CN106388285A - Assisting device applied to construction project cost budget - Google Patents
Assisting device applied to construction project cost budget Download PDFInfo
- Publication number
- CN106388285A CN106388285A CN201610732095.5A CN201610732095A CN106388285A CN 106388285 A CN106388285 A CN 106388285A CN 201610732095 A CN201610732095 A CN 201610732095A CN 106388285 A CN106388285 A CN 106388285A
- Authority
- CN
- China
- Prior art keywords
- casing
- end cavity
- case lid
- support bar
- elastomer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- A—HUMAN NECESSITIES
- A47—FURNITURE; DOMESTIC ARTICLES OR APPLIANCES; COFFEE MILLS; SPICE MILLS; SUCTION CLEANERS IN GENERAL
- A47B—TABLES; DESKS; OFFICE FURNITURE; CABINETS; DRAWERS; GENERAL DETAILS OF FURNITURE
- A47B37/00—Tables adapted for other particular purposes
-
- A—HUMAN NECESSITIES
- A47—FURNITURE; DOMESTIC ARTICLES OR APPLIANCES; COFFEE MILLS; SPICE MILLS; SUCTION CLEANERS IN GENERAL
- A47B—TABLES; DESKS; OFFICE FURNITURE; CABINETS; DRAWERS; GENERAL DETAILS OF FURNITURE
- A47B13/00—Details of tables or desks
-
- A—HUMAN NECESSITIES
- A47—FURNITURE; DOMESTIC ARTICLES OR APPLIANCES; COFFEE MILLS; SPICE MILLS; SUCTION CLEANERS IN GENERAL
- A47B—TABLES; DESKS; OFFICE FURNITURE; CABINETS; DRAWERS; GENERAL DETAILS OF FURNITURE
- A47B17/00—Writing-tables
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention discloses an assisting device applied to construction project cost budget. The assisting device comprises a box body and a box cover, wherein the box body comprises a lower end cavity and an upper end cavity; a storage body is arranged in the lower end cavity of the box body; elastic bodies, which are connected to the inner wall of the upper end cavity of the box body, are arranged in the upper end cavity of the box body; the elastic bodies are provided with springs; the springs are uniformly distributed in the elastic bodies; two free ends of the springs are connected to arc-shaped pieces which are arranged on the inner walls of the upper end cavity of the box body by virtue of connecting rods; hooks are arranged at the free ends of the connecting rods; the hooks can be hung on the arc-shaped pieces; the at least two elastic bodies are symmetrically distributed on the opposite upper end cavity inner walls of the box body; textile fabrics are arranged on the inner walls of four sides of the upper end cavity of the box body; and a handle is arranged on the surface of the box cover. According to the technical scheme, the assisting device is simple in structure, diverse in functions and strong in practicability.
Description
Technical field
The present invention relates to Project Cost Field is and in particular to a kind of auxiliary device being applied to construction engineering cost budget.
Background technology
Construction costs refers to carry out the full payment that a certain engineering construction is spent, and its core content is investment estimate, sets
Meter budgetary estimate, correction budgetary estimate, working drawing budget, Engineering Settlement, budget needed for the completion of projects etc..The main task of construction costs:It is according to figure
Paper, quota and bill code, calculate the flat cost included in engineering, and such as artificial, material and equipment, construction equipment make
With enterprise administration expense, measure expense, set-fee, profit and tax etc..
Traditional tool kit function is single, can only be used for placing each appliances such as photographing unit, computer, drawing, T-square,
But because engineering cost personnel needs to measure at the construction field (site) and handle official business, and not necessarily each job site has suitably
Desk and the position being suitable for placement spider.
Meanwhile, in spider carrying process, typically adopt directly hand-held because spider volume is larger it has not been convenient to carry,
Carry quite laborious, the instrument simultaneously using is placed mixed and disorderly.
Based on this, study and develop a kind of auxiliary device being applied to construction engineering cost budget of design.
Content of the invention
The technical problem to be solved is:Overcome prior art defect, provide one kind to be applied to architectural engineering and make
The auxiliary device of valency budget, the spider solving the use of cost process is inconvenient to carry, and places, and instrument is placed the technology such as mixed and disorderly and asked
Topic.
The present invention is achieved through the following technical solutions:
A kind of auxiliary device being applied to construction engineering cost budget, includes lower end cavity and upper end including casing, case lid, casing
Cavity, is provided with memory bank, is provided with and is connected with the upper end cavity inner wall of casing in the upper end cavity of casing in the lower end cavity of casing
Elastomer, elastomer is provided with spring, and spring is evenly distributed on that elasticity is internal, and two free ends of spring pass through connecting rod respectively
It is connected with the arcuate member of the upper end cavity inner wall being arranged on casing, the free end of connecting rod is provided with hook, and hook can be suspended on arc
On shape part, the number at least two of described elastomer, it is symmetrically distributed in the relative upper end cavity inner wall of casing, described casing
Upper end cavity surrounding inwall is weaving cloth;The surface of case lid is provided with handle;The opposite end of case lid is provided with baffle plate, and baffle plate is provided with
Support bar, support bar one end and panel hinge, the other end of support bar is held within the weaving of the upper end cavity surrounding of casing
On cloth, described support bar is expansion link.
Described casing, case lid are located inside the shell as integrative-structure, and described memory bank is upper end open four side body structure, institute
The bottom stating shell is provided with roller, and the surrounding partition of described memory bank is bendable folded structure.
Cost personnel often surveys to field conditions such as actual landforms using to spider in the course of the work, surveys
Amount, because the particularity of landform occurs uneven it has not been convenient to place spider, spider during simultaneously using
Be inconvenient to carry, cause operation inconvenience it is considered to above-mentioned situation, the technical program one body structure of design is as equipment just
Carry spider in placement.Existing body structure homogeneous solid space structure, because the volume of spider is larger, even if dismounting
Afterwards, volume is still larger, and the body structure of the technical program design includes upper end oral cavity and lower end cavity, and lower end cavity can design
For the drawer structure of multiple genesis analysis, calculate for construction costs, need the measuring scale, the rule that use in measurement process
Etc. some other instrument, and the upper end cavity structure of casing is adjustable space structure, can be according to the object institute duty put into into
Between be adjusted and in particular to adjustment structure with regulative mode be:Using elastomer as adjustment structure, in casing
Wall surrounding is respectively provided with an elastomer, and elasticity is provided with spring in vivo, because upper end cavity four wall of casing is weaving cloth, tool
There is certain flexibility, the connecting rod that the inwall in casing upper end is connected with the free end of elastomer inner spring, connecting rod one end sets
The hook put, can hang over the hook end of connecting rod on the arcuate member being arranged on cabinet wall, thus realizing by stretching or pressing
The adjustment to casing upper end space realized by contracting spring.
Concrete operations mode is, when the top needing spider is put into casing, can hang the hook of elastomer in advance
On arcuate member, spring elongation, because the elastomer positioned at cabinet wall surrounding is all stretched, the inner space of casing upper end
Expanded.Hook can be taken out from arcuate member after taking out spider, spring reset, the upper end space structure of casing is contracted
Little, casing diminishes, beneficial to carrying and place.
Memory bank is easy to place multiple objects accommodating construction costs use, object can be placed on trabeculae and mediastinum piece
Intersect in the cavity forming multiple receiving objects, be easy to sorting placement, take beneficial to engineering cost personnel.Backing plate directly spreads
It is located at the bottom of memory bank, increase the tolerances of memory bank.
Roller is set in the lower end of shell, is moved easily the body structure equipped with spider.Setting casing is bendable simultaneously
Folded structure, can dual-purpose body structure as needed.
In the technical program, by surrounding in the upper end cavity of casing be set to weave cloth, alternatively equivalent other structures, can
Deform upon, there is certain elasticity.
The surface setting aperture of case lid, its Main Function is easy for placing spider, can be directly by three of spider
Little in the hole is inserted in the bottom of frame.
Baffle plate is set at the two ends of case lid, baffle plate is supported by support bar, support bar is expansion link, when needing support
When, expansion link stretches, and baffle plate and case lid surface are located on same horizontal plane, can be used as workbench.All instruments are put into case
After internal, baffle plate can be put down, expansion link shrinks, baffle plate is in vertical state.
As the above analysis, the use of elastomer, makes the inner space of casing realize adjustable, and concrete range of accommodation can be led to
The telescopic spring length crossing elastomer is realized;The use of baffle plate, can use as workbench within the specific limits, increased casing
Purposes.
Preferably, the number of described elastomer is four, and each inwall side of the upper end cavity surrounding of casing is all distributed one,
And it is distributed at grade, two free ends of described arcuate member are fixed on weaving cloth.Here the number of elastomer is entered
Row preferably, is set to four, carries out stretching by the spring internal to elasticity, compression adjustment, realizes further to cabinet space
Size adjusts.
Preferably, described support bar is made up of more piece hollow pipe, and the longitudinal section of support bar includes multiple donuts, and radius
It is sequentially reduced.During support bar uses, stretching, the length of support bar increases, and also can be shunk support bar, its length pole
Big shortening.
Preferably, one end of described case lid is fixedly connected with casing, and button is passed through in the opposite end that case lid is fixedly connected end with casing
Component is flexibly connected with casing.
It is fixed on casing using by one end of case lid, in addition three ends are free end, then, when case lid is opened, can extend into case
The inlet cavities of body cavity inside are larger.
Preferably, described buckling piece is Magnet fastener.Buckling piece can be also other equivalent structures, is easy to case lid is solid with casing
Fixed connection, case lid is covered on casing.
The present invention compared with prior art, has such advantages as and beneficial effect:
(1)A kind of auxiliary device being applied to construction engineering cost budget of the present invention, sets using in the cavity of casing upper end
Put elastomer, realize casing upper end void space size is adjusted by the stretching of elastomer inner spring, compression, be easy to put
Put spider, when spider takes out, upper end space reduces.
(2)The technical program arranges baffle plate in the opposite end of casing, and baffle plate can act on workbench together with case lid and use,
Take full advantage of body structure, realize multi-functional use.
(3)The technical program structure is simple, and functional diversities are practical.
(4)The technical program arranges memory bank, and memory bank includes multiple cavitys for accommodating object, can achieve to use
The sorting placement of instrument, realizes several functions.
Brief description
Fig. 1 is a kind of structural representation of the auxiliary device being applied to construction engineering cost budget of the present invention;
Fig. 2 is the structural representation of memory bank in Fig. 1 of the present invention;
Fig. 3 is the structural representation of Fig. 1 elastomer of the present invention;
Fig. 4 is the expansion plane graph of Fig. 2;
Fig. 5 is the internal structure schematic diagram of embodiment 1 elastomer;
In figure:1- casing, 2- memory bank, 3- spring, 4- arcuate member, 5- baffle plate, 6- support bar, 7- buckling piece, 8- case lid, 9- handle
Handss, 10- shell, 12- connecting rod, 13- links up with, 14- arcuate member.
Specific embodiment
For making the object, technical solutions and advantages of the present invention become more apparent, with reference to embodiment and accompanying drawing, to this
Invention is described in further detail, and the exemplary embodiment of the present invention and its explanation are only used for explaining the present invention, do not make
For limitation of the invention.
Embodiment 1:
A kind of auxiliary device being applied to construction engineering cost budget, including casing 1, case lid 8, casing 1 include lower end cavity and
Upper end cavity, is provided with memory bank 2 in the lower end cavity of casing 1, be provided with the upper end cavity of casing 1 with the upper end cavity of casing in
The elastomer 4 that wall connects, elastomer 4 is provided with spring 3, and spring 3 is evenly distributed in elastomer 4, and two free ends of spring 3 divide
Tong Guo connecting rod 12 not be connected with the arcuate member 14 of the upper end cavity inner wall being arranged on casing 1, the free end of connecting rod 12 is provided with
Hook 13, hook 13 can be suspended on arcuate member 14, and the number at least two of described elastomer 4 is symmetrically distributed in casing 1 phase
To upper end cavity inner wall, the upper end cavity surrounding inwall of described casing 1 is weaving cloth;The surface of case lid 8 is provided with handle 9;Case
Lid 8 opposite end be provided with baffle plate 5, baffle plate 5 is provided with support bar 6, and support bar 6 one end is hinged with baffle plate 5, support bar 6 another
One end is held within the weaving cloth of upper end cavity surrounding of casing 1, and described support bar 6 is expansion link;
Described casing 1, case lid 8 are located in shell 10 as integrative-structure, and described memory bank 2 is upper end open four side body structure,
The bottom of described shell 10 is provided with roller, described memory bank(2)Surrounding partition be bendable folded structure.
Wherein, the number of described elastomer 4 is four, and each inwall side of the upper end cavity surrounding of casing 1 is all distributed one
Individual, and it is distributed at grade, two free ends of described arcuate member 14 are fixed on weaving cloth.
Wherein, described support bar 6 is made up of more piece hollow pipe, and the longitudinal section of support bar 6 includes multiple donuts, and half
Footpath is sequentially reduced.
Wherein, one end of described case lid 8 is fixedly connected with casing 1, and the opposite end that case lid 8 is fixedly connected end with casing 1 leads to
Cross buckling piece 7 to be flexibly connected with casing 1.
The present embodiment technical scheme compared with prior art,
1)A kind of auxiliary device being applied to construction engineering cost budget of the present invention, is arranged using in the cavity of casing upper end
Elastomer, realizes casing upper end void space size is adjusted by the stretching of elastomer inner spring, compression, is easy to place
Spider, when spider takes out, upper end space reduces.
2)The technical program arranges baffle plate in the opposite end of casing, and baffle plate can act on workbench together with case lid and use,
Take full advantage of body structure, realize multi-functional use.
3)The technical program structure is simple, and functional diversities are practical.
4)The technical program arranges memory bank, and memory bank includes multiple cavitys for accommodating object, can achieve to use
The sorting placement of instrument.
Above-described specific embodiment, has been carried out to the purpose of the present invention, technical scheme and beneficial effect further
Describe in detail, be should be understood that the specific embodiment that the foregoing is only the present invention, be not intended to limit the present invention
Protection domain, all any modification, equivalent substitution and improvement within the spirit and principles in the present invention, done etc., all should comprise
Within protection scope of the present invention.
Claims (5)
1. a kind of auxiliary device being applied to construction engineering cost budget it is characterised in that:Including casing(1), case lid(8), case
Body(1)Including lower end cavity and upper end cavity, casing(1)Lower end cavity in be provided with memory bank(2), casing(1)Upper end empty
Intracavity is provided with the elastomer being connected with the upper end cavity inner wall of casing(4), elastomer(4)It is provided with spring(3), spring(3)Uniformly
It is distributed in elastomer(4)Interior, spring(3)Two free ends respectively pass through connecting rod(12)Be arranged on casing(1)Upper end
The arcuate member of cavity inner wall(14)Connect, connecting rod(12)Free end be provided with hook(13), hook(13)Arc can be suspended on
Part(14)On, described elastomer(4)Number at least two, be symmetrically distributed in casing(1)Relative upper end cavity inner wall, institute
State casing(1)Upper end cavity surrounding inwall be weaving cloth;Case lid(8)Surface be provided with handle(9);Case lid(8)Relatively two
End is provided with baffle plate(5), baffle plate(5)It is provided with support bar(6), support bar(6)One end and baffle plate(5)Hinged, support bar(6)Another
One end is held within casing(1)The weaving cloth of upper end cavity surrounding on, described support bar(6)For expansion link;
Described casing(1), case lid(8)It is located at shell as integrative-structure(10)Interior, described memory bank(2)For upper end open four side
Body structure, described shell(10)Bottom be provided with roller, described memory bank(2)Surrounding partition be bendable folded structure.
2. a kind of auxiliary device being applied to construction engineering cost budget according to claim 1 is it is characterised in that institute
State elastomer(4)Number be four, casing(1)Each inwall side of upper end cavity surrounding be all distributed one, and be distributed in
On same plane, described arcuate member(14)Two free ends be fixed on weaving cloth on.
3. a kind of auxiliary device being applied to construction engineering cost budget according to claim 2 it is characterised in that:Described
Support bar(6)It is made up of more piece hollow pipe, support bar(6)Longitudinal section include multiple donuts, and radius is sequentially reduced.
4. a kind of auxiliary device being applied to construction engineering cost budget according to claim 1 it is characterised in that:Described
Case lid(8)One end and casing(1)It is fixedly connected, case lid(8)With casing(1)Buckling piece is passed through in the opposite end being fixedly connected end
(7)With casing(1)It is flexibly connected.
5. a kind of auxiliary device being applied to construction engineering cost budget according to claim 4 it is characterised in that:Described
Buckling piece(7)For Magnet fastener.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610732095.5A CN106388285A (en) | 2016-08-26 | 2016-08-26 | Assisting device applied to construction project cost budget |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610732095.5A CN106388285A (en) | 2016-08-26 | 2016-08-26 | Assisting device applied to construction project cost budget |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106388285A true CN106388285A (en) | 2017-02-15 |
Family
ID=58005271
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610732095.5A Pending CN106388285A (en) | 2016-08-26 | 2016-08-26 | Assisting device applied to construction project cost budget |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106388285A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001358479A (en) * | 2000-04-24 | 2001-12-26 | Hewlett Packard Co <Hp> | Flat supporting system for attaching device to rack |
CN204642485U (en) * | 2015-04-01 | 2015-09-16 | 衢州毛陈化工科技有限公司 | The article placing box that a kind of internal interval is adjustable |
CN204772470U (en) * | 2015-07-15 | 2015-11-18 | 牡丹江师范学院 | Building engineering is toolbox for cost |
CN205415567U (en) * | 2016-03-22 | 2016-08-03 | 李熠 | Surveying instrument places case |
CN205456776U (en) * | 2016-03-21 | 2016-08-17 | 王琼 | Construction cost budgeting toolbox |
-
2016
- 2016-08-26 CN CN201610732095.5A patent/CN106388285A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001358479A (en) * | 2000-04-24 | 2001-12-26 | Hewlett Packard Co <Hp> | Flat supporting system for attaching device to rack |
CN204642485U (en) * | 2015-04-01 | 2015-09-16 | 衢州毛陈化工科技有限公司 | The article placing box that a kind of internal interval is adjustable |
CN204772470U (en) * | 2015-07-15 | 2015-11-18 | 牡丹江师范学院 | Building engineering is toolbox for cost |
CN205456776U (en) * | 2016-03-21 | 2016-08-17 | 王琼 | Construction cost budgeting toolbox |
CN205415567U (en) * | 2016-03-22 | 2016-08-03 | 李熠 | Surveying instrument places case |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Kaldor | Many-body perturbation-theory calculations with finite, bound basis sets | |
CN106388285A (en) | Assisting device applied to construction project cost budget | |
CN106307915A (en) | Auxiliary equipment making engineering building cost evaluation convenient | |
CN106272298A (en) | Construction engineering cost equipment | |
CN205768300U (en) | A kind of integral type easel | |
CN205502989U (en) | Folded cascade electric power support | |
CN209095526U (en) | A kind of project cost toolbox for budget | |
CN207488282U (en) | A kind of water quality Site Detection workbench | |
CN207576474U (en) | A kind of compact-sized flexible rack for test tube | |
CN105459055B (en) | Multifunctional tool box | |
CN216515493U (en) | Auxiliary device for pit digging and sand filling method | |
CN212196661U (en) | Cell quantitative detection kit | |
CN205761287U (en) | A kind of comprehensive Colorimetric cylinder holder | |
CN207157811U (en) | Simple drawing box for construction site | |
CN103572955A (en) | Multifunctional positioning frame for automatic pasting machine | |
CN211843888U (en) | Counting currency instrument for accounting | |
CN109953489A (en) | A kind of detachable Multifunctional desk | |
CN218195089U (en) | Portable toolbox for building | |
CN210198381U (en) | On-spot survey and drawing platform of building engineering | |
CN206594883U (en) | A kind of design specialist teaching aid | |
CN209715177U (en) | A kind of chemical analysis Portable test tube stand | |
CN209340813U (en) | Economical management teaching training display board fixed frame | |
CN217674152U (en) | Portable ceramic tile repair detector | |
CN213308383U (en) | Fixed placer of instrument and meter | |
CN219316458U (en) | Portable lime pay-off |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170215 |