CN106372331A - Loop closing fixed value setting and checking method of ultra-high voltage alternating-current system - Google Patents

Loop closing fixed value setting and checking method of ultra-high voltage alternating-current system Download PDF

Info

Publication number
CN106372331A
CN106372331A CN201610798807.3A CN201610798807A CN106372331A CN 106372331 A CN106372331 A CN 106372331A CN 201610798807 A CN201610798807 A CN 201610798807A CN 106372331 A CN106372331 A CN 106372331A
Authority
CN
China
Prior art keywords
cyclization
voltage
fixed value
power
extra
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610798807.3A
Other languages
Chinese (zh)
Inventor
王建明
张健
王�琦
褚晓杰
任大伟
贺庆
吴萍
郑彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Shanxi Electric Power Co Ltd
China Electric Power Research Institute Co Ltd CEPRI
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Shanxi Electric Power Co Ltd
China Electric Power Research Institute Co Ltd CEPRI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Shanxi Electric Power Co Ltd, China Electric Power Research Institute Co Ltd CEPRI filed Critical State Grid Corp of China SGCC
Priority to CN201610798807.3A priority Critical patent/CN106372331A/en
Publication of CN106372331A publication Critical patent/CN106372331A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Power Engineering (AREA)
  • Computer Hardware Design (AREA)
  • Evolutionary Computation (AREA)
  • Geometry (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention relates to a loop closing fixed value setting and checking method of an ultra-high voltage alternating-current system. The loop closing fixed value setting and checking method comprises a fixed value setting part and a fixed value checking part, wherein the fixed value setting part comprises loop closing voltage difference fixed value and phase angle difference fixed value setting. According to the loop closing fixed value setting and checking method of the technical scheme provided by the invention, reactive voltage and tidal current distribution of the ultra-high voltage alternating-current system are accurately analyzed, and a loop closing voltage difference fixed value is determined according to a tapping gear of an ultra-high voltage transformer, the operating level of network voltage and the like; a loop closing phase angle difference fixed value is determined according to section power and tidal current distribution before loop closing; whether the fixed values are feasible is checked according to the influence of loop closing impact power on the stability of a power system. The loop closing fixed value setting and checking method is suitable for the ultra-high voltage alternating-current power transmission system.

Description

A kind of extra-high-voltage alternating current closing the ring fixed value adjusting check method
Technical field
The present invention relates to a kind of check method of adjusting of extra-high-voltage alternating current system is and in particular to a kind of extra-high-voltage alternating current system Cyclization fixed value adjusting check method.
Background technology
Extra-high-voltage alternating current system refers to the AC electric power systems of 1000 kilovolts and above.Cyclization refers in electric power In system, the Network Closing that circuit, transformator or chopper string are constituted is run.For example, system shown in Figure 11 and system 2 are logical Cross alternating current circuit 1 to connect, alternating current circuit 2 side switch closes (shown in black), opposite side switch k (shown in white) is in disconnected Open state, then the operation of closure switch k is exactly Loop Closing Operation.
When the voltage difference of cyclization point both sides and phase angle difference are excessive, larger to the power rush of power system during cyclization, close Power flow changing after ring is also larger, power system may be led to lose stable.Accordingly, it would be desirable to be given suitable cyclization voltage difference and Phase angle difference setting valve.When the voltage difference of cyclization point both sides and phase angle difference actual value just allow switch motion to carry out when being less than setting valve Loop Closing Operation, does not otherwise carry out Loop Closing Operation.
According to long-term operating experience, in China's schedule regulation, the cyclization definite value for high pressure/extra-high voltage Force system will Seeking Truth: the voltage difference definite value maximum of 500kv system is not to be exceeded that 10%, the 220kv system maximum of rated voltage is not to be exceeded volume Determine the 20% of voltage;The phase angle difference definite value of 500kv and 220kv system is typically not to be exceeded 20~30 degree.Adopt above-mentioned in operation Cyclization definite value generally individually can guarantee that the smooth cyclization of power system security.But for 1000kv extra-high-voltage alternating current power system, by In the engineering that puts into operation is less, run time is shorter, therefore there is no the setting range of the Regulations clear and definite cyclization definite value of correlation, not yet See extra-high-voltage alternating current closing the ring fixed value calculation method, the definite value providing in practice lacks theory analysis and quantitative Analysis support, This runs to the sacurity dispatching of extra-high-voltage alternating current system and brings difficulty.
Content of the invention
For solving above-mentioned deficiency of the prior art, it is an object of the invention to provide a kind of extra-high-voltage alternating current closing the ring is fixed Value is adjusted check method, solves the problems, such as how rationally accurately to provide extra-high-voltage alternating current closing the ring definite value.
The purpose of the present invention is to be realized using following technical proposals:
The present invention provides a kind of extra-high-voltage alternating current closing the ring fixed value adjusting check method, and it thes improvement is that, described Method comprises the steps:
Step 1: fixed value adjusting;With
Step 2: definite value is checked.
Further, the fixed value adjusting of described step 1 includes the step 11 carrying out side by side: voltage difference fixed value adjusting and step 12: phase angle difference fixed value adjusting.
Further, the voltage difference fixed value adjusting in described step 11 includes:
Step 110: the voltage control according to extra high voltage line throwing nonloaded line and Operating Voltage level determine extra-high The tap gear of pressure transformer;
Step 111: control decoupling principle to determine cyclization point both sides voltage range and the most respectively according to cyclization point both sides voltage Big voltage difference;
Step 112: according to maximum voltage difference and consider voltage margin, determine cyclization voltage difference definite value.
Further, in described step 111, cyclization point both sides include sky and fill line end side and bus side;For Sky fills line end side, specifies longtime running standard according to extra-high voltage, determines that its ceiling voltage is 1100kv;For bus one Side, by dispatching of power netwoks operating provisions, (minimum voltage of dispatching of power netwoks operating provisions is according to electric system simulation to its minimum voltage Calculating the minimum voltage that the stable operation determining requires, if being less than this value, after grid collapses, having the risk of unstability) to Go out;Both differences are the maximum voltage difference of cyclization point both sides.
Further, in described step 112, obtain cyclization voltage with the maximum voltage difference making alive nargin of cyclization point both sides Difference definite value, described voltage margin takes 10kv.
Further, the phase angle difference fixed value adjusting in described step 12 includes:
Step 121: determine maximum power value and the near region transmission line of electricity maximum work of extra-high voltage cyclization circuit place section Rate value;The maximum power value of section is calculated by electric system simulation, and section power is sent out when being more than the maximum power value of section Electrical network unstability after raw fault;Near region transmission line of electricity maximum power value is determined by line power nonoverload after fault;
Step 122: arrange trend mode according to above-mentioned maximum power value in power system simulation software, calculate cyclization point The maximum phase angle difference of both sides;
Step 123: according to maximum phase angle difference and consider Phase margin, determine cyclization phase angle difference definite value.
Further, in described step 122, cyclization point both sides include sky and fill line end side and bus side.
Further, in described step 123, it is fixed that cyclization point both sides phase angle difference obtains cyclization phase angle difference plus Phase margin Value;Described Phase margin takes 5 °.
Further, the definite value of described step 2 is checked and is included: presses the voltage of above-mentioned determination in power system simulation software Difference definite value and phase angle difference definite value arrange extra-high-voltage alternating current system operation mode before cyclization, and involutive ring operation carries out simulation calculation, Extra high voltage line percussion power during analysis cyclization and power system stability situation.
Further, if to lead to power system to lose stable for extra high voltage line percussion power during cyclization, return step Rapid 1 fixed value adjusting, equal proportion reduces cyclization voltage difference and phase angle difference definite value;
For new cyclization definite value, re-start definite value and check, and analyze power system stability situation;
Repeat to check and adjust, until Loop Closing Operation system stability.
Further, if final voltage difference definite value and phase angle difference definite value are less than initial definite value, line voltage is transported Row controls requirement, section and near region Line Flow to control requirement to be modified.
Compared with immediate prior art, the excellent effect that the technical scheme of present invention offer has is:
Method proposed by the present invention according to extra-high-voltage alternating current System Reactive Power voltage and trend distribution character, in conjunction with power system Stability analysis, proposes voltage difference definite value and the adjusting and check method of phase angle difference definite value during extra-high-voltage alternating current closing the ring, solves How rationally accurately to provide the problem of extra-high-voltage alternating current closing the ring definite value.
Method proposed by the present invention have the advantages that theoretical sturdy, clear logic, analysis accurately, exploitativeness strong.Method In theoretical based on electric power system tide and stability analysis, make full use of extra-high-voltage alternating current System Reactive Power voltage characteristic, trend distribution Characteristic and cyclization impact characteristics research conclusion, the control both having considered the extra-high voltage AC circuit itself treating cyclization requires, and examines again Consider influencing each other of Loop Closing Operation and power system stability.Whole method flow is clear, and thinking clearly, can be true according to the method Fixed rational extra-high-voltage alternating current closing the ring definite value.
Brief description
Fig. 1 is Force system Loop Closing Operation schematic diagram;
Fig. 2 is the flow chart of the extra-high-voltage alternating current closing the ring fixed value adjusting check method that the present invention provides;
Fig. 3 is that Bei Jingdong in the specific embodiment one that the present invention provides-Jinan extra-high-voltage alternating current system correlation rack is illustrated Figure;
Fig. 4 is extra high voltage line power after Loop Closing Operation in the specific embodiment one that the present invention provides.
Specific embodiment
Below in conjunction with the accompanying drawings the specific embodiment of the present invention is described in further detail.
The following description and drawings fully illustrate specific embodiments of the present invention, to enable those skilled in the art to Put into practice them.Other embodiments can include structure, logic, electric, process and other change.Embodiment Only represent possible change.Unless explicitly requested, otherwise individually assembly and function are optional, and the order operating is permissible Change.The part of some embodiments and feature can be included in or replace part and the feature of other embodiments.This The scope of bright embodiment includes the gamut of claims, and all obtainable of claims is equal to Thing.Herein, these embodiments of the present invention individually or generally with term " invention " can be represented, this is only For convenience, and if in fact disclosing the invention more than, the scope being not meant to automatically limit this application is to appoint What single invention or inventive concept.
The purpose of the present invention is according to extra-high-voltage alternating current System Reactive Power voltage and trend distribution character, in conjunction with electric power system stability Setting analysis, propose voltage difference definite value and the adjusting and check method of phase angle difference definite value during extra-high-voltage alternating current closing the ring, solve such as What rationally accurately provides the problem of extra-high-voltage alternating current closing the ring definite value.
For the deficiencies in the prior art, the present invention proposes extra-high-voltage alternating current closing the ring fixed value adjusting check method, accurate The really reactive voltage of analysis extra-high-voltage alternating current system and trend distribution, according to extra-high voltage transformer tap gear, line voltage fortune Row level etc. determines cyclization voltage difference definite value;Determine that cyclization is mutually reported to the leadship after accomplishing a task definite value according to section power before cyclization and trend distribution;Root Whether feasible check definite value according to the impact to power system stability for the cyclization percussion power.The present invention is applied to ultra-high voltage AC transmission System.
The invention provides extra-high-voltage alternating current closing the ring fixed value adjusting check method, main contents include fixed value adjusting and Definite value checks two parts.Fixed value adjusting part includes cyclization voltage difference definite value and phase angle difference fixed value adjusting.The flow process of the present invention is such as Shown in Fig. 2, the flow process of the present invention specifically includes:
For voltage difference fixed value adjusting, comprising:
First, controlled according to the voltage that extra high voltage line throws nonloaded line and Operating Voltage level determines extra-high buckling The tap gear of depressor.
Secondly, decoupling principle is controlled to determine both sides electricity respectively according to cyclization point both sides (sky fills line end and bus) voltage Pressure scope and maximum voltage difference.Line end is filled for sky, specifies that longtime running ceiling voltage is 1100kv according to extra-high voltage;Right In bus, by dispatching of power netwoks operating provisions, (minimum voltage of dispatching of power netwoks operating provisions is according to power system to its minimum voltage The minimum voltage that the stable operation that simulation calculation determines requires, if being less than this value, has the risk of unstability after grid collapses) Be given.Both differences get final product the maximum voltage difference of cyclization point both sides.
Again, according to maximum voltage difference and consider certain voltage margin, determine cyclization voltage difference definite value;With cyclization point two The maximum voltage difference making alive nargin of side obtains cyclization voltage difference definite value, and described voltage margin takes 10kv.
For phase angle difference fixed value adjusting, comprising:
First, maximum power value and the near region transmission line of electricity peak power of extra-high voltage cyclization circuit place section are determined Value;
Secondly, arrange trend mode according to above-mentioned maximum power value in power system simulation software, calculate cyclization point two The maximum phase angle difference of side;
Again, according to maximum phase angle difference and consider certain Phase margin, determine cyclization phase angle difference definite value.Cyclization point both sides Phase angle difference obtains cyclization phase angle difference definite value plus Phase margin;Described Phase margin takes 5 °.
The definite value of the method that the present invention provides checks part, presses the voltage difference of above-mentioned determination in power system simulation software Definite value and phase angle difference definite value arrange extra-high-voltage alternating current system operation mode before cyclization, and involutive ring operation carries out simulation calculation, point Extra high voltage line percussion power during analysis cyclization and power system stability situation.If cyclization impact leads to power system to lose surely Fixed, then return the fixed value adjusting part of the method that the present invention provides, equal proportion reduces cyclization voltage difference and phase angle difference definite value.For New cyclization definite value, re-starts definite value and checks, and calculates analysis power system stability situation.Repeat to check and adjust, directly To Loop Closing Operation system stability.If final cyclization voltage difference and phase angle difference definite value are less than initial definite value, then need to electrical network Voltage runs to control to require accordingly to be revised with section and the control requirement of near region Line Flow and (specifically how to revise and be not belonging to this The technique study scope that invention provides).
Embodiment one
It is described in detail as a example Jingdone district-Jinan extra-high voltage AC circuit cyclization to the north of below, its rack schematic diagram such as Fig. 3 Shown.Wherein Bei Jingdong-Jinan is extra-high-voltage alternating current double loop, and pungent amp- Liaocheng, Huanghua-Binzhou are 500kv alternating current circuit, and this 6 Loop line constitutes the province's discontinuity surface between East China major network and Shandong Power.As shown in Fig. 2 the method that the present invention provides is embodied as flow process As follows:
(1) voltage difference fixed value adjusting:
First, controlled according to the voltage that extra high voltage line throws nonloaded line and Operating Voltage level determines extra-high buckling The tap gear of depressor.In the present embodiment, respectively after nonloaded line is thrown in Beijing east and Jinan, for ensureing line end voltage not Super 1100kv, need to be controlled to the busbar voltage in Beijing east and Jinan.If the transformer tapping in Beijing east and Jinan is placed in 525kv gear, then need to control Beijing east not super 506kv of not super 1013kv, 500kv busbar voltage of 1000kv busbar voltage, need to control The not super 507kv of not super 1015kv, 500kv busbar voltage of Jinan processed 1000kv busbar voltage.For dispatching of power netwoks runs, It is larger that 500kv busbar voltage controls requirement to realize difficulty, needs to adjust transformer tapping gear.It is computed, by Beijing east and Ji Southern main transformer tap adjusts to 538kv gear, then need to control not super 1014kv, 500kv bus electricity of Beijing east 1000kv busbar voltage Press not super 519kv, the not super 520kv of not super 1015kv, 500kv busbar voltage of Jinan 1000kv busbar voltage, this voltage need to be controlled Requirement is controlled to realize difficulty little.Accordingly, it is determined that the extra-high voltage transformer tap in Beijing east and Jinan is placed in 538kv gear.
Secondly, decoupling principle is controlled according to cyclization point both sides (cyclization point both sides include sky and fill line end and bus) voltage Determine both sides voltage range and maximum voltage difference respectively.Line end is filled for sky, ceiling voltage is 1100kv;For bus, The dispatching of power netwoks operating provisions minimum 515kv of its 500kv busbar voltage, converts and is about 1010kv to 1000kv side magnitude of voltage.Close Circling point both sides voltage maximum difference is 90kv.
Again, according to maximum voltage difference and consider the nargin of 10kv, determine that cyclization voltage difference definite value is 100kv.
(2) phase angle difference fixed value adjusting:
First, maximum power value and the near region transmission line of electricity peak power of extra-high voltage cyclization circuit place section are determined Value.What extra-high voltage cyclization circuit was located is North China-Shandong section, and its maximum power value is 4000mw.Beijing is to the east of Jinan 500kv On transmission path, the maximum power value of single time 500kv circuit is 1500mw.
Secondly, arrange trend mode according to above-mentioned maximum power value in power system simulation software, calculate trend and understand The maximum phase angle difference of cyclization point both sides is about 24 degree;
Again, according to maximum phase angle difference and consider certain nargin, determine that cyclization phase angle difference definite value is 30 degree.
(3) definite value is checked:
Voltage difference definite value 100kv determining by step (1) and (2) in power system simulation software and phase angle difference definite value 30 Degree arranges system operation mode before cyclization, and involutive ring operation carries out simulation calculation, extra high voltage line percussion power during cyclization Peak value about 1817mw (as shown in Figure 4), system keeps stable.Can determine Bei Jingdong-Jinan extra-high-voltage alternating current closing the ring electricity Pressure reduction definite value is 100kv, phase angle difference definite value is 30 degree.
The present embodiment is applied to adjusting and checking of Bei Jingdong-Jinan extra-high voltage AC circuit cyclization definite value, is suitable for simultaneously In other extra-high-voltage alternating current systems it needs to be determined that the situation of cyclization definite value.
Above example is only not intended to limit in order to technical scheme to be described, although with reference to above-described embodiment pair The present invention has been described in detail, and those of ordinary skill in the art still can enter to the specific embodiment of the present invention Row modification or equivalent, these without departing from any modification of spirit and scope of the invention or equivalent, all in application Within the claims of the pending present invention.

Claims (10)

1. a kind of extra-high-voltage alternating current closing the ring fixed value adjusting check method is it is characterised in that methods described comprises the steps:
Step 1: fixed value adjusting;With
Step 2: definite value is checked.
2. cyclization fixed value adjusting check method as claimed in claim 1 is it is characterised in that the fixed value adjusting bag of described step 1 Include the step 11 carrying out side by side: voltage difference fixed value adjusting and step 12: phase angle difference fixed value adjusting.
3. cyclization fixed value adjusting check method as claimed in claim 2 is it is characterised in that the voltage difference in described step 11 is fixed Value adjust including:
Step 110: controlled according to the voltage that extra high voltage line throws nonloaded line and Operating Voltage level determines extra-high buckling The tap gear of depressor;
Step 111: control decoupling principle to determine cyclization point both sides voltage range and maximum electricity respectively according to cyclization point both sides voltage Pressure reduction;
Step 112: according to maximum voltage difference and consider voltage margin, determine cyclization voltage difference definite value.
4. cyclization fixed value adjusting check method as claimed in claim 3 is it is characterised in that in described step 111, cyclization point two Side includes sky and fills line end side and bus side;Line end side is filled for sky, longtime running is specified according to extra-high voltage Standard, determines that its ceiling voltage is 1100kv;For bus side, its minimum voltage is given by dispatching of power netwoks operating provisions;Two The difference of person is the maximum voltage difference of cyclization point both sides.
5. cyclization fixed value adjusting check method as claimed in claim 3 is it is characterised in that in described step 112, use cyclization point The maximum voltage difference making alive nargin of both sides obtains cyclization voltage difference definite value, and described voltage margin takes 10kv.
6. cyclization fixed value adjusting check method as claimed in claim 2 is it is characterised in that the phase angle difference in described step 12 is fixed Value adjust including:
Step 121: determine maximum power value and the near region transmission line of electricity maximum power value of extra-high voltage cyclization circuit place section; The maximum power value of section is calculated by electric system simulation, and section power breaks down when being more than the maximum power value of section Electrical network unstability afterwards;Near region transmission line of electricity maximum power value is determined by line power nonoverload after fault;
Step 122: arrange trend mode according to above-mentioned maximum power value in power system simulation software, calculate cyclization point both sides Maximum phase angle difference;
Step 123: according to maximum phase angle difference and consider Phase margin, determine cyclization phase angle difference definite value.
7. cyclization fixed value adjusting check method as claimed in claim 6 is it is characterised in that in described step 122, cyclization point two Side includes sky and fills line end side and bus side.
8. cyclization fixed value adjusting check method as claimed in claim 6 is it is characterised in that in described step 123, cyclization point two Side phase angle difference obtains cyclization phase angle difference definite value plus Phase margin;Described Phase margin takes 5 °.
9. cyclization fixed value adjusting check method as claimed in claim 1 is it is characterised in that the definite value verification packet of described step 2 Include: in power system simulation software, arrange extra-high-voltage alternating current before cyclization by the voltage difference definite value and phase angle difference definite value of above-mentioned determination System operation mode, and involutive ring operation carries out simulation calculation, extra high voltage line percussion power during analysis cyclization and power train System stable case.
If 10. cyclization fixed value adjusting check method as claimed in claim 9 is it is characterised in that extra-high line ball during cyclization It is stable that road percussion power leads to power system to lose, then the fixed value adjusting of return to step 1, and equal proportion reduces cyclization voltage difference and phase Angular difference definite value;
For new cyclization definite value, re-start definite value and check, and analyze power system stability situation;
Repeat to check and adjust, until Loop Closing Operation system stability.
CN201610798807.3A 2016-08-31 2016-08-31 Loop closing fixed value setting and checking method of ultra-high voltage alternating-current system Pending CN106372331A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610798807.3A CN106372331A (en) 2016-08-31 2016-08-31 Loop closing fixed value setting and checking method of ultra-high voltage alternating-current system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610798807.3A CN106372331A (en) 2016-08-31 2016-08-31 Loop closing fixed value setting and checking method of ultra-high voltage alternating-current system

Publications (1)

Publication Number Publication Date
CN106372331A true CN106372331A (en) 2017-02-01

Family

ID=57900276

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610798807.3A Pending CN106372331A (en) 2016-08-31 2016-08-31 Loop closing fixed value setting and checking method of ultra-high voltage alternating-current system

Country Status (1)

Country Link
CN (1) CN106372331A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108199366A (en) * 2017-12-06 2018-06-22 国网北京市电力公司 Circuit Loop Closing Operation method and apparatus
CN109193920A (en) * 2018-09-26 2019-01-11 云南电网有限责任公司电力科学研究院 A kind of cyclization tune electric control system and method based on controllable inductor

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
任大伟等: "浙北—福州特高压交流输电工程系统调试中电网运行方式的调整", 《电网技术》 *
任大伟等: "皖电东送工程系统调试中电网运行方式的调整", 《电网技术》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108199366A (en) * 2017-12-06 2018-06-22 国网北京市电力公司 Circuit Loop Closing Operation method and apparatus
CN109193920A (en) * 2018-09-26 2019-01-11 云南电网有限责任公司电力科学研究院 A kind of cyclization tune electric control system and method based on controllable inductor

Similar Documents

Publication Publication Date Title
CN103746401B (en) A kind ofly improve the method that Multi-infeed HVDC transmission system resists the ability of commutation failure
CN102761128B (en) On-line coordinated automatic control method for economical operation and reactive power optimization of transformer
CN102593829B (en) Method and device for determining transmission section in consideration of key branch circuit
CN103647269B (en) A kind of extra-high voltage DC transmission system series connection bivalve group balance movement control method
CN102412575B (en) Simulation evaluation method for configuration scheme of safe automatic device of transmitting-end power grid high-frequency cutting machine
CN106469908A (en) The static security synthesis aid decision-making method that a kind of multiple faults is coordinated
CN105391050B (en) Cut the check method and system of machine allocation plan high week
CN103701133B (en) Powerless control method in HVDC (High Voltage Direct Current) transmission system low power run situation
CN106549425A (en) A kind of failure isolated island fast control method containing flexible direct current
CN109103879A (en) A kind of full dimension closed loop network appraisal procedure
CN106372331A (en) Loop closing fixed value setting and checking method of ultra-high voltage alternating-current system
CN103425822A (en) Extra-high voltage alternating-current synchronous networking channel flow transfer ratio simulation analysis method
CN206057453U (en) A kind of transformator loading test platform topological structure based on high voltage converter
CN104392287A (en) 500 kV/220 kV receiving end power grid partitioning method
CN109787266A (en) Extra-high voltage direct-current complex fault on-line analysis decision-making technique and system
CN110071499B (en) Method and system for rapidly judging safety loop closing of power distribution network
CN103296672B (en) Method for restraining high direct current voltage after direct current line fault in voltage-reduction restarting mode
CN106300347B (en) A kind of engineer application method that can quickly determine 10kV distribution line cyclization tune electricity feasibilities
CN104410071A (en) 35KV high voltage distribution network loop-closing and loop-opening current estimation method
CN104993477B (en) A kind of alternating current-direct current power network static security Parallel analytic method based on configuration mode
CN103904679B (en) The control method of high voltage direct current transmission discrete constant current command type current limiting low-voltage unit
CN103560529B (en) Control method for restraining irregular power fluctuation of power system alternating current tie lines
CN107026476A (en) A kind of method and apparatus for suppressing electromagnetic looped network power circulation
CN106157170A (en) A kind of electric power system dispatching method of controlling operation thereof based on power supply reliability
CN105262099A (en) Method for adjusting voltage of wind farm through coordination and cooperation of blower fan and voltage-adjustable reactive compensator

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170201

RJ01 Rejection of invention patent application after publication