CN106383924A - Line quadrature graph drafting method realizing regulation and control scope full coverage - Google Patents
Line quadrature graph drafting method realizing regulation and control scope full coverage Download PDFInfo
- Publication number
- CN106383924A CN106383924A CN201610733077.9A CN201610733077A CN106383924A CN 106383924 A CN106383924 A CN 106383924A CN 201610733077 A CN201610733077 A CN 201610733077A CN 106383924 A CN106383924 A CN 106383924A
- Authority
- CN
- China
- Prior art keywords
- layer
- line
- graph
- equipment
- branch line
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/30—Circuit design
- G06F30/39—Circuit design at the physical level
- G06F30/392—Floor-planning or layout, e.g. partitioning or placement
Landscapes
- Engineering & Computer Science (AREA)
- Computer Hardware Design (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Architecture (AREA)
- Evolutionary Computation (AREA)
- Geometry (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
The invention provides a line quadrature graph drafting method realizing regulation and control scope full coverage; the line quadrature graph tries to comprise break equipment, distribution transformer, cable branch box and key position pole number information; the method comprises the following steps: obtaining line quadrature graph drafting data from an equipment management system; drafting an exit layer and a main line layer; drafting a branch line layer and a secondary branch line layer; building a distribution transform graph layer, and drafting a distribution transform layer on the distribution transform graph layer; adjusting a line quadrature graph layout, and issuing same; calculating user property and quantity connected in different segments, prioritizing users according to user property and quantity, thus allowing regulation and control personnel to recovery power supply of users and residents with higher priority according to prioritization. In a fault processing process, the regulation and control personnel can make a more scientific and reasonable power supply recovery scheme according to the property and quantity of users connected to different segments, thus recovering power supply of users and residents with higher priority.
Description
Technical field
The present invention relates to a kind of orthogonal drawing drawing method of circuit realizing modification scope all standing, belong to electric automatization system
Figure field.
Background technology
Conventional electrical power distribution automatization system circuit orthogonal graph only comprises line disconnection equipment, embodies electrical network connected mode, but
Do not comprise the information such as distribution transformer, cable branch box and key position shaft tower number it is impossible to accomplish distribution modification scope all standing,
The fault disposal method of science cannot be formulated according to user gradation, be unfavorable for the lifting of power grid enterprises' good service level.
In recent years, power grid enterprises at different levels regulating and controlling mechanism is devoted to lifting good service level, realizes distribution modification scope complete
Cover, constantly explore the method for drafting of circuit orthogonal graph, make every effort to comprise to cut-off equipment, distribution transformer, cable branch box and pass
The information such as key position shaft tower number, take into account neat, attractive in appearance simultaneously, project its scheduling controlling purposes, more comprehensively, accurately represent electrical network
Connected mode, realizes the accurate scheduling of all standing.
Content of the invention
The purpose of the present invention is to propose to a kind of orthogonal drawing drawing method of circuit realizing modification scope all standing, make every effort to comprise
Cut-off the information such as equipment, distribution transformer, cable branch box and key position shaft tower number, project its scheduling controlling purposes, more entirely
Face, accurately represent electrical network connected mode, realize the accurate scheduling of scope all standing.
Employed technical scheme comprise that for reaching above-mentioned purpose:
A kind of orthogonal drawing drawing method of circuit realizing modification scope all standing is it is characterised in that comprise the following steps:
1】Draw:
1.1】Obtain from equipment management system and draw orthogonal graph desired data;
1.2】Draw outlet layer and main line layer, and mark circuit section name, cut-off device numbering and shaft tower number is installed;As main line
Comprise ring main unit and cable distribution box in layer, then the equipment square frame that cut-offs in this ring main unit is marked, and mark this ring main unit
And the title of cable distribution box and numbering;
1.3】Draw branch line layer and secondary branch line layer, and mark branched line title, cut-off device numbering, T contact key
Position shaft tower number;Comprise ring main unit and cable distribution box as in branch line layer and secondary branch line layer, then by this ring main unit
The equipment square frame of cut-offfing marks, and marks title and the numbering of this ring main unit and cable distribution box;
1.4】Newly-built distribution transforming figure layer, draws distribution transforming layer in distribution transforming figure layer, and regulation and control person on duty can show or hide should as needed
Figure layer equipment;
1.5】Orthogonal graph distributing adjustment, issues;
2】According to step 1】The orthogonal graph issued, user's property of statistics different section institutes tape splicing and quantity, according to user's property
With quantity prioritization, regulation and control personnel preferentially recover the power supply of the high user of priority and resident according to priority.
Above-mentioned outlet layer comprises substation bus bar and gate out switch;
Main line layer comprises main line and its disjunction equipment, is drawn using horizontal;
Branch line layer comprises branched line and its disjunction equipment, is drawn using vertical;
Secondary branch line layer comprises secondary branch circuit and its disjunction equipment, is drawn using horizontal;
Distribution transforming floor comprises public change, specially becomes and entrance line road, and public affairs become and the special T line becoming is connected on main line, branch line and secondary branch line
Power supply point-rendering accurate.
It is an advantage of the invention that:The orthogonal drawing drawing method of circuit of the present invention, Special attention will be given to its realize modification scope all standing
Feature, makes every effort to comprise to cut-off the information such as equipment, distribution transformer, cable branch box and key position shaft tower number, takes into account whole simultaneously
Together, attractive in appearance, more comprehensively, accurately represent electrical network connected mode.The circuit orthogonal graph that the present invention provides comprises to cut-off equipment and joins
Piezoelectric transformer information, in fault disposal process, regulation and control personnel can be according to user's property sum of circuit difference section institute tape splicing
Amount, formulates more scientific and reasonable service restoration scheme, the preferential power supply recovering responsible consumer and resident, makes regulation and control personnel
Preferably fulfil commander's responsibility of distribution network failure disposal, correctness and promptness that lifting fault is disposed, lift power supply enterprise
Service level.
Brief description
Fig. 1 is an embodiment flow chart of the inventive method;
Fig. 2 is to carry out the schematic diagram that main line and branched line are drawn in the present invention;
Fig. 3 is a schematic diagram carrying out the drafting of the equipment such as ring main unit in the present invention;
Fig. 4 is a schematic diagram carrying out distribution transformer drafting in the present invention.
Specific embodiment
For ease of understanding the present invention, it is illustrated below in conjunction with the accompanying drawings.
Determine the screen resolution of regulation and control work station during drawing first, typically adopt 1920*1200 resolution, then according to
1:1 displaying ratio, the unified font size determining various pel sizes, live width and mark.
Then circuit is divided into 5 each levels, i.e. outlet layer, main line layer, branch line layer, secondary branch line layer and distribution transforming layer,
Wherein outlet layer comprises substation bus bar and gate out switch;Main line layer comprises the disjunction equipment such as main line and its block switch, adopts
Drawn with horizontal;Branch line layer comprises the disjunction equipment such as branched line and its demarcation switch, is drawn using vertical;Secondary branch line
Layer comprises the disjunction equipment such as secondary branch circuit and its demarcation switch, is drawn using horizontal;Distribution transforming layer comprises public change, specially become and its
Entrance line road, does not embody its specific annexation, but the power supply point that its T is connected on main line, branch line and secondary branch line must
Draw accurately.
With reference to Fig. 1, introduce the concrete steps of electrical power distribution automatization system circuit orthogonal graph drawing practice:
1】Draw;
CH1-1, from equipment management system(PMS)Obtain and draw orthogonal graph desired data;
CH1-2, drafting outlet layer and main line layer, and mark circuit section name, cut-off device numbering and shaft tower number is installed;Please join
Examine Fig. 2;
Contain ring main unit and cable distribution box in CH1-3, such as main line layer, then the equipment square frame that cut-offs in this ring main unit marked,
And mark title and the numbering of this ring main unit and cable distribution box, refer to Fig. 3;
CH1-4, drafting branch line layer and secondary branch line layer, and mark branched line title, cut-off device numbering, T contact pass
Key position shaft tower number;With reference to Fig. 2;
Ring main unit and cable distribution box is comprised, then by opening in this ring main unit in CH1-5, such as branch line layer and secondary branch line layer
Disconnected equipment square frame marks, and marks title and the numbering of this ring main unit and cable distribution box;
CH1-6, newly-built distribution transforming figure layer;
CH1-7, drafting distribution transformer and its entrance line road, this equipment component is included in distribution transforming figure layer, and regulation and control person on duty can
This figure layer equipment of show or hide, refer to Fig. 4 as needed;
CH1-8, orthogonal graph distributing adjustment, according to the principle adjustment that integral layout is neat, attractive in appearance, well-balanced;
CH1-9, orthogonal graph are issued;
2】According to step 1】The user's property of orthogonal graph statistics different section institutes tape splicing issued and quantity, according to user's property and
Quantity prioritization, regulation and control personnel preferentially recover the power supply of the high user of priority and resident according to priority.
Claims (2)
1. a kind of orthogonal drawing drawing method of circuit realizing modification scope all standing is it is characterised in that comprise the following steps:
1】Draw:
1.1】Obtain from equipment management system and draw orthogonal graph desired data;
1.2】Draw outlet layer and main line layer, and mark circuit section name, cut-off device numbering and shaft tower number is installed;As main line
Comprise ring main unit and cable distribution box in layer, then the equipment square frame that cut-offs in this ring main unit is marked, and mark this ring main unit
And the title of cable distribution box and numbering;
1.3】Draw branch line layer and secondary branch line layer, and mark branched line title, cut-off device numbering, T contact key
Position shaft tower number;Comprise ring main unit and cable distribution box as in branch line layer and secondary branch line layer, then by this ring main unit
The equipment square frame of cut-offfing marks, and marks title and the numbering of this ring main unit and cable distribution box;
1.4】Newly-built distribution transforming figure layer, draws distribution transforming layer in distribution transforming figure layer, and regulation and control person on duty can show or hide should as needed
Figure layer equipment;
1.5】Orthogonal graph distributing adjustment, issues;
2】According to step 1】The orthogonal graph issued, user's property of statistics different section institutes tape splicing and quantity, according to user's property
With quantity prioritization, regulation and control personnel preferentially recover the power supply of the high user of priority and resident according to priority.
2. a kind of orthogonal drawing drawing method of circuit realizing modification scope all standing according to claim 1, its feature exists
In described outlet layer comprises substation bus bar and gate out switch;
Main line layer comprises main line and its disjunction equipment, is drawn using horizontal;
Branch line layer comprises branched line and its disjunction equipment, is drawn using vertical;
Secondary branch line layer comprises secondary branch circuit and its disjunction equipment, is drawn using horizontal;
Distribution transforming floor comprises public change, specially becomes and entrance line road, and public affairs become and the special T line becoming is connected on main line, branch line and secondary branch line
Power supply point-rendering accurate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610733077.9A CN106383924A (en) | 2016-08-27 | 2016-08-27 | Line quadrature graph drafting method realizing regulation and control scope full coverage |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610733077.9A CN106383924A (en) | 2016-08-27 | 2016-08-27 | Line quadrature graph drafting method realizing regulation and control scope full coverage |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106383924A true CN106383924A (en) | 2017-02-08 |
Family
ID=57917247
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610733077.9A Pending CN106383924A (en) | 2016-08-27 | 2016-08-27 | Line quadrature graph drafting method realizing regulation and control scope full coverage |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106383924A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111736034A (en) * | 2020-05-23 | 2020-10-02 | 张涛涛 | Power failure distribution transformer and topology analysis based power distribution network fault area rapid identification method |
CN111935256A (en) * | 2020-07-30 | 2020-11-13 | 许昌许继软件技术有限公司 | Orthogonal graph Web publishing method and system for distribution network master station system |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2013026178A1 (en) * | 2011-08-23 | 2013-02-28 | General Electric Company | Orthogonal layout generation |
CN103020335A (en) * | 2012-11-23 | 2013-04-03 | 山东电力集团公司 | Method for automatically converting distribution network geographic wiring diagram into region orthogonal diagram |
CN103942733A (en) * | 2014-04-25 | 2014-07-23 | 常州东瑞电力软件有限公司 | Power distribution network wiring diagram automatic generation method |
CN104166943A (en) * | 2014-07-04 | 2014-11-26 | 国家电网公司 | Method and device for drawing cable line graph |
CN104362615A (en) * | 2014-10-17 | 2015-02-18 | 国家电网公司 | Non-fault segment power supply recovery method based on information platform |
-
2016
- 2016-08-27 CN CN201610733077.9A patent/CN106383924A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2013026178A1 (en) * | 2011-08-23 | 2013-02-28 | General Electric Company | Orthogonal layout generation |
CN103020335A (en) * | 2012-11-23 | 2013-04-03 | 山东电力集团公司 | Method for automatically converting distribution network geographic wiring diagram into region orthogonal diagram |
CN103942733A (en) * | 2014-04-25 | 2014-07-23 | 常州东瑞电力软件有限公司 | Power distribution network wiring diagram automatic generation method |
CN104166943A (en) * | 2014-07-04 | 2014-11-26 | 国家电网公司 | Method and device for drawing cable line graph |
CN104362615A (en) * | 2014-10-17 | 2015-02-18 | 国家电网公司 | Non-fault segment power supply recovery method based on information platform |
Non-Patent Citations (2)
Title |
---|
李晓凯等: ""配电网管理中的自动制图研究"", 《继电器》 * |
王彬: ""石家庄供电公司10kV配电GIS信息系统的设计与实现"", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111736034A (en) * | 2020-05-23 | 2020-10-02 | 张涛涛 | Power failure distribution transformer and topology analysis based power distribution network fault area rapid identification method |
CN111935256A (en) * | 2020-07-30 | 2020-11-13 | 许昌许继软件技术有限公司 | Orthogonal graph Web publishing method and system for distribution network master station system |
CN111935256B (en) * | 2020-07-30 | 2023-04-07 | 许昌许继软件技术有限公司 | Orthogonal graph Web publishing method and system for distribution network master station system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106651652A (en) | Power grid GIS-based multi-business system information fused power grid visualization method | |
CN104240139A (en) | Multi-service system information fusion power grid comprehensive visualization method based on three-dimensional GIS | |
CN105893516B (en) | Based on power distribution network fortune inspection cockpit of the battalion with adjusting data and its application | |
CN105373655A (en) | Method for organically correlating primary and secondary system connection diagrams of intelligent substation | |
CN105207121A (en) | Power distribution network fault emergency maintenance method based on topology analysis | |
CN102956021A (en) | Power grid comprehensive visualization method based on multi-service system information fusion | |
CN106163017A (en) | LED view urban architecture facade cluster light Internet control system | |
CN103679559A (en) | Visual grid system and fault identification method thereof | |
CN105429291A (en) | Correlation method of primary wiring diagram and secondary system logic connecting diagram of intelligent substation | |
CN102571514A (en) | Intelligent power consumption cell system | |
CN102809960A (en) | Large-screen-application-based three-party linkage visible monitoring system and method for regulation centre | |
CN106872856A (en) | Distribution network failure based on polynary fault collection actively rushes to repair system, method | |
CN110443402A (en) | A kind of urban distribution network gridding planing method adapting to high reliability power demands | |
CN102957205A (en) | Method and system for establishing distribution network model | |
CN102186063A (en) | Intelligent substation video monitoring method | |
CN104820890B (en) | A kind of power scheduling device model and power network production equipment information fusion method | |
CN106383924A (en) | Line quadrature graph drafting method realizing regulation and control scope full coverage | |
CN105071376A (en) | Method for implementing integrated framework of main distribution network | |
CN103369306B (en) | A kind of transformer substation video interlock method and system | |
CN202794997U (en) | Regulation and control center three-party linkage visualization monitoring system based on large screen application | |
CN103530743A (en) | Method for establishing information management system for distribution network line | |
DE102017118958A1 (en) | Energy management system device and an energy management system method | |
CN105117840B (en) | A kind of Study of Risk Evaluation Analysis for Power System method considering information system effect | |
CN108038332A (en) | A kind of online artwork rapid generation for the state power grid that faces the future | |
CN112884228B (en) | Big data-based transformer area line loss management and control system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170208 |