CN106400646A - Temporary pavement splicing block and steel plate type box pavement - Google Patents

Temporary pavement splicing block and steel plate type box pavement Download PDF

Info

Publication number
CN106400646A
CN106400646A CN201611070975.7A CN201611070975A CN106400646A CN 106400646 A CN106400646 A CN 106400646A CN 201611070975 A CN201611070975 A CN 201611070975A CN 106400646 A CN106400646 A CN 106400646A
Authority
CN
China
Prior art keywords
splicing block
temporary
frame
temporary pavement
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611070975.7A
Other languages
Chinese (zh)
Inventor
张强
李聪
李凤君
袁志强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BUCG NO 16 CONSTRUCTION ENGINEERING Co Ltd
Original Assignee
BUCG NO 16 CONSTRUCTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BUCG NO 16 CONSTRUCTION ENGINEERING Co Ltd filed Critical BUCG NO 16 CONSTRUCTION ENGINEERING Co Ltd
Priority to CN201611070975.7A priority Critical patent/CN106400646A/en
Publication of CN106400646A publication Critical patent/CN106400646A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C9/00Special pavings; Pavings for special parts of roads or airfields
    • E01C9/08Temporary pavings
    • E01C9/083Temporary pavings made of metal, e.g. plates, network

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention relates to the field of building construction, in particular to a temporary pavement splicing block and a steel plate type box pavement. The temporary pavement splicing block comprises a bottom plate, a top plate, keels and a surrounding rack, wherein the keels are arranged in the middle of the surrounding rack, the top plate is arranged on one side of the surrounding rack and fixedly connected with the surrounding rack and the keels, and the bottom plate is arranged on the other side of the surrounding rack and fixedly connected with the surrounding rack and the keels. Connecting structures are arranged at the two opposite ends of the surrounding rack and used for connecting multiple temporary pavement splicing blocks. The temporary pavement comprises the multiple temporary pavement splicing blocks, and the adjacent temporary pavement splicing blocks are connected by the connecting structures to form the temporary pavement. By means of the temporary pavement splicing block and the steel plate type box pavement, the temporary pavement can be repeatedly used, and resource waste is reduced; transportation is convenient, and the cost, manpower and time are saved; environmental protection is facilitated; the traffic expense is reduced, and the absorption cost is avoided; the maneuverability is high; the flatness of the pavement can be guaranteed for a long term; and pre-installation procedures are simple, and the cost is low.

Description

Temporary pavement splicing block and steel plate type box road surface
Technical field
The present invention relates to the realm of building construction, especially relate to a kind of temporary pavement splicing block and steel plate type box road surface.
Background technology
At present, job site in all parts of the country overwhelming majority temporary road, place ground are all laid using concrete, wait to tie When structure completion carries out fitting up, afforests the stage, need again to abolish.
Using the current programme of concrete laying road and place, there is following defect:
(1) the employing concrete laying that each engineering is gone round and begun again, causes the serious wasting of resources;
(2) road laid, the not reproducible use in place ground, and need to consume and manually abolish, occur secondary labour cost, Machinery cost;
(3) the extra labour cost of inevitable increase, fee of material, machinery cost, traffic expense etc., clear building waste, also increase Add Transport Desk student contributions pooled to pay for class activities, transported the place of regulation, also needed to pay the expense of dissolving, increase project cost;
(4) abolishing the materials such as the concrete behind road surface does not only have purposes, has become building waste on the contrary, causes resource wave Take, be unfavorable for environmental protection;
(5) inevitably dissolve expense;
(6), during engineering is carried out, such as need to change site layout project planning, be unfavorable for changing in time or increase extra cost;
(7) engineering of engineering time span length, is unfavorable for ensureing later stage road surface, the flatness on place ground.
Disadvantages described above, increased cost, and is unfavorable for environmental protection, and each job site national adopts this scheme, week and Renew adopts, and the cost causing wastes and the wasting of resources is huge.
Content of the invention
It is an object of the invention to provide a kind of temporary pavement splicing block and steel plate type box road surface, to solve prior art Present in technical problem.
The temporary pavement splicing block that the present invention provides, including base plate, top board, Os Draconis with enclose frame;
Described Os Draconis enclose in the middle of frame described in being arranged on;
Described top board encloses frame side described in being arranged on, and encloses frame and described Os Draconis are fixedly connected with described;
Described base plate encloses the opposite side of frame described in being arranged on, and encloses frame and described Os Draconis are fixedly connected with described;
The described relative two ends of frame of enclosing are provided with attachment structure, for polylith temporary pavement splicing block links together.
Further, described attachment structure includes steady pin and pin-and-hole;
Described steady pin encloses one end of frame described in being arranged on;
Described pin-and-hole encloses the other end of frame described in being arranged on;
Described steady pin and described pin-and-hole tight fit, enable to described steady pin and adjacent temporary pavement splicing block Described pin-and-hole is fixedly connected.
Further, described attachment structure includes fixing bolt and screwed hole;
Described fixing bolt encloses one end of frame described in being arranged on;
Described screwed hole encloses the other end of frame described in being arranged on;
Described fixing bolt and described screwed hole are threaded, enable to described fixing bolt and adjacent temporary pavement The described screwed hole of splicing block is fixedly connected.
Further, described top board is provided with lifting hole(eyelet).
Further, it is provided with suspension ring in described lifting hole(eyelet).
Further, described suspension ring are several fonts;
The two ends of described suspension ring are arranged between described base plate and described top board;
The middle part of described suspension ring is arranged on outside described top board.
Further, described Os Draconis are the many channel-section steels that be arranged in parallel.
Further, described enclosing is provided with the opposite sides of attachment structure and is additionally provided with connecting hole on frame;
Described connecting hole is screwed hole.
Present invention also offers a kind of steel plate type box road surface, it includes the above-mentioned temporary road splicing block of polylith;
Adjacent described temporary road splicing block is connected as a temporary road by described attachment structure.
Further, the size model of described temporary road splicing block is multiple;
The described temporary road splicing block parallel connection of different size model;
Or,
The described temporary road splicing block of different size model replaces connection.
Temporary pavement splicing block and steel plate type box road surface that the present invention provides, by by base plate, top board, Os Draconis with enclose frame The temporary pavement splicing block of the uniform sizes constituting constitutes a temporary road, enables to temporary pavement and can repeat turnover Use, decrease the wasting of resources;Convenient transport, cost-saving, less manpower, save time;Beneficial to environmental protection;Reduce traffic expense, avoid Dissolve expense;Mobility strong;The flatness on road surface can be ensured for a long time;Operation before installation is simple, and cost is few.
Brief description
In order to be illustrated more clearly that the specific embodiment of the invention or technical scheme of the prior art, below will be to concrete In embodiment or description of the prior art the accompanying drawing of required use be briefly described it should be apparent that, below describe in Accompanying drawing is some embodiments of the present invention, for those of ordinary skill in the art, before not paying creative work Put, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is the structural representation of temporary pavement splicing block provided in an embodiment of the present invention;
Fig. 2 is the position view of the lifting hole(eyelet) of temporary pavement splicing block provided in an embodiment of the present invention;
Fig. 3 is the structural representation of the suspension ring of temporary pavement splicing block provided in an embodiment of the present invention;
Fig. 4 is the structural representation of temporary road provided in an embodiment of the present invention;
Fig. 5 is another kind of structural representation of temporary road provided in an embodiment of the present invention;
Fig. 6 is another structural representation of temporary road provided in an embodiment of the present invention.
Reference:
1:Top board;2:Enclose frame;3:Steady pin;4:Connecting hole;5:Pin-and-hole;6:Lifting hole(eyelet);7:Suspension ring;8:First splicing block;9: Second splicing block;10:Connector.
Specific embodiment
Below in conjunction with accompanying drawing, technical scheme is clearly and completely described with the enforcement it is clear that described Example is a part of embodiment of the present invention, rather than whole embodiments.Based on the embodiment in the present invention, ordinary skill The every other embodiment that personnel are obtained under the premise of not making creative work, broadly falls into the scope of protection of the invention.
In describing the invention, it should be noted that term " " center ", " on ", D score, "left", "right", " vertical ", The orientation of instruction such as " level ", " interior ", " outward " or position relationship are based on orientation shown in the drawings or position relationship, merely to Be easy to describe the present invention and simplify description, rather than instruction or the hint device of indication or element must have specific orientation, With specific azimuth configuration and operation, therefore it is not considered as limiting the invention.
Additionally, term " first ", " second ", " the 3rd " are only used for describing purpose, and it is not intended that instruction or hint phase To importance.
In describing the invention, it should be noted that unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected, or is integrally connected;Can To be to be mechanically connected or electrical connection;Can be to be joined directly together it is also possible to be indirectly connected to by intermediary, Ke Yishi The connection of two element internals.For the ordinary skill in the art, above-mentioned term can be understood at this with concrete condition Concrete meaning in invention.
As illustrated in the accompanying drawings from 1 to 3, the invention provides a kind of temporary pavement splicing block, it include base plate, top board 1, Os Draconis and Enclose frame 2;
Described Os Draconis enclose in the middle of frame 2 described in being arranged on;
Described top board 1 encloses frame 2 side described in being arranged on, and encloses frame 2 and described Os Draconis are fixedly connected with described;
Described base plate encloses the opposite side of frame 2 described in being arranged on, and encloses frame 2 and described Os Draconis are fixedly connected with described;
The described relative two ends of frame 2 of enclosing are provided with attachment structure, for polylith temporary pavement splicing block links together.
In the present embodiment, temporary pavement splicing block by base plate, top board 1, Os Draconis and encloses frame 2 and forms, and encloses frame 2 side of being set to Shape, is fixedly installed Os Draconis in it, the upper and lower ends of Os Draconis are respectively arranged with base plate and top board 1, and top board 1 and base plate all with Enclose frame 2 to be fixedly connected, enclose frame 2, Os Draconis, base plate and the top board 1 that make constitute an entirety.
In the present embodiment, the annexation enclosed between frame 2, Os Draconis, top board 1 and base plate is welding, so ensure that The intensity of temporary pavement splicing block.
It is pointed out that in the present embodiment, enclosing the annexation between frame 2, Os Draconis, top board 1 and base plate is welding, But it is not limited solely to weld, and it can also be other connected modes, can be such as threaded grade that is to say, that its As long as can link together enclosing frame 2, Os Draconis, top board 1 and base plate.
In the present embodiment, it is provided with attachment structure on enclosing frame 2, and attachment structure has been arranged on and has enclosed relatively the two of frame 2 Side, enables to polylith temporary pavement splicing block and is spliced.
It is pointed out that in the present embodiment, top board 1 and base plate are whole sheet material, but it is not just for whole sheet material Set-up mode, its can also be the sheet material of polylith smaller piece completely spread after formed top board 1 or base plate.
It is preferred embodiment that described attachment structure includes steady pin 3 and pin-and-hole 5;
Described steady pin 3 encloses one end of frame 2 described in being arranged on;
Described pin-and-hole 5 encloses the other end of frame 2 described in being arranged on;
Described steady pin 3 and described pin-and-hole 5 tight fit, enable to described steady pin 3 and the splicing of adjacent temporary pavement The described pin-and-hole 5 of block is fixedly connected.
In the present embodiment, attachment structure is steady pin 3 and pin-and-hole 5 forms, and steady pin 3 is fixedly installed on and encloses the one of frame 2 End, pin-and-hole 5 is arranged on the other end enclosing frame 2, steady pin 3 and pin-and-hole 5 tight fit.
In the present embodiment, steady pin 3 is cylinder, and pin-and-hole 5 is circular port.
It is pointed out that the shape of steady pin 3 can also be other shapes, can be such as square, then now pin-and-hole 5 Shape be also required to as square.
It is preferred embodiment that described attachment structure includes fixing bolt and screwed hole;
Described fixing bolt encloses one end of frame 2 described in being arranged on;
Described screwed hole encloses the other end of frame 2 described in being arranged on;
Described fixing bolt and described screwed hole are threaded, enable to described fixing bolt and adjacent temporary pavement The described screwed hole of splicing block is fixedly connected.
In the present embodiment, attachment structure is to be arranged on the fixing bolt enclosing frame 2 one end, and is arranged on and encloses frame 2 other end Screwed hole, fixing bolt and screwed hole can carry out screw thread cooperation.
In the previous embodiments, steady pin 3 and to enclose the fixing mode of frame 2 be welding, in the present embodiment, steady pin 3 with enclose The height fashion of frame 2 is threaded, but it is not limited solely to weld and threaded, and it can also be other connection sides Formula, as long as it can also be wholely set that is to say, that steady pin 3 can be fixedly installed on encloses on frame 2.
It is preferred embodiment to be provided with lifting hole(eyelet) 5 on described top board 1.
In the present embodiment, top board 1 is provided with lifting hole(eyelet) 5, can be using crane by temporary pavement splicing block by lifting hole(eyelet) 5 Sling.
It is preferred embodiment to be provided with suspension ring 6 in described lifting hole(eyelet) 5.
For the ease of the lifting to temporary pavement splicing block, in the present embodiment, in lifting hole(eyelet) 5, it is provided with suspension ring 6.
When using, it is more convenient for being lifted by crane suspension ring 6 by crane.
It is preferred embodiment that described suspension ring 6 are several fonts;
The two ends of described suspension ring 6 are arranged between described base plate and described top board 1;
The middle part of described suspension ring 6 is arranged on outside described top board 1.
In the present embodiment, suspension ring 6 are several fonts, and its two ends is arranged between base plate and top board 1;The middle part of suspension ring 6 sets Put outside top board 1.
In the present embodiment, such set-up mode, enables to suspension ring 6 and is stretched in lifting hole(eyelet) 5, ensure that When needing to sling, can be lifted by crane using lifting hole(eyelet) 5.When being spliced into road using temporary pavement splicing block, suspension ring 6 can enter Enter in lifting hole(eyelet) 5, the pedestrian in suspension ring 6 road pavement will not be made to produce and hinder.
It is preferred embodiment that described Os Draconis are the many channel-section steels that be arranged in parallel.
In the present embodiment, Os Draconis are the many channel-section steels be arrangeding in parallel.
The channel-section steel be arrangeding in parallel can be horizontally-parallel setting, if also parallel longitudinal setting, can also be and be set to well Word structure, is the many channel-section steels be arrangeding in parallel in length and breadth.
In the present embodiment, enclose and the opposite sides of attachment structure is provided with frame 2 is additionally provided with connecting hole 4, that is, arrange solid The side of the side of rationed marketing 3 and setting pin-and-hole 5 is provided with connecting hole 4.
In the present embodiment, connecting hole 4 is screwed hole.
By the setting of steady pin and pin-and-hole, polylith temporary pavement splicing block can be carried out lateral connection, by connecting Polylith temporary pavement splicing block can be carried out longitudinally connected by hole 4 and connector 10, and then road surface is lengthened and widens, Being more widely applied of the temporary pavement that can make.
Present invention also offers a kind of steel plate type box road surface, as Figure 4-Figure 6, it includes the above-mentioned temporary road of polylith Splicing block;
Adjacent described temporary road splicing block is connected as a temporary road by described attachment structure.
It is preferred embodiment that the size model of described temporary road splicing block is multiple.
It is preferred embodiment, the described temporary road splicing block parallel connection of different size model.
As shown in figure 4, a row is the first splicing block 8, another row is the second different splicing block 9 of model, the first splicing block 8 It is respectively set to after two rows with the second splicing block 9, then the first splicing block 8 and the second splicing block 9 are connected to by attachment structure Together.
Another set-up mode in the present embodiment is as shown in figure 5, the described temporary road splicing block of different size model Alternately connect.
I.e. the first splicing block 8 and the second splicing block 9 alternately connect setting.
In the present embodiment, as shown in fig. 6, the first splicing block 8 is connected as a row, the second splicing block 9 by connector 10 One row is connected as by connector, afterwards the first splicing block 8 and the second splicing block 9 is passed through steady pin 3 and the cooperation of pin-and-hole 5 connects It is connected together.
From the above, it is seen that the technical security requirement of the present invention is as follows:
1st, project under construction should customize the design of steel plate type box road bed first to live perfecting program, including The length on road surface, width and position etc., reserve the position of the facilities such as good bottom water pipe, cable.
2nd, project under construction should carry out basis according to scheme and related request, and plain soil padding is not less than 300mm thickness, must not use Mud, fertile soil, cultivated plant soil etc., basis need to roll compacting, compactness >=93% by different level, and this key dimension should be slightly bigger than steel plate The size of formula roadbed, reinforcement measure need to be carried out in basic both sides.
3rd, project under construction should be basic levelling, and screed-coat error is within ± 2mm.
4th, project under construction should be in both sides of the road setting gutter, and on gutter, eaves should be slightly below roadbed bottom surface.Gutter is horizontal Wear road, roadbed standard knot seam crossing need to be avoided.
5th, technical staff set up, remove in roadbed, using before All Jobs personnel must be carried out on-the-job and technical training with Safety education, and assign safe practice and tell somebody what one's real intentions are.All Jobs personnel must take appointment with certificate, must not operation after drinking.
It is necessary to by professional signal department rope staffing lifting operation when the 6, installing.In installation process, absolute altitude need to be carried out at any time Detection.
7th, any position of roadbed must not arbitrarily be removed, changes, is welded with, be cut, and such as need to change, must be through design side's technology Personnel allow rear operable.
8th, roadbed is only used as personnel, vehicle passes through road occupation, must not use it for anything else.Electrogas welding operation, work with torches should Away from steel plate type box roadbed.
9th, forbid to store material on roadbed.
10th, project under construction answers periodic cleaning roadbed, in time the debris such as the rain on cleaning roadbed, snow.
From the above, it is seen that advantages of the present invention is as follows:
1st, repeat and be used in turn, reduce the wasting of resources
In the present invention, standard plate is welded using steel processing, should not damage, can life-time service.Project under construction can be using rent The mode such as rent, buy uses, and road deck uses after finishing, and can do simply dirty clearly, repairing or not repair and can come into operation again. Compared with existing concrete road surface, the wasting of resources can be greatly reduced, increase operation rate.
2nd, convenient transport, cost-saving, less manpower, save time
Because the present invention is welded into standard plate using steel, convenient transport, and entirety adopts combination type to connect, and installs and tears open Utilize live existing tower crane or truck crane when unloading, only need 2-4 operative's assembling, dismantle.Compared with existing concrete road surface, Cost-saving, less manpower, save time, turn avoid simultaneously and abolish road surface secondary labour cost, machinery cost, fee of material etc. occur.
3rd, it is beneficial to environmental protection
Because the present invention is using sizing steel box road surface, reusable, it is no pollution.Compared with existing concrete road surface, The operation abolishing road surface can be saved, it is to avoid substantial amounts of concrete waste material becomes building waste.
4th, reduce traffic expense, avoid the expense of dissolving
Because the present invention is using sizing steel box road surface, compared with existing concrete road surface, the operation abolishing road surface can be saved, subtract Lack traffic expense, it is to avoid the expense of dissolving of building waste.
5th, mobility strong
Project under construction, as in engineering progress, needs to change site layout project planned in advance, road surface can dismantle at any time, become More, shift, or even change invention, can immediately use after installation.Compared with existing concrete road surface, save the work abolished, again pour into a mould Sequence.
6th, the flatness on road surface can be ensured for a long time
Because adopting steel box road surface in the present invention, design is invented, be ensure that with material road surface is integrally difficult to be etched, destroys Deng, can life-time service, or even be used in turn for many years.Significantly surmount compared with the effect on existing concrete road surface, be difficult to be etched, Destroy, deform etc., not having the phenomenons such as hole, water.
7th, the operation before installing is simple, and cost is few
Because of the design form on box road surface in the present invention, it is not required to roadbed is done complex process, only need wanting in by specification Ask it is ensured that consolidation, levelling.
8th, suspension ring 6 are arranged rationally, are easy to lift by crane, facilitate car, do not affect overall attractive in appearance
Because of the suspension ring 6 in the present invention, using telescopic setting.During lifting plate, suspension ring 6 are sling, hang up hoist lifting hook; The not used time, only need to extract hoist lifting hook, suspension ring 6 fall naturally, have both facilitated construction, make suspension ring 6 and evenness of road surface, without prejudice to again Cross car and and entirety aesthetic.
Temporary pavement splicing block and steel plate type box road surface that the present invention provides, by by base plate, top board 1, Os Draconis with enclose The temporary pavement splicing block of the uniform sizes that frame 2 is constituted constitutes a temporary road, and enabling to temporary pavement can repeat It is used in turn, decrease the wasting of resources;Convenient transport, cost-saving, less manpower, save time;Beneficial to environmental protection;Reduce traffic expense, keep away Exempt from the expense of dissolving;Mobility strong;The flatness on road surface can be ensured for a long time;Operation before installation is simple, and cost is few.
Finally it should be noted that:Various embodiments above only in order to technical scheme to be described, is not intended to limit;To the greatest extent Pipe has been described in detail to the present invention with reference to foregoing embodiments, it will be understood by those within the art that:Its according to So the technical scheme described in foregoing embodiments can be modified, or wherein some or all of technical characteristic is entered Row equivalent;And these modifications or replacement, do not make the essence of appropriate technical solution depart from various embodiments of the present invention technology The scope of scheme.

Claims (10)

1. a kind of temporary pavement splicing block is it is characterised in that including base plate, top board, Os Draconis and enclosing frame;
Described Os Draconis enclose in the middle of frame described in being arranged on;
Described top board encloses frame side described in being arranged on, and encloses frame and described Os Draconis are fixedly connected with described;
Described base plate encloses the opposite side of frame described in being arranged on, and encloses frame and described Os Draconis are fixedly connected with described;
The described relative two ends of frame of enclosing are provided with attachment structure, for polylith temporary pavement splicing block links together.
2. temporary pavement splicing block according to claim 1 is it is characterised in that described attachment structure includes steady pin and pin Hole;
Described steady pin encloses one end of frame described in being arranged on;
Described pin-and-hole encloses the other end of frame described in being arranged on;
Described steady pin and described pin-and-hole tight fit, enable to the described of described steady pin and adjacent temporary pavement splicing block Pin-and-hole is fixedly connected.
3. temporary pavement splicing block according to claim 1 it is characterised in that described attachment structure include fixing bolt and Screwed hole;
Described fixing bolt encloses one end of frame described in being arranged on;
Described screwed hole encloses the other end of frame described in being arranged on;
Described fixing bolt and described screwed hole are threaded, enable to described fixing bolt and the splicing of adjacent temporary pavement The described screwed hole of block is fixedly connected.
4. temporary pavement splicing block according to claim 1 is it is characterised in that be provided with lifting hole(eyelet) on described top board.
5. temporary pavement splicing block according to claim 4 is it is characterised in that be provided with suspension ring in described lifting hole(eyelet).
6. temporary pavement splicing block according to claim 5 is it is characterised in that described suspension ring are several fonts;
The two ends of described suspension ring are arranged between described base plate and described top board;
The middle part of described suspension ring is arranged on outside described top board.
7. temporary pavement splicing block according to claim 1 is it is characterised in that described Os Draconis are the many grooves that be arranged in parallel Steel.
8. temporary pavement splicing block according to claim 1 is it is characterised in that described enclosing is provided with attachment structure on frame Opposite sides is additionally provided with connecting hole;
Described connecting hole is screwed hole.
9. a kind of steel plate type box road surface is it is characterised in that the temporary road including described in polylith any one of claim 1-7 is spelled Connect block;
Adjacent described temporary road splicing block is connected as a temporary road by described attachment structure.
10. steel plate type box road surface according to claim 9 is it is characterised in that the size of described temporary road splicing block Model is multiple;
The described temporary road splicing block parallel connection of different size model;
Or, the described temporary road splicing block of different size model replaces connecting.
CN201611070975.7A 2016-11-28 2016-11-28 Temporary pavement splicing block and steel plate type box pavement Pending CN106400646A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611070975.7A CN106400646A (en) 2016-11-28 2016-11-28 Temporary pavement splicing block and steel plate type box pavement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611070975.7A CN106400646A (en) 2016-11-28 2016-11-28 Temporary pavement splicing block and steel plate type box pavement

Publications (1)

Publication Number Publication Date
CN106400646A true CN106400646A (en) 2017-02-15

Family

ID=58082387

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611070975.7A Pending CN106400646A (en) 2016-11-28 2016-11-28 Temporary pavement splicing block and steel plate type box pavement

Country Status (1)

Country Link
CN (1) CN106400646A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106884366A (en) * 2017-04-24 2017-06-23 中建二局第二建筑工程有限公司华东分公司 A kind of assembled road and its construction method
CN114182599A (en) * 2021-12-31 2022-03-15 太原理工大学 Platform plate and assembled heavy platform

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1981003514A1 (en) * 1980-05-27 1981-12-10 K Landry Soil erosion prevention blocks
JP2010150764A (en) * 2008-12-24 2010-07-08 Nikken Sekkei Civil Engineering Ltd Block for forming greening road surface, and the greening road surface having the block laid thereon
CN204435152U (en) * 2014-11-12 2015-07-01 湖北华舟重工应急装备股份有限公司 Modularization road slab is used in a kind of construction
CN204715149U (en) * 2015-06-26 2015-10-21 胡增浩 A kind of highway construction precast plate
CN105088918A (en) * 2015-07-25 2015-11-25 中国石油化工集团公司 Spliced type roadbed box
CN205134133U (en) * 2015-08-18 2016-04-06 中建八局第四建设有限公司 Precast concrete board road component
CN206133055U (en) * 2016-07-08 2017-04-26 西北工业大学 Acquire little structure device of angle polarized light or radial polarized light

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1981003514A1 (en) * 1980-05-27 1981-12-10 K Landry Soil erosion prevention blocks
JP2010150764A (en) * 2008-12-24 2010-07-08 Nikken Sekkei Civil Engineering Ltd Block for forming greening road surface, and the greening road surface having the block laid thereon
CN204435152U (en) * 2014-11-12 2015-07-01 湖北华舟重工应急装备股份有限公司 Modularization road slab is used in a kind of construction
CN204715149U (en) * 2015-06-26 2015-10-21 胡增浩 A kind of highway construction precast plate
CN105088918A (en) * 2015-07-25 2015-11-25 中国石油化工集团公司 Spliced type roadbed box
CN205134133U (en) * 2015-08-18 2016-04-06 中建八局第四建设有限公司 Precast concrete board road component
CN206133055U (en) * 2016-07-08 2017-04-26 西北工业大学 Acquire little structure device of angle polarized light or radial polarized light

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106884366A (en) * 2017-04-24 2017-06-23 中建二局第二建筑工程有限公司华东分公司 A kind of assembled road and its construction method
CN114182599A (en) * 2021-12-31 2022-03-15 太原理工大学 Platform plate and assembled heavy platform

Similar Documents

Publication Publication Date Title
CN106284089B (en) A kind of steel trestle rapid constructing method
CN102011369B (en) Construction method of steel shells of bridge closure segments striding over various roads
CN109252445A (en) Cast-in-situ Beam assembled Large Diameter Pipeline steel pipe support structure and its construction method
CN106400646A (en) Temporary pavement splicing block and steel plate type box pavement
CN108914963A (en) Assembled arcading barricade
CN113529740B (en) Beam string supporting system
CN214993171U (en) Bridge bent cap construction is with assembled sectional shelf-unit platform
CN206941364U (en) Bailey beam make-shift bridge
CN109914666A (en) Profiled sheet Combined concrete flooring large area pouring construction method
CN106400668B (en) A kind of combined Wavelike steel webplate bottom plate Shear connection key and construction method
CN206233055U (en) Temporary pavement splicing block and steel plate type box road surface
CN105672113B (en) A kind of Wavelike steel webplate lower flange steel reinforced concrete combines cage structure and construction method
CN106939557A (en) A kind of pin-connected panel bracket casting platform of brace support
CN205062668U (en) Light -duty pier bent cap of highway construction segmental timbering
CN204902693U (en) Protection device for be used for foundation ditch blasting
CN108842933B (en) Tower crane opening blocking method
CN207377078U (en) A kind of construction scaffold of reusable edible
CN111042575A (en) Steel structure upright post reinforcing structure and method for basement roof temporary road
CN206655065U (en) Combined type support post and overhead rail system for overhead rail system
CN103195079B (en) Installing type template, installing type template group and complete installing type plate device
CN115305833A (en) Capping beam construction system and method
CN209523123U (en) A kind of working job platform
CN103498559A (en) Splicing movable bridge frame of steel structure industrial factory building and construction method for applying splicing movable bridge frame to roof construction
CN208293437U (en) Cast-in-situ Beam assembled Large Diameter Pipeline steel pipe support structure
CN207619988U (en) The cast-in-place concrete of bar shaped foundation pit is to supportting the connection structure with prefabricated linking beam

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170215

RJ01 Rejection of invention patent application after publication