CN106358085A - Method for managing tasks under television standby state and television - Google Patents

Method for managing tasks under television standby state and television Download PDF

Info

Publication number
CN106358085A
CN106358085A CN201610932437.8A CN201610932437A CN106358085A CN 106358085 A CN106358085 A CN 106358085A CN 201610932437 A CN201610932437 A CN 201610932437A CN 106358085 A CN106358085 A CN 106358085A
Authority
CN
China
Prior art keywords
pending task
execution
moment
task
pending
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610932437.8A
Other languages
Chinese (zh)
Other versions
CN106358085B (en
Inventor
骆婷
吴青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hisense Electronic Technology (shenzhen) Co Ltd
Original Assignee
Hisense Electronic Technology (shenzhen) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hisense Electronic Technology (shenzhen) Co Ltd filed Critical Hisense Electronic Technology (shenzhen) Co Ltd
Priority to CN201610932437.8A priority Critical patent/CN106358085B/en
Publication of CN106358085A publication Critical patent/CN106358085A/en
Application granted granted Critical
Publication of CN106358085B publication Critical patent/CN106358085B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N21/00Selective content distribution, e.g. interactive television or video on demand [VOD]
    • H04N21/40Client devices specifically adapted for the reception of or interaction with content, e.g. set-top-box [STB]; Operations thereof
    • H04N21/43Processing of content or additional data, e.g. demultiplexing additional data from a digital video stream; Elementary client operations, e.g. monitoring of home network or synchronising decoder's clock; Client middleware
    • H04N21/443OS processes, e.g. booting an STB, implementing a Java virtual machine in an STB or power management in an STB
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N21/00Selective content distribution, e.g. interactive television or video on demand [VOD]
    • H04N21/40Client devices specifically adapted for the reception of or interaction with content, e.g. set-top-box [STB]; Operations thereof
    • H04N21/45Management operations performed by the client for facilitating the reception of or the interaction with the content or administrating data related to the end-user or to the client device itself, e.g. learning user preferences for recommending movies, resolving scheduling conflicts
    • H04N21/458Scheduling content for creating a personalised stream, e.g. by combining a locally stored advertisement with an incoming stream; Updating operations, e.g. for OS modules ; time-related management operations
    • H04N21/4586Content update operation triggered locally, e.g. by comparing the version of software modules in a DVB carousel to the version stored locally

Abstract

The embodiment of the invention provides a method for managing tasks under a television standby state and a television. The method comprises the following steps: acquiring a to-be-executed task in a preset time frame at a recommended start execution moment after a standby command input by a user is received; determining an execution sequence of each to-be-executed task and an actual start execution moment of each to-be-executed task according to the priority of each to-be-executed task and the recommended start execution moment of each to-be-executed task; and setting the television to a standby state if the time difference between the actual start execution moment of the first to-be-executed task in the execution sequence and the current moment is greater than a preset threshold value; and setting the television to a false-standby state and executing the corresponding to-be-executed task respectively at the actual start execution moment of each to-be-executed task according to the execution sequence. The method is used for improving the real-time performance for showing a task processing result to users.

Description

Task management method and TV under television standby state
Technical field
The present embodiments relate to TV technology, under more particularly, to a kind of television standby state task management method and TV.
Background technology
At present, with the continuous development of TV tech, TV needs task to be processed to get more and more, and for example, TV needs Processing of task includes the task of user's reservation, periodically downloads latest data information etc. from data server.
In actual application, after television startup, data message that TV is shown to user needs for up-to-date Data message, this data message can include electronic program guides (electronic programguide, abbreviation epg) data, Program data, program station logo data etc..In the prior art, first judge whether the task of process in need after television startup, For example judge that whether having carried out epg data in data server updates, if having, execution needs task to be processed, and in execution The result of task after complete task, is shown to user.
However, after television startup, because TV needs to first carry out task, then the process knot showing task to user Fruit, so that the time delay of the result of user's acquisition task is larger, leads to user poor to the experience of TV.
Content of the invention
The embodiment of the present invention provides task management method and TV under a kind of television standby state, for improving to user's exhibition Show the real-time of the result of task.
In a first aspect, the embodiment of the present invention provides task management method under a kind of television standby state, comprising:
After the standby command receiving user input, it is engraved in treating in preset period of time when obtaining the initial execution of recommendation and holds Row task;
The recommendation of the priority according to each described pending task and each described pending task initiates the execution moment, really The reality of the execution sequence of fixed each described pending task and each described pending task initiates the execution moment;
If the reality of first pending task initiates the time difference in execution moment and current time in described execution sequence More than predetermined threshold value, then the state of described TV is set to holding state;
According to described execution sequence, respectively in the reality initial execution moment of each described pending task, by described TV State be set to false as holding state, and execute each described pending task.
In a kind of possible embodiment, obtain the pending task recommending to be engraved in preset period of time during initial execution, Including:
It is engraved in treating in described preset period of time when obtaining and recommending initial execution in the precontract task list of described TV to hold Row task;
And/or,
It is engraved in the pending task in described preset period of time when obtaining and recommend initial execution to data server requests.
In alternatively possible embodiment, priority according to each described pending task and each described pending The recommendation of task initiates the execution moment, determines the execution sequence of each described pending task, comprising:
Recommendation according to each described pending task initiates execution moment vertical order, to each described pending Business carries out the first sequence, obtains execution sequence undetermined;
According to the priority order from high to low of each described pending task, initial to recommending in described pending task Execution moment identical pending task carries out the second sequence, obtains described execution sequence.
In alternatively possible embodiment, for any one in described pending task first pending Business, the recommendation of the described priority according to each described pending task and each described pending task initiates the execution moment, determines The reality of each described pending task initiates the execution moment, comprising:
Judge that whether the described first pending task is first pending task in described execution sequence;
If so, then initial for the recommendation of the described first pending task execution moment is defined as the described first pending task Reality initiate execution the moment;
If it is not, then by the actual execution finish time of the second pending task or pushing away of described first pending task Recommending the initial execution moment is defined as the reality of the described first pending task and initiates the execution moment, and described second pending task is In described execution sequence, the previous pending task of described first pending task.
In alternatively possible embodiment, the described actual execution finish time by the second pending task or When recommending the initial execution of reality that the initial execution moment is defined as the described first pending task of described first pending task Carve, comprising:
Whether the priority judging the described first pending task is higher than the priority of the described second pending task;
If so, then initial for the recommendation of the described first pending task execution moment is defined as the described first pending task Reality initiate execution the moment;
If it is not, then the recommendation of the actual execution finish time of the described second pending task, the first pending task is risen In execution moment beginning, the moment the latest is defined as the reality initial execution moment of the described first pending task.
In alternatively possible embodiment, if in described execution sequence, the reality of first pending task is initial holding The row moment is less than or equal to described predetermined threshold value with the time difference of current time, and methods described also includes:
Described TV is switched to false holding state.
Second aspect, the embodiment of the present invention provides a kind of TV, including acquisition module, determining module, setup module with hold Row module, wherein,
Described acquisition module is used for, and after the standby command receiving user input, obtains and recommends the initial execution moment Pending task in preset period of time;
Described determining module is used for, the pushing away of the priority according to each described pending task and each described pending task Recommend the initial execution moment, determine that the execution sequence of each described pending task and the reality of each described pending task initiate and holds The row moment;
Described setup module is used for, if in described execution sequence first pending task reality initiate execution the moment with The time difference of current time is more than predetermined threshold value, then the state of described TV is set to holding state;
Described setup module is additionally operable to, according to described execution sequence, initial in the reality of each described pending task respectively In the execution moment, the state of described TV is set to false as holding state, and executes each described pending by described performing module Business.
In a kind of possible embodiment, described acquisition module specifically for:
It is engraved in treating in described preset period of time when obtaining and recommending initial execution in the precontract task list of described TV to hold Row task;
And/or,
It is engraved in the pending task in described preset period of time when obtaining and recommend initial execution to data server requests.
In alternatively possible embodiment, described determining module includes sequencing unit, wherein,
Described judging unit is used for, and it is vertical suitable that the recommendation according to each described pending task initiates the execution moment Sequence, carries out the first sequence to each described pending task, obtains execution sequence undetermined;
Described sequencing unit is additionally operable to, according to the priority order from high to low of each described pending task, to described Recommend initial execution moment identical pending task to carry out the second sequence in pending task, obtain described execution sequence.
In alternatively possible embodiment, described determining module also includes judging unit and determining unit, wherein,
Described judging unit is used for, and judges that whether the described first pending task is that in described execution sequence first treats Execution task, described first pending task is any one the pending task in each described pending task;
Described determining unit is used for, and judges that the described first pending task is in described execution sequence in described judging unit First pending task when, the recommendation of the described first pending task is initiateed the execution moment and is defined as described first and waits to hold The reality of row task initiates the execution moment;
Described determining unit is additionally operable to, and judges that the described first pending task is not that described execution is suitable in described judging unit During first pending task in sequence, the actual execution finish time of the second pending task or described first are waited to hold The initial execution moment of recommending of row task is defined as the reality initial execution moment of the described first pending task, and described second treats Execution task is in described execution sequence, the previous pending task of described first pending task.
In alternatively possible embodiment, judge that the described first pending task is not described in described judging unit During first pending task in execution sequence, described determining unit specifically for:
Whether the priority judging the described first pending task is higher than the priority of the described second pending task;
If so, then initial for the recommendation of the described first pending task execution moment is defined as the described first pending task Reality initiate execution the moment;
If it is not, then the recommendation of the actual execution finish time of the described second pending task, the first pending task is risen In execution moment beginning, the moment the latest is defined as the reality initial execution moment of the described first pending task.
In alternatively possible embodiment, if in described execution sequence, the reality of first pending task is initial holding The row moment is less than or equal to described predetermined threshold value with the time difference of current time, and described setup module is additionally operable to cut described TV It is changed to false holding state.
Task management method and TV under television standby state provided in an embodiment of the present invention, defeated to user in television reception After the standby command entering, TV obtains pending task, and when the priority according to pending task and the initial execution of recommendation Carve, pending task is ranked up, so that the execution that each pending task can be orderly during television standby, this Sample, after television startup, to user, TV quickly can show that completed task (for example, is downloaded from data server Latest data information), improve the real-time of the result showing task to user, and then improve the viewing to TV for the user Experience.
Brief description
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing Have technology description in required use accompanying drawing be briefly described it should be apparent that, drawings in the following description are these Some bright embodiments, for those of ordinary skill in the art, without having to pay creative labor, acceptable Other accompanying drawings are obtained according to these accompanying drawings.
The schematic flow sheet of task management method under the television standby state that Fig. 1 provides for the present invention;
The schematic flow sheet of the execution sequence method of the pending task of determination that Fig. 2 provides for the present invention;
The schematic flow sheet of carving method during the determination actual initial execution that Fig. 3 provides for the present invention;
The structural representation one of the TV that Fig. 4 provides for the present invention;
The structural representation two of the TV that Fig. 5 provides for the present invention.
Specific embodiment
Purpose, technical scheme and advantage for making the embodiment of the present invention are clearer, below in conjunction with the embodiment of the present invention In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described it is clear that described embodiment is The a part of embodiment of the present invention, rather than whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art The every other embodiment being obtained under the premise of not making creative work, broadly falls into the scope of protection of the invention.
In this application, the state of TV includes running status, false holding state, holding state and off-mode.In electricity When being considered as running status, TV can execute all tasks, and user normally can be watched to TV;It is that vacation is treated in TV Under machine state, the power module of TV runs, and TV can be with executable portion task, but user normally cannot be seen to TV See;When TV is for holding state, the power module of TV runs, and TV stops executing all tasks;It is shutdown shape in TV During state, all modules of TV are out of service.
When TV switches to holding state from running status, the task that TV determination can execute under false holding state (for example, downloading latest data information from data server), and during TV is for holding state, automatically by TV State switches to false holding state, and executes multiple-task under false holding state, so, (switches to fortune after television startup Row state), TV quickly can show the completed task (latest data for example, downloaded from data server to user Information), and then improve the viewing experience to TV for the user.
Below, by specific embodiment, the technical scheme shown in the application is described in detail.It should be noted that under These specific embodiments of face can be combined with each other, may be in certain embodiments for same or analogous concept or process Repeat no more.
Under the television standby state that Fig. 1 provides for the present invention, the schematic flow sheet of task management method, refers to Fig. 1, should Method may include that
S101, after the standby command receiving user input, obtain and recommend to be engraved in preset period of time during initial execution Pending task;
The recommendation of s102, the priority according to each pending task and each pending task initiates the execution moment, determines each The reality of the execution sequence of pending task and each pending task initiates the execution moment;
If the reality of first pending task initiates the time difference in execution moment and current time in s103 execution sequence More than predetermined threshold value, then the state of TV is set to holding state;
S104, according to execution sequence, the reality in each pending task initiates the execution moment respectively, and the state of TV is set It is set to false holding state, and execute each pending task.
In actual application, user can input control instruction to TV according to actual needs, so that first by TV State be set to running status, off-mode or holding state.
After television reception to the standby command of user input, TV is engraved in default when can obtain the initial execution of recommendation Pending task in period.Optionally, TV can obtain the recommendation initial execution moment in the precontract task list of TV Pending task in preset period of time;And/or, it is engraved in preset period of time when obtaining and recommend initial execution to data server requests Interior pending task;The task that the pending task that precontract task list is somebody's turn to do is preengage for user, for example, in precontract task list Task can be user set period in carry out performance recording, to data server requests obtain pending task be Need to carry out the task of data download in data server, for example, after data server has updated epg data, Up-to-date epg data is downloaded in data server.
Optionally, each pending task has its corresponding recommendation initial execution moment it is recommended that the initial execution moment is The pending task optimal initial execution moment;Optionally, the recommendation of the pending task initial execution moment can be pre- for user First set or TV determines according to practical situation, for example, when pending task is performance recording, Yong Hushe Determine the initial time of performance recording, then the initial time of user setup is the recommendation initial execution moment of this pending task, When pending task is to download epg data from data server (radio server), then data server has updated epg data Moment be this pending task recommendation initiate execution the moment.Optionally, partly pending task can also have it corresponding Recommend finish time, the recommendation finish time of pending task when user setup, then this pending task recommend knot to having In the bundle moment, when user is not provided with the recommendation finish time of pending task, and TV cannot accurately determine pending task needs How long just can complete, then this pending task does not have corresponding recommendation finish time.
Optionally, preset period of time can be the preset duration corresponding period after current time, and for example, current time is 10 Point, preset duration is 10 hours, then preset period of time is 10. -20 points.In actual application, can be according to actual needs This preset period of time is set.
After TV acquires pending task, TV is according to the priority of each pending task and each pending The recommendation of task initiates the execution moment, determines that the execution sequence of each pending task and the reality of each pending task initiate and holds The row moment.Wherein it is recommended that the initial execution moment is more early, position in execution sequence for the pending task is more forward, treats when multiple When the recommendation of the execution task initial execution moment is identical, then priority is higher, and position in execution sequence for the pending task is got over Forward.Optionally, determine that the reality the obtaining initial execution moment can be the specific moment, such as 10 points etc., determine the reality obtaining Border initiates the physical end that the execution moment can also be other pending tasks and executes the moment, because other pending tasks are being worked as Front be also not carried out, accordingly, it is determined that to the actual execution moment be not a specific moment.In actual application, can To arrange the priority of each pending task according to actual needs, optionally, the priority of the pending task of user's reservation The priority of the pending task selecting usually above TV, the pending task of user's reservation can be the program of user's reservation Record, the pending task that TV selects can be to download epg renewal, program updating etc. from data server.
The reality determining the execution sequence and each pending task that obtain each pending task in TV initiates the execution moment Afterwards, TV judge the reality of first pending task in execution sequence initiate execution the moment with the time difference of current time be No more than predetermined threshold value, if so, then first pending task of explanation also needs to the long period and just starts to execute, and therefore, it can The state of TV is set to holding state, if it is not, then first pending task of explanation begins to execute quickly, in order to avoid TV carries out the wasting of resources that frequently state switches and leads to, then directly the state of TV is set to false as holding state, with TV is made to wait first pending task to start to execute under false holding state.
After the state of TV is set to holding state, the execution sequence that TV obtains according to determination, respectively each The reality of pending task initiates the execution moment, the state of TV is set to false as holding state, and executes each pending task. Optionally, after a pending tasks carrying is complete, TV judges that the reality of next pending task initiates the execution moment Whether it is more than predetermined threshold value with the difference of current time, if so, then the state of TV is set to holding state, if it is not, then making The state of TV remains false holding state, and waits next pending task to start to execute under false holding state.
Below, by specific example, the method shown in Fig. 1 embodiment is described in detail.
Exemplary it is assumed that TV have received the standby command of user input at 8 points, TV obtains recommends initial execution When be engraved in 3 pending tasks between 8 points to 18 points, be designated as the pending task of pending task 1- 3 respectively, wait to hold for this 3 The priority of row task and recommend the initial execution moment as shown in table 1, wherein, all pending tasks have it corresponding to recommend Begin execution the moment, partly pending task have its corresponding recommend terminate execution the moment:
Table 1
After TV acquires the pending task shown in table 1, TV is according to pending task-pending task 3 Priority and recommend the initial execution moment, determine the execution sequence of pending task-pending task 3 and actual initial hold The row moment is as shown in table 2:
Table 2
After TV determines that the reality obtaining the execution sequence shown in table 2 and each pending task initiates the execution moment, TV determines that the reality of first pending task (pending task 1) initiates execution moment () and current time () at 10 points at 8 points Time difference (2 hours) be more than predetermined threshold value (15 minutes), then the state of TV is set to holding state.
At 10 points, the state of TV is switched to false holding state from holding state, and at 10 points, execution is pending Task 1.Optionally, in order to ensure can start to execute pending task 1 at 10 points, can be (such as 9: 58 before 10 points Point), the state of TV is switched to false holding state, and does homework, for example, by TV for executing pending task 1 Program is adjusted to need recorded program.
In 12 TVs, pending task 1 execution terminates, then start to execute pending task 2, due to cannot accurately be treated The execution duration that execution task 2 needs, therefore, after the execution of pending task 2 terminates, gets started the pending task of execution 3, after the execution of pending task 3 completes, the state of TV is switched to holding state from false holding state.
Because, in the standby of TV, TV has been automatically performed the pending task of pending task 1- 3, then in TV After start, user can acquire the TV programme having completed to record, and meanwhile, user can also see electricity the very first time The epg data downloaded in apparent standby and program updating data, and then improve the viewing experience to TV for the user.
Task management method under television standby state provided in an embodiment of the present invention, in television reception treating to user input After machine instruction, TV obtains pending task, and the priority according to pending task and recommendation initial execution moment, treats Execution task is ranked up, so that the execution that each pending task can be orderly during television standby, so, in electricity After start, TV quickly can show the completed task (latest data for example, downloaded from data server to user Information), improve the real-time of the result to user's displaying task and then improve the viewing experience to TV for the user.
On the basis of embodiment illustrated in fig. 1, optionally, can be by implementation feasible as follows according to each pending The recommendation of the priority of task and each pending task initiates the execution moment, determines execution sequence (Fig. 1 of each pending task S102 in illustrated embodiment), specifically, embodiment shown in Figure 2.
The schematic flow sheet of the execution sequence method of the pending task of determination that Fig. 2 provides for the present invention, refers to Fig. 2, The method may include that
S201, according to each pending task recommendation initiate execution moment vertical order, to each pending task Carry out the first sequence, obtain execution sequence undetermined;
S202, according to each pending task priority order from high to low, to recommending initial holding in pending task The row moment, identical pending task carried out the second sequence, obtained execution sequence.
In the embodiment shown in Figure 2, when TV it needs to be determined that during the execution sequence of pending task, tv line is according to treating The recommendation of execution task initiates execution moment vertical order, carries out the first sequence to pending task, obtains undetermined holding Row order, wherein it is recommended that the initial execution moment is more early, the position in execution sequence undetermined is more forward.
After determination obtains execution sequence undetermined, if exist in execution sequence undetermined recommending initial execution moment identical Pending task, then the priority according to pending task, carry out the to recommending the initial execution pending task of moment identical Two sequences, obtain execution sequence, and wherein, when recommending the initial execution moment identical, priority is higher, the position in execution sequence Put more forward.
In above process, the initial execution moment of recommending of pending task is used for representing pending task it is pressed for time Degree, the priority of pending task is used for representing the significance level of pending task, therefore, executes the moment according to recommending to initiate Determine the execution sequence obtaining closer to actual demand with priority.
On the basis of any one embodiment above-mentioned, optionally, can be by implementation feasible as follows according to each The recommendation of the priority of pending task and each pending task initiates the execution moment, determines that the reality of each pending task rises Begin to execute the moment (s102 in embodiment illustrated in fig. 1), wherein, when TV determines that the reality of each pending task initiates execution The process carved is identical, below, execution is initiateed with the reality that TV determines any one the first pending task in pending task It is described in detail as a example the process in moment, specifically, embodiment shown in Figure 3.
During the determination actual initial execution that Fig. 3 provides for the present invention, the schematic flow sheet of carving method, refers to Fig. 3, the party Method may include that
S301, judge that whether the first pending task is first pending task in execution sequence;
If so, then execute s302;
If it is not, then executing s303;
S302, the reality that initial for the recommendation of the first pending task execution moment is defined as the first pending task initiate The execution moment;
S303, judge the priority of the first pending task whether higher than the priority of the second pending task, second treats Execution task be execution sequence in, the previous pending task of the first pending task;
If so, then execute s302;
If it is not, then executing s304;
S304, by the recommendation of the actual execution finish time of the second pending task, the first pending task initiate execution In moment, the moment the latest is defined as the reality initial execution moment of the first pending task.
In the embodiment shown in fig. 3, when it needs to be determined that when the reality of the first pending task initiates the execution moment, first sentencing Whether disconnected first pending task is first pending task in execution sequence, if so, then directly by first pending The initial execution moment of recommending of business is defined as the reality initial execution moment of the first pending task;If not it is determined that being located at the The second pending task before one pending task, and the second pending task is adjacent with the first pending task, and judge Whether the priority of the first pending task is higher than the priority of the second pending task.
If the priority of the first pending task is higher than the priority of the second pending task, direct first pending The initial execution moment of recommending of business is defined as the reality initial execution moment of the first pending task.
If the priority of the first pending task is equal to or less than the priority of the second pending task, second is waited to hold The actual execution finish time of row task, the moment the latest in the initial execution moment of recommending of the first pending task are defined as the The reality of one pending task initiates the execution moment.It should be noted that due to the second pending task now can't be determined Actual execution finish time, therefore, it is impossible to determine the second pending task actual execution finish time pending with first The relation recommending the initial execution moment of task, can only the second pending task actual execute complete after, then determine first The reality of pending task initiates the execution moment, if the physical end execution moment of the second pending task is pending early than first The recommendation of task initiates the execution moment, then are defined as first pending initial for the recommendation of the first pending task execution moment The reality of business initiates the execution moment, otherwise, the actual execution of the second pending task is completed constantly to be defined as first pending The reality of task initiates the execution moment.
Below, by specific example, the method shown in Fig. 3 embodiment is described in detail.
Exemplary it is assumed that TV acquire pending task, the execution sequence of pending task, pending task Recommendation initiate execution the moment and priority as shown in table 3:
Table 3
When TV it needs to be determined that the reality of the pending task of pending task 1- 3 shown in above-mentioned table 3 initiates when executing During quarter, TV first determines that the reality of pending task 1 initiates the execution moment, specifically, because pending task 1 is execution sequence In first pending task, therefore, it can by the recommendation of pending task 1 initiate execution the moment (10 points) be defined as pending The reality of task 1 initiates the execution moment.
After TV has determined that the reality of pending task 1 initiates the execution moment, TV determines the reality of pending task 2 In the initial execution moment, specifically, because pending task 2 is not carried out first pending task in order, TV judges to treat The priority (3) of execution task 2 is higher than the priority (1) of pending task 1, and therefore, the recommendation of pending task 2 is risen by TV Execution moment (10 points 20 minutes) of beginning is defined as the reality of pending task 2 and initiates the execution moment.
After TV has determined that the reality of pending task 2 initiates the execution moment, TV determines the reality of pending task 3 In the initial execution moment, specifically, because pending task 3 is not carried out first pending task in order, TV judges to treat The priority (1) of execution task 3 is not higher than the priority (3) of pending task 2, and therefore, TV is by the reality of pending task 2 Execution finish time, the moment the latest in the initial execution moment of recommending of pending task 3 are defined as the reality of pending task 3 The initial execution moment.
From the foregoing, it will be observed that TV determines that the reality of the pending task of pending task 1- 3 obtaining initiates the execution moment such as table 4 Shown:
Table 4
It should be noted that during TV executes the pending task 3 of above-mentioned pending task 1-, due to pending The priority of task 2 is higher than the priority of pending task 1, therefore, in 10: 20 timesharing, if pending task 1 has been not carried out, Then suspend and execute pending task 1, after all of pending task all completes, more undone pending can be executed Business 1, it is of course also possible to after having executed pending task 2, then executing undone pending task 1, accordingly, treat The reality of the execution task 3 initial execution moment then needs to elapse backward accordingly.
The structural representation one of the TV that Fig. 4 provides for the present invention, refers to Fig. 4, and this TV can include acquisition module 401st, determining module 402, setup module 403 and performing module 404, wherein,
Described acquisition module 401 is used for, after the standby command receiving user input, when obtaining the initial execution of recommendation It is engraved in the pending task in preset period of time;
Described determining module 402 is used for, the priority according to each described pending task and each described pending task Recommend the initial execution moment, determine that the execution sequence of each described pending task and the reality of each described pending task initiate The execution moment;
Described setup module 403 is used for, if the reality of first pending task initiates execution in described execution sequence Carve and the time difference of current time is more than predetermined threshold value, then the state of described TV is set to holding state;
Described setup module 403 is additionally operable to, and according to described execution sequence, the reality in each described pending task rises respectively Begin the execution moment, the state of described TV is set to false as holding state, and executed by described performing module each described pending Task.
TV provided in an embodiment of the present invention can execute the technical scheme shown in said method embodiment, and it realizes principle And beneficial effect is similar to, no longer repeated herein.
In a kind of possible embodiment, described acquisition module 401 specifically for:
It is engraved in treating in described preset period of time when obtaining and recommending initial execution in the precontract task list of described TV to hold Row task;
And/or,
It is engraved in the pending task in described preset period of time when obtaining and recommend initial execution to data server requests.
The structural representation two of the TV that Fig. 5 provides for the present invention, on the basis of embodiment illustrated in fig. 4, refers to figure 5, described determining module 402 includes sequencing unit 4021, wherein,
Described judging unit 4021 is used for, and it is vertical that the recommendation according to each described pending task initiates the execution moment Sequentially, the first sequence is carried out to each described pending task, obtain execution sequence undetermined;
Described sequencing unit 4021 is additionally operable to, according to the priority order from high to low of each described pending task, right Recommend initial execution moment identical pending task to carry out the second sequence in described pending task, obtain described execution sequence.
Further, described determining module 402 also includes judging unit 4022 and determining unit 4023, wherein,
Described judging unit 4022 is used for, and judges that whether the described first pending task is first in described execution sequence Individual pending task, described first pending task is any one the pending task in each described pending task;
Described determining unit 4023 is used for, and judges that the described first pending task is described holding in described judging unit 4022 During first pending task in row order, by the recommendation of the described first pending task initiate the execution moment be defined as described The reality of the first pending task initiates the execution moment;
Described determining unit 4023 is additionally operable to, and judges that the described first pending task is not institute in described judging unit 4022 When stating first pending task in execution sequence, by actual execution finish time of the second pending task or described The initial execution moment of recommending of the first pending task is defined as the reality initial execution moment of the described first pending task, institute Second pending task of stating is in described execution sequence, the previous pending task of described first pending task.
In alternatively possible embodiment, judge that the described first pending task is not in described judging unit 4022 During first pending task in described execution sequence, described determining unit 4023 specifically for:
Whether the priority judging the described first pending task is higher than the priority of the described second pending task;
If so, then initial for the recommendation of the described first pending task execution moment is defined as the described first pending task Reality initiate execution the moment;
If it is not, then the recommendation of the actual execution finish time of the described second pending task, the first pending task is risen In execution moment beginning, the moment the latest is defined as the reality initial execution moment of the described first pending task.
In alternatively possible embodiment, if in described execution sequence, the reality of first pending task is initial holding The row moment is less than or equal to described predetermined threshold value with the time difference of current time, and described setup module 403 is additionally operable to described electricity Depending on switching to false holding state.
TV provided in an embodiment of the present invention can execute the technical scheme shown in said method embodiment, and it realizes principle And beneficial effect is similar to, no longer repeated herein.
One of ordinary skill in the art will appreciate that: all or part of step realizing above-mentioned each method embodiment can be led to Cross the related hardware of programmed instruction to complete.Aforesaid program can be stored in a computer read/write memory medium.This journey Sequence upon execution, executes the step including above-mentioned each method embodiment;And aforesaid storage medium includes: rom, ram, magnetic disc or Person's CD etc. is various can be with the medium of store program codes.
Finally it is noted that various embodiments above, only in order to technical scheme to be described, is not intended to limit;To the greatest extent Pipe has been described in detail to the present invention with reference to foregoing embodiments, it will be understood by those within the art that: its according to So the technical scheme described in foregoing embodiments can be modified, or wherein some or all of technical characteristic is entered Row equivalent;And these modifications or replacement, do not make the essence of appropriate technical solution depart from various embodiments of the present invention technology The scope of scheme.

Claims (10)

1. under a kind of television standby state task management method it is characterised in that include:
After the standby command receiving user input, obtain recommend to be engraved in preset period of time during initial execution pending Business;
The recommendation of the priority according to each described pending task and each described pending task initiates the execution moment, determines each The reality of the execution sequence of described pending task and each described pending task initiates the execution moment;
If in described execution sequence the reality of first pending task initiate execution the moment be more than with the time difference of current time Predetermined threshold value, then be set to holding state by the state of described TV;
According to described execution sequence, respectively in the reality initial execution moment of each described pending task, by the shape of described TV State is set to false as holding state, and executes each described pending task.
2. method according to claim 1 recommends to be engraved in treating in preset period of time during initial execution it is characterised in that obtaining Execution task, comprising:
It is engraved in pending in described preset period of time when obtaining and recommending initial execution in the precontract task list of described TV Business;
And/or,
It is engraved in the pending task in described preset period of time when obtaining and recommend initial execution to data server requests.
3. method according to claim 1 and 2 is it is characterised in that according to the priority of each described pending task and each The recommendation of described pending task initiates the execution moment, determines the execution sequence of each described pending task, comprising:
Recommendation according to each described pending task initiates execution moment vertical order, and each described pending task is entered Row first sorts, and obtains execution sequence undetermined;
According to the priority order from high to low of each described pending task, to recommending initial execution in described pending task Moment, identical pending task carried out the second sequence, obtained described execution sequence.
4. method according to claim 1 and 2 is it is characterised in that for any one in described pending task the One pending task, the recommendation of the described priority according to each described pending task and each described pending task initiates holds In the row moment, determine that the reality of each described pending task initiates the execution moment, comprising:
Judge that whether the described first pending task is first pending task in described execution sequence;
If so, then the initial execution moment of recommending of the described first pending task is defined as the reality of the described first pending task Border initiates the execution moment;
If it is not, then the recommendation of the actual execution finish time of the second pending task or described first pending task is risen The reality that execution moment beginning is defined as the described first pending task initiates the execution moment, and described second pending task is described In execution sequence, the previous pending task of described first pending task.
5. method according to claim 4 is it is characterised in that at the end of the described actual execution by the second pending task The reality that the recommendation initial execution moment of quarter or described first pending task is defined as the described first pending task initiates The execution moment, comprising:
Whether the priority judging the described first pending task is higher than the priority of the described second pending task;
If so, then the initial execution moment of recommending of the described first pending task is defined as the reality of the described first pending task Border initiates the execution moment;
If it is not, then initiate the recommendation of the actual execution finish time of the described second pending task, the first pending task holding In the row moment, the moment the latest is defined as the reality initial execution moment of the described first pending task.
If 6. method according to claim 1 and 2 is it is characterised in that first pending task in described execution sequence Reality initiate the time difference of execution moment and current time and be less than or equal to described predetermined threshold value, methods described also includes:
Described TV is switched to false holding state.
7. a kind of TV is it is characterised in that include acquisition module, determining module, setup module and performing module, wherein,
Described acquisition module is used for, and after the standby command receiving user input, is engraved in pre- when obtaining the initial execution of recommendation If the pending task in the period;
Described determining module is used for, and the recommendation of the priority according to each described pending task and each described pending task rises Begin the execution moment, when determining that the execution sequence of each described pending task and the reality of each described pending task initiate execution Carve;
Described setup module is used for, if in described execution sequence the reality of first pending task initiate the execution moment with current The time difference in moment is more than predetermined threshold value, then the state of described TV is set to holding state;
Described setup module is additionally operable to, according to described execution sequence, respectively in the initial execution of reality of each described pending task In the moment, the state of described TV is set to false as holding state, and each described pending task is executed by described performing module.
8. TV according to claim 7 it is characterised in that described acquisition module specifically for:
It is engraved in pending in described preset period of time when obtaining and recommending initial execution in the precontract task list of described TV Business;
And/or,
It is engraved in the pending task in described preset period of time when obtaining and recommend initial execution to data server requests.
9. the TV according to claim 7 or 8 is it is characterised in that described determining module includes sequencing unit, wherein,
Described judging unit is used for, and the recommendation according to each described pending task initiates execution moment vertical order, right Each described pending task carries out the first sequence, obtains execution sequence undetermined;
Described sequencing unit is additionally operable to, and according to the priority order from high to low of each described pending task, waits to hold to described Recommend initial execution moment identical pending task to carry out the second sequence in row task, obtain described execution sequence.
10. the TV according to claim 7 or 8 is it is characterised in that described determining module also includes judging unit and determination Unit, wherein,
Described judging unit is used for, and judges that whether the described first pending task is that in described execution sequence first is pending Task, described first pending task is any one the pending task in each described pending task;
Described determining unit is used for, and judges that the described first pending task is in described execution sequence in described judging unit During one pending task, initial for the recommendation of the described first pending task execution moment is defined as described first pending The reality of business initiates the execution moment;
Described determining unit is additionally operable to, and judges that the described first pending task is not in described execution sequence in described judging unit First pending task when, by the actual execution finish time of the second pending task or described first pending The initial execution moment of recommending of business is defined as the reality initial execution moment of the described first pending task, and described second is pending Task is in described execution sequence, the previous pending task of described first pending task.
CN201610932437.8A 2016-10-31 2016-10-31 Task management method and TV under television standby state Active CN106358085B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610932437.8A CN106358085B (en) 2016-10-31 2016-10-31 Task management method and TV under television standby state

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610932437.8A CN106358085B (en) 2016-10-31 2016-10-31 Task management method and TV under television standby state

Publications (2)

Publication Number Publication Date
CN106358085A true CN106358085A (en) 2017-01-25
CN106358085B CN106358085B (en) 2019-08-06

Family

ID=57865169

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610932437.8A Active CN106358085B (en) 2016-10-31 2016-10-31 Task management method and TV under television standby state

Country Status (1)

Country Link
CN (1) CN106358085B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109963197A (en) * 2017-12-14 2019-07-02 深圳Tcl新技术有限公司 A kind of method, storage medium and the intelligent terminal of smart download video resource
CN110968405A (en) * 2018-09-30 2020-04-07 杭州海康威视系统技术有限公司 Method and device for detecting planned tasks
CN112584246A (en) * 2020-12-07 2021-03-30 深圳创维-Rgb电子有限公司 EPG update processing method and device based on television, intelligent terminal and medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101808187A (en) * 2010-03-26 2010-08-18 深圳创维数字技术股份有限公司 Method for establishing local video library and set top box
CN101917578A (en) * 2010-08-26 2010-12-15 青岛海信电器股份有限公司 Method and device for recording standby programs
CN102196311A (en) * 2011-06-09 2011-09-21 深圳市同洲电子股份有限公司 Digital television receiving system and method
CN105635819A (en) * 2015-12-29 2016-06-01 深圳市九洲电器有限公司 Set top box power supply management method and system
WO2016107389A1 (en) * 2014-12-31 2016-07-07 华为技术有限公司 Multimedia processing device, multimedia processing server and method therefor

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101808187A (en) * 2010-03-26 2010-08-18 深圳创维数字技术股份有限公司 Method for establishing local video library and set top box
CN101917578A (en) * 2010-08-26 2010-12-15 青岛海信电器股份有限公司 Method and device for recording standby programs
CN102196311A (en) * 2011-06-09 2011-09-21 深圳市同洲电子股份有限公司 Digital television receiving system and method
WO2016107389A1 (en) * 2014-12-31 2016-07-07 华为技术有限公司 Multimedia processing device, multimedia processing server and method therefor
CN105635819A (en) * 2015-12-29 2016-06-01 深圳市九洲电器有限公司 Set top box power supply management method and system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109963197A (en) * 2017-12-14 2019-07-02 深圳Tcl新技术有限公司 A kind of method, storage medium and the intelligent terminal of smart download video resource
CN110968405A (en) * 2018-09-30 2020-04-07 杭州海康威视系统技术有限公司 Method and device for detecting planned tasks
CN112584246A (en) * 2020-12-07 2021-03-30 深圳创维-Rgb电子有限公司 EPG update processing method and device based on television, intelligent terminal and medium

Also Published As

Publication number Publication date
CN106358085B (en) 2019-08-06

Similar Documents

Publication Publication Date Title
CN106358085A (en) Method for managing tasks under television standby state and television
CN103760966A (en) Picture buffering implementation method
CN107786583A (en) A kind of document down loading method and device
CN106331089A (en) Video play control method and system
CN105228109A (en) A kind of method of smart message prompting and device
CN105786839A (en) Application data acquisition method and apparatus
CN104219561A (en) Method and user equipment for cleaning offline videos
CN104837037A (en) Method and device for generating video playback list
CN104281369A (en) Picture uploading processing method and device
CN106131689A (en) Method for downloading video and device
CN106126335A (en) The Media Survey method of terminal unit and terminal unit
CN105786539A (en) File downloading method and device
CN106445936A (en) Data processing method and equipment
CN104994429A (en) Video playing method and device
CN102164305A (en) Video processing method and device and mobile communication terminal
CN105025343A (en) Caching method and device of TS video
CN106060661B (en) Television no-signal processing method and device and intelligent television
CN104837061A (en) Method and device for modifying and managing video playlist
CN104581352B (en) The method and system of fast positioning in a kind of TV box
CN112423099A (en) Video loading method and device and electronic equipment
CN113611099B (en) Remote controller control method, control device and remote controller system
CN105159765A (en) Method and apparatus for managing application programs among multiple domains
CN106657837B (en) Television system switching method and television
CN107231465B (en) File playing method and device
CN109618211A (en) Short-sighted channel tool edit methods and Related product

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant