CN106383287B - 通过提高数据同步性提升电网稳定断面测量精度的方法 - Google Patents
通过提高数据同步性提升电网稳定断面测量精度的方法 Download PDFInfo
- Publication number
- CN106383287B CN106383287B CN201611102706.4A CN201611102706A CN106383287B CN 106383287 B CN106383287 B CN 106383287B CN 201611102706 A CN201611102706 A CN 201611102706A CN 106383287 B CN106383287 B CN 106383287B
- Authority
- CN
- China
- Prior art keywords
- measurement
- time
- error
- pmu
- stable section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000005259 measurement Methods 0.000 title claims abstract description 83
- 238000000034 method Methods 0.000 title claims abstract description 13
- 230000005540 biological transmission Effects 0.000 claims abstract description 11
- 239000004576 sand Substances 0.000 claims abstract description 11
- 239000011159 matrix material Substances 0.000 claims abstract description 10
- 239000000203 mixture Substances 0.000 claims abstract description 6
- 239000013598 vector Substances 0.000 claims description 6
- 239000011541 reaction mixture Substances 0.000 claims description 2
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 230000001360 synchronised effect Effects 0.000 abstract description 2
- 238000005457 optimization Methods 0.000 description 2
- 238000010276 construction Methods 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
Abstract
通过提高数据同步性提升电网稳定断面测量精度的方法,其特征在于包括如下步骤:1)获得稳定断面组成节点的一段时间序列的测量值,测量值包括电压幅值、电流幅值以及功率值;2)获得距离稳定断面组成节点较近的PMU的一段时间序列的测量值,测量值包括电压幅值、电流幅值以及功率值;3)计算普通测量zs和PMU测量zw相关系数矩阵ρsw;4)依据相关系数矩阵ρsw,求解测量集合的基准测量时刻t;5)根据基准测量时刻t可以得出较为精确的输电网稳定断面测量数值。本发明的有益效果为:本发明通过将测量数据进行同步,减少输电网断面测量的误差,为电网安全稳定分析提供相对准确的数据,进而减少电网稳定控制措施预留的裕度,提高电网利用率。
Description
技术领域
本发明涉及一种提升电网稳定断面测量精度的方法,特别是一种通过提高数据同步性提升电网稳定断面测量精度的方法。
背景技术
输电网稳定断面测量是电力系统安全稳定的基础,电力系统关于输电断面的控制依赖稳定断面测量的精确程度。输电网稳定断面测量的实质是一部分测量量的集合,决定断面测量精度的因素不仅仅是测量装置的精度,众多测量量时间维度上的同步性也是决定性因素之一。本发明统计测量装置测量延时分布特性,依托输电网个别测量点装设的PMU,对断面测量量数据集合进行时间维度上的同步,提高输电网稳定断面测量的精度,提升电网稳定控制精益化程度,实现电网可靠经济运行。
发明内容
本发明提供一种通过提高数据同步性提升电网稳定断面测量精度的方法,解决了输电网断面测量存在误差,电网安全稳定分析数据不准确等问题。
本发明是通过以下技术方案实现的:
通过提高数据同步性提升电网稳定断面测量精度的方法,包括如下步骤:
1)获得稳定断面组成节点的一段时间序列的测量值,测量值包括电压幅值、电流幅值以及功率值;
2)获得距离稳定断面组成节点较近的PMU的一段时间序列的测量值,测量值包括电压幅值、电流幅值以及功率值;
3)计算普通测量zs和PMU测量zw相关系数矩阵ρsw;
4)依据相关系数矩阵ρsw,求解测量集合的基准测量时刻t;
5)根据基准测量时刻t可以得出较为精确的输电网稳定断面测量数值。
其中,所述的相关系数矩阵ρsw的计算过程如下:
测量精度由装置的测量精度和数据同步偏差两部分因素决定:
ε=et+em (1)
式(1)中,ε为测量数据的整体误差,et为时间同步性引起的误差,em为装置测量误差;et的数值由被测量的变化率和与基准时刻的偏差两部分因素决定:
et=ktd (2)
式(2)中k为被测量量的变化率,td为测量时刻与基准时刻的偏差;普通测量时延td认为服从以下概率密度:
E[εεT]=E[emem T]+E[etet T]
=k2E[tdtd T]+E[etet T] (4)
测量在短时间内,衡量不同测量信号在时域上的同步关系的常用方法是求取不同测量的相关系数:
式(5)中,ρsw为普通测量zs和PMU测量zw相关系数;t1为当前普通测量的时刻,因为普通测量彼此时刻互不统一并且没有时标,t1数值未知;t2为当前PMU测量序列的截止时刻;τ为当前PMU测量序列的时间序列。
C为互协方差函数,其表达式如式(6):
式(6)中,μs和μw分别为zs和zw的一段时间内的均值。
其中,所述的Rsw为测量zs和zw互相关系函数,表达式如式(7):
Rsw(t1,t2)=E{zs(t1)[zw(t2)]T} (7)
ρsw(t1,t2-τ)是一系列按时间顺序排列的PMU测量向量与普通测量向量的相关系数矩阵。
其中,相关度最高的列向量所对应的PMU测量时刻,即是普通混合测量系统的当前基准测量时刻:
ρsw(t1,t2-τt)=max[ρsw(t1,t2-τ)] (8)
t=t2-τt (9)
式(8)和(9)中,τt为相关度最高列其所对应的时刻;t为测量集合的基准测量时刻;装置测量误差已知,要得到整体误差,首先要得到时间同步性引起的误差。
与现有技术相比,本发明的有益效果为:本发明通过将测量数据进行同步,减少输电网断面测量的误差,为电网安全稳定分析提供相对准确的数据,进而减少电网稳定控制措施预留的裕度,提高电网利用率。不仅提高了电网安全稳定分析的精确度,也可以在一定程度上缓解电网输电阻塞,节省电网建设上的投资。
附图说明
图1是本发明系统负荷变化曲线图。
图2是图1中系统在区域Ⅰ时的稳态系统断面测量对比图。
图3是图1中系统在区域Ⅱ-Ⅳ时的动态系统断面测量对比图。
具体实施方式
下面结合附图和具体实施方式对本发明作进一步的说明。
实施例1
如图1-3所示,通过提高数据同步性提升电网稳定断面测量精度的方法,稳定断面数据由5个测量点组成,具体数值见表1,表1为选取的5个测量点的稳定断面数据,数据刷新频率设置为10帧/min,测量值服从标准差为0.02、误差均值为0的正态分布;其测量延时服从标准差为0.1s、均值为0.1的正态分布,稳定断面数据的5个测量点的测量变化率如图1所示,图中,CASE-1为没有经过优化的断面测量,CASE-2为经过优化过的断面测量。
表1
Claims (1)
1.通过提高数据同步性提升电网稳定断面测量精度的方法,其特征在于包括如下步骤:
1)获得稳定断面组成节点的一段时间序列的测量值,测量值包括电压幅值、电流幅值以及功率值;
2)获得距离稳定断面组成节点较近的PMU的一段时间序列的测量值,测量值包括电压幅值、电流幅值以及功率值;
3)计算普通测量zs和PMU测量zw相关系数矩阵ρsw;
4)依据相关系数矩阵ρsw,求解测量集合的基准测量时刻t;
5)根据基准测量时刻t可以得出较为精确的输电网稳定断面测量数值;
所述的相关系数矩阵ρsw的计算过程如下:
测量精度由装置的测量精度和数据同步偏差两部分因素决定:
ε=et+em (1)
式(1)中,ε为测量数据的整体误差,et为时间同步性引起的误差,em为装置测量误差;et的数值由被测量的变化率和与基准时刻的偏差两部分因素决定:
et=ktd (2)
式(2)中k为被测量量的变化率,td为测量时刻与基准时刻的偏差;普通测量时延td认为服从以下概率密度:
测量在短时间内,衡量不同测量信号在时域上的同步关系的常用方法是求取不同测量的相关系数:
式(5)中,ρsw为普通测量zs和PMU测量zw相关系数;t1为当前普通测量的时刻,因为普通测量彼此时刻互不统一并且没有时标,t1数值未知;t2为当前PMU测量序列的截止时刻;τ为当前PMU测量序列的时间序列;
C为互协方差函数,其表达式如式(6):
式(6)中,μs和μw分别为zs和zw的一段时间内的均值;
所述的Rsw为测量zs和zw互相关系函数,表达式如式(7):
Rsw(t1,t2)=E{zs(t1)[zw(t2)]T} (7);
相关度最高的列向量所对应的PMU测量时刻,即是普通混合测量系统的当前基准测量时刻:
ρsw(t1,t2-τt)=max[ρsw(t1,t2-τ)] (8)
t=t2-τt (9)
式(8)和(9)中,τt为相关度最高列其所对应的时刻;t为测量集合的基准测量时刻;ρsw(t1,t2-τ)是一系列按时间顺序排列的PMU测量向量与普通测量向量的相关系数矩阵;装置测量误差已知,要得到整体误差,首先要得到时间同步性引起的误差。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611102706.4A CN106383287B (zh) | 2016-12-05 | 2016-12-05 | 通过提高数据同步性提升电网稳定断面测量精度的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611102706.4A CN106383287B (zh) | 2016-12-05 | 2016-12-05 | 通过提高数据同步性提升电网稳定断面测量精度的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106383287A CN106383287A (zh) | 2017-02-08 |
CN106383287B true CN106383287B (zh) | 2022-03-15 |
Family
ID=57959414
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611102706.4A Active CN106383287B (zh) | 2016-12-05 | 2016-12-05 | 通过提高数据同步性提升电网稳定断面测量精度的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106383287B (zh) |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10027119B2 (en) | 2016-05-28 | 2018-07-17 | PXiSE Energy Solutions, LLC | Decoupling synchrophasor based control system for multiple distributed energy resources |
US10615604B2 (en) | 2016-05-28 | 2020-04-07 | PXiSE Energy Solutions, LLC | Decoupling synchrophasor based control system for distributed energy resources |
US10452032B1 (en) | 2016-09-08 | 2019-10-22 | PXiSE Energy Solutions, LLC | Optimizing power contribution of distributed energy resources for real time power demand scheduling |
US10599175B1 (en) | 2017-02-28 | 2020-03-24 | PXiSE Energy Solutions, LLC | Time synchronized frequency and voltage regulation of electric power balancing areas |
US10990072B2 (en) | 2017-11-28 | 2021-04-27 | PXiSE Energy Solutions, LLC | Maintaining power grid stability using predicted data |
CN108362931A (zh) * | 2017-12-25 | 2018-08-03 | 北京四方继保自动化股份有限公司 | 一种应用于电网稳定控制的同步数据采集方法 |
CN112199421B (zh) * | 2020-12-04 | 2021-03-09 | 中国电力科学研究院有限公司 | 一种多源异构数据融合和量测数据多源互校验方法及系统 |
US11056912B1 (en) | 2021-01-25 | 2021-07-06 | PXiSE Energy Solutions, LLC | Power system optimization using hierarchical clusters |
CN117060592B (zh) * | 2023-08-30 | 2024-02-23 | 国网山东省电力公司德州供电公司 | 基于多域协同的电网数据同步校准方法及系统 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101750562A (zh) * | 2010-01-13 | 2010-06-23 | 湖北省电力公司 | 基于潮流方程灵敏度分析的非pmu测点动态过程估计方法 |
CN102611102A (zh) * | 2012-03-13 | 2012-07-25 | 河海大学 | 一种基于pmu实测的电力系统分区建模方法 |
CN103116097A (zh) * | 2013-01-25 | 2013-05-22 | 中国电力科学研究院 | 基于多断面混合量测信息的设备参数在线辨识方法 |
CN103606113A (zh) * | 2013-12-02 | 2014-02-26 | 东北石油大学 | 基于pmu装置的电力系统静态状态估计方法 |
-
2016
- 2016-12-05 CN CN201611102706.4A patent/CN106383287B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101750562A (zh) * | 2010-01-13 | 2010-06-23 | 湖北省电力公司 | 基于潮流方程灵敏度分析的非pmu测点动态过程估计方法 |
CN102611102A (zh) * | 2012-03-13 | 2012-07-25 | 河海大学 | 一种基于pmu实测的电力系统分区建模方法 |
CN103116097A (zh) * | 2013-01-25 | 2013-05-22 | 中国电力科学研究院 | 基于多断面混合量测信息的设备参数在线辨识方法 |
CN103606113A (zh) * | 2013-12-02 | 2014-02-26 | 东北石油大学 | 基于pmu装置的电力系统静态状态估计方法 |
Non-Patent Citations (2)
Title |
---|
Estimating the Voltage Stability Margin Using PMU Measurements;Heng-Yi Su等;《IEEE TRANSACTIONS ON POWER SYSTEMS》;20160731;第31卷(第4期);第3221-3229页 * |
电力系统电压稳定分区和关键断面的确定;赵金利等;《电力系统自动化》;20080910;第32卷(第17期);第1-5页 * |
Also Published As
Publication number | Publication date |
---|---|
CN106383287A (zh) | 2017-02-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106383287B (zh) | 通过提高数据同步性提升电网稳定断面测量精度的方法 | |
Pearson et al. | High-precision calibration of the radiocarbon time scale, 500–2500 BC | |
CN109255160B (zh) | 基于神经网络的单元延时预测方法和单元延时灵敏度计算方法 | |
US10557894B2 (en) | Reference signal correction circuit | |
CN110031877B (zh) | 一种基于grnn模型的区域nwp对流层延迟改正方法 | |
CN102654771B (zh) | 一种模拟通道的自动校准方法及系统 | |
US11125627B2 (en) | Device and method for determining a temperature or a temperature-dependent value usable for determining the temperature, temperature sensor, pressure sensor and combination sensor | |
US20130069616A1 (en) | Offset calibration technique to improve performance of band-gap voltage reference | |
CN101988957B (zh) | 变电站合并单元电量采样准确性的动态检测方法及系统 | |
CN102353470A (zh) | 电压动态跟踪的热电阻测量方法 | |
CN103941622A (zh) | 基于fpga的高精度秒脉冲倍频出采样脉冲的方法 | |
CN106302014B (zh) | 宽量程高精度的信号测量方法 | |
CN112345813A (zh) | 动态测量精度的动态补偿方法 | |
CN106154257B (zh) | 基于FFT与apFFT的精密测量雷达二次测频方法 | |
CN106707252A (zh) | 精密测距模拟器测距精度标校装置及方法 | |
KR101664010B1 (ko) | 시각 동기화 데이터를 이용한 전력계통의 선로정수 추정방법 | |
CN106093905B (zh) | 基于apFFT相位差的精密测量雷达频偏分类测频方法 | |
CN107732940B (zh) | 一种基于adpss的电力系统稳定器参数优化试验方法 | |
Wei et al. | Application of a simultaneous iterations reconstruction technique for a 3-D water vapor tomography system | |
Mattia et al. | 0.7 V supply self-biased nanoWatt MOS-only threshold voltage monitor | |
CN111367157B (zh) | 一种多路比相测量系统及方法 | |
Duggleby | Estimation of the reliability of parameters obtained by non‐linear regression | |
CN102142952A (zh) | 一种准确产生tdev噪声的方法和装置 | |
Dølven et al. | Response time correction of slow response sensor data by deconvolution of the growth-law equation | |
Andreassen et al. | Glaciological and geodetic mass balance of ten long-term glaciers in Norway. |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |