Current switching control method based on cascaded multilevel over-electric phase break system Download PDF

Info

Publication number
CN106379201A
CN106379201A CN201610890444.6A CN201610890444A CN106379201A CN 106379201 A CN106379201 A CN 106379201A CN 201610890444 A CN201610890444 A CN 201610890444A CN 106379201 A CN106379201 A CN 106379201A
Authority
CN
China
Prior art keywords
current
train
phase
ground surface
surface over
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610890444.6A
Other languages
Chinese (zh)
Inventor
熊成林
吴瑕杰
刁飞
雷海
葛兴来
宋文胜
冯晓云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Jiaotong University
Original Assignee
Southwest Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Jiaotong University filed Critical Southwest Jiaotong University
Priority to CN201610890444.6A priority Critical patent/CN106379201A/en
Publication of CN106379201A publication Critical patent/CN106379201A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60MPOWER SUPPLY LINES, AND DEVICES ALONG RAILS, FOR ELECTRICALLY- PROPELLED VEHICLES
    • B60M3/00Feeding power to supply lines in contact with collector on vehicles; Arrangements for consuming regenerative power
    • B60M3/04Arrangements for cutting in and out of individual track sections

Abstract

The invention discloses a current switching control method based on a cascaded multilevel over-electric phase break system. A current transformer of the cascaded multilevel over-electric phase break system is controlled to output current; when a pantograph of a train is in contact with a power supply arm of a traction power supply network and a neutral section at the same time, controllable switching of load current, required by the train, between the power supply arm of the traction network and the neutral section is realized, so that no impact current is generated when the pantograph is separated from or connected to the power supply arm of the traction network or the neutral section, and the adverse effect on a vehicle network in a transient process is avoided. According to the current switching control method, when an electric locomotive or a motor train unit passes through the cascaded multilevel over-electric phase break system, no impact is generated during load current switching of the train, the problems of arc discharge and overvoltage of interceptive current are solved, and the train can flexibly pass through an electrical split phase.

Description

Current switching control method based on cascade connection multi-level ground surface over-current split-phase system
Technical field
The present invention relates to the field of electric split-phase is had and in particular to one kind using traditional single phase industrial frequency traction electric power system etc. Current switching control method based on cascade connection multi-level ground surface over-current split-phase system.
Background technology
The method of electric locomotive (EMUs) phase splitting has multiple, and early stage train speed is slower, generally adopts manual mistake Electric split-phase, is provided with the operation of split-phase mark conductor driver phase splitting in phase-separating section.To before neutral section, driver is first by draft stage potential drop To 0, disconnect accessory system, then tractive transformer former limit main circuit breaker is disconnected, make locomotive not charged by neutral section.Locomotive enters After entering the service area of next phase supply arm, driver closes main breaking and starts accessory system, progressively recovers traction level.Manually Phase splitting driver's high labor intensive, must be by driver's power-off, if there be not power-off phase splitting when crossing split-phase, can be in entrance Property section when Traction networks and pantograph produce overvoltage arcing, burn out Traction networks and pantograph, or even the major accident such as line to line fault, This problem of continuous improvement with train running speed will be more prominent.
At present, electric locomotive (EMUs) generally adopts automatic phase splitting method, mainly has two kinds:Ground is automatically undue Mutually with automatic passing over of neutral section on car.During using ground surface over-current split-phase, electric locomotive (EMUs) does not need any action, and main circuit breaks The electric time is very short, the suitable gradient larger and the big difficult location of freight volume, Japanese this method is used for EMU.
Accompanying drawing 1 is the fundamental diagram of traditional ground automatic neutral-section passing device, and its course of work is as follows:Work as electric locomotive (EMUs) run to that during CG1, (current of traffic is as shown in the figure;CG1~CG4 is locomotive position sensor, opens for producing Close switching signal, when train operation is to a certain position, corresponding switch motion), switch K1 closure, neutral section contact net is by A phase Power supply, treats that locomotive enters neutral section, when reaching second place sensor CG2, K1 disconnects, and K2 closes rapidly, completes neutral section and supply The commutation conversion of electricity.Because now neutral section is powered by B phase, electric locomotive (EMUs) can be without any additional behaviour Make, load passes through split-phase section in the case of being basically unchanged, when locomotive sails out of at CG4, K2 disconnects, and each equipment recovers original shape State.During backward going, two switches are controlled to disconnect in turn and closure with reverse order by control system.During ground surface over-current split-phase, Electric locomotive (EMUs) carries out voltage conversion in neutral section, is that band carries disconnection split-phase switch, can produce cut-off overvoltage, split Close requirement higher;It is fully loaded another split-phase switch of closure simultaneously, locomotive has tractive transformer, because two-phase phase place differs Sample, the stable state magnetic flux of transformer has difference, can be because dynamic magnetic flux saturation leads to combined floodgate surge overcurrent during combined floodgate.For rotation Motor the locomotive from tractive transformer power taking, also result in accessory system excessively stream during combined floodgate.
For the shortcoming of traditional ground phase splitting device, researcher is had to propose corrective measure, the ground after improvement As shown in Figure 2, its operation principle is as follows for phase splitting device:(the train operation when electric locomotive (EMUs) runs to CG1 Direction is as shown in the figure;CG1~CG4 is locomotive position sensor, and for producing switch switching signal, train operation is to a certain position When, corresponding switch motion), controller sends control signal makes IGCT SCR1, SCR2 turn on.A phase voltage is become by step-down Depressor TX1, IGCT SCR1, SCR2, step-up transformer TX3 reaches neutral section.The triggering of IGCT SCR1, SCR2 adopts voltage Zero cross fired.When locomotive driving is to CG3, controller sends control signal makes IGCT SCR1, SCR2 turn off, controller simultaneously Sending control signal makes SCR3, SCR4 turn on.So neutral section is just powered by A phase and is changed into B phase and powers.B phase voltage passes through fall Pressure transformer TX2, IGCT SCR3, SCR4, step-up transformer TX3 reaches neutral section.When at locomotive driving to CG4, control Device sends control signal makes IGCT SCR1, SCR2, SCR3, SCR4 turn off.System returns to reset condition.It can be seen that, after improvement Scheme still can not be fully solved the shortcoming of traditional ground phase splitting device, due to needing to adopt step transformer, increase Complexity and the cost of system are added.
In sum, there is problems with the ground surface over-current neutral section of prior art:1) due in whole process being Fully loaded section breaker is higher to switching requirements;2), during neutral section voltage conversion, it is that band carries disconnection split-phase switch, can produce and dam Overvoltage;3) when neutral section carries out voltage switching, before and after switching, voltage-phase is inconsistent, the stable state of tractive transformer on locomotive Magnetic flux just has difference, can be because dynamic magnetic flux saturation leads to combined floodgate surge overcurrent during combined floodgate.For electric rotating machine and from leading Draw the locomotive of transformer power taking, during combined floodgate, also result in accessory system excessively stream.
Content of the invention
The technical problem to be solved is to provide a kind of electricity based on cascade connection multi-level ground surface over-current split-phase system Stream method for handover control, makes related system when electric locomotive band carries logical phase splitting, is capable of electric current needed for electric locomotive Controlled switching between traction power supply arm and neutral section, thus realize that pantograph is disconnected with the no flow point of target wire or no stream closes Close.
For solving above-mentioned technical problem, the technical solution used in the present invention is:
A kind of current switching control method based on cascade connection multi-level ground surface over-current split-phase system, comprises the following steps:
Step 1:In the ground surface over-current split-phase system being built using cascade connection multi-level ground surface over-current neutral section, have for true Determine the primary importance sensor CG1 of locomotive position, second place sensor CG2, the 3rd position sensor CG3, the 4th position pass Sensor CG4;
Have for measuring contact net voltage phase between contact net supply arm A, contact net supply arm B and phase splitting device The contact net voltage-phase detection module PTA of position and contact net voltage-phase detection module PTB;
Electric locomotive has train load electric current real time emission device, and ground surface over-current split-phase system has corresponding train and bears Carry electric current real time receiving apparatus;
Step 2:When electric locomotive travels to primary importance sensor CG1 position, primary importance sensor CG1 signal opens Dynamic, carry out the once adjustment of train load electric current, train real time load current emission device sends train load current signal;
Step 3:After ground surface over-current split-phase system train load electric current real time receiving apparatus receive, using dq Current Decoupling control Method processed controls output current of converter in ground surface over-current split-phase system, so that load current needed for electric locomotive is powered by contact net Arm A is transferred to neutral section;
Step 4:When train proceeds to the 3rd position sensor CG3, carry out the secondary adjustment of train load electric current, make electricity Load current needed for power locomotive is transferred to contact net supply arm B by neutral section.
According to such scheme, described dq current decoupling control method adopts traditional dq current decoupled control or prediction dq electricity Stream uneoupled control.
According to such scheme, described is not power-off phase splitting system based on cascade connection multi-level ground surface over-current split-phase system.
According to such scheme, current switching speed between supply arm and neutral section is by the speed of service of train, supply arm Length in parallel with neutral section together decides on.
Compared with prior art, the invention has the beneficial effects as follows:By dq electric current is adopted to the current transformer in corresponding system Uneoupled control, realizes the controlled switching in traction power supply arm and neutral section for the load current needed for electric locomotive, thus realizing train Band carries shock-free logical phase splitting, the transient process thoroughly avoiding traditional phase splitting mode to exist, and improves the suitable of device Ying Xing.
Brief description
Fig. 1 is the fundamental diagram of traditional ground phase splitting device.
Fig. 2 is a kind of improved ground surface over-current neutral section fundamental diagram.
Fig. 3 is cascade connection multi-level ground surface over-current split-phase system construction drawing of the present invention.
Fig. 4 is the adjustment schematic diagram of the d shaft current of the current switching control schematic diagram of the present invention.
Fig. 5 is that the adjustment schematic diagram of the q shaft current of the current switching control schematic diagram of the present invention (is carried from traction with train band Supply arm A runs to traction power supply arm B, train power is as a example traction power supply arm A switches to the process of neutral section).
Fig. 6 is a kind of control figure of dq Current Decoupling that the present invention adopts.
Specific embodiment
The present invention is further detailed explanation with reference to the accompanying drawings and detailed description.The system be provided with for Determine locomotive position sensor CG1, CG2, CG3, CG4 of locomotive position, in contact net supply arm A, contact net supply arm B and mistake It is provided between electric neutral section measuring the contact net voltage-phase detection module PTA of contact net voltage-phase and contact net electricity Pressure phase detecting module PTB, is provided with electric locomotive load current real time receiving apparatus.The ground surface over-current split-phase of cascade connection multi-level Device constitute system as shown in figure 3, current switching control schematic diagram of the present invention as shown in Figure 4, Figure 5, its specific implementation process As follows:
1st, train is when CG1 runs to CG4
1) when not reaching CG1, in given correspondence system, the reference d shaft current of current transformer, q shaft current give and are train Zero, neutral section voltage is consistent with the output voltage of supply arm A, when pantograph is simultaneously in parallel with neutral section and traction power supply arm A, Realize neutral section and the no impact of traction power supply arm is in parallel.
2) electric locomotive (or electric EMU) is when reaching CG1, block of bow collector of electric locomotive contact simultaneously traction power supply arm A with Neutral section lead, ground surface over-current split-phase system receives the real time load electric current of electric locomotive and is set as current transformer in correspondence system Reference d shaft current and with reference to q shaft current, its given value of current all rises according to given slope, so that neutral section voltage Amplitude and phase place changes so that load current needed for electric locomotive is transferred to neutral section from traction power supply arm A;When train is subject to When the wire of pantograph and traction power supply arm A departs from, realize no flow separation.
3) when electric locomotive runs on neutral section, according to patent CN201410036720.3 or CN201510133802.4 Method carries out the adjustment of adjacent two bridge arm voltage phase-amplitudes, after the completion of adjustment, the electricity of the voltage of neutral section and traction power supply arm B Pressure is completely the same, so when train pantograph is contacted with traction power supply arm B and neutral section simultaneously, neutral section and supply arm B it Between there is not circulation.
4), after electric locomotive (or electric EMU) remains running in arrival CG3, block of bow collector of electric locomotive contacts traction simultaneously Supply arm B and neutral section, set the reference d shaft current of current transformer in correspondence system and reference q shaft current as zero, its given value of current All decline according to given slope, so that the amplitude of neutral section voltage and phase place change so that bearing needed for electric locomotive Carry electric current and be transferred to traction power supply arm B from neutral section, train pantograph departs from realization no flow point during neutral section and breaks.
2nd, train is when CG4 runs to CG1
1) when not reaching CG4, in given correspondence system, the reference d shaft current of current transformer gives and is zero train, neutrality Section voltage is consistent with the output voltage of supply arm B, when pantograph is simultaneously in parallel with neutral section and traction power supply arm B, in realization Property section and traction power supply arm no impact in parallel.
2) electric locomotive (or electric EMU) is when reaching CG4, block of bow collector of electric locomotive contact simultaneously traction power supply arm B with Neutral section lead, ground surface over-current split-phase system receives the real time load electric current of electric locomotive and is set as current transformer in correspondence system Reference d shaft current and with reference to q shaft current, its given value of current all rises according to given slope, so that neutral section voltage Amplitude and phase place changes so that load current needed for electric locomotive is transferred to neutral section from traction power supply arm B;When train is subject to When the wire of pantograph and traction power supply arm A departs from, realize no flow separation.
3) when electric locomotive runs on neutral section, according to patent CN201410036720.3 or CN201510133802.4 Method carries out the adjustment of adjacent two bridge arm voltage phase-amplitudes, after the completion of adjustment, the electricity of the voltage of neutral section and traction power supply arm A Pressure is completely the same, so when train pantograph is contacted with traction power supply arm A and neutral section simultaneously, neutral section and supply arm A it Between there is not circulation.
4), after electric locomotive (or electric EMU) remains running in arrival CG2, block of bow collector of electric locomotive contacts traction simultaneously Supply arm A and neutral section, set the reference d shaft current of current transformer in correspondence system and reference q shaft current as zero, its given value of current All decline according to given slope, so that the amplitude of neutral section voltage and phase place change so that bearing needed for electric locomotive Carry electric current and be transferred to traction power supply arm A from neutral section, train pantograph departs from realization no flow point during neutral section and breaks.
Dq current decoupled control is adopted by current transformer in correspondence system, can be achieved with train band and carry during logical phase splitting Train load controlled current flow switches, thus avoiding corresponding transient process.
The current switching speed based on current transformer in the ground surface over-current split-phase system of cascade connection multi-level current transformer for the determination is first It needs to be determined that following parameter:
1) length L of phase-separating section neutrality section and supply arm parallel connection part, unit m are determined;
2) speed v of logical phase splitting train, unit m/s are determined;
3) determine the maximum current Imax needed for train.
After above-mentioned parameter determines, you can determine the time t that pantograph is contacted simultaneously with contact net and neutral section,
T=L/v (1)
Obtaining current switching time is kt, then speed Sc of power switching is
Sc=Imax/kt (2)
In formula, k is current switching time coefficient, k ∈ (0,1).
The present invention passes through to design a kind of current switching control method based on cascade connection multi-level ground surface over-current split-phase system, leads to Cross to corresponding current transformer output voltage amplitude and phase controlling, electric locomotive (or EMUs) run contact net supply arm with When property section, pantograph are contacted with the two simultaneously, realize bearing power needed for electric locomotive between neutral section and traction power supply arm Controlled switching, reach the no electrically separated of pantograph and target wire and no impact closure it is achieved that electric locomotive (motor-car Group) the logical phase splitting of band load no impact, to contact net and all no any impact of electric locomotive (or EMUs), and can reduce Requirement to switching device.

Claims (4)

1. a kind of current switching control method based on cascade connection multi-level ground surface over-current split-phase system it is characterised in that include with Lower step:
Step 1:In the ground surface over-current split-phase system being built using cascade connection multi-level ground surface over-current neutral section, have for determining machine The primary importance sensor CG1 of truck position, second place sensor CG2, the 3rd position sensor CG3, the 4th position sensor CG4;
Have for measuring contact net voltage-phase between contact net supply arm A, contact net supply arm B and phase splitting device Contact net voltage-phase detection module PTA and contact net voltage-phase detection module PTB;
Electric locomotive has train load electric current real time emission device, and ground surface over-current split-phase system has corresponding train load electricity Stream real time receiving apparatus;
Step 2:When electric locomotive travels to primary importance sensor CG1 position, primary importance sensor CG1 signal enabling, enters The once adjustment of ranks car load current, train real time load current emission device sends train load current signal;
Step 3:After ground surface over-current split-phase system train load electric current real time receiving apparatus receive, using dq current decoupled control side Method controls output current of converter in ground surface over-current split-phase system, makes load current needed for electric locomotive by contact net supply arm A It is transferred to neutral section;
Step 4:When train proceeds to the 3rd position sensor CG3, carry out the secondary adjustment of train load electric current, make electric power machine Load current needed for car is transferred to contact net supply arm B by neutral section.
2. the current switching control method based on cascade connection multi-level ground surface over-current split-phase system as claimed in claim 1, it is special Levy and be, described dq current decoupling control method adopts traditional dq current decoupled control or prediction dq current decoupled control.
3. the current switching control method based on cascade connection multi-level ground surface over-current split-phase system as claimed in claim 1, it is special Levy and be, described is not power-off phase splitting system based on cascade connection multi-level ground surface over-current split-phase system.
4. the current switching based on cascade connection multi-level ground surface over-current split-phase system as described in any one of claims 1 to 3 controls Method it is characterised in that current switching speed between supply arm and neutral section by the speed of service of train, supply arm with neutral Duan Binglian length together decides on.
CN201610890444.6A 2016-10-12 2016-10-12 Current switching control method based on cascaded multilevel over-electric phase break system Pending CN106379201A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610890444.6A CN106379201A (en) 2016-10-12 2016-10-12 Current switching control method based on cascaded multilevel over-electric phase break system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610890444.6A CN106379201A (en) 2016-10-12 2016-10-12 Current switching control method based on cascaded multilevel over-electric phase break system

Publications (1)

Publication Number Publication Date
CN106379201A true CN106379201A (en) 2017-02-08

Family

ID=57936299

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610890444.6A Pending CN106379201A (en) 2016-10-12 2016-10-12 Current switching control method based on cascaded multilevel over-electric phase break system

Country Status (1)

Country Link
CN (1) CN106379201A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108621866A (en) * 2018-05-11 2018-10-09 西南交通大学 A kind of cascade connection multi-level ground surface over-current neutral section based on battery energy storage
CN108790956A (en) * 2018-05-29 2018-11-13 中国铁道科学研究院集团有限公司 A kind of double-current system train crosses phase-separating section period control method
CN109033627A (en) * 2018-07-25 2018-12-18 西南交通大学 A kind of train crosses split-phase vehicle-net-bridge coupling model construction method
CN109839879A (en) * 2019-03-07 2019-06-04 西南交通大学 Digital simulation device and its analogy method, host computer-LKJ device, LKJ simulation system
CN110091760A (en) * 2018-01-31 2019-08-06 株洲中车时代电气股份有限公司 A kind of excessive phase current control method and device in flexibility ground
CN110091766A (en) * 2018-01-31 2019-08-06 株洲中车时代电气股份有限公司 A kind of intelligent ground automatic passing over of neutral section method and device
CN111319517A (en) * 2020-03-04 2020-06-23 西南交通大学 Train pantograph position detection method in virtual in-phase power supply system
CN111907382A (en) * 2019-05-09 2020-11-10 株洲中车时代电气股份有限公司 Power supply system for supplying power to long stator of long stator linear motor and step changing method
CN112550087A (en) * 2019-09-26 2021-03-26 株洲中车时代电气股份有限公司 Switching method, passing phase separation method, switching device and passing phase separation device for train passing phase separation switch assembly

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102555840A (en) * 2012-03-05 2012-07-11 西南交通大学 Coasting over-voltage split-phase pulse blocking and pulse unblocking method for alternating-current transmission system
CN103818271A (en) * 2014-01-26 2014-05-28 西南交通大学 Cascaded multi-level-based ground overvoltage phase splitting device
CN105539208A (en) * 2016-01-25 2016-05-04 西南交通大学 Power control method based on cascaded multilevel ground overvoltage phase splitting system
CN105799553A (en) * 2016-04-22 2016-07-27 中国船舶重工集团公司第七〇二研究所 Electronic ground automatic neutral section passing device
CN105922894A (en) * 2016-04-22 2016-09-07 中国船舶重工集团公司第七〇二研究所 Passing neutral section system based on high-power converter device, and control method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102555840A (en) * 2012-03-05 2012-07-11 西南交通大学 Coasting over-voltage split-phase pulse blocking and pulse unblocking method for alternating-current transmission system
CN103818271A (en) * 2014-01-26 2014-05-28 西南交通大学 Cascaded multi-level-based ground overvoltage phase splitting device
CN105539208A (en) * 2016-01-25 2016-05-04 西南交通大学 Power control method based on cascaded multilevel ground overvoltage phase splitting system
CN105799553A (en) * 2016-04-22 2016-07-27 中国船舶重工集团公司第七〇二研究所 Electronic ground automatic neutral section passing device
CN105922894A (en) * 2016-04-22 2016-09-07 中国船舶重工集团公司第七〇二研究所 Passing neutral section system based on high-power converter device, and control method thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张杰等: "一种动车组网侧变流器的动态性能", 《电工技术学报》 *

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110091760A (en) * 2018-01-31 2019-08-06 株洲中车时代电气股份有限公司 A kind of excessive phase current control method and device in flexibility ground
CN110091766A (en) * 2018-01-31 2019-08-06 株洲中车时代电气股份有限公司 A kind of intelligent ground automatic passing over of neutral section method and device
CN108621866A (en) * 2018-05-11 2018-10-09 西南交通大学 A kind of cascade connection multi-level ground surface over-current neutral section based on battery energy storage
CN108790956A (en) * 2018-05-29 2018-11-13 中国铁道科学研究院集团有限公司 A kind of double-current system train crosses phase-separating section period control method
CN109033627B (en) * 2018-07-25 2022-09-09 西南交通大学 Train passing split-phase train-network-bridge coupling model construction method
CN109033627A (en) * 2018-07-25 2018-12-18 西南交通大学 A kind of train crosses split-phase vehicle-net-bridge coupling model construction method
CN109839879A (en) * 2019-03-07 2019-06-04 西南交通大学 Digital simulation device and its analogy method, host computer-LKJ device, LKJ simulation system
CN109839879B (en) * 2019-03-07 2023-09-08 西南交通大学 Data simulation device and simulation method thereof, upper computer-LKJ device and LKJ simulation system
CN111907382A (en) * 2019-05-09 2020-11-10 株洲中车时代电气股份有限公司 Power supply system for supplying power to long stator of long stator linear motor and step changing method
CN112550087A (en) * 2019-09-26 2021-03-26 株洲中车时代电气股份有限公司 Switching method, passing phase separation method, switching device and passing phase separation device for train passing phase separation switch assembly
CN112550087B (en) * 2019-09-26 2022-08-02 株洲中车时代电气股份有限公司 Switching method, passing phase separation method, switching device and passing phase separation device for train passing phase separation switch assembly
CN111319517A (en) * 2020-03-04 2020-06-23 西南交通大学 Train pantograph position detection method in virtual in-phase power supply system
CN111319517B (en) * 2020-03-04 2022-05-10 西南交通大学 Method for detecting position of train pantograph in virtual in-phase power supply system

Similar Documents

Publication Publication Date Title
CN106379201A (en) Current switching control method based on cascaded multilevel over-electric phase break system
CN105539208A (en) Power control method based on cascaded multilevel ground overvoltage phase splitting system
CN103818271B (en) A kind of ground surface over-current neutral section based on cascade connection multi-level
CN101837744A (en) Novel method and device for phase separation control of ground surface over-current
CN103863141B (en) A kind of control method based on cascade connection multi-level ground surface over-current neutral section
CN109414997B (en) Vehicle electrical system, charging station and method for transmitting electrical energy
CN101820276B (en) Control method and the gate drivers of IGBT
CN100477474C (en) Three-level neutral point clamping inverter circuit
CN100497032C (en) Electric vehicle controller
CN109789810A (en) A kind of electric railway subregion institute's automatic neutral-section passing system and its control method
US20190106011A1 (en) Autonomous interconnection of a drive battery
CN205921399U (en) Transformer combined floodgate control system
CN110091766B (en) Intelligent ground automatic passing neutral section method and device
CN105015366B (en) Phase switching method for rapidly adjusting phase of reference voltage of inverter
CN113299505B (en) Mixed current-limiting on-off direct current breaker
CN106058939A (en) Closing control system and inrush current free control method of transformer
CN107834864B (en) A kind of combined power supply device direct Power Control method
CN108528249A (en) Team control charging system and matrix switch module
CN105691244A (en) System no-load monitoring device for electrified railway cut-through power supply and monitoring method thereof
CN110091754A (en) A kind of hybrid ground automatic neutral-section passing device and control method
CN201685724U (en) Novel ground overcurrent phase-split control device
CN1307798C (en) Circuit arrangement for the reliable switching of electrical circuits
CN105691245A (en) No-impact partition phase conversion system and method for electric locomotive
CN104786873B (en) A kind of voltage reconstruction method based on phaselocked loop
CN207345549U (en) Rail vehicle

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170208