CN106391986A CN201610711914.8A CN201610711914A CN106391986A CN 106391986 A CN106391986 A CN 106391986A CN 201610711914 A CN201610711914 A CN 201610711914A CN 106391986 A CN106391986 A CN 106391986A
Authority
CN
China
Prior art keywords
forging
blank
hours
car
stock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610711914.8A
Other languages
Chinese (zh)
Inventor
文成
金光涛
陈国兰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Se Ruibili Industrial Co Ltd In Jiangsu
Original Assignee
Se Ruibili Industrial Co Ltd In Jiangsu
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Se Ruibili Industrial Co Ltd In Jiangsu filed Critical Se Ruibili Industrial Co Ltd In Jiangsu
Priority to CN201610711914.8A priority Critical patent/CN106391986A/en
Publication of CN106391986A publication Critical patent/CN106391986A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21KMAKING FORGED OR PRESSED METAL PRODUCTS, e.g. HORSE-SHOES, RIVETS, BOLTS OR WHEELS
    • B21K7/00Making railway appurtenances; Making vehicle parts
    • B21K7/12Making railway appurtenances; Making vehicle parts parts for locomotives or vehicles, e.g. frames, underframes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J5/00Methods for forging, hammering, or pressing; Special equipment or accessories therefor
    • B21J5/002Hybrid process, e.g. forging following casting

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Forging (AREA)

Abstract

The invention relates to a manufacturing method for a car yoke forged piece. The manufacturing method comprises the following steps of: (a) extruding a cast aluminum rod raw material so as to increase the sectional area of the cast aluminum rod raw material by twice to five times, and saw-cutting the cast aluminum rod raw material into sections, thereby obtaining blank; (b) putting the blank at a temperature being 450-500 DEG C to heat for more than 3 hours, and pre-forging the blank while the blank is hot; (c) putting the pre-forged blank at a temperature being 450-500 DEG C to heat for more than 3 hours, and carrying out finish forging on the blank while the blank is hot; (d) putting the finish-forged blank at a temperature being 525-530 DEG C to heat for 2-5 hours, and then, carrying out ageing treatment; and (e), carrying out shot blasting treatment on the blank subjected to the ageing treatment to form a rough surface, and machining the rough surface, thereby obtaining the car yoke forged piece. According to the manufacturing method, the blank is heated, forged, subjected to ageing treatment and subjected to shot blasting treatment in sequence, so that strength, plasticity and hardness of the yoke forged piece can be improved.

Description

A kind of car connects the preparation method of fork forging
Technical field
The present invention relates to a kind of preparation method of auto parts and components is and in particular to a kind of car connects the preparation side of fork forging Method.
Background technology
Car connects fork and generally includes connecting portion 1, the bar portion 2 being integrally formed at connecting portion 1 both sides and shape as shown in Figure 1 Become the projection 3 in bar portion 2 end.In prior art, car connects the forging technology process pitched is substantially:With round steel as raw material, first Heating forges into crude green body, and then heating forges as finished product again.Heating typically adopts gas furnace heating.And gas furnace heating Temperature uneven, because combustion of natural gas is really oxidation reaction process, be also easy to lead to decarburization simultaneously.Whole process is multiple Miscellaneous, long flow path, makes metal inside tissue change uneven and difference is moved, and crystal grain increases;The toughness of product, plasticity, tensile strength etc. are all Influenced to different extents, so that product quality and service life is had a certain impact.And so heating twice forges Process is simple, the product obtaining is easy to cannot be used for because of insufficient strength in car, increased the cost of enterprise.
Content of the invention
The invention aims to overcoming the deficiencies in the prior art and providing a kind of car to connect the preparation method of fork forging.
For reaching above-mentioned purpose, the technical solution adopted in the present invention is:A kind of car connects the preparation method of fork forging, It comprises the following steps:
A () carries out extruding to aluminium casting rod raw material makes its area of section increase 2~5 times, and subsequently it being carried out being sawed into section with obtaining Stock;
B described stock is placed in 450~500 DEG C and heats more than 3 hours by (), subsequently carry out blocking to it while hot;
C described stock after blocking is placed in 450~500 DEG C and heats more than 3 hours by () again, subsequently carry out end to it while hot Forging;
D described stock after finish-forging is placed in 525~530 DEG C of heating 2~5 hours by () after, carry out Ageing Treatment;
E described stock after Ageing Treatment is carried out bead by (), be machined out after forming rough surface.
Optimally, in step (c), described stock is carried out carry out trimming process after finish-forging to remove unnecessary rim charge.
Optimally, in step (d), before carrying out Ageing Treatment, shaping is carried out to described stock using mould.
Optimally, in step (d), described Ageing Treatment is to be incubated 5~10 hours at 170~180 DEG C.
Optimally, in step (e), residing bead uses the shot of 0.3~0.5mm.
Because technique scheme is used, the present invention compared with prior art has following advantages:Car of the present invention connects The preparation method of fork forging, stock priority is carried out heat, forging, timeliness, shot-peening, so can improve and connect the strong of fork forging Degree, plasticity and hardness.
Brief description
Fig. 1 connects the structural representation of fork forging for car of the present invention;
Wherein, 1, connecting portion;2nd, bar portion;3rd, raised.
Specific embodiment
Below in conjunction with accompanying drawing, the preferred embodiment of the invention is described in detail.
Embodiment 1
The present embodiment provides a kind of car to connect the preparation method of fork forging, and it comprises the following steps:
A () carries out extruding compacting to aluminium casting rod raw material makes 2~5 times of its area of section increase (specifically increase multiple by car The size connecting fork forging determines, will not produce impact to the performance of final products), with improve aluminium casting rod raw material packing and Performance, subsequently carries out being sawed into section obtaining stock to it;
B stock is placed in 450 DEG C and heats 3 hours by (), carry out blocking to it while hot followed by mould, be forged into similar sedan-chair Car connects the shape of fork;
C stock after blocking is placed in 450 DEG C and heats 3 hours by () again, carry out finish-forging to it while hot followed by mould, forging Cause the shape being connected fork with car basically identical, then carry out trimming to process to remove unnecessary rim charge;
(to form the strengthening such as Si-Mg alloy, almag d stock after finish-forging is placed in 525 DEG C of heating 5 hours by () after Phase), carry out within 10 hours Ageing Treatment (to improve hardness) in 170 DEG C of insulations;
E stock after Ageing Treatment is carried out bead using the shot of 0.3mm by (), carry out machine after forming rough surface Process.
Embodiment 2
The present embodiment provides a kind of car to connect the preparation method of fork forging, and it comprises the following steps:
A () carries out extruding compacting to aluminium casting rod raw material makes 2~5 times of its area of section increase (specifically increase multiple by car The size connecting fork forging determines, will not produce impact to the performance of final products), with improve aluminium casting rod raw material packing and Performance, subsequently carries out being sawed into section obtaining stock to it;
B stock is placed in 500 DEG C and heats 5 hours by (), carry out blocking to it while hot followed by mould, be forged into similar sedan-chair Car connects the shape of fork;
C stock after blocking is placed in 500 DEG C and heats 5 hours by () again, carry out finish-forging to it while hot followed by mould, forging Cause the shape being connected fork with car basically identical, then carry out trimming to process to remove unnecessary rim charge;
(to form the strengthening such as Si-Mg alloy, almag d stock after finish-forging is placed in 530 DEG C of heating 2 hours by () after Phase), carry out within 5 hours Ageing Treatment (to improve hardness) in 180 DEG C of insulations;
E stock after Ageing Treatment is carried out bead using the shot of 0.5mm by (), carry out machine after forming rough surface Process.
Embodiment 3
The present embodiment provides a kind of car to connect the preparation method of fork forging, and it comprises the following steps:
A () carries out extruding compacting to aluminium casting rod raw material makes 2~5 times of its area of section increase (specifically increase multiple by car The size connecting fork forging determines, will not produce impact to the performance of final products), with improve aluminium casting rod raw material packing and Performance, subsequently carries out being sawed into section obtaining stock to it;
B stock is placed in 460 DEG C and heats 10 hours by (), carry out blocking to it while hot followed by mould, be forged into similar Car connects the shape of fork;
C stock after blocking is placed in 480 DEG C and heats 6 hours by () again, carry out finish-forging to it while hot followed by mould, forging Cause the shape being connected fork with car basically identical, then carry out trimming to process to remove unnecessary rim charge;
(to form the strengthening such as Si-Mg alloy, almag d stock after finish-forging is placed in 528 DEG C of heating 3 hours by () after Phase), carry out within 8 hours Ageing Treatment (to improve hardness) in 175 DEG C of insulations;
E stock after Ageing Treatment is carried out bead using the shot of 0.4mm by (), carry out machine after forming rough surface Process.
Car in embodiment 1 to embodiment 3 is connected with fork forging and carries out performance test, the results are shown in Table 1 for it.
Above-described embodiment only technology design to illustrate the invention and feature, its object is to allow person skilled in the art Scholar will appreciate that present disclosure and implements according to this, can not be limited the scope of the invention with this.All according to the present invention Equivalence changes or modification that Spirit Essence is made, all should be included within the scope of the present invention.

Claims (5)

1. a kind of car connects the preparation method of fork forging it is characterised in that it comprises the following steps:
A () carries out extruding to aluminium casting rod raw material makes its area of section increase 2~5 times, and subsequently it being carried out being sawed into section with obtaining stock;
B described stock is placed in 450~500 DEG C and heats more than 3 hours by (), subsequently carry out blocking to it while hot;
C described stock after blocking is placed in 450~500 DEG C and heats more than 3 hours by () again, subsequently carry out finish-forging to it while hot;
D described stock after finish-forging is placed in 525~530 DEG C of heating 2~5 hours by () after, carry out Ageing Treatment;
E described stock after Ageing Treatment is carried out bead by (), be machined out after forming rough surface.
2. car according to claim 1 connect fork forging preparation method it is characterised in that:In step (c), to described Stock carries out trimming and processes to remove unnecessary rim charge after carrying out finish-forging.
3. car according to claim 1 connect fork forging preparation method it is characterised in that:In step (d), carrying out Before Ageing Treatment, shaping is carried out to described stock using mould.
4. car according to claim 1 connect fork forging preparation method it is characterised in that:In step (d), when described Effect is processed as being incubated 5~10 hours at 170~180 DEG C.
5. car according to claim 1 connect fork forging preparation method it is characterised in that:In step (e), residing spray Ball processes the shot using 0.3~0.5mm.
CN201610711914.8A 2016-08-16 2016-08-16 Manufacturing method for car yoke forged piece Pending CN106391986A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610711914.8A CN106391986A (en) 2016-08-16 2016-08-16 Manufacturing method for car yoke forged piece

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610711914.8A CN106391986A (en) 2016-08-16 2016-08-16 Manufacturing method for car yoke forged piece

Publications (1)

Publication Number Publication Date
CN106391986A true CN106391986A (en) 2017-02-15

Family

ID=58004384

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610711914.8A Pending CN106391986A (en) 2016-08-16 2016-08-16 Manufacturing method for car yoke forged piece

Country Status (1)

Country Link
CN (1) CN106391986A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108284137A (en) * 2017-12-25 2018-07-17 常州市胜彪标准件模具有限公司 A kind of cold extruding processing method of machine components shape requirement straight slot
CN111957877A (en) * 2020-07-14 2020-11-20 沈阳和世泰通用钛业有限公司 Forging forming method for vehicle cross arm

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005031605A (en) * 2003-07-11 2005-02-03 Umemoto Seisakusho:Kk Ball joint and universal tripod head
CN101279354A (en) * 2008-05-15 2008-10-08 宁夏天地奔牛实业集团有限公司 Method for producing connecting pin forging
CN203257860U (en) * 2013-04-27 2013-10-30 南京亨发达汽配制造有限公司 Connecting fork forged blank for universal joint
CN204004036U (en) * 2014-01-20 2014-12-10 永嘉县正菱精密锻造有限公司 Fork is in transmission connection

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005031605A (en) * 2003-07-11 2005-02-03 Umemoto Seisakusho:Kk Ball joint and universal tripod head
CN101279354A (en) * 2008-05-15 2008-10-08 宁夏天地奔牛实业集团有限公司 Method for producing connecting pin forging
CN203257860U (en) * 2013-04-27 2013-10-30 南京亨发达汽配制造有限公司 Connecting fork forged blank for universal joint
CN204004036U (en) * 2014-01-20 2014-12-10 永嘉县正菱精密锻造有限公司 Fork is in transmission connection

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杜方孟等: ""高速列车用扭转臂脱碳层控制方法研究", 《机车车辆工艺》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108284137A (en) * 2017-12-25 2018-07-17 常州市胜彪标准件模具有限公司 A kind of cold extruding processing method of machine components shape requirement straight slot
CN111957877A (en) * 2020-07-14 2020-11-20 沈阳和世泰通用钛业有限公司 Forging forming method for vehicle cross arm
CN111957877B (en) * 2020-07-14 2022-05-03 沈阳和世泰通用钛业有限公司 Forging forming method for vehicle cross arm

Similar Documents

Publication Publication Date Title
CN104439909B (en) A kind of aluminium alloy wheel hub forging method
CN104707929B (en) High-temperature alloy disc die forging method
CN102672096A (en) Precision die forging and shaping technical method for automobile steering knuckle rough type parts
CN104148428B (en) A kind of cold-extrusion shaping method of axial symmetry rod head part
KR101293631B1 (en) A manufacturing method of a cylinder-cover for a large-sized engine
CN103464991A (en) Gear ring machining process
CN112589021B (en) Manufacturing method of IN718 alloy double-flange high-cylinder casing ring piece
CN104128750A (en) Torsion rod spring manufacturing technology
CN110804690A (en) Manufacturing process for improving ultrasonic detection qualification rate of 42CrMo forge piece
CN106541069A (en) A kind of Integral die-forged method of large-scale GH4169 turbine wheel shafts
WO2015188543A1 (en) Method for manufacturing high-magnesium aluminum alloy commercial wheel hub
CN106112417A (en) Exempt to weld major axis inner constant velocity universal joint precision forging Forging Technology
CN106391986A (en) Manufacturing method for car yoke forged piece
CN104959778A (en) Constant speed universal joint end face transmission gear precision forging moulding technology
CN104625627A (en) Manufacturing method of titanium alloy electrode bar for plasma rotation electrode
CN105215641B (en) The forging processing method of locking bolt
CN103846388A (en) Drive sprocket forming and manufacturing method
CN103567719B (en) A kind of forging method of change
CN113305262A (en) High-strength one-bridge swing arm forging process
CN103706745A (en) Manufacturing method of damping shaft sleeve
CN107262647A (en) A kind of method for upsetting of large-scale round steel bar
CN104889295A (en) Forging process of six-throw crankshaft
CN113510205A (en) Die forging and roll forming method for high-temperature alloy special-shaped section flange disc-shaped part
CN103878280A (en) Forging method of ultrahigh strength aluminum alloy
CN106345966A (en) Process for producing lower swing arms of automobiles

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170215

RJ01 Rejection of invention patent application after publication