A kind of pressing straight drink dual temperature cup Download PDF

Info

Publication number
CN106388492B
CN106388492B CN201610896798.1A CN201610896798A CN106388492B CN 106388492 B CN106388492 B CN 106388492B CN 201610896798 A CN201610896798 A CN 201610896798A CN 106388492 B CN106388492 B CN 106388492B
Authority
CN
China
Prior art keywords
water
cup
chamber
pipe
air inlet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610896798.1A
Other languages
Chinese (zh)
Other versions
CN106388492A (en
Inventor
金波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Tengyu environmental protection equipment Co., Ltd.
Original Assignee
Shaoxing Keqiao Sun Zhen Chemical Fiber Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaoxing Keqiao Sun Zhen Chemical Fiber Co Ltd filed Critical Shaoxing Keqiao Sun Zhen Chemical Fiber Co Ltd
Priority to CN201610896798.1A priority Critical patent/CN106388492B/en
Publication of CN106388492A publication Critical patent/CN106388492A/en
Application granted granted Critical
Publication of CN106388492B publication Critical patent/CN106388492B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • AHUMAN NECESSITIES
    • A47FURNITURE; DOMESTIC ARTICLES OR APPLIANCES; COFFEE MILLS; SPICE MILLS; SUCTION CLEANERS IN GENERAL
    • A47GHOUSEHOLD OR TABLE EQUIPMENT
    • A47G19/00Table service
    • A47G19/22Drinking vessels or saucers used for table service
    • A47G19/2205Drinking glasses or vessels
    • A47G19/2255Details related to the connection between the liquid containing part and the supporting part
    • AHUMAN NECESSITIES
    • A47FURNITURE; DOMESTIC ARTICLES OR APPLIANCES; COFFEE MILLS; SPICE MILLS; SUCTION CLEANERS IN GENERAL
    • A47GHOUSEHOLD OR TABLE EQUIPMENT
    • A47G19/00Table service
    • A47G19/22Drinking vessels or saucers used for table service
    • A47G19/2205Drinking glasses or vessels
    • A47G19/2266Means for facilitating drinking, e.g. for infants or invalids
    • AHUMAN NECESSITIES
    • A47FURNITURE; DOMESTIC ARTICLES OR APPLIANCES; COFFEE MILLS; SPICE MILLS; SUCTION CLEANERS IN GENERAL
    • A47GHOUSEHOLD OR TABLE EQUIPMENT
    • A47G19/00Table service
    • A47G19/22Drinking vessels or saucers used for table service
    • A47G19/2288Drinking vessels or saucers used for table service with means for keeping liquid cool or hot

Landscapes

  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Pediatric Medicine (AREA)
  • Table Devices Or Equipment (AREA)

Abstract

The invention discloses a kind of pressing straight drink dual temperature cup, belong to household implements technical field, it includes cup and lid, is characterised by:Water-stop sheet is set in cup, the inner chamber of cup is divided into the hydrothermal area set gradually from bottom to top and warm water zone by water-stop sheet, and water pipe, one end connection warm water zone of water pipe, other end connection hydrothermal area are set on water-stop sheet, control valve is connected on water pipe, control valve controls the break-make of water pipe;Tea interval is installed in warm water zone, the first air inlet pipe is installed in tea interval;The water nozzle for offering water chamber is set on lid, air admission hole is offered in the side wall of water chamber, one end connection water chamber, the other end of air admission hole install the second air inlet pipe, and the second air inlet pipe is connected with the first air inlet pipe;Plug is installed in water chamber, briquetting is installed in the side wall of water chamber, plug is stretched in one end of briquetting, and the outer wall of other end protrusion water nozzle is set.This glass being capable of the suitable straight drink warm water of supply temperature at any time.

Description

A kind of pressing straight drink dual temperature cup
Technical field
The invention belongs to household implements technical field, and in particular to a kind of pressing straight drink dual temperature cup.
Background technology
Cup is as daily life necessity, its constantly improve on pattern and function, including various suctions Pipe cup and thermos cup.Although existing thermos cup has heat insulation function, one glass of water is all hot in soaking time, or even is scalded Mouth, it is impossible to immediately quote, it is necessary to open cup lid to accelerate to radiate, exist again unhygienic and overturn cup and pour off the wind of all water Danger;Water Deng cup slowly becomes after warm water and needs to drink in a short time to finish, and otherwise becomes to be not suitable for the cold water drunk. Existing STRAW CUP is applied to infant more, and the suction pipe that stretches into cup is set in cup lid, using the water in suction pipe suction cup body, Some sets the Ka Gai that can bend suction pipe, Ka Gai to bend suction pipe when closing also on cup lid, prevents the water in cup through inhaling Pipe flows out;The active force to suction pipe is discharged when Ka Gai is opened, suction pipe stretches naturally, opens the inner chamber of suction pipe.
But above-mentioned cup all can be only in rim of a cup upward, bottom of a cup positive laying state directed downwardly when, directly drunk using rim of a cup Water aspirates water using suction pipe.Drinking person sitting is then needed using rim of a cup drinking-water or is lain prone;Using suction pipe then with Suction force required for the lengthening of suction pipe also increases.These are all undoubtedly larger challenge for weak bed patient, It is unfavorable for the rehabilitation of patient.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of pressing straight drink dual temperature cup, can directly drink temperature at any time and fit Suitable warm water.
In order to solve the above technical problems, the technical scheme is that:A kind of pressing straight drink dual temperature cup of invention, including cup Body and the lid being fitted on cup, it is characterised in that:Water-stop sheet is set in cup, and the inner chamber of cup is divided into certainly by water-stop sheet It is lower and on the hydrothermal area that sets gradually and warm water zone, water pipe is set on water-stop sheet, the first cavity and second logical is offered in water pipe One end of chamber, the first cavity and the second cavity connects warm water zone, the other end connects hydrothermal area, and control valve is connected on water pipe, Control valve controls the break-make of the first cavity and the second cavity simultaneously;Tea interval is installed in warm water zone, connecting hole is opened up in tea interval, is connected First air inlet pipe is installed, the first air inlet pipe is passed through in warm water zone in hole;
Lid is provided with water nozzle, and water chamber is offered in water nozzle, and water chamber has bottom wall, limbers is offered on bottom wall, Air admission hole is offered in the side wall of water chamber, one end connection water chamber, the other end of air admission hole install the second air inlet pipe, and second enters Tracheae is stretched into connecting hole to be connected with the first air inlet pipe;Plug is installed, plug inserts in the bottom wall, and plug can seal in water chamber Air admission hole and water chamber are closed, briquetting is installed in the side wall of water chamber, plug, other end protrusion water nozzle are stretched in one end of briquetting Outer wall set.
Preferably, the control valve includes draw back plate, clamps seat, pull bar, spring and rotating shaft handle, in water pipe side Fixed on water-stop sheet to clamp seat, the opposite side of water pipe sets draw back plate, and along seat periphery is clamped around shock mount, the both ends of spring are successively It is connected to from the both sides of water pipe on draw back plate, draw back plate connection pull bar, the other end of pull bar is hinged on rotating shaft handle, turned Axle handle is hinged in the side wall of cup.
Preferably, the cup of hydrothermal area uses double-layer cup body, has heat-insulation chamber between double-layer cup body.
Preferably, the lid is provided with outside housing cover.
Compared with prior art, the beneficial effects of the invention are as follows:
1st, because cup is divided into hydrothermal area and warm water zone, the low water of temperature can be held in warm water zone, in hydrothermal area Hot water is held, when to be drunk water, operation control valve, water pipe is opened, cup is tilted, the hot water in hydrothermal area is passed through water pipe One cavity flows into warm water zone, while the gas in warm water zone enters hydrothermal area by another cavity, maintains the gas in two sections Flattening weighing apparatus so that the hot water in hydrothermal area can automatically flow into warm water zone, and the water low with temperature is mixed into the warm water suitably drunk, Continue to tilt cup after closing water pipe, be close to inversion state or in inversion state, water nozzle is put into the mouth of drinking person In, briquetting is pressed, briquetting, which presses plug, makes its deformation, departs from the side wall of water chamber, enters water chamber through limbers Water flows out due to losing the plugging action of plug, while air also enters air admission hole, is entered by the first air inlet pipe and second The path that tracheae is formed enters warm water zone, maintains warm water zone to be balanced with ambient pressure, the water in warm water zone is flowed out automatically;Wait to drink With finishing, the pressing effect to briquetting is unclamped, plug resiles under its own resilient effect, realized to water chamber and air inlet The blocking in hole, no longer air inlet and water outlet, complete once straight drink.
2nd, it is simple in construction due to the form that control valve is engaged using draw back plate with clamping seat, it is easy to implement and performance is steady It is fixed.
3rd, because the cup of hydrothermal area uses double-layer cup body, there is heat-insulation chamber between double-layer cup body, it is possible to increase hydrothermal area Heat insulation effect, extend soaking time.
4th, because lid upper cover has filled outside housing cover, extraneous dust pollution water nozzle and plug, more sanitation and hygiene can be prevented, Prevent that briquetting from surprisingly being extruded simultaneously.
5th, the present invention is simple in construction, and the warm water more suitably drunk can be provided for drinking person, realizes straight drink, especially right It is very convenient for bed patient, it is easy to utilize.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention;
Fig. 2 is Fig. 1 A-A sectional views;
Fig. 3 is Fig. 1 B-B sectional views(Do not include outside housing cover);
Fig. 4 is the zoomed-in view of local I in Fig. 1;
Fig. 5 is the zoomed-in view of local I I in Fig. 1.
Reference is:1st, cup;2nd, lid;3rd, outside housing cover;4th, water nozzle;5th, water-stop sheet;6th, heat-insulation chamber;7th, tea interval;8、 First air inlet pipe;9th, the second air inlet pipe;10th, connecting hole;11st, water pipe;12nd, the first cavity;13rd, the second cavity;14th, seat is clamped; 15th, spring;16th, draw back plate;17th, pull bar;18th, rotating shaft handle;19th, plug;20th, limbers;21st, water chamber;22nd, hot water Area;23rd, briquetting;24th, air admission hole;25th, warm water zone.
Embodiment
The present invention is described in further detail with embodiment below in conjunction with the accompanying drawings.
The present invention is defined as inflow direction by outside using the flow direction for passing in and out cup 1 as reference into the direction of cup 1, Correspondingly it will be defined as flowing out direction by the direction in cup 1 out;It is corresponding upper when cup 1 is in into nature laying state Above and below lower direction is defined as successively.
As shown in figure 1, the present invention is provided with water-stop sheet 5 in cup 1, the inner chamber of cup 1 is divided under by water-stop sheet 5 The hydrothermal area 22 set gradually on and and warm water zone 25, water pipe 11 is set on water-stop sheet 5, the first cavity 12 is offered in water pipe 11 With the second cavity 13, the first cavity 12 connects warm water zone 25, the other end with one end of the second cavity 13 and connects hydrothermal area 22, Control valve is connected on water pipe 11, control valve controls the break-make of the first cavity 12 and the second cavity 13 simultaneously.As shown in Figure 2 and Figure 4, Draw back plate 16 is provided with control valve used, clamps seat 14, pull bar 17, spring 15 and rotating shaft handle 18, in the side of water pipe 11 Water-stop sheet 5 on it is fixed clamp seat 14, the opposite side of water pipe 11 sets draw back plate 16, along clamping the periphery of seat 14 around shock mount 15, The both ends of spring 15 are connected on draw back plate 16 from the both sides of water pipe 11 successively, and draw back plate 16 connects pull bar 17, pull bar 17 The other end be hinged on rotating shaft handle 18, rotating shaft handle 18 is hinged in the side wall of cup 1.Installation tea interval 7 in warm water zone 25, Connecting hole 10 is opened up in tea interval 7, the first air inlet pipe 8 is installed in connecting hole 10, the first air inlet pipe 8 is passed through in warm water zone 25;
Lid 2 is equipped with cup 1, lid 2 is provided with water nozzle 4, as shown in Figure 3 and Figure 5, offered out in water nozzle 4 Water cavity 21, water chamber 21 have bottom wall, limbers 20 are offered on bottom wall, air admission hole 24 is offered in the side wall of water chamber 21, Air admission hole 24 one end connection water chamber 21, the other end install the second air inlet pipe 9, the second air inlet pipe 9 stretch into connecting hole 10 with First air inlet pipe 8 is connected;Plug 19 is installed, plug 19 inserts in the bottom wall, and plug 19 can close air admission hole in water chamber 21 24 and water chamber 21, briquetting 23 is installed in the side wall of water chamber 21, plug 19, other end protrusion are stretched in one end of briquetting 23 The outer wall of water nozzle 4 is set.
In order to improve the heat insulation effect of hydrothermal area 22, the cup 1 of hydrothermal area 22 uses double-layer cup body, had between double-layer cup body There is heat-insulation chamber 6, extend the soaking time of hydrothermal area 22 using heat-insulation chamber 6.And outside housing cover 3 is housed in the cover of lid 2, it can place Dust enters in the water nozzle 4 on lid 2, relatively sanitary.
The course of work of the present invention is as follows:
Normal condition, spring 15 pull draw back plate 16 to the direction of seat 14 is clamped, and are squeezed in draw back plate 16 and clamp on seat 14, Water pipe 11 positioned there between is pressed from both sides flat, close the first cavity 12 and the second cavity 13, warm water zone 25 and be in hydrothermal area 22 Isolation.In use, take down outside housing cover 3, cup 1 is tilted, presses rotating shaft handle 18, rotating shaft handle 18 passes through 17 grams of pull bar The active force of spring 15 is taken, draw back plate 16 is pulled to the relative direction for clamping seat 14, departs from draw back plate 16 and clamp seat 14, lose To the squeezing action of water pipe 11, water pipe 11 is resiled under natural resiliency, and the first cavity 12 and the second cavity 13 are on State, now the water in hydrothermal area 22 pass through the first cavity 12 flow into warm water zone 25 so that the hot water water low with temperature is mixed into The warm water suitably drunk, while the gas in warm water zone 25 enters hydrothermal area 22 by the second cavity 13 so that in warm water zone 25 The air pressure of air pressure and hydrothermal area 22 keep balancing, can automatically flow into the offer condition of warm water zone 25 guarantor for the hot water in hydrothermal area 22 Barrier, the effect of pressing of countershaft handle 18 is then unclamped, the return under the pulling force of spring 15 of draw back plate 16, is recovered to water pipe 11 Squeezing action, the first cavity 12 of closing and the second cavity 13, completion cold water and hot water dissolve.Now continue to tilt cup 1, make It is close to inversion state or is substantially at inversion state, and water nozzle 4 is put into the mouth of drinking person, presses briquetting 23, pressing Block 23, which presses plug 19, makes its deformation, and plug 19 departs from the side wall of water chamber 21, loses the plugging action to water chamber 21, passes through The water that limbers 20 enters water chamber 21 flows out due to losing the plugging action of plug 19, while air also enters air admission hole 24, the path being made up of the first air inlet pipe 8 and the second air inlet pipe 9 enters warm water zone 25, maintains warm water zone 25 and ambient pressure Balance, makes the water in warm water zone 25 flow out automatically;Wait to drink and finish, unclamp the pressing effect to briquetting 23, plug 19 is certainly Resiled under the effect of body elastic force, realize the blocking to water chamber 21 and air admission hole 24, no longer air inlet and water outlet, completed once straight Drink.
During whole drink, only need drinking person or service personnel to press briquetting 23, taken out without any Suction acts, and goes out water management and is realized completely by manipulating briquetting 23, provides straight drink-service business for drinking person, facilitates drinking person to crouch Drink, is more applicable for weak patient, avoids due to physical demands caused by suction, beneficial to the rehabilitation of patient.
The above described is only a preferred embodiment of the present invention, being not the limitation for making other forms to the present invention, appoint It is the present invention that what those skilled in the art, which is combined, changes or retrofited possibly also with the technology contents of the disclosure above, Equivalent embodiment.But it is every without departing from technical solution of the present invention content, the technical spirit according to the present invention is implemented to more than Any simple modification, equivalent variations and the remodeling that example is made, still fall within the protection domain of technical solution of the present invention.

Claims (4)

1. a kind of pressing straight drink dual temperature cup, including cup and the lid being fitted on cup, cup is interior to set water-stop sheet, water proof The inner chamber of cup is divided into the hydrothermal area set gradually from bottom to top and warm water zone by plate, it is characterised in that:Set on water-stop sheet Water pipe, offers the first cavity and the second cavity in water pipe, and one end of the first cavity and the second cavity connects warm water zone, another End connects hydrothermal area, and control valve is connected on water pipe, and control valve controls the break-make of the first cavity and the second cavity simultaneously;Warm water zone Interior installation tea interval, connecting hole is opened up in tea interval, the first air inlet pipe is installed, the first air inlet pipe is passed through in warm water zone in connecting hole;Lid Body is provided with water nozzle, and water chamber is offered in water nozzle, and water chamber has bottom wall, and limbers, the side of water chamber are offered on bottom wall Air admission hole is offered in wall, one end connection water chamber, the other end of air admission hole install the second air inlet pipe, and the second air inlet pipe stretches into company The air inlet pipe of Kong Zhongyu first is connect to be connected;Plug is installed in water chamber, plug inserts in the bottom wall, plug can close air admission hole and Water chamber, briquetting is installed in the side wall of water chamber, plug is stretched in one end of briquetting, and the outer wall of other end protrusion water nozzle is set Put.
2. pressing straight drink dual temperature cup according to claim 1, it is characterised in that:The control valve includes draw back plate, card Seat, pull bar, spring and rotating shaft handle are filled, fixed on the water-stop sheet of water pipe side to clamp seat, the opposite side of water pipe, which is set, to be pushed away Arm-tie, it is connected to successively from the both sides of water pipe on draw back plate around shock mount, the both ends of spring along seat periphery is clamped, draw back plate connection Pull bar, the other end of pull bar are hinged on rotating shaft handle, and rotating shaft handle is hinged in the side wall of cup.
3. pressing straight drink dual temperature cup according to claim 1 or 2, it is characterised in that:The cup of hydrothermal area is using double-deck Cup, there is heat-insulation chamber between double-layer cup body.
4. pressing straight drink dual temperature cup according to claim 3, it is characterised in that:The lid is provided with outside housing cover.
CN201610896798.1A 2016-10-14 2016-10-14 A kind of pressing straight drink dual temperature cup Active CN106388492B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610896798.1A CN106388492B (en) 2016-10-14 2016-10-14 A kind of pressing straight drink dual temperature cup

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610896798.1A CN106388492B (en) 2016-10-14 2016-10-14 A kind of pressing straight drink dual temperature cup

Publications (2)

Publication Number Publication Date
CN106388492A CN106388492A (en) 2017-02-15
CN106388492B true CN106388492B (en) 2017-12-26

Family

ID=59229679

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610896798.1A Active CN106388492B (en) 2016-10-14 2016-10-14 A kind of pressing straight drink dual temperature cup

Country Status (1)

Country Link
CN (1) CN106388492B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107374252A (en) * 2017-08-31 2017-11-24 广西驰胜农业科技有限公司 A kind of cup for being easy to steep sesame cream
CN107581940A (en) * 2017-08-31 2018-01-16 广西驰胜农业科技有限公司 A kind of cup for being easy to steep soya-bean milk
CN112842037A (en) * 2021-02-04 2021-05-28 李宝云 Rapid cooling vacuum cup

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0923898A1 (en) * 1997-12-20 1999-06-23 Burkhard Krüger Non-spilling beverage lid
CN203776590U (en) * 2014-04-24 2014-08-20 嘉兴职业技术学院 Anti-reflux cup
CN204071524U (en) * 2014-08-08 2015-01-07 永康市光电科技有限公司 A kind of Novel thermos cup effluent switch
CN204950397U (en) * 2015-09-12 2016-01-13 徐柏青 Swagger cup
CN105231762A (en) * 2015-11-26 2016-01-13 李辛 Temperature adjusting cup used for insulation cup
CN105747773A (en) * 2016-05-09 2016-07-13 陆晓飞 Inner cap

Also Published As

Publication number Publication date
CN106388492A (en) 2017-02-15

Similar Documents

Publication Publication Date Title
CN106388492B (en) A kind of pressing straight drink dual temperature cup
CN104470486B (en) waist-fumigating cover
CN202457932U (en) Drinking water heating device with preheating function
CN106333583B (en) It is a kind of to be easy to the horizontal dual temperature cup drunk
CN106510361B (en) One kind stings dynamic formula and directly drinks dual temperature cup
CN2547572Y (en) Vehicular drinking-water apparatus
CN106308341B (en) A kind of sitting-lying double-purpose directly drinks dual temperature cup
CN110025195B (en) Straw and scald-proof water cup
CN205606906U (en) High -efficient cold and hot disconnect -type water heater inner bag that keeps warm
CN106333582B (en) A kind of straight drink dual temperature cup
CN106308342B (en) Rotary-nozzle type direct-drinking double-temperature cup
CN207784950U (en) Heat exchange tank and apply its Drinking fountain
CN202785735U (en) Water dispenser ultraviolet sterilization device with cocurrent inlet-outlet water
CN106388493B (en) A kind of diaphragm type directly drinks dual temperature cup
CN108402895A (en) A kind of water intake mechanism of electric kettle
CN106343848A (en) Push type direct drinking dual-temperature cup
CN207949639U (en) Portable patient's drinking device
CN2516875Y (en) Double-liner multifunctional electric water boiler
CN207685058U (en) A kind of integral water purifier of included heating refrigerating function
CN205458338U (en) Heatable soap dispenser
CN214964580U (en) Double-pressure-relief water dispenser
CN205729100U (en) A kind of water heating temperature equipment of band water quality detection
CN203468327U (en) Bagged water dispenser
CN205663983U (en) High efficiency filter tap with filter equipment
CN219515964U (en) Dechlorination electric kettle

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Jin Bo

Inventor before: Ren Xiangyi

CB03 Change of inventor or designer information
TA01 Transfer of patent application right

Effective date of registration: 20171124

Address after: 312000 Zhejiang Province, Shaoxing city Keqiao District Qianqing town Jiang Shu Village

Applicant after: Shaoxing Keqiao Sun Zhen Chemical Fiber Co., Ltd.

Address before: 255000 Shandong city of Zibo province high tech Zone Willow Road No. 105 new Century Square block C eleven room 1112

Applicant before: Zibo Zhengbang Intellectual Property Co., Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180718

Address after: 330114 No. 9, Xiyuan village, Xixia village, Xixia Town, Xinjian County, Nanchang, Jiangxi

Patentee after: Liu Xiaohong

Address before: 312000 Jiangshu Village, Qianqing Town, Keqiao District, Shaoxing City, Zhejiang Province

Patentee before: Shaoxing Keqiao Sun Zhen Chemical Fiber Co., Ltd.

TR01 Transfer of patent right

Effective date of registration: 20181108

Address after: 226000 Tongzhou District East Club Town, Nantong, Jiangsu

Patentee after: Nantong Tengyu environmental protection equipment Co., Ltd.

Address before: 330114 No. 9, Xiyuan village, Xixia village, Xixia Town, Xinjian County, Nanchang, Jiangxi

Patentee before: Liu Xiaohong

TR01 Transfer of patent right