CN106371481A - Terminal energy-saving management method and apparatus, and terminal - Google Patents

Terminal energy-saving management method and apparatus, and terminal Download PDF

Info

Publication number
CN106371481A
CN106371481A CN201510432538.4A CN201510432538A CN106371481A CN 106371481 A CN106371481 A CN 106371481A CN 201510432538 A CN201510432538 A CN 201510432538A CN 106371481 A CN106371481 A CN 106371481A
Authority
CN
China
Prior art keywords
monitoring
terminal
value
monitoring threshold
current
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201510432538.4A
Other languages
Chinese (zh)
Inventor
薛亮
刘玉鹏
郝志坚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN201510432538.4A priority Critical patent/CN106371481A/en
Priority to PCT/CN2016/080401 priority patent/WO2016180241A1/en
Publication of CN106371481A publication Critical patent/CN106371481A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04MTELEPHONIC COMMUNICATION
    • H04M1/00Substation equipment, e.g. for use by subscribers
    • H04M1/72Mobile telephones; Cordless telephones, i.e. devices for establishing wireless links to base stations without route selection
    • H04M1/725Cordless telephones
    • H04M1/73Battery saving arrangements
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D30/00Reducing energy consumption in communication networks
    • Y02D30/70Reducing energy consumption in communication networks in wireless communication networks

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Power Sources (AREA)
  • Telephone Function (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a terminal energy-saving management method and apparatus, and a terminal. First of all, an energy consumption monitoring threshold used for representing energy consumption of a terminal application is set, then when the terminal application is started, an actual energy consumption value of the terminal application is monitored, when it is monitored that the current actual energy consumption value of the terminal application is greater than the preset energy consumption monitoring threshold, automatic energy-saving control can be performed on the terminal application, such that the terminal application is prevented from consuming too much electric energy of a terminal, the effects of saving energy of the terminal and increasing endurance time of the terminal are realized, energy conservation, convenience, rapidness and high efficiency can be automatically realized without tedious setting by a user, and satisfaction of user experience can be improved to a greater degree.

Description

Terminal administration of energy conservation method, device and terminal
Technical field
The present invention relates to field of terminal is and in particular to a kind of terminal administration of energy conservation method, device and terminal.
Background technology
In recent years, the screen size with intelligent terminal is increasing, pixel more and more higher, not only fhd (full High definition, full HD) screen and 2k or even 4k screen all begin to use.Along with intelligence eventually The core number of end processor and frequency constantly increase, and what various terminals were applied increases and use, and leads in terminal The development of battery capacity much do not catch up with the development speed of intelligent terminal itself, lead to user must not differ sky One fills, or even half a day one fills, and badly influences the satisfaction of Consumer's Experience.
Content of the invention
The main technical problem to be solved in the present invention is to provide a kind of terminal administration of energy conservation method, device and end End, solves how to be terminal energy-conservation, increases the problem in terminal cruising time.
For solving above-mentioned technical problem, the present invention provides a kind of terminal administration of energy conservation method, comprising:
It is provided for characterizing the energy consumption monitoring threshold value of terminal applies energy consumption;
The actual consumption value of this terminal applies is monitored after terminal applies are opened;
When monitoring that described actual consumption value is more than described energy consumption monitoring threshold value, described terminal applies are carried out Saving pipe controlled.
In an embodiment of the present invention, described energy consumption monitoring threshold value include system temperature rise monitoring threshold t and/ Or system power consumes monitoring threshold i;Described actual consumption value include system temperature actual lift-off value t and/or System power actual consumption value i.
In an embodiment of the present invention, when described energy consumption monitoring threshold value includes system temperature rise monitoring threshold t, Described system temperature rise monitoring threshold t includes front stage operation temperature rise monitoring threshold t1 and running background temperature rise monitoring threshold Value t2;The actual lift-off value t of described system temperature includes foreground system temperature increase t1 and background system temperature Lift-off value t2;
When after terminal applies being opened in front stage operation, monitor the foreground system temperature increase of this terminal applies Whether t1 is more than described front stage operation temperature rise monitoring threshold t1;
When after terminal applies being opened in running background, monitor the background system temperature increase of this terminal applies Whether t2 is more than described running background temperature rise monitoring threshold t2;
When described energy consumption monitoring threshold value includes system power consumption monitoring threshold i, described system power consumption prison Survey threshold value i and include foreground system current drain monitoring threshold i1 and background system current drain monitoring threshold i2; Described system power actual consumption value i includes foreground system current consumption value i1 and background system current consumption value i2;
When after terminal applies being opened in front stage operation, monitor the foreground system current consumption value of this terminal applies Whether i1 is more than described foreground system current drain monitoring threshold i1;
When after terminal applies being opened in front stage operation, monitor the background system current consumption value of this terminal applies Whether i2 is more than described background system current drain monitoring threshold i2.
In an embodiment of the present invention, described when monitoring that described foreground system temperature increase t1 is more than During front stage operation temperature rise monitoring threshold t1, and/or monitor that described foreground system current consumption value i1 is more than institute When stating foreground system current drain monitoring threshold i1, described saving pipe controlled includes limiting described terminal applies occupancy Resource;
When monitor described background system temperature increase t2 be more than described running background temperature rise monitoring threshold t2 When, and/or monitor described background system current consumption value i2 more than described background system current drain monitoring threshold During value i2, described saving pipe controlled includes closing the process that described terminal applies take.
In an embodiment of the present invention, before carrying out control to described terminal applies, also include judging institute State terminal applies whether in default non-control list of application;As no, then carry out described energy-conservation control.
In an embodiment of the present invention, when described energy consumption monitoring threshold value includes system temperature rise monitoring threshold t, Arrange described front stage operation temperature rise monitoring threshold t1 and running background temperature rise monitoring threshold t2 to include:
The temperature gathering described terminal each major heading device on foreground when described terminal applies are normally run raises Value, the described temperature increase according to obtaining arranges described front stage operation temperature rise monitoring threshold t1;Or direct root According to empirical value, described front stage operation temperature rise monitoring threshold t1 is set;
The temperature gathering described terminal each major heading device on backstage when described terminal applies are normally run raises Value, the described temperature increase according to obtaining arranges described running background temperature rise monitoring threshold t2;Or direct root According to empirical value, described running background temperature rise monitoring threshold t2 is set;
When described energy consumption monitoring threshold value includes system temperature rise monitoring threshold t, described foreground system electric current is set and disappears Consumption monitoring threshold i1 and background system current drain monitoring threshold i2 includes:
When described terminal applies are normally run on foreground by being connected on the current sample electricity of terminal supplying power one end Resistance obtains current system electric current actual consumption value, according to this current system power actual consumption value setting described before Platform system power consumes monitoring threshold i1;Or described foreground system current drain prison is directly set based on experience value Survey threshold value i1;
When described terminal applies are normally run on backstage by being connected on the current sample electricity of terminal supplying power one end Resistance obtains current system electric current actual consumption value, according to this current system power actual consumption value setting described before System power consumes monitoring threshold i2 afterwards;Or described background system current drain prison is directly set based on experience value Survey threshold value i2.
In an embodiment of the present invention, terminal applies unlatching after in front stage operation when, by gather institute The temperature increase stating terminal each major heading device carries out average value processing and obtains foreground system temperature increase t1; Obtain the foreground system current drain of this terminal applies by being connected on the current sampling resistor of terminal supplying power one end Value i1;
When after terminal applies being opened in running background, by gathering the temperature of described terminal each major heading device Lift-off value carries out average value processing and obtains background system temperature increase t2;By being connected on terminal supplying power one end Current sampling resistor obtains background system current consumption value i2 of this terminal applies.
In an embodiment of the present invention, described major heading device includes processor cpu, graphic process unit At least one of gpu, Power Management Unit pmu and radio-frequency power amplifier.
In order to solve the above problems, present invention also offers a kind of terminal energy-saving management device, comprising:
Setup module, for being provided for characterizing the energy consumption monitoring threshold value of terminal applies energy consumption;
Monitoring modular, for monitoring the actual consumption value of this terminal applies after terminal applies are opened;
Management and control module, for when monitoring that described actual consumption value is more than described energy consumption monitoring threshold value, to institute State terminal applies and carry out saving pipe controlled.
In an embodiment of the present invention, described setup module includes temperature control setting submodule and/or electric current sets Put submodule, described monitoring modular includes temperature monitoring submodule and/or current monitoring submodule;Described energy consumption Monitoring threshold includes system temperature rise monitoring threshold t and/or system power consumes monitoring threshold i;Described actual energy Consumption value includes system temperature actual lift-off value t and/or system power actual consumption value i;
Described temperature control setting submodule is used for arranging system temperature rise monitoring threshold t;
Described electric current setting submodule is used for arranging system power consumption monitoring threshold i;
Described temperature monitoring submodule is used for monitoring system temperature actual lift-off value t;
Described current monitoring submodule is used for monitoring system electric current actual consumption value i.
In an embodiment of the present invention, when described energy consumption monitoring threshold value includes system temperature rise monitoring threshold t, Described system temperature rise monitoring threshold t includes front stage operation temperature rise monitoring threshold t1 and running background temperature rise monitoring threshold Value t2;Described temperature control setting submodule includes the foreground temperature control for arranging front stage operation temperature rise monitoring threshold t1 Arranging unit and the backstage temperature control arranging unit for arranging front stage operation temperature rise monitoring threshold t2;Described system Temperature actual lift-off value t includes foreground system temperature increase t1 and background system temperature increase t2, described Temperature monitoring submodule includes foreground temperature monitoring unit and temperature monitoring in backstage takes unit;
Described foreground temperature monitoring unit is for, when after terminal applies being opened in front stage operation, monitoring this terminal Whether the foreground system temperature increase t1 of application is more than described front stage operation temperature rise monitoring threshold t1;
Described backstage temperature monitoring unit is for, when after terminal applies being opened in running background, monitoring this terminal Whether the background system temperature increase t2 of application is more than described running background temperature rise monitoring threshold t2;
When described energy consumption monitoring threshold value includes system power consumption monitoring threshold i, described system power consumption prison Survey threshold value i and include foreground system current drain monitoring threshold i1 and background system current drain monitoring threshold i2; Described electric current setting submodule includes setting for the foreground electric current arranging foreground system current drain monitoring threshold i1 Put unit and the backstage current setting unit for arranging background system current drain monitoring threshold i2;Described system System electric current actual consumption value i includes foreground system current consumption value i1 and background system current consumption value i2;Institute State current monitoring submodule and include foreground current monitoring unit and backstage current monitoring unit;
Described foreground current monitoring unit is for, when after terminal applies being opened in front stage operation, monitoring this terminal Whether foreground system current consumption value i1 of application is more than described foreground system current drain monitoring threshold i1;
Described backstage current monitoring unit is for, when after terminal applies being opened in front stage operation, monitoring this terminal Whether background system current consumption value i2 of application is more than described background system current drain monitoring threshold i2.
In an embodiment of the present invention, described management and control module includes resource management and control submodule and process management and control Submodule;
Described resource management and control submodule is used for monitoring described foreground system temperature in described foreground temperature monitoring unit When degree lift-off value t1 is more than described front stage operation temperature rise monitoring threshold t1, and/or described foreground current monitoring list Unit monitors that described foreground system current consumption value i1 is more than described foreground system current drain monitoring threshold i1 When, limit described terminal applies and take resource;
Described process management and control submodule is used for platform temperature monitoring unit in the rear and monitors described background system temperature When degree lift-off value t2 is more than described running background temperature rise monitoring threshold t2, and/or described backstage current monitoring list Unit monitors that described background system current consumption value i2 is more than described background system current drain monitoring threshold i2 When, close the process that described terminal applies take.
In order to solve the above problems, present invention also offers a kind of terminal, including terminal energy-conservation as above Managing device.
The invention has the beneficial effects as follows:
Terminal administration of energy conservation method, device and terminal that the present invention provides, being provided for sign terminal first should With the energy consumption monitoring threshold value of energy consumption, then after terminal applies are opened, monitor the actual consumption of this terminal applies Value, and when monitoring that the current actual consumption value of this terminal applies is more than the energy consumption monitoring threshold value pre-setting, Automatic energy saving management and control can be carried out to this terminal applies, it is to avoid this terminal applies consumes the electric energy of terminal excessively, Thus reaching terminal energy-conservation, and increase the effect in terminal cruising time, and do not need user to carry out loaded down with trivial details setting Put and can be automatically obtained energy-conservation, convenient, fast, efficient, expiring of Consumer's Experience, can be lifted on increasing degree Meaning degree.
Brief description
The terminal administration of energy conservation method flow schematic diagram that Fig. 1 provides for the embodiment of the present invention one;
Fig. 2 illustrates according to the flow process that temperature carries out administration of energy conservation for example one offer of the embodiment of the present invention one Figure;
Fig. 3 illustrates according to the flow process that electric current carries out administration of energy conservation for example two offer of the embodiment of the present invention one Figure;
The terminal structure schematic diagram that Fig. 4 provides for the embodiment of the present invention two;
Fig. 5 carries out energy-saving management device structural representation for what the embodiment of the present invention two provided according to electric current;
Fig. 6 is the administration of energy conservation carrying out administration of energy conservation according to temperature of example one offer of the embodiment of the present invention two Apparatus structure schematic diagram;
Fig. 7 is the administration of energy conservation carrying out administration of energy conservation according to electric current of example two offer of the embodiment of the present invention two Apparatus structure schematic diagram;
Fig. 8 is the section carrying out administration of energy conservation according to temperature and electric current of example three offer of the embodiment of the present invention two Can managing device structural representation.
Specific embodiment
Combine accompanying drawing below by specific embodiment the present invention is described in further detail.
Embodiment one:
The terminal administration of energy conservation method that the present embodiment provides is shown in Figure 1, comprising:
Step 101: be provided for characterizing the energy consumption monitoring threshold value of terminal applies energy consumption;
Step 102: monitor the actual consumption value of this terminal applies after terminal applies are opened;
Step 103: when monitoring that described actual consumption value is more than described energy consumption monitoring threshold value, to terminal applies Carry out saving pipe controlled.
In above-mentioned steps 101, the energy consumption monitoring threshold value of setting includes system temperature rise monitoring threshold t and/or system electricity Stream consumes monitoring threshold i;Actual consumption value in corresponding above-mentioned steps 103 includes the actual rising of system temperature Value t and/or system power actual consumption value i.In order to be more convenient for that the solution of the present invention is clearly understood from, under With following three kinds of examples, the present invention is described in detail respectively in face.
Example one: energy consumption monitoring threshold value includes system temperature rise monitoring threshold t
The system temperature rise monitoring threshold t now arranging includes front stage operation temperature rise monitoring threshold t1 and running background Temperature rise monitoring threshold t2;The actual lift-off value t of corresponding system temperature include foreground system temperature increase t1 and Background system temperature increase t2;Foreground in the present embodiment refers to the shape in system front stage operation for the terminal applies State, backstage then refers to that terminal applies reside in the state on backstage.
Now, in above-mentioned steps 101, setting energy consumption monitoring threshold value includes arranging front stage operation temperature rise monitoring threshold T1 and running background temperature rise monitoring threshold t2;
During setting front stage operation temperature rise monitoring threshold t1, can gather when terminal applies are normally run on foreground eventually Hold the temperature increase of each major heading device, then according to the temperature increase setting front stage operation temperature rise obtaining Monitoring threshold t1;For example the multiple temperature increase obtaining are weighted with the temperature value obtaining after average treatment As front stage operation temperature rise monitoring threshold t1;Certainly, described front stage operation also can be directly set based on experience value Temperature rise monitoring threshold t1;
When running temperature rise monitoring threshold t1 before and after setting, the acquisition terminal when terminal applies are normally run on backstage The temperature increase of each major heading device, according to the temperature increase setting described running background temperature rise prison obtaining Survey threshold value t2;The temperature value for example multiple temperature increase obtaining being weighted obtaining after average treatment is made For running background temperature rise monitoring threshold t2;Certainly, described running background temperature also can be directly set based on experience value Rise monitoring threshold t2;
Corresponding, subsequently terminal applies unlatching after in front stage operation when, by acquisition terminal each major heading device The temperature increase of part carries out average value processing and obtains foreground system temperature increase t1;Subsequently open in terminal applies After opening in running background, average value processing is carried out by the temperature increase of acquisition terminal each major heading device and obtains To background system temperature increase t2.
Major heading device in this example includes processor cpu, graphic process unit gpu, Power Management Unit pmu At least one of with radio-frequency power amplifier pa, and specifically can be obtained by arranging corresponding temperature sensor The temperature of these major heading devices, the amplitude being then based on the temperature rising of each target main device is weighted putting down All process the temperature rise monitoring threshold after obtaining synthesis.
Then, when after terminal applies unlatching in front stage operation, monitor the foreground system temperature liter of this terminal applies Whether high level t1 is more than setting front stage operation temperature rise monitoring threshold t1;
When after terminal applies being opened in running background, monitor the background system temperature increase of this terminal applies Whether t2 is more than running background temperature rise monitoring threshold t2;
When the foreground system temperature increase t1 monitoring terminal applies is more than the front stage operation temperature rise monitoring setting During threshold value t1, then limit this terminal applies and take resource, including but not limited to limit the cpu of this terminal applies And/or gpu resource;
When monitoring that background system temperature increase t2 is more than running background temperature rise monitoring threshold t2, then close Close the process of terminal applies occupancy.
Certainly, in the present embodiment, in order to lift the satisfaction of Consumer's Experience further, also can additionally arrange One non-control list of application, comprises user and is not intended to carry out the application of energy-conservation control, Ke Yishi in this list Some conventional applications that programming count usage frequency obtains or user flexibly add according to oneself demand Some application etc.;Before above-mentioned control is carried out to terminal applies, first judge that whether this terminal applies exists In this non-control application class table, in this way, then control is not carried out to it, but now can send to user and report to the police Prompting;When determining that this terminal applies is not in this control list of application, just it is carried out with above-mentioned energy-conservation control. Above-mentioned management process is shown in Figure 2, comprising:
Step 201: get the temperature of terminal each major heading device when terminal applies are separately operable with resident backstage Degree lift-off value;
Step 202: according to the temperature liter of each major heading device in front stage operation and resident backstage for the terminal applies High level arranges front stage operation temperature rise monitoring threshold t1 and running background temperature rise monitoring threshold t2;
Step 203: terminal applies start, and judge terminal applies on front stage operation or resident backstage, such as front Platform runs, and goes to step 204;Otherwise, go to step 208;
Step 204: whether the foreground system temperature increase t1 monitoring this terminal applies is more than setting foreground fortune Row temperature rise monitoring threshold t1, in this way, goes to step 205;Otherwise, go to step 207;
Step 205: judge this terminal applies whether in non-control list of application, such as no, go to step 206; Otherwise, go to step 207;
Step 206: cpu the and/or gpu resource of limiting terminal application.
Step 207: do not process.
Step 208: whether the background system temperature increase t2 monitoring this terminal applies is more than setting backstage fortune Row temperature rise monitoring threshold t2, in this way, goes to step 208;Otherwise, go to step 209;
Step 209: judge this terminal applies whether in non-control list of application, such as no, go to step 210; Otherwise, go to step 211;
Step 210: positive closing terminal applies process.
Step 211: do not process.
Example two: energy consumption monitoring threshold value includes system power and consumes monitoring threshold i
The system power that now arranges consume monitoring threshold i include foreground system current drain monitoring threshold i1 and Background system current drain monitoring threshold i2;Corresponding system power actual consumption value i includes foreground system electricity Stream consumption figures i1 and background system current consumption value i2;Foreground in this example refers to terminal applies before system The state that platform runs, backstage then refers to that terminal applies reside in the state on backstage.
Now, in above-mentioned steps 101, setting energy consumption monitoring threshold value includes arranging the monitoring of foreground system current drain Threshold value i1 and background system current drain monitoring threshold i2;
During setting foreground system current drain monitoring threshold i1, pass through when terminal applies are normally run on foreground Be connected on terminal supplying power one end current sampling resistor obtain current system electric current actual consumption value, according to deserve Front system power actual consumption value arranges foreground system current drain monitoring threshold i1;Or directly based on experience value Described foreground system current drain monitoring threshold i1 is set;
During setting background system current drain monitoring threshold i2, pass through when terminal applies are normally run on backstage Be connected on terminal supplying power one end current sampling resistor obtain current system electric current actual consumption value, according to deserve Before and after front system power actual consumption value setting is described, system power consumes monitoring threshold i2;Or directly according to warp Test value and described background system current drain monitoring threshold i2 is set.
Corresponding, subsequently terminal applies unlatching after in front stage operation when, by being connected on terminal supplying power one end Current sampling resistor obtain foreground system current consumption value i1 of this terminal applies;By being connected on terminal electricity The current sampling resistor of source one end obtains background system current consumption value i2 of this terminal applies.
Then, when after terminal applies unlatching in front stage operation, the foreground system electric current monitoring this terminal applies disappears Whether consumption value i1 consumes monitoring threshold i1 more than platform system power;
When after terminal applies being opened in running background, monitor the foreground system current consumption value of this terminal applies Whether i2 consumes monitoring threshold i2 more than platform system power;
Monitor threshold when foreground system current consumption value i1 monitoring terminal applies is more than foreground system current drain During value i1, limiting terminal application takies resource;Including but not limited to limit this terminal applies cpu and/or Gpu resource;
Monitor threshold when background system current consumption value i2 monitoring terminal applies is more than background system current drain During value i2, the process that application of closing a terminal takies.
Certainly, in this example, in order to lift the satisfaction of Consumer's Experience further, one also can additionally be arranged Individual non-control list of application, comprises user and is not intended to carry out the application of energy-conservation control in this list, can be certainly Some conventional applications that dynamic statistics usage frequency obtains or user flexibly add according to oneself demand Some applications etc.;Before carrying out above-mentioned control to terminal applies, first judge this terminal applies whether at this In non-control application class table, in this way, then control is not carried out to it, but now can send warning to user and carry Show;When determining that this terminal applies is not in this control list of application, just it is carried out with above-mentioned energy-conservation control. Above-mentioned management process is shown in Figure 3, comprising:
Step 301: get current system electric current actual consumption when terminal applies are separately operable with resident backstage Value;
Step 302: according to the current system electric current actual consumption in front stage operation and resident backstage for the terminal applies Value setting foreground system current drain monitoring threshold i1 and background system current drain monitoring threshold i2;
Step 303: terminal applies start, and judge terminal applies on front stage operation or resident backstage, such as front Platform runs, and goes to step 304;Otherwise, go to step 308;
Step 304: whether foreground system current consumption value i1 monitoring this terminal applies is more than foreground system electricity Stream consumes monitoring threshold i1, in this way, goes to step 305;Otherwise, go to step 307;
Step 305: judge this terminal applies whether in non-control list of application, such as no, go to step 306; Otherwise, go to step 307;
Step 306: cpu the and/or gpu resource of limiting terminal application.
Step 307: do not process.
Step 308: whether background system current consumption value i2 monitoring this terminal applies is more than described backstage system System current drain monitoring threshold i2, in this way, goes to step 308;Otherwise, go to step 309;
Step 309: judge this terminal applies whether in non-control list of application, such as no, go to step 310; Otherwise, go to step 311;
Step 310: positive closing terminal applies process.
Step 311: do not process.
Example three: energy consumption monitoring threshold value includes system temperature rise monitoring threshold t and system power consumes monitoring threshold i
Now can according to the step in example one and example two be respectively provided with platform run temperature rise monitoring threshold t1, Running background temperature rise monitoring threshold t2, foreground system current drain monitoring threshold i1 and background system current drain Monitoring threshold i2.
After terminal applies unlatching in front stage operation, when the foreground system temperature increase monitoring terminal applies When t1 is more than front stage operation temperature rise monitoring threshold t1, or monitor terminal applies foreground system current consumption value When i1 is more than foreground system current drain monitoring threshold i1, just limits this terminal applies and take resource;
Terminal applies open after in running background, when monitoring terminal applies background system temperature increase t2 During more than running background temperature rise monitoring threshold t2, or monitoring terminal application background system current consumption value i2 is big When background system current drain monitoring threshold i2, close the process of this terminal applies occupancy.
In above-mentioned regulation model, if temperature rising value and current consumption value wherein any one value exceed right Corresponding control can be carried out to this terminal applies during the threshold value answered.In this example, also may call in temperature When appreciation and current consumption value exceed corresponding threshold value simultaneously, just can carry out control, now as follows:
After terminal applies unlatching in front stage operation, when the foreground system temperature increase monitoring terminal applies T1 is more than front stage operation temperature rise monitoring threshold t1, and monitors terminal applies foreground system current consumption value i1 During more than foreground system current drain monitoring threshold i1, just limit this terminal applies and take resource;
Terminal applies open after in running background, when monitoring terminal applies background system temperature increase t2 More than running background temperature rise monitoring threshold t2, and after monitoring terminal application background system current consumption value i2 is more than When platform system power consumes monitoring threshold i2, just close the process of this terminal applies occupancy.
It should be appreciated that the terminal applies in the present embodiment can be all terminal applies for terminal, Can also be for a Terminal Type application specific in terminal, such as only for the terminal applies of high energy consumption, or Select to need to carry out the terminal applies of control only for user oneself.And it should be appreciated that in the present embodiment For the corresponding threshold value set by different terminal applies can identical it is also possible to different.
Embodiment two:
Terminal energy-saving management device in the present embodiment can be arranged in terminal, and the terminal in the present embodiment please Shown in Figure 4, it may include processor cpu, graphic process unit gpu, Power Management Unit pmu, radio frequency The hardware module such as power amplifier pa and sensing system.This terminal can be mobile phone, ipad, ipod etc. Deng;Shown in Figure 5, the terminal energy-saving management device in the present embodiment includes:
Setup module 1, for being provided for characterizing the energy consumption monitoring threshold value of terminal applies energy consumption;
Monitoring modular 2, for monitoring the actual consumption value of this terminal applies after terminal applies are opened;
Management and control module 3, for when monitoring that actual consumption value is more than energy consumption monitoring threshold value, entering to terminal applies Row saving pipe controlled.
Setup module 1 in the present embodiment includes temperature control setting submodule and/or electric current setting submodule, monitoring Module 2 includes temperature monitoring submodule and/or current monitoring submodule;Energy consumption monitoring threshold value includes system temperature rise Monitoring threshold t and/or system power consume monitoring threshold i;Actual consumption value includes the actual rising of system temperature Value t and/or system power actual consumption value i;
In order to be more convenient for that the solution of the present invention is clearly understood from, the present embodiment is also respectively with following three kinds of examples The present invention is described in detail.
Example one: energy consumption monitoring threshold value includes system temperature rise monitoring threshold t
In this example, shown in Figure 6, the setup module 1 of terminal energy-saving management device includes temperature control Setting submodule 11, monitoring modular 2 includes temperature monitoring submodule 21,
Temperature control setting submodule 11 is used for arranging system temperature rise monitoring threshold t;System temperature rise monitoring threshold now Value t includes front stage operation temperature rise monitoring threshold t1 and running background temperature rise monitoring threshold t2;Temperature control arranges submodule Block 11 includes the foreground temperature control arranging unit 111 for arranging front stage operation temperature rise monitoring threshold t1 and is used for The backstage temperature control arranging unit 112 of setting front stage operation temperature rise monitoring threshold t2;
During foreground temperature control arranging unit 111 setting front stage operation temperature rise monitoring threshold t1, can exist in terminal applies The temperature increase of acquisition terminal each major heading device when foreground is normally run, then according to the temperature liter obtaining High level arranges front stage operation temperature rise monitoring threshold t1;For example the multiple temperature increase obtaining are weighted putting down The temperature value obtaining after all processing is as front stage operation temperature rise monitoring threshold t1;Certainly, also can be directly according to warp Test value and described front stage operation temperature rise monitoring threshold t1 is set;
When running temperature rise monitoring threshold t1 before and after backstage temperature control arranging unit 112 setting, in terminal applies rear The temperature increase of acquisition terminal each major heading device when platform normally runs, the temperature increase according to obtaining sets Put described running background temperature rise monitoring threshold t2;For example the multiple temperature increase obtaining are weighted averagely The temperature value obtaining after process is as running background temperature rise monitoring threshold t2;Certainly, also can directly rule of thumb Value arranges described running background temperature rise monitoring threshold t2;
Temperature monitoring submodule 21 is used for monitoring system temperature actual lift-off value t;The actual lift-off value of system temperature T includes foreground system temperature increase t1 and background system temperature increase t2, temperature monitoring submodule 21 Take unit 212 including foreground temperature monitoring unit 211 and the monitoring of backstage temperature;
Foreground temperature monitoring unit 211 is for, when after terminal applies being opened in front stage operation, monitoring this terminal Whether the foreground system temperature increase t1 of application is more than described front stage operation temperature rise monitoring threshold t1;It is concrete Average value processing can be carried out by the temperature increase of acquisition terminal each major heading device and obtain foreground system temperature liter High level t1;
Backstage temperature monitoring unit 212 is for, when after terminal applies being opened in running background, monitoring this terminal Whether the background system temperature increase t2 of application is more than described running background temperature rise monitoring threshold t2;It is concrete Average value processing can be carried out by the temperature increase of acquisition terminal each major heading device and obtain background system temperature liter High level t2.
Major heading device in this example includes processor cpu, graphic process unit gpu, Power Management Unit pmu At least one of with radio-frequency power amplifier pa, and specifically can be obtained by arranging corresponding temperature sensor The temperature of these major heading devices, the amplitude being then based on the temperature rising of each target main device is weighted putting down All process the temperature rise monitoring threshold after obtaining synthesis.
Management and control module 3 in this example includes resource management and control submodule 31 and process management and control submodule 32;
Resource management and control submodule 31 is used for monitoring that foreground system temperature raises in foreground temperature monitoring unit 111 When value t1 is more than front stage operation temperature rise monitoring threshold t1, limiting terminal application takies resource;Including but do not limit In cpu the and/or gpu resource limiting this terminal applies;
Process management and control submodule 32 is used for monitoring that background system temperature raises in backstage temperature monitoring unit 112 When value t2 is more than running background temperature rise monitoring threshold t2, the process that application of closing a terminal takies.
Certainly, in this example, in order to lift the satisfaction of Consumer's Experience further, one also can additionally be arranged Individual non-control list of application, comprises user and is not intended to carry out the application of energy-conservation control in this list, can be certainly Some conventional applications that dynamic statistics usage frequency obtains or user flexibly add according to oneself demand Some applications etc.;Now, terminal energy-saving management device may also include judge module 4, and terminal applies are being entered Before the above-mentioned control of row, first judge this terminal applies whether in this non-control application class table, in this way, then not Control is carried out to it, but now can send alarm to user.
Example two: energy consumption monitoring threshold value includes system power and consumes monitoring threshold i
In this example, shown in Figure 7, the setup module 1 of terminal energy-saving management device includes electric current Setting submodule 12, monitoring modular 2 includes current monitoring submodule 22;
Electric current setting submodule 12 is used for arranging system power consumption monitoring threshold i, and this system power consumption is supervised Survey threshold value i and include foreground system current drain monitoring threshold i1 and background system current drain monitoring threshold i2; Electric current setting submodule 12 includes setting for the foreground electric current arranging foreground system current drain monitoring threshold i1 Put unit 121 and the backstage current setting unit 122 for arranging background system current drain monitoring threshold i2; System power actual consumption value i includes foreground system current consumption value i1 and background system current consumption value i2; Current monitoring submodule 22 includes foreground current monitoring unit 221 and backstage current monitoring unit 222;
During foreground current setting unit 121 setting foreground system current drain monitoring threshold i1, in terminal applies Current system electric current is obtained by being connected on the current sampling resistor of terminal supplying power one end when normally running on foreground Actual consumption value, arranges foreground system current drain monitoring threshold according to this current system power actual consumption value i1;Or directly described foreground system current drain monitoring threshold i1 is set based on experience value;
During backstage current setting unit 122 setting background system current drain monitoring threshold i2, in terminal applies Current system electric current is obtained by being connected on the current sampling resistor of terminal supplying power one end when normally running on backstage Actual consumption value, according to this monitoring of system power consumption in front and back described in current system power actual consumption value setting Threshold value i2;Or directly described background system current drain monitoring threshold i2 is set based on experience value.
Foreground current monitoring unit 221 is for, when after terminal applies being opened in front stage operation, monitoring this terminal Whether foreground system current consumption value i1 of application is more than described foreground system current drain monitoring threshold i1;Its The foreground system of this terminal applies specifically can be obtained by being connected on the current sampling resistor of terminal supplying power one end Current consumption value i1;
Backstage current monitoring unit 222 is for, when after terminal applies being opened in front stage operation, monitoring this terminal Whether background system current consumption value i2 of application is more than described background system current drain monitoring threshold i2;Its The background system of this terminal applies specifically can be obtained by being connected on the current sampling resistor of terminal supplying power one end Current consumption value i2.
Management and control module in this example still includes resource management and control submodule 31 and process management and control submodule 32;
Resource management and control submodule 31 is used for monitoring foreground system electric current in terminal applies foreground current monitoring unit When consumption figures i1 is more than foreground system current drain monitoring threshold i1, limiting terminal application takies resource;
Process management and control submodule 32 is used for monitoring background system electric current in terminal applies backstage current monitoring unit When consumption figures i2 is more than background system current drain monitoring threshold i2, the process that application of closing a terminal takies.
Certainly, in this example, in order to lift the satisfaction of Consumer's Experience further, one also can additionally be arranged Individual non-control list of application, comprises user and is not intended to carry out the application of energy-conservation control in this list, can be certainly Some conventional applications that dynamic statistics usage frequency obtains or user flexibly add according to oneself demand Some applications etc.;Now, terminal energy-saving management device may also include judge module 4, and terminal applies are being entered Before the above-mentioned control of row, first judge this terminal applies whether in this non-control application class table, in this way, then not Control is carried out to it, but now can send alarm to user.
Example three: energy consumption monitoring threshold value includes system temperature rise monitoring threshold t and system power consumes monitoring threshold i
In this example, shown in Figure 8, the setup module 1 of terminal energy-saving management device includes temperature control Setting submodule 11 and electric current setting submodule 12, temperature monitoring submodule 21 and monitoring modular 2 include electricity Stream monitoring submodule 22.
Now can according to the step in example one and example two be respectively provided with platform run temperature rise monitoring threshold t1, Running background temperature rise monitoring threshold t2, foreground system current drain monitoring threshold i1 and background system current drain Monitoring threshold i2.
Terminal energy-saving management device after terminal applies unlatching in front stage operation when, when monitoring terminal applies When foreground system temperature increase t1 is more than front stage operation temperature rise monitoring threshold t1, or monitor terminal applies When foreground system current consumption value i1 is more than foreground system current drain monitoring threshold i1, just limit this terminal Application takies resource;
Terminal energy-saving management device terminal applies open after in running background, when monitoring terminal applies backstage When system temperature lift-off value t2 is more than running background temperature rise monitoring threshold t2, or monitoring terminal application backstage system When system current consumption value i2 is more than background system current drain monitoring threshold i2, closes this terminal applies and take Process.
In above-mentioned regulation model, if temperature rising value and current consumption value wherein any one value exceed right Corresponding control can be carried out to this terminal applies during the threshold value answered.In this example, also may call in temperature When appreciation and current consumption value exceed corresponding threshold value simultaneously, just can carry out control, now as follows:
After the unlatching of terminal energy-saving management device terminal applies in front stage operation, before monitoring terminal applies Platform system temperature lift-off value t1 is more than front stage operation temperature rise monitoring threshold t1, and monitors that terminal applies foreground is When system current consumption value i1 is more than foreground system current drain monitoring threshold i1, just limits this terminal applies and account for Use resource;
Terminal energy-saving management device terminal applies open after in running background, when monitoring terminal applies backstage System temperature lift-off value t2 is more than running background temperature rise monitoring threshold t2, and monitoring terminal application background system electricity When stream consumption figures i2 is more than background system current drain monitoring threshold i2, just close this terminal applies occupancy Process.
It should be appreciated that the terminal applies in the present embodiment can be all terminal applies for terminal, Can also be for a Terminal Type application specific in terminal, such as only for the terminal applies of high energy consumption, or Select to need to carry out the terminal applies of control only for user oneself.And it should be appreciated that in the present embodiment For the corresponding threshold value set by different terminal applies can identical it is also possible to different.
Above content is to further describe it is impossible to recognize with reference to specific embodiment is made for the present invention Determine the present invention be embodied as be confined to these explanations.Ordinary skill for the technical field of the invention For personnel, without departing from the inventive concept of the premise, some simple deduction or replace can also be made, Protection scope of the present invention all should be considered as belonging to.

Claims (13)

1. a kind of terminal administration of energy conservation method is it is characterised in that include:
It is provided for characterizing the energy consumption monitoring threshold value of terminal applies energy consumption;
The actual consumption value of this terminal applies is monitored after terminal applies are opened;
When monitoring that described actual consumption value is more than described energy consumption monitoring threshold value, described terminal applies are carried out Saving pipe controlled.
2. terminal administration of energy conservation method as claimed in claim 1 is it is characterised in that described energy consumption is supervised Survey threshold value and include system temperature rise monitoring threshold t and/or system power consumption monitoring threshold i;Described actual consumption Value includes system temperature actual lift-off value t and/or system power actual consumption value i.
3. terminal administration of energy conservation method as claimed in claim 2 is it is characterised in that described energy consumption is supervised When survey threshold value includes system temperature rise monitoring threshold t, described system temperature rise monitoring threshold t includes front stage operation temperature Rise monitoring threshold t1 and running background temperature rise monitoring threshold t2;Before the actual lift-off value t of described system temperature includes Platform system temperature lift-off value t1 and background system temperature increase t2;
When after terminal applies being opened in front stage operation, monitor the foreground system temperature increase of this terminal applies Whether t1 is more than described front stage operation temperature rise monitoring threshold t1;
When after terminal applies being opened in running background, monitor the background system temperature increase of this terminal applies Whether t2 is more than described running background temperature rise monitoring threshold t2;
When described energy consumption monitoring threshold value includes system power consumption monitoring threshold i, described system power consumption prison Survey threshold value i and include foreground system current drain monitoring threshold i1 and background system current drain monitoring threshold i2; Described system power actual consumption value i includes foreground system current consumption value i1 and background system current consumption value i2;
When after terminal applies being opened in front stage operation, monitor the foreground system current consumption value of this terminal applies Whether i1 is more than described foreground system current drain monitoring threshold i1;
When after terminal applies being opened in front stage operation, monitor the background system current consumption value of this terminal applies Whether i2 is more than described background system current drain monitoring threshold i2.
4. terminal administration of energy conservation method as claimed in claim 3 monitors institute it is characterised in that working as When stating foreground system temperature increase t1 more than described front stage operation temperature rise monitoring threshold t1, and/or monitor When described foreground system current consumption value i1 is more than described foreground system current drain monitoring threshold i1, described Saving pipe controlled includes limiting described terminal applies occupancy resource;
When monitor described background system temperature increase t2 be more than described running background temperature rise monitoring threshold t2 When, and/or monitor described background system current consumption value i2 more than described background system current drain monitoring threshold During value i2, described saving pipe controlled includes closing the process that described terminal applies take.
5. the terminal administration of energy conservation method as described in any one of claim 1-4 is it is characterised in that right Before described terminal applies carry out control, also include judging whether described terminal applies should in default non-control With in list;As no, then carry out described energy-conservation control.
6. the terminal administration of energy conservation method as described in claim 3 or 4 is it is characterised in that described energy Consumption monitoring threshold is when including system temperature rise monitoring threshold t, arrange described front stage operation temperature rise monitoring threshold t1 and Running background temperature rise monitoring threshold t2 includes:
The temperature gathering described terminal each major heading device on foreground when described terminal applies are normally run raises Value, the described temperature increase according to obtaining arranges described front stage operation temperature rise monitoring threshold t1;Or direct root According to empirical value, described front stage operation temperature rise monitoring threshold t1 is set;
The temperature gathering described terminal each major heading device on backstage when described terminal applies are normally run raises Value, the described temperature increase according to obtaining arranges described running background temperature rise monitoring threshold t2;Or direct root According to empirical value, described running background temperature rise monitoring threshold t2 is set;
When described energy consumption monitoring threshold value includes system temperature rise monitoring threshold t, described foreground system electric current is set and disappears Consumption monitoring threshold i1 and background system current drain monitoring threshold i2 includes:
When described terminal applies are normally run on foreground by being connected on the current sample electricity of terminal supplying power one end Resistance obtains current system electric current actual consumption value, according to this current system power actual consumption value setting described before Platform system power consumes monitoring threshold i1;Or described foreground system current drain prison is directly set based on experience value Survey threshold value i1;
When described terminal applies are normally run on backstage by being connected on the current sample electricity of terminal supplying power one end Resistance obtains current system electric current actual consumption value, according to this current system power actual consumption value setting described before System power consumes monitoring threshold i2 afterwards;Or described background system current drain prison is directly set based on experience value Survey threshold value i2.
7. the terminal administration of energy conservation method as described in claim 3 or 4 is it is characterised in that in terminal After application unlatching in front stage operation, carried out by gathering the temperature increase of described terminal each major heading device Average value processing obtains foreground system temperature increase t1;By being connected on the current sample electricity of terminal supplying power one end Resistance obtains foreground system current consumption value i1 of this terminal applies;
When after terminal applies being opened in running background, by gathering the temperature of described terminal each major heading device Lift-off value carries out average value processing and obtains background system temperature increase t2;By being connected on terminal supplying power one end Current sampling resistor obtains background system current consumption value i2 of this terminal applies.
8. terminal administration of energy conservation method as claimed in claim 7 is it is characterised in that described major heading Device is included in processor cpu, graphic process unit gpu, Power Management Unit pmu and radio-frequency power amplifier At least one.
9. a kind of terminal energy-saving management device is it is characterised in that include:
Setup module, for being provided for characterizing the energy consumption monitoring threshold value of terminal applies energy consumption;
Monitoring modular, for monitoring the actual consumption value of this terminal applies after terminal applies are opened;
Management and control module, for when monitoring that described actual consumption value is more than described energy consumption monitoring threshold value, to institute State terminal applies and carry out saving pipe controlled.
10. terminal energy-saving management device as claimed in claim 9 is it is characterised in that described setting mould Block includes temperature control setting submodule and/or electric current setting submodule, and described monitoring modular includes temperature monitoring submodule Block and/or current monitoring submodule;Described energy consumption monitoring threshold value includes system temperature rise monitoring threshold t and/or is System current drain monitoring threshold i;Described actual consumption value includes system temperature actual lift-off value t and/or system Electric current actual consumption value i;
Described temperature control setting submodule is used for arranging system temperature rise monitoring threshold t;
Described electric current setting submodule is used for arranging system power consumption monitoring threshold i;
Described temperature monitoring submodule is used for monitoring system temperature actual lift-off value t;
Described current monitoring submodule is used for monitoring system electric current actual consumption value i.
11. terminal energy-saving management devices as claimed in claim 10 are it is characterised in that described energy consumption is supervised When survey threshold value includes system temperature rise monitoring threshold t, described system temperature rise monitoring threshold t includes front stage operation temperature Rise monitoring threshold t1 and running background temperature rise monitoring threshold t2;Described temperature control setting submodule is included for arranging The foreground temperature control arranging unit of front stage operation temperature rise monitoring threshold t1 and being used for arranges front stage operation temperature rise monitoring threshold The backstage temperature control arranging unit of value t2;The actual lift-off value t of described system temperature includes foreground system temperature and raises Value t1 and background system temperature increase t2, described temperature monitoring submodule include foreground temperature monitoring unit and Backstage temperature monitoring takes unit;
Described foreground temperature monitoring unit is for, when after terminal applies being opened in front stage operation, monitoring this terminal Whether the foreground system temperature increase t1 of application is more than described front stage operation temperature rise monitoring threshold t1;
Described backstage temperature monitoring unit is for, when after terminal applies being opened in running background, monitoring this terminal Whether the background system temperature increase t2 of application is more than described running background temperature rise monitoring threshold t2;
When described energy consumption monitoring threshold value includes system power consumption monitoring threshold i, described system power consumption prison Survey threshold value i and include foreground system current drain monitoring threshold i1 and background system current drain monitoring threshold i2; Described electric current setting submodule includes setting for the foreground electric current arranging foreground system current drain monitoring threshold i1 Put unit and the backstage current setting unit for arranging background system current drain monitoring threshold i2;Described system System electric current actual consumption value i includes foreground system current consumption value i1 and background system current consumption value i2;Institute State current monitoring submodule and include foreground current monitoring unit and backstage current monitoring unit;
Described foreground current monitoring unit is for, when after terminal applies being opened in front stage operation, monitoring this terminal Whether foreground system current consumption value i 1 of application is more than described foreground system current drain monitoring threshold i 1;
Described backstage current monitoring unit is for, when after terminal applies being opened in front stage operation, monitoring this terminal Whether background system current consumption value i2 of application is more than described background system current drain monitoring threshold i2.
12. terminal energy-saving management devices as claimed in claim 11 are it is characterised in that described management and control mould Block includes resource management and control submodule and process management and control submodule;
Described resource management and control submodule is used for monitoring described foreground system temperature in described foreground temperature monitoring unit When degree lift-off value t1 is more than described front stage operation temperature rise monitoring threshold t1, and/or described foreground current monitoring list Unit monitors that described foreground system current consumption value i 1 is more than described foreground system current drain monitoring threshold i1 When, limit described terminal applies and take resource;
Described process management and control submodule is used for platform temperature monitoring unit in the rear and monitors described background system temperature When degree lift-off value t2 is more than described running background temperature rise monitoring threshold t2, and/or described backstage current monitoring list Unit monitors that described background system current consumption value i2 is more than described background system current drain monitoring threshold i2 When, close the process that described terminal applies take.
A kind of 13. terminals are it is characterised in that include the terminal section as described in any one of claim 9-12 Can managing device.
CN201510432538.4A 2015-07-21 2015-07-21 Terminal energy-saving management method and apparatus, and terminal Withdrawn CN106371481A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201510432538.4A CN106371481A (en) 2015-07-21 2015-07-21 Terminal energy-saving management method and apparatus, and terminal
PCT/CN2016/080401 WO2016180241A1 (en) 2015-07-21 2016-04-27 Energy-conservation management method and apparatus for terminal and terminal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510432538.4A CN106371481A (en) 2015-07-21 2015-07-21 Terminal energy-saving management method and apparatus, and terminal

Publications (1)

Publication Number Publication Date
CN106371481A true CN106371481A (en) 2017-02-01

Family

ID=57248481

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510432538.4A Withdrawn CN106371481A (en) 2015-07-21 2015-07-21 Terminal energy-saving management method and apparatus, and terminal

Country Status (2)

Country Link
CN (1) CN106371481A (en)
WO (1) WO2016180241A1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110045812A (en) * 2018-01-12 2019-07-23 广东欧珀移动通信有限公司 Information processing method, device, computer equipment and computer readable storage medium
CN110399000A (en) * 2019-07-02 2019-11-01 维沃移动通信有限公司 A kind of mobile terminal temperature control method mobile terminal
CN112393765A (en) * 2020-11-16 2021-02-23 广东百德朗科技有限公司 Campus building energy consumption management method, system, equipment and readable storage medium
US11044201B2 (en) * 2017-04-07 2021-06-22 Samsung Electronics Co., Ltd. Traffic control method and electronic device thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010056700A (en) * 2008-08-27 2010-03-11 Kyocera Corp Mobile terminal, power consumption control program, and power consumption control method
CN101938819A (en) * 2010-09-09 2011-01-05 中兴通讯股份有限公司 System and method for controlling power consumption of mobile terminal
CN102156530A (en) * 2010-09-30 2011-08-17 华为终端有限公司 Power consumption management method and device thereof for mobile terminal
CN104184884A (en) * 2013-05-28 2014-12-03 中兴通讯股份有限公司 Device and method for managing and controlling power consumption of mobile terminal and mobile terminal
CN104581903A (en) * 2014-12-19 2015-04-29 小米科技有限责任公司 Method and device for reducing power consumption of terminal equipment
CN104731302A (en) * 2013-12-20 2015-06-24 贝壳网际(北京)安全技术有限公司 Power-saving operation method and power-saving operation system of mobile terminal

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2870661A1 (en) * 2004-05-19 2005-11-25 France Telecom METHOD FOR OPTIMALLY MANAGING THE CHARGE OF A BATTERY OF A MOBILE TELECOMMUNICATION TERMINAL
CN201781542U (en) * 2010-08-31 2011-03-30 上海闻泰电子科技有限公司 Electricity-saving mobile phone
CN102946630B (en) * 2012-11-06 2015-12-16 东莞宇龙通信科技有限公司 The method for managing power supply of mobile terminal and mobile terminal
CN103024204B (en) * 2012-12-13 2015-10-07 广东欧珀移动通信有限公司 A kind of electricity saving method of mobile terminal and device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010056700A (en) * 2008-08-27 2010-03-11 Kyocera Corp Mobile terminal, power consumption control program, and power consumption control method
CN101938819A (en) * 2010-09-09 2011-01-05 中兴通讯股份有限公司 System and method for controlling power consumption of mobile terminal
CN102156530A (en) * 2010-09-30 2011-08-17 华为终端有限公司 Power consumption management method and device thereof for mobile terminal
CN104184884A (en) * 2013-05-28 2014-12-03 中兴通讯股份有限公司 Device and method for managing and controlling power consumption of mobile terminal and mobile terminal
CN104731302A (en) * 2013-12-20 2015-06-24 贝壳网际(北京)安全技术有限公司 Power-saving operation method and power-saving operation system of mobile terminal
CN104581903A (en) * 2014-12-19 2015-04-29 小米科技有限责任公司 Method and device for reducing power consumption of terminal equipment

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11044201B2 (en) * 2017-04-07 2021-06-22 Samsung Electronics Co., Ltd. Traffic control method and electronic device thereof
CN110045812A (en) * 2018-01-12 2019-07-23 广东欧珀移动通信有限公司 Information processing method, device, computer equipment and computer readable storage medium
CN110045812B (en) * 2018-01-12 2021-01-15 Oppo广东移动通信有限公司 Information processing method, information processing device, computer equipment and computer readable storage medium
CN110399000A (en) * 2019-07-02 2019-11-01 维沃移动通信有限公司 A kind of mobile terminal temperature control method mobile terminal
CN112393765A (en) * 2020-11-16 2021-02-23 广东百德朗科技有限公司 Campus building energy consumption management method, system, equipment and readable storage medium

Also Published As

Publication number Publication date
WO2016180241A1 (en) 2016-11-17

Similar Documents

Publication Publication Date Title
CN106371481A (en) Terminal energy-saving management method and apparatus, and terminal
CN104184884B (en) A kind of control device and method, mobile terminal of mobile terminal power consumption
CN103593039A (en) Electricity saving control method and electricity saving control device
CN104239132A (en) Wakeup synchronization method, device and terminal
CN106897125A (en) Smart machine and its management method of service or application
CN103701889A (en) Data center energy saving method on basis of cloud computing
CN105208642A (en) Application management method and terminal
CN106200867A (en) Method, device and the terminal of a kind of terminal energy-efficient treatment
CN106654739B (en) A kind of socket and housed device intelligence power-off implementation method of band intelligence power down function
CN107844187A (en) Power consumption management method, device and electronic equipment
CN110460490A (en) Server cluster based on Internet of Things monitors system and method
CN104219746B (en) Method, device and terminal for autonomously adjusting wake-up time
CN105141762B (en) A kind of low electric closedown method and system of mobile terminal
CN103376414A (en) Method and device for monitoring electric quantity of battery
CN103793310A (en) Method for monitoring server main board in real time
CN105004896A (en) Electric meter system with period real-time power consumption data monitoring function
Chen et al. Development of a smart home energy saving system combining multiple smart devices
CN107506286A (en) CPU and memory block automatically upper inserting method and system
CN105847527A (en) Method for preventing automatic shutdown of mobile terminal, and mobile terminal
CN207601589U (en) A kind of intelligent socket monitoring system for managing electricity consumption based on microprocessor
CN105430721A (en) Data interaction control method, data interaction control device and wearable equipment
CN107222612B (en) Background application program closing method and device of mobile terminal
CN205066845U (en) Water gauge based on wifi wireless transmission network
CN104300672A (en) Intelligent electricity limiting method, device and system
CN203232270U (en) Automatic restart system of electrical energy collection terminal of transformer station

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20170201