygen venting system processed.
CN201610417767.3A 2016-06-15 2016-06-15 Coal gas electricity generation boiler oxygen-enriched combustion system Active CN106402928B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610417767.3A CN106402928B (en) 2016-06-15 2016-06-15 Coal gas electricity generation boiler oxygen-enriched combustion system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610417767.3A CN106402928B (en) 2016-06-15 2016-06-15 Coal gas electricity generation boiler oxygen-enriched combustion system

Publications (2)

Publication Number Publication Date
CN106402928A CN106402928A (en) 2017-02-15
CN106402928B true CN106402928B (en) 2018-11-30

Family

ID=58006546

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610417767.3A Active CN106402928B (en) 2016-06-15 2016-06-15 Coal gas electricity generation boiler oxygen-enriched combustion system

Country Status (1)

Country Link
CN (1) CN106402928B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109681775A (en) * 2019-01-28 2019-04-26 南京科技职业学院 A kind of system and its technique controlling waste gas spreading
CN111219994A (en) * 2019-10-31 2020-06-02 鞍钢股份有限公司 Oxygen-enriched combustion safety protection control method for heating furnace
CN111121872B (en) * 2019-12-27 2022-07-15 液化空气(中国)投资有限公司 Device and method capable of monitoring and adjusting combustion condition in furnace in real time

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006504927A (en) * 2002-10-30 2006-02-09 クレブス アンド シスラー エルピー Boiler improvements with oxygen-enriched combustion for increased efficiency and reduced emissions
CN203112858U (en) * 2013-03-25 2013-08-07 华北电力大学(保定) Bleeding oxygen reutilization device in metallurgical production
CN103953918A (en) * 2014-04-28 2014-07-30 首钢京唐钢铁联合有限责任公司 Oxygen-enriched combustion system and technique for boiler of coal gas and pulverized coal co-combustion power station
CN104694684A (en) * 2015-02-28 2015-06-10 北京首钢自动化信息技术有限公司 Blast furnace oxygen-rich rapid cut-off valve control system and method
CN205174366U (en) * 2015-11-11 2016-04-20 中冶南方工程技术有限公司 System for gas boiler of iron and steel enterprise uses oxygen boosting burning
CN206055675U (en) * 2016-06-15 2017-03-29 江苏永钢集团有限公司 Coal gas electricity generation boiler oxygen-enriched combustion system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006504927A (en) * 2002-10-30 2006-02-09 クレブス アンド シスラー エルピー Boiler improvements with oxygen-enriched combustion for increased efficiency and reduced emissions
CN203112858U (en) * 2013-03-25 2013-08-07 华北电力大学(保定) Bleeding oxygen reutilization device in metallurgical production
CN103953918A (en) * 2014-04-28 2014-07-30 首钢京唐钢铁联合有限责任公司 Oxygen-enriched combustion system and technique for boiler of coal gas and pulverized coal co-combustion power station
CN104694684A (en) * 2015-02-28 2015-06-10 北京首钢自动化信息技术有限公司 Blast furnace oxygen-rich rapid cut-off valve control system and method
CN205174366U (en) * 2015-11-11 2016-04-20 中冶南方工程技术有限公司 System for gas boiler of iron and steel enterprise uses oxygen boosting burning
CN206055675U (en) * 2016-06-15 2017-03-29 江苏永钢集团有限公司 Coal gas electricity generation boiler oxygen-enriched combustion system

Also Published As

Publication number Publication date
CN106402928A (en) 2017-02-15

Similar Documents

Publication Publication Date Title
CN202732012U (en) Ventilation air methane oxidization power generation system
CN106402928B (en) Coal gas electricity generation boiler oxygen-enriched combustion system
CN103868061B (en) Environment-friendly oxygen-enriched combustion method applied to cement kiln and device thereof
CN204165045U (en) Warm flue gas recirculation coal powder burner in one
CN203655468U (en) Low-concentration coal-mine gas comprehensive utilization and emission reduction system
CN105909326B (en) Extraction for heat supply structure and power plant steam unit heating system
CN109252959A (en) Solid oxide fuel cell peculiar to vessel and steam-injected gas turbine combined generating system and method
CN102564146A (en) Heating furnace flue gas waste heat recovery and power generation system
CN103628985A (en) System for heating natural gas by using waste heat of waste heat boiler in gas turbine power plant
CN102563858B (en) Complementary combustion device for low temperature waste heat power generation
CN206055675U (en) Coal gas electricity generation boiler oxygen-enriched combustion system
CN201810401U (en) Gas caloric value allocation device in underground coal deployment combined-cycle power plant system
CN102635932A (en) Gas water heater
CN104976628A (en) Catalytic combustion device
CN202253719U (en) Membrane method oxygen-enrichment combustion-supporting energy saving system
CN101078367A (en) Method for increasing PG 6531 combustion turbine power
CN209761508U (en) System for driving and reducing station power consumption rate of waste incineration power plant by water feeding pump
CN209279149U (en) A kind of heat power plant boiler heating starting device
CN202643715U (en) Gas steam combined cycle power generation process waste heat utilization system
CN202562305U (en) Heating furnace flue gas waste heat recovery and power generation system
CN102562304A (en) Power generator of catalytic combustion gas turbine
CN205977286U (en) Pressure regulating system of natural gas distributing type energy
CN204829834U (en) A utilize device that is arranged in methanol production from coal steam and tail gas
CN205977420U (en) Combustion engine heating control system that admits air
CN203940751U (en) A kind of mineral hot furnace tail gas recycle afterheat generating system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190712

Address after: 215600 Yong village, Nanfeng Town, Zhangjiagang, Jiangsu

Patentee after: Lian Feng Steel (Zhangjiagang) Co., Ltd.

Address before: Nanfeng town Zhangjiagang city Suzhou city Jiangsu province 215628 wing Jiangsu Yonggang Group Co Ltd

Patentee before: Jiangsu Yonggang Group Co., Ltd.