CN106400671A - 索囊结构组合桥 - Google Patents

索囊结构组合桥 Download PDF

Info

Publication number
CN106400671A
CN106400671A CN201611054687.2A CN201611054687A CN106400671A CN 106400671 A CN106400671 A CN 106400671A CN 201611054687 A CN201611054687 A CN 201611054687A CN 106400671 A CN106400671 A CN 106400671A
Authority
CN
China
Prior art keywords
air bag
layer
bridge
control system
rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611054687.2A
Other languages
English (en)
Other versions
CN106400671B (zh
Inventor
陈宇峰
董云
陈亚东
孙华圣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaiyin Institute of Technology
Original Assignee
Huaiyin Institute of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaiyin Institute of Technology filed Critical Huaiyin Institute of Technology
Priority to CN201611054687.2A priority Critical patent/CN106400671B/zh
Publication of CN106400671A publication Critical patent/CN106400671A/zh
Application granted granted Critical
Publication of CN106400671B publication Critical patent/CN106400671B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D12/00Bridges characterised by a combination of structures not covered as a whole by a single one of groups E01D2/00 - E01D11/00
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/16Suspension cables; Cable clamps for suspension cables ; Pre- or post-stressed cables

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本发明公开了索囊结构组合桥,包括锚锭、钢绞线拉索、气囊、充气稳压控制系统、桥面铺装结构层,以及用于固定钢绞线拉索、气囊、桥面铺装结构层成一体的连接结构,两座锚锭分设稳固于桥跨两端,钢绞线拉索两端固定连接锚锭,气囊设于钢绞线拉索上方,桥面铺装结构层铺设于气囊上方,充气稳压控制系统连接气囊。本发明充分利用了高性能纤维织物复合材料制的气囊与钢绞线拉索结合的优良抗拉性能,满足中小桥人群和车辆载荷需求,充气稳压控制系统保证气囊内压力波动较小,提供持续拉应力。本发明结构简单,整体物资用材较少,运输轻便,建设工期大幅缩短,整体造价显著降低。

Description

索囊结构组合桥
技术领域
本发明涉及桥结构领域,具体涉及运用于山区低载荷桥和景区景观桥的索囊结构组合桥。
背景技术
在河流、道路、崖岸上建设用于长期通行的桥结构目前种类较多,但普遍造价高、用材繁多,建设周期较长。尤其在运输不便的山区,建筑材料运输的困难程度尤为突显,更使桥总造价升高,建筑周期拉长。
发明内容
本发明要解决的技术问题是提供一种索囊结构组合桥,材料用量少,建筑周期短,总造价较低,是一种新型结构桥。
本发明通过以下技术方案实现:
索囊结构组合桥,包括锚锭、钢绞线拉索、气囊、充气稳压控制系统、桥面铺装结构层,以及用于固定钢绞线拉索、气囊、桥面铺装结构层成一体的连接结构,两座锚锭分设稳固于桥跨两端,钢绞线拉索两端固定连接锚锭,气囊设于钢绞线拉索上方,桥面铺装结构层铺设于气囊上方,充气稳压控制系统连接气囊。
人群和车辆载荷通过桥面铺装层传递到气囊囊体受压面载荷,在受压载荷作用下囊体会产生径向和纬向拉应力,囊体底部拉索承受全部载荷拉力。采用高性能纤维织物复合材料制成囊体气囊具有较强拉应力,钢绞线拉索具有承受较强拉力性能,索囊结构组合桥充分利用了两者结合的优良抗拉性能。充气稳压控制系统保证囊体内压力波动较小,提供持续拉应力。同时采用高性能纤维织物复合材料制的气囊囊体还具有低渗漏性和高耐候性,满足较长时期的正常使用。
本发明进一步改进方案是,所述气囊囊体由外向内包括耐候层、阻氦层、承力层和热合层,所述耐候层采用tadlar层或镀铝层,阻氦层采用Mylar层,承力层采用有机芳纶纤维层、或聚对苯并二恶唑层、或Kevlar纤维层、或Zylon纤维层、或Nylon纤维层,热合层采用Hytrel层,热合层采用Hytrel层。
本发明更进一步改进方案是,所述充气稳压控制系统包括压力传感器、数据采集卡、计算机、继电器、开关阀和空压机,气囊依次连接压力传感器、数据采集卡、继电器、开关阀,再回接至气囊,计算机连接数据采集卡,空压机连接开关阀。
充气稳压控制系统在工作时,首先由高精度的压力传感器测得气囊内压力并转换成电压信号,USB数据采集卡采集信号后输入计算机,将信号转换为压力数值,并判断是否充气或者保持不变。利用数据采集卡输出电压信号控制功率继电器输出板,继电器控制气动高速开关阀的开闭, 决定是否对气囊进行充气,空气压缩机作为气源与开关阀相连。
本发明更进一步改进方案是,所述空压机通过气动三联件与开关阀连接。
本发明更进一步改进方案是,所述桥面铺装结构层是木质拼装结构、或钢结构、或混凝土结构、或木质钢组合结构。
本发明与现有技术相比,具有以下明显优点:
本发明充分利用了高性能纤维织物复合材料制的气囊与钢绞线拉索结合的优良抗拉性能,满足中小桥人群和车辆载荷需求,充气稳压控制系统保证气囊内压力波动较小,提供持续拉应力。本发明结构简单,整体物资用材较少,运输轻便,建设工期大幅缩短,整体造价显著降低。尤其对于山区而言,解决了材料运输的重要难题。同时索囊结构组合桥造型美观,也可在景区建成景观桥。
附图说明
图1为本发明示意图。
图2为充气稳压控制系统示意图。
具体实施方式
如图1所示,本发明包括锚锭1、钢绞线拉索2、气囊3、充气稳压控制系统4、桥面铺装结构层5,以及用于固定钢绞线拉索、气囊、桥面铺装结构层成一体的连接结构,两座锚锭1分设稳固于桥跨两端,钢绞线拉索2两端固定连接锚锭1,气囊3设于钢绞线拉索2上方,桥面铺装结构层5铺设于气囊3上方,充气稳压控制系统4连接气囊3。所述气囊3囊体由外向内包括耐候层、阻氦层、承力层和热合层,所述耐候层采用tadlar层(或镀铝层),阻氦层采用Mylar层,承力层采用有机芳纶纤维层(或聚对苯并二恶唑层、或Kevlar纤维层、或Zylon纤维层、或Nylon纤维层,热合层采用Hytrel层),热合层采用Hytrel层。
如图2所示,所述充气稳压控制系统4包括压力传感器41、数据采集卡42、计算机43、继电器44、开关阀45和空压机46,气囊3依次连接压力传感器41、数据采集卡42、继电器44、开关阀45,再回接至气囊3,计算机43连接数据采集卡42,空压机46通过气动三联件47与开关阀45连接。充气稳压控制系统在工作时,首先由高精度的压力传感器测得气囊内压力并转换成电压信号,USB数据采集卡采集信号后输入计算机,计算机利用预先编制好的程序将信号转换为压力数值,并判断是否充气或者保持不变。利用数据采集卡输出电压信号控制功率继电器输出板,继电器控制气动高速开关阀的开闭, 决定是否对气囊进行充气,空气压缩机作为气源与开关阀相连。充气稳压控制系统保证气囊内压力波动较小,提供持续拉应力。
所述桥面铺装结构层5可采用木质拼装结构(或钢结构、或混凝土结构、或木质钢组合结构)。

Claims (5)

1.索囊结构组合桥,其特征在于:包括锚锭(1)、钢绞线拉索(2)、气囊(3)、充气稳压控制系统(4)、桥面铺装结构层(5),以及用于固定钢绞线拉索、气囊、桥面铺装结构层成一体的连接结构,两座锚锭(1)分设稳固于桥跨两端,钢绞线拉索(2)两端固定连接锚锭(1),气囊(3)设于钢绞线拉索(2)上方,桥面铺装结构层(5)铺设于气囊(3)上方,充气稳压控制系统(4)连接气囊(3)。
2.根据权利要求1所述的索囊结构组合桥,其特征在于:所述气囊(3)囊体由外向内包括耐候层、阻氦层、承力层和热合层,所述耐候层采用tadlar层或镀铝层,阻氦层采用Mylar层,承力层采用有机芳纶纤维层、或聚对苯并二恶唑层、或Kevlar纤维层、或Zylon纤维层、或Nylon纤维层,热合层采用Hytrel层,热合层采用Hytrel层。
3.根据权利要求1所述的索囊结构组合桥,其特征在于:所述充气稳压控制系统(4)包括压力传感器(41)、数据采集卡(42)、计算机(43)、继电器(44)、开关阀(45)和空压机(46),气囊(3)依次连接压力传感器(41)、数据采集卡(42)、继电器(44)、开关阀(45),再回接至气囊(3),计算机(43)连接数据采集卡(42),空压机(46)连接开关阀(45)。
4.根据权利要求3所述的索囊结构组合桥,其特征在于:所述空压机(46)通过气动三联件(47)与开关阀(45)连接。
5.根据权利要求1所述的索囊结构组合桥,其特征在于:所述桥面铺装结构层(5)是木质拼装结构、或钢结构、或混凝土结构、或木质钢组合结构。
CN201611054687.2A 2016-11-25 2016-11-25 索囊结构组合桥 Active CN106400671B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611054687.2A CN106400671B (zh) 2016-11-25 2016-11-25 索囊结构组合桥

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611054687.2A CN106400671B (zh) 2016-11-25 2016-11-25 索囊结构组合桥

Publications (2)

Publication Number Publication Date
CN106400671A true CN106400671A (zh) 2017-02-15
CN106400671B CN106400671B (zh) 2018-05-29

Family

ID=58081725

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611054687.2A Active CN106400671B (zh) 2016-11-25 2016-11-25 索囊结构组合桥

Country Status (1)

Country Link
CN (1) CN106400671B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110804934A (zh) * 2019-10-15 2020-02-18 中国船舶重工集团应急预警与救援装备股份有限公司 一种用于充气式栈桥的气囊收放装置

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201056668Y (zh) * 2007-04-29 2008-05-07 武汉理工大学 潜浮式倒悬索桥
CN201106150Y (zh) * 2007-10-29 2008-08-27 武汉理工大学 潜浮式索张桥
CN201381471Y (zh) * 2009-01-20 2010-01-13 北京航空航天大学 展开式索-杆-膜组合应急桥
KR200471594Y1 (ko) * 2013-10-15 2014-03-04 주식회사 스틸코리아 자정식 스트레스 리본 교량
CN104120831A (zh) * 2014-08-11 2014-10-29 哈尔滨工业大学 大跨度充气式预应力张弦桁架及其施工方法
CN206204759U (zh) * 2016-11-25 2017-05-31 淮阴工学院 索囊结构组合桥

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201056668Y (zh) * 2007-04-29 2008-05-07 武汉理工大学 潜浮式倒悬索桥
CN201106150Y (zh) * 2007-10-29 2008-08-27 武汉理工大学 潜浮式索张桥
CN201381471Y (zh) * 2009-01-20 2010-01-13 北京航空航天大学 展开式索-杆-膜组合应急桥
KR200471594Y1 (ko) * 2013-10-15 2014-03-04 주식회사 스틸코리아 자정식 스트레스 리본 교량
CN104120831A (zh) * 2014-08-11 2014-10-29 哈尔滨工业大学 大跨度充气式预应力张弦桁架及其施工方法
CN206204759U (zh) * 2016-11-25 2017-05-31 淮阴工学院 索囊结构组合桥

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110804934A (zh) * 2019-10-15 2020-02-18 中国船舶重工集团应急预警与救援装备股份有限公司 一种用于充气式栈桥的气囊收放装置
CN110804934B (zh) * 2019-10-15 2021-04-20 中国船舶重工集团应急预警与救援装备股份有限公司 一种用于充气式栈桥的气囊收放装置

Also Published As

Publication number Publication date
CN106400671B (zh) 2018-05-29

Similar Documents

Publication Publication Date Title
CN103088750B (zh) 单叶双曲面空间索网主缆的特大跨径悬索桥及其建造方法
CN107394678B (zh) 一种伸缩臂封网跨越架
CN200996127Y (zh) 斜拉拱组合桥
CN108239915B (zh) 超高性能混凝土上承式箱形拱桥节段预制安装方法
CN106958189B (zh) 一种适用于超大跨径的斜拉式吊桥结构
CN103306219A (zh) 一种快速修复加固震后受损桥墩的方法
CN201172597Y (zh) 大跨重载缆索吊机
CN103821075B (zh) 大跨径斜拉装配式公路钢桥
CN105274941A (zh) 一种部分地锚斜拉悬索协作体系桥梁总体施工方法
CN204781326U (zh) 一种新型预应力工业料场罩棚结构
CN203080400U (zh) 一种单叶双曲面空间索网主缆的特大跨径悬索桥
CN106400671A (zh) 索囊结构组合桥
CN105220616A (zh) 一种用于斜拉—悬索协作桥的索网减振体系
CN206204759U (zh) 索囊结构组合桥
CN103236656A (zh) 一种立柱悬索式跨越架及其作业方法
CN103321150A (zh) 应用于纤维增强复合材料筋拉索的可调预紧力摩擦式锚具
CN102182251A (zh) 多重弦支结构的下弦节点紧固装置及其紧固张拉方法
CN103015320B (zh) 一种用于千米级斜拉桥的斜拉索装置及其安装方法
CN101831953A (zh) 一种带有中心拉环的肋环型刚性索穹顶结构
CN109082996A (zh) 用于桥梁施工的斜拉扣挂结构
CN101812886A (zh) 一种肋环型刚性索穹顶结构
CN201193372Y (zh) 一种葵花型索穹顶结构
CN106968160A (zh) 一种钢桁梁与混凝土梁混合的短边跨斜拉桥结构
CN205024700U (zh) 一种改进型的柔性被动防护网
CN101672002A (zh) 组合型特大桥

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: 223200 Jiangsu province Huaian Huaian District bamboo Lane Street Huaiyin Institute of Technology Xiao Hu Campus

Patentee after: Huaijin Polytechnical College

Address before: 223005 Huaian 1 Jiangsu Higher Education Park

Patentee before: Huaijin Polytechnical College

CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 223400 8th floor, Anton building, 10 Haian Road, Lianshui County, Jiangsu.

Patentee after: Huaijin Polytechnical College

Address before: 223200 Jiangsu province Huaian Huaian District bamboo Lane Street Huaiyin Institute of Technology Xiao Hu Campus

Patentee before: Huaijin Polytechnical College

CP02 Change in the address of a patent holder