CN106339815A - Concrete construction process structured data realization method - Google Patents
Concrete construction process structured data realization method Download PDFInfo
- Publication number
- CN106339815A CN106339815A CN201610751195.2A CN201610751195A CN106339815A CN 106339815 A CN106339815 A CN 106339815A CN 201610751195 A CN201610751195 A CN 201610751195A CN 106339815 A CN106339815 A CN 106339815A
- Authority
- CN
- China
- Prior art keywords
- quality
- quality evaluation
- concrete construction
- concrete
- data
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 43
- 238000010276 construction Methods 0.000 title claims abstract description 35
- 238000013441 quality evaluation Methods 0.000 claims abstract description 19
- 238000007689 inspection Methods 0.000 claims abstract description 15
- 238000000547 structure data Methods 0.000 claims description 11
- 238000011156 evaluation Methods 0.000 claims description 6
- 238000012360 testing method Methods 0.000 description 8
- 238000003908 quality control method Methods 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q10/06395—Quality analysis or management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- General Physics & Mathematics (AREA)
- Tourism & Hospitality (AREA)
- Theoretical Computer Science (AREA)
- Educational Administration (AREA)
- Marketing (AREA)
- Development Economics (AREA)
- General Business, Economics & Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Physics & Mathematics (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Game Theory and Decision Science (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Stored Programmes (AREA)
Abstract
The invention discloses a concrete construction process structured data realization method. The method comprises the following realization steps: 1) teasing out the concrete construction process, and carrying out structured operation on a quality three-inspection record form, a process quality evaluation form and a unit project quality evaluation form of each process; 2)according to the quality three-inspection record form and the process quality evaluation form of each process, establishing a data item corresponding relationship between the quality three-inspection record form and the process quality evaluation form; and 3) according to quality evaluation index, carrying out automatic quality evaluation on each process of a concrete unit automatically. Through the concrete construction process structured data realization method, repeat entry of construction and supervision unit construction site data is greatly reduced; and according to system built-in configurable quality evaluation criteria, automatic quality evaluation is carried out on each process of the concrete unit automatically, thereby improving quality evaluation work efficiency and data accuracy, and effectively improving quality management level of the construction site.
Description
Technical field
The present invention relates to concrete construction association area, especially a kind of concrete construction sequence structure data realization side
Method.
Background technology
Operation animation effect is the work progress evaluating the whether standard compliant yardstick engineering project of process quality, is by one
The operation of interrelated, the mutual restriction of series is constituted, and process quality is basis, directly affects the total quality of engineering project,
The quality of Construction Process of Engineering Project to be controlled, must control the quality of operation first. and construction quality is shape in working procedure
Become, in order to construction quality is checked on from postmortem, turn to Prior Control, reach the purpose to put prevention first.
Conventional concrete process quality is tested and comments process to be the list beaten using machine, and then manual typing quality is commented at the scene
Determine list, including three inspection tables, process quality evaluation form, element project performance rating table etc., data inputting repeats also inconvenience, with
When paper form easily lose, be also not easy preserve.
Content of the invention
It is an object of the invention to overcoming the deficiencies in the prior art, here provides a kind of concrete construction sequence structure number
According to implementation method;Concrete construction includes, by concrete construction sequence structure data implementation method, realizing concrete construction
Operation supervisor tests when commenting, and is related to the part of performance rating, three inspections, evaluation, examination during realizing automatic push quality management and control
Test detection, photo site, report table to a higher authorities for approval;Commented by testing of supervisor's typing quality, difficulty action accomplishment report work to a higher authorities for approval;In inspection of quality
The record of any quality control during evaluation, can be reviewed.
The present invention is achieved in that a kind of concrete construction sequence structure data implementation method of construction, and its feature exists
In: the step that described concrete construction sequence structure data is realized is as follows;
Step (1): combing goes out concrete construction operation, examines log, process quality evaluation form, list to the quality three of each operation
First evaluation of engineering quality table carries out structuring operation;
Step (2): according to quality three inspection log and the process quality evaluation form of each operation, set up three inspection tables and process quality is commented
Determine the data item corresponding relation of table;
Step (3): according to the index of performance rating, automatically the performance rating of automatization is carried out to each operation of concrete unit.
It is an advantage of the current invention that: by concrete construction sequence structure data implementation method, greatly reduce construction
And the repetition typing of supervisor's job site data, and according to the built-in criteria of quality evaluation joined of system, automatically to mixed
The each operation of solidifying soil unit carries out the performance rating of automatization, improves the accuracy that quality tests the work efficiency data commented,
Effectively improve the quality management level of job site.
Brief description
Fig. 1 is concrete construction sequence structure data implementation method implementation process diagram of the present invention.
Specific embodiment
Below in conjunction with accompanying drawing 1, the present invention is described in detail, and the technical scheme in the embodiment of the present invention is carried out clearly
Chu, it is fully described by it is clear that described embodiment is only a part of embodiment of the present invention, rather than whole embodiments.
Based on the embodiment in the present invention, it is all that those of ordinary skill in the art are obtained under the premise of not making creative work
Other embodiment, broadly falls into the scope of protection of the invention.
The present invention passes through to improve provides a kind of concrete construction sequence structure data implementation method, and the step that it is realized is such as
Under;
Step (1): combing goes out concrete construction operation, examines log, process quality evaluation form, list to the quality three of each operation
First evaluation of engineering quality table carries out structuring operation;
Step (2): according to quality three inspection log and the process quality evaluation form of each operation, set up three inspection tables and process quality is commented
Determine the data item corresponding relation of table;
Step (3): according to the index of performance rating, automatically the performance rating of automatization is carried out to each operation of concrete unit.
Concrete construction includes, by concrete construction sequence structure data implementation method, realizing concrete construction operation
Supervisor tests when commenting, and is related to the part of performance rating, three inspections, evaluation, test inspection during realizing automatic push quality management and control
Survey, photo site, report table to a higher authorities for approval;Commented by testing of supervisor's typing quality, difficulty action accomplishment report work to a higher authorities for approval;In inspection of quality evaluation
During, the record of any quality control can be reviewed.
By concrete construction sequence structure data implementation method, greatly reduce construction and supervisor job site
The repetition typing of data, and according to the built-in criteria of quality evaluation joined of system, automatically each operation of concrete unit is entered
The performance rating of row automatization, improves the accuracy that quality tests the work efficiency data commented, and effective to improve construction existing
The quality management level of field.
Described above to the disclosed embodiments, makes professional and technical personnel in the field be capable of or uses the present invention.
Multiple modifications to these embodiments will be apparent from for those skilled in the art, as defined herein
General Principle can be realized without departing from the spirit or scope of the present invention in other embodiments.Therefore, the present invention
It is not intended to be limited to the embodiments shown herein, and be to fit to and principles disclosed herein and features of novelty phase one
The scope the widest causing.
Claims (1)
1. a kind of concrete construction sequence structure data implementation method it is characterised in that: described concrete construction sequence structure
The step changing data realization is as follows;
Step (1): combing goes out concrete construction operation, examines log, process quality evaluation form, list to the quality three of each operation
First evaluation of engineering quality table carries out structuring operation;
Step (2): according to quality three inspection log and the process quality evaluation form of each operation, set up three inspection tables and process quality is commented
Determine the data item corresponding relation of table;
Step (3): according to the index of performance rating, automatically the performance rating of automatization is carried out to each operation of concrete unit.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610751195.2A CN106339815A (en) | 2016-08-30 | 2016-08-30 | Concrete construction process structured data realization method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610751195.2A CN106339815A (en) | 2016-08-30 | 2016-08-30 | Concrete construction process structured data realization method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106339815A true CN106339815A (en) | 2017-01-18 |
Family
ID=57822725
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610751195.2A Pending CN106339815A (en) | 2016-08-30 | 2016-08-30 | Concrete construction process structured data realization method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106339815A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107480171A (en) * | 2017-06-29 | 2017-12-15 | 中国建筑局(集团)有限公司 | Database combining construction process and engineering data and manufacturing method |
CN110987082A (en) * | 2019-12-21 | 2020-04-10 | 广州新稳房屋安全鉴定有限公司 | Safety detection method for reinforced concrete building structure |
-
2016
- 2016-08-30 CN CN201610751195.2A patent/CN106339815A/en active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107480171A (en) * | 2017-06-29 | 2017-12-15 | 中国建筑局(集团)有限公司 | Database combining construction process and engineering data and manufacturing method |
CN110987082A (en) * | 2019-12-21 | 2020-04-10 | 广州新稳房屋安全鉴定有限公司 | Safety detection method for reinforced concrete building structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106940839B (en) | Power transmission and transformation project quality data management and control system and method | |
CN106507372A (en) | A kind of wireless network zone-skipping coverage detection method, device and communication system | |
CN105069587B (en) | A kind of relay protection check device based on mobile interchange | |
CN102110053A (en) | Random testing method based on Android | |
CN110691369B (en) | Indoor signal leakage analysis method and system based on MDT | |
CN103439592A (en) | Method for intelligently testing intelligent substation on site | |
CN101833499A (en) | Software testing validating method based on reachability tree | |
CN108469739A (en) | Remote home packing quality control system based on Internet of Things, video and artificial intelligence | |
CN104754590A (en) | Method and device for assessing LTE (long term evolution) network sites | |
CN110189311A (en) | A kind of calculation method of transmission line of electricity screen of trees hidden danger region trees felling area | |
CN106339815A (en) | Concrete construction process structured data realization method | |
CN105306471A (en) | System and method for management and control of access control policy of security domain boundary equipment of smart grid | |
CN115908432A (en) | Material output quality detection system and prediction method | |
CN103675529B (en) | The protective relaying device automatic test approach of feature based word and device | |
CN105116301A (en) | Data auxiliary determining method based on dynamic statistics | |
CN203011829U (en) | Cuvette, water quality concentration detecting device and water quality monitoring system | |
CN103839215A (en) | Multi-dimensional comprehensive information security assessment service platform system | |
CN106375037A (en) | Wireless signal test method | |
CN105976273A (en) | Highly roller compacted concrete dam construction procedure quality evaluation system and method | |
CN106909508A (en) | A kind of information system testing results method and system | |
CN105761162B (en) | Electric power enterprise technical standard evaluation method | |
CN109104730A (en) | A kind of network road measurement method, equipment and system | |
CN109982333A (en) | A kind of site selecting method and system that TD-LTE depth covering benefit is blind | |
CN106524953A (en) | Flatness detecting method for stator laminates | |
CN114035531A (en) | Automatic calibration method for stability control device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170118 |