CN106351202A - Treatment method for annularly continuous bead-like karst caves of tunnel - Google Patents
Treatment method for annularly continuous bead-like karst caves of tunnel Download PDFInfo
- Publication number
- CN106351202A CN106351202A CN201610824112.8A CN201610824112A CN106351202A CN 106351202 A CN106351202 A CN 106351202A CN 201610824112 A CN201610824112 A CN 201610824112A CN 106351202 A CN106351202 A CN 106351202A
- Authority
- CN
- China
- Prior art keywords
- solution cavity
- reinforcement cage
- steel reinforcement
- karst
- treatment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 34
- 235000019994 cava Nutrition 0.000 title abstract 8
- 238000010276 construction Methods 0.000 claims abstract description 9
- 229910000831 Steel Inorganic materials 0.000 claims description 45
- 239000010959 steel Substances 0.000 claims description 45
- 230000002787 reinforcement Effects 0.000 claims description 32
- 239000010410 layer Substances 0.000 claims description 28
- 239000004746 geotextile Substances 0.000 claims description 15
- 230000003014 reinforcing effect Effects 0.000 claims description 15
- 239000004567 concrete Substances 0.000 claims description 13
- 239000002356 single layer Substances 0.000 claims description 12
- 238000011161 development Methods 0.000 claims description 11
- 238000003672 processing method Methods 0.000 claims description 10
- 238000007689 inspection Methods 0.000 claims description 9
- 239000011435 rock Substances 0.000 claims description 9
- 210000005239 tubule Anatomy 0.000 claims description 9
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 9
- 230000003044 adaptive effect Effects 0.000 claims description 6
- 239000010425 asbestos Substances 0.000 claims description 6
- 239000004568 cement Substances 0.000 claims description 6
- 238000005553 drilling Methods 0.000 claims description 6
- 238000003780 insertion Methods 0.000 claims description 6
- 230000037431 insertion Effects 0.000 claims description 6
- 229910052895 riebeckite Inorganic materials 0.000 claims description 6
- 239000011378 shotcrete Substances 0.000 claims description 6
- 239000012790 adhesive layer Substances 0.000 claims description 5
- 241000521257 Hydrops Species 0.000 claims description 3
- 206010030113 Oedema Diseases 0.000 claims description 3
- 206010057071 Rectal tenesmus Diseases 0.000 claims description 3
- 229910001294 Reinforcing steel Inorganic materials 0.000 claims description 3
- 238000012790 confirmation Methods 0.000 claims description 3
- 230000007797 corrosion Effects 0.000 claims description 3
- 238000005260 corrosion Methods 0.000 claims description 3
- 230000032798 delamination Effects 0.000 claims description 3
- 238000001514 detection method Methods 0.000 claims description 3
- 238000006253 efflorescence Methods 0.000 claims description 3
- 230000008030 elimination Effects 0.000 claims description 3
- 238000003379 elimination reaction Methods 0.000 claims description 3
- 238000013467 fragmentation Methods 0.000 claims description 3
- 238000006062 fragmentation reaction Methods 0.000 claims description 3
- 238000001556 precipitation Methods 0.000 claims description 3
- 230000002265 prevention Effects 0.000 claims description 3
- 206010037844 rash Diseases 0.000 claims description 3
- 238000009416 shuttering Methods 0.000 claims description 3
- 239000007921 spray Substances 0.000 claims description 3
- 239000004575 stone Substances 0.000 claims description 3
- 208000012271 tenesmus Diseases 0.000 claims description 3
- 238000013024 troubleshooting Methods 0.000 claims description 3
- 238000003032 molecular docking Methods 0.000 claims 3
- 230000009172 bursting Effects 0.000 claims 1
- 230000000694 effects Effects 0.000 abstract description 3
- 238000005507 spraying Methods 0.000 description 3
- 238000013461 design Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000004880 explosion Methods 0.000 description 2
- 239000002344 surface layer Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 239000011229 interlayer Substances 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Architecture (AREA)
- Soil Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Paleontology (AREA)
- Agronomy & Crop Science (AREA)
- General Engineering & Computer Science (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
The invention provides a treatment method for annularly continuous bead-like karst caves of a tunnel. The method comprises steps of execution of emergency treatment measures, primary support treatment of vault caves, primary support treatment of left-skewback caves and primary support treatment of right-hance caves. The treatment method for the annularly continuous bead-like caves of the tunnel is safe, reliable, scientific, feasible, convenient to construct, economical and reasonable, solves the technical problems in construction of the bead-like caves while the construction duration is short, provides reference for follow-up similar cave treatment especially treatment of the vault caves, and realizes the effects of saving time and labor and facilitating construction.
Description
Technical field
The present invention relates to constructing tunnel field, the more particularly, to circumferentially continuous karst cave treatment side of karst landform tunnel beading
Method.
Background technology
The enforcement planned along with " one with a road ", southwest highway enters fast-developing period, southwest
Ground situation is typical Karst landforms, the globality poor of karst features, many solution cavities or contain mud, chamber containing Sha Rong, cranny development,
Interlayer is more, rock unrooted, only leans on the frictional force between rock to fix, easily occurs loosening block, the danger of fall.String
Pearl solution cavity is more dangerous with respect to the solution cavity of other forms and complicated, circumferentially continuous appearance in especially same mileage section
Solution cavity, country rock developmental state is unknown, secondary development easily, to the peace of the constructing tunnel of the solution cavity section construction of Karst Geological Landscape
Entirely, progress and benefit cause difficulty.
Especially vault occur solution cavity, need to carry out early stage closing again, thus the principle of vault karst cave treatment be in line with
Safety first, early closing, light and handy, high-strength, be easy to construct, conventional design is stuffed entirely with completing, or carries out formwork erection with concrete and beat
The mode of shield arch, time-consuming, laborious, effect is poor, is difficult to construct.
Content of the invention
Present invention seek to address that the deficiencies in the prior art, and provide at the circumferentially continuous solution cavity of karst landform tunnel beading
Reason method.
The present invention for achieving the above object, employs the following technical solutions: karst landform tunnel beading is circumferentially continuous molten
Hole processing method, corrode for construction corrosion the tunnel of low middle mountain region looks vault, left side arch springing and right side haunch three at go here and there
Pearl solution cavity, has insertion between solution cavity it is characterised in that its method is as follows:
(1) emergency trouble shooting measures:
1. strict control excavates drilling depth
Due to cause the geological condition of this section extremely complex it is impossible to effectively verify the front globality of rock and intensity and
Fractured situation is it is therefore necessary to strict control excavates drilling depth;
2. accurate advanced prediction
Carry out advance borehole confirmation in shaped corroded cave model development area, be sampled holing in surface no karst section, after verifying
Whether continuous also have larger solution cavity, has or not hydrops in solution cavity, carries out estimating of the intensity of solution cavity rock and the preliminary scale of solution cavity,
And have the release under water condition and air adaptive processes;
3. efflorescence prevention and secondary development are processed
Due to shaped corroded cave model at this, between solution cavity, there is insertion, through air adaptive processes after a while and explosion
After the Secondary Disturbance of operation, air slaking and secondary development it is easy to fragmentation tenesmus in lava, is attached to the precipitation on protolith surface
Layer situation is similar to it is easy to delamination landing, so must carry out shaped corroded cave model getting rid of the danger process;Get rid of the danger after terminating, molten
Intracavity portion carries out omnibearing spray operation, especially can not ignore the whitewashing closing of bottom and bottom;
(2) the preliminary bracing processing method of vault solution cavity:
1. insert steel reinforcement cage, the reinforced mesh of colligation monolayer on the reinforcing bar above steel reinforcement cage;
2. squeeze into double-deck advanced tubule;
3. 4 steel pipes are welded on advanced tubule, blossom type is arranged;
4. lay reinforced mesh on ductule, colligation is on advanced tubule;
5. on reinforced mesh place steel reinforcement cage, steel reinforcement cage bottom layer of the reinforcing steel colligation on reinforced mesh, above steel reinforcement cage
Colligation monolayer reinforced mesh on reinforcing bar;
6. weld the steel floral tube of buried depth 0.5m, carry out quincuncial arrangement, expose 0.2m;
7. from the pre-buried corrugated tube with holes in solution cavity edge, corrugated tube is wrapped up with geotextiles, draws and row in hole from solution cavity side bottom
Water system is docked;
8., after the completion of more than, gunite concrete operation can be carried out after inspection declaration is qualified, jetting cement operation time control controlling angle exists
Between 30~40 degree, sprayed by internal layer outer layers, internal layer is forbidden using geotextiles and asbestos gauge when gear spray-up;
(3) the preliminary bracing processing method of arch springing solution cavity on the left of:
1. below arch springing 1m, shuttering makes plain concrete backfill, and embedded bar is easy to steel reinforcement cage and is fixed;
2. arch springing 1m above position setting steel reinforcement cage, the reinforced mesh of colligation monolayer on the reinforcing bar of steel reinforcement cage internal layer, entirely
Steel reinforcement cage is fixed on embedded bar;
3. weld the steel floral tube of buried depth 0.5m, carry out quincuncial arrangement, expose 0.2m;
4. from the pre-buried corrugated tube with holes in solution cavity edge, corrugated tube is wrapped up with geotextiles, draws and row in hole from solution cavity side bottom
Water system is docked;
5., after the completion of above, gunite concrete operation can after inspection declaration is qualified, be carried out, jetting cement operation time control controlling angle, by
Internal layer outer layers are sprayed, and internal layer is forbidden using geotextiles and asbestos gauge when gear spray-up;
(4) the preliminary bracing processing method of haunch solution cavity on the right side of:
1. hang steel reinforcement cage, colligation monolayer reinforced mesh on the reinforcing bar of steel reinforcement cage internal layer;
2. weld the steel floral tube of buried depth 0.5m, carry out quincuncial arrangement, expose 0.2m;
3. from the pre-buried corrugated tube with holes in solution cavity edge, corrugated tube is wrapped up with geotextiles, draws and row in hole from solution cavity side bottom
Water system is docked;
4. after the completion of more than, inspection declaration is qualified can carry out gunite concrete operation.
Particularly, the shaped corroded cave model method of getting rid of the danger in methods described (1) is divided into two parts it may be assumed that will relatively using digging machine
Big danger stone is processed in time, careful will carry out targeted elimination to exposed molten cavity wall, disposes yellow adhesive layer and convex
The Stalactitum rising;Using detection stand artificial treatment, to the molten cavity wall do not removed loosen but do not drop carry out yellow attachment
Layer and raised Stalactitum carry out after-treatment.
Particularly, all of karst cave treatment of shaped corroded cave model must synchronization process.
The invention has the beneficial effects as follows: the circumferentially continuous karst cave treatment side of karst landform tunnel beading that the present invention provides
Method, safe and reliable, science is feasible, easy construction, that economical rationality, duration compactly solve shaped corroded cave model construction technology is difficult
Topic, the karst cave treatment for being similar to later provides reference and reference, especially vault karst cave treatment method, reached save time, laborsaving,
It is easy to the effect constructed.
Specific embodiment
With reference to embodiment, the invention will be further described:
The circumferentially continuous karst cave treatment method of karst landform tunnel beading, corrodes low middle mountain region looks for construction corrosion
Shaped corroded cave model at the three of the vault in tunnel, left side arch springing and right side haunch, has insertion between solution cavity it is characterised in that its side
Method is as follows:
(1) emergency trouble shooting measures:
1. strict control excavates drilling depth
Due to cause the geological condition of this section extremely complex it is impossible to effectively verify the front globality of rock and intensity and
Fractured situation, it is therefore necessary to strict control excavates drilling depth, is excavated according to a Pin spacing every time;
2. accurate advanced prediction
Carry out advance borehole confirmation in shaped corroded cave model development area, be sampled holing in surface no karst section, after verifying
Whether continuous also have larger solution cavity, has or not hydrops in solution cavity, carries out estimating of the intensity of solution cavity rock and the preliminary scale of solution cavity,
And have the release under water condition and air adaptive processes;
3. efflorescence prevention and secondary development are processed
Due to shaped corroded cave model at this, between solution cavity, there is insertion, through air adaptive processes after a while and explosion
After the Secondary Disturbance of operation, air slaking and secondary development it is easy to fragmentation tenesmus in lava, is attached to the precipitation on protolith surface
Layer situation is similar to it is easy to delamination landing, so shaped corroded cave model must be carried out getting rid of the danger process, the shaped corroded cave model side of getting rid of the danger
Method is divided into two parts it may be assumed that processing larger danger stone in time using digging machine, wants careful carrying out to exposed molten cavity wall
Targeted elimination, disposes yellow adhesive layer and raised Stalactitum;Using detection stand artificial treatment, to the molten cavity wall do not removed
Loosen the yellow adhesive layer that carries out still not dropped and carry out after-treatment with raised Stalactitum;
Get rid of the danger after end, carry out omnibearing spray operation in molten intracavity portion, especially can not ignore bottom and bottom
Whitewashing closing;
(2) the preliminary bracing processing method of vault solution cavity:
1. insert steel reinforcement cage, specification isHrb400 reinforcing bar, the high 40cm of cage, bar spacing is 25*25cm, and bilayer sets
Put, above steel reinforcement cageHrb400 reinforcing bar on colligation monolayer φ 8 specification be 10*10 reinforced mesh;
2. squeeze into double-deck advanced tubule, the spacing of advanced tubule is 0.3m;
3. 4 are welded on advanced tubuleSteel pipe, length of steel pipe is 60cm, and blossom type is arranged;
4. the specification laying φ 8 on ductule is the reinforced mesh of 25*25, and colligation is on advanced tubule;
5. on reinforced mesh place steel reinforcement cage, steel reinforcement cage bottom layer of the reinforcing steel colligation on reinforced mesh, above steel reinforcement cage
Hrb400 reinforcing bar on colligation monolayer φ 8 specification be 10*10 reinforced mesh;
6. weld buried depth 0.5m'sSteel floral tube, carries out quincuncial arrangement according to spacing 0.5m, exposes 0.2m;
7. from the pre-buried corrugated tube with holes in solution cavity edge, corrugated tube is wrapped up with geotextiles, draws and row in hole from solution cavity side bottom
Water system is docked;
8., after the completion of more than, can carry out after inspection declaration is qualified spraying c25 concrete work, jetting cement operation time control controlling angle
Between 30~40 degree, sprayed by internal layer outer layers, control jetting thickness is 50cm, internal layer is forbidden using geotextiles and asbestos gauge
When gear spray-up;
(3) the preliminary bracing processing method of arch springing solution cavity on the left of:
1. below arch springing 1m, shuttering makes c10 concrete backfill, pre-buriedHrb400 reinforcing bar to be easy to steel reinforcement cage solid
Fixed;
2. arch springing 1m above position settingHrb400 steel reinforcement cage, the high 40cm of cage, bar spacing is 25*25cm, double-deck
Setting, steel reinforcement cage internal layerHrb400 reinforcing bar on colligation monolayer φ 8 specification be 10*10 reinforced mesh, whole steel reinforcement cage
It is fixed on embedded bar;
3. weld buried depth 0.5m'sSteel floral tube, carries out quincuncial arrangement according to spacing 0.5m, exposes 0.2m;
4. from the pre-buried corrugated tube with holes in solution cavity edge, corrugated tube is wrapped up with geotextiles, draws and row in hole from solution cavity side bottom
Water system is docked;
5., after the completion of more than, can carry out after inspection declaration is qualified spraying c25 concrete work, pilot angle during jetting cement operation
Degree, is sprayed by internal layer outer layers, and control jetting thickness is 50cm, and internal layer is forbidden using geotextiles and asbestos gauge when gear spray-up;
(4) the preliminary bracing processing method of haunch solution cavity on the right side of:
1. hangHrb400 steel reinforcement cage, the high 40cm of cage, bar spacing is 25*25cm, and double-deck setting, in steel reinforcement cage
LayerHrb400 reinforcing bar on colligation monolayer φ 8 specification be 10*10 reinforced mesh;
2. weld buried depth 0.5m'sSteel floral tube, carries out quincuncial arrangement according to spacing 0.5m, exposes 0.2m;
3. from the pre-buried corrugated tube with holes in solution cavity edge, corrugated tube is wrapped up with geotextiles, draws and row in hole from solution cavity side bottom
Water system is docked;
4. after the completion of more than, inspection declaration is qualified can carry out spraying c25 concrete work.
Particularly, all of karst cave treatment of shaped corroded cave model must synchronization process.
Above the present invention is exemplarily described it is clear that the present invention implements is not subject to the restrictions described above,
As long as employing method of the present invention design and the various improvement that carry out of technical scheme, or not improved directly apply to other fields
Close, all within protection scope of the present invention.
Claims (3)
1. karst landform tunnel beading circumferentially continuous karst cave treatment method, corrodes the tunnel of low middle mountain region looks for construction corrosion
Shaped corroded cave model at the three of the vault in road, left side arch springing and right side haunch, has insertion between solution cavity it is characterised in that its method
As follows:
(1) emergency trouble shooting measures:
1. strict control excavates drilling depth
Due to causing the geological condition of this section extremely complex it is impossible to effectively verify globality and intensity and the crack of front rock
Developmental state is it is therefore necessary to strict control excavates drilling depth;
2. accurate advanced prediction
Carry out advance borehole confirmation in shaped corroded cave model development area, be sampled holing in surface no karst section, verifying is subsequently
No also have larger solution cavity, has or not hydrops in solution cavity, carries out estimating of the intensity of solution cavity rock and the preliminary scale of solution cavity, and
There are the release under water condition and air adaptive processes;
3. efflorescence prevention and secondary development are processed
Due to shaped corroded cave model at this, between solution cavity, there is insertion, through air adaptive processes after a while and bursting work
Secondary Disturbance after, lava air slaking and secondary development occur it is easy to fragmentation tenesmus, be attached to the beds of precipitation feelings on protolith surface
Condition is similar to it is easy to delamination landing, so must carry out shaped corroded cave model getting rid of the danger process;Get rid of the danger after terminating, in molten intracavity
Portion carries out omnibearing spray operation, especially can not ignore the whitewashing closing of bottom and bottom;
(2) the preliminary bracing processing method of vault solution cavity:
1. insert steel reinforcement cage, the reinforced mesh of colligation monolayer on the reinforcing bar above steel reinforcement cage;
2. squeeze into double-deck advanced tubule;
3. 4 steel pipes are welded on advanced tubule, blossom type is arranged;
4. lay reinforced mesh on ductule, colligation is on advanced tubule;
5. steel reinforcement cage, reinforcing bar on reinforced mesh, above steel reinforcement cage for the steel reinforcement cage bottom layer of the reinforcing steel colligation are placed on reinforced mesh
Upper colligation monolayer reinforced mesh;
6. weld the steel floral tube of buried depth 0.5m, carry out quincuncial arrangement, expose 0.2m;
7. from the pre-buried corrugated tube with holes in solution cavity edge, corrugated tube is wrapped up with geotextiles, draws and hole internal drainage system from solution cavity side bottom
System docking;
8., after the completion of more than, gunite concrete operation can be carried out after inspection declaration is qualified, jetting cement operation time control controlling angle, by internal layer
Outer layers are sprayed, and internal layer is forbidden using geotextiles and asbestos gauge when gear spray-up;
(3) the preliminary bracing processing method of arch springing solution cavity on the left of:
1. below arch springing 1m, shuttering makes plain concrete backfill, and embedded bar is easy to steel reinforcement cage and is fixed;
2. arch springing 1m above position setting steel reinforcement cage, the reinforced mesh of colligation monolayer on the reinforcing bar of steel reinforcement cage internal layer, whole reinforcing bar
Cage is fixed on embedded bar;
3. weld the steel floral tube of buried depth 0.5m, carry out quincuncial arrangement, expose 0.2m;
4. from the pre-buried corrugated tube with holes in solution cavity edge, corrugated tube is wrapped up with geotextiles, draws and hole internal drainage system from solution cavity side bottom
System docking;
5., after the completion of above, gunite concrete operation after inspection declaration is qualified, can be carried out, jetting cement operation time control controlling angle 30~
Between 40 degree, sprayed by internal layer outer layers, internal layer is forbidden using geotextiles and asbestos gauge when gear spray-up;
(4) the preliminary bracing processing method of haunch solution cavity on the right side of:
1. hang steel reinforcement cage, colligation monolayer reinforced mesh on the reinforcing bar of steel reinforcement cage internal layer;
2. weld the steel floral tube of buried depth 0.5m, carry out quincuncial arrangement, expose 0.2m;
3. from the pre-buried corrugated tube with holes in solution cavity edge, corrugated tube is wrapped up with geotextiles, draws and hole internal drainage system from solution cavity side bottom
System docking;
4. after the completion of more than, inspection declaration is qualified can carry out gunite concrete operation.
2. the circumferentially continuous karst cave treatment method of karst landform tunnel according to claim 1 beading it is characterised in that
The shaped corroded cave model method of getting rid of the danger in methods described (1) is divided into two parts it may be assumed that locating larger danger stone in time using digging machine
Reason, wants the careful Stalactitum carrying out targeted elimination, disposing yellow adhesive layer and projection to exposed molten cavity wall;Use
Detection stand artificial treatment, loosens to the molten cavity wall do not removed but the Stalactitum carrying out yellow adhesive layer and projection not dropped
Carry out after-treatment.
3. the circumferentially continuous karst cave treatment method of karst landform tunnel according to claim 1 beading it is characterised in that
The all of karst cave treatment of shaped corroded cave model must synchronization process.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610824112.8A CN106351202B (en) | 2016-09-14 | 2016-09-14 | The circumferentially continuous karst cave treatment method of karst landform tunnel beading |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610824112.8A CN106351202B (en) | 2016-09-14 | 2016-09-14 | The circumferentially continuous karst cave treatment method of karst landform tunnel beading |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106351202A true CN106351202A (en) | 2017-01-25 |
CN106351202B CN106351202B (en) | 2019-06-04 |
Family
ID=57858546
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610824112.8A Expired - Fee Related CN106351202B (en) | 2016-09-14 | 2016-09-14 | The circumferentially continuous karst cave treatment method of karst landform tunnel beading |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106351202B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109707382A (en) * | 2018-12-06 | 2019-05-03 | 中国核工业第二二建设有限公司 | Crack unilateral side method for blocking |
CN110241671A (en) * | 2019-07-08 | 2019-09-17 | 郑州市交通规划勘察设计研究院 | A kind of construction method of repair way basal part solution cavity |
CN110295602A (en) * | 2019-04-24 | 2019-10-01 | 浙江省钱塘江管理局勘测设计院 | A kind of underwater concrete pouring technique |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101922303A (en) * | 2010-08-30 | 2010-12-22 | 中铁第四勘察设计院集团有限公司 | Method for treating tunnel passing through underground river karst hall |
CN104632248A (en) * | 2015-01-22 | 2015-05-20 | 山东大学 | Protection and treatment method for tunnel top karst cave |
-
2016
- 2016-09-14 CN CN201610824112.8A patent/CN106351202B/en not_active Expired - Fee Related
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101922303A (en) * | 2010-08-30 | 2010-12-22 | 中铁第四勘察设计院集团有限公司 | Method for treating tunnel passing through underground river karst hall |
CN104632248A (en) * | 2015-01-22 | 2015-05-20 | 山东大学 | Protection and treatment method for tunnel top karst cave |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109707382A (en) * | 2018-12-06 | 2019-05-03 | 中国核工业第二二建设有限公司 | Crack unilateral side method for blocking |
CN110295602A (en) * | 2019-04-24 | 2019-10-01 | 浙江省钱塘江管理局勘测设计院 | A kind of underwater concrete pouring technique |
CN110241671A (en) * | 2019-07-08 | 2019-09-17 | 郑州市交通规划勘察设计研究院 | A kind of construction method of repair way basal part solution cavity |
Also Published As
Publication number | Publication date |
---|---|
CN106351202B (en) | 2019-06-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP7125550B2 (en) | SUPPORT STRUCTURE AND CONSTRUCTION METHOD FOR TWO-STAGE HIGH-SPEED CLOSING TUNNEL WITH INVERTED ARCH | |
CN102383806B (en) | Construction technology for allowing tunnel to pass through ultra-large karst cave | |
CN203756182U (en) | Support structure applied to shallow road tunnel in weak rock area | |
CN104612713B (en) | Construction method of tunnel in ultra-shallow buried section | |
CN104074529B (en) | A kind of cave continuous bivalve, lane, deep reinforcement means | |
CN105041333B (en) | It is a kind of first to fill out the method for digging method processing Tunnel Landslide afterwards | |
CN104612698A (en) | Method for constructing upper step middle partition wall of shallow-buried excavation tunnel | |
CN102562077B (en) | Excavation construction method of frame tunnel penetrating special structure at lower portion | |
CN104989434B (en) | A kind of processing method caved in tunnel work face using poling combination arch | |
CN105781571A (en) | Construction method for soft rock deformation tunnel lining support dismantling-replacing arch | |
CN105443132A (en) | Construction method of shallow-buried subsurface-excavated cross-shaped cross-strut tunnel | |
CN109184700B (en) | Construction method for clamping rock in soft surrounding rock small-clear-distance tunnel stability | |
CN108203983A (en) | A kind of deep foundation pit supporting structure and method | |
CN106050266A (en) | Construction method for undermining connected channel between shield sections in water-rich sand cobble stratum tunnel | |
CN107587881A (en) | A kind of composite lining structure and construction technology for permafrost tunnel | |
CN110067564A (en) | A kind of soft rock large cross-section tunnel big machinery melts cut construction method | |
CN107725064A (en) | Tunnel partition wall structure and the method that tunnel step excavation is realized using middle-wall method | |
CN105443143B (en) | A kind of coal mine gob roadway support device and its construction method | |
CN106351202A (en) | Treatment method for annularly continuous bead-like karst caves of tunnel | |
CN102400694A (en) | Method for reinforcing joint of shield tunnel and mine tunnel | |
CN105065037A (en) | Double-layer arch center support construction method for highway soft rock tunnel | |
CN110159298A (en) | A kind of first branch button arch construction method of Underground Subway Station | |
CN107165641B (en) | High inclination-angle ladder way opposite direction excavating construction method in thin layer breaking up hard rock stratum | |
CN210317344U (en) | Tunnel steel pipe encircles preliminary bracing structure | |
CN109973115B (en) | Construction method for drainage of vault of tunnel in karst area |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: No.173, No.2 Xingang Road, Tanggu, Binhai New Area, Tianjin, 300456 Patentee after: Civil Aviation Airport Construction Engineering Co.,Ltd. Address before: No.173, No.2 Xingang Road, Tanggu, Binhai New Area, Tianjin, 300456 Patentee before: NO.4 ENGINEERING COMPANY LTD. OF CCCC FIRST HARBOR ENGINEERING Co.,Ltd. |
|
CP01 | Change in the name or title of a patent holder | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190604 |
|
CF01 | Termination of patent right due to non-payment of annual fee |