CN106375120A - Fast topology method and apparatus of IT infrastructure - Google Patents

Fast topology method and apparatus of IT infrastructure Download PDF

Info

Publication number
CN106375120A
CN106375120A CN201610782869.5A CN201610782869A CN106375120A CN 106375120 A CN106375120 A CN 106375120A CN 201610782869 A CN201610782869 A CN 201610782869A CN 106375120 A CN106375120 A CN 106375120A
Authority
CN
China
Prior art keywords
topological
model
configuration item
infrastructure
incidence relation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610782869.5A
Other languages
Chinese (zh)
Other versions
CN106375120B (en
Inventor
杨克伟
黄大鹏
陈新亮
卢克伟
张泽钦
胡剑
朱志琨
朱汶珍
李念
许宜斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HANGZHOU DONGFANG COMMUNICATION SOFTWARE TECHNOLOGY Co Ltd
Original Assignee
HANGZHOU DONGFANG COMMUNICATION SOFTWARE TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HANGZHOU DONGFANG COMMUNICATION SOFTWARE TECHNOLOGY Co Ltd filed Critical HANGZHOU DONGFANG COMMUNICATION SOFTWARE TECHNOLOGY Co Ltd
Priority to CN201610782869.5A priority Critical patent/CN106375120B/en
Publication of CN106375120A publication Critical patent/CN106375120A/en
Application granted granted Critical
Publication of CN106375120B publication Critical patent/CN106375120B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/12Discovery or management of network topologies
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/14Network analysis or design
    • H04L41/145Network analysis or design involving simulating, designing, planning or modelling of a network

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

The invention relates to a fast topology method and apparatus of IT infrastructure. The method provided by the embodiment of the invention comprises the following steps: obtaining information of at least one configuration item required for a user application scene, and determining a topological model required for completing a target IT topological graph according to the application scene; determining all configuration items required for completing the target IT topological graph according to the topological model and the at least one configuration item; and determining an incidence relation among all configuration items according to an incidence list, and establishing the target IT topological graph according to the hierarchical layout of the topological model. According to the method provided by the embodiment of the invention, based on any one or more configuration items, the physical topology links or business pairing of related configuration items are obtained, and the topological graph is quickly generated according to a topology discovery algorithm, so that the topology speed is high, and the fast topology method and apparatus is suitable for a variety of topology application scenes, such as fault locating, associated alarm analysis and alarm influence analysis.

Description

A kind of it infrastructure rapid topology method and device
Technical field
The present invention relates to it infrastructure topology field, more particularly, to a kind of it infrastructure rapid topology method and dress Put.
Background technology
At present, the topology of it infrastructure relies primarily on the artificial mode drawn and realizes or the mode reality based on link Existing, but there is certain technological deficiency in both of which.The artificial mode drawn: need attendant to be carried out according to network topological diagram Manual drawing, workload is loaded down with trivial details and error-prone;Cannot accomplish to automatically update topological diagram according to it infrastructure data, ageing Difference.Mode based on traditional link: the acquisition of topological diagram depends on link data triggering to generate;Data promptness depends on wheel The inquiry cycle;Topological computation complexity is higher, poor-performing, and it is larger to expend server resource.
Content of the invention
On the one hand, embodiments provide a kind of it infrastructure rapid topology method, the method includes: obtain and use The information of at least one configuration item needed for the application scenarios of family, and target it topological diagram institute is completed according to the determination of described application scenarios The topological model needing;Determined according to described topological model and at least one configuration item described and complete described target it topological diagram institute The all configuration items needing;Incidence relation between described all configuration items is determined according to linked list, and according to described Top Modules The hierarchical layout of type sets up target it topological diagram.
Alternatively, open in said method, also include: abstract analysis are carried out to all it infrastructure, determines each basis Corresponding relation between facility and configuration item classification, and described corresponding relation is stored in described linked list;Determine inhomogeneity Incidence relation between other configuration item, and described incidence relation is stored to described linked list.
Alternatively, in the above-mentioned methods, incidence relation includes physical feature relation, physical couplings and/or relies on pass System.
Alternatively, in the above-mentioned methods, topological model is stored in model library, and described model library includes multiple topological models, And every kind of topological model corresponds to different application scenarios respectively.
On the other hand, the embodiment of the present invention provides a kind of it infrastructure rapid topology device, and this device includes: model is true Cover half block, for obtaining the information of at least one configuration item needed for user's application scenarios, and according to described application scenarios from mould The topological model completing needed for target it topological diagram is chosen in type storehouse;Configuration item determining module, for according to described topological model And described at least one configuration item determines all configuration items completing needed for described target it topological diagram;Topological diagram sets up mould Block, for determining the incidence relation between described all configuration items according to linked list, and the level according to described topological model Layout sets up target it topological diagram.
Alternatively, in said apparatus, also include: linked list sets up module, be used for setting up described linked list, to institute There are it infrastructure to carry out abstract analysis, determine the corresponding relation between each infrastructure and configuration item classification, and will be described Corresponding relation is stored in described linked list;And determine incidence relation between different classes of configuration item, and by described pass Connection relation stores to described linked list.
Alternatively, in said apparatus, incidence relation includes physical feature relation, physical couplings and/or relies on pass System.
Alternatively, in said apparatus, model library, for storing multiple topological models, and every kind of topological model is right respectively Answer different application scenarios.
The it infrastructure rapid topology method and device that the embodiment of the present invention is provided, based on arbitrarily single or multiple Configuration item sets out, and obtains physical topology link or the business pairing of relevant configuration item, further according to the fast fast-growing of topology discovery algorithm Become topological diagram, topological speed soon it is adaptable to multiple flutter application scenarios, such as divide by fault location, warning association analysis, alarm impact property Analysis.
Brief description
Fig. 1 is a kind of schematic flow sheet of it infrastructure rapid topology method provided in an embodiment of the present invention;
The rapid topology schematic flow sheet of the embodiment one that Fig. 2 provides for the present invention;
Fig. 3 is a kind of it infrastructure rapid topology apparatus structure schematic diagram provided in an embodiment of the present invention.
Specific embodiment
Below by drawings and Examples, technical scheme is described in further detail.
The present invention provides a kind of it infrastructure rapid topology method, by carrying out abstract point to it infrastructure in advance Analysis, determines the concrete classification of the configuration item belonging to different it infrastructure, and determines the incidence relation between different configuration items, with And set up different topological models according to not being both application scenarios;Then determined according to the application scenarios that user provides and correspond to therewith Topological model, and then the information of at least one configuration item according to needed for its application scenarios that topological model and user provide Determine all configuration items set up needed for target it topological diagram;It is then determined that the incidence relation between all configuration items, final root Hierarchical layout according to topological model quickly draws target it topological diagram.
Fig. 1 is a kind of schematic flow sheet of it infrastructure rapid topology method provided in an embodiment of the present invention, as Fig. 1 institute Show, the method includes:
Step s101, obtains the information of at least one configuration item needed for application scenarios that user provides, and according to application Scene determines the topological model completing needed for target it topological diagram.
It should be noted that the method need to set up corresponding topological model previously according to different application scenarios, Multiple topological models are stored in model library, and each topological model need to be recorded all needed for the corresponding application scenarios of this model Configuration item.
Step s102, determines according to topological model and at least one configuration item and completes needed for above-mentioned target it topological diagram All configuration items.
Step s103, determines the incidence relation between all configuration items, and the layer according to topological model according to linked list Secondary layout sets up target it topological diagram.
Linked list is used for storing the specific category of the configuration item belonging to different it infrastructure, and has also stated that inhomogeneity Incidence relation between other configuration item.
Alternatively, said method also includes step s100, carries out abstract analysis to it infrastructure, and according to abstract result Different it infrastructure are divided in different configuration item classifications, determine that the association between different classes of configuration item is closed System, and set up linked list to store the configuration item class belonging to the incidence relation of different configuration items and different it infrastructure Not.
Alternatively, in embodiments of the present invention it infrastructure are divided into: physical resource, virtual resource, platform resource, The big class such as application software and operation system, specifically: physical resource includes the subclass network equipment (as switch, router), prevents Wall with flues, physical server, storage device etc.;Virtual resource includes subclass Internet resources pond (as sdn), computing resource pond, storage Resource pool etc.;Platform resource includes subclass operating system, middleware, database;Application software package enclosed tool class application software, industry Business module and application interface etc..It should be noted that the classification to it infrastructure that the embodiment of the present invention is provided is only one Plant embodiment, do not limit its specific criteria for classifying, its concrete division can be defined using needs according to difference.
Alternatively, in above-mentioned steps, incidence relation includes: physical feature relation (logic means relation), physical connection are closed System's (logic connecting relation) and dependence (impact relation);Wherein, physical feature closes the hardware meaning between different configuration items Physical/logical relation, such as: board is a part for switch, plate is installed on switch;Physical couplings refer to different configurations Software physics/logic connecting relation between, such as: fire wall is connected with interface;Dependence refers to phase between different configuration items Mutual relation, such as: application software is disposed on the application server.
Alternatively, incidence relation can be expressed by different describing modes, the specific descriptions class of description incidence relation Type includes: relationship type, inverse relationship type and uml relationship type, the following table is description incidence relation using different classes What type was expressed embodies mode and its affiliated incidence relation.
Table 1 incidence relation list
Association type Relationship type Inverse relationship type Uml relationship type Incidence relation
Incidence relation 01 Use By ... use Polymerization Dependence
Incidence relation 02 Composition By ... form Combination Physical feature relation
Incidence relation 03 Install Operate in Polymerization Dependence
Incidence relation 04 Connect Connect Association Physical couplings
Incidence relation 05 Management By ... management Polymerization Dependence
Incidence relation 06 Rely on Quilt ... relies on Rely on Dependence
Incidence relation 07 Dispose Deposit in Polymerization Dependence
Incidence relation 08 Safeguard By ... safeguard Polymerization Dependence
Incidence relation 09 Deployment Operate in Association Physical couplings
As shown in table 1, incidence relation 1 can use relationship type " using ", inverse relationship type " by ... using " and " polymerization " of uml relationship type is described, the concrete same meaning of the incidence relation of two configuration items that three represents, at this Only using relationship type, the incidence relation between configuration item is described in inventive embodiments one.
It is described in more detail below by the method that a pair of embodiment of the present invention of embodiment is provided.
Embodiment one
The rapid topology schematic flow sheet of the embodiment one that Fig. 2 provides for the present invention, as shown in Fig. 2 certain user is provided Application scenarios be: application scenarios 1, the information of the configuration item of needs is: operation system, management personnel, application software, virtual Machine.
The detailed process that the method then being carried according to embodiments of the present invention carries out quickly topology is:
Determine that the topological model corresponding to application scenarios 1 is topological model 1;
Determine that all configuration items needed for application scenarios 1 are: operation system, management personnel, application software, data base, in Between part, virtual machine and physical machine;
Obtaining the incidence relation between configuration item according to linked list is: management personnel's management business system, operation system Using middleware, data base and application software, virtual machine installs application software, data base and middleware, and physical machine installs application Software, data base and middleware;
Hierarchical layout according to topological model 1 quickly draws target it topological diagram.
Fig. 3 is a kind of it infrastructure rapid topology apparatus structure schematic diagram provided in an embodiment of the present invention, as Fig. 3 institute Show, this device includes:
Model determining module, for obtaining the information of at least one configuration item needed for user's application scenarios, and according to institute State application scenarios and determine the topological model completing needed for target it topological diagram;
Configuration item determining module, described in completing according to described topological model and at least one configuration item described determination All configuration items needed for target it topological diagram;
Topological diagram sets up module, for determining the incidence relation between described all configuration items according to linked list, and root Set up target it topological diagram according to the hierarchical layout of described topological model.
Fig. 3 is a kind of it infrastructure rapid topology device provided in an embodiment of the present invention, as shown in figure 3, this device bag Include:
Model determining module 10, for obtaining the application scenarios in of user and its letter of at least one required configuration item Breath, and the topological model m completing needed for target it topological diagram is determined from model library 50 according to application scenarios in;
According to topological model m and at least one configuration item, configuration item determining module 20, for determining that completing target it opens up Flutter all configuration item m needed for figure;
Topological diagram sets up module 30, for determining the incidence relation between all configuration item m according to linked list, and according to The hierarchical layout of topological model m sets up target it topological diagram out.
Alternatively, said apparatus also include: linked list sets up module 40, are used for setting up linked list, to all it bases Infrastructure carries out abstract analysis, determines the corresponding relation between each infrastructure and configuration item classification, and corresponding relation is deposited It is stored in linked list;And determine incidence relation between different classes of configuration item, and incidence relation is stored to associated column Table.The concrete foundation of linked list refers to above-mentioned steps 100, and it will not go into details herein.
Alternatively, in said apparatus, model library 50, for storing multiple topological models, and every kind of topological model is respectively The different application scenarios of correspondence.
Professional should further appreciate that, each example describing in conjunction with the embodiments described herein Unit and algorithm steps, can be hard in order to clearly demonstrate with electronic hardware, computer software or the two be implemented in combination in Part and the interchangeability of software, generally describe composition and the step of each example in the above description according to function. These functions to be executed with hardware or software mode actually, the application-specific depending on technical scheme and design constraint. Professional and technical personnel can use different methods to each specific application realize described function, but this realization It is not considered that it is beyond the scope of this invention.
The step of the method in conjunction with the embodiments described herein description or algorithm can be with hardware, computing device Software module, or the combination of the two is implementing.Software module can be placed in random access memory (ram), internal memory, read only memory (rom), electrically programmable rom, electrically erasable rom, depositor, hard disk, moveable magnetic disc, cd-rom or technical field In interior known any other form of storage medium.
Above-described specific embodiment, has been carried out to the purpose of the present invention, technical scheme and beneficial effect further Describe in detail, be should be understood that the specific embodiment that the foregoing is only the present invention, be not intended to limit the present invention Protection domain, all any modification, equivalent substitution and improvement within the spirit and principles in the present invention, done etc., all should comprise Within protection scope of the present invention.

Claims (8)

1. a kind of it infrastructure rapid topology method is it is characterised in that methods described includes:
Obtain the information of at least one configuration item needed for user's application scenarios, and target is completed according to the determination of described application scenarios Topological model needed for it topological diagram;
Determined according to described topological model and at least one configuration item described and complete owning needed for described target it topological diagram Configuration item;
Incidence relation between described all configuration items is determined according to linked list, and the hierarchical layout according to described topological model Set up target it topological diagram.
2. method according to claim 1 is it is characterised in that methods described also includes:
Abstract analysis are carried out to all it infrastructure, determine the corresponding relation between each infrastructure and configuration item classification, And described corresponding relation is stored in described linked list;
Determine the incidence relation between different classes of configuration item, and described incidence relation is stored to described linked list.
3. method according to claim 2 is it is characterised in that described incidence relation includes physical feature relation, physics even Connect relation and/or dependence.
4. method according to claim 1 is it is characterised in that described topological model is stored in model library, described model library Including multiple topological models, and every kind of topological model corresponds to different application scenarios respectively.
5. a kind of it infrastructure rapid topology device is it is characterised in that described device includes:
Model determining module, for obtaining the information of at least one configuration item needed for user's application scenarios, and answers according to described Choose the topological model completing needed for target it topological diagram with scene from model library;
Configuration item determining module, completes described target for determining according to described topological model and at least one configuration item described All configuration items needed for it topological diagram;
Topological diagram sets up module, for determining the incidence relation between described all configuration items according to linked list, and according to institute The hierarchical layout stating topological model sets up target it topological diagram.
6. device according to claim 5 is it is characterised in that described device also includes:
Linked list sets up module, is used for setting up described linked list, and all it infrastructure are carried out with abstract analysis, determines every Corresponding relation between individual infrastructure and configuration item classification, and described corresponding relation is stored in described linked list;And Determine the incidence relation between different classes of configuration item, and described incidence relation is stored to described linked list.
7. device according to claim 6 is it is characterised in that described incidence relation includes physical feature relation, physics even Connect relation and/or dependence.
8. device according to claim 5 is it is characterised in that described model library, for storing multiple topological models, and often Plant topological model and correspond to different application scenarios respectively.
CN201610782869.5A 2016-08-31 2016-08-31 A kind of IT infrastructure rapid topology method and device Active CN106375120B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610782869.5A CN106375120B (en) 2016-08-31 2016-08-31 A kind of IT infrastructure rapid topology method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610782869.5A CN106375120B (en) 2016-08-31 2016-08-31 A kind of IT infrastructure rapid topology method and device

Publications (2)

Publication Number Publication Date
CN106375120A true CN106375120A (en) 2017-02-01
CN106375120B CN106375120B (en) 2019-07-23

Family

ID=57898753

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610782869.5A Active CN106375120B (en) 2016-08-31 2016-08-31 A kind of IT infrastructure rapid topology method and device

Country Status (1)

Country Link
CN (1) CN106375120B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107579851A (en) * 2017-09-14 2018-01-12 郑州云海信息技术有限公司 The method and apparatus for determining the execution sequence of resource layout template
CN108123832A (en) * 2017-12-15 2018-06-05 安徽长泰信息安全服务有限公司 A kind of IT infrastructure rapid topology method and device
CN111709601A (en) * 2020-05-08 2020-09-25 苏州数设科技有限公司 Data processing method and device
CN111708531A (en) * 2020-05-08 2020-09-25 深圳数设科技有限公司 Data processing method and device
CN112084195A (en) * 2020-09-09 2020-12-15 国网安徽省电力有限公司池州供电公司 Intelligent management method for large-scale optical distribution cluster communication topology in Internet
CN112463513A (en) * 2019-09-06 2021-03-09 中国移动通信集团河北有限公司 IT system technology model selection method and device and computing equipment
CN114070741A (en) * 2020-07-28 2022-02-18 中移(苏州)软件技术有限公司 Topological graph generation method, system, equipment and storage medium
CN114567537A (en) * 2022-03-01 2022-05-31 中国工商银行股份有限公司 Information processing method, device, equipment and medium

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103532780A (en) * 2013-10-11 2014-01-22 北京有度致远信息科技股份有限公司 Operation and maintenance monitoring integral system and integral monitoring method used in IT (information technology) field
CN104468193A (en) * 2014-11-11 2015-03-25 上海天玑科技股份有限公司 Method for monitoring service system based on module finding
CN104683164A (en) * 2013-11-27 2015-06-03 贵州电网公司信息通信分公司 Method of generating monitoring topological graph by using simplified configuration item correlation model

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103532780A (en) * 2013-10-11 2014-01-22 北京有度致远信息科技股份有限公司 Operation and maintenance monitoring integral system and integral monitoring method used in IT (information technology) field
CN104683164A (en) * 2013-11-27 2015-06-03 贵州电网公司信息通信分公司 Method of generating monitoring topological graph by using simplified configuration item correlation model
CN104468193A (en) * 2014-11-11 2015-03-25 上海天玑科技股份有限公司 Method for monitoring service system based on module finding

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107579851A (en) * 2017-09-14 2018-01-12 郑州云海信息技术有限公司 The method and apparatus for determining the execution sequence of resource layout template
CN108123832A (en) * 2017-12-15 2018-06-05 安徽长泰信息安全服务有限公司 A kind of IT infrastructure rapid topology method and device
CN112463513A (en) * 2019-09-06 2021-03-09 中国移动通信集团河北有限公司 IT system technology model selection method and device and computing equipment
CN111709601A (en) * 2020-05-08 2020-09-25 苏州数设科技有限公司 Data processing method and device
CN111708531A (en) * 2020-05-08 2020-09-25 深圳数设科技有限公司 Data processing method and device
CN111708531B (en) * 2020-05-08 2023-07-04 上海数设科技有限公司 Data processing method and device
CN114070741A (en) * 2020-07-28 2022-02-18 中移(苏州)软件技术有限公司 Topological graph generation method, system, equipment and storage medium
CN114070741B (en) * 2020-07-28 2024-01-26 中移(苏州)软件技术有限公司 Topology graph generation method, system, equipment and storage medium
CN112084195A (en) * 2020-09-09 2020-12-15 国网安徽省电力有限公司池州供电公司 Intelligent management method for large-scale optical distribution cluster communication topology in Internet
CN114567537A (en) * 2022-03-01 2022-05-31 中国工商银行股份有限公司 Information processing method, device, equipment and medium
CN114567537B (en) * 2022-03-01 2024-01-30 中国工商银行股份有限公司 Information processing method, device, equipment and medium

Also Published As

Publication number Publication date
CN106375120B (en) 2019-07-23

Similar Documents

Publication Publication Date Title
CN106375120A (en) Fast topology method and apparatus of IT infrastructure
CN104182517B (en) The method and device of data processing
CN106980623B (en) Data model determination method and device
US10063427B1 (en) Visualizing and interacting with resources of an infrastructure provisioned in a network
CN106940702A (en) Entity refers to the method and apparatus with entity in semantic knowledge-base in connection short text
CN104270428B (en) A kind of cloud polymerization and relevant device
CN106982230A (en) A kind of flow rate testing methods and system
CN107832446B (en) Configuration item information searching method and computing device
CN110415521A (en) Prediction technique, device and the computer readable storage medium of traffic data
CN108764741B (en) For determining the method and device of the layout of the production equipment in factory set region
CN101315644A (en) Part classification method based on developable clustering
CN106663023A (en) Grouping virtual machines in a cloud application
CN108241531A (en) A kind of method and apparatus for distributing resource for virtual machine in the cluster
CN111783141B (en) Data storage method, device and equipment based on block chain and storage medium
CN108305181A (en) The determination of social influence power, information distribution method and device, equipment and storage medium
CN102508971A (en) Method for establishing product function model in concept design stage
CN109155008A (en) Enhanced using the feature set of knowledge engine
CN110287223A (en) Information storage means and device, electronic device and storage medium
CN104424012B (en) Method and apparatus for providing self-defined virtual bench
CN106330556B (en) A kind of method and apparatus calling related information for generating service module
CN109461198A (en) The processing method and processing device of grid model
CN105373561B (en) The method and apparatus for identifying the logging mode in non-relational database
CN104978382A (en) Clustering method based on local density on MapReduce platform
CN110071845A (en) The method and device that a kind of pair of unknown applications are classified
Lokoč et al. Color-sketch simulator: a guide for color-based visual known-item search

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant