CN106351202A - Treatment method for annularly continuous bead-like karst caves of tunnel - Google Patents

Treatment method for annularly continuous bead-like karst caves of tunnel Download PDF

Info

Publication number
CN106351202A
CN106351202A CN201610824112.8A CN201610824112A CN106351202A CN 106351202 A CN106351202 A CN 106351202A CN 201610824112 A CN201610824112 A CN 201610824112A CN 106351202 A CN106351202 A CN 106351202A
Authority
CN
China
Prior art keywords
solution cavity
reinforcement cage
steel reinforcement
karst
treatment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610824112.8A
Other languages
Chinese (zh)
Other versions
CN106351202B (en
Inventor
杭宝国
李祯
邱中原
范长青
杨龙龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Civil Aviation Airport Construction Engineering Co Ltd
Original Assignee
No 4 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No 4 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical No 4 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority to CN201610824112.8A priority Critical patent/CN106351202B/en
Publication of CN106351202A publication Critical patent/CN106351202A/en
Application granted granted Critical
Publication of CN106351202B publication Critical patent/CN106351202B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Architecture (AREA)
  • Soil Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Paleontology (AREA)
  • Agronomy & Crop Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention provides a treatment method for annularly continuous bead-like karst caves of a tunnel. The method comprises steps of execution of emergency treatment measures, primary support treatment of vault caves, primary support treatment of left-skewback caves and primary support treatment of right-hance caves. The treatment method for the annularly continuous bead-like caves of the tunnel is safe, reliable, scientific, feasible, convenient to construct, economical and reasonable, solves the technical problems in construction of the bead-like caves while the construction duration is short, provides reference for follow-up similar cave treatment especially treatment of the vault caves, and realizes the effects of saving time and labor and facilitating construction.

Description

The circumferentially continuous karst cave treatment method of karst landform tunnel beading
Technical field
The present invention relates to constructing tunnel field, the more particularly, to circumferentially continuous karst cave treatment side of karst landform tunnel beading Method.
Background technology
The enforcement planned along with " one with a road ", southwest highway enters fast-developing period, southwest Ground situation is typical Karst landforms, the globality poor of karst features, many solution cavities or contain mud, chamber containing Sha Rong, cranny development, Interlayer is more, rock unrooted, only leans on the frictional force between rock to fix, easily occurs loosening block, the danger of fall.String Pearl solution cavity is more dangerous with respect to the solution cavity of other forms and complicated, circumferentially continuous appearance in especially same mileage section Solution cavity, country rock developmental state is unknown, secondary development easily, to the peace of the constructing tunnel of the solution cavity section construction of Karst Geological Landscape Entirely, progress and benefit cause difficulty.
Especially vault occur solution cavity, need to carry out early stage closing again, thus the principle of vault karst cave treatment be in line with Safety first, early closing, light and handy, high-strength, be easy to construct, conventional design is stuffed entirely with completing, or carries out formwork erection with concrete and beat The mode of shield arch, time-consuming, laborious, effect is poor, is difficult to construct.
Content of the invention
Present invention seek to address that the deficiencies in the prior art, and provide at the circumferentially continuous solution cavity of karst landform tunnel beading Reason method.
The present invention for achieving the above object, employs the following technical solutions: karst landform tunnel beading is circumferentially continuous molten Hole processing method, corrode for construction corrosion the tunnel of low middle mountain region looks vault, left side arch springing and right side haunch three at go here and there Pearl solution cavity, has insertion between solution cavity it is characterised in that its method is as follows:
(1) emergency trouble shooting measures:
1. strict control excavates drilling depth
Due to cause the geological condition of this section extremely complex it is impossible to effectively verify the front globality of rock and intensity and Fractured situation is it is therefore necessary to strict control excavates drilling depth;
2. accurate advanced prediction
Carry out advance borehole confirmation in shaped corroded cave model development area, be sampled holing in surface no karst section, after verifying Whether continuous also have larger solution cavity, has or not hydrops in solution cavity, carries out estimating of the intensity of solution cavity rock and the preliminary scale of solution cavity, And have the release under water condition and air adaptive processes;
3. efflorescence prevention and secondary development are processed
Due to shaped corroded cave model at this, between solution cavity, there is insertion, through air adaptive processes after a while and explosion After the Secondary Disturbance of operation, air slaking and secondary development it is easy to fragmentation tenesmus in lava, is attached to the precipitation on protolith surface Layer situation is similar to it is easy to delamination landing, so must carry out shaped corroded cave model getting rid of the danger process;Get rid of the danger after terminating, molten Intracavity portion carries out omnibearing spray operation, especially can not ignore the whitewashing closing of bottom and bottom;
(2) the preliminary bracing processing method of vault solution cavity:
1. insert steel reinforcement cage, the reinforced mesh of colligation monolayer on the reinforcing bar above steel reinforcement cage;
2. squeeze into double-deck advanced tubule;
3. 4 steel pipes are welded on advanced tubule, blossom type is arranged;
4. lay reinforced mesh on ductule, colligation is on advanced tubule;
5. on reinforced mesh place steel reinforcement cage, steel reinforcement cage bottom layer of the reinforcing steel colligation on reinforced mesh, above steel reinforcement cage Colligation monolayer reinforced mesh on reinforcing bar;
6. weld the steel floral tube of buried depth 0.5m, carry out quincuncial arrangement, expose 0.2m;
7. from the pre-buried corrugated tube with holes in solution cavity edge, corrugated tube is wrapped up with geotextiles, draws and row in hole from solution cavity side bottom Water system is docked;
8., after the completion of more than, gunite concrete operation can be carried out after inspection declaration is qualified, jetting cement operation time control controlling angle exists Between 30~40 degree, sprayed by internal layer outer layers, internal layer is forbidden using geotextiles and asbestos gauge when gear spray-up;
(3) the preliminary bracing processing method of arch springing solution cavity on the left of:
1. below arch springing 1m, shuttering makes plain concrete backfill, and embedded bar is easy to steel reinforcement cage and is fixed;
2. arch springing 1m above position setting steel reinforcement cage, the reinforced mesh of colligation monolayer on the reinforcing bar of steel reinforcement cage internal layer, entirely Steel reinforcement cage is fixed on embedded bar;
3. weld the steel floral tube of buried depth 0.5m, carry out quincuncial arrangement, expose 0.2m;
4. from the pre-buried corrugated tube with holes in solution cavity edge, corrugated tube is wrapped up with geotextiles, draws and row in hole from solution cavity side bottom Water system is docked;
5., after the completion of above, gunite concrete operation can after inspection declaration is qualified, be carried out, jetting cement operation time control controlling angle, by Internal layer outer layers are sprayed, and internal layer is forbidden using geotextiles and asbestos gauge when gear spray-up;
(4) the preliminary bracing processing method of haunch solution cavity on the right side of:
1. hang steel reinforcement cage, colligation monolayer reinforced mesh on the reinforcing bar of steel reinforcement cage internal layer;
2. weld the steel floral tube of buried depth 0.5m, carry out quincuncial arrangement, expose 0.2m;
3. from the pre-buried corrugated tube with holes in solution cavity edge, corrugated tube is wrapped up with geotextiles, draws and row in hole from solution cavity side bottom Water system is docked;
4. after the completion of more than, inspection declaration is qualified can carry out gunite concrete operation.
Particularly, the shaped corroded cave model method of getting rid of the danger in methods described (1) is divided into two parts it may be assumed that will relatively using digging machine Big danger stone is processed in time, careful will carry out targeted elimination to exposed molten cavity wall, disposes yellow adhesive layer and convex The Stalactitum rising;Using detection stand artificial treatment, to the molten cavity wall do not removed loosen but do not drop carry out yellow attachment Layer and raised Stalactitum carry out after-treatment.
Particularly, all of karst cave treatment of shaped corroded cave model must synchronization process.
The invention has the beneficial effects as follows: the circumferentially continuous karst cave treatment side of karst landform tunnel beading that the present invention provides Method, safe and reliable, science is feasible, easy construction, that economical rationality, duration compactly solve shaped corroded cave model construction technology is difficult Topic, the karst cave treatment for being similar to later provides reference and reference, especially vault karst cave treatment method, reached save time, laborsaving, It is easy to the effect constructed.
Specific embodiment
With reference to embodiment, the invention will be further described:
The circumferentially continuous karst cave treatment method of karst landform tunnel beading, corrodes low middle mountain region looks for construction corrosion Shaped corroded cave model at the three of the vault in tunnel, left side arch springing and right side haunch, has insertion between solution cavity it is characterised in that its side Method is as follows:
(1) emergency trouble shooting measures:
1. strict control excavates drilling depth
Due to cause the geological condition of this section extremely complex it is impossible to effectively verify the front globality of rock and intensity and Fractured situation, it is therefore necessary to strict control excavates drilling depth, is excavated according to a Pin spacing every time;
2. accurate advanced prediction
Carry out advance borehole confirmation in shaped corroded cave model development area, be sampled holing in surface no karst section, after verifying Whether continuous also have larger solution cavity, has or not hydrops in solution cavity, carries out estimating of the intensity of solution cavity rock and the preliminary scale of solution cavity, And have the release under water condition and air adaptive processes;
3. efflorescence prevention and secondary development are processed
Due to shaped corroded cave model at this, between solution cavity, there is insertion, through air adaptive processes after a while and explosion After the Secondary Disturbance of operation, air slaking and secondary development it is easy to fragmentation tenesmus in lava, is attached to the precipitation on protolith surface Layer situation is similar to it is easy to delamination landing, so shaped corroded cave model must be carried out getting rid of the danger process, the shaped corroded cave model side of getting rid of the danger Method is divided into two parts it may be assumed that processing larger danger stone in time using digging machine, wants careful carrying out to exposed molten cavity wall Targeted elimination, disposes yellow adhesive layer and raised Stalactitum;Using detection stand artificial treatment, to the molten cavity wall do not removed Loosen the yellow adhesive layer that carries out still not dropped and carry out after-treatment with raised Stalactitum;
Get rid of the danger after end, carry out omnibearing spray operation in molten intracavity portion, especially can not ignore bottom and bottom Whitewashing closing;
(2) the preliminary bracing processing method of vault solution cavity:
1. insert steel reinforcement cage, specification isHrb400 reinforcing bar, the high 40cm of cage, bar spacing is 25*25cm, and bilayer sets Put, above steel reinforcement cageHrb400 reinforcing bar on colligation monolayer φ 8 specification be 10*10 reinforced mesh;
2. squeeze into double-deck advanced tubule, the spacing of advanced tubule is 0.3m;
3. 4 are welded on advanced tubuleSteel pipe, length of steel pipe is 60cm, and blossom type is arranged;
4. the specification laying φ 8 on ductule is the reinforced mesh of 25*25, and colligation is on advanced tubule;
5. on reinforced mesh place steel reinforcement cage, steel reinforcement cage bottom layer of the reinforcing steel colligation on reinforced mesh, above steel reinforcement cage Hrb400 reinforcing bar on colligation monolayer φ 8 specification be 10*10 reinforced mesh;
6. weld buried depth 0.5m'sSteel floral tube, carries out quincuncial arrangement according to spacing 0.5m, exposes 0.2m;
7. from the pre-buried corrugated tube with holes in solution cavity edge, corrugated tube is wrapped up with geotextiles, draws and row in hole from solution cavity side bottom Water system is docked;
8., after the completion of more than, can carry out after inspection declaration is qualified spraying c25 concrete work, jetting cement operation time control controlling angle Between 30~40 degree, sprayed by internal layer outer layers, control jetting thickness is 50cm, internal layer is forbidden using geotextiles and asbestos gauge When gear spray-up;
(3) the preliminary bracing processing method of arch springing solution cavity on the left of:
1. below arch springing 1m, shuttering makes c10 concrete backfill, pre-buriedHrb400 reinforcing bar to be easy to steel reinforcement cage solid Fixed;
2. arch springing 1m above position settingHrb400 steel reinforcement cage, the high 40cm of cage, bar spacing is 25*25cm, double-deck Setting, steel reinforcement cage internal layerHrb400 reinforcing bar on colligation monolayer φ 8 specification be 10*10 reinforced mesh, whole steel reinforcement cage It is fixed on embedded bar;
3. weld buried depth 0.5m'sSteel floral tube, carries out quincuncial arrangement according to spacing 0.5m, exposes 0.2m;
4. from the pre-buried corrugated tube with holes in solution cavity edge, corrugated tube is wrapped up with geotextiles, draws and row in hole from solution cavity side bottom Water system is docked;
5., after the completion of more than, can carry out after inspection declaration is qualified spraying c25 concrete work, pilot angle during jetting cement operation Degree, is sprayed by internal layer outer layers, and control jetting thickness is 50cm, and internal layer is forbidden using geotextiles and asbestos gauge when gear spray-up;
(4) the preliminary bracing processing method of haunch solution cavity on the right side of:
1. hangHrb400 steel reinforcement cage, the high 40cm of cage, bar spacing is 25*25cm, and double-deck setting, in steel reinforcement cage LayerHrb400 reinforcing bar on colligation monolayer φ 8 specification be 10*10 reinforced mesh;
2. weld buried depth 0.5m'sSteel floral tube, carries out quincuncial arrangement according to spacing 0.5m, exposes 0.2m;
3. from the pre-buried corrugated tube with holes in solution cavity edge, corrugated tube is wrapped up with geotextiles, draws and row in hole from solution cavity side bottom Water system is docked;
4. after the completion of more than, inspection declaration is qualified can carry out spraying c25 concrete work.
Particularly, all of karst cave treatment of shaped corroded cave model must synchronization process.
Above the present invention is exemplarily described it is clear that the present invention implements is not subject to the restrictions described above, As long as employing method of the present invention design and the various improvement that carry out of technical scheme, or not improved directly apply to other fields Close, all within protection scope of the present invention.

Claims (3)

1. karst landform tunnel beading circumferentially continuous karst cave treatment method, corrodes the tunnel of low middle mountain region looks for construction corrosion Shaped corroded cave model at the three of the vault in road, left side arch springing and right side haunch, has insertion between solution cavity it is characterised in that its method As follows:
(1) emergency trouble shooting measures:
1. strict control excavates drilling depth
Due to causing the geological condition of this section extremely complex it is impossible to effectively verify globality and intensity and the crack of front rock Developmental state is it is therefore necessary to strict control excavates drilling depth;
2. accurate advanced prediction
Carry out advance borehole confirmation in shaped corroded cave model development area, be sampled holing in surface no karst section, verifying is subsequently No also have larger solution cavity, has or not hydrops in solution cavity, carries out estimating of the intensity of solution cavity rock and the preliminary scale of solution cavity, and There are the release under water condition and air adaptive processes;
3. efflorescence prevention and secondary development are processed
Due to shaped corroded cave model at this, between solution cavity, there is insertion, through air adaptive processes after a while and bursting work Secondary Disturbance after, lava air slaking and secondary development occur it is easy to fragmentation tenesmus, be attached to the beds of precipitation feelings on protolith surface Condition is similar to it is easy to delamination landing, so must carry out shaped corroded cave model getting rid of the danger process;Get rid of the danger after terminating, in molten intracavity Portion carries out omnibearing spray operation, especially can not ignore the whitewashing closing of bottom and bottom;
(2) the preliminary bracing processing method of vault solution cavity:
1. insert steel reinforcement cage, the reinforced mesh of colligation monolayer on the reinforcing bar above steel reinforcement cage;
2. squeeze into double-deck advanced tubule;
3. 4 steel pipes are welded on advanced tubule, blossom type is arranged;
4. lay reinforced mesh on ductule, colligation is on advanced tubule;
5. steel reinforcement cage, reinforcing bar on reinforced mesh, above steel reinforcement cage for the steel reinforcement cage bottom layer of the reinforcing steel colligation are placed on reinforced mesh Upper colligation monolayer reinforced mesh;
6. weld the steel floral tube of buried depth 0.5m, carry out quincuncial arrangement, expose 0.2m;
7. from the pre-buried corrugated tube with holes in solution cavity edge, corrugated tube is wrapped up with geotextiles, draws and hole internal drainage system from solution cavity side bottom System docking;
8., after the completion of more than, gunite concrete operation can be carried out after inspection declaration is qualified, jetting cement operation time control controlling angle, by internal layer Outer layers are sprayed, and internal layer is forbidden using geotextiles and asbestos gauge when gear spray-up;
(3) the preliminary bracing processing method of arch springing solution cavity on the left of:
1. below arch springing 1m, shuttering makes plain concrete backfill, and embedded bar is easy to steel reinforcement cage and is fixed;
2. arch springing 1m above position setting steel reinforcement cage, the reinforced mesh of colligation monolayer on the reinforcing bar of steel reinforcement cage internal layer, whole reinforcing bar Cage is fixed on embedded bar;
3. weld the steel floral tube of buried depth 0.5m, carry out quincuncial arrangement, expose 0.2m;
4. from the pre-buried corrugated tube with holes in solution cavity edge, corrugated tube is wrapped up with geotextiles, draws and hole internal drainage system from solution cavity side bottom System docking;
5., after the completion of above, gunite concrete operation after inspection declaration is qualified, can be carried out, jetting cement operation time control controlling angle 30~ Between 40 degree, sprayed by internal layer outer layers, internal layer is forbidden using geotextiles and asbestos gauge when gear spray-up;
(4) the preliminary bracing processing method of haunch solution cavity on the right side of:
1. hang steel reinforcement cage, colligation monolayer reinforced mesh on the reinforcing bar of steel reinforcement cage internal layer;
2. weld the steel floral tube of buried depth 0.5m, carry out quincuncial arrangement, expose 0.2m;
3. from the pre-buried corrugated tube with holes in solution cavity edge, corrugated tube is wrapped up with geotextiles, draws and hole internal drainage system from solution cavity side bottom System docking;
4. after the completion of more than, inspection declaration is qualified can carry out gunite concrete operation.
2. the circumferentially continuous karst cave treatment method of karst landform tunnel according to claim 1 beading it is characterised in that The shaped corroded cave model method of getting rid of the danger in methods described (1) is divided into two parts it may be assumed that locating larger danger stone in time using digging machine Reason, wants the careful Stalactitum carrying out targeted elimination, disposing yellow adhesive layer and projection to exposed molten cavity wall;Use Detection stand artificial treatment, loosens to the molten cavity wall do not removed but the Stalactitum carrying out yellow adhesive layer and projection not dropped Carry out after-treatment.
3. the circumferentially continuous karst cave treatment method of karst landform tunnel according to claim 1 beading it is characterised in that The all of karst cave treatment of shaped corroded cave model must synchronization process.
CN201610824112.8A 2016-09-14 2016-09-14 The circumferentially continuous karst cave treatment method of karst landform tunnel beading Expired - Fee Related CN106351202B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610824112.8A CN106351202B (en) 2016-09-14 2016-09-14 The circumferentially continuous karst cave treatment method of karst landform tunnel beading

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610824112.8A CN106351202B (en) 2016-09-14 2016-09-14 The circumferentially continuous karst cave treatment method of karst landform tunnel beading

Publications (2)

Publication Number Publication Date
CN106351202A true CN106351202A (en) 2017-01-25
CN106351202B CN106351202B (en) 2019-06-04

Family

ID=57858546

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610824112.8A Expired - Fee Related CN106351202B (en) 2016-09-14 2016-09-14 The circumferentially continuous karst cave treatment method of karst landform tunnel beading

Country Status (1)

Country Link
CN (1) CN106351202B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109707382A (en) * 2018-12-06 2019-05-03 中国核工业第二二建设有限公司 Crack unilateral side method for blocking
CN110241671A (en) * 2019-07-08 2019-09-17 郑州市交通规划勘察设计研究院 A kind of construction method of repair way basal part solution cavity
CN110295602A (en) * 2019-04-24 2019-10-01 浙江省钱塘江管理局勘测设计院 A kind of underwater concrete pouring technique

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101922303A (en) * 2010-08-30 2010-12-22 中铁第四勘察设计院集团有限公司 Method for treating tunnel passing through underground river karst hall
CN104632248A (en) * 2015-01-22 2015-05-20 山东大学 Protection and treatment method for tunnel top karst cave

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101922303A (en) * 2010-08-30 2010-12-22 中铁第四勘察设计院集团有限公司 Method for treating tunnel passing through underground river karst hall
CN104632248A (en) * 2015-01-22 2015-05-20 山东大学 Protection and treatment method for tunnel top karst cave

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109707382A (en) * 2018-12-06 2019-05-03 中国核工业第二二建设有限公司 Crack unilateral side method for blocking
CN110295602A (en) * 2019-04-24 2019-10-01 浙江省钱塘江管理局勘测设计院 A kind of underwater concrete pouring technique
CN110241671A (en) * 2019-07-08 2019-09-17 郑州市交通规划勘察设计研究院 A kind of construction method of repair way basal part solution cavity

Also Published As

Publication number Publication date
CN106351202B (en) 2019-06-04

Similar Documents

Publication Publication Date Title
JP7125550B2 (en) SUPPORT STRUCTURE AND CONSTRUCTION METHOD FOR TWO-STAGE HIGH-SPEED CLOSING TUNNEL WITH INVERTED ARCH
CN102383806B (en) Construction technology for allowing tunnel to pass through ultra-large karst cave
CN203756182U (en) Support structure applied to shallow road tunnel in weak rock area
CN104612713B (en) Construction method of tunnel in ultra-shallow buried section
CN104074529B (en) A kind of cave continuous bivalve, lane, deep reinforcement means
CN105041333B (en) It is a kind of first to fill out the method for digging method processing Tunnel Landslide afterwards
CN104612698A (en) Method for constructing upper step middle partition wall of shallow-buried excavation tunnel
CN102562077B (en) Excavation construction method of frame tunnel penetrating special structure at lower portion
CN104989434B (en) A kind of processing method caved in tunnel work face using poling combination arch
CN105781571A (en) Construction method for soft rock deformation tunnel lining support dismantling-replacing arch
CN105443132A (en) Construction method of shallow-buried subsurface-excavated cross-shaped cross-strut tunnel
CN109184700B (en) Construction method for clamping rock in soft surrounding rock small-clear-distance tunnel stability
CN108203983A (en) A kind of deep foundation pit supporting structure and method
CN106050266A (en) Construction method for undermining connected channel between shield sections in water-rich sand cobble stratum tunnel
CN107587881A (en) A kind of composite lining structure and construction technology for permafrost tunnel
CN110067564A (en) A kind of soft rock large cross-section tunnel big machinery melts cut construction method
CN107725064A (en) Tunnel partition wall structure and the method that tunnel step excavation is realized using middle-wall method
CN105443143B (en) A kind of coal mine gob roadway support device and its construction method
CN106351202A (en) Treatment method for annularly continuous bead-like karst caves of tunnel
CN102400694A (en) Method for reinforcing joint of shield tunnel and mine tunnel
CN105065037A (en) Double-layer arch center support construction method for highway soft rock tunnel
CN110159298A (en) A kind of first branch button arch construction method of Underground Subway Station
CN107165641B (en) High inclination-angle ladder way opposite direction excavating construction method in thin layer breaking up hard rock stratum
CN210317344U (en) Tunnel steel pipe encircles preliminary bracing structure
CN109973115B (en) Construction method for drainage of vault of tunnel in karst area

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: No.173, No.2 Xingang Road, Tanggu, Binhai New Area, Tianjin, 300456

Patentee after: Civil Aviation Airport Construction Engineering Co.,Ltd.

Address before: No.173, No.2 Xingang Road, Tanggu, Binhai New Area, Tianjin, 300456

Patentee before: NO.4 ENGINEERING COMPANY LTD. OF CCCC FIRST HARBOR ENGINEERING Co.,Ltd.

CP01 Change in the name or title of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190604

CF01 Termination of patent right due to non-payment of annual fee