CN106355985A - Method for mounting transmission tower teaching device - Google Patents

Method for mounting transmission tower teaching device Download PDF

Info

Publication number
CN106355985A
CN106355985A CN201610785723.6A CN201610785723A CN106355985A CN 106355985 A CN106355985 A CN 106355985A CN 201610785723 A CN201610785723 A CN 201610785723A CN 106355985 A CN106355985 A CN 106355985A
Authority
CN
China
Prior art keywords
comprehensive
poi
air switch
steel tower
switch case
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610785723.6A
Other languages
Chinese (zh)
Other versions
CN106355985B (en
Inventor
刘志军
郭向明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Zhidao Technology Co Ltd
Original Assignee
Tianjin Zhidao Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Zhidao Technology Co Ltd filed Critical Tianjin Zhidao Technology Co Ltd
Priority to CN201610785723.6A priority Critical patent/CN106355985B/en
Publication of CN106355985A publication Critical patent/CN106355985A/en
Application granted granted Critical
Publication of CN106355985B publication Critical patent/CN106355985B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B25/00Models for purposes not provided for in G09B23/00, e.g. full-sized devices for demonstration purposes

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Educational Administration (AREA)
  • Educational Technology (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Instructional Devices (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a method for mounting a transmission tower teaching device. The method comprises the following steps: producing a teaching display wall backboard; mounting an integrated electric meter box and an integrated air switch box; mounting an uplink POI device, a downlink POI device and an integrated grounding bar; mounting an optical fiber introducing terminal box; mounting integrated information source equipment; connecting wires. All that is required for a mounting enterprise is to demonstrate lines and parts required to be mounted when the teaching device is mounted for an enterprise requiring communication line mounting, so that not only can the enterprise requiring mounting know about equipment to be mounted and arrangement of related communication lines simply and clearly, but also the time of the mounting enterprise for preparing related materials is saved, the problems of repeated preparation of the materials and mismatching of the prepared materials with the equipment required to be mounted are solved, and the mounting efficiency and the mounting quality are improved.

Description

The installation method of steel tower teaching apparatus
Technical field
The present invention relates to device installation method technical field, more specifically to a kind of installation side of steel tower teaching apparatus Method.
Background technology
Communication, refers to communication for information and the transmission carrying out between person to person or man and nature by certain behavior or medium, from Referring broadly to the both sides needing information or in many ways any means are being adopted without prejudice in the case of respective wish, any medium, will Information is accurately safely transmitted to another side from certain side.
Constantly accelerate with informationalized fusion with industrialization, add that government public safety investment is continuously increased, private network leads to Letter market scale constantly expands in recent years.
Content of the invention
Instant invention overcomes deficiency of the prior art, there is provided a kind of installation method of steel tower teaching apparatus.
The purpose of the present invention is achieved by following technical proposals.
The installation method of steel tower teaching apparatus, is carried out as steps described below:
Step 1, measures the size in teaching apparatus region to be installed, the usage amount of raw material needed for determination, according to having set The teaching apparatus scheme counted, carries out the Steel Structure Installation of teaching apparatus, then lays big core in mounted steel structure surface Plate, and measure the size of aluminium-plastic panel, aluminium-plastic panel is attached to teaching and shows wall back plate surface, thus completing teaching to show the wall back of the body Plate, the overall construction showing wall edge sealing and every circuit;
Step 2, shows in the teaching having completed and installs comprehensive ammeter box and comprehensive air switch case on wall backboard first, comprehensive Air switch case is arranged on the side of comprehensive ammeter box;
Step 3, then installs up poi device, descending poi device and integrated ground row in the side of comprehensive air switch case, Up poi device and descending poi device are arranged on top, up poi device and the descending poi device that integrated ground is arranged;
Step 4, is introduced into optical fiber terminal box and is arranged on teaching displaying wall back plate surface, introduce optical fiber terminal box and pass through comprehensively Earthing bar connecting line and integrated ground row be connected, introduces optical fiber terminal box by up-downgoing poi line and up poi device and descending Poi device is connected;
Step 5, installs comprehensive source device above up poi device and descending poi device, and comprehensive information source is set Standby internal structure is installed and line, installs and connects compartment system, comprehensive source device is passed through information source circuit and meets distribution system System is connected;
Step 6, electrical source importing device is connected with comprehensive ammeter box, completes the installation of steel tower teaching apparatus.
Described steel tower teaching apparatus include electrical source importing device, comprehensive ammeter box, comprehensive air switch case, integrated ground row, comprehensive Close source device, connect compartment system, compartment system and introduce optical fiber terminal box, described comprehensive source device passes through information source circuit It is connected with the described compartment system that connects, the described compartment system that connects is connected with up-downgoing poi line, and the lower section of described up-downgoing poi line sets It is equipped with integrated ground row's connecting line, described integrated ground row arranges connecting line by ground path and described integrated ground and is connected, institute The one end stating integrated ground row's connecting line is connected with described introducing optical fiber terminal box, is provided with described introducing in optical fiber terminal box Introduce optical fiber, the top of described up-downgoing poi line is respectively arranged with up poi device and descending poi device, described up poi Device is connected with described up-downgoing poi line by circuit respectively with described descending poi device, one end of described up-downgoing poi line It is connected with described introducing optical fiber terminal box, the described other end introducing optical fiber terminal box is connected with described comprehensive air switch case, in institute The side stating comprehensive air switch case is provided with described comprehensive ammeter box, and described comprehensive ammeter box is connected with described electrical source importing device, Described compartment system is arranged on the top of described comprehensive source device, between described compartment system and described comprehensive source device It is provided with monitoring display device, described monitoring display device is used for monitoring electrical source importing device, comprehensive ammeter box, comprehensive air switch Case, integrated ground row and comprehensive source device ruuning situation.
Described comprehensive ammeter box includes steel tower ammeter box, mobile electric meter case, UNICOM's ammeter box and telecommunications ammeter box, described Steel tower ammeter box, described mobile electric meter case, described UNICOM ammeter box and described telecommunications ammeter box set gradually, described steel tower electricity Electricity box are connected with described electrical source importing device.
Described comprehensive air switch case includes steel tower air switch case, mobile air switch case, UNICOM's air switch case and telecommunications air switch case, described Steel tower air switch case is arranged on the side of described steel tower ammeter box, and described mobile air switch case is arranged on the one of described mobile electric meter case Side, described UNICOM air switch case is arranged on the side of described UNICOM ammeter box, and described telecommunications air switch case is arranged on described telecommunications ammeter The side of case, is connected with described up-downgoing poi line in the bottom of described telecommunications air switch case.
Described integrated ground row includes steel tower earthing bar, mobile grounding row, UNICOM's earthing bar and telecommunications earthing bar, described Steel tower earthing bar, described mobile grounding row, described UNICOM earthing bar and described telecommunications earthing bar set gradually, and described steel tower Earthing bar, described mobile grounding row, described UNICOM earthing bar and described telecommunications earthing bar pass through respectively ground path with described Integrated ground row's connecting line is connected.
Described comprehensive source device includes mobile source device, UNICOM's source device and telecommunications source device, described shifting Dynamic source device, described UNICOM source device and described telecommunications source device set gradually, and described mobile source device, institute State UNICOM's source device and described telecommunications source device is connected with the described compartment system that connects by information source circuit respectively.
The invention has the benefit that compared with prior art, installation enterprises are only by communication line to be installed Enterprise installs this teaching apparatus first, and the circuit of required installation and part all are demonstrated out, so can not only make to treat Equipment to be mounted and associated communication trace arrangements needed for the simple and clear understanding of installation enterprises, also save installation enterprise simultaneously Industry prepares the time of associated materials, it is to avoid repeat to prepare material and the material that prepared is unmatched with required installation equipment asks Topic, thus improve installation effectiveness and installing quality.
Brief description
Fig. 1 is the attachment structure schematic diagram of steel tower teaching apparatus in the present invention;
Specific embodiment
Below by specific embodiment, technical scheme is further described.
The installation method of steel tower teaching apparatus, is carried out as steps described below:
Step 1, measures the size in teaching apparatus region to be installed, the usage amount of raw material needed for determination, according to having set The teaching apparatus scheme counted, carries out the Steel Structure Installation of teaching apparatus, then lays big core in mounted steel structure surface Plate, and measure the size of aluminium-plastic panel, aluminium-plastic panel is attached to teaching and shows wall back plate surface, thus completing teaching to show the wall back of the body Plate, the overall construction showing wall edge sealing and every circuit;
Step 2, shows in the teaching having completed and installs comprehensive ammeter box and comprehensive air switch case on wall backboard first, comprehensive Air switch case is arranged on the side of comprehensive ammeter box;
Step 3, then installs up poi device, descending poi device and integrated ground row in the side of comprehensive air switch case, Up poi device and descending poi device are arranged on top, up poi device and the descending poi device that integrated ground is arranged;
Step 4, is introduced into optical fiber terminal box and is arranged on teaching displaying wall back plate surface, introduce optical fiber terminal box and pass through comprehensively Earthing bar connecting line and integrated ground row be connected, introduces optical fiber terminal box by up-downgoing poi line and up poi device and descending Poi device is connected;
Step 5, installs comprehensive source device above up poi device and descending poi device, and comprehensive information source is set Standby internal structure is installed and line, installs and connects compartment system, comprehensive source device is passed through information source circuit and meets distribution system System is connected;
Step 6, electrical source importing device is connected with comprehensive ammeter box, completes the installation of steel tower teaching apparatus.
As shown in figure 1, steel tower teaching apparatus include electrical source importing device, comprehensive ammeter box, comprehensive air switch case, integrated ground Row, comprehensive source device, connect compartment system, compartment system and introduce optical fiber terminal box, comprehensive source device passes through information source line Road is connected with connecing compartment system, connects compartment system and is connected with up-downgoing poi line, and the lower section of up-downgoing poi line is provided with comprehensive connecing Ground row's connecting line, integrated ground row arranges connecting line by ground path and integrated ground and is connected, and integrated ground arranges the one of connecting line End is connected with introducing optical fiber terminal box, is provided with introducing optical fiber in being introduced into optical fiber terminal box, and the top of up-downgoing poi line is respectively It is provided with up poi device and descending poi device, up poi device and descending poi device pass through circuit and up-downgoing respectively Poi line is connected, and one end of up-downgoing poi line is connected with introducing optical fiber terminal box, introduces the other end and the synthesis of optical fiber terminal box Air switch case is connected, and the side of comprehensive air switch case is provided with comprehensive ammeter box, comprehensive ammeter box is connected with electrical source importing device, point Distribution system is arranged on the top of comprehensive source device, is provided with monitoring display dress between compartment system and comprehensive source device Put, monitoring display device is used for monitoring electrical source importing device, comprehensive ammeter box, comprehensive air switch case, integrated ground row and comprehensive letter Source device ruuning situation.
Comprehensive ammeter box includes steel tower ammeter box, mobile electric meter case, UNICOM's ammeter box and telecommunications ammeter box, steel tower ammeter Case, mobile electric meter case, UNICOM's ammeter box and telecommunications ammeter box set gradually, and steel tower ammeter box is connected with electrical source importing device.
Comprehensive air switch case includes steel tower air switch case, mobile air switch case, UNICOM's air switch case and telecommunications air switch case, steel tower air switch Case is arranged on the side of steel tower ammeter box, and mobile air switch case is arranged on the side of mobile electric meter case, and UNICOM's air switch case is arranged on connection The side of energising electricity box, telecommunications air switch case is arranged on the side of telecommunications ammeter box, is connected with up and down in the bottom of telecommunications air switch case Row poi line.
Integrated ground row includes steel tower earthing bar, mobile grounding row, UNICOM's earthing bar and telecommunications earthing bar, and steel tower is grounded Row, mobile grounding row, UNICOM's earthing bar and telecommunications earthing bar set gradually, and steel tower earthing bar, mobile grounding row, UNICOM connect Ground row and telecommunications earthing bar are passed through ground path respectively and are connected with integrated ground row's connecting line.
Comprehensive source device includes mobile source device, UNICOM's source device and telecommunications source device, and mobile information source sets Standby, UNICOM's source device and telecommunications source device set gradually, and mobile source device, UNICOM's source device and telecommunications letter Source device is connected with connecing compartment system by information source circuit respectively.
Compared with prior art, installation enterprises install this teaching dress first only by the enterprise in communication line to be installed Put, the circuit of required installation and part all are demonstrated out, enterprise to be installed so can not only be made simple and clear Equipment to be mounted needed for solution and associated communication trace arrangements, also save simultaneously installation enterprises prepare associated materials when Between, it is to avoid repeat to prepare material and the material being prepared and the unmatched problem of required installation equipment, thus improve installation Efficiency and installation quality.
Above the present invention is done with exemplary description it should illustrate, in the situation of the core without departing from the present invention Under, any simple deformation, modification or other skilled in the art can not spend the equivalent of creative work equal Fall into protection scope of the present invention.

Claims (6)

1. steel tower teaching apparatus installation method it is characterised in that: carry out as steps described below:
Step 1, measures the size in teaching apparatus region to be installed, the usage amount of raw material needed for determination, according to having designed Teaching apparatus scheme, carry out the Steel Structure Installation of teaching apparatus, then mounted steel structure surface lay lumber core, and The size of measurement aluminium-plastic panel, aluminium-plastic panel is attached to teaching and shows wall back plate surface, thus completing teaching to show wall backboard, entirety Show wall edge sealing and the construction of every circuit;
Step 2, shows in the teaching having completed and installs comprehensive ammeter box and comprehensive air switch case, comprehensive air switch on wall backboard first Case is arranged on the side of comprehensive ammeter box;
Step 3, then installs up poi device, descending poi device and integrated ground row in the side of comprehensive air switch case, up Poi device and descending poi device are arranged on top, up poi device and the descending poi device that integrated ground is arranged;
Step 4, is introduced into optical fiber terminal box and is arranged on teaching displaying wall back plate surface, introduce optical fiber terminal box and pass through integrated ground Row's connecting line is connected with integrated ground row, introduces optical fiber terminal box and passes through up-downgoing poi line and up poi device and descending poi Device is connected;
Step 5, installs comprehensive source device above up poi device and descending poi device, and in comprehensive source device Portion's structure is installed and line, installs and connects compartment system, comprehensive source device is passed through information source circuit and connects compartment system phase Even;
Step 6, electrical source importing device is connected with comprehensive ammeter box, completes the installation of steel tower teaching apparatus.
2. steel tower teaching apparatus according to claim 1 installation method it is characterised in that: described steel tower teaching apparatus bag Include electrical source importing device, comprehensive ammeter box, comprehensive air switch case, integrated ground row, comprehensive source device, connect compartment system, distribution System and introducing optical fiber terminal box, described comprehensive source device is connected with the described compartment system that connects by information source circuit, described Connect compartment system to be connected with up-downgoing poi line, the lower section of described up-downgoing poi line is provided with integrated ground row's connecting line, described Integrated ground row arranges connecting line by ground path and described integrated ground and is connected, described integrated ground arrange connecting line one end and Described introducing optical fiber terminal box is connected, and described introducing in optical fiber terminal box is provided with introducing optical fiber, described up-downgoing poi line Top is respectively arranged with up poi device and descending poi device, and described up poi device and described descending poi device lead to respectively Cross circuit to be connected with described up-downgoing poi line, one end of described up-downgoing poi line is connected with described introducing optical fiber terminal box, institute The other end stating introducing optical fiber terminal box is connected with described comprehensive air switch case, is provided with described in the side of described comprehensive air switch case Comprehensive ammeter box, described comprehensive ammeter box is connected with described electrical source importing device, and described compartment system is arranged on described comprehensive letter The top of source device, is provided with monitoring display device, described monitoring between described compartment system and described comprehensive source device Display device is used for monitoring electrical source importing device, comprehensive ammeter box, comprehensive air switch case, integrated ground row and comprehensive source device fortune Market condition.
3. steel tower teaching apparatus according to claim 2 installation method it is characterised in that: described comprehensive ammeter box includes Steel tower ammeter box, mobile electric meter case, UNICOM's ammeter box and telecommunications ammeter box, described steel tower ammeter box, described mobile electric meter case, Described UNICOM ammeter box and described telecommunications ammeter box set gradually, described steel tower ammeter box and described electrical source importing device phase Even.
4. steel tower teaching apparatus according to claim 2 installation method it is characterised in that: described comprehensive air switch case includes Steel tower air switch case, mobile air switch case, UNICOM's air switch case and telecommunications air switch case, described steel tower air switch case is arranged on described steel tower electricity The side of electricity box, described mobile air switch case is arranged on the side of described mobile electric meter case, and described UNICOM air switch case is arranged on described The side of UNICOM's ammeter box, described telecommunications air switch case is arranged on the side of described telecommunications ammeter box, in described telecommunications air switch case Bottom is connected with described up-downgoing poi line.
5. steel tower teaching apparatus according to claim 2 installation method it is characterised in that: described integrated ground row include Steel tower earthing bar, mobile grounding row, UNICOM's earthing bar and telecommunications earthing bar, described steel tower earthing bar, described mobile grounding row, Described UNICOM earthing bar and described telecommunications earthing bar set gradually, and described steel tower earthing bar, described mobile grounding row, described UNICOM's earthing bar and described telecommunications earthing bar are passed through ground path respectively and are connected with described integrated ground row's connecting line.
6. steel tower teaching apparatus according to claim 2 installation method it is characterised in that: described comprehensive source device bag Include mobile source device, UNICOM's source device and telecommunications source device, described mobile source device, described UNICOM source device And described telecommunications source device sets gradually, and described mobile source device, described UNICOM source device and described telecommunications Source device is connected with the described compartment system that connects by information source circuit respectively.
CN201610785723.6A 2016-08-31 2016-08-31 The installation method of steel tower teaching apparatus Active CN106355985B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610785723.6A CN106355985B (en) 2016-08-31 2016-08-31 The installation method of steel tower teaching apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610785723.6A CN106355985B (en) 2016-08-31 2016-08-31 The installation method of steel tower teaching apparatus

Publications (2)

Publication Number Publication Date
CN106355985A true CN106355985A (en) 2017-01-25
CN106355985B CN106355985B (en) 2019-03-12

Family

ID=57857694

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610785723.6A Active CN106355985B (en) 2016-08-31 2016-08-31 The installation method of steel tower teaching apparatus

Country Status (1)

Country Link
CN (1) CN106355985B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070229490A1 (en) * 2006-03-31 2007-10-04 Research In Motion Limited Map version control methods and apparatus for updating the use of network-maintained map data sets for mobile communication devices
CN201655133U (en) * 2009-12-11 2010-11-24 河北省电力公司石家庄培训中心 Transmission tower model for assembly installation training
US20110137546A1 (en) * 2009-12-04 2011-06-09 Gm Global Technology Operations, Inc. Application programming interface (api) for navigation applications that merges incremental updates with existing map database
CN103338465A (en) * 2013-06-18 2013-10-02 京信通信系统(广州)有限公司 Mobile communication high-power multi-antenna distribution and coverage method and system
CN104090816A (en) * 2014-07-23 2014-10-08 国家电网公司 System and method for extra-high-voltage steel tube tower simulating training
CN204695673U (en) * 2015-06-13 2015-10-07 西安科技大学 A kind of for the three-dimensional digital sand table in urban planning and construction
CN204965909U (en) * 2015-09-21 2016-01-13 王邓红 Building entity teaching mode

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070229490A1 (en) * 2006-03-31 2007-10-04 Research In Motion Limited Map version control methods and apparatus for updating the use of network-maintained map data sets for mobile communication devices
US20110137546A1 (en) * 2009-12-04 2011-06-09 Gm Global Technology Operations, Inc. Application programming interface (api) for navigation applications that merges incremental updates with existing map database
CN201655133U (en) * 2009-12-11 2010-11-24 河北省电力公司石家庄培训中心 Transmission tower model for assembly installation training
CN103338465A (en) * 2013-06-18 2013-10-02 京信通信系统(广州)有限公司 Mobile communication high-power multi-antenna distribution and coverage method and system
CN104090816A (en) * 2014-07-23 2014-10-08 国家电网公司 System and method for extra-high-voltage steel tube tower simulating training
CN204695673U (en) * 2015-06-13 2015-10-07 西安科技大学 A kind of for the three-dimensional digital sand table in urban planning and construction
CN204965909U (en) * 2015-09-21 2016-01-13 王邓红 Building entity teaching mode

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘博光 等: "铁塔室内分布系统建设解决方案的研究", 《移动通信》 *
杜发辉 等: "基于铁塔公司多运营商多制式室分建设项目实践与案例分析", 《移动通信》 *

Also Published As

Publication number Publication date
CN106355985B (en) 2019-03-12

Similar Documents

Publication Publication Date Title
CN103217584B (en) The measuring method of large-scale grounding network impedance ground
CN111060764A (en) Rotating mechanism for tire pressure monitoring system and electromagnetic compatibility testing method
CN104793125A (en) Test device for measuring plates for distributors of photovoltaic header boxes
CN207488378U (en) A kind of microwave filter detection device
CN202153257U (en) Electric energy meter suspending device for detection
CN106355985A (en) Method for mounting transmission tower teaching device
CN109738756A (en) Transmission line faultlocating system, method and apparatus
CN102723675B (en) Instrument box wiring fixture
CN201919132U (en) Device for testing telephone on rack, inspecting line, removing failure and overhauling
CN207927129U (en) A kind of train simulation real time monitoring apparatus
CN208143258U (en) The platform area identifying system of power line carrier
CN205810339U (en) A kind of carrier device for liquid crystal module detection
CN204794901U (en) Solar module semi -automatization withstand voltage test platform
CN202563012U (en) Large-scale power station grounding net impedance parameter measuring device
CN103025109B (en) A kind of horizontal wiring cabinet
CN102354202B (en) Test stand for aging of ECU utilized by ABS of vehicle
CN206756996U (en) A kind of telephone set single-board testing device
CN205940645U (en) Bus duct check out test set
CN202770960U (en) Electric energy meter chip testing device
CN205981452U (en) LED chromaticity coordinates test machine
CN203587446U (en) Tension testing device of junction box
CN205067623U (en) Intelligent substation movable voltage merging cells check gauge
CN216817986U (en) 5k omega non-inductive resistor device for measuring voltage to ground
CN204241680U (en) A kind of multifunctional electric energy quality testing platform
CN209105119U (en) A kind of photovoltaic module connection test device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Installation method of tower teaching device

Effective date of registration: 20221122

Granted publication date: 20190312

Pledgee: Pudong Shanghai Development Bank Limited by Share Ltd. Tianjin branch

Pledgor: TIANJIN KNOWDOO TECHNOLOGY Co.,Ltd.

Registration number: Y2022120000062